1 SECTION LANDSCAPE WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections apply to work specified in this section. 1.2 DESCRIPTION OF WORK A. Subgrade elevations: Excavation, filling and grading required to establish elevations are not specified in this section. 1.3 QUALITY ASSURANCE A. Ship landscape materials with certificates of inspection required by governing authorities. Comply with regulations applicable to landscape materials. Do not make substitutions. If specified landscape material is not obtainable, submit to Engineer proof of non-availability and proposal for use of equivalent material. When authorized, adjustment of contract amount will be made. B. Package standard products with manufacturer's certified analysis. For other materials, provide analysis by recognized laboratory made in accordance with methods established by the Association of Official Agriculture Chemists, wherever applicable. C. Soil tests for on-site or off-site topsoil associated with amendments or fertilizer applications shall be performed at the Contractor s expense. Additional testing may be required during the construction period for consistency of quality assurance. 1.4 SUBMITTALS A. Certification: Submit certificates of inspection as required by governmental authorities, and manufacturer's or vendors certified analysis for soil amendments, fertilizer materials, and hydromulch. Submit other data substantiating that materials comply with specified requirements. Submit seed vendor's certified statement for each grass seed mixture required, stating botanical and common name, percentage by weight, and percentages of purity, germination, and weed seed for each grass seed species. B. Planting Schedule: Submit planting schedule showing scheduled dates for each type of planting in each area of site. Once accepted, revise dates only as accepted in writing by the Engineer, after documentation of reasons for delay. LANDSCAPE WORK

2 C. Off-Site Topsoil 1. Before delivery of topsoil from off-site sources, furnish Engineer with written statement giving location of properties from which topsoil is to be obtained, names and addresses of owners, depth to be stripped, and crops grown during the past two (2) years. 2. The Contractor shall provide and pay for materials testing. Testing agency shall be acceptable to the Engineer. Provide the following data: a. Test two representative material samples (1/2 gallon each) proposed for use from both on-site and off-site sources. b. Topsoil: (From on site and/or off site). The following tests will be required. 1) ph factor. 2) Mechanical analysis particle size distribution 3) Percentage of organic content. 4) Recommendations on type and quantity of additives required to establish satisfactory ph factor and supply of nutrients to bring nutrients to satisfactory level for planting for specific grass species indicated. 1.5 PRODUCT DELIVERY, STORAGE AND HANDLING A. Deliver packaged materials in original, unopened containers showing weight, analysis and name of manufacturer. Protect materials from moisture and deterioration during delivery, and while stored at site. 1.6 JOB CONDITIONS A. Proceed with and complete landscape work as rapidly as portions of site become available, working within seasonal limitations for each kind of landscape work required. B. Determine location of underground utilities and perform work in a manner which will avoid possible damage. Hand excavate, as required. Maintain grade stakes set by others until removal is approved by parties concerned. C. When conditions detrimental to plant growth are encountered, such as rubble fill, adverse drainage conditions, or obstructions, notify Engineer before planting. D. Plant or install materials during normal planting seasons for each type of landscape work required. Correlate planting with specified maintenance periods to provide maintenance from date of substantial completion. E. Do not damage previously installed trees and shrubs. F. Observe precautionary measures to protect existing paved areas against damage during the planting operation. G. Work Notification: Notify Engineer at least forty-eight (48) hours in advance of the time Contractor intends to seed, and do not proceed with such work until permission has been granted. LANDSCAPE WORK

3 H. Perform seeding work only after planting and other work affecting ground surface has been completed. I. Seeding shall take place during normal planting seasons as established below: 1. Time of Seeding a. Seeding operations shall not occur at a time when the soil or backfill is frozen or the soil is saturated. b. Seeding seasons shall be April 1 st to June 6 th and August 20 th to October 31 st. c. When delays in operations carry the work beyond the seasons specified, or when conditions of high winds (winds that exceed five (5) mph velocity), drought, excessive moisture or ice are such that satisfactory results are not likely to be obtained at any stage of the work, the work will stop. Seeding work shall be resumed only when the desired results are likely to be obtained or when the Owner and/or Engineer accepts a corrective measure and procedure. d. Dormant seeding may take place after November 15, but prior to continuous soil freeze. Success of dormant seeding determined at Engineer s discretion. e. Soil conditions shall prevail when the time of planting is in dispute. J. Restrict traffic from lawn areas until grass is established. Erect signs and barriers as required. 1.7 SPECIAL PROJECT WARRANTY A. Warranty lawns through specified maintenance period, and until final acceptance. B. The Contractor shall replace displaced mulch, remove eroded topsoil and adjust or replace disturbed seeded areas. C. Warranty trees and shrubs, for a period of one year after date of final acceptance against defects including death and unsatisfactory growth, except for defects resulting from neglect by Owner, abuse or damage by others, or unusual phenomena or incidents which are beyond landscape installer's control. Inspection for final acceptance of work shall be made at the end of the warranty period. PART 2 - PRODUCTS 2.1 TOPSOIL A. Topsoil will be stockpiled for re-use in landscape work. If quantity of stockpiled topsoil is insufficient, provide additional topsoil as required to complete landscape work. B. Provide new topsoil which is fertile, friable, natural loam, surface soil, reasonably free of subsoil, clay lumps, brush, weeds and other litter, and free of roots, stumps, stones larger than 1 in any dimension, and other extraneous or toxic matter harmful to plant growth. Obtain topsoil from local sources or from areas having similar soil characteristics to that found at project site. Obtain topsoil only from naturally, well-drained sites where topsoil occurs in a depth of not less than 4"; do not obtain from bogs or marshes. In addition: 1. Silt and/or clay content in combination shall not exceed 25% 2. Sand content shall be a minimum of 70% LANDSCAPE WORK

4 C. Contractor to condition topsoil as necessary. Topsoil from on-site and off-site sources shall have an acidity range of ph 6.0 to 7.0 and shall contain not less than 5% organic matter as determined by loss of ignition of moisture-free samples dried at 100 degrees C. 1. Where topsoil ph is below 6.0, limestone shall be added at a rate of 2-1/2 lbs. per cu. yd. of topsoil to raise the ph value one full point or as recommended by an independent soil testing laboratory or certified agronomist. 2. Where topsoil ph is above 7.0, screened sulfur shall be added at a rate of 2 lbs. per cu. yd. of topsoil to lower the ph value one full point or as recommended by an independent soil testing laboratory or certified agronomist. 2.2 SOIL AMENDMENTS A. Lime: Natural dolomitic limestone containing not less than 85 percent of total carbonates with a minimum of 30 percent magnesium carbonates, ground so that not less than 90 percent passes a 10- mesh sieve and not less than 50 percent passes a 100-mesh sieve. B. Other liming material shall have a minimum calcium carbonate equivalent of 80 percent and shall be crushed to such fineness that 98 percent will pass a 20 mesh sieve and at least 50 percent will pass a 100 mesh sieve. C. Aluminum Sulfate: Shall be horticultural grade, in dry powder form. D. Peat Humus: FS Q-P-166 and with texture and Ph range suitable for intended use. E. Bonemeal: Commercial, raw, finely ground; 1% nitrogen and 20% phosphoric acid. F. Superphosphate: Soluble mixture of treated minerals; 18% available phosphoric acid. 2.3 MULCH A. Tackifier: Liquid concentrate diluted with water forming a transparent 3-dimensional film-like crust permeable to water and air and containing no agents toxic to seed germination. 1. Available manufacturers and types: Polybind DLR; Celtite, Inc., Cleveland, OH; Curasol AK: American Hoechst Corp., Elk Grove, IL, or approved equal B. Straw Mulch: Provide clean, seed-free salt hay or threshed straw of wheat, rye, oats or barley. C. Hydromulch: Wood cellulose fiber mulch: Degradable green dyed wood cellulose fiber or 100% recycled long fiber pulp, free from weeds or other foreign matter toxic to seed germination and suitable for hydromulching. Available manufacturers and types are as follows: 1. Conwed Hydromulch: Conwed Corp., St. Paul, MN 2. Cellin Hydromulch: Cellin MFG., Inc., Lorton, VA 3. Superior Turf Fiber: Cellin MFG., Inc., Lorton, VA, or approved equal LANDSCAPE WORK

5 2.4 FERTILIZER A. Commercial fertilizer shall be non-burning product composed of slow-release polymer, encapsulated granules. B. All fertilizer shall be added per recommendations of the soil testing laboratory or certified agronomist. Contractor to use the specific product below that best reflects the results of the soil tests and recommendations: 1. Lawn a. Type A: Starter fertilizer with a nutrient analysis of , NPK. Use for first two applications. b. Type B: Fertilizer for third application with a nutrient analysis of , NPK. 2. Trees and shrubs a. Provide partially organic fertilizer containing by weight 6% nitrogen, 10% phosphorous and 4% potash. Material uniform in composition, dry and free flowing and shall be delivered to the site in original unopened containers, each bearing manufacturer's guaranteed analysis. 3. All Other Areas: a. Type C: Starter fertilizer with a nutrient analysis of , NPK. Use for the first two applications. b. Type B: Fertilizer for third application with a nutrient analysis of , NPK. 2.5 GRASS MATERIALS A. Grass Seed: Provide certified, fresh, clean, new-crop seed complying with tolerance for purity and germination established by Official Seed Analysts of North America. Provide seed of grass species, proportions and minimum percentages of purity, germination, and maximum percentage of weed seed, as specified below: 1. For Residential Lawn Areas: Proportion By Weight Min. % Purity Min. % Germination Lbs. per 1,000 SF Description 1. Eclipse, Baron, Abbey, or Bristol KY Bluegrass 25% 90% 85% Palmer III, Manhattan 3, or Achiever Perennial Ryegrass 30% 95% 85% Jamestown II or Treasure Chewings Fescue 20% 95% 85% Rebel II or Aztec Tall Fescue 25% 95% 85% 1.5 Total 6.0 LANDSCAPE WORK

6 2. For Right of Way Areas: Proportion By Weight Min. % Purity Min. % Germination Lbs. per 1,000 SF Description 1. Jamestown II or Treasure Chewings Fescue 15% 95% 85% Palmer III, Manhattan 3, or Pennant II Perennial Ryegrass 10% 95% 90% Rebel II or Aztec Tall Fescue 40% 95% 85% Reliant II Hard Fescue 20% 95% 85% Salty Alkali Grass 15% 90% 85% 0.9 Total PREPARATION OF PLANTING SOIL A. Before mixing, clean topsoil of roots, plants, sods, stones, clay lumps, and other extraneous materials harmful or toxic to plant growth. Mix specified soil amendments and fertilizers with topsoil as necessary. Delay mixing of fertilizer if planting will not follow placing or planting soil within a few days. For pit and trench type backfill, mix planting soil prior to backfilling, and stockpile at site. 1. For conventional seeding method, add fertilizer and mix thoroughly into upper 4 inches (4 ) of topsoil at rates specified herein. 2. For hydroseeding method, mix fertilizer into slurry as specified herein. PART 3 - EXECUTION 3.1 PREPARATION GENERAL A. Rough grade; ditches, slopes and swales shall be evident prior to development of lawn areas. Secure Owner s/engineer s review and acceptance before start of seeding work. 3.2 PREPARATION FOR AREAS TO BE SEEDED A. Loosen subgrade of lawn areas to a minimum depth of 4". Remove stones over 1" in any dimension and sticks, roots, rubbish and other extraneous matter. Limit preparation to areas which will be planted promptly after preparation. B. Spread planting soil mixture to minimum depth of 4" to meet lines, grades and elevations shown, after light rolling and natural settlement. C. Excess topsoil, remaining after all requirements of this Contract are met, shall be removed from the site. LANDSCAPE WORK

7 D. Preparation of unchanged grades: 1. Where lawns are to be planted in areas that have not been altered or disturbed by excavating, grading, or stripping operations, prepare soil for lawn planting as follows: a. Till to a depth of not less than 6". b. Apply soil amendments and initial fertilizers as specified. c. Remove high areas and in fill in depressions. d. Till soil to a homogenous mixture of fine texture, free of lumps, clods, stones, roots and other extraneous matter. 2. Prior to preparation of unchanged areas, remove existing grass, vegetation and turf. Dispose of such material outside of Owner's property. Do not turn existing vegetation over into soil being prepared for seeded areas. E. In the event seeding is delayed and spontaneous weed and noxious grass growth occurs in newly placed or freshly worked existing topsoil, Contractor shall apply herbicides per manufacturer s instructions, as necessary to satisfactorily eliminate such growth. Herbicides in no way shall affect soil quality, inhibit subsequent seed germination, growth, or pose a hazard to adjacent plant material. 3.3 FINE GRADING AND SEED BED PREPARATION A. Disc, harrow or otherwise completely pulverize to a depth of 3 where topsoil has been spread and to a depth of 6 where topsoil has not been stripped. Remove all stone over 1 in any dimension and sticks, roots, rubbish and extraneous matter. B. Fine grade lawn areas to smooth, even surface with loose, uniformly fine texture. Roll and rake and remove ridges and fill depressions, as required to meet finish grades. Limit fine grading to areas which can be planted immediately after grading. 1. Where seeded area is adjacent to pavement such as walks, curbs, parking lots, etc., the topsoil shall be no more than ½ below pavement surface prior to the seeding operation. C. Fine grade the area to receive seed, using a machine or hand-rake, prior to sowing of grass seed. D. The borders of the area of ground disturbed shall be merged by feathering topsoil into surrounding surface areas by compacting, raking or other means, to permit water run-off and to present a uniform slope and transition. E. Clean and clear all obstructions from drainage structures, ditches, swales, as may be necessary to provide a clean, open, free running passageway for all surface water. F. Fertilizing (For Conventional Seeding Method Only) 1. Apply fertilizers by mechanical rotary or drop type distributor, thoroughly and evenly incorporated with soil to a depth of 3 by dicing or other approved method. Fertilize areas inaccessible to power equipment with hand tools and incorporate into soil. Adjacent to existing trees the depth shall be adjusted to avoid disturbance of roots. LANDSCAPE WORK

8 G. Moisten prepared lawn areas before planting if soil is dry. Water thoroughly and allow surface moisture to dry before planting lawns. Do not create a muddy soil condition. H. Restore lawn areas to specified condition if eroded or otherwise disturbed after fine grading and prior to planting. 3.4 SEEDING AND MULCHING NEW LAWNS (CONVENTIONAL METHOD) A. Do not use wet seed or seed which is moldy or otherwise damaged in transit or storage. B. Refer to Paragraph 2.5 GRASS MATERIALS for seeding rates. C. Mechanical drills or seeder shall place the seed to a depth not exceeding ¼. Two passes of seeder shall be made over each area, the second pass being made at right angles to the direction of the first, one-half of the required amount of seed being sown in each pass. Broadcast seed shall be covered to a depth not exceeding ¼ by raking, brush or chain harrowing, or other approved method. Broadcast seeding shall not be done when the wind speed exceeds fifteen (15) miles per hour. After sowing, the seeded areas shall be lightly rolled and watered with fine spray. Rollers for firming the seedbed before and after seeding shall weigh not more than sixty-five (65) lbs. per foot of width. Cultipaker or similar equipment may be used in one operation to cover the seed and firm the seedbed after seeding. D. Mulching 1. Place straw mulch on seeded areas within twenty-four (24) hours after seeding. 2. Place straw mulch uniformly in a continuous blanket at the rate of 2-½ tons per acre, or two 50 lb. bales per 1,000 square feet. A mechanical blower may be used for straw mulch application when acceptable to the Engineer. 3. Crimp straw into soil by mechanical means. 4. Anchor straw mulch with liquid tackifier applied uniformly at a rate of 60 gal. per acre. 5. Protect buildings, paving, plantings, and all nonseeded areas from liquid tackifier over-spray. E. Provide erosion control measures in ditches or swales at intervals required to adequately slow water velocity and impede soil erosion. 3.5 SEEDING AND MULCHING NEW LAWNS (FOR HYDROSEEDING METHOD) A. Method of Hydroseeding 1. Use a hydromulcher (sprayer); mix and apply in accordance with manufacturer s recommendations. 2. Apply uniformly over entire area, as determined by intensity of green vegetable dye. 3. Uniformly mix grass seed, fertilizer, mulch, and water for all seed types. B. During the hydroseeding process, the Contractor shall not direct spray directly onto buildings, mailboxes, utility poles, trees, shrubs, and pavement and shall use caution so as not to spray into existing or new shrub and planting beds. Overspray into planting areas will be removed by Contractor and affected areas returned to their original state. Areas directly adjacent to buildings or areas inaccessible by spraying shall be seeded by the conventional method. LANDSCAPE WORK

9 C. Mixture A: Apply hydroseed slurry to indicated steep erosion prone areas (slopes greater than 3:1 ratio). 1. Seed: Refer to Para. 2.5 on seeding rates 2. Type A fertilizer: 200 lbs./acre 3. Tackifier: 60 gal./acre 4. Wood cellulose fiber mulch: 1,500 lbs./acre or 35 lbs./1,000 SF D. Mixture B: Apply hydroseed slurry for large or gentle sloping areas. 1. Seed: Refer to Para. 2.5 on seeding rates 2. Type A fertilizer: 516 lbs./acre 3. Wood cellulose fiber mulch: 1,500 lbs./acre or 35 lbs./1,000 SF E. On slopes in excess of 3:1 ratio, hydroseed mix to be amended by adding Fiber-Lock or acceptable equivalent per manufacturer s specifications. 3.6 RECONDITIONING EXISTING LAWNS A. Recondition existing lawn areas damaged by Contractor s operations including storage of materials and equipment and movement of vehicles. Also recondition existing lawn areas where minor regrading is required. B. Provide grass seed, soil amendments and fertilizer as specified herein and as required, to provide a satisfactorily reconditioned lawn. C. Provide topsoil as specified herein and as required, to fill low spots and meet proposed finish grades. D. Cultivate bare and compacted areas thoroughly to provide a satisfactory surface for seeding. E. Remove diseased and unsatisfactory lawn areas; do not bury into soil. Remove topsoil containing foreign and/or deleterious materials resulting from Contractor s operations, including oil drippings, stone, gravel, and other loose building materials. F. Where substantial lawn remains, but is sparse, Contractor to mow, rake aerate if compacted, fill low spots, remove humps, and cultivate soil, fertilize, and seed. Remove weeds before seeding, or if extensive, apply selective chemical weed killers as required. Apply mulch as specified herein to maintain moist condition. 3.7 MAINTENANCE A. Begin maintenance immediately after planting. Maintain seeded lawns, not less than 60 days after initial seeding has been completed and longer as required to establish lawns acceptable to the Owner and/or Engineer. If seeded in the fall of the year and not given the full 60 days of maintenance, or if not considered acceptable at that time, continue maintenance the following spring until acceptable lawn is established. LANDSCAPE WORK

10 B. Contractor is responsible for all maintenance operations described so as to establish a healthy, uniform stand of approved grasses until final acceptance. An acceptable stand of grass shall be free from eroded or bare areas, weeds, disease, insects, fungus, and undesirable grass species. C. Maintain lawns by watering, fertilization, applying herbicides, fungicides and/or insecticides, weeding, mowing, trimming, and other operations such as rolling, regrading and reseeding as required to establish a smooth, acceptable lawn, free of eroded or bare areas. D. Apply a second application of Type A fertilizer to seeded areas approximately 30 days after seeding at the manufacturer s recommended normal rate. E. If the initial seeding work is completed during the late summer or early fall season, the Contractor shall apply Type B fertilizer the following spring at the manufacturer s recommended normal rate. F. Contractor to repair, rework, and reseed all areas that have washed out, eroded or do not germinate adequately. Restore bare areas by scarifying, topdressing with topsoil as specified herein at a depth of ¼ to ½. Apply seed at a rate of 2 lbs. per 1,000 SF or as determined by the Engineer. Roll with a light roller and cover with a ½ mulch pre-moistened peat moss. G. Contractor shall provide barricades, temporary fencing, signs or policing as may be necessary to eliminate or minimize damage to seeded areas. Contractor shall be responsible for all damage that occurs unless determined that damage was beyond the Contractor's control. Should damage occur beyond Contractor's control, Contractor will submit request for change order and provide reasonable proof of damage. H. During the maintenance period, any decline in the condition of the newly seeded areas, and/or newly planted trees and shrubs, as so determined by the Engineer and/or Owner s Representative, shall be acted upon by the Contractor immediately so as to identify potential problems and shall undertake corrective measures. 3.8 CLEANUP AND PROTECTION A. During landscape work keep pavements clean and work area in an orderly condition. B. Protect landscape work and materials from damage due to landscape operations, operations by other contractors and trades and trespassers. Maintain protection during installation and maintenance periods. Treat, repair or replace damaged landscape work. C. Remove construction equipment, excess materials and tools. Haul from site debris resulting from work of this section, and dispose of legally, and to the satisfaction of the Engineer and/or Owner s Representative. 3.9 INSPECTION AND ACCEPTANCE A. When landscape work is completed, including maintenance, the Engineer will examine the work to determine compliance. Landscape work may be examined for acceptance in parts as determined by LANDSCAPE WORK

11 the Engineer, and/or the Owner s Representative provided work offered for examination is complete, including maintenance. B. Lawn areas will be considered acceptable provided all requirements, including maintenance, have been complied with, and a healthy, uniform, close stand of the specified grass is established free of weeds, undesirable grass species, disease, and insects. C. No individual lawn areas shall have bare spots or unacceptable cover totaling more than 2% of the individual areas, in areas requested to be reviewed. D. Where landscape work does not comply with requirements, replace rejected work and continue specified maintenance until compliance with the specifications is achieved. Remove defected plants and materials promptly from project site. END OF SECTION LANDSCAPE WORK

SECTION SEEDING. C. Seed mix to be used will be as specified in the Bid Schedule.

SECTION SEEDING. C. Seed mix to be used will be as specified in the Bid Schedule. SECTION 02710 - PART 1 - GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for preparing the ground and furnishing and applying

More information

EXTERIOR IMPROVEMENTS PLANTING. .02 Lawns and Grasses. A. General. 1. Intent:

EXTERIOR IMPROVEMENTS PLANTING. .02 Lawns and Grasses. A. General. 1. Intent: 32 00 00 EXTERIOR IMPROVEMENTS 32 90 00 PLANTING.02 Lawns and Grasses A. General 1. Intent: a. The work in this section specifies the labor, materials, and installation methods necessary to establish the

More information

SECTION TURF AND GRASSES

SECTION TURF AND GRASSES SECTION 32 92 00 TURF AND GRASSES PART 1: GENERAL 1.01 DESCRIPTION Restore all disturbed grass and landscaped areas to conditions equal to or better than before the work began and to the satisfaction of

More information

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for APPROVED BY COUNCIL FEBRUARY 15, 1994 CITY OF BE CONVEYED TO THE CITY The Owner will be responsible to ensure that all lands which will be transferred to the City for parkland, drainage or boulevard purposes

More information

Section Seeding

Section Seeding Section 02936 Seeding PART 1 - GENERAL 1.01 SECTION INCLUDES A. Fertilizing. B. Seeding. C. Hydroseeding. D. Mulching. E. Maintenance. F. Sodding. 1.02 RELATED WORK A. Documents affecting work of this

More information

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans. SECTION 7300 LANDSCAPING 7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans. 7302 QUALITY ASSURANCE. A. Qualifications of Personnel.

More information

SECTION FINE GRADING AND SOIL PREPARATION

SECTION FINE GRADING AND SOIL PREPARATION SECTION 32 90 00 PART 1 GENERAL 1.01 SECTION INCLUDES A. Examination. B. Preparation. C. Subsoil Preparation. D. Placing Topsoil. E. Soil Tests. F. Coordination of Soil Amendments. G. Fine Grading. H.

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 32 9200 TURF AND NATIVE/ADAPTIVE PLANTINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION 900 TURF ESTABLISHMENT

SECTION 900 TURF ESTABLISHMENT SECTION 900 901.0 DESCRIPTION This section covers the furnishing of all labor, materials, tools, equipment and performances of all work and services necessary or incidental to turf restoration as indicated

More information

a. Section includes planting soils specified by composition of the mixes.

a. Section includes planting soils specified by composition of the mixes. SECTION 32 9113 SOIL PREPARATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

ITEM 164 SEEDING AND EROSION CONTROL BLANKET

ITEM 164 SEEDING AND EROSION CONTROL BLANKET AFTER NOVEMBER 1, 2008 ITEM 164 SEEDING AND EROSION CONTROL BLANKET 164.1 Description. This Item shall govern for preparing the ground, sowing of seeds, application of a fertilizer, and stabilization with

More information

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3 SECTION VI (Sub-section 241) Grassing Article Page 1. Scope of Work 241-1 2. General 241-1 3. Sprigging 241-1 4. Sodding 241-1 thru 241-3 5. Soil Amendments 241-3 6. Non Grassed Areas 241-4 7. Topsoil

More information

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TURF AND GRASSES

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TURF AND GRASSES 32 92 00 PART 1 - GENERAL 1.01 INTRODUCTION A. Preferred Methods for Installation of Turf: On the Pullman, Tri-Cities and Spokane campuses, sod is the preferred method of turf installation. On the Vancouver

More information

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Scope.1 This guideline addresses the materials, and equipment necessary for the supply, placement, and amendment of the growing medium. 1.2 Related Work:.1 Section 32 93 00

More information

SECTION LANDSCAPING

SECTION LANDSCAPING SECTION 02900 LANDSCAPING 1.01 General: The contractor shall be responsible for providing all labor, materials, tools, equipment, topsoil, fertilizer, lime and seed necessary for restoration and stabilization

More information

Section 9 Landscaping and Street Trees

Section 9 Landscaping and Street Trees Section 9 Landscaping and Street Trees GENERAL REQUIREMENTS...9-1 I. MATERIALS...9-1 9.1 GRASS...9-1 9.2 STREET TREES...9-1 A. General...9-1 B. Species...9-2 C. Design Standards...9-2 9.3 LANDSCAPING...9-3

More information

SECTION TOPSOIL AND SEEDING

SECTION TOPSOIL AND SEEDING SECTION 13400 TOPSOIL AND SEEDING DECEMBER 2015 TOPSOIL AND SEEDING Page 1 1 GENERAL... 2 DESCRIPTION... 2 RELATED SECTIONS... 2 JOB CONDITIONS... 2 INSPECTION... 2 2 PRODUCTS... 3 SEEDING PRODUCT DELIVERY,

More information

SECTION LANDSCAPING

SECTION LANDSCAPING PART 1 -GENERAL 1.01 DESCRIPTION SECTION 32 9200 A. Furnish all labor, materials, and equipment required to complete all landscaping work indicated on the drawings and specified herein. This includes seeding,

More information

SITE TOPSOIL & FINISH GRADING

SITE TOPSOIL & FINISH GRADING CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02911-1 PART 1 GENERAL 1.1 Related Work.1 Section 02311 Site Grading.2 Section 02315 Excavating, Trenching, & Backfilling.3 Section 02906 Planting of Trees,

More information

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 329000 PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 01 Specification Sections, apply

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING Section 02922 PART 1 GENERAL 1.01 SUMMARY This Section includes the following: A. Restoration of existing lawn areas disturbed by construction shall be by installation of new sod. B. Planting of sod within

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2006

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2006 SECTION 02900 - LANDSCAPING 1.1 SUMMARY A. Landscaping includes the layout, soil preparation, excavation for and planting of landscape materials, including trees, shrubs, ground covers, plants, and lawns,

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2009

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2009 SECTION 02900 - LANDSCAPING 1.1 SUMMARY A. Landscaping includes the layout, soil preparation, excavation for and planting of landscape materials, including trees, shrubs, ground covers, plants, and lawns,

More information

B. Finish Grade: Elevation of finished surface of planting soil.

B. Finish Grade: Elevation of finished surface of planting soil. SECTION 02930 - PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A.

More information

A. Provide labor and materials necessary for installation of turf sod and other related work as required.

A. Provide labor and materials necessary for installation of turf sod and other related work as required. SECTION 32 92 00 TURF AND GRASSES PART 1 - GENERAL 1.1 SUMMARY A. Provide labor and materials necessary for installation of turf sod and other related work as required. B. Related work described elsewhere:

More information

SECTION SEEDING

SECTION SEEDING SECTION 32 92 19 SEEDING PART 1 GENERAL 1.01 DESCRIPTION A. The WORK under this section consists of the revegetation with seeded grasses. CONTRACTOR shall furnish all labor, materials, equipment, tools,

More information

A. Surface parking areas shall be constructed of bituminous paving.

A. Surface parking areas shall be constructed of bituminous paving. September 2008 32 12 16 Asphalt Paving 1.0 General A. Surface parking areas shall be constructed of bituminous paving. 2.0 Products A. Aggregate Base Course conform to IDOT Std. Spec. Sect. 1000, ref.

More information

Public Notice. REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material. June 22, ADDENDUM NO.

Public Notice. REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material. June 22, ADDENDUM NO. Public Notice REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material June 22, 2018 ADDENDUM NO.: One (1) TO ALL PROSPECTIVE BIDDERS: PLEASE BE ADVISED OF THE FOLLOWING

More information

1. Division 2 Section "Earthwork" for excavation, filling, and rough grading and for subsurface aggregate drainage and drainage backfill materials.

1. Division 2 Section Earthwork for excavation, filling, and rough grading and for subsurface aggregate drainage and drainage backfill materials. SECTION 329300 - LANDSCAPE PLANTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION SOIL PREPARATION

SECTION SOIL PREPARATION SECTION 329113 SOIL PREPARATION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Components of planting mediums. 2. Testing and certification of components. 3. Mixing of planting mediums. 4. Transporting

More information

LAWN RENOVATION & OVERSEEDING

LAWN RENOVATION & OVERSEEDING LAWN RENOVATION & OVERSEEDING A healthy established lawn is able to out-compete many weeds and withstand a certain amount of pressure from disease and insect attack as well as drought. You can help maintain

More information

Section Lawn & Grasses Pearl s Premium DRAFT. Pearl s Premium Lawn Grasses are the only acceptable seed / sod choice for this specification.

Section Lawn & Grasses Pearl s Premium DRAFT. Pearl s Premium Lawn Grasses are the only acceptable seed / sod choice for this specification. Section 02930 DRAFT Pearl s Premium Lawn Grasses are the only acceptable seed / sod choice for this specification. No substitutes are permitted. Part 1 General 1.1 Summary (Non-inclusive) A. Section Includes:

More information

SECTION PLANTING SOIL for SOIL CELLS. This specification defines material and performance requirements for soils which are to be used

SECTION PLANTING SOIL for SOIL CELLS. This specification defines material and performance requirements for soils which are to be used This specification defines material and performance requirements for soils which are to be used within the Silva Cell system. The SPECIFICATION EDITOR must select the type of soil appropriate to each particular

More information

SECTION 605 PLANTING

SECTION 605 PLANTING SECTION 605 PLANTING I. GENERAL 1.1. DESCRIPTION OF WORK The Contractor shall furnish all labor, supervision, material (except as herein provided), tools, equipment, supplies, and services; and, shall

More information

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following: SECTION 320190.13 LANDSCAPE MAINTENANCE FOR 90 DAYS PART 1 - GENERAL 1.1 SUMMARY A. Section includes requirements for 90 day landscape maintenance for the following: 1. Watering trees and grass. 2. Monitoring

More information

SECTION TREES, SHRUBS AND GROUNDCOVERS

SECTION TREES, SHRUBS AND GROUNDCOVERS SECTION 02950 TREES, SHRUBS AND GROUNDCOVERS PART 1 GENERAL 1.01 REFER TO SECTION 01000 FOR GENERAL REQUIREMENTS 1.02 APPLICABLE PUBLICATIONS A. The publications listed below form a part of this specification

More information

SECTION SODDING

SECTION SODDING SECTION 02925 SODDING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Preparation of subsoil. 2. Placing topsoil. 3. Fertilizing. 4. Sod installation. 5. Maintenance. B. Related Sections: 1. Drawings

More information

This section covers the planting of seed, sod, trees and vegetation.

This section covers the planting of seed, sod, trees and vegetation. Tender 1, 2017 Page 1 of 5 1. INTENT This section covers the planting of seed, sod, trees and vegetation. 1.1 REFERENCES Agriculture and Agri-Food Canada; The Canadian System of Soil Classification, Third

More information

DIVISION 32 EXTERIOR IMPROVEMENTS SECTION TURF AND GRASSES

DIVISION 32 EXTERIOR IMPROVEMENTS SECTION TURF AND GRASSES DIVISION 32 EXTERIOR IMPROVEMENTS SECTION 32 92 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION AMENDED TOPSOIL

SECTION AMENDED TOPSOIL SECTION 02486 AMENDED TOPSOIL PART 1 - GENERAL 1.01 SUMMARY A. Work described in this section includes requirements for soil amendments, soil preparation, preparation and finish grading of turf restoration

More information

Tel

Tel PEARLʼS PREMIUM Grass Seed and Sod: Pearl's Premium patent pending grass seed blends enable an ultra low maintenance approach to lawn care that can save you time and money. Whatʼs the secret? Go to www.pearlspremium.com

More information

SECTION LANDSCAPE

SECTION LANDSCAPE 1 SECTION 02900 LANDSCAPE PART 1 GENERAL 1.1 Summary A. This section contains requirements relating to lawns, trees, shrubs, flowering plants and ground covers including site preparation, material installation

More information

Section 816. TURF ESTABLISHMENT

Section 816. TURF ESTABLISHMENT 816.01 Section 816. TURF ESTABLISHMENT 816.01. Description. This work consists of conducting soil tests, preparing the soil, and placing sod or seed and mulch to permanently stabilize disturbed areas as

More information

Content. 1. Particular Preambles for Standard Method of Measurement. 2. Particular Specification for Soil Fiber System. 3.

Content. 1. Particular Preambles for Standard Method of Measurement. 2. Particular Specification for Soil Fiber System. 3. Content 1. Particular Preambles for Standard Method of Measurement 2. Particular Specification for Soil Fiber System 3. Section Detail 4. Job Reference and Photos Particular Preambles for Standard Method

More information

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING 40.01 SCOPE: The contractor shall furnish all labor, materials, equipment, and supplies; and shall perform all work necessary for the installation of

More information

SECTION SODDING

SECTION SODDING SECTION 02924 SODDING PART 1 GENERAL 1.01 SUMMARY A. Repair lawns and grassed rights of way damaged or removed during the construction of the pump station. 1.02 RELATED WORK A. Clearing and Grubbing -

More information

SECTION LANDSCAPING

SECTION LANDSCAPING SECTION 02900 LANDSCAPING PART 1 - GENERAL 1.01 WORK INCLUDED A. Clearing and grubbing. B. Site grading to subgrade for topsoil. C. Leaching of subgrade soils. D. Placing topsoil and prepared soil backfill.

More information

LAWNS Chapter 12. Topic Outline. Establishing a Lawn. Establishing a Lawn

LAWNS Chapter 12. Topic Outline. Establishing a Lawn. Establishing a Lawn LAWNS Chapter 12 Presented By: Melanie W. Barrow, ANR Horticulture Extension Agent For: Master Gardener Training Topic Outline Establishing a Lawn Renovating an Old Lawn Lawn Maintenance Annual Maintenance

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-32 92 19 (August 2017) ---------------------------- Preparing Activity: NAVFAC Superseding UFGS-32 92 19 (October 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

SECTION STRUCTURAL SOIL

SECTION STRUCTURAL SOIL SECTION 329110 STRUCTURAL SOIL PART 1 - GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY A. This work shall consist of manufacturing and supplying a narrowly graded rock to support pavement without compression

More information

SECTION LANDSCAPE ESTABLISHMENT

SECTION LANDSCAPE ESTABLISHMENT SECTION 02970 LANDSCAPE ESTABLISHMENT 120-day Landscape Establishment PART 1 GENERAL 1.01 SCOPE OF WORK A. A. This work shall include all labor, materials, equipment, supplies, and services to sustain

More information

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation 1.0 Purpose These guidelines are for the use of all Campus landscaping. 2.0 General Requirements 1. Native trees and shrubs appropriate for this region are strongly preferred. The university has a do not

More information

Earthwork Excavating, Backfilling, and Compaction for Utilities Irrigation System Landscaping.

Earthwork Excavating, Backfilling, and Compaction for Utilities Irrigation System Landscaping. SECTION 02935 SODDING PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02221 - Excavating, Backfilling, and Compaction for Utilities. 3. 02810 - Irrigation System. 4. 02900 - Landscaping.

More information

317)

317) NDS, Inc. (317) 317) 346-4110 www.drainagesolutionsinc.com April 2015 Product Guide Specification Specifier Notes: This product guide specification is written in Construction Specifications Institute (CSI)

More information

EXTERIOR PLANTS

EXTERIOR PLANTS c. Fertilize immediately prior to sodding or immediately after the sodding operation at a rate of.5 pounds of nitrogen per 1000 square feet. d. Work is to be done at typically accepted sodding times in

More information

B. Finish Grade: Elevation of finished surface of planting soil.

B. Finish Grade: Elevation of finished surface of planting soil. SECTION 329200 - TURF AND GRASSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Modification to General Conditions and Division 01 Specification

More information

Town of Essex Small Site Erosion Control Guide

Town of Essex Small Site Erosion Control Guide Town of Essex Small Site Erosion Control Guide Why do we need to protect against erosion? Water Quality: Erosion and the transport of sediment and pollutants impacts the water quality of nearby streams

More information

ATTACHMENT A BIORETENTION SOIL SPECIFICATION

ATTACHMENT A BIORETENTION SOIL SPECIFICATION 1.00 BIORETENTION SOIL ATTACHMENT A BIORETENTION SOIL SPECIFICATION Bioretention soil shall achieve an initial infiltration rate of at least 8-inch per hour nor more than 20 inches per hour in situ and

More information

C. Sod Procurement: Comply with white fringed beetle and fire ants quarantine requirements.

C. Sod Procurement: Comply with white fringed beetle and fire ants quarantine requirements. SECTION 329300 - PLANTS 1.1 QUALITY ASSURANCE A. Installer's Personnel Certifications: Certified Landscape Technician, CLT-Exterior. Provide at least 1 person who shall be present at all times during execution

More information

Volume 2, Chapter 12 - Revegetation

Volume 2, Chapter 12 - Revegetation Volume 2, Chapter 12 - Revegetation Users Guidance: If a UDFCD Section number in this chapter is skipped: It was adopted as is; please refer to that Section in the corresponding UDFCD Manual, Volume, Chapter

More information

DIVISION II PLANTING SECTION 02950

DIVISION II PLANTING SECTION 02950 Subdivision Requirements Manual Page 1 of 9 PART I - GENERAL 1.1 Related Work.1 Topsoil and Finish Grade : Section 02212.2 Seeding : Section 02933.3 Hydraulic Seeding : Section 02934.4 Sodding : Section

More information

Turfgrass Sod General

Turfgrass Sod General 8 8.1. General 8.1.1. Purpose statement & intent 1. The intent of this section of the standard is to state standard requirements for quality grades and other classifications of grass types in turfgrass

More information

THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE.

THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE. THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.2 THE COMPLETE 2011 EDITION MAY BE FOUND AT: HTTP://WWW.SEATTLE.GOV/UTIL/ENGINEERING/STANDARD_PLANS_&_SPECS/INDEX.ASP

More information

REQUIREMENTS FOR SUCCESSFUL ALFALFA ESTABLISHMENT

REQUIREMENTS FOR SUCCESSFUL ALFALFA ESTABLISHMENT REQUIREMENTS FOR SUCCESSFUL ALFALFA ESTABLISHMENT Garry D. Lacefield Extension Forage Specialist University of Kentucky Establishing a good stand of alfalfa is expensive and time consuming, but the success

More information

SECTION SEEDING

SECTION SEEDING PART 1 GENERAL 1.01 RELATED DOCUMENTS SECTION 32 9219 SEEDING A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

02 SITE 0252p LAWN SOLUTIONS in landscape natural grass surfaces

02 SITE 0252p LAWN SOLUTIONS in landscape natural grass surfaces 0252P LAWN SOLUTIONS IN LANDSCAPE NATURAL GRASS SURFACES Branded worksection This branded worksection Template has been developed by NATSPEC in conjunction with Lawn Solutions Australia and may be used

More information

BMP-33. Stabilizing fine-graded disturbed areas by establishing permanent grass stands with sod.

BMP-33. Stabilizing fine-graded disturbed areas by establishing permanent grass stands with sod. BMP-33 BMP: SODDING Definition Stabilizing fine-graded disturbed areas by establishing permanent grass stands with sod. PurDoses 1. To establish permanent turf immediately. 2. To prevent erosion and damage

More information

Milpitas College Extension Milpitas Dry Landscape

Milpitas College Extension Milpitas Dry Landscape SAN JOSÉ / EVERGREEN COMMUNITY COLLEGE DISTRICT Milpitas College Extension Milpitas Dry Landscape PROJECT MANUAL VOLUME II TABLE OF CONTENTS DIVISION 02 through 30 Not Used DIVISION 31 - EARTHWORK Document

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS 32 92 23 (April 2006) -------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-02922 (May 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

EROSION & SEDIMENT CONTROL

EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL Surface Water Protection During Well Site Construction Kelly Kees, PE WVDEP, Office of Oil and Gas SEDIMENT & EROSION CONTROL PLANS Per West Virginia State Code 22-6-6(d) 22-6A-7(c),

More information

Town of Fuquay-Varina

Town of Fuquay-Varina 170 LANDSCAPING 170.01 GENERAL 170.01.01 Street trees shall be provided in accordance with the Land Development Ordinance for site plans and subdivisions 170.01.02 Street trees, landscape areas, landscape

More information

The following general requirements will be met for all planter box installations:

The following general requirements will be met for all planter box installations: Greenville County Technical Specification for: WQ-25 PLANTER BOX 1.0 Planter Box 1.1 Description Planter boxes are designed to capture and temporarily store stormwater runoff. Planter Boxes are intended

More information

C-10. Disconnected Impervious Surface

C-10. Disconnected Impervious Surface C-10. Disconnected Impervious Surface Design Objective Disconnected Impervious Surface (DIS) is the practice of directing stormwater runoff from built-upon areas to properly sized, sloped and vegetated

More information

SECTION PLANTING SOIL FOR SOIL CELLS (SILVA CELLS)

SECTION PLANTING SOIL FOR SOIL CELLS (SILVA CELLS) This guide specification was prepared utilizing 3-part format recommended by the Construction Specifications Institute (CSI), and generally incorporates recommendations from their SectionFormat /Page Format,

More information

EC Building a Bluegrass Lawn

EC Building a Bluegrass Lawn University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Historical Materials from University of Nebraska- Lincoln Extension Extension 1965 EC65-1212 Building a Bluegrass Lawn Clark

More information

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION Please read through this instruction completely before beginning your installation. Be sure the proper equipment, and safety precautions are in

More information

How Lawns Grow- Growing Your Lawn and Not the Bay! Chuck Schuster Extension Educator University of Maryland Extension

How Lawns Grow- Growing Your Lawn and Not the Bay! Chuck Schuster Extension Educator University of Maryland Extension How Lawns Grow- Growing Your Lawn and Not the Bay! Chuck Schuster Extension Educator University of Maryland Extension 301-590-2807 cfs@umd.edu You Are The Experts! Nothing has changed in the last 50 years

More information

EC-11 COMPOST. Greenville County Technical Specification for. 1.0 Compost. 1.1 Description

EC-11 COMPOST. Greenville County Technical Specification for. 1.0 Compost. 1.1 Description Greenville County Technical Specification for EC-11 COMPOST 1.0 Compost 1.1 Description This specification covers compost produced from various organic by-products, for use as an infill material for sediment

More information

for Owners and Maintenance Staff

for Owners and Maintenance Staff Grasspave2 Maintenance Guide for Owners and Maintenance Staff by Invisible Structures, Inc. 1600 Jackson Street, Suite 310 Golden, Colorado 80401 Ph: 800-233-1510 Fax: 800-233-1522 www.invisiblestructures.com

More information

SECTION VEGETATIVE EROSION CONTROL. A. This section addresses permanent and temporary vegetation and cover crops.

SECTION VEGETATIVE EROSION CONTROL. A. This section addresses permanent and temporary vegetation and cover crops. SECTION 02377 VEGETATIVE EROSION CONTROL PART 1 GENERAL 1.01 SUMMARY A. This section addresses permanent and temporary vegetation and cover crops. B. Related Work Specified Elsewhere: 1. Section 01210,

More information

45.2. MATERIALS Shrubs, Trees and Other Plants Planting Pit Mulch and Cover Grass Materials

45.2. MATERIALS Shrubs, Trees and Other Plants Planting Pit Mulch and Cover Grass Materials TABLE OF CONTENTS PART II - CONSTRUCTION MATERIALS AND METHODS Section 45 PLANT LANDSCAPING 45.1. GENERAL... 45.1 45.2. MATERIALS... 45.1 45.2.1. Shrubs, Trees and Other Plants... 45.1 45.2.2. Planting

More information

Unit D: Fruit and Vegetable Crop Production. Lesson 1: Planning and Preparing a Vegetable Garden Site

Unit D: Fruit and Vegetable Crop Production. Lesson 1: Planning and Preparing a Vegetable Garden Site Unit D: Fruit and Vegetable Crop Production Lesson 1: Planning and Preparing a Vegetable Garden Site 1 Terms Adequate sunlight Climate Compost Cool-season vegetables Cover crop Crop rotation Fertile soil

More information

A. Contractor shall provide product data for each type of product indicated.

A. Contractor shall provide product data for each type of product indicated. 31 13 00 SELECTIVE TREE AND SHRUB REMOVAL AND TRIMMING SECTION 1 GENERAL 1.1 SUMMARY A. This section includes general protection and pruning of existing trees and plants that are affected by execution

More information

Section 815. LANDSCAPING

Section 815. LANDSCAPING 815.01 Section 815. LANDSCAPING 815.01. Description. This work consists of providing and planting trees, shrubs, and other plants, including replacements, classified as nursery stock. The Engineer may

More information

Erosion Control for Home Builders in the. City of Jacksonville

Erosion Control for Home Builders in the. City of Jacksonville Erosion Control for Home Builders in the City of Jacksonville Eroding construction sites are a leading cause of water quality problems in Jacksonville. For every acre under construction, about a dump truck

More information

A. Finish Grade: Elevation of finished surface of planting soil.

A. Finish Grade: Elevation of finished surface of planting soil. SECTION 329200 - TURF AND GRASSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS 808.1 Description. This work shall consist of furnishing and planting material in the locations designated on the plans or established by the engineer.

More information

Recommended Resources: The following resources may be useful in teaching this

Recommended Resources: The following resources may be useful in teaching this Unit D: Fruit and Vegetable Crop Production Lesson 1: Planning and Preparing a Vegetable Garden Site Student Learning Objectives: Instruction in this lesson should result in students achieving the following

More information

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA REFERENCE DRAWINGS FOR REET ROCK HILL, SOUTH CAROLINA COVER SHEET 1 OF 6 GENERAL NOTES 2 OF 6 REMOVE WIRE AND NYLON TWINE FROM BALL AND CANOPY. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER INSTALLATION.

More information

Grass Species and Fertilization Practices to Minimize Negative Effects of Lawns. Dr. Rebecca Brown University of Rhode Island

Grass Species and Fertilization Practices to Minimize Negative Effects of Lawns. Dr. Rebecca Brown University of Rhode Island Grass Species and Fertilization Practices to Minimize Negative Effects of Lawns Dr. Rebecca Brown University of Rhode Island Lawns: Good or Bad? Maintained turf covers >50 million acres in the US; majority

More information

HOME & GARDEN INFORMATION CENTER

HOME & GARDEN INFORMATION CENTER http://www.clemson.edu/extension/hgic HGIC 1203 1-888-656-9988 HOME & GARDEN INFORMATION CENTER Lawn Establishment There are four aspects of turfgrass establishment: selecting a turfgrass that is adapted

More information

HVA C, Roofing, Interior & Exterior Renovations -Missouri Hills Youth Center SECTION TURF AND GRASSES

HVA C, Roofing, Interior & Exterior Renovations -Missouri Hills Youth Center SECTION TURF AND GRASSES HVA C, Roofing, Interior & Exterior Renovations -Missouri Hills Youth Center SECTION 329200 - TURF AND GRASSES PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including

More information

3.1 EROSION PREVENTION FACT SHEETS (EPP)

3.1 EROSION PREVENTION FACT SHEETS (EPP) 3.1 EROSION PREVENTION FACT SHEETS (EPP) Erosion Prevention Practices EPP-01 Tire Washing Symbol TW Description As a result of vehicular ingress and egress to the construction site, the facility would

More information

Toronto District School Board Church Street Junior Public School

Toronto District School Board Church Street Junior Public School Playing Field Turfgrass Assessment and Recommendations Toronto District School Board Church Street Junior Public School Tuesday, November 24, 2015 David Smith, P.Ag. Rob Witherspoon, M.Sc. 550 Musquash

More information

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING 32 90 00 PART 1 - GENERAL 1.01 SCOPE: A. This document provides guidelines that shall be used for all WSU facilities that require Landscape Architectural (LA) design and construction services. B. References:

More information

Construction Specification for Planting

Construction Specification for Planting Engineering and Construction Services Division Standard Specifications for Road Works TS 5.30 April 2014 for Planting Table of Contents TS 5.30.01 SCOPE... 3 TS 5.30.02 REFERENCES... 3 TS 5.30.03 DEFINITIONS

More information

SECTION SOIL PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SOIL PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 329113 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Vegetation. Fe=0.90 (When fully established; lower while vegetation is first growing)

Vegetation. Fe=0.90 (When fully established; lower while vegetation is first growing) 2.9 Erosion Control Description:, used as an erosion control, is the sowing or sodding of grasses, small grains, or legumes to provide temporary and final vegetative stabilization for disturbed areas.

More information

The Nature of Soil Soil Conservation Sustainable Ag.

The Nature of Soil Soil Conservation Sustainable Ag. Chapter 6 & 7 The Nature of Soil Soil Conservation Sustainable Ag. Climate Soil Forming Factors Parent material Organisms Topography Time Value of Soil Soil is under appreciated Condition of soil affects

More information

Lawn Establishment. Introduction. Preparing the site. Planning the new lawn

Lawn Establishment. Introduction. Preparing the site. Planning the new lawn Establishing a new lawn begins with careful planning, knowledge of soil conditions, and an understanding of the environmental and cultural requirements of turfgrasses. Figure 1. Using a measuring wheel

More information