1 Dorrance H. Hamilton Building Josh Kreutzberger Penn State Architectural Engineering Technical Report 3 Advisor: Dr. Mistrick

2 Site Overview Martin Building December 2006 Scott Library & Administrative Building Dorrance H. Hamilton Building Orlowitz Residence Hall 2

3 Building Overview o Thomas Jefferson University (TJU) o Philadelphia, PA o Medical Education o Architect: Burt Hill o 129,000 ft2 with an additional 60,000 ft2 plaza area o 6 stories above grade with 2 story underground parking garage December 2006 Dorrance H. Hamilton Building 3

4 Redesign Spaces (Exterior) o Plaza Orlowitz Residence Hall 10th Street Scott Library & Administrative Building 11th Street Martin Building Locust Street December 2006 Dorrance H. Hamilton Building 4

5 Redesign Spaces (1 st Floor) o Lobby o Auditorium December 2006 Dorrance H. Hamilton Building 5

6 Redesign Spaces (5 th Floor) o Classroom December 2006 Dorrance H. Hamilton Building 6

7 General Design Goals o NEW HEART OF CAMPUS o TJU Pres. Robert L. Barchi, M.D., PhD o Smooth Transition between the Plaza Lobby Auditorium o Learning Environment o Friendly o Exciting o Comfortable o Innovative o Welcoming December 2006 Dorrance H. Hamilton Building 7

8 Plaza (Exterior) Typical Granite Edge Scott Library & Administrative Building Existing Otter Fountain Orlowitz Residence Hall 10th Street 11th Street Martin Building Statue Locust Street Typical Granite Benches Walkway Asphalt Block Pavement Grassy Area Asphalt Block Pavement December 2006 Dorrance H. Hamilton Building 8

9 Plaza - Design Objectives o Aesthetically Appealing o Egress Path Lighting o Target 1 fc (Horizontal) o Accent Statue and Fountain o Highlight Columns of Curved Glass Façade (Hamilton Building) o Also included in Lobby Redesign o Uplight Plaza Trees in Front of Scott Building o Emphasize Oval Granite Edge o CCT of 4100K December 2006 Dorrance H. Hamilton Building 9

10 Plaza Schematic Design Martin Building Scott Library & Administrative Building Orlowitz Residence Hall Small Spotlights will uplight trees and light statue Either bollards or pole mounted fixtures for pathway and area lighting of plaza Outdoor wall sconces to accent columns Application Image December 2006 Granite benches to have step light on each end of the benches Dorrance H. Hamilton Building 10

11 Lobby (1 st Floor) Curved Glass Facade Open to Above (30 High Ceiling) 105 Elevators (2) Plasma Screens Stair to Second Floor 105 December 2006 Dorrance H. Hamilton Building 11

12 Lobby (1 st Floor) Lobby Elevation Looking South Lobby Elevation Looking East December 2006 Dorrance H. Hamilton Building 12

13 Lobby (1 st Floor) Lobby Elevation Looking North December 2006 Dorrance H. Hamilton Building 13

14 Lobby (1 st Floor) Lobby Elevation Looking West December 2006 Dorrance H. Hamilton Building 14

15 Lobby - Design Objectives o Aesthetically Appealing o Sparkle o Circulation = Task o Target = 5 fc Horizontal & 3 fc Vertical o Incorporate Daylighting o Photosensors, Dimming, Controls o Smooth Transition from Outside o Accent Architecture o Highlight Elevators & Doorways o Design for Plasma Screens o Warm CCT for Wood Panels December 2006 Dorrance H. Hamilton Building 15

16 Lobby Schematic Design Indoor CFL Wall Sconce Outdoor CFL Wall Sconce 6-8 Downlight Try CFL, but may need HID Decorative Pendant HID or CFL Option: Since the ceiling is 15 high, a nice direct-indirect fixture may work well in this space. December 2006 Dorrance H. Hamilton Building 16

17 Auditorium (1 st Floor) Projection Screens in Ceiling Above Main Entrance Recessed Sliding Blackboard with Stationary White board 62 Observation Window Main Entrance Fabric Wrapped Acoustic Panels Along Wall 78 December 2006 Dorrance H. Hamilton Building 17

18 Auditorium (1 st Floor) Auditorium Elevation Looking South December 2006 Dorrance H. Hamilton Building 18

19 Auditorium (1 st Floor) Auditoriuim Elevation Looking West (Front of Space) December 2006 Dorrance H. Hamilton Building 19

20 Auditorium - Design Objectives o Scene Selection Lectures, Film Projections, VDT Use, and Presentations o Lighting for Reading/Writing Tasks o Smooth Transition from Lobby o Target = 50 fc Horizontal o Accent Blackboard/Whiteboard o Create Interesting Space o Highlight Speaker December 2006 Dorrance H. Hamilton Building 20

21 Auditorium - Schematic Design Recessed Compact Fluorescent Downlights Recessed LED Step Lights Recessed Fluorescent Luminaire Linear Fluorescent Wallwashers Recessed Linear Fluorescent Wallwashers December 2006 Dorrance H. Hamilton Building 21

22 Classroom (5 th Floor) December 2006 Dorrance H. Hamilton Building 22

23 Classroom (5 th Floor) Projection Screens in Ceiling Above (3) 10 Sliding Blackboards with White Board in Rear Classroom Elevation Looking Towards Front of Room December 2006 Dorrance H. Hamilton Building 23

24 Classroom Design Objectives o Scene Selection Lectures, VDT Use, and Presentations o Lighting for Reading/Writing Tasks o Target = 50 fc Horizontal o Accent Blackboard/Whiteboard o Highlight Speaker o Easy to Use Controls December 2006 Dorrance H. Hamilton Building 24

25 Classroom Schematic Design Recessed Fluorescent Luminaire Linear Fluorescent Wallwashers Option: The Recessed Fluorescent Luminaires may be turned to run parallel to the length of the room instead of the width of the room in order to make the room appear to be longer than it actually is. December 2006 Dorrance H. Hamilton Building 25

26 Thanks! Questions? Comments? December 2006 Dorrance H. Hamilton Building 26

Center for Health Research and Rural Advocacy

Center for Health Research and Rural Advocacy CHRRA Angela Nudy Pennsylvania State University Lighting/Electrical Option Faculty Advisor: Dr. Mistrick Images Compliments of Ewing Cole Brief Overview Location: Geisinger Health System Campus in Danville,

More information

Lobby Lighting Redesign

Lobby Lighting Redesign Lobby Lighting Redesign Description of Space The lobby is located on the first floor of the building. Upon entering the building through the curved façade that features large expanses of glass, one would

More information

Hawthorn Building. Penn State Altoona Campus Altoona, PA. Walter Nichols. Lighting/Electrical Option Faculty Advisor: Dr.

Hawthorn Building. Penn State Altoona Campus Altoona, PA. Walter Nichols. Lighting/Electrical Option Faculty Advisor: Dr. Hawthorn Building Penn State Altoona Campus Altoona, PA Walter Nichols Lighting/Electrical Option Faculty Advisor: Dr. Richard Mistrick 58,800 sq.ft. 2 Stories above grade Steel frame with curtain wall

More information

TECHNICAL ASSIGNMENT #3: SCHEMATIC LIGHTING DESIGN

TECHNICAL ASSIGNMENT #3: SCHEMATIC LIGHTING DESIGN TECHNICAL ASSIGNMENT #3: SCHEMATIC LIGHTING DESIGN Jason Weaver 12/13/2007 Background The central role of a college is to help students develop a worldview. The three things one needs to understand in

More information

Thesis Proposal. Brian Regan The Virginia Historical Society Building West Wing Addition RICHMOND, VIRGINIA

Thesis Proposal. Brian Regan The Virginia Historical Society Building West Wing Addition RICHMOND, VIRGINIA Thesis Proposal Brian Regan The Virginia Historical Society Building West Wing Addition RICHMOND, VIRGINIA New Addition s Functions Auditorium Entrances located on ground and basement floors Museum Art

More information

University of California, San Diego Cal IT 2 Brian Smith. Schematic Design Presentation 06 December 2005

University of California, San Diego Cal IT 2 Brian Smith. Schematic Design Presentation 06 December 2005 University of California, San Diego Cal IT 2 Brian Smith Schematic Design Presentation 06 December 2005 Building Overview Location: University of California, San Diego Size: 220,000 s.f. Architect: NBBJ

More information

University Park, PA. The Pennsylvania State University Architectural Engineering Lighting and Electrical Faculty Advisor: Dr.

University Park, PA. The Pennsylvania State University Architectural Engineering Lighting and Electrical Faculty Advisor: Dr. University Park, PA The Pennsylvania State University Architectural Engineering Lighting and Electrical Faculty Advisor: Dr. Martin Moeck A Building Overview The main spaces include: Convenience Store

More information

Senior Thesis Presentation

Senior Thesis Presentation Senior Thesis Presentation 5th Year Architectural Engineering Lighting/ Electrical Option Advisors: Dr. Mistrick & Prof. Dannerth Building Overview Size: 104, 000 square feet on 4 levels (3 stories above

More information

Lighting Proposal Memo. Lighting Proposal. Angela Nudy Lighting/Electrical Dr. Mistrick Lighting Proposal Memo 1

Lighting Proposal Memo. Lighting Proposal. Angela Nudy Lighting/Electrical Dr. Mistrick Lighting Proposal Memo 1 Lighting Proposal Angela Nudy Lighting/Electrical Dr. Mistrick 12.16.2006 Lighting Proposal Memo 1 Executive Summary I have chosen to redesign the lighting for four interior spaces and one exterior space

More information

THE AUGUST WILSON CENTER FOR AFRICAN AMERICAN CULTURE PITTSBURGH, PENNSYLVANIA. PERKINS + WILL chematic Design Presentation MICHAEL P.

THE AUGUST WILSON CENTER FOR AFRICAN AMERICAN CULTURE PITTSBURGH, PENNSYLVANIA. PERKINS + WILL chematic Design Presentation MICHAEL P. PITTSBURGH, PENNSYLVANIA PERKINS + WILL chematic Design Presentation MICHAEL P. ROYER SCHEMATIC DESIGN PRESENTATION: PROJECT OVERVIEW LOCATION: Liberty Avenue Pittsburgh, Pennsylvania SIZE: 63,000 Square

More information

Lighting Depth: Courtyard Franklin Care Center, Franklin Lakes, NJ

Lighting Depth: Courtyard Franklin Care Center, Franklin Lakes, NJ Lighting Depth: Courtyard Courtyard Overview: The perimeter buildings of the Franklin Care Center wrap around the central two story building creating two courtyard areas. The courtyard is entered through

More information

SMEAL COLLEGE OF BUSINESS BUILDING University Park, PA

SMEAL COLLEGE OF BUSINESS BUILDING University Park, PA SMEAL COLLEGE OF BUSINESS BUILDING University Park, PA Yena K. Han The Pennsylvania State University Architectural Engineering, Lighting/Electrical Faculty Advisor: Richard G. Mistrick, Ph.D., P.E., FIES

More information

HARRY RANSOM HUMANITIES RESEARCH CENTER

HARRY RANSOM HUMANITIES RESEARCH CENTER HARRY RANSOM HUMANITIES RESEARCH CENTER EXPANSION AND RENOVATION THE UNIVERSITY OF TEXAS AT AUSTIN SCHEMATIC LIGHTING DESIGN LIGHTING / ELECTRICAL OPTION DR. RICHARD MISTRICK, ADVISOR THE HARRY RANSOM

More information

Lighting Existing Conditions and Design Criteria Report Brian Regan Ltg./Elect. Virginia Historical Society 10/8/03

Lighting Existing Conditions and Design Criteria Report Brian Regan Ltg./Elect. Virginia Historical Society 10/8/03 Lighting Existing Conditions and Design Criteria Report Brian Regan Ltg./Elect. Virginia Historical Society 10/8/03 Executive Summary The existing lighting conditions and design criteria report describes

More information

Holy Cross Hospital North Addition. Fall 2005 Phil Mackey

Holy Cross Hospital North Addition. Fall 2005 Phil Mackey Holy Cross Hospital North Addition Fall 2005 Phil Mackey 1 Existing Design 2 Existing Design Building Functions: 1 st floor consists of the new main entrance/lobby, concourse, conference center with multi-purpose

More information

Thesis Proposal Update #2

Thesis Proposal Update #2 Thesis Proposal Update #2 Princeton Theological Seminary Library Princeton, NJ Stephanie Deckard Lighting Electrical Faculty Advisor Dr. Kevin Houser 3/11/2013 Executive Summary The Princeton Theological

More information

Lighting Design Criteria: Codes and Standards

Lighting Design Criteria: Codes and Standards EXTERIOR LIGHTING Lighting Design Criteria: Codes and Standards IESNA Lighting Handbook 10 th Edition RP-33-14 Lighting for Exterior Environments ASHRAE/IES Standard 90.1-2010 IBC 2012 2 Site Lighting

More information

Princeton Theological Seminary Library - Schematic Design Stephanie Deckard

Princeton Theological Seminary Library - Schematic Design Stephanie Deckard Princeton Theological Seminary Library - Schematic Design Stephanie Deckard 1 Location Princeton, NJ Size 99,585 sqft Stories 4 + 1 basement 2 Owner Princeton Theological Seminary Design Architects Einhorn

More information

Schematic Design Ideas for the Westlake Recreation Center. Presented by: Summer Padgett At Lutron Electronics On December 9, 2003

Schematic Design Ideas for the Westlake Recreation Center. Presented by: Summer Padgett At Lutron Electronics On December 9, 2003 Schematic Design Ideas for the Westlake Recreation Center Presented by: Summer Padgett At Lutron Electronics On December 9, 2003 The Westlake Recreation This facility serves as a park and recreation center

More information

Lighting Existing Conditions and Design Criteria Report

Lighting Existing Conditions and Design Criteria Report Lighting Existing Conditions and Design Criteria Report EXECUTIVE SUMMARY This report will describe the existing lighting system of the specific spaces of my redesign the auditorium, the atrium, the outdoor

More information

HARRY RANSOM HUMANITIES RESEARCH CENTER

HARRY RANSOM HUMANITIES RESEARCH CENTER HARRY RANSOM HUMANITIES RESEARCH CENTER Additions and Renovations MICHAEL ANTHONY LOMBARDI Lighting/Electrical Emphasis Dr. Richard Mistrick, Advisor The Pennsylvania State University HARRY RANSOM HUMANITIES

More information

Inspiration. Wall Street. Innovative Dynamic. Original. Established. Powerful Enlightened. Competitive. Modern. Intrigue

Inspiration. Wall Street. Innovative Dynamic. Original. Established. Powerful Enlightened. Competitive. Modern. Intrigue Building Information Located in Washington DC on the George Washington University Campus Addition to existing Business School 170,000 Sq Ft 6 floors above grade, 2 floors below Educational Building Mission

More information

Schematic Design Proposal Presentation

Schematic Design Proposal Presentation Steven A. Neimeister 9 December 2003 Architectural Engineering 481W AstroPower Headquarters Newark, Delaware Lighting/Electrical Option Consultant: Dr. M. Moeck Introduction to AstroPower Welcome to AstroPower!

More information

Surface Materials. Surface Material Reflectance. Acoustic Ceiling 80% Tile. Painted Gypsum 75% Wall Board. Vinyl Composition 32% Tile

Surface Materials. Surface Material Reflectance. Acoustic Ceiling 80% Tile. Painted Gypsum 75% Wall Board. Vinyl Composition 32% Tile Genetics Laboratory Space Description The Genetics Laboratory is located on the second floor of the laboratory building. The main functions of this space are as a learning and research area. There is a

More information

Lord Stirling Community School

Lord Stirling Community School Lord Stirling Community School Schematic Design Proposal AE Senior Thesis Nehal M. Youssef About the Building A new face for an old town The building of the Lord Stirling Community School was the beginning

More information

Lindsey Beane. Executive Summary

Lindsey Beane. Executive Summary Executive Summary The purpose of this technical assignment is to compile lighting information and make an analysis about the existing spaces. This report will include a list of the equipment used, required

More information

Main Lobby Area (North Vestibule thru South Vestibule):

Main Lobby Area (North Vestibule thru South Vestibule): Main Lobby Area (North Vestibule thru South Vestibule): Overview of Space: This is the entrance level from both the North, city street entrance, and the South, campus entrance. The space is 190 x 30 x

More information

Lighting Depth CAL IT 2. Brian Smith. Introduction

Lighting Depth CAL IT 2. Brian Smith. Introduction Introduction Lighting Depth The University of California, San Diego Cal IT 2 building is a large research, academic building. As stated earlier, the building is used for lectures, laboratory experiments,

More information

Lighting Existing Conditions and Design Criteria Report

Lighting Existing Conditions and Design Criteria Report page 1 of 19 Lighting Existing Conditions and Design Criteria Report The lighting in the includes very general lighting used in buildings with an office type setting. The fixture schedule for the Hall

More information

LIGHTING EXISTING CONDITIONS SUMMARY EXECUTIVE SUMMARY Sara Lappano Ltg./Elec. Corron Cultural Center Middletown, VA

LIGHTING EXISTING CONDITIONS SUMMARY EXECUTIVE SUMMARY Sara Lappano Ltg./Elec. Corron Cultural Center Middletown, VA LIGHTING EXISTING CONDITIONS SUMMARY EXECUTIVE SUMMARY Sara Lappano Ltg./Elec. Corron Cultural Center Middletown, VA 11.4.2002 Contained in this report is a summary of the lighting existing conditions

More information

Shepherd University Wellness Center AE 481 Thesis Proposal

Shepherd University Wellness Center AE 481 Thesis Proposal A E 481 THESIS PROPOSAL Shepherd University Wellness Center AE 481 Thesis Proposal Shepherdstown, West Virginia Lighting/ Electrical Option Dr. Houser and Professor Dannerth December 10, 2010 Executive

More information

Shepherd University Wellness Center AE 481 Revised Thesis Proposal

Shepherd University Wellness Center AE 481 Revised Thesis Proposal A E 481 REVISED THESIS PROPOSAL Shepherd University Wellness Center AE 481 Revised Thesis Proposal Shepherdstown, West Virginia Lighting/ Electrical Option Dr. Houser and Professor Dannerth March 24, 2011

More information

Lobby Lighting Design

Lobby Lighting Design Lobby Lighting Design The main lobby in Duques is hall is located on the first and second floor of the building. It is the main pathway in and out of the building for the more important spaces, such as

More information

Duke University Medical School. Duke School of Nursing

Duke University Medical School. Duke School of Nursing Duke School of Nursing Lighting and Electrical Depth Proposal and Breadth Topics Proposal for Spring 2008 Semester December 18 th, 2007 Table of Contents Executive Summary....................................

More information

Advances in Non-Residential Lighting Technologies

Advances in Non-Residential Lighting Technologies Advances in Non-Residential Lighting Technologies CABEC conference San Diego, CA October 21, 2011 Steven Mesh, LC, IESNA Lighting Education & Design 140 Gardenside Drive, #304 San Francisco, CA 94131 415-516-8126

More information

Overview. The Reading Room

Overview. The Reading Room Overview The library for is the largest space in the George E. Bello Center. This space not only houses all the school s books and reference material, but there are computer terminals set up for students

More information

Exterior Façade Lighting Design

Exterior Façade Lighting Design Exterior Façade Lighting Design Duques Hall is located on George Washington campus in downtown Washington DC. It is located amidst some other university buildings, however, the façade is very visible from

More information

Kimberly Morton The Pennsylvania State University Architectural Engineering Program Lighting/Electrical Faculty Advisor: Dr.

Kimberly Morton The Pennsylvania State University Architectural Engineering Program Lighting/Electrical Faculty Advisor: Dr. Kimberly Morton The Pennsylvania State University Architectural Engineering Program Lighting/Electrical Faculty Advisor: Dr. Martin Moeck Building Location COSI (Center Of Science and Industry) is located

More information

Jennifer Mers. Rio Hondo Library and Learning Resource Center. Executive Summary. General Building. Lighting/Electrical Option

Jennifer Mers. Rio Hondo Library and Learning Resource Center. Executive Summary. General Building. Lighting/Electrical Option Executive Summary This assignment goes into depth into the existing lighting conditions of the Rio Hondo Library and Learning. The lobby, Reference Stacks and Microfilm Area, the Stack Area on the second

More information

Franklin Square Hospital Center

Franklin Square Hospital Center Franklin Square Hospital Center Baltimore, MD Thesis Proposal Cassandra Watson + Electrical Electrical Advisor Professor Dannerth Advisor Dr. Mistrick 16 December 2009 Table of Contents Executive Summary...

More information

Café DUSON- Overview

Café DUSON- Overview Café DUSON- Overview Café DUSON is a study lounge with seating and tables to seat approximately 65 people in an area of about 1850 SF. The café is a double high space with full height windows on the North

More information

Lighting Existing Conditions and Design Criteria Report EXECUTIVE SUMMARY

Lighting Existing Conditions and Design Criteria Report EXECUTIVE SUMMARY Lighting Existing Conditions and Design Criteria Report EXECUTIVE SUMMARY The Lighting Existing Conditions and Design Criteria Report will examine the existing lighting conditions in the (in general and

More information

Schematic Design Presentation December 15, 2006 David Smith

Schematic Design Presentation December 15, 2006 David Smith Schematic Design Presentation December 15, 2006 David Smith Overview Located in Lancaster, PA 65,000 square feet 4 stories, 3 above grade Architect of record is Philip Johnson-Alan Ritchie Architects Ground

More information

INDEPENDENCE VISITOR CENTER PHILADELPHIA, PA

INDEPENDENCE VISITOR CENTER PHILADELPHIA, PA The trellis lines the east wall of the independence visitor center. It has brick columns with a white painted wooden trellis that is covered in ivy. The trellis is built on top of a brick walkway. The

More information

Towson West Village Commons

Towson West Village Commons AE 481W T ECHNICAL REPORT 1A LIGHTING PROPOSAL Towson West Village Commons Towson Universityy Towson, Marylandd Advisor: Dr. Richard Mistrick Author: Patrick Morgan TECHNICAL REPORT 1A LIGHTING PROPOSAL

More information

Depth Work Part 1: Lighting Design

Depth Work Part 1: Lighting Design During the upcoming spring semester I will be investigating and redesigning some of the systems in Redifer Commons. This thesis study will be composed of three sections, which will all end up intertwining.

More information

Thesis Proposal Sherrerd Hall, Princeton University, NJ

Thesis Proposal Sherrerd Hall, Princeton University, NJ Sherrerd Hall, Princeton University, NJ Faculty Consultants: Ted Dannerth and Richard Mistrick Table of Contents Executive Summary... 2 Background... 3 Lighting Depth... 7 Problem... 7 Solution... 7 Building

More information

Chandler City Hall Chandler, Arizona

Chandler City Hall Chandler, Arizona Chandler City Hall Chandler, Arizona Thesis Proposal AE481W: Architectural Engineering Senior Thesis Friday December 10 th, 2010 Stephanie Romanias Lighting/Electrical Faculty Consultants: Dr. Kevin Houser

More information

New LED Product Offerings

New LED Product Offerings New LED Product Offerings from we know light. TCP LED NEW Product Offerings LED Indoor Lighting PL Lamps EdgeLit Downlights HID DirecT8/DirecT5 T8/T5 Tubes Liscio by TCP Linear Accent Lighting Luxterior

More information

Existing Area Description: The area is an angle around the North point of the building. It is a wide patio wrapping the façade of the building.

Existing Area Description: The area is an angle around the North point of the building. It is a wide patio wrapping the façade of the building. Exterior Street Entrance: Overview of Space: The street entrance is the main entrance for the members of the community who are entering the library. The purpose of this space is to effectively and aesthetically

More information

CEILING DESIGN: WHAT is it? and what DOES IT DO?

CEILING DESIGN: WHAT is it? and what DOES IT DO? CEILING DESIGN: WHAT is it? and what DOES IT DO? What is it Large horizontal surface attached to or suspended from building structure Elements: Planes Coves Coffers Slots Soffits Headers Slats Materials

More information

2.0 Lighting Depth Introduction

2.0 Lighting Depth Introduction 2.0 Lighting Depth Introduction The lighting for four different spaces, the business news open office, first floor cafeteria seating, east lobby, and east façade, were analyzed and redesigned. The existing

More information

The New York University Concourse Project. New York City. Existing Conditions and Design Criteria

The New York University Concourse Project. New York City. Existing Conditions and Design Criteria The New York University Concourse Project New York City Existing Conditions and Design Criteria Kevin Hsia Lighting/Electrical Option Advisor: Dr. Richard Mistrick September 29, 2008 executive summary

More information

S A N TA M O N I C C I T Y S E R V I C E S B U I L D I N G E X T E R I O R L I G H T I N G

S A N TA M O N I C C I T Y S E R V I C E S B U I L D I N G E X T E R I O R L I G H T I N G S A N TA M O N I C C I T Y S E R V I C E S B U I L D I N G E X T E R I O R L I G H T I N G MAY 8, 2017 SCHEMATIC CALCULATION RENDERING OVERALL VIEW ENTRY LIGHTING LOW MOUNTING HEIGHT RECESSED WALL MOUNTED

More information

Lighting Depth Part 1: Exterior Space

Lighting Depth Part 1: Exterior Space Lighting Depth Part 1: Exterior Space Metaphor and Ideas: The first space of my lighting redesign is the front façade of the Recreation Center shown below. Metaphorically, I want the front porch to act

More information

The Bahen Centre for Information Technology. Meeting Room Lighting Redesign. Introduction. University of Toronto ~ Toronto, Ontario, Canada

The Bahen Centre for Information Technology. Meeting Room Lighting Redesign. Introduction. University of Toronto ~ Toronto, Ontario, Canada Meeting Room Lighting Redesign Meeting Room #4287 Introduction The Meeting Room (room #4287) is located on the fourth floor within the grand spiral staircase in the atrium. The room is shaped like half

More information

LIGHTING NORTH FAÇADE AND PLAZA

LIGHTING NORTH FAÇADE AND PLAZA LIGHTING NORTH FAÇADE AND PLAZA The main entry to UCI Natural Science Unit II is marked by a four-story glass curtain wall, an outdoor stair feature and a 5875 square foot landscaped plaza. Trees are located

More information

University of California Santa Barbara. Student Resource Building

University of California Santa Barbara. Student Resource Building Student Resource Building Technical Assignment 1 October 16 th, 2006 1 Executive Summary The following report seeks to address the conditions of the proposed lighting system at the Student Resource Building

More information

1.0 Introduction to Lighting Depth. 1.1 Hotel Tower Facace and Porte Cochere

1.0 Introduction to Lighting Depth. 1.1 Hotel Tower Facace and Porte Cochere 1.0 Introduction to Lighting Depth Dover Downs is primarily used for entertainment for the wealthy. When people go somewhere to spend money expectations are higher than usual. The lighting design for Dover

More information

Eric Anderson. Technical Report 1. Existing Lighting Conditions

Eric Anderson. Technical Report 1. Existing Lighting Conditions Eric Anderson Technical Report 1 Existing Lighting Conditions Executive Summary: The contents of Technical Report One include the evaluation of the lighting design and basic features of The Web Shop: The

More information

Lighting System Conceptual Design

Lighting System Conceptual Design Kevin Michael Danna Penn State Architectural Engineering Senior Thesis BUILDING OVERVIEW One Christina Crescent is a six story office building located in Wilmington, Delaware and is home to Barclays Bank

More information

Sacramento Republic FC Stadium. Stadium Specialty Ligh ng Concept Package. 100% Schema c Design. 13 May 2016

Sacramento Republic FC Stadium. Stadium Specialty Ligh ng Concept Package. 100% Schema c Design. 13 May 2016 Stadium Specialty Ligh ng Concept Package 00% Schema c Design (BEHIND) Fixture: LED landscape floodlight. Applica on: Two narrow beam floodlights for each large shard, mounted behind fabric on structural

More information

City of Green Administration Building. Brian Koze November 12, Lighting Schematic Design Presentation

City of Green Administration Building. Brian Koze November 12, Lighting Schematic Design Presentation City of Green Administration Building Brian Koze November 12, 2010 Lighting Schematic Design Presentation Building Statistics Location City of Green, Ohio Occupant City of Green Administration Size 53,671

More information

student National Lighting Design Competition Winners 2010

student National Lighting Design Competition Winners 2010 student National Lighting Design Competition Winners 2010 winner student Hiroki Usui Project: FUEL Convenience Store/Gas Station School: Washington State University, Spokane, WA Cooper Lighting s 34th

More information

UNIVERSITY OF PENNSYLVANIA NEURAL AND BEHAVIORAL SCIENCES BUILDING 415 University Ave, Philadelphia, PA 19104

UNIVERSITY OF PENNSYLVANIA NEURAL AND BEHAVIORAL SCIENCES BUILDING 415 University Ave, Philadelphia, PA 19104 UNIVERSITY OF PENNSYLVANIA NEURAL AND BEHAVIORAL SCIENCES BUILDING 415 University Ave, Philadelphia, PA 19104 Reinhardt Swart Lighting + Electrical Advisor Shawn Good Lighting Design Memo Update 1 9.9.13

More information

Lighting Proposal Memo

Lighting Proposal Memo Lighting Proposal Memo AE 481W Tech Report 1 Part 1 Bucks County Justice Center Doylestown, PA Joshua Lange Lighting/Electrical Dr. Richard Mistrick 9/8/2014 Executive summary This report is a summary

More information

UBC Technical Guidelines Section Edition Interior Building Lighting Page 1 of 5

UBC Technical Guidelines Section Edition Interior Building Lighting Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Related UBC Guidelines.1 Section 27 05 05 Communication Rooms Design Guidelines 2.13 1.2 Coordination Requirements.1 UBC Energy & Water Services.2 UBC Building Operations Electrical

More information

Technical Report 1 Part 2

Technical Report 1 Part 2 Technical Report 1 Part 2 John Conley Lighting + Electrical Option Thesis Advisor Shawn Good Oakland University Engineering Center Rochester, MI 09.19.2014 Lighting calculation 3dsMax files can be found

More information

RHBL 7325 ENVIRONMENTAL ANALYSIS. By: Whitney Musick

RHBL 7325 ENVIRONMENTAL ANALYSIS. By: Whitney Musick RHBL 7325 ENVIRONMENTAL ANALYSIS By: Whitney Musick UALR s Ottenheimer Library Photo Credit: http://www.flickr.com/photos/30091470@n08/4565851613/ Background Description Ottenheimer Library is centrally

More information

Technical Assignment 1 Existing Lighting Conditions and Design Criteria

Technical Assignment 1 Existing Lighting Conditions and Design Criteria Technical Assignment 1 Existing Lighting Conditions and Design Criteria Jason Greer Lighting/Electrical Option AGI Files: P:\AE 481\Technical Assignment 1\AGI Files October 5, 2007 Table of Contents Table

More information

Light Fixtures: A Lamp in a Box. Light fixtures are MORE than a decorative object.

Light Fixtures: A Lamp in a Box. Light fixtures are MORE than a decorative object. 1 Light Fixtures: A Lamp in a Box Light fixtures are MORE than a decorative object. 2 What defines a Light Fixture? Keyless Porcelain Socket Keyed (pull chain) Porcelain Socket Specifications: Method of

More information

Business Customer Information. Account Number (9 digits) Account Holder Name Phone (As shown on your utility bill) Service Street Address

Business Customer Information. Account Number (9 digits) Account Holder Name Phone  (As shown on your utility bill) Service Street Address Commercial Lighting Rebate Application Please complete the application including existing and installed information. Application will be returned without valid purchase receipt/invoice or if equipment

More information

DALI Dimming Controls

DALI Dimming Controls DALI Dimming Controls ezdali Fluorescent dimming made simple and affordable A New Digital Revolution ezdali, Watt Stopper s new digital dimming and scene controls, uses the DALI communications protocol

More information

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect 1 Site Summary Address 7200 Bluff Springs Road Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 2014 Total Campus Building Area (combined) 25,314 SF Introduction The

More information

Code Compliance. Lightcloud. Guides for California Title 24 & ASHRAE

Code Compliance. Lightcloud. Guides for California Title 24 & ASHRAE Guides for California Title 24 & ASHRAE Code Compliance Lightcloud Makes Compliance Easy What are California Title 24 & ASHRAE? Links to Energy Codes Interior Lighting Controls Exterior Lighting Controls

More information

Technical Report One

Technical Report One Technical Report One Yale Sculpture Building Lighting Conditions and Design Criteria Report: Technical Report 1 10.05.06 Prepared for: Dr. Richard Mistrick CC: Ted Dannerth Date: October 6, 2006 Executive

More information

실내디자인스튜디오 Reflected ceiling plan

실내디자인스튜디오 Reflected ceiling plan 21001 실내디자인스튜디오 2 210Reflected ceiling plan 21002 Design Process 1 2 3 4 5 사무공간디자인에관한 Orientation 사무공간디자인을위한자료조사 사무공간실내디자인사례조사 Bubble diagram 의작성과동선계획 Block layout 의작성과 idea Sketch 6 7 8 9 10 예비평면도의작성

More information

Balance LC. classroom light control fixture solution. simple to order simple to install simple to use

Balance LC. classroom light control fixture solution. simple to order simple to install simple to use Balance LC classroom light control fixture solution Balance LC classroom light control fixture solution: simple to order simple to install simple to use The fi rst light control solution to combine individually

More information

Multipurpose Room. Existing Conditions General Overview. Mark W. Miller Sibley memorial Hospital Grand Oaks Washington, DC

Multipurpose Room. Existing Conditions General Overview. Mark W. Miller Sibley memorial Hospital Grand Oaks Washington, DC Multipurpose Room ` N Figure 1: 1 st Floor Plan Multipurpose Room Location Existing Conditions General Overview The Multipurpose Room, as the name implies, serves as a multifunctional space for the Assisted

More information

Lighting Existing Conditions and Design Criteria Report

Lighting Existing Conditions and Design Criteria Report The building was constructed a few years ago to act as both a Headquarters and to be a display of what the product they manufacture can accomplish when put to work. The architecture of the building was

More information

District Design Guidelines - Cultural District

District Design Guidelines - Cultural District District Design Guidelines - Cultural District The Cultural District is the entertainment and cultural center of Overland Park, anchored by the American Museum of Natural History and Cinetopia, a state

More information

REVISIONS Summary of Change. 6/1/12 All Replaced entire document with new revision

REVISIONS Summary of Change. 6/1/12 All Replaced entire document with new revision Revision Date Section REVISIONS Summary of Change 6/1/12 All Replaced entire document with new revision REV 6/12 1 of 5 UNIVERSITY CONTACT: EXTERIOR LIGHTING Electrical Services, Maintenance & Operations

More information

Stocking Solutions. Downlights LED Panels Floods & Wall Packs

Stocking Solutions. Downlights LED Panels Floods & Wall Packs Stocking Solutions Downlights LED Panels Floods & Wall Packs Because Experience Makes the Difference Since 1976, LSI Industries has been introducing smart, innovative lighting solutions to help its customers

More information

FWC APPROVED SEA TURTLE LIGHTING

FWC APPROVED SEA TURTLE LIGHTING FWC APPROVED SEA TURTLE LIGHTING All exterior lighting for the entire project area including structural and landscape lighting must be reviewed and approved by FWC regardless of whether or not the area

More information

Gathering Space. Function and Orientation. Space Characteristics Gregory Wolfe 2004 Senior Thesis Lighting / Electrical

Gathering Space. Function and Orientation. Space Characteristics Gregory Wolfe 2004 Senior Thesis Lighting / Electrical Gathering Space Function and Orientation The gathering space and reception area on the first floor is the first space you encounter upon entering the Westwood Community Church. As such, its purpose is

More information

3. Desk lamps are generally 12 to 20 high and are used to light a specific work area.

3. Desk lamps are generally 12 to 20 high and are used to light a specific work area. page 1 of 5 Lighting is essential to the look and function of any room. And today there are more options in lighting your home than ever before. To help you choose the best type of lighting for your needs,

More information

Duke Tower Main Entrance Lobby Overview

Duke Tower Main Entrance Lobby Overview Duke Tower Main Entrance Lobby Overview This is the main entrance to the building that is located in the prominent tower portion of the building. The floor of this lobby has the Duke University School

More information

LIGHTRECYCLE PRODUCT GUIDE

LIGHTRECYCLE PRODUCT GUIDE April 2016 1. Fluorescent tubes measuring less than or equal to 2 ft Includes all diameters and light outputs, shaped fluorescent tubes, and UV-A and UV-B tubes. 2. Fluorescent tubes measuring greater

More information

Executive Summary. Houston Museum of American Art New York, New York

Executive Summary. Houston Museum of American Art New York, New York Executive Summary This proposal details the work to be completed in the spring of 2013. It presents a description of the redesign of several systems present in the. Included are explanations of two depth

More information

Momo Sushi. Robert Blecker ABS 643

Momo Sushi. Robert Blecker ABS 643 Robert Blecker ABS 643 Building Information: -Momo Sushi is a Japanese restaurant that specializes in sushi. -The restaurant is located in Henderson on Stephanie St. and it was chosen because of its unique

More information

Technical Assignment I

Technical Assignment I WHEELOCK COLLEGE CAMPUS CENTER AND STUDENT RESIDENCE 200 THE RIVERWAY, BOSTON, MA 02215 Technical Assignment I Lighting Existing Conditions and Design Criteria E X E C U T I V E S U M M A R Y The lighting

More information

USG LIBRETTO GMS CEILING ILLUMINATION OPPORTUNITIES

USG LIBRETTO GMS CEILING ILLUMINATION OPPORTUNITIES 01 June, 2007 USG LIBRETTO GMS CEILING ILLUMINATION OPPORTUNITIES The Libretto GMS ceiling system allows for a wide variety of creative illumination opportunities. Lighting can be integrated from both

More information

ELECTRICAL EXISTING CONDITIONS AND DESIGN ANALYSIS

ELECTRICAL EXISTING CONDITIONS AND DESIGN ANALYSIS Executive Summary ELECTRICAL EXISTING CONDITIONS AND DESIGN ANALYSIS Sara Lappano Ltg./Elec. Corron Cultural Center Middletown, VA Faculty Advisor: Dr. Moeck 11.4.2002 As in the prior lighting technical

More information

PRESCRIPTIVE APPROACH

PRESCRIPTIVE APPROACH PRESCRIPTIVE APPROACH 1. Actual and Allowed LPD 2. Complete Building Method 3. Area Category Method 4. Tailored Method This section contains exercises for lighting power adjustments, Complete Building

More information

BC LIGHTRECYCLE EXPANSION PROGRAM PRODUCT LIST September 7, 2012 Version

BC LIGHTRECYCLE EXPANSION PROGRAM PRODUCT LIST September 7, 2012 Version BC LIGHTRECYCLE EXPANSION PROGRAM PRODUCT LIST September 7, 2012 Version BC LightRecycle Program Product List The following table provides eco-fee rates for the BC LightRecycle Expansion program. These

More information

Lindsay Frederick. Lighting + Electrical. Dr. Houser Faculty Advisor. Native American Cultural Center Arizona. Technical Report I

Lindsay Frederick. Lighting + Electrical. Dr. Houser Faculty Advisor. Native American Cultural Center Arizona. Technical Report I Lindsay Frederick Lighting + Electrical Dr. Houser Faculty Advisor Native American Cultural Center Arizona Technical Report I Calculation files can be found at Y:/NACC Native American Cultural Center Technical

More information

What Markets we serve:

What Markets we serve: BACKGROUND -Founded in 1938 -Headquartered in Waukegan, Illinois -Third generation ownership -Third largest fluorescent provider to the home center market -Ships 2.7 million lighting products annually

More information

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is. Energy Conservation Code Commercial Electric CHAPTER 5 WORKSHEET 1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is. a.

More information

Building Electrical System Overview

Building Electrical System Overview Philip Mackey L/E Dr. Mistrick Holy Cross Hospital North Addition Silver Spring, MD 0/3/05 Building Electrical System Overview Executive Summary: The following report describes the existing emergency power

More information

West pedestrian entry to Car Park One with view of interior atrium. West elevation detail of elevator and stair of Car Park One.

West pedestrian entry to Car Park One with view of interior atrium. West elevation detail of elevator and stair of Car Park One. Client: Chesapeake Energy Corporation Completion: July 2011 Scope: 383,250 sf -5 levels with 170 cars per level Cost: Withheld at Owner s Request Awards: Architizer A+ Awards Finalist; AIA, Central Oklahoma,

More information