1 SECTION SODDING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Preparation of subsoil. 2. Placing topsoil. 3. Fertilizing. 4. Sod installation. 5. Maintenance. B. Related Sections: 1. Drawings and general provisions of the Contract including General and Supplemental General Conditions, and Technical Specifications. 1.2 UNIT PRICE - MEASUREMENT AND PAYMENT A. Sodded Areas: 1. Basis of Measurement: By square yard. 2. Basis of Payment: Includes preparation of topsoil, sodding, watering and maintenance to specified time limit. 1.3 REFERENCES A. ASTM International: 1. ASTM C602 - Standard Specification for Agricultural Liming Materials. B. Turfgrass Producers International: 1. TPI - Guideline Specifications to Turfgrass Sodding. 1.4 DEFINITIONS A. Weeds: Include Dandelion, Jimsonweed, Quackgrass, Horsetail, Morning Glory, Rush Grass, Mustard, Lambsquarter, Chickweed, Cress, Crabgrass, Canadian Thistle, Nutgrass, Poison Oak, Blackberry, Tansy Ragwort, Bermuda Grass, Johnson Grass, Poison Ivy, Nut Sedge, Nimble Will, Bindweed, Bent Grass, Wild Garlic, Perennial Sorrel, and Brome Grass. 1.5 SUBMITTALS A. Section Submittal Procedures. B. Product Data: Submit data for sod grass species, fertilizer, mulch, and other accessories. SODDING

2 1.6 CLOSEOUT SUBMITTALS A. Section Execution Requirements. B. Operation and Maintenance Data: Submit maintenance instructions, cutting method and maximum grass height. 1.7 QUALITY ASSURANCE A. Sod: Root development capable of supporting its own weight without tearing, when suspended vertically by holding upper two corners. 1.8 QUALIFICATIONS A. Sod Producer: Company specializing in manufacturing Products specified in this section with minimum three years experience. B. Installer: Company specializing in performing work of this section with minimum three years experience. 1.9 DELIVERY, STORAGE, AND HANDLING A. Section Product Requirements. B. Deliver sod on pallets. Protect exposed roots from dehydration. C. Do not deliver more sod than can be laid within 48 hours COORDINATION A. Section Administrative Requirements. B. Coordinate with installation of underground sprinkler system piping and watering heads MAINTENANCE SERVICE A. Section Execution Requirements. B. Maintain sodded areas immediately after placement until grass is well established and exhibits vigorous growing condition. PART 2 PRODUCTS 2.1 SOD A. Sod: Field grown; standard grade; cultivated grass sod; Bermudagrass or Centipede type; with strong fibrous root system, free of stones, burned or bare spots; containing no more than 10 weeds per 1000 sq ft. SODDING

3 2.2 SOIL MATERIALS A. Topsoil: Fertile, agricultural soil, typical for locality, capable of sustaining vigorous plant growth, taken from drained site; free of subsoil, clay, or impurities, plants, weeds and roots. 2.3 ACCESSORIES A. Fertilizer: Commercial grade; recommended for grass, with fifty percent of elements derived from organic sources; of proportion necessary to eliminate deficiencies of topsoil. B. Water: Clean, fresh and free of substances or matter capable of inhibiting vigorous growth of grass. C. Wood Pegs: Softwood, sufficient size and length to anchor sod on slope. D. Wire Mesh: Interwoven hexagonal plastic mesh of 2 inch size. E. Edging: Galvanized steel. 2.4 HARVESTING SOD A. Machine cut sod and load on pallets in accordance with TPI guidelines. B. Cut sod in area not exceeding 1 sq yd, with minimum 1/2 inch and maximum 1 inch topsoil base. 2.5 SOURCE QUALITY CONTROL A. Section Quality Requirements. B. Analyze to ascertain percentage of nitrogen, phosphorus, potash, soluble salt content, organic matter content, and ph value. C. Provide recommendation for fertilizer and lime application rates for specified sod grass species as result of testing. D. Testing is not required when recent tests are available for imported topsoil. Submit these test results to testing laboratory. Indicate, by test results, information necessary to determine suitability. PART 3 EXECUTION 3.1 EXAMINATION A. Section Administrative Requirements. B. Verify prepared soil base is ready to receive the Work of this section. SODDING

4 3.2 PREPARATION OF SUBSOIL A. Prepare sub-soil and eliminate uneven areas and low spots. B. Maintain lines, levels, profiles and contours. Make changes in grade gradual. Blend slopes into level areas. C. Remove foreign materials and undesirable plants and their roots. Do not bury foreign material beneath areas to be sodded. D. Remove contaminated subsoil. E. Scarify sub-soil to depth of 4 inches where topsoil is to be placed. F. Repeat cultivation in areas where equipment, used for hauling and spreading topsoil, has compacted subsoil. 3.3 PLACING TOPSOIL A. Spread topsoil to minimum depth of 4 inches over area to be sodded. B. Place topsoil during dry weather and on dry unfrozen subgrade. C. Remove vegetable matter and foreign non-organic material from topsoil while spreading. D. Grade topsoil to eliminate rough, low or soft areas and to ensure positive drainage. E. Install edging at periphery of sodded areas in straight lines to consistent depth. 3.4 FERTILIZING A. Apply fertilizer at application rate recommended by soil analysis. B. Apply fertilizer after smooth raking of topsoil and prior to installation of sod. C. Apply fertilizer no more than 48 hours before laying sod. D. Mix fertilizer thoroughly into upper 4 inches of topsoil. E. Lightly water soil to aid dissipation of fertilizer. 3.5 LAYING SOD A. Moisten prepared surface immediately prior to laying sod. B. Lay sod within 48 hours after harvesting to prevent deterioration. C. Lay sod tight with no open joints visible, and no overlapping; stagger end joints 12 inches minimum. Do not stretch or overlap sod pieces. SODDING

5 D. Lay smooth. Align with adjoining grass areas. E. Place top elevation of sod 1/2 inch below adjoining paving and/or curbs. F. On slopes 6 inches per foot and steeper, lay sod perpendicular to slope and secure every row with wooden pegs at maximum 3 feet on center. When using big roll, lay sod parallel to slope. Drive pegs flush with soil portion of sod. G. Do not place sod when temperature is lower than 40 degrees F. H. Prior to placing sod, on slopes exceeding 8 inches per foot or where indicated on Drawings, place mesh over topsoil. Securely anchor wire mesh in place with wood pegs sunk firmly into ground. I. Water sodded areas immediately after installation. Saturate sod to 4 inches of soil. J. After sod and soil have dried, roll sodded areas to bond sod to soil and to remove minor depressions and irregularities. K. Roll before first watering. 3.6 MAINTENANCE A. Mow grass at regular intervals to maintain at maximum height of 2-1/2 inches. Do not cut more than 1/3 of grass blade at each mowing. B. Neatly trim edges and hand clip where necessary. C. Immediately remove clippings after mowing and trimming. D. Water to prevent grass and soil from drying out. E. Roll surface to remove or irregularities. F. Control growth of weeds. Apply herbicides. Remedy damage resulting from improper use of herbicides. G. Immediately replace sod on areas showing deterioration or bare spots. H. Protect sodded areas with warning signs during maintenance period. END OF SECTION SODDING

Section Seeding

Section Seeding Section 02936 Seeding PART 1 - GENERAL 1.01 SECTION INCLUDES A. Fertilizing. B. Seeding. C. Hydroseeding. D. Mulching. E. Maintenance. F. Sodding. 1.02 RELATED WORK A. Documents affecting work of this

More information

SECTION FINE GRADING AND SOIL PREPARATION

SECTION FINE GRADING AND SOIL PREPARATION SECTION 32 90 00 PART 1 GENERAL 1.01 SECTION INCLUDES A. Examination. B. Preparation. C. Subsoil Preparation. D. Placing Topsoil. E. Soil Tests. F. Coordination of Soil Amendments. G. Fine Grading. H.

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING Section 02922 PART 1 GENERAL 1.01 SUMMARY This Section includes the following: A. Restoration of existing lawn areas disturbed by construction shall be by installation of new sod. B. Planting of sod within

More information

SECTION SODDING

SECTION SODDING SECTION 02924 SODDING PART 1 GENERAL 1.01 SUMMARY A. Repair lawns and grassed rights of way damaged or removed during the construction of the pump station. 1.02 RELATED WORK A. Clearing and Grubbing -

More information

EXTERIOR IMPROVEMENTS PLANTING. .02 Lawns and Grasses. A. General. 1. Intent:

EXTERIOR IMPROVEMENTS PLANTING. .02 Lawns and Grasses. A. General. 1. Intent: 32 00 00 EXTERIOR IMPROVEMENTS 32 90 00 PLANTING.02 Lawns and Grasses A. General 1. Intent: a. The work in this section specifies the labor, materials, and installation methods necessary to establish the

More information

SECTION 900 TURF ESTABLISHMENT

SECTION 900 TURF ESTABLISHMENT SECTION 900 901.0 DESCRIPTION This section covers the furnishing of all labor, materials, tools, equipment and performances of all work and services necessary or incidental to turf restoration as indicated

More information

A. Provide labor and materials necessary for installation of turf sod and other related work as required.

A. Provide labor and materials necessary for installation of turf sod and other related work as required. SECTION 32 92 00 TURF AND GRASSES PART 1 - GENERAL 1.1 SUMMARY A. Provide labor and materials necessary for installation of turf sod and other related work as required. B. Related work described elsewhere:

More information

Turfgrass Sod General

Turfgrass Sod General 8 8.1. General 8.1.1. Purpose statement & intent 1. The intent of this section of the standard is to state standard requirements for quality grades and other classifications of grass types in turfgrass

More information

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Grass Linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] May be used on short, steep

More information

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3 SECTION VI (Sub-section 241) Grassing Article Page 1. Scope of Work 241-1 2. General 241-1 3. Sprigging 241-1 4. Sodding 241-1 thru 241-3 5. Soil Amendments 241-3 6. Non Grassed Areas 241-4 7. Topsoil

More information

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for APPROVED BY COUNCIL FEBRUARY 15, 1994 CITY OF BE CONVEYED TO THE CITY The Owner will be responsible to ensure that all lands which will be transferred to the City for parkland, drainage or boulevard purposes

More information

SECTION SEEDING

SECTION SEEDING PART 1 GENERAL 1.01 RELATED DOCUMENTS SECTION 32 9219 SEEDING A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Scope.1 This guideline addresses the materials, and equipment necessary for the supply, placement, and amendment of the growing medium. 1.2 Related Work:.1 Section 32 93 00

More information

BMP-33. Stabilizing fine-graded disturbed areas by establishing permanent grass stands with sod.

BMP-33. Stabilizing fine-graded disturbed areas by establishing permanent grass stands with sod. BMP-33 BMP: SODDING Definition Stabilizing fine-graded disturbed areas by establishing permanent grass stands with sod. PurDoses 1. To establish permanent turf immediately. 2. To prevent erosion and damage

More information

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 329000 PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 01 Specification Sections, apply

More information

LAWNS Chapter 12. Topic Outline. Establishing a Lawn. Establishing a Lawn

LAWNS Chapter 12. Topic Outline. Establishing a Lawn. Establishing a Lawn LAWNS Chapter 12 Presented By: Melanie W. Barrow, ANR Horticulture Extension Agent For: Master Gardener Training Topic Outline Establishing a Lawn Renovating an Old Lawn Lawn Maintenance Annual Maintenance

More information

SITE TOPSOIL & FINISH GRADING

SITE TOPSOIL & FINISH GRADING CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02911-1 PART 1 GENERAL 1.1 Related Work.1 Section 02311 Site Grading.2 Section 02315 Excavating, Trenching, & Backfilling.3 Section 02906 Planting of Trees,

More information

SECTION TREES, PLANTS AND GROUNDCOVER. A. Preparation of subsoil, topsoil and planting soil mixture.

SECTION TREES, PLANTS AND GROUNDCOVER. A. Preparation of subsoil, topsoil and planting soil mixture. SECTION 02950 TREES, PLANTS AND GROUNDCOVER PART 1 1 - GENERAL 1.1 SECTION INCLUDES A. Preparation of subsoil, topsoil and planting soil mixture. B. Excavating for planting pits, beds and trenches. C.

More information

a. Section includes planting soils specified by composition of the mixes.

a. Section includes planting soils specified by composition of the mixes. SECTION 32 9113 SOIL PREPARATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. Surface parking areas shall be constructed of bituminous paving.

A. Surface parking areas shall be constructed of bituminous paving. September 2008 32 12 16 Asphalt Paving 1.0 General A. Surface parking areas shall be constructed of bituminous paving. 2.0 Products A. Aggregate Base Course conform to IDOT Std. Spec. Sect. 1000, ref.

More information

SECTION TURF AND GRASSES

SECTION TURF AND GRASSES SECTION 32 92 00 TURF AND GRASSES PART 1: GENERAL 1.01 DESCRIPTION Restore all disturbed grass and landscaped areas to conditions equal to or better than before the work began and to the satisfaction of

More information

Guide for Laying Your New Lawn

Guide for Laying Your New Lawn Guide for Laying Your New Lawn Laying cultivated turf will enable you to enjoy a fine lawn giving instant beautiful impact to your garden without the inconvenience, associated with seeding. To ensure that

More information

Earthwork Excavating, Backfilling, and Compaction for Utilities Irrigation System Landscaping.

Earthwork Excavating, Backfilling, and Compaction for Utilities Irrigation System Landscaping. SECTION 02935 SODDING PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02221 - Excavating, Backfilling, and Compaction for Utilities. 3. 02810 - Irrigation System. 4. 02900 - Landscaping.

More information

SECTION SOIL PREPARATION

SECTION SOIL PREPARATION SECTION 329113 SOIL PREPARATION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Components of planting mediums. 2. Testing and certification of components. 3. Mixing of planting mediums. 4. Transporting

More information

SECTION TOPSOIL AND SEEDING

SECTION TOPSOIL AND SEEDING SECTION 13400 TOPSOIL AND SEEDING DECEMBER 2015 TOPSOIL AND SEEDING Page 1 1 GENERAL... 2 DESCRIPTION... 2 RELATED SECTIONS... 2 JOB CONDITIONS... 2 INSPECTION... 2 2 PRODUCTS... 3 SEEDING PRODUCT DELIVERY,

More information

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TURF AND GRASSES

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TURF AND GRASSES 32 92 00 PART 1 - GENERAL 1.01 INTRODUCTION A. Preferred Methods for Installation of Turf: On the Pullman, Tri-Cities and Spokane campuses, sod is the preferred method of turf installation. On the Vancouver

More information

LAWN RENOVATION & OVERSEEDING

LAWN RENOVATION & OVERSEEDING LAWN RENOVATION & OVERSEEDING A healthy established lawn is able to out-compete many weeds and withstand a certain amount of pressure from disease and insect attack as well as drought. You can help maintain

More information

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION Please read through this instruction completely before beginning your installation. Be sure the proper equipment, and safety precautions are in

More information

ITEM 164 SEEDING AND EROSION CONTROL BLANKET

ITEM 164 SEEDING AND EROSION CONTROL BLANKET AFTER NOVEMBER 1, 2008 ITEM 164 SEEDING AND EROSION CONTROL BLANKET 164.1 Description. This Item shall govern for preparing the ground, sowing of seeds, application of a fertilizer, and stabilization with

More information

INSTALLATION TIPS. Site Preparation

INSTALLATION TIPS. Site Preparation INSTALLATION TIPS To calculate the amount of sod you need for a project you should first divide the project area into squares and rectangles. Measure length times width of those areas then add them together

More information

Lawn Solutions Australia. Simple specifications for turf installation

Lawn Solutions Australia. Simple specifications for turf installation Lawn Solutions Australia Simple specifications for turf installation Simple Specifications The following pages detail short and concise specification summaries to aid in the selection and specification

More information

EC-11 COMPOST. Greenville County Technical Specification for. 1.0 Compost. 1.1 Description

EC-11 COMPOST. Greenville County Technical Specification for. 1.0 Compost. 1.1 Description Greenville County Technical Specification for EC-11 COMPOST 1.0 Compost 1.1 Description This specification covers compost produced from various organic by-products, for use as an infill material for sediment

More information

SECTION LANDSCAPING

SECTION LANDSCAPING SECTION 02900 LANDSCAPING 1.01 General: The contractor shall be responsible for providing all labor, materials, tools, equipment, topsoil, fertilizer, lime and seed necessary for restoration and stabilization

More information

SECTION 605 PLANTING

SECTION 605 PLANTING SECTION 605 PLANTING I. GENERAL 1.1. DESCRIPTION OF WORK The Contractor shall furnish all labor, supervision, material (except as herein provided), tools, equipment, supplies, and services; and, shall

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS 32 92 23 (April 2006) -------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-02922 (May 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

SECTION LANDSCAPING

SECTION LANDSCAPING PART 1 -GENERAL 1.01 DESCRIPTION SECTION 32 9200 A. Furnish all labor, materials, and equipment required to complete all landscaping work indicated on the drawings and specified herein. This includes seeding,

More information

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation 1.0 Purpose These guidelines are for the use of all Campus landscaping. 2.0 General Requirements 1. Native trees and shrubs appropriate for this region are strongly preferred. The university has a do not

More information

Content. 1. Particular Preambles for Standard Method of Measurement. 2. Particular Specification for Soil Fiber System. 3.

Content. 1. Particular Preambles for Standard Method of Measurement. 2. Particular Specification for Soil Fiber System. 3. Content 1. Particular Preambles for Standard Method of Measurement 2. Particular Specification for Soil Fiber System 3. Section Detail 4. Job Reference and Photos Particular Preambles for Standard Method

More information

SOD INSTALLATION AND CARE GUIDE. Over 40 Years of QUALITY SOD & QUALITY SERVICE. Delivery, Installation & Pick-Up

SOD INSTALLATION AND CARE GUIDE. Over 40 Years of QUALITY SOD & QUALITY SERVICE. Delivery, Installation & Pick-Up SOD INSTALLATION AND CARE GUIDE Over 40 Years of QUALITY SOD & QUALITY SERVICE Delivery, Installation & Pick-Up WHAT TYPE OF SOD DO I NEED? Bermuda: Bermuda needs at least 8 hours of sun per day and can

More information

SOIL TEST NOTES. Applying Lime to Established Lawns

SOIL TEST NOTES. Applying Lime to Established Lawns ,.------ Virginia Cooperative Extension Service ----~ VIRGINl,t. TECH ANO VIRGINIA STATE VIRGINIA'S LAND GR,t.NT UNIVERSITIES SOIL TESTING LABORATORY Publication 452-238 Reprinted 1988 SOIL TEST NOTES

More information

SECTION PLANTING SOIL for SOIL CELLS. This specification defines material and performance requirements for soils which are to be used

SECTION PLANTING SOIL for SOIL CELLS. This specification defines material and performance requirements for soils which are to be used This specification defines material and performance requirements for soils which are to be used within the Silva Cell system. The SPECIFICATION EDITOR must select the type of soil appropriate to each particular

More information

THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE.

THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE. THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.2 THE COMPLETE 2011 EDITION MAY BE FOUND AT: HTTP://WWW.SEATTLE.GOV/UTIL/ENGINEERING/STANDARD_PLANS_&_SPECS/INDEX.ASP

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2006

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2006 SECTION 02900 - LANDSCAPING 1.1 SUMMARY A. Landscaping includes the layout, soil preparation, excavation for and planting of landscape materials, including trees, shrubs, ground covers, plants, and lawns,

More information

SECTION SEEDING. C. Seed mix to be used will be as specified in the Bid Schedule.

SECTION SEEDING. C. Seed mix to be used will be as specified in the Bid Schedule. SECTION 02710 - PART 1 - GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for preparing the ground and furnishing and applying

More information

SECTION SEEDING

SECTION SEEDING SECTION 32 92 19 SEEDING PART 1 GENERAL 1.01 DESCRIPTION A. The WORK under this section consists of the revegetation with seeded grasses. CONTRACTOR shall furnish all labor, materials, equipment, tools,

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 32 9200 TURF AND NATIVE/ADAPTIVE PLANTINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

ATTACHMENT A BIORETENTION SOIL SPECIFICATION

ATTACHMENT A BIORETENTION SOIL SPECIFICATION 1.00 BIORETENTION SOIL ATTACHMENT A BIORETENTION SOIL SPECIFICATION Bioretention soil shall achieve an initial infiltration rate of at least 8-inch per hour nor more than 20 inches per hour in situ and

More information

The following general requirements will be met for all planter box installations:

The following general requirements will be met for all planter box installations: Greenville County Technical Specification for: WQ-25 PLANTER BOX 1.0 Planter Box 1.1 Description Planter boxes are designed to capture and temporarily store stormwater runoff. Planter Boxes are intended

More information

Milpitas College Extension Milpitas Dry Landscape

Milpitas College Extension Milpitas Dry Landscape SAN JOSÉ / EVERGREEN COMMUNITY COLLEGE DISTRICT Milpitas College Extension Milpitas Dry Landscape PROJECT MANUAL VOLUME II TABLE OF CONTENTS DIVISION 02 through 30 Not Used DIVISION 31 - EARTHWORK Document

More information

Erosion Control for Home Builders in the. City of Jacksonville

Erosion Control for Home Builders in the. City of Jacksonville Erosion Control for Home Builders in the City of Jacksonville Eroding construction sites are a leading cause of water quality problems in Jacksonville. For every acre under construction, about a dump truck

More information

317)

317) NDS, Inc. (317) 317) 346-4110 www.drainagesolutionsinc.com April 2015 Product Guide Specification Specifier Notes: This product guide specification is written in Construction Specifications Institute (CSI)

More information

HOME & GARDEN INFORMATION CENTER

HOME & GARDEN INFORMATION CENTER http://www.clemson.edu/extension/hgic HGIC 1203 1-888-656-9988 HOME & GARDEN INFORMATION CENTER Lawn Establishment There are four aspects of turfgrass establishment: selecting a turfgrass that is adapted

More information

SECTION AMENDED TOPSOIL

SECTION AMENDED TOPSOIL SECTION 02486 AMENDED TOPSOIL PART 1 - GENERAL 1.01 SUMMARY A. Work described in this section includes requirements for soil amendments, soil preparation, preparation and finish grading of turf restoration

More information

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans. SECTION 7300 LANDSCAPING 7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans. 7302 QUALITY ASSURANCE. A. Qualifications of Personnel.

More information

This section covers the planting of seed, sod, trees and vegetation.

This section covers the planting of seed, sod, trees and vegetation. Tender 1, 2017 Page 1 of 5 1. INTENT This section covers the planting of seed, sod, trees and vegetation. 1.1 REFERENCES Agriculture and Agri-Food Canada; The Canadian System of Soil Classification, Third

More information

SECTION CONCRETE PAVING

SECTION CONCRETE PAVING SECTION 321313 - CONCRETE PAVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Curbs and gutters. 2. Concrete base for stone wallts. 1.2 ACTION SUBMITTALS A. Product Data: For each type of product

More information

Lawns. Handouts: Lawns and Irrigation Study Guide MontGuide Successful Lawns

Lawns. Handouts: Lawns and Irrigation Study Guide MontGuide Successful Lawns Lawns Handouts: Lawns and Irrigation Study Guide MontGuide Successful Lawns Functional Benefits of Turfgrass Soil erosion control Dust prevention Rainwater entrapment Solar heat dissipation Glare reduction

More information

SECTION STRUCTURAL SOIL

SECTION STRUCTURAL SOIL SECTION 329110 STRUCTURAL SOIL PART 1 - GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY A. This work shall consist of manufacturing and supplying a narrowly graded rock to support pavement without compression

More information

B. Finish Grade: Elevation of finished surface of planting soil.

B. Finish Grade: Elevation of finished surface of planting soil. SECTION 02930 - PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A.

More information

Guidelines for Installing Rolled Erosion Control Products in Slope, Channel and Shoreline Applications Laurie Honnigford

Guidelines for Installing Rolled Erosion Control Products in Slope, Channel and Shoreline Applications Laurie Honnigford Guidelines for Installing Rolled Erosion Control Products in Slope, Channel and Shoreline Applications Laurie Honnigford Soil erosion is evident in so many situations and the environmental impact can be

More information

Section 815. LANDSCAPING

Section 815. LANDSCAPING 815.01 Section 815. LANDSCAPING 815.01. Description. This work consists of providing and planting trees, shrubs, and other plants, including replacements, classified as nursery stock. The Engineer may

More information

Section 816. TURF ESTABLISHMENT

Section 816. TURF ESTABLISHMENT 816.01 Section 816. TURF ESTABLISHMENT 816.01. Description. This work consists of conducting soil tests, preparing the soil, and placing sod or seed and mulch to permanently stabilize disturbed areas as

More information

2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88.

2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88. 1. EXISTING CONDITIONS AND UTILITY INFORMATION SHOWN ON THESE PLANS ARE BASED ON A SET OF PLANS ENTITLED "SCHOOL OF COMMUNICATIONS AND MEDIA BUILDING AND LIFE HALL RENOVATION" DATED MARCH 11, 2015 REVISED

More information

fertilization: environmental impact

fertilization: environmental impact L-5510 11-09 Lawn fertilization: environmental impact Marty Vahlenkamp, J. A. McAfee, Justin Mechell, Bruce Lesikar* A s more land is developed for new housing and businesses, water pollution is becoming

More information

2-B-18-UR. Revised: 3/27/2018

2-B-18-UR. Revised: 3/27/2018 Revised: 3/27/2018 Revised: 3/27/2018 GI FOR KIDS A MEDICAL OFFICE BLDG. 0000 BOARDWALK BLVD. KNOXVILLE, TENNESSEE CONSTRUCTION PRELIMINARY - NOT FOR Landscape Plan Target Publix Town Center Boulevard

More information

A Section Subgrade Preparation. A Work shall be in conformance with MoDOT through

A Section Subgrade Preparation. A Work shall be in conformance with MoDOT through 1.1 SECTION INCLUDES A Section includes placing an aggregate base course consisting of a uniform mixture of graded materials on a prepared subgrade. The drawings specify the type of aggregate. B. Drawings

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2009

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2009 SECTION 02900 - LANDSCAPING 1.1 SUMMARY A. Landscaping includes the layout, soil preparation, excavation for and planting of landscape materials, including trees, shrubs, ground covers, plants, and lawns,

More information

Toronto District School Board Church Street Junior Public School

Toronto District School Board Church Street Junior Public School Playing Field Turfgrass Assessment and Recommendations Toronto District School Board Church Street Junior Public School Tuesday, November 24, 2015 David Smith, P.Ag. Rob Witherspoon, M.Sc. 550 Musquash

More information

TOPICS TO COVER. Turfgrass Types Seeding Fertilizer Lawn Care Lawn Pests & Problems

TOPICS TO COVER. Turfgrass Types Seeding Fertilizer Lawn Care Lawn Pests & Problems LAWN CARE TOPICS TO COVER Turfgrass Types Seeding Fertilizer Lawn Care Lawn Pests & Problems TURFGRASS TYPES Kentucky Bluegrass Ryegrass Fine Fescue Tall Fescue Most northern lawns are a combination of

More information

Section Lawn & Grasses Pearl s Premium DRAFT. Pearl s Premium Lawn Grasses are the only acceptable seed / sod choice for this specification.

Section Lawn & Grasses Pearl s Premium DRAFT. Pearl s Premium Lawn Grasses are the only acceptable seed / sod choice for this specification. Section 02930 DRAFT Pearl s Premium Lawn Grasses are the only acceptable seed / sod choice for this specification. No substitutes are permitted. Part 1 General 1.1 Summary (Non-inclusive) A. Section Includes:

More information

SECTION LANDSCAPE

SECTION LANDSCAPE 1 SECTION 02900 LANDSCAPE PART 1 GENERAL 1.1 Summary A. This section contains requirements relating to lawns, trees, shrubs, flowering plants and ground covers including site preparation, material installation

More information

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS 808.1 Description. This work shall consist of furnishing and planting material in the locations designated on the plans or established by the engineer.

More information

Public Notice. REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material. June 22, ADDENDUM NO.

Public Notice. REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material. June 22, ADDENDUM NO. Public Notice REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material June 22, 2018 ADDENDUM NO.: One (1) TO ALL PROSPECTIVE BIDDERS: PLEASE BE ADVISED OF THE FOLLOWING

More information

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following: SECTION 320190.13 LANDSCAPE MAINTENANCE FOR 90 DAYS PART 1 - GENERAL 1.1 SUMMARY A. Section includes requirements for 90 day landscape maintenance for the following: 1. Watering trees and grass. 2. Monitoring

More information

EXTERIOR PLANTS

EXTERIOR PLANTS c. Fertilize immediately prior to sodding or immediately after the sodding operation at a rate of.5 pounds of nitrogen per 1000 square feet. d. Work is to be done at typically accepted sodding times in

More information

Rolled Erosion Control Products (RECPs) General Usage and Installation Guidelines for Slope

Rolled Erosion Control Products (RECPs) General Usage and Installation Guidelines for Slope March 2014 Version 1.0 Rolled Erosion Control Products (RECPs) General Usage and Installation Guidelines for Slope Erosion Control Technology Council IMPORTANT NOTICE on Safety Procedures: Manufacturer

More information

NEW GARDEN MAINTENANCE GUIDE. Enjoy a luscious garden with our simple month-by-month garden TLC guide

NEW GARDEN MAINTENANCE GUIDE. Enjoy a luscious garden with our simple month-by-month garden TLC guide NEW GARDEN MAINTENANCE GUIDE Enjoy a luscious garden with our simple month-by-month garden TLC guide JANUARY When weather conditions are suitable, ensure that the soil is well aerated by spiking it regularly

More information

LAWN. (fane utd 'TfCacHtciuutce. Extension Circular 657 May Federal Cooperative Extension Service Oregon State College Corvallis

LAWN. (fane utd 'TfCacHtciuutce. Extension Circular 657 May Federal Cooperative Extension Service Oregon State College Corvallis LAWN (fane utd 'TfCacHtciuutce Federal Cooperative Extension Service Oregon State College Corvallis Extension Circular 657 May 1959 LAWN (Zone cutcc TtCcUHteHOHce Correct fertilizing, mowing, and watering

More information

Lawn Establishment. Introduction. Preparing the site. Planning the new lawn

Lawn Establishment. Introduction. Preparing the site. Planning the new lawn Establishing a new lawn begins with careful planning, knowledge of soil conditions, and an understanding of the environmental and cultural requirements of turfgrasses. Figure 1. Using a measuring wheel

More information

EnkaTech Note. Installation Guide for Enkamat Slopes and Channels. Site Preparation. Anchor Trench. Enkamat Installation

EnkaTech Note. Installation Guide for Enkamat Slopes and Channels. Site Preparation. Anchor Trench. Enkamat Installation EnkaTech Note Installation Guide for Enkamat Slopes and Channels Site Preparation For both slope and channel applications, the site must be shaped to the design specifications (grade, geometry, soil compaction,

More information

Lawns. Alec Kowalewski Turfgrass Specialist Oregon State University

Lawns. Alec Kowalewski Turfgrass Specialist Oregon State University Lawns Alec Kowalewski Turfgrass Specialist Oregon State University alec.kowalewski@oregonstate.edu Background Master of Science (2003 to 2006) Crop and Soil Science Turfgrass Management Leaf litter disposal

More information

C. Sod Procurement: Comply with white fringed beetle and fire ants quarantine requirements.

C. Sod Procurement: Comply with white fringed beetle and fire ants quarantine requirements. SECTION 329300 - PLANTS 1.1 QUALITY ASSURANCE A. Installer's Personnel Certifications: Certified Landscape Technician, CLT-Exterior. Provide at least 1 person who shall be present at all times during execution

More information

Appendix C. Soil Amendments. Appendix C. C.1 General Description. C.2 Physical Feasibility & Design Applications

Appendix C. Soil Amendments. Appendix C. C.1 General Description. C.2 Physical Feasibility & Design Applications Soil Amendments C.1 General Description C.2 Physical Feasibility & Design Applications C.3 Design Criteria C.3.1 Soil Testing C.3.2 Determining Depth of Compost Incorporation C.3.3 Compost Specifications

More information

Virginia Nutrient Management Standards and Criteria Revised July 2014

Virginia Nutrient Management Standards and Criteria Revised July 2014 Commonwealth of Virginia Virginia Nutrient Management Standards and Criteria Revised July 2014 Department of Conservation and Recreation Division of Soil and Water Conservation 600 East Main Street, 4

More information

Recycle Florida Today. FDOT Use Of Compost Today And Future

Recycle Florida Today. FDOT Use Of Compost Today And Future Recycle Florida Today FDOT Use Of Compost Today And Future Current Use - Roadside Turf and Landscaping Current Use - Roadside Turf and Landscaping FDOT Approaches Construction Contracts Embedded in road/bridge

More information

Chapter 4 - Lawn establishment

Chapter 4 - Lawn establishment Chapter 4 - Lawn establishment Careful preparation of any site is required when a lawn is to be laid by turf or by seed. Although final seedbed preparation for sowing grass with seed is more critical than

More information

What You Need to Know About Home Lawn Fertilizers

What You Need to Know About Home Lawn Fertilizers What You Need to Know About Home Lawn Fertilizers Another Report on Effective Turf Maintenance from the Lawn Institute A well-planned, reasonable fertility program is a basic part of proper lawn maintenance.

More information

SECTION 02230BP AGGREGATE BASE

SECTION 02230BP AGGREGATE BASE SECTION 02230BP AGGREGATE BASE This page is intentionally left blank. Fluor-B&W Portsmouth, LLC (FBP) SITE PREPARATION INFRASTRUCTURE PHASE 1 SPECIFICATION COVER SHEET Client: U.S. Department of Energy

More information

A. Finish Grade: Elevation of finished surface of planting soil.

A. Finish Grade: Elevation of finished surface of planting soil. SECTION 329200 - TURF AND GRASSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

How Lawns Grow- Growing Your Lawn and Not the Bay! Chuck Schuster Extension Educator University of Maryland Extension

How Lawns Grow- Growing Your Lawn and Not the Bay! Chuck Schuster Extension Educator University of Maryland Extension How Lawns Grow- Growing Your Lawn and Not the Bay! Chuck Schuster Extension Educator University of Maryland Extension 301-590-2807 cfs@umd.edu You Are The Experts! Nothing has changed in the last 50 years

More information

1. Which of the five checklists in the Municipal Construction Stormwater Site Inspection Toolkit will you use to document this inspection?

1. Which of the five checklists in the Municipal Construction Stormwater Site Inspection Toolkit will you use to document this inspection? GROUP ACTIVITY 2 Municipal Construction Stormwater Site Inspection Toolkit Overview You are a municipal stormwater inspector (Inspector) heading out to inspect a building development site where construction

More information

Section Specification for Geotextile Used in Permanent Erosion Control Application

Section Specification for Geotextile Used in Permanent Erosion Control Application Project Name: Project Number: 1 GENERAL Section 02370 Specification for Geotextile Used in Permanent Erosion Control Application 1.1 SECTION INCLUDES A. Geotextile to prevent soil loss resulting in excessive

More information

DIVISION II PLANTING SECTION 02950

DIVISION II PLANTING SECTION 02950 Subdivision Requirements Manual Page 1 of 9 PART I - GENERAL 1.1 Related Work.1 Topsoil and Finish Grade : Section 02212.2 Seeding : Section 02933.3 Hydraulic Seeding : Section 02934.4 Sodding : Section

More information

Section 917. TURF AND LANDSCAPING MATERIALS

Section 917. TURF AND LANDSCAPING MATERIALS 917.01 Section 917. TURF AND LANDSCAPING MATERIALS 917.01. General Requirements. Nursery stock, seed, sod, mulching material, and chemical fertilizer nutrients must meet the requirements of this section.

More information

2.1.4 Roof Downspout Rain Gardens

2.1.4 Roof Downspout Rain Gardens 2008 SWMM, 2010 Revision City of Tacoma 2.1.4 Roof Downspout Rain Gardens Purpose and Definition Bioretention areas are shallow stormwater retention facilities designed to mimic forested systems by controlling

More information

GEOMEMBRANE FIELD INSTALLATION

GEOMEMBRANE FIELD INSTALLATION GEOMEMBRANE FIELD INSTALLATION CONTENTS Introduction Quality Control and Quality Assurance Types of lining systems Basic Lining Design Executive Lining Design Basic Lining Design Specification Executive

More information

Addendum No. 2 for Drainage Improvements For Nueces River Fishing Area

Addendum No. 2 for Drainage Improvements For Nueces River Fishing Area Project No. 15-015K September 20, 2016 TO ALL POTENTIAL BIDDERS Subject: Addendum No. 2 for Drainage Improvements For Nueces River Fishing Area Ladies/Gentlemen: This addendum is considered part of the

More information

Town of Essex Small Site Erosion Control Guide

Town of Essex Small Site Erosion Control Guide Town of Essex Small Site Erosion Control Guide Why do we need to protect against erosion? Water Quality: Erosion and the transport of sediment and pollutants impacts the water quality of nearby streams

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-02 66 00 (February 2010) ----------------------------- Preparing Activity: USACE Superseding UFGS-02 66 00 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

LANDSCAPE WORK

LANDSCAPE WORK SECTION 329000 - LANDSCAPE WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections