1 Van Buren Bridge Project IFB # VBB GENERAL TREE & LANDSCAPE PROVISIONS CONSTRUCTION SPECIFICATIONS PROJECTS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS DEPARTMENT OF PUBLIC WORKS CITY OF FALLS CHURCH November 2015

2 TREE & LANDSCAPE SPECIFICATIONS CITY OF FALLS CHURCH DEPARTMENT OF PUBLIC WORKS A. GENERAL STANDARDS & SPECIFICATIONS... 3 B. CITY ARBORIST... 3 C. PROTECTION Description Prior to Construction Plant Protection Area (PPA) Work Within the PPA At Completion of Project Damage to Preserved Vegetation... 5 D. TREE & STUMP REMOVAL Description Materials Procedures Damage to Preserved Vegetation... 7 E. PLANTING SPECIFICATIONS Description General Workmanship Plant Materials Other Materials Planting Schedule Seeding and Sodding Prior to Planting Planting Procedure Prior to Acceptance Warranty of Plant Material Tree & Landscape Specifications Page 2 of 10

3 TREE & LANDSCAPE SPECIFICATIONS CITY OF FALLS CHURCH DEPARTMENT OF PUBLIC WORKS A. GENERAL STANDARDS & SPECIFICATIONS All tree and landscape-related work shall be performed in full compliance with the following documents, read together as a single specification: ANSI A300, Tree Care Operations ANSI Z133, Standards for Safety in Tree Care Operations ANSI Z60, Standards for Nursery Stock VDOT Road & Bridge Specifications, most current edition, Sections: o (a through h) Materials o 602 Topsoil o 603 Seeding o 604 Sodding The aforementioned documents, as amended by issuing entities, are hereby incorporated into this contract by reference. B. CITY ARBORIST The City Arborist shall be notified a minimum of three days in advance of commencing any form of tree or planting work: or arborist@fallschurchva.gov. Per the City s Department of Public Works (DPW) General Provisions for Construction Projects, the City Arborist has the authority to direct and inspect all work and materials used for any landscape planting, tree protection or tree removal, as well as the authority to require additional tree protection measures and mitigation work. C. PROTECTION 1. Description Existing vegetation, where shown in the construction plans or designated by the City Project Manager, shall be saved and protected throughout construction and through the life of the Contract. Tree Preservation shall consist of any and all measures specified in construction plans to help existing trees survive during construction. These measures may include (but are not limited to): watering, mulching, pruning, fertilizing, control of pests or invasive plants, root padding, root pruning and installation of protective fencing. 2. Prior to Construction All required tree work must be completed and tree preservation measures installed before any vehicle or construction equipment may enter the site. The Contractor s construction foreman, the Contractor s arborist and the City Arborist shall meet to mark the location of the limits of disturbance, tree preservation fencing and root pruning line (where required), erosion control measures, access routes, and areas for storage, concrete washout and parking. All tree preservation measures, invasive plant control and tree removal are to be discussed at this time. Tree & Landscape Specifications Page 3 of 10

4 3. Plant Protection Area (PPA) Tree & Landscape Specifications Page 4 of 10 IFB # VBB A. No construction equipment may enter the Plant Protection Area (PPA), before or after the PPA is marked, except under a temporary access plan approved by the City Arborist. B. Plant protection fencing shall be six-foot high chain link fence with 11-gauge mesh. Supports shall be 1 5/8 inch outside-diameter pipes, set at least 2 feet into the ground, no more than 8 feet apart. Temporary fencing set in concrete blocks shall not be used unless absolutely necessary; block locations must be marked on the ground with stakes and paint. C. Weatherproof signs at least 8.5 x 11 saying PLANT PROTECTION AREA: No Entry, No Materials or equivalent language, shall be placed a maximum of 20 feet apart on the plant protection fencing. D. No vehicles or materials or debris of any kind, nor concrete washouts nor rinse water from any substance shall be allowed inside the Plant Protection Area. No burning shall be allowed on site. E. All erosion and sediment control measures shall be installed outside of the PPA. Devices such as silt fencing, debris basins, and water diversion structures shall be installed to prevent siltation and/or erosion from affecting the PPA. F. All underground utilities and drain or irrigation lines shall be routed outside the PPA. If alternative routes are not possible, lines shall be tunneled or bored under the PPA with the approval of the City Arborist. G. The Contractor shall maintain the plant protection fencing in place at all times throughout construction. The City Arborist must grant approval before any plant protection fencing may be removed, even temporarily. 4. Work Within the PPA A. Irrigation for preserved vegetation shall be supplied by the Contractor from early spring until the ground freezes in the fall when natural rainfall is less than 1 inch per week. Irrigation must be designed to deliver a minimum of 1 inch of water at a time. B. All materials to be removed from within the PPA, including trees, brush, debris, pavement, structures or underground features, shall be performed by hand or using equipment operated from outside the PPA. Materials must be lifted out, not skidded across the ground. The City Arborist shall be present during all such operations within the TPA to monitor demolition activity. C. Selective tree removal within the PPA will be allowed only under the direction of the City Arborist. The work must be performed by an experienced tree service contractor, not construction workers. Trees to be removed shall be felled in such a way that damage to preserved trees is avoided or minimized. D. All tree work contractors are required to have a City of Falls Church annual Tree Contractor license; the most recent list of licensed Tree Contractors is posted on the City s website. E. Root pruning, where required, shall be performed outside the PPA by cutting all roots cleanly to a depth of at least 24 inches. Roots shall be cut using a vibrating knife or narrow mechanical trencher with sharp blades, or by manually digging a trench and cutting exposed roots with a saw. Once a trench is opened up, approximately 4 wide,

5 all exposed roots shall be hand pruned to make clean-cut ends. Pruned roots shall be promptly covered with moist soil. F. All pruning on preserved trees must be performed to ANSI A300 and Z133 standards by an arborist certified by the International Society of Arboriculture (ISA), and in accordance with the construction plans and the direction of the City Arborist. Construction workers shall not be allowed to prune trees. G. If the City Arborist approves temporary access over the root area of trees to be retained, a roadbed of at least 15 inches of wood chips or crushed rock shall be created and replenished as necessary by the Contractor to protect the soil from compaction. H. When the roots of trees designated to be saved are exposed by the Contractor s operation, they shall be wrapped with heavy, moist material, such as burlap or canvas, for protection and to prevent excessive drying. The material shall be kept moist and securely fastened until the roots are covered to finish grade. All material and fasteners shall be removed from the roots before covering. I. Fertilizers shall not be applied unless specified in the construction plan or soil tests indicate the need, and shall be applied at the rate indicated by the soil test. Fertilizer products shall be in slow-release granular form, uniform in composition, free flowing, and delivered to the project in original containers with manufacturer labels attached. J. Pesticides shall not be applied unless specified in the construction plan or by the City Arborist. All pesticides shall be registered with the Virginia Department of Agriculture and Consumer Services; copies of the MSDS for each product shall be supplied to the City. All materials and applications shall be in accordance with all Commonwealth of Virginia pesticide laws and regulations and be approved by the City Arborist before application. All pesticide applications must be performed by an individual with a valid Virginia Commercial Pesticide Applicator License. K. Mulch shall consist of double shredded hardwood, shredded hardwood bark, or arborist wood chips from tree removal and pruning operations only (no tub-grinder chips or hog fuel). Mulch shall be placed where specified on the construction plan, no less than 3 inches and no more than 4 inches deep, and shall be kept 4 inches away from tree trunks. L. Wood chips from on-site tree work operations may be spread in vegetated areas of the site if approved by the City Arborist, to a depth of no more than 4 inches, with no chips against tree trunks. 5. At Completion of Project At the completion of construction (and all equipment has been removed from site), notify the City Arborist for an inspection before removing the plant protection fencing. At this time, all trees will be inspected and any repairs needed will be stipulated by the City and promptly made by the Contractor. 6. Damage to Preserved Vegetation Refer also to Job Site Damages, in the City of Falls Church s Contract General Provisions. A. If damage occurs to any preserved tree during construction, it shall be reported to the City Arborist as soon as possible so that prompt remedial action can be taken. Such repairs, and the replacement in kind of those trees that cannot be satisfactorily repaired, shall be performed at the Contractor s expense. Tree & Landscape Specifications Page 5 of 10

6 B. If due to, or for any reason related to the Contractor s operation, any tree, shrub, ground cover or herbaceous vegetation designated to be saved is destroyed, disfigured, or damaged to the extent that continued life is questionable as determined by the City Arborist, it shall be removed by the Contractor at the direction of the City Arborist. The Contractor will be assessed damages equal to the value of the vegetation as determined in the Guide for Plant Appraisal, Current Edition, published by the International Society of Arboriculture, plus the estimated cost of restoration with a similar species. C. Damage which may require replacement of vegetation includes torn or broken bark, stripping, broken branches, exposed root systems, cut root systems, poisoned root systems, compaction of surface soil and roots, puncture wounds, drastic reduction of surface roots or leaf canopy, changes in grade greater than 6 inches, or any other changes to the site that may jeopardize the survival or health of the vegetation to be preserved. D. Any damage so assessed will be deducted from the monies due or that may become due the Contractor. D. TREE & STUMP REMOVAL 1. Description This work shall consist of the selective removal and disposal of trees, stumps and woody debris on construction projects. Stumps to remain shall be treated with an approved herbicide to prevent sprouting. 2. Materials Herbicides used shall be registered with the Virginia Department of Agriculture and Consumer Services; copies of the MSDS for each product shall be supplied to the City. All materials and applications shall be in accordance with all Commonwealth of Virginia pesticide laws and regulations and be approved by the City Arborist before application. All pesticide applications must be performed by an individual with a valid Virginia Commercial Pesticide Applicator License. 3. Procedures A. Trees to be removed shall be clearly marked and approved by the City Arborist prior to demolition or entry of any equipment on site. B. The Contractor s tree removal operations shall not damage trees and shrubs that are to remain (including off-site trees). If roots are entwined, the City Arborist may require root pruning before commencing tree removal. Tree removal within 50 feet of a tree to remain must be performed by an experienced tree service contractor, not construction workers. C. All tree work contractors are required to have a City of Falls Church annual Tree Contractor license; the most recent list of licensed Tree Contractors is posted on the City s website. D. Stumps and any visible surface roots shall be ground to a depth of at least 18 inches. Stump chips shall be hauled away and the resulting depression filled with Class A or B Topsoil conforming to VDOT (b), compacted to match the surrounding soil. Tree & Landscape Specifications Page 6 of 10

7 Tree & Landscape Specifications Page 7 of 10 IFB # VBB E. Where the construction plan calls out stumps to remain, they shall be cut not higher than 4 inches above the ground unless otherwise specified on the plan. Stumps of living trees and shrubs shall be coated with a herbicide solution within 48 hours after they are cut. The exposed surface of stumps and exposed live roots shall be saturated with herbicide to the point of runoff. F. Woody plant debris shall be disposed of by either hauling from the site or chipping. Wood greater than 6 inches in diameter shall be disposed of as saw logs, pulpwood, firewood or other usable material. Chips may be spread in vegetated areas of the site if approved by the City Arborist, to a depth of no more than 4 inches, with no chips against tree trunks. 4. Damage to Preserved Vegetation A. Any damage to remaining trees due to tree removal activities shall be reported to the City Arborist as soon as possible so that prompt remedial action can be taken. B. If due to, or for any reason related to the Contractor s operation, any tree, shrub, ground cover or herbaceous vegetation designated to be saved is destroyed, disfigured, or damaged to the extent that continued life is questionable as determined by the City Arborist, it shall be removed by the Contractor at the direction of the City Arborist. The Contractor will be assessed damages equal to the value of the vegetation as determined in the Guide for Plant Appraisal, Current Edition, published by the International Society of Arboriculture, plus the estimated cost of restoration with a similar species. C. Damage which may require replacement of vegetation includes torn or broken bark, stripping, broken branches, exposed root systems, cut root systems, poisoned root systems, compaction of surface soil and roots, puncture wounds, drastic reduction of surface roots or leaf canopy, changes in grade greater than 6 inches, or any other changes to the site that may jeopardize the survival or health of the vegetation to be preserved. D. Any damage so assessed will be deducted from the monies due or that may become due the Contractor. E. PLANTING SPECIFICATIONS 1. Description This work shall consist of furnishing and installing plant material as indicated on the construction plans, including all labor, materials, plants, equipment, incidentals, and cleanup. 2. General Workmanship A. During installation of trees and shrubs, all work areas shall be kept neat, clean and free of all trash and debris, and all reasonable precautions shall be taken to avoid damage to existing plants, turf, structures, and private property. B. The Contractor shall be responsible for removal and disposal off-site of all trash, excess backfill and any materials incidental to the project. 3. Plant Materials A. The Contractor shall acquire plant materials from certified nurseries that have been inspected by state and/or federal agencies.

8 B. All plant materials shall conform to the American Standard for Nursery Stock, ANSI Z60 latest edition, published by American Hort. Pay particular note to the fact that all trees must have their root crowns visible at or near the soil surface, and that circling roots are not acceptable. Plants that do not meet all elements of ANSI Z60 will be rejected. C. All plant materials shall bear nursery tags indicating the genus, species and if applicable, cultivar or variety. The Contractor shall remove all tags after the City Arborist has inspected and approved the plant material. D. The Contractor and her/his suppliers shall keep all plant materials damp and protected from damage, sun, wind and temperature extremes during transport. Plants shall be handled by their root balls or containers only. E. All plant materials must pass inspection by the City Arborist prior to planting. The Contractor shall phone at least three days prior to installation to schedule inspections. F. Substitutions in plant material or sizes specified will not be accepted unless approved by the City Arborist prior to delivery. 4. Other Materials A. Unless otherwise specified, imported topsoil shall meet the specifications of VDOT Road & Bridge Specifications Section (b). B. Fertilizers, if required, shall be formulated to supply required elements as indicated by soil testing. Fertilizer products shall be in slow-release granular form, uniform in composition, free flowing, and delivered to the project in original containers with manufacturer labels attached. C. Unless otherwise specified in the construction plans, compost shall consist of decomposed vegetable matter which has been composted to support bacterial cultures. Such compost shall not contain live plant seeds or plant disease organisms. D. Unless otherwise specified in the construction plans, mulch shall consist of double shredded hardwood, shredded hardwood bark, or arborist wood chips from tree removal and pruning operations only (no tub-grinder chips or hog fuel). Mulch shall be placed as specified on the construction plan, no less than 3 inches and no more than 4 inches deep, and shall be kept 4 inches away from tree trunks. 5. Planting Schedule A. The Contractor shall not begin soil or planting work until all construction is finished and all irrigation work is complete and approved. B. Planting operations shall be performed during periods within the planting season when weather and soil conditions are suitable and in accordance with accepted local practice. The Contractor shall not install plants in soil that is muddy or frozen. C. Planting season dates: 1. Deciduous Trees March 1 to May 30 or September 1 to December Evergreen Trees March 1 to May 15 or September 1 to November Other Plants: March 1 to December 15. Tree & Landscape Specifications Page 8 of 10

9 D. Plant material shall be planted on the day of delivery if/when practical. In the event that this is not possible, the Contractor shall keep plants damp and protect them from damage, sun, wind and temperature extremes until they are planted. Any plants not installed within three days after delivery shall be rejected, unless the City Arborist and Contractor provide otherwise by written agreement. 6. Seeding and Sodding A. Seeding shall follow VDOT Road & Bridge Specifications, Section 603. B. Sodding shall follow VDOT Road & Bridge Specifications, Section Prior to Planting A. Soil shall be prepared, and topsoil applied if specified in the construction plans, following VDOT Road & Bridge Specifications, Section (b & c). B. If soils are compacted in a planting area, the Contractor shall spread six inches of compost over the area and till to a depth of eighteen inches. The Contractor shall not add sand, and shall not till within a tree preservation area. C. The Contractor shall have the soil fertility tested at an accredited laboratory and submit the results to the City Arborist prior to installing plant material. Only if needed, the Contractor shall supply and apply fertilizer at the rate indicated by the soil test. D. If the soil drains at a rate less than one inch per hour, the Contractor shall install drainage to carry water away from bottom of the planting hole, or move or raise the planting site (berm construction). E. The Contractor shall verify existing conditions and utility locations before digging planting holes or planting beds. The City of Falls Church may require the Contractor to stake the locations of individual plants within the approved planting areas. F. The City Arborist must approve plant material location adjustments from the construction plans prior to planting. 8. Planting Procedure A. Remove any excess soil from the top of the soil ball so that the top of the root flare is exposed and the top of the ball is as level as possible. B. Dig tree and shrub planting holes a minimum of two and a half times the width of the root ball and no deeper than the height of the root ball. C. Remove all ropes, ties and tags from trees and shrubs to prevent girdling branches and trunks. D. Plant trees and shrubs at the height of the surrounding grade. Root flares must be visible at or barely above the final soil surface. E. Pruning at the time of planting shall be done only to remove dead or damaged branches or co-dominant leaders. F. Balled and burlapped plants: Remove pinning nails and rope lacing, remove the top 12 of the wire basket, then cut away the wrapping. G. Container plants: Remove the container completely. Using a sharp tool, cut the outer 1 inch off from the entire root/soil ball to remove any small circling roots. Tree & Landscape Specifications Page 9 of 10

10 H. Backfill planting holes with soil only. Do not add fertilizer or organic matter such as peat moss into the backfill. Do not add gravel or sand. When half of the soil has been returned to the planting hole, use water to settle soil and eliminate air pockets. Water again after the remaining soil has been placed. I. Form a three-inch rim of soil around the planting holes for individual trees in turf areas, to hold water and mulch. J. Plant perennials at the same depth they were in the containers. For bare root perennials, plant with the soil even with the top of the root crown. Dig the hole wide enough to allow the roots to spread out in the soil. Push the soil back into the hole over the roots and use water to settle the soil. K. Stake trees only where requested by the City Arborist, in areas of high traffic or highly windy locations. Unless otherwise specified, pound three six-foot stakes at least two feet into the ground outside the root ball. Use plastic chain lock tie or fabric straps that won t damage the bark, and allow trees 2-3 inches of flex. Place the ties at 1/3 of the tree s height. Remove all staking material after one year. L. Use tree wrap only if specified by the City Arborist. In these instances use white wrap, attaching without the use of wire, rope or ties, and remove after one year. M. The Contractor shall supply and place mulch as specified on the construction plan. For trees and shrubs, place mulch no less than 3 inches and no more than 4 inches deep, and keep it 4 inches away from tree trunks. For perennials, place mulch no more than 2 inches deep. 9. Prior to Acceptance Upon the completion of all planting work and before final acceptance, the Contractor shall remove all material, equipment and debris resulting from his work. All paved areas shall be broom cleaned and the site left in a neat and acceptable condition as approved by the City Arborist. 10. Warranty of Plant Material A. The Contractor shall warranty (guarantee) all plant material to be in vigorous growing condition at planting, and shall guarantee plant growth for at least one year from the date of final acceptance of the planting. If any plants die or fail to flourish within that year, replacements shall be made at the beginning of the first succeeding planting season. B. During the Warranty Period, the Contractor shall maintain all plantings as required for healthy growth. This work shall include watering when natural rainfall is less than 1 inch per week; controlling weed growth; mowing turf areas; restoring planting saucers and mulch; repairing stakes and guy supports; resetting plants to proper grades or vertical position as required; and pest control as required to keep plants healthy. Tree & Landscape Specifications Page 10 of 10

DIVISION II PLANTING SECTION 02950

DIVISION II PLANTING SECTION 02950 Subdivision Requirements Manual Page 1 of 9 PART I - GENERAL 1.1 Related Work.1 Topsoil and Finish Grade : Section 02212.2 Seeding : Section 02933.3 Hydraulic Seeding : Section 02934.4 Sodding : Section

More information

EXTERIOR PLANTS

EXTERIOR PLANTS c. Fertilize immediately prior to sodding or immediately after the sodding operation at a rate of.5 pounds of nitrogen per 1000 square feet. d. Work is to be done at typically accepted sodding times in

More information

Section 815. LANDSCAPING

Section 815. LANDSCAPING 815.01 Section 815. LANDSCAPING 815.01. Description. This work consists of providing and planting trees, shrubs, and other plants, including replacements, classified as nursery stock. The Engineer may

More information

SECTION LANDSCAPE

SECTION LANDSCAPE 1 SECTION 02900 LANDSCAPE PART 1 GENERAL 1.1 Summary A. This section contains requirements relating to lawns, trees, shrubs, flowering plants and ground covers including site preparation, material installation

More information

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation 1.0 Purpose These guidelines are for the use of all Campus landscaping. 2.0 General Requirements 1. Native trees and shrubs appropriate for this region are strongly preferred. The university has a do not

More information

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS 808.1 Description. This work shall consist of furnishing and planting material in the locations designated on the plans or established by the engineer.

More information

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES PART 1 DESIGN DIRECTIVES 1.1 GENERAL SECTION 02951 PLANTING DETAILS A. This section consists of AutoCad drawings depicting typical landscape details governing the installation of plant materials on the

More information

A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work.

A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work. SECTION 02910 TREE RELOCATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work. B. Related Section: 1. 02900 - Landscaping.

More information

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 329000 PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 01 Specification Sections, apply

More information

PLANT MATERIAL AND PLANTING. C. Maintaining and replacing plants for completed planting work.

PLANT MATERIAL AND PLANTING. C. Maintaining and replacing plants for completed planting work. PART 1 - GENERAL PLANT MATERIAL AND PLANTING 1.01 SECTION INCLUDES A. Plant Material and Planting B. Tree Drainage Wells C. Warranty for Plant Material 1.02 DESCRIPTION OF WORK A. Furnishing and installing

More information

SECTION 605 PLANTING

SECTION 605 PLANTING SECTION 605 PLANTING I. GENERAL 1.1. DESCRIPTION OF WORK The Contractor shall furnish all labor, supervision, material (except as herein provided), tools, equipment, supplies, and services; and, shall

More information

A. Contractor shall provide product data for each type of product indicated.

A. Contractor shall provide product data for each type of product indicated. 31 13 00 SELECTIVE TREE AND SHRUB REMOVAL AND TRIMMING SECTION 1 GENERAL 1.1 SUMMARY A. This section includes general protection and pruning of existing trees and plants that are affected by execution

More information

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING 40.01 SCOPE: The contractor shall furnish all labor, materials, equipment, and supplies; and shall perform all work necessary for the installation of

More information

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents. SECTION 32 9300 PLANTS PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents. B. Related Sections: 1. Section 32 9001:

More information

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans. SECTION 7300 LANDSCAPING 7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans. 7302 QUALITY ASSURANCE. A. Qualifications of Personnel.

More information

A. Surface parking areas shall be constructed of bituminous paving.

A. Surface parking areas shall be constructed of bituminous paving. September 2008 32 12 16 Asphalt Paving 1.0 General A. Surface parking areas shall be constructed of bituminous paving. 2.0 Products A. Aggregate Base Course conform to IDOT Std. Spec. Sect. 1000, ref.

More information

Section 9 Landscaping and Street Trees

Section 9 Landscaping and Street Trees Section 9 Landscaping and Street Trees GENERAL REQUIREMENTS...9-1 I. MATERIALS...9-1 9.1 GRASS...9-1 9.2 STREET TREES...9-1 A. General...9-1 B. Species...9-2 C. Design Standards...9-2 9.3 LANDSCAPING...9-3

More information

SECTION TREE TRANSPLANTING

SECTION TREE TRANSPLANTING SECTION 329643 TREE TRANSPLANTING PART 1 - GENERAL 1.1 SUMMARY A. Section includes requirements for transplanting trees. 1.2 SUBMITTALS A. Product Data: For each type of product indicated. B. Qualifications:

More information

Planting Containerized Trees

Planting Containerized Trees Planting Containerized Trees Dig a hole Dig a hole 3 to 4 times wider than the container and only as deep as the existing root ball. The hole should have sloping sides like a saucer to allow for proper

More information

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer.

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer. Authorised by : Parks & Gardens Manager Section 5 Page 1 of 6 SECTION 5: STREET TREE PLANTING 1.0 GENERAL This section describes the work to be carried out to prepare planting sites and complete planting

More information

City of Regina Standard Construction Specification SECTION TREES, SHRUBS AND GROUND COVERS

City of Regina Standard Construction Specification SECTION TREES, SHRUBS AND GROUND COVERS 1.0 GENERAL 1.1 Related Work 1.1.1 Section 02210 - Site Grading Rough 1.1.2 Section 02212 - Planting Soil and Finish Grading 1.1.3 Section 02990 - Landscape Maintenance 1.2 Source Quality Control 1.2.1

More information

2-B-18-UR. Revised: 3/27/2018

2-B-18-UR. Revised: 3/27/2018 Revised: 3/27/2018 Revised: 3/27/2018 GI FOR KIDS A MEDICAL OFFICE BLDG. 0000 BOARDWALK BLVD. KNOXVILLE, TENNESSEE CONSTRUCTION PRELIMINARY - NOT FOR Landscape Plan Target Publix Town Center Boulevard

More information

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX L-1 TREE PLANTING (TYPICAL SECTION) L-2 TREE ANCHORING - TYPE A (FOR TREES LARGER THAN 2 INCHES CALIPER) L-3 TREE ANCHORING - TYPE B (FOR TREES UP

More information

SECTION TREES, SHRUBS AND GROUNDCOVERS

SECTION TREES, SHRUBS AND GROUNDCOVERS SECTION 02950 TREES, SHRUBS AND GROUNDCOVERS PART 1 GENERAL 1.01 REFER TO SECTION 01000 FOR GENERAL REQUIREMENTS 1.02 APPLICABLE PUBLICATIONS A. The publications listed below form a part of this specification

More information

Guelph Humane Society Section PLANTING Page 1

Guelph Humane Society Section PLANTING Page 1 Page 1 Part 1 General 1.1 DESCRIPTION.1 This section describes the requirements for the supply and installation for plant material of different stock sizes and types, accessories, planting, mulching, maintenance,

More information

SECTION TREES, PLANTS AND GROUND COVERS

SECTION TREES, PLANTS AND GROUND COVERS SECTION 02950 TREES, PLANTS AND GROUND COVERS PART 1 - GENERAL 1.1 SUMMARY: A. Section Includes: 1. Trees. 2. Plants and shrubs. 3. Ground covers. 4. Non-plant materials required to complete installation

More information

Planting Landscape Trees Larry A. Sagers Extension Horticulture Specialist Utah State University Thanksgiving Point Office

Planting Landscape Trees Larry A. Sagers Extension Horticulture Specialist Utah State University Thanksgiving Point Office Trees and Shrubs Provide Beauty Wind protection Shade Wildlife habitat Visual Screening Topics of the Day Buying Trees Digging Holes Planting Trees Planting Landscape Trees Larry A. Sagers Extension Horticulture

More information

SECTION 910 LANDSCAPING

SECTION 910 LANDSCAPING SECTION 910 911.0 DESCRIPTION This section covers the furnishing of all labor, material, equipment, and performance of all work and services necessary or incidental to plant removal and installation as

More information

Success with Trees in Your Yard. Debbie D. Dillion Extension Agent, Horticulture Serving Culpeper, Madison, & Orange Counties

Success with Trees in Your Yard. Debbie D. Dillion Extension Agent, Horticulture Serving Culpeper, Madison, & Orange Counties Success with Trees in Your Yard Debbie D. Dillion Extension Agent, Horticulture Serving Culpeper, Madison, & Orange Counties P s for Success with Trees Planning Proper selection Proper planting planting

More information

1.3 SOURCE QUALITY CONTROL.1 Obtain approval from Engineer/Architect of plant material at source prior to digging.

1.3 SOURCE QUALITY CONTROL.1 Obtain approval from Engineer/Architect of plant material at source prior to digging. Issued 2006/08/01 Section 02906 Planting of Trees, Shrubs and Ground Covers Page 1 of 9 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 02311 Site Grading..3 Section

More information

ANEW LANDSCAPE really

ANEW LANDSCAPE really Installing Woody Landscape Plants, Groundcovers, Perennials, and Annuals ANEW LANDSCAPE really approaches a finished project once plant materials have been installed. Since plants are the most admired

More information

University of Delaware

University of Delaware SECTION 01 56 18 _ Tree Protection University Contact: UD Assistant Director of Grounds: Office (302) 831 2797 UD Landscape Planner: Office (302) 831 1817 PART 1 GENERAL 1.1 SUMMARY Information in this

More information

NURSERY FACILITY CONTENTS

NURSERY FACILITY CONTENTS NURSERY FACILITY CONTENTS 1. NURSERY FACILITY 2 1.1 EXTENT OF SECTION 2 1.2 SCOPE OF WORK 2 1.3 TRANSPLANT TREES 5 1.3.1 Planting of trees 5 1.3.2 Pruning of trees 5 1.3.3 Disposal of prunings 5 1.3.4

More information

ACTIVITY: Trees, Shrubs and Vines ES 10

ACTIVITY: Trees, Shrubs and Vines ES 10 Targeted Constituents Significant Benefit Partial Benefit Low or Unknown Benefit Sediment Heavy Metals Floatable Materials Oxygen Demanding Substances Nutrients Toxic Materials Oil & Grease Bacteria &

More information

Exhibit A. Scope of Work

Exhibit A. Scope of Work Exhibit A Scope of Work TURF / LAWNS Mowing Lawns shall be mowed weekly during growing season and as required during winter months. The height of mowing shall be maintained consistently to prevent scalping

More information

Planting Landscape Trees

Planting Landscape Trees 1 Planting Landscape Trees Margaret Shao, Salt Lake County Extension Agent, and Michael Kuhns, Extension Forester, Utah State University 05/01/2010 This fact sheet covers the basics of landscape tree planting

More information

Exhibit II - Expanded Scope of Work. Xeriscaping / Rain Water Harvesting Sustainability Program

Exhibit II - Expanded Scope of Work. Xeriscaping / Rain Water Harvesting Sustainability Program Exhibit II - Expanded Scope of Work Xeriscaping / Rain Water Harvesting Sustainability Program National Guard Armory, Located at 308 North Fiske Boulevard Cocoa, FL 32922 PART 1 GENERAL 1.01 BACKGROUND

More information

HALIFAX REGIONAL MUNICIPALITY

HALIFAX REGIONAL MUNICIPALITY [PROJECT NAME] PLANTING OF TREES, SHRUBS PART 1 - GENERAL 1.1 Work Included 1.2 Related Sections 1.3 Reference Standards 1.4 Quality Control 1.5 Delivery, Storage and Protection 1.6 Samples 1.7 Warranty

More information

Guidelines for planting within the 100 Ft. Buffer

Guidelines for planting within the 100 Ft. Buffer CAPE COD COOPERATIVE EXTENSION PO Box 367 Barnstable, MA 02630 508 375-6690 (www.capecodextension.org) Guidelines for planting within the 100 Ft. Buffer Introduction: The Barnstable County Extension Service

More information

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT 8 8 CONCRETE RAMP WOOD STEPS SWIMMING POOL 8 METAL POOL ENCLOSURE FENCE 9 SINGLE LEAF METAL GATE 0 LAWN HANGING CANOPY WITH DOWN LIGHTS METAL & GLASS AWNING AMENITY ROOM WITH FOLDING GLASS WALLS CONCRETE

More information

Construction Specification for Planting

Construction Specification for Planting Engineering and Construction Services Division Standard Specifications for Road Works TS 5.30 April 2014 for Planting Table of Contents TS 5.30.01 SCOPE... 3 TS 5.30.02 REFERENCES... 3 TS 5.30.03 DEFINITIONS

More information

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Scope.1 This guideline addresses the materials, and equipment necessary for the supply, placement, and amendment of the growing medium. 1.2 Related Work:.1 Section 32 93 00

More information

Planting Trees & Shrubs. Choosing Trees and Shrubs. Tree Quotes

Planting Trees & Shrubs. Choosing Trees and Shrubs. Tree Quotes Planting Trees & Shrubs Handouts: Planting and Maintaining Trees and Shrubs Study Guide Choosing Trees and Shrubs Tip: Walk around the neighborhood, see what grows in your area and bring a sample to the

More information

SIUE LANDSCAPE UPGRADE

SIUE LANDSCAPE UPGRADE SIUE LANDSCAPE UPGRADE Project Introduction The Southern Illinois University Edwardsville campus was established and built in the mid-1960's, based on a landscape master plan by HOK. The landscape plan

More information

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following: SECTION 320190.13 LANDSCAPE MAINTENANCE FOR 90 DAYS PART 1 - GENERAL 1.1 SUMMARY A. Section includes requirements for 90 day landscape maintenance for the following: 1. Watering trees and grass. 2. Monitoring

More information

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA REFERENCE DRAWINGS FOR REET ROCK HILL, SOUTH CAROLINA COVER SHEET 1 OF 6 GENERAL NOTES 2 OF 6 REMOVE WIRE AND NYLON TWINE FROM BALL AND CANOPY. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER INSTALLATION.

More information

OVERALL LANDSCAPE PLAN

OVERALL LANDSCAPE PLAN OVERALL LANDSCAPE PLAN : LIC. NO: SM RECORD COPY BY: L.0 OVERALL LANDSCAPE PLAN Scale: " = 40'-0" 0 40' 80' Scale: " = 40' L.0 L2.0 TREE PLANTING PLAN Scale: " = 40'-0" 0 Scale: " = 40' 40' wsbeng.com

More information

Planting Trees & Shrubs. and Shrubs Study Guide

Planting Trees & Shrubs. and Shrubs Study Guide Planting Trees & Shrubs Handouts: Planting and Maintaining Trees Handouts: Planting and Maintaining Trees and Shrubs Study Guide Choosing Trees and Shrubs Tip: Walk around the neighborhood, see what grows

More information

Root-bound potted tree after pot removal

Root-bound potted tree after pot removal Urban/Community Forestry Planting Landscape Trees Margaret Shao, Salt Lake County Extension Agent, and Michael Kuhns, Extension Forester, Utah State University NR/FF/017 pr This fact sheet covers the basics

More information

Master Gardener Recommended Horticulture Best Management Practices

Master Gardener Recommended Horticulture Best Management Practices Master Gardener Recommended Horticulture Best Management Practices Practices that should always be recommended: Group plants with similar needs (water, fertilizer, sun ) for easier maintenance Fertilize

More information

Town of Fuquay-Varina

Town of Fuquay-Varina 170 LANDSCAPING 170.01 GENERAL 170.01.01 Street trees shall be provided in accordance with the Land Development Ordinance for site plans and subdivisions 170.01.02 Street trees, landscape areas, landscape

More information

SECTION LANDSCAPE ESTABLISHMENT

SECTION LANDSCAPE ESTABLISHMENT SECTION 02970 LANDSCAPE ESTABLISHMENT 120-day Landscape Establishment PART 1 GENERAL 1.01 SCOPE OF WORK A. A. This work shall include all labor, materials, equipment, supplies, and services to sustain

More information

SECTION LANDSCAPING

SECTION LANDSCAPING SECTION 02900 LANDSCAPING PART 1 - GENERAL 1.01 WORK INCLUDED A. Clearing and grubbing. B. Site grading to subgrade for topsoil. C. Leaching of subgrade soils. D. Placing topsoil and prepared soil backfill.

More information

B. Finish Grade: Elevation of finished surface of planting soil.

B. Finish Grade: Elevation of finished surface of planting soil. SECTION 02930 - PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A.

More information

Punch-list Item Punch-list Photo Remedy for Signoff. Burlap and Wire Basket Visible (top 2/3 must be removed)

Punch-list Item Punch-list Photo Remedy for Signoff. Burlap and Wire Basket Visible (top 2/3 must be removed) Punch-list Item Punch-list Photo Remedy for Signoff Burlap and Wire Basket Visible (top 2/3 must be removed) Trees cannot be planted without having the top 2/3 of the burlap and wire removed. The burlap

More information

SECTION TREE AND PLANT PROTECTION

SECTION TREE AND PLANT PROTECTION SECTION 01 56 39 TREE AND PLANT PROTECTION PART 1 GENERAL 1.1 SUMMARY A. As a condition of project approval, all trees within the project limit including lay down or staging areas shall be inventoried

More information

SELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree!

SELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree! SELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree! Craig R. Miller Parks & Open Space Manager www.cpnmd.org Environmental Factors to Consider: Minimum temperature the

More information

Selecting Quality Trees from the Nursery. Created from research by Dr. Edward F. Gilman and Traci Partin (University of Florida)

Selecting Quality Trees from the Nursery. Created from research by Dr. Edward F. Gilman and Traci Partin (University of Florida) Selecting Quality Trees from the Nursery Created from research by Dr. Edward F. Gilman and Traci Partin (University of Florida) Poor vs. good quality Advantages to selecting quality trees Higher survival

More information

TREE PLANTING AND ESTABLISHMENT. Keith Wood Colorado State Forest Service

TREE PLANTING AND ESTABLISHMENT. Keith Wood Colorado State Forest Service TREE PLANTING AND ESTABLISHMENT Keith Wood Colorado State Forest Service Select the Right Tree for the Right Place Match the Tree to the Site: Growth Habit, Water Needs, Durability (Hardiness) Insect and

More information

HG Homeowner Landscape Series: Planting Problems of Trees and Shrubs

HG Homeowner Landscape Series: Planting Problems of Trees and Shrubs Many cultural and pest problems on woody ornamentals can be avoided by selection of high quality plant material. Work with your landscape designer and installer to use plants that are properly adapted

More information

Planting and Establishment

Planting and Establishment Planting and Establishment Photos Sources: Vince Urbina, Keith Wood,& Donna Davis, CSFS Other Sources: The Right Tree for the Right Place; the National Arbor Day Foundation, et al General Recommendations

More information

SECTION LANDSCAPING

SECTION LANDSCAPING PART 1 -GENERAL 1.01 DESCRIPTION SECTION 32 9200 A. Furnish all labor, materials, and equipment required to complete all landscaping work indicated on the drawings and specified herein. This includes seeding,

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2006

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2006 SECTION 02900 - LANDSCAPING 1.1 SUMMARY A. Landscaping includes the layout, soil preparation, excavation for and planting of landscape materials, including trees, shrubs, ground covers, plants, and lawns,

More information

Unit 4 Landscape Installation

Unit 4 Landscape Installation Unit 4 Landscape Installation Chapter 8 (lawns) slp 4.1 Soil Amendments I. Soil conditioners change the physical AND chemical properties of a soil A. Physical 1. Aggregate same size particles into clumps

More information

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES PART 1 - GENERAL 1.01 SCOPE A. Work covered by this section includes all of the planning, compliance, design, installation, and warranty elements for new landscaping using trees. Contractor shall furnish

More information

5.0 Storm Water Landscape Guidance Introduction

5.0 Storm Water Landscape Guidance Introduction 5.0 Storm Water Landscape Guidance Introduction Landscaping is a critical element to improve both the function and appearance of storm water management practices. Integrated storm water landscapes can

More information

2571 PLANT INSTALLATION AND ESTABLISHMENT

2571 PLANT INSTALLATION AND ESTABLISHMENT 2571 PLANT INSTALLATION AND ESTABLISHMENT 2571.1 DESCRIPTION This work consists of providing, planting, and establishing trees, shrubs, vines, and perennials of the species, variety, grade, size, or age,

More information

Entegra Roof Tile: Bermuda Natural Gray Roof Tile with no antique

Entegra Roof Tile: Bermuda Natural Gray Roof Tile with no antique Entegra Roof Tile: Bermuda Natural Gray Roof Tile with no antique ONE STORY RESIDENCES IN THE AREA 6610 S.W. 62 ND Court 6620 S.W. 62 ND Court (Subject Property) 6630 S.W. 62 ND Court 6700 S.W. 62 ND

More information

Tree Pits Construction Guide

Tree Pits Construction Guide Tree Pits Construction Guide What are tree pits? Tree pits collect stormwater runoff from small carpark areas or roads. Runoff filters through the tree roots and surrounding soil mix, trapping sediment

More information

Guideline SpeciVications for Selecting, Planting, and Early Care of Young Trees

Guideline SpeciVications for Selecting, Planting, and Early Care of Young Trees Guideline SpeciVications for Selecting, Planting, and Early Care of Young Trees This document is a compilation of the Guideline Speci,ication for Nursery Tree Quality: Strategies for Growing a High Quality

More information

SECTION 900 TURF ESTABLISHMENT

SECTION 900 TURF ESTABLISHMENT SECTION 900 901.0 DESCRIPTION This section covers the furnishing of all labor, materials, tools, equipment and performances of all work and services necessary or incidental to turf restoration as indicated

More information

C7.1 PUBLIC ROADWAY PLAN TRILLIUM AVENUE RESOURCE INTERNATIONAL INC. Description. Issued By Drawing Issue & Revision Status. Date.

C7.1 PUBLIC ROADWAY PLAN TRILLIUM AVENUE RESOURCE INTERNATIONAL INC. Description. Issued By Drawing Issue & Revision Status. Date. C7.1 www.resourceinternational.com 6350 PRESIDENTIAL GATEWAY COLUMBUS, OHIO 43231 PHONE: (614) 823-4949 FAX: (614) 823-4990 RESOURCE INTERNATIONAL INC. OUTLOT "A" OUTLOT "B" WINCHESTER PIKE WATER LINE

More information

PART E SPECIFICATIONS

PART E SPECIFICATIONS PART E SPECIFICATIONS Bid Opportunity No. 386-2004 Page 1 of 9 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Standard Construction

More information

SECTION FINE GRADING AND SOIL PREPARATION

SECTION FINE GRADING AND SOIL PREPARATION SECTION 32 90 00 PART 1 GENERAL 1.01 SECTION INCLUDES A. Examination. B. Preparation. C. Subsoil Preparation. D. Placing Topsoil. E. Soil Tests. F. Coordination of Soil Amendments. G. Fine Grading. H.

More information

Watering Guide. 1. Trees, Shrubs, Perennials, Annuals Sod Seed Pruning Plants Fertilizing Plants...

Watering Guide. 1. Trees, Shrubs, Perennials, Annuals Sod Seed Pruning Plants Fertilizing Plants... Watering Guide The following instructions provide general guidelines for maintaining and improving plant and lawn health, longevity and appearance. Properly watering all new plant material and transplanted

More information

I. DEFINITIONS For the purpose of this policy the following terms, phrases, words and their derivations shall have the meaning given herein.

I. DEFINITIONS For the purpose of this policy the following terms, phrases, words and their derivations shall have the meaning given herein. CITY OF DYERSVILLE TREE AND LANDSCAPING ON PUBLIC RIGHT-OF-WAY POLICY This policy shall regulate the planting, maintenance, and removal of trees and shrubs in public rights-of-way. An approval from the

More information

Home Depot Page 1 of Humacao, Puerto Rico 03/19/10

Home Depot Page 1 of Humacao, Puerto Rico 03/19/10 PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide trees, shrubs, vines and groundcover in accordance with the contract documents. 1.02 REFERENCES A. "American Standard for Nursery Stock", 1990 Edition,

More information

LAUREL STREET WATER TANK - LANDSCAPE RFP SECTION SECTION LANDSCAPING PLANTS

LAUREL STREET WATER TANK - LANDSCAPE RFP SECTION SECTION LANDSCAPING PLANTS SECTION 32 93 00 PART 1 GENERAL 1.1 SUMMARY A. The Project requires particular attention to the aesthetic and landscape architectural design elements that are incorporated into the project site plan. The

More information

39 N. B Street San Mateo, California Construction Tree Protection Plan

39 N. B Street San Mateo, California Construction Tree Protection Plan 39 N. B Street San Mateo, California Construction Tree Protection Plan Summary was retained by HMCA Inc. to prepare a Construction Tree Protection Plan for the 39 North B Street property in San Mateo,

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2009

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2009 SECTION 02900 - LANDSCAPING 1.1 SUMMARY A. Landscaping includes the layout, soil preparation, excavation for and planting of landscape materials, including trees, shrubs, ground covers, plants, and lawns,

More information

WMU Tree Care Plan and Policies

WMU Tree Care Plan and Policies WMU Tree Care Plan and Policies PURPOSE The purpose of the Western Michigan University Tree Care Plan and Policies is to define protocols and give guidance and direction as to the best practices for any

More information

Select the location: Dig a wide planting hole: Place the tree in the hole at the proper height: Backfill with soil around the rootball:

Select the location: Dig a wide planting hole: Place the tree in the hole at the proper height: Backfill with soil around the rootball: Planting a Tree Select the location: Choose a spot where the tree can reach full size; note the expected mature height & spread of the species. Plant trees at least half the mature leaf crown width away

More information

Plant Care Guide. Watering

Plant Care Guide. Watering Plant Care Guide At Earthadelic we believe the care you give your new landscape is just as important as the design and installation. Learning how to properly maintain your plants is the key to enjoying

More information

The following general requirements will be met for all planter box installations:

The following general requirements will be met for all planter box installations: Greenville County Technical Specification for: WQ-25 PLANTER BOX 1.0 Planter Box 1.1 Description Planter boxes are designed to capture and temporarily store stormwater runoff. Planter Boxes are intended

More information

Extension of Naugatuck Street Hartford, Connecticut

Extension of Naugatuck Street Hartford, Connecticut Extension of Naugatuck Street Hartford, Connecticut DEVELOPMENT TEAM LIST OF DRAWINGS Property Owner - Right of Way Construction Manager- Roadway Residential Developer Civil Engineer Landscape Architect

More information

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING 32 90 00 PART 1 - GENERAL 1.01 SCOPE: A. This document provides guidelines that shall be used for all WSU facilities that require Landscape Architectural (LA) design and construction services. B. References:

More information

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers Stormwater Standards Clackamas County Service District No. 1 APPENDIX B Planting Guide for Buffers Table of Contents Appendix B - Planting Guide for Buffers... Page B.1 General... 1 B.1.1 Introduction...

More information

SECTION SOIL BIOENGINEERING OR SHORELINE STABILIZATION

SECTION SOIL BIOENGINEERING OR SHORELINE STABILIZATION SECTION 32 93 43 SOIL BIOENGINEERING OR SHORELINE STABILIZATION PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish all labor, materials, supplies, equipment, tools and transportation; perform

More information

City of Gering Tree Rebate Program

City of Gering Tree Rebate Program City of Gering 2018-2019 Tree Rebate Program (To be completed by Property Owner) The City of Gering is sponsoring a Tree Rebate Program for the 2018-2019 year, in an effort to encourage property owners

More information

SECTION SODDING

SECTION SODDING SECTION 02924 SODDING PART 1 GENERAL 1.01 SUMMARY A. Repair lawns and grassed rights of way damaged or removed during the construction of the pump station. 1.02 RELATED WORK A. Clearing and Grubbing -

More information

Cooperative Extension

Cooperative Extension Cooperative Extension College of Agriculture & Home Economics Washington State University Pullman Washington Introduction People use landscape plantings for various purposes. They may plant to join or

More information

L1.00 REFER TO: L1.01 TREE PRESERVATION PLAN L2.01 LANDSCAPE PLAN REFER TO: L1.02 TREE PRESERVATION PLAN L2.02 LANDSCAPE PLAN MATCHLINE

L1.00 REFER TO: L1.01 TREE PRESERVATION PLAN L2.01 LANDSCAPE PLAN REFER TO: L1.02 TREE PRESERVATION PLAN L2.02 LANDSCAPE PLAN MATCHLINE 06/2/204 C 204 THIS DOCUMENT AND THE DESIGNS CONTAINED THEREIN REMAINS THE PROPERTY OF PROSS DESIGN GROUP, INC. AS AN INSTRUMENT OF PROFESSIONAL SERVICE. IT IS NOT TO BE USED IN WHOLE OR IN PART FOR ANY

More information

1. Division 2 Section "Earthwork" for excavation, filling, and rough grading and for subsurface aggregate drainage and drainage backfill materials.

1. Division 2 Section Earthwork for excavation, filling, and rough grading and for subsurface aggregate drainage and drainage backfill materials. SECTION 329300 - LANDSCAPE PLANTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

REQUEST FOR BIDS LANDSCAPING SERVICES HAYMARKET, VIRGINIA

REQUEST FOR BIDS LANDSCAPING SERVICES HAYMARKET, VIRGINIA REQUEST FOR BIDS LANDSCAPING SERVICES HAYMARKET, VIRGINIA The Town of Haymarket, Virginia is requesting bids (RFBs) from professional landscaping companies which wish to be considered for providing landscaping

More information

Planting Landscape Trees

Planting Landscape Trees Planting Landscape Trees Outline of Planting Dig shallow/wide hole Find the top-most root Place tree in hole Position top root 1-2 above landscape soil Straighten tree Remove synthetic materials Add backfill

More information

CARING FOR YOUR NEW Landscape

CARING FOR YOUR NEW Landscape CARING FOR YOUR NEW Landscape GUIDE 2744 Tanaga Basin New Lenox, Illinois 60451 (t)708.860.8310 (f)888.354.0955 www.agemalandscape.com First Things First A landscape is a work of art, and always a work-in-progress.

More information

Operations and Maintenance Plan

Operations and Maintenance Plan Civil Engineering Land Surveying Environmental Consulting Landscape Architecture Operations and Maintenance Plan for Solar Panel Facility Haverhill, MA Prepared By: Hancock Associates #19168 Prepared For:

More information

Best Management Practices for Tree Preservation, Transplanting and Removal

Best Management Practices for Tree Preservation, Transplanting and Removal Best Management Practices for Tree Preservation, Transplanting and Removal CITY OF CHARLOTTESVILLE Neighborhood Development Services Revised August 2009 Table of Contents 1. Definitions 1 2. Planning for

More information

F. Finish Grade: Elevation of finished surface of topsoil.

F. Finish Grade: Elevation of finished surface of topsoil. January 2014, rev 00 32 9310 Trees, Shrubs and Groundcovers PART 1. - GENERAL 1.01 Section Includes A. Provide trees, shrubs, and groundcovers as shown and specified. The work includes: 1.02 Definitions

More information

BMP-33. Stabilizing fine-graded disturbed areas by establishing permanent grass stands with sod.

BMP-33. Stabilizing fine-graded disturbed areas by establishing permanent grass stands with sod. BMP-33 BMP: SODDING Definition Stabilizing fine-graded disturbed areas by establishing permanent grass stands with sod. PurDoses 1. To establish permanent turf immediately. 2. To prevent erosion and damage

More information