2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88.

Size: px
Start display at page:

Download "2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88."

Transcription

1 1. EXISTING CONDITIONS AND UTILITY INFORMATION SHOWN ON THESE PLANS ARE BASED ON A SET OF PLANS ENTITLED "SCHOOL OF COMMUNICATIONS AND MEDIA BUILDING AND LIFE HALL RENOVATION" DATED MARCH 11, 2015 REVISED THROUGH 4/28/15 PREPARED BY CANNON DESIGN / REMINGTON & VERNICK ENG.. REFER TO SHEETS C0001 THROUGH C0014 AND ASSOCIATED PROJECT SPECIFICATIONS FOR COORDINATION AND ADDITIONAL INFORMATION. ALL PLAN NOTES, GENERAL SPECIFICATIONS, SITE / CIVIL, AND LANDSCAPING SPECIFICATIONS APPLY AND REMAIN IN FORCE FOR THE WORK SHOWN HEREIN UNLESS OTHERWISE NOTED. 2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88.

2 FOR COMPREHENSIVE DEMOLITION NOTES SEE SHEETS C0003 & C0004 OF CANNON / RVE PLAN SET.

3 1. LAWN AREAS TO RECEIVE 6" TOPSOIL AND SEED. (SEE TOPSOIL NOTE BELOW). FOR SEEDING REQUIREMENTS REFER TO SOIL EROSION AND SEDIMENT CONTROL NOTES AND STANDARDS. 2. PLANTING BED AREAS TO RECEIVE 12" OF TOPSOIL AND 3" MULCH COVER. 3. STONE DUST AREA TO BE 3" COMPACTED STONE DUST ON FILTER FABRIC MATERIAL INSTALLED OVER FIRM SUBGRADE. LIMITS OF STONE DUST SURFACE TO BE ADJUSTED PER OWNER. 4. TOPSOIL SHALL FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, STONES LARGE THAN 2" IN ANY DIMENSIONS, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH, AND SHALL BE TYPICAL FOR LOCALITY. A SOIL TEST SHALL BE CONDUCTED PRIOR TO THE INSTALLATION AND SPREADING OF THE TOPSOIL. THIS SOIL TEST SHALL BE LEVEL 3 TOPSOIL EVALUATION PREPARED BY RUTGERS SOIL TESTING LABORATORY OR APPROVED EQUIVALENT. THE SOIL TEST WILL INCLUDE TESTING FOR NUTRIENTS,PH, SOLUBLE SALT LEVEL, ORGANIC MATTER CONTENT, PERCENTAGES OF SAND / SILT / CLAY, SOIL TEXTURE CLASS AND GRAVEL CONTENT.

4 1. FOR ADDITIONAL DRAINAGE AND UTILITY INFORMATION SEE SHEET C101 OF RVE PLANS. 2. FOR SOIL CONSERVATION AND SEDIMENT CONTROL INFORMATION REFER TO RVE PLANS.

5 1128 ROUTE 31 NORTH, LEBANON, N.J PHONE (908) FAX (908)

6 1. LAWN AREAS TO RECEIVE 6" TOPSOIL AND SEED. (SEE TOPSOIL NOTE BELOW). FOR SEEDING REQUIREMENTS REFER TO SOIL EROSION AND SEDIMENT CONTROL NOTES AND STANDARDS. 2. PLANTING BED AREAS TO RECEIVE 12" OF TOPSOIL AND 3" MULCH COVER. 3. STONE DUST AREA TO BE 3" COMPACTED STONE DUST ON FILTER FABRIC MATERIAL INSTALLED OVER FIRM SUBGRADE. LIMITS OF STONE DUST SURFACE TO BE ADJUSTED PER OWNER. 4. TOPSOIL SHALL FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, STONES LARGE THAN 2" IN ANY DIMENSIONS, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH, AND SHALL BE TYPICAL FOR LOCALITY. A SOIL TEST SHALL BE CONDUCTED PRIOR TO THE INSTALLATION AND SPREADING OF THE TOPSOIL. THIS SOIL TEST SHALL BE LEVEL 3 TOPSOIL EVALUATION PREPARED BY RUTGERS SOIL TESTING LABORATORY OR APPROVED EQUIVALENT. THE SOIL TEST WILL INCLUDE TESTING FOR NUTRIENTS,PH, SOLUBLE SALT LEVEL, ORGANIC MATTER CONTENT, PERCENTAGES OF SAND / SILT / CLAY, SOIL TEXTURE CLASS AND GRAVEL CONTENT.

7 CONCRETE PAVEMENT (TYP.) CAST STONE QUATREFOIL CAST STONE QUATREFOIL AS MFG. BY SUN PRECAST CO.,INC RIDGE ROAD BEAVER SPRINGS, PA Tel: (570) Fax:(570) COLOR: TERRACOTTA ALL JOINTS SHALL BE SEALED WITH CONCRETE PAVER SAYLOR COURSE (SEE DETAIL) CONCRETE PAVERS (TYP.) AS MFG. BY: HANOVER ARCHITECTURAL PRODUCTS P HANOVER PREST BRICK TRADITIONAL 3 COLOR RANDOM BLEND MATRIX: # B92079 NATURAL FINISH MATRIX: # B92079 TUDOR FINISH MATRIX: # B92827 TUDOR FINISH SIZE: 2 3 8"X 4" X 8" R=2.67' R=4.31' NON-SHRINKING CAULK TO MATCH CAST STONE COLOR. THE QUATREFOIL SHALL BE CAST IN 8 SECTIONS TOTAL 4 - LEFT/ 4 - RIGHT SECTIONS THE QUATREFOIL SHALL BE INSTALLED SHOP DRAWINGS SHALL BE SUBMITTED FOR APPROVAL PRIOR TO FABRICATION. QUATREFOIL SHALL BE SET IN 1" THK. MORTAR BED. R=11.73' WIDTH VARIES SEE MATERIALS PLANS PAVE EDGE RIGID EDGE RESTRAINT (TYP.) SIZE: 1.7" x 3.7" EDGE RESTRAINT SHALL BE ANCHORED WITH 3/8" DIA. x 10"L. STEEL 12" O.C. STEEL SPIKE SHALL BE EMBEDDED INTO BASE COURSE AS SHOWN. AS MFG. BY: PAVE TECH INC. P INSTALL PER MANUFACTURERS RECOMMENDATIONS CONTRACTOR SHALL CALCULATE CURVED & STRAIGHT PORTIONS OF THE WALK. CURVED PORTIONS SHALL HAVE PAVE EDGE FLEXIBLE INSTALLED. ALL SECTIONS SHALL BE AJOINED WITH CONNECTOR PIPES. R=9.68' 4" THK. CAST STONE QUATREFOIL CONCRETE PAVEMENT 6" 6" 1" THK. MORTAR SETTING BED 6" THK. DENSE GRADED AGGREGATE (TYP.) ALL BASE MATERIAL SHALL BE COMPACTED IN 3" LIFTS TO 95% COMPACTION. CONTRACTOR SHALL HAVE A COMPACTION TEST PERFORMED TO ENSURE THAT ALL BASES MEET THE COMPACTION REQUIREMENTS. SAWCUT CONTROL JOINT PATTERN AS SHOWN ON PLANS 3/16" WIDE x 1" DEEP COMPACTED SUBGRADE COMPACT TO 95% 3/4" THK. BITUMINOUS SETTING BED 93% SAND & 7% ASPHALT 1.5% 1.5% NEOPRENE TACK COAT OVER 3/4" BITUMINOUS SETTING BED (TYP.) SWEEP JOINTS WITH C-144 SAND CONCRETE PAVER SAYLOR COURSE SEE DETAIL THIS SHEET FINISHED GRADE LIGHT POLE & FIXTURE (PROVIDED BY OWNER). REFER TO DETAIL 17 ON SHEET L501 OF SLAM ARCHITECTS & ENGINEERS PLAN SET HAND HOLE 4-3/4"X24"X4" ANCHOR BOLTS WITH 3/4" MIN. BOLT PROJECTION (STD) MATCH BOLT PATTERN OF LIGHT POLE SAWCUT CONTROL JOINT PATTERN AS SHOWN ON PLANS 3/16" WIDE x 1" DEEP. FOR 16' WIDE JOINTS SEE SECTION THIS SHEET. #4 BARE COPPER WIRE CLASS A CONCRETE RIGID FIBER FORM (SONOTUBE) FILLED WITH CONCRETE 4 - #4 BARS W/ #3 12" CONCRETE WALK (SEE CONCRETE WALK SECTION DETAIL) 5'-0" 1" HEAVY WALL CONDUIT RECONNECT TO CONDUIT FROM ORIGINAL LIGHT LOCATION. PULL NEW #12 AWG CONDUCTORS FROM ORIGINAL POWER SOURCE. UNDERGROUND SPLICES SHALL NOT BE ACCEPTABLE. CADWELD CONNECTION 21' DIA. OR AS REQUIRED 3/4" X 10'-0" COPPER CLAD GROUND ROD (LOCATE AWAY FROM STORMWATER SYSTEM) NOTE: VERIFY LOCATION AND DEPTH TO TOP OF EXISTING STORMWATER SYSTEM JOINT SEALANT BROOM FINISH PERPENDICULAR TO DIRECTION OF TRAVEL NOTE: PLATE DOWEL (1/4" 2'-0" O.C. TYP.) 6" THICK CONCRETE BASE (TYP.) W / FIBERMESH REINFORCEMENT 6" STEP PAVEMENT AS SHOWN 2" HOT MIX ASPHALT BASE COURSE MIX 19M64 HERRINGBONE PATTERN 6" THICK CONCRETE BASE (TYP.) W / FIBERMESH REINFORCEMENT DOWEL EXPANSION JOINT - EJ (TYP.) W / PREMOLDED JOINT FILLER AND TOOLED EDGES 6" THICK DENSE GRADED AGGREGATE (TYP.) ALL BASE MATERIAL SHALL BE COMPACTED IN 3" LIFTS TO 95% COMPACTION. CONTRACTOR SHALL HAVE A COMPACTION TEST PERFORMED TO ENSURE THAT ALL BASES MEET THE COMPACTION REQUIREMENTS. COMPACTED SUBGRADE NOT TO SCALE 8" DENSE GRADED AGGREGATE SUBBASE MATERIAL 2 COURSES CONCRETE PAVERS SEE SAYLOR COURSE DETAIL FOR PAVER INFORMATION. NOTE: 1. JOINT FILLER AT ALL FIXED OBJECTS SUCH AS CURBS, MANHOLES, & WALLS EXCEPT AS NOTED. 2. EXPANSION JOINT 20'-0" MAX. SPACING OR AS INDICATED ON PLANS. 3. CONTROL JOINTS AS INDICATED ON PLANS. COMPACTED SUBGRADE COMPACT TO 95%

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK 13440 DELTA PROJECT NO. 2017.226.001 SEPTEMBER 2017 ISSUED FOR BID INDEX OF DRAWINGS GENERAL CIVIL ARCHITECT/ENGINEER PROJECT

More information

SECTION 900 TURF ESTABLISHMENT

SECTION 900 TURF ESTABLISHMENT SECTION 900 901.0 DESCRIPTION This section covers the furnishing of all labor, materials, tools, equipment and performances of all work and services necessary or incidental to turf restoration as indicated

More information

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT 8 8 CONCRETE RAMP WOOD STEPS SWIMMING POOL 8 METAL POOL ENCLOSURE FENCE 9 SINGLE LEAF METAL GATE 0 LAWN HANGING CANOPY WITH DOWN LIGHTS METAL & GLASS AWNING AMENITY ROOM WITH FOLDING GLASS WALLS CONCRETE

More information

Technical Bullet Series on Clay Brick Pavers

Technical Bullet Series on Clay Brick Pavers 2701 Shorefair Drive, Winston-Salem, NC 27105 pinehallbrick.com 1-800-334-8689 Technical Bullet Series on Clay Brick Pavers #4 Designing For Heavy Vehicular Traffic Abstract This Tech Bullet focuses on

More information

Public Notice. REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material. June 22, ADDENDUM NO.

Public Notice. REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material. June 22, ADDENDUM NO. Public Notice REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material June 22, 2018 ADDENDUM NO.: One (1) TO ALL PROSPECTIVE BIDDERS: PLEASE BE ADVISED OF THE FOLLOWING

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 355 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS TABLE OF CONTENTS 355.01 SCOPE 355.02 REFERENCES

More information

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Scope.1 This guideline addresses the materials, and equipment necessary for the supply, placement, and amendment of the growing medium. 1.2 Related Work:.1 Section 32 93 00

More information

Te c h S p e c 3. Edge Restraints for Interlocking Concrete Pavements

Te c h S p e c 3. Edge Restraints for Interlocking Concrete Pavements Te c h S p e c 3 Edge Restraints for Interlocking Concrete Pavements Introduction Edge restraints are an essential component of interlocking concrete pavements. Restraints hold the pavers tightly together,

More information

SITE TOPSOIL & FINISH GRADING

SITE TOPSOIL & FINISH GRADING CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02911-1 PART 1 GENERAL 1.1 Related Work.1 Section 02311 Site Grading.2 Section 02315 Excavating, Trenching, & Backfilling.3 Section 02906 Planting of Trees,

More information

SECTION PLANTING SOIL for SOIL CELLS. This specification defines material and performance requirements for soils which are to be used

SECTION PLANTING SOIL for SOIL CELLS. This specification defines material and performance requirements for soils which are to be used This specification defines material and performance requirements for soils which are to be used within the Silva Cell system. The SPECIFICATION EDITOR must select the type of soil appropriate to each particular

More information

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC. GRAND ARBOR RESERVE BIRCHWOOD POINT, LOT-1 10203 MINERAL POINT ROAD MADISON, WISCONSIN GRAND ARBOR RESERVE, LLC 6417 ODANA RD MADISON, WISCONSIN 53719 CONTACT: DAN SCHMIDT PHONE: 608-285-8680 FAX: 608-255-3387

More information

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs The following form is to be filled out by the Project Consultant(s) and submitted to the City of Kitchener, Planning Division for

More information

SECTION FINE GRADING AND SOIL PREPARATION

SECTION FINE GRADING AND SOIL PREPARATION SECTION 32 90 00 PART 1 GENERAL 1.01 SECTION INCLUDES A. Examination. B. Preparation. C. Subsoil Preparation. D. Placing Topsoil. E. Soil Tests. F. Coordination of Soil Amendments. G. Fine Grading. H.

More information

SECTION STRUCTURAL SOIL

SECTION STRUCTURAL SOIL SECTION 329110 STRUCTURAL SOIL PART 1 - GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY A. This work shall consist of manufacturing and supplying a narrowly graded rock to support pavement without compression

More information

City of Bonita Springs Driveway Permit Information Packet

City of Bonita Springs Driveway Permit Information Packet City of Bonita Springs Driveway Permit Information Packet General: As stated in American Association of State Highway and Transportation Officials (AASHTO) Geometric Design of Highways and Streets A driveway

More information

GUIDELINES FOR PERMEABLE SIDEWALK-LANDSCAPING PERMIT

GUIDELINES FOR PERMEABLE SIDEWALK-LANDSCAPING PERMIT GUIDELINES FOR PERMEABLE SIDEWALK-LANDSCAPING PERMIT Green spaces are vital to San Francisco s quality of life as they provide a range of environmental benefits and bring beauty to our neighborhoods and

More information

C-10. Disconnected Impervious Surface

C-10. Disconnected Impervious Surface C-10. Disconnected Impervious Surface Design Objective Disconnected Impervious Surface (DIS) is the practice of directing stormwater runoff from built-upon areas to properly sized, sloped and vegetated

More information

PR 2 PM 3 PR 2 PR 2 BIORETENTION AND FOREBAY PLANTINGS (IN HATCHED AREA) TO INCLUDE: NORTHERN BAYBERRY (MORELLA PENSYLVANICA) VIRGINIA ROSE (ROSA VIRGINIANA) SWITCH GRASS (PANICUM VIRGATUM) DWARF HUCKLEBERRY

More information

Milpitas College Extension Milpitas Dry Landscape

Milpitas College Extension Milpitas Dry Landscape SAN JOSÉ / EVERGREEN COMMUNITY COLLEGE DISTRICT Milpitas College Extension Milpitas Dry Landscape PROJECT MANUAL VOLUME II TABLE OF CONTENTS DIVISION 02 through 30 Not Used DIVISION 31 - EARTHWORK Document

More information

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District The following is a list of the minimum requirements required on Soil Erosion and Sediment Control

More information

SECTION SOIL PREPARATION

SECTION SOIL PREPARATION SECTION 329113 SOIL PREPARATION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Components of planting mediums. 2. Testing and certification of components. 3. Mixing of planting mediums. 4. Transporting

More information

SECTION SODDING

SECTION SODDING SECTION 02925 SODDING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Preparation of subsoil. 2. Placing topsoil. 3. Fertilizing. 4. Sod installation. 5. Maintenance. B. Related Sections: 1. Drawings

More information

2-B-18-UR. Revised: 3/27/2018

2-B-18-UR. Revised: 3/27/2018 Revised: 3/27/2018 Revised: 3/27/2018 GI FOR KIDS A MEDICAL OFFICE BLDG. 0000 BOARDWALK BLVD. KNOXVILLE, TENNESSEE CONSTRUCTION PRELIMINARY - NOT FOR Landscape Plan Target Publix Town Center Boulevard

More information

Preparing a Stormwater Control Plan for a Small Land Development Project

Preparing a Stormwater Control Plan for a Small Land Development Project Preparing a Stormwater Control Plan for a Small Land Development Project Addendum to the Stormwater C.3 Guidebook December 1, 2012 Introduction As of December 1, 2012, development projects that create

More information

Stormwater Control Plan: Small (Tier 1) Land Development Project

Stormwater Control Plan: Small (Tier 1) Land Development Project Stormwater Control Plan: Small (Tier 1) Land Development Project Project ID for Tracking (for City Staff only): The California Regional Water Quality Control Board for the Central Coast Region (Water Board)

More information

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans. SECTION 7300 LANDSCAPING 7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans. 7302 QUALITY ASSURANCE. A. Qualifications of Personnel.

More information

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for APPROVED BY COUNCIL FEBRUARY 15, 1994 CITY OF BE CONVEYED TO THE CITY The Owner will be responsible to ensure that all lands which will be transferred to the City for parkland, drainage or boulevard purposes

More information

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX L-1 TREE PLANTING (TYPICAL SECTION) L-2 TREE ANCHORING - TYPE A (FOR TREES LARGER THAN 2 INCHES CALIPER) L-3 TREE ANCHORING - TYPE B (FOR TREES UP

More information

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information Bridgewater State University Virtual Commons - Bridgewater State University Phase II Final Report Taunton River Watershed Project 2011 Final Report: Appendix C. LID Parking Lot Design and Teaching Tool

More information

SECTION PLANTING SOIL FOR SOIL CELLS (SILVA CELLS)

SECTION PLANTING SOIL FOR SOIL CELLS (SILVA CELLS) This guide specification was prepared utilizing 3-part format recommended by the Construction Specifications Institute (CSI), and generally incorporates recommendations from their SectionFormat /Page Format,

More information

The following general requirements will be met for all planter box installations:

The following general requirements will be met for all planter box installations: Greenville County Technical Specification for: WQ-25 PLANTER BOX 1.0 Planter Box 1.1 Description Planter boxes are designed to capture and temporarily store stormwater runoff. Planter Boxes are intended

More information

Installation Manual May 9/14 No revision

Installation Manual May 9/14 No revision 815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Manual May 9/14 No revision Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles

More information

Installation & WillowCreekPavingStones.com POWER TOOLS YOU MAY NEED TO RENT PROJECT COMPONENTS. Willow Creek pavers Aggregate base material

Installation & WillowCreekPavingStones.com POWER TOOLS YOU MAY NEED TO RENT PROJECT COMPONENTS. Willow Creek pavers Aggregate base material Installation & Design Guidelines Installation Checklist PROJECT COMPONENTS Willow Creek pavers Aggregate base material 3/4'' crushed stone (including finer particles) typically used for road base. Bedding

More information

a. Section includes planting soils specified by composition of the mixes.

a. Section includes planting soils specified by composition of the mixes. SECTION 32 9113 SOIL PREPARATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

GREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M

GREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M GREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M MANAGE STORMWATER RUNOFF 4 x8 : 96 specially designed pavers will reduce or eliminate storm water run-off and

More information

Tree Pits Construction Guide

Tree Pits Construction Guide Tree Pits Construction Guide What are tree pits? Tree pits collect stormwater runoff from small carpark areas or roads. Runoff filters through the tree roots and surrounding soil mix, trapping sediment

More information

Erosion Control for Home Builders in the. City of Jacksonville

Erosion Control for Home Builders in the. City of Jacksonville Erosion Control for Home Builders in the City of Jacksonville Eroding construction sites are a leading cause of water quality problems in Jacksonville. For every acre under construction, about a dump truck

More information

Permeable Interlocking Pavers

Permeable Interlocking Pavers Design Manual Chapter 5 - Roadway Design 5K - Permeable Interlocking Pavers 5K-1 Permeable Interlocking Pavers A. General Permeable pavements are designed to infiltrate runoff, whereas runoff sheds off

More information

Section Seeding

Section Seeding Section 02936 Seeding PART 1 - GENERAL 1.01 SECTION INCLUDES A. Fertilizing. B. Seeding. C. Hydroseeding. D. Mulching. E. Maintenance. F. Sodding. 1.02 RELATED WORK A. Documents affecting work of this

More information

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION Please read through this instruction completely before beginning your installation. Be sure the proper equipment, and safety precautions are in

More information

317)

317) NDS, Inc. (317) 317) 346-4110 www.drainagesolutionsinc.com April 2015 Product Guide Specification Specifier Notes: This product guide specification is written in Construction Specifications Institute (CSI)

More information

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion Topics Erosion, TESC and Construction sequencing Procedures and timing Remedies for failing sites Curtis Hinman WSU Extension and Bio Systems Eng. Faculty Low Impact Development Specialist chinman@wsu.edu

More information

Subsurface Infiltration Bed

Subsurface Infiltration Bed Subsurface Infiltration Bed The Subsurface Infiltration Bed BMP consists of a storage bed underlying either a vegetated or hardscaped surface for the purpose of temporary storage and infiltration of stormwater

More information

Introduction. Functions of Non woven Geotextile (TechGeo) Separation. Filtration. Drainage. Containment. Tech Geo. . Geotextile Overview

Introduction. Functions of Non woven Geotextile (TechGeo) Separation. Filtration. Drainage. Containment. Tech Geo. . Geotextile Overview Introduction Nonwoven Geotextile (TechGeo) - Functions & Applications TechGeo is made from the highest quality PP fibers. It is a Nonwoven Geotextile, needle punched to form a strong fabric that relates

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

Why pavers?case. Study. Community Center Parking Lot City of benicia. Community Center Parking Lot City of benicia

Why pavers?case. Study. Community Center Parking Lot City of benicia. Community Center Parking Lot City of benicia Why pavers?case Study 1 Calstone Permeable Pavers Provide Functional Aesthetic for New Community Center The City of Benicia recently completed the construction of a new community center. The project was

More information

2.1.4 Roof Downspout Rain Gardens

2.1.4 Roof Downspout Rain Gardens 2008 SWMM, 2010 Revision City of Tacoma 2.1.4 Roof Downspout Rain Gardens Purpose and Definition Bioretention areas are shallow stormwater retention facilities designed to mimic forested systems by controlling

More information

SECTION TOPSOIL AND SEEDING

SECTION TOPSOIL AND SEEDING SECTION 13400 TOPSOIL AND SEEDING DECEMBER 2015 TOPSOIL AND SEEDING Page 1 1 GENERAL... 2 DESCRIPTION... 2 RELATED SECTIONS... 2 JOB CONDITIONS... 2 INSPECTION... 2 2 PRODUCTS... 3 SEEDING PRODUCT DELIVERY,

More information

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 329000 PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 01 Specification Sections, apply

More information

SECTION LANDSCAPE

SECTION LANDSCAPE 1 SECTION 02900 LANDSCAPE PART 1 GENERAL 1.1 Summary A. This section contains requirements relating to lawns, trees, shrubs, flowering plants and ground covers including site preparation, material installation

More information

CUTTING EDGE TURF PRODUCTS

CUTTING EDGE TURF PRODUCTS CUTTING EDGE TURF PRODUCTS Pallet-Item # 400401PT 0.75 CU. FT. CUTTING EDGE PREMIUM TOP SOIL Screened At 3/8 of an Inch Can Be Used for New Lawns, Gardens and Flower Pots Can Assist Seed Germination Can

More information

FEB 2016 COUNTY MAP NTS

FEB 2016 COUNTY MAP NTS COUNTY MAP NTS MILWAUKEE COUNTY SHEET INDEX N. 76TH STREET N. 70TH STREET N. 60TH STREET PROJECT LOCATION N. PARK PLAZA COURT ALDI'S SITE N. 51ST STREET SHEET SHEET TITLE G1 TITLE SHEET G2 GENERAL SYMBOLS

More information

Section 9 Landscaping and Street Trees

Section 9 Landscaping and Street Trees Section 9 Landscaping and Street Trees GENERAL REQUIREMENTS...9-1 I. MATERIALS...9-1 9.1 GRASS...9-1 9.2 STREET TREES...9-1 A. General...9-1 B. Species...9-2 C. Design Standards...9-2 9.3 LANDSCAPING...9-3

More information

Homeowners Guide to Stormwater BMP Maintenance

Homeowners Guide to Stormwater BMP Maintenance Homeowners Guide to Stormwater BMP Maintenance What You Need to Know to Take Care of Your Property Rain Barrel Dry Well Rain Garden Pervious Asphalt Porous Pavers City of El Monte Stormwater BMP Management

More information

CITY OF SOUTH BURLINGTON, VERMONT SOUTH BURLINGTON CITY OFFICE STORMWATER IMPROVEMENTS JUNE 2014

CITY OF SOUTH BURLINGTON, VERMONT SOUTH BURLINGTON CITY OFFICE STORMWATER IMPROVEMENTS JUNE 2014 CITY OF SOUTH BURLINGTON, VERMONT SOUTH BURLINGTON CITY OFFICE STORMWATER IMPROVEME PROJECT LOCATION JUNE 2014 PREPARED BY:. 125 COLLEGE STREET - 4TH FLOOR BURLINGTON, VERMONT 05401 GENERAL NOTES: LEGEND:

More information

ROADWAY SECTION PRINCIPAL ARTERIAL 2-01

ROADWAY SECTION PRINCIPAL ARTERIAL 2-01 ROADWAY SECTION PRINCIPAL ARTERIAL 2-01 ROADWAY SECTION MINOR ARTERIAL COMMERCIAL/MIXED USE 2-02 ROADWAY SECTION MINOR ARTERIAL REDISENTIAL 2-03 ROADWAY SECTION COLLECTOR COMMERCIAL MIXED USE 2-04 ROADWAY

More information

PLANTING SCHEDULE KEYNOTES Quant. Min. Planting Size* 212" cal. 7 gal. Hibiscus syriacus 'Helene' Hydrangea panculata 'Jane' or Rosa x Radsunny

PLANTING SCHEDULE KEYNOTES Quant. Min. Planting Size* 212 cal. 7 gal. Hibiscus syriacus 'Helene' Hydrangea panculata 'Jane' or Rosa x Radsunny PLANTING SCHEDULE KEYNOTES Quant. EXISTING ROCK DRAINAGE SWELL EXISTING ELECTRICAL TRANSFORMER LAVENDER TWIST REDBUD Cercis canadensis var. texensis 'Oklahoma' 2"" cal 4. PREPARE SITE FOR PLANTING BY GRUBBING

More information

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3 SECTION VI (Sub-section 241) Grassing Article Page 1. Scope of Work 241-1 2. General 241-1 3. Sprigging 241-1 4. Sodding 241-1 thru 241-3 5. Soil Amendments 241-3 6. Non Grassed Areas 241-4 7. Topsoil

More information

L1.00 REFER TO: L1.01 TREE PRESERVATION PLAN L2.01 LANDSCAPE PLAN REFER TO: L1.02 TREE PRESERVATION PLAN L2.02 LANDSCAPE PLAN MATCHLINE

L1.00 REFER TO: L1.01 TREE PRESERVATION PLAN L2.01 LANDSCAPE PLAN REFER TO: L1.02 TREE PRESERVATION PLAN L2.02 LANDSCAPE PLAN MATCHLINE 06/2/204 C 204 THIS DOCUMENT AND THE DESIGNS CONTAINED THEREIN REMAINS THE PROPERTY OF PROSS DESIGN GROUP, INC. AS AN INSTRUMENT OF PROFESSIONAL SERVICE. IT IS NOT TO BE USED IN WHOLE OR IN PART FOR ANY

More information

PLAN SUBMITTER'S CHECKLIST

PLAN SUBMITTER'S CHECKLIST Page 1 of 8 PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and reference the plan sheets/pages where the information may be found, where appropriate, or write

More information

ARCHITECTURAL PAVING STONE PRODUCT CATALOG

ARCHITECTURAL PAVING STONE PRODUCT CATALOG ARCHITECTURAL PAVING STONE PRODUCT CATALOG ARCHITECTURAL PAVING STONES - 360, H STREET, WASHINGTON, D.C. ARCHITECTURAL PAVING STONE Nitterhouse s high strength Architectural Pavers combine durability with

More information

PERMEABLE PAVEMENTS. Have been around for a long time, but are poised for a resurgence

PERMEABLE PAVEMENTS. Have been around for a long time, but are poised for a resurgence PERMEABLE PAVEMENTS Have been around for a long time, but are poised for a resurgence Three Broad Types of Pavers PC: Porous Concrete PA: Porous Asphalt IP: Interlocking Concrete Pavers The depth of the

More information

SMALL PAVER PROJECT. Home Gardeners School March 19, Presented by Robert W. Bellek Owner

SMALL PAVER PROJECT. Home Gardeners School March 19, Presented by Robert W. Bellek Owner SMALL PAVER PROJECT Home Gardeners School March 19, 2016 Presented by Robert W. Bellek Owner LET S GET STARTED You re going to need some important tools in order to accomplish your patio with less headaches

More information

Capillary Action Subsurface Irrigation

Capillary Action Subsurface Irrigation Sandy Soil Layer-Green Pavement Irrigation and Drainage Grass Grid Green Pavement Grass Grid Growing Medium Geotextile Capillary Action Subsurface Irrigation Graded Gravel Geotextile WCID-Water Conservation,

More information

Appendix C. Soil Amendments. Appendix C. C.1 General Description. C.2 Physical Feasibility & Design Applications

Appendix C. Soil Amendments. Appendix C. C.1 General Description. C.2 Physical Feasibility & Design Applications Soil Amendments C.1 General Description C.2 Physical Feasibility & Design Applications C.3 Design Criteria C.3.1 Soil Testing C.3.2 Determining Depth of Compost Incorporation C.3.3 Compost Specifications

More information

BREWSTER SR173 PROPOSED: OKANOGAN RIVER PADDLERS CAMPGROUND WATERBODY: OKANOGAN RIVER NEAR: BREWSTER COUNTY: OKANOGAN STATE: WASHINGTON

BREWSTER SR173 PROPOSED: OKANOGAN RIVER PADDLERS CAMPGROUND WATERBODY: OKANOGAN RIVER NEAR: BREWSTER COUNTY: OKANOGAN STATE: WASHINGTON OKANOGAN RIVER PROJECT LOCATION SR53 COLUMBIA RIVER SR73 METHOW RIVER PATEROS SR7 SR7 BRIDGEPORT VICINITY MAP NEAR: VICINITY 2 GEBBERS FARMS INC APN 302570024 STATE HWY 7 DOUGLAS CO. PUD NO. APN 302570037

More information

Analyzing the Bioretention Construction Sequence

Analyzing the Bioretention Construction Sequence Analyzing the Bioretention Construction Sequence Avoiding future problems through careful installation procedures, construction inspection and first year maintenance 20 Steps to Better Bioretention Step

More information

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. ATTACH FABRIC TO POSTS WITH MINIMUM 3 ZIP TIES (50 LB. TENSILE) PER POST IN TOP 8" OF FABRIC. MONOFILAMENT GEOTEXTILE FABRIC PER MNDOT TABLE

More information

815 NE 172 nd Avenue Vancouver, WA Installation Manual

815 NE 172 nd Avenue Vancouver, WA Installation Manual 815 NE 172 nd Avenue Vancouver, WA 98684 800-377-3877 www.xeripave.com info@xeripave.com Installation Manual Installation steps include job planning, layout, excavating and preparing the soil sub grade,

More information

BANK UNDERDRAIN (ALTERNATE LOCATION) (PIPE SHALL BE WRAPPED WITH GEOTEXTILE) DRAINAGE LAYER GRANULAR MATERIAL CLASS II 3" NOMINAL DEPTH

BANK UNDERDRAIN (ALTERNATE LOCATION) (PIPE SHALL BE WRAPPED WITH GEOTEXTILE) DRAINAGE LAYER GRANULAR MATERIAL CLASS II 3 NOMINAL DEPTH NATURAL GROUND WITH SEEPAGE LAYERS AND / OR PERVIOUS SOIL CAP MATERIAL FOR "GRANULAR BLANKET" SHALL BE GRANULAR MATERIAL CLASS II SOD AND TOPSOIL OR TOPSOIL, SEED, AND MULCH AS SPECIFIED ON PLANS CLASSED

More information

Lesson 2: Stormwater Best Management Practices (BMPs)

Lesson 2: Stormwater Best Management Practices (BMPs) Lesson 2: Stormwater Best Management Practices (BMPs) Environmental Stewards Class Christopher C. Obropta, Ph.D., P.E. Extension Specialist in Water Resources 732-932-9800 ext. 6209 obropta@envsci.rutgers.edu

More information

9 Steps to a Lasting Paver Installation

9 Steps to a Lasting Paver Installation 9 Steps to a Lasting Paver Installation A whitepaper listing the time-proven paver installation process for Connecticut and Southern New England By Tom Bahler Although this whitepaper is fairly long and

More information

Soil Health Practices in the Landscape

Soil Health Practices in the Landscape Soil Health Practices in the Landscape Salvatore Mangiafico Rutgers Cooperative Extension Environmental and Resource Management Agent In this session... Benefits of healthy soils in the landscape Plant

More information

24. Disconnected Impervious Surface (DIS)

24. Disconnected Impervious Surface (DIS) 24. Disconnected Impervious Surface (DIS) Description Disconnected Impervious Surface (DIS) is the practice of directing stormwater runoff from built-upon areas to properly sized, sloped and vegetated

More information

Permeable Pavement Systems

Permeable Pavement Systems Permeable Pavement Systems EGRA Stone ECO Stone CONSERVATION DESIGN FORUM Permeable Pavement Presentation Outline Case Studies Benefits Hydrologic Design Engineering Design Construction Considerations

More information

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e 12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8 Site Design Measures 32 P a g e Rooftop and Impervious Area Disconnection (Self-retaining areas) Description Disconnection

More information

An Introduction to Soil Stabilization for Pavements

An Introduction to Soil Stabilization for Pavements An Introduction to Soil Stabilization for Pavements J. Paul Guyer, P.E., R.A. Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years experience

More information

ALLEGAN COUNTY ROAD COMMISSION 108TH AVENUE RECONSTRUCTION PROJECT 5,000' EAST OF 15TH STREET TO 6,750' EAST OF 15TH STREET

ALLEGAN COUNTY ROAD COMMISSION 108TH AVENUE RECONSTRUCTION PROJECT 5,000' EAST OF 15TH STREET TO 6,750' EAST OF 15TH STREET TH ST. ND ST. 0TH ST. 8TH ST. TH ST. TH ST. ND ST. 0TH ST. 8TH ST. TH ST. TH ST. ND ST. 0TH ST. 8TH ST. TH ST. TH ST. ND ST. 0TH ST. 8TH ST. TH ST. TH ST. ND ST. 0TH ST. 8TH ST. TH ST. TH ST. ND ST. 0TH

More information

1. Which of the five checklists in the Municipal Construction Stormwater Site Inspection Toolkit will you use to document this inspection?

1. Which of the five checklists in the Municipal Construction Stormwater Site Inspection Toolkit will you use to document this inspection? GROUP ACTIVITY 2 Municipal Construction Stormwater Site Inspection Toolkit Overview You are a municipal stormwater inspector (Inspector) heading out to inspect a building development site where construction

More information

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration Model Construction SWPPP Planning & Development Services 1800 Continental Place Mount Vernon WA 98273 voice 360-416-1320 inspections 360-416-1330 www.skagitcounty.net/stormwaterpermitting Permit #: General

More information

Use of Best Management Practices

Use of Best Management Practices Use of Best Management Practices Presented at the ANJEC Flood Hazard Workshop Bordentown, NJ March 13, 2008 Stormwater BMPs "a technique, measure or structural control that is used for a given set of conditions

More information

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education Wisconsin Contractors Institute Continuing Education Erosion & Sediment Control Course # 12775 2 hours Wisconsin Contractors Institute N27 W23953 Paul Road, Suite 203 Pewaukee, WI 53072 Website: www.wicontractorsinstitute.com

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES 01050-1 Construction Surveying 1 LS 01500-1 Temporary Fences & Barricades 1,500 LF 02600-1 Shoring, Cofferdam, Temp. Sheeting, & Dewatering 1 LS 01565-1 Storm Drainage & Erosion Sediment Control 1 LS 01565-2

More information

STS Directory Accreditation number: STS 0030

STS Directory Accreditation number: STS 0030 International standard: ISO/IEC 17025:2005 Swiss standard: SN EN ISO/IEC 17025:2005 BSL Baustofflabor AG Postgässli 23a 3661 Uetendorf Head: Felix Solcà Responsible for MS: Dr. Benjamin Kaeser Telephone:

More information

All materials in this presentation are taken from materials produced by:

All materials in this presentation are taken from materials produced by: 1 PART I 2 All materials in this presentation are taken from materials produced by: Georgia Soil and Water Conservation Commission 4310 Lexington Road P.O. Box 8024 Athens, GA 30603 706-542-3065 Fax 706-542-4242

More information

Permeable Pavement [STRATEGY] Page 1

Permeable Pavement [STRATEGY] Page 1 [STRATEGY] Brief Description Permeable pavement systems, also referred to as pervious or porous paving, allow stormwater runoff to filter through the pavement section and infiltrate into the soil below.

More information

Please make the following changes in your copy of the bid proposal for the captioned project:

Please make the following changes in your copy of the bid proposal for the captioned project: Charles A. Kilpatrick, P.E. Commissioner September 8, 2014 DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000 Order No.: F50 Route: 0501 Project: (NFO) 0501-005-640,C501,B648

More information

SECTION AMENDED TOPSOIL

SECTION AMENDED TOPSOIL SECTION 02486 AMENDED TOPSOIL PART 1 - GENERAL 1.01 SUMMARY A. Work described in this section includes requirements for soil amendments, soil preparation, preparation and finish grading of turf restoration

More information

Request for Approval of Design Modification

Request for Approval of Design Modification March 7, 2017 Piper Peterson U. S. Environmental Protection Agency 1200 Sixth Avenue, ECL-122, Suite 900 Seattle, Washington 98101 Subject: Request for Approval of Design Modification T-117 Early Action

More information

Operation Maintenance and Repair Plan Rain Garden

Operation Maintenance and Repair Plan Rain Garden Operation Maintenance and Repair Plan Property Owner / Operator Unit wall system Minimum 1 Repair, replace, reset, soil mix and mulch to remove gullies when erosion is evident. Replenish soil mix and mulch

More information

SECTION SODDING

SECTION SODDING SECTION 02924 SODDING PART 1 GENERAL 1.01 SUMMARY A. Repair lawns and grassed rights of way damaged or removed during the construction of the pump station. 1.02 RELATED WORK A. Clearing and Grubbing -

More information

C7.1 PUBLIC ROADWAY PLAN TRILLIUM AVENUE RESOURCE INTERNATIONAL INC. Description. Issued By Drawing Issue & Revision Status. Date.

C7.1 PUBLIC ROADWAY PLAN TRILLIUM AVENUE RESOURCE INTERNATIONAL INC. Description. Issued By Drawing Issue & Revision Status. Date. C7.1 www.resourceinternational.com 6350 PRESIDENTIAL GATEWAY COLUMBUS, OHIO 43231 PHONE: (614) 823-4949 FAX: (614) 823-4990 RESOURCE INTERNATIONAL INC. OUTLOT "A" OUTLOT "B" WINCHESTER PIKE WATER LINE

More information

St. Monica Food Pantry

St. Monica Food Pantry St. Monica Food Pantry 32 9000-1 SECTION 32 9000 - LANDSCAPING PART 1 - GENERAL 1.1 SUMMARY: A. Work described in this section: 1. Landscape Plantings 2. Vegetable Garden 3. Rain Garden / Bio-swale 4.

More information

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

A. Surface parking areas shall be constructed of bituminous paving.

A. Surface parking areas shall be constructed of bituminous paving. September 2008 32 12 16 Asphalt Paving 1.0 General A. Surface parking areas shall be constructed of bituminous paving. 2.0 Products A. Aggregate Base Course conform to IDOT Std. Spec. Sect. 1000, ref.

More information

Operations and Maintenance Plan

Operations and Maintenance Plan Civil Engineering Land Surveying Environmental Consulting Landscape Architecture Operations and Maintenance Plan for Solar Panel Facility Haverhill, MA Prepared By: Hancock Associates #19168 Prepared For:

More information

A. Contractor shall provide product data for each type of product indicated.

A. Contractor shall provide product data for each type of product indicated. 31 13 00 SELECTIVE TREE AND SHRUB REMOVAL AND TRIMMING SECTION 1 GENERAL 1.1 SUMMARY A. This section includes general protection and pruning of existing trees and plants that are affected by execution

More information

A. Provide labor and materials necessary for installation of turf sod and other related work as required.

A. Provide labor and materials necessary for installation of turf sod and other related work as required. SECTION 32 92 00 TURF AND GRASSES PART 1 - GENERAL 1.1 SUMMARY A. Provide labor and materials necessary for installation of turf sod and other related work as required. B. Related work described elsewhere:

More information

Appendix G. Detailed Design

Appendix G. Detailed Design Appendix G Detailed Design G1: Construction details Construction detail drawings usually include important details and specifications for required project design elements. This section provides information

More information