1 Building Technology III New York City College of Technology Course Day 21 Revit Day 12 () The New Academic Building & Space Programming Professor Paul C. King, RA, AIA, ARA

2 Lab : Copy Structure from Floor of Level 6 to Roof Structure Corridor

3 Lab : Force walls to attach to bottom of slab Structure Corridor Select the Slab Edit Boundary > Accept Sketch Attach to its bottom (yes)

4 Lab : Add shaft walls around columns Structure Corridor Interior Wall: Add shaft wall enclosures around columns

5 Lab : Split Walls Structure Corridor Interior Wall: Split and Trim back walls to make room for the doors

6 Lab : Place first lab un-even door Structure Corridor : Typical have two uneven leafs. The smaller leaf is typically latched and only opened when large equipment needs to be moved in or out Doors > Load Family Double-Uneven 48 x 80

7 Lab : Mirror Doors across bay and across corridor Structure Corridor Interior Wall: Mirror the first door across to the next bay. Doors are centered on each room. Mirror a pair of doors across the corridor.

8 Lab : Copy Doors Structure Corridor Interior Wall: Copy the group of 4 doors and the column enclosures across the corridor

9 Lab : Mirror entire corridor (doors and enclosures) Structure Corridor Typ. Corridor: Delete the walls on the north corridor. Mirror the doors and wall enclosures from the south corridor across the central grid line

10 Lab : Typical Floor : Showing North/South Corridors Structure Corridor Typical Floor: Shows completed corridors

11 Lab : Create Interior 4 ¼ Furring (non-rated) Structure Corridor Interior Wall: Furring will be used to create a non-rated enclosure around columns near the exterior. For extra durability a second furring partition with a second layer of 5/8 GWB on the outside can be created. Select 4 7/8 Wall Type > Edit Type > Duplicate Remove Layer 5 Interior GYB and Save

12 Lab : 4 ¼ Furring (non-rated) Column Enclosure Structure Corridor Interior Wall: Create column enclosures at the exterior wall. Align with the corridor enclosures at the doors and make them 2-8 from the exterior wall Draw Finish Face Exterior (go clockwise as you draw)

13 Lab : Copy Column Enclosures across plan Structure Corridor Interior Wall: Copy across & Cleanup as you go

14 Lab : Mirror Column Enclosures to South Façade Structure Corridor Interior Wall: Copy across & Cleanup as you go

15 Lab Programming : Research Labs Structure Corridor Lab Bays: Column Grid is 20-6 Bay Size is Research Lab Spaces will be single, double or triple bay. For each research lab you should include a faculty office of approximately 120 sq ft. Doors can be removed to simplify corridor and to maximize available shaft space.

16 Lab Programming : Research s with Benches Structure Corridor

17 Lab Programming : Possible Teaching Lab Spaces Structure Corridor Program: When a project begins development the architect working closely with the client develops and refines the building program. A program is a listing of required spaces with their square footages. In an academic building the program may be broken down by department. Working with this as a guide the architect looks to fit these puzzle pieces into the building layout.

18 Structure Corridor Lab Programming : Program Spaces & Sizes Lab Bays: Column Grid is 20-6 Bay Size is Research Lab Spaces will be single, double or triple bay. For each research lab you should include a faculty office of approximately 120 sq ft. Doors can be removed to simplify corridor and to maximize available shaft space. Space Type Description Size Required Research Labs Single (1) Bay 215 sq ft Double (2) Bay 430 sq ft Triple (3) Bay 650 sq ft Teaching Labs (2) Bay 16 Students 430 sq ft (4) Bay 32 Students 860 sq ft (6) Bay 32 Students 1290 sq ft Classrooms For 16 and 32 students Faculty Offices 1 for each research lab 120 sq ft Lecture Halls Fixed Seating 60 Seats Fixed Seating 120 Seats Bathrooms Men's & Women's each floor

19 Structure Corridor Lab Programming : Program by Department Space Planning Work with these numbers as a start. For each research lab you will need 1 faculty office. On the basement level or the lab or atrium you should include the large lecture halls. The lower two floors should be teaching labs & classrooms. Department Research Labs 1-Bay 2-Bay 3-Bay Classrooms Biology Chemistry Physics Dental Hygiene Nursing Total by Type Total Bays

20 Lab Programming : Layout by Department Structure Corridor Patchwork: A programmed floor plan may include a combination of spaces by department as well as some shared spaces. Programming is a compromise.

21 Project Day 09 - Wrap Up Structure Corridor Structure Corridor

Conference-Seminar Table & chair Case Study (tiered) Swivel chairs, Continuous Counter Top

Conference-Seminar Table & chair Case Study (tiered) Swivel chairs, Continuous Counter Top III. DESIGN 3.03 Academic Building Interior Space Square Footage Standards A. Plan academic spaces in new buildings and in the major renovation of existing buildings to conform to the following space standards:

More information

2014 Michael G. Meyers Design Competition

2014 Michael G. Meyers Design Competition 2014 Michael G. Meyers Design Competition #College2020MGMC HISTORY - CULTURE - ACADEMIA. This year, the design problem for the MGMC is to design a new academic building for Rice University. The University

More information

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation Mechanical Technical Report 1 Standard 62.1 Ventilation Compliance Evaluation Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department

More information

2014 Exhibition of School Planning and Architecture. Lassonde School of Engineering. York University Toronto, Ontario, Canada

2014 Exhibition of School Planning and Architecture. Lassonde School of Engineering. York University Toronto, Ontario, Canada 2014 Exhibition of School Planning and Architecture Lassonde School of Engineering York University Toronto, Ontario, Canada Lassonde School of Engineering The natural setting for the building was an inspiration

More information

UNIVERSITY OF TORONTO FACULTY OF LAW

UNIVERSITY OF TORONTO FACULTY OF LAW VIEW LOOKING NORTH FROM HOSKIN AVENUE AND PHILOSOPHER S WALK UNIVERSITY OF TORONTO FACULTY OF LAW Kuwabara Payne McKenna Blumberg Architects September 00 Consultant Team Phillips Faarrevaag Smallenberg

More information

Common Building Code Misinterpretations

Common Building Code Misinterpretations Common Building Code Misinterpretations Presented by: Ron Melucci, P.E. Technical Manager, FP Division Engineering Planning and Management, Inc. rbm@epm inc.com www.epm inc.com 508 875 2121 Engineering

More information

AIA Albuquerque 2016 Design Awards

AIA Albuquerque 2016 Design Awards AIA Albuquerque 2016 Design Awards Citation Award General Design San Juan College School of Energy Dekker/Perich/Sabatini Citation Award General Design CNM Main Campus Wayfinding Studio Collaboration

More information

TECHNICAL ASSIGNMENT #3: SCHEMATIC LIGHTING DESIGN

TECHNICAL ASSIGNMENT #3: SCHEMATIC LIGHTING DESIGN TECHNICAL ASSIGNMENT #3: SCHEMATIC LIGHTING DESIGN Jason Weaver 12/13/2007 Background The central role of a college is to help students develop a worldview. The three things one needs to understand in

More information

University of Pennsylvania, Neural and Behavioral Sciences Building

University of Pennsylvania, Neural and Behavioral Sciences Building University of Pennsylvania, Neural and Behavioral Sciences Building Philadelphia, Pennsylvania Category: Architecture The genesis for the new Neural and Behavioral Sciences (NBS) building is the acknowledgment

More information

Service Description Service Shop Customer Charge Comments. Electronic Shop. Electric Shop Yes additional circuits for equipment

Service Description Service Shop Customer Charge Comments. Electronic Shop. Electric Shop Yes additional circuits for equipment Fire alarm repairs Electronic Shop Fire alarm sound level testing Electronic Shop Fire system inspections Electronic Shop Installation of additional fire detection/alarm/supression devices Electronic Shop

More information

Creating 3D Interior Maps for Campus Planning

Creating 3D Interior Maps for Campus Planning Creating 3D Interior Maps for Campus Planning ESRI User Conference 2016 Parvaneh Kossari Harvard Planning & Project Management Antje Kunze SMARTERBETTERCITIES Harvard Planning & Project Management Harvard

More information

NECC Strategic Plan Goal Team 1: Develop a Comprehensive Campus in Downtown Lawrence

NECC Strategic Plan Goal Team 1: Develop a Comprehensive Campus in Downtown Lawrence NECC Strategic Plan Goal Team 1: Develop a Comprehensive Campus in Downtown Lawrence Meeting Minutes April 9, 2014 Lawrence Campus Backfill Subcommittee Updates Martha Leavitt/Dick Goulet Revised goal

More information

Wayne State University

Wayne State University 5557 Cass Ave WSU Project #048-251652 Issued For Bids February 24, 2015 FTC&H Project Number Fishbeck, Thompson, Carr & Huber, Inc. Engineers Scientists Architects Constructors 39500 MacKenzie Drive, Suite

More information

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016 LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016 PROJECT OVERVIEW PROJECT OVERVIEW + PRE-DESIGN BEGAN IN FALL OF 2015 + EXISTING CONDITIONS ANALYSIS + PROJECTED GROWTH IN HIGH SCHOOL

More information

Monadnock State Park Welcome Center American Institute of Architects New Hampshire Chapter

Monadnock State Park Welcome Center American Institute of Architects New Hampshire Chapter Monadnock State Park Welcome Center American Institute of Architects New Hampshire Chapter 2019 High School Design Competition Program Educational Objectives To increase awareness of the relationships

More information

Jamie Devenger Senior Thesis Princeton University Sherrerd Hall 1 Lighting Proposal Memo September 11, 2009

Jamie Devenger Senior Thesis Princeton University Sherrerd Hall 1 Lighting Proposal Memo September 11, 2009 Jamie Devenger Senior Thesis Princeton University Sherrerd Hall 1 I am proposing to study five spaces for the lighting portion of my thesis. The spaces to be analyzed and redesigned are as follows: Large

More information

NYC Department of Education

NYC Department of Education Asset: NEW UTRECHT AF - BROOKLYN, 1601 80 STREET, New York, 11214 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 4:06 PM 2018-06-13 10:51 AM AA : Architectural

More information

FIRE-RESISTANCE-RATED CONSTRUCTION A Primer on IBC Chapter 7

FIRE-RESISTANCE-RATED CONSTRUCTION A Primer on IBC Chapter 7 FIRE-RESISTANCE-RATED CONSTRUCTION A Primer on IBC Chapter 7 NEW ENGLAND BUILDING OFFICIALS EDUCATION ASSOCIATION 48th CONFERENCE October 6-8, 2014 UMass Amherst Milton Gregory Grew, AIA Architect Building

More information

bold/italic items are revisions to the previous program notes

bold/italic items are revisions to the previous program notes bold/italic items are revisions to the previous program notes Future Meetings: - Dr. Caldwell - Students - Industry Partners (Mike Betts? Sam Geil? Kevin Harmon? TBD by SCCCD) A. Specific Room Requirements

More information

Educate and Promote Innovations in Sustainable Living

Educate and Promote Innovations in Sustainable Living American Institute of Architects New Hampshire Chapter 2011-2012 High School Design Competition Program Educational Objectives To increase your awareness of the relationships between space, human scale

More information

Planning Guide for the Refurbishment, Renovation, or Construction of Instructional Space Environments

Planning Guide for the Refurbishment, Renovation, or Construction of Instructional Space Environments Planning Guide for the Refurbishment, Renovation, or Construction of Instructional Space Environments April 7, 2014 Introduction This Planning Guide was developed to assist Cornell faculty and staff as

More information

SAGINAW CHARTER TOWNSHIP PLANNING COMMISSION SAGINAW CHARTER TOWNSHIP HALL SEPTEMBER 19, Members Present Members Absent Others Present

SAGINAW CHARTER TOWNSHIP PLANNING COMMISSION SAGINAW CHARTER TOWNSHIP HALL SEPTEMBER 19, Members Present Members Absent Others Present SAGINAW CHARTER TOWNSHIP PLANNING COMMISSION SAGINAW CHARTER TOWNSHIP HALL SEPTEMBER 19, 2018 Members Present Members Absent Others Present C. Nolan S. King, Dir. of Community Dev. G. Fahndrich M. Mahlberg,

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: LEHMAN AF - BRONX, 3000 EAST TREMONT AVENUE, New York, 10461 Inspection Id Inspection Type Time In Last Edited SA : Architectural -

More information

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools 143 Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky

More information

BUILDING CODE OF THE CITY OF NEW YORK. New York City Department of Buildings 4 June 2007

BUILDING CODE OF THE CITY OF NEW YORK. New York City Department of Buildings 4 June 2007 BUILDING CODE OF THE CITY OF NEW YORK New York City Department of Buildings 4 June 2007 Fatma Amer, PE, Deputy Commissioner, Technical Affairs James Colgate, RA, Executive Architect John Lee, RA Keith

More information

ARCHITECT S RECORD 2010 AWARD CYCLE

ARCHITECT S RECORD 2010 AWARD CYCLE Texas A&M Engineering College TEXAS A&M ENGINEERING COLLEGE TEXAS A&M ENGINEERING COLLEGE Doha, Qatar Architects Legoretta + Legoretta Mexico City, Mexico Clients Qatar Petroleum Onshore Engineering Doha,

More information

UNIVERSITY COLLEGE LONDON EMERGENCY PLAN. Regulatory Reform (Fire Safety) Order 2005 PART ONE - SPECIFIC INSTRUCTIONS & OTHER RELEVANT INFORMATION:

UNIVERSITY COLLEGE LONDON EMERGENCY PLAN. Regulatory Reform (Fire Safety) Order 2005 PART ONE - SPECIFIC INSTRUCTIONS & OTHER RELEVANT INFORMATION: UCL ESTATES Fire Safety UNIVERSITY COLLEGE LONDON EMERGENCY PLAN Regulatory Reform (Fire Safety) Order 2005 Name & Address of Building: Occupying Department(s) / School(s) / Institute(s): Christopher Ingold

More information

BIg Impact. Small Addition, A 2-ft. bump-out brings a midcentury home into the next century

BIg Impact. Small Addition, A 2-ft. bump-out brings a midcentury home into the next century Small Addition, BIg Impact A 2-ft. bump-out brings a midcentury home into the next century by Paul buum I first worked with Stacy and Eileen to remodel their Wisconsin vacation cabin, and we were in the

More information

Construction Innovation Center Building 186

Construction Innovation Center Building 186 Construction Innovation Center Building 186 FPE 596 Professors Presented Culminating Experience in Fire Protection Engineering Christopher Pascual & Frederick W. Mowrer Christopher Torres Objective / Overview

More information

NYC Department of Education

NYC Department of Education Asset: COLUMBUS AF - BRONX, 925 ASTOR AVENUE, New York, 10469 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 9:21 AM 2017-11-29 8:45 AM AA : Architectural - Associate

More information

MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE

MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE 18422 Bear Valley Road Victorville, CA 92395 Date 25 September 2012 dha Job No. 12155 TABLE OF CONTENTS I. Purpose.... Page 1 II. Existing

More information

NFPA 101 Code Update from 2012 Edition to the 2015 Edition

NFPA 101 Code Update from 2012 Edition to the 2015 Edition NFPA 101 Code Update from 2012 Edition to the 2015 Edition Presented by: Gary Furdell AHCA Fire Protection Specialist 1 2 2012 Update to 2015 Chapter 18 New Health Care Occupancies 4 18.1.3.2 Atrium walls

More information

LEARNING RESOURCE CENTRE CASE STUDIES. alkizim muneeer khalid b02/52599/2012 project 1 the learning resource centre

LEARNING RESOURCE CENTRE CASE STUDIES. alkizim muneeer khalid b02/52599/2012 project 1 the learning resource centre LEARNING RESOURCE CENTRE CASE STUDIES alkizim muneeer khalid b02/52599/2012 project 1 the learning resource centre Golden West College Architect: Steinberg Architects Materials: Glass Concrete Location:

More information

Higher Education Solutions

Higher Education Solutions Higher Education Solutions Table of Contents We re Allsteel. Our products and services turn insights into action, and solutions into lasting success. 3-9 Allsteel Services & Workplace Trends 10-11 Common

More information

Diamond Schmitt Architects MEDIA RELEASE November 24, 2011

Diamond Schmitt Architects MEDIA RELEASE November 24, 2011 Diamond Schmitt Architects MEDIA RELEASE November 24, 2011 ALGONQUIN CENTRE FOR CONSTRUCTION EXCELLENCE OPENS LEED Platinum trades school is a living laboratory TORONTO The Algonquin Centre for Construction

More information

Supplement 3 NYU IDENTITY INTERIOR SIGNAGE

Supplement 3 NYU IDENTITY INTERIOR SIGNAGE Supplement 3 NYU IDENTITY INTERIOR SIGNAGE Table of Contents Start Here Why Interior Sign Guidelines Are Needed... 3 Steps for Ordering Signs... 3 Important to Know... 3 Elements Logos... 4 Typography....

More information

Bethlehem University 2008 Projects Summary

Bethlehem University 2008 Projects Summary 2008 Projects Summary 2008 Projects Summary In Addition to following up daily engineering related issues and supervising the Maintenance and Security Departments the University Engineer is involved in

More information

Academics Efficient use of space will be used to enhance investments in new pedagogies such as active learning classrooms.

Academics Efficient use of space will be used to enhance investments in new pedagogies such as active learning classrooms. Goals and Assumptions Physical Planning Goals and Objectives The guiding principles of this Master Plan were developed in consultation with various constituencies that make up the NMSU community and were

More information

Mark D. Williams Custom Homes, Inc. Total House: Under $250,000. Minneapolis

Mark D. Williams Custom Homes, Inc. Total House: Under $250,000. Minneapolis Mark D. Williams Custom Homes, Inc. Total House: Under $250,000 Minneapolis PROJECT DESCRIPTION: We began working with our clients by meeting them with their realtor as they were shopping for their home.

More information

Interior signs are an extension of the exterior sign system and their content and design should take this into consideration.

Interior signs are an extension of the exterior sign system and their content and design should take this into consideration. General Guideline The Interior Sign standard is developed to address the need for a cost effective, functional, flexible and serviceable sign system. The intent is to assure code compliance, consistency

More information

Designing the Catherine and Isiah Leggett Math and Science Building

Designing the Catherine and Isiah Leggett Math and Science Building Designing the Catherine and Isiah Leggett Math and Science Building Takoma Park / Silver Spring Campus June 28, 2018 Design Charrette Kickoff Welcome Remarks Dr. Stephen Cain, Chief of Staff, Montgomery

More information

PORTFOLIO SARAH NG

PORTFOLIO SARAH NG PORTFOLIO 2016-2017 SARAH NG CONTENT ARCHITECTURE SHIELD - THE HUMAN RIGHTS MUSEUM TIME LAPSE - ONE WILSHIRE APARTMENT DOORWAY - HISTORICAL SOCIETY MUSEUM INTERIORS WAVE - OFFICE DESIGN STYLE ON U - RETAIL

More information

APPENDIX F: LOCKSETS AND ACCESS CONTROL

APPENDIX F: LOCKSETS AND ACCESS CONTROL APPENDIX F: LOCKSETS AND ACCESS CONTROL F.1 LOCKSETS The University, with the exception of the Housing Division which uses a Best 7-pin system, utilizes a Corbin Russwin 7-pin IC Core keying system. Locksets

More information

Orleans Primary School : Richmond

Orleans Primary School : Richmond Orleans Primary School : Richmond Client: London Borough of Richmond upon Thames Local Authority Contractor: Phase - Neilcott Construction (main build), Tandem Studio (Joinery/fit out), Phase 2 Bolt &

More information

Facilities Management Services

Facilities Management Services Facilities Management Services Operating Budget Facilities Management (FM) receives an Operating Budget each year predicated on funding the routine, predictable costs of cleaning, maintaining,, and repairing,

More information

ILASA Conference 2010

ILASA Conference 2010 ILASA Conference 2010 CASE STUDY: The Life Sciences Development At The University of The Western Cape Presented by: Penny Unsworth Introduction Project commenced: November 2007 Works Completion Reached:

More information

Update on University Avenue Study. September 21, 2015

Update on University Avenue Study. September 21, 2015 Update on University Avenue Study September 21, 2015 Existing Building Capacity Analysis Desired Potential Programs for Corridor District University Commons 50,000 +/- GSF Consolidate Student Services

More information

LABELING OF FIRE-RATED GLAZING STUDY GROUP REPORT TO CTC MEETING CHICAGO, IL - OCTOBER 13-14, 2011 CODE CHANGES

LABELING OF FIRE-RATED GLAZING STUDY GROUP REPORT TO CTC MEETING CHICAGO, IL - OCTOBER 13-14, 2011 CODE CHANGES LABELING OF FIRE-RATED GLAZING STUDY GROUP REPORT TO CTC MEETING CHICAGO, IL - OCTOBER 3-4, 20 CODE CHANGES Issue : Clarification of when 703.6 can be used rather than 76. 76.2 --rated glazing. --rated

More information

LIGHTING CONTROLS

LIGHTING CONTROLS 260923 LIGHTING CONTROLS PART 1: GENERAL 1.01 SUMMARY COMMENTS A. CU has developed this lighting control guideline to direct design professionals toward standard solutions that meet the University s performance

More information

DD Phase Client Coordination Meeting Finishes & Site

DD Phase Client Coordination Meeting Finishes & Site DD Phase Client Coordination Meeting Finishes & Site MCC Student Activity Space, The following report was prepared by the Architect and will be assumed to be correct unless written exceptions are received

More information

PALOMAR COLLEGE LEARNING RESOURCE CENTER

PALOMAR COLLEGE LEARNING RESOURCE CENTER PALOMAR COLLEGE LEARNING RESOURCE CENTER C15-05-PID The Learning Resource Center will centralize the college s information services in one location and will become the focal point of campus, offering a

More information

Department of Chemistry Emergency Action Plan

Department of Chemistry Emergency Action Plan Department of Chemistry Emergency Action Plan The purpose of this policy is to prepare Department of Chemistry personnel to handle emergencies such as chemical spills, fire, tornados, or bomb threats.

More information

Tech Report 1, Part 1: Lighting Proposal Memo TO: Shawn Good

Tech Report 1, Part 1: Lighting Proposal Memo TO: Shawn Good Tech Report 1, Part 1: Lighting Proposal Memo TO: Shawn Good FROM: Sarah Miller DATE: 9 September, 2013 SUBJECT: University of Maryland: Prince Frederick Hall This memo discusses the different spaces I

More information

HISTORIC RESOURCES INVENTORY - BUILDING AND STRUCTURES

HISTORIC RESOURCES INVENTORY - BUILDING AND STRUCTURES HISTORIC RESOURCES INVENTORY - BUILDING AND STRUCTURES Connecticut Commission on Culture & Tourism, One Constitution Plaza, 2nd Floor, Hartford, CT 06103 * Note: Please attach any additional or expanded

More information

Kaleida Health, Gates Vascular Institute and UB Clinical Translational Research Center A Buffalo research facility fosters interaction and innovation

Kaleida Health, Gates Vascular Institute and UB Clinical Translational Research Center A Buffalo research facility fosters interaction and innovation contract Kaleida Health, Gates Vascular Institute and UB Clinical Translational Research Center A Buffalo research facility fosters interaction and innovation 2012 HEALTHCARE ENVIRONMENT AWARDS The Institute

More information

Erin McCauley The Gateway Building

Erin McCauley The Gateway Building Erin McCauley The Gateway Building Schematic Lighting Design The Gateway Building Location Syracuse, NY SUNY ESF Campus Construction August 6, 2010-2012 Project Cost $28.3 Million Size 50,000 SF Sustainable

More information

District Facilities Master Plan

District Facilities Master Plan W o r k s h o p B o a r d District Facilities Master Plan February 29, 2012 BACKGROUND + CONTEXT ANALYSIS OPTIONS RECOMMENDATIONS NEXT STEPS DFMP AGENDA BACKGROUND + CONTEXT ANALYSIS OPTIONS RECOMMENDATIONS

More information

MOLSON S BANK BUILDING 166 EAST HASTINGS STREET, VANCOUVER, BC

MOLSON S BANK BUILDING 166 EAST HASTINGS STREET, VANCOUVER, BC RESIDENTIAL ROOM Window Provide an operable window New pressed metal door, 20 min. FPR, in new metal buck or existing wood frame, made good Proximity access control technology door hardware, closer in

More information

Cleaning Brief City Recital Hall

Cleaning Brief City Recital Hall Floor Areas Frequency Comment Ground Floor Administration Monday to Friday Administration should be cleaned on a daily basis Box Office Daily unless noted Clean floors - mop and/or vacuum Stage Door area

More information

PARP:PS (Pompeii Archaeological Research Project: Porta Stabia) I Pompeii, Italy project team member I 2010

PARP:PS (Pompeii Archaeological Research Project: Porta Stabia) I Pompeii, Italy project team member I 2010 HELEN TURNER LEED AP, NCIDQ No. 25491 Assistant Professor helen.turner@uky.com EDUCATION University of Cincinnati I Cincinnati, Ohio Master of Science in Architecture 2009-2011 Ohio University I Athens,

More information

CAMPUS MASTER PLAN DRAFT PLAN UPDATE JANUARY

CAMPUS MASTER PLAN DRAFT PLAN UPDATE JANUARY NEW MEXICO HIGHLANDS UNIVERSITY CAMPUS MASTER PLAN DRAFT PLAN UPDATE JANUARY 27 2010 MASTER PLANNING GOALS TO BALANCE THE STRATEGIC GOALS OF THE UNIVERSITY WITH THE PHYSICAL CAMPUS through the assessment

More information

Glass and Glazing projects as Turn Key

Glass and Glazing projects as Turn Key A Subsidiary of LANCET GLASS Middle East. We undertake All kind of Glass and Glazing projects as Turn Key Complete Solution provider and supplier of All kind of mirrors Laminated Glass STRUCTURAL ARCHITECTURAL

More information

HORTICULTURE 3140: INTERIORSCAPING. Dr. Paul Thomas Spring Diana Vathanakamsang

HORTICULTURE 3140: INTERIORSCAPING. Dr. Paul Thomas Spring Diana Vathanakamsang HORTICULTURE 3140: INTERIORSCAPING Dr. Paul Thomas Spring 2007 Diana Vathanakamsang JUBILEE INTERIORSCAPING A student-run business designed to enhance beauty and add life to any and all interior spaces

More information

Solana Ranch Elementary School

Solana Ranch Elementary School 2015 Exhibition of School Planning and Architecture Solana Ranch Elementary School Category: New Construction Solana Beach School District Solana Beach, CA Project name Project name Landscape Plan Community

More information

EDITION AUGUST 2016 PRIVA-LITE TEXGLASS COMFORT INTIMACY DESIGN ADVANCED SOLUTIONS FOR MODERN INTERIORS. New Nya NORDISKA Collection

EDITION AUGUST 2016 PRIVA-LITE TEXGLASS COMFORT INTIMACY DESIGN ADVANCED SOLUTIONS FOR MODERN INTERIORS. New Nya NORDISKA Collection EDITION AUGUST 2016 PRIVA-LITE TEXGLASS COMFORT INTIMACY DESIGN ADVANCED SOLUTIONS FOR MODERN INTERIORS New Nya NORDISKA Collection PRIVA-LITE TEXGLASS COMFORT INTIMACY DESIGN It is a fusion of trendy

More information

building tour

building tour building tour 02.04.2016 1 Yuma Street, nw 42nd Street, nw Yuma Dunblane House Capital Hall atrium chapel Warren Street, nw Warren Nebraska Avenue, nw Founded in 1896, American University Washington College

More information

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting PROJECT MANAGEMENT AGENDA Project: George Keverian School Feasibility Study Project No.: 16049 Re: School Building Committee Meeting Meeting Date: 3/22/2017 Meeting Location: Mayor s Conference Room, City

More information

Winston-Salem State University Campus Master Plan 2016 Update

Winston-Salem State University Campus Master Plan 2016 Update Winston-Salem State University Campus Master Plan 2016 Update Request for Qualifications Page 1 of 6 Overview Winston-Salem State University (WSSU) is requesting qualifications from planning firms specializing

More information

UNIVERSITY COLLEGE LONDON EMERGENCY PLAN. Regulatory Reform (Fire Safety) Order 2005 PART ONE - SPECIFIC INSTRUCTIONS & OTHER RELEVANT INFORMATION:

UNIVERSITY COLLEGE LONDON EMERGENCY PLAN. Regulatory Reform (Fire Safety) Order 2005 PART ONE - SPECIFIC INSTRUCTIONS & OTHER RELEVANT INFORMATION: Bldg Name: Rockefeller & Medical School (201 & 374) UCL ESTATES Fire Safety UNIVERSITY COLLEGE LONDON EMERGENCY PLAN Regulatory Reform (Fire Safety) Order 2005 Name & Address of Building: Occupying Department(s)

More information

2013 Exhibition of School Planning and Architecture. Sandy High School. Sandy, Oregon

2013 Exhibition of School Planning and Architecture. Sandy High School. Sandy, Oregon 2013 Exhibition of School Planning and Architecture Sandy High School Sandy, Oregon Sandy High School Main Exterior Image Sandy High School High School Site Preserved Woodland Existing Ball Fields Sandy

More information

Natural History Building - University of Illinois at Urbana-Champaign. Project Profile

Natural History Building - University of Illinois at Urbana-Champaign. Project Profile Natural History Building - University of Illinois at Urbana-Champaign Project Profile Completed in 1894, the Natural History Building at the University of Illinois at Urbana-Champaign (UIUC), serves as

More information

City of South Salt Lake Fire Code Training Exiting, Egress Systems and Egress Control

City of South Salt Lake Fire Code Training Exiting, Egress Systems and Egress Control City of South Salt Lake Fire Code Training Exiting, Egress Systems and Egress Control 11-27-12 This document is designed as a summary guide using IFC requirements for the provisions associated with exiting,

More information

EMERGENCY EVACUATION PLAN

EMERGENCY EVACUATION PLAN UCL ESTATES & FACILITIES DIVISION Construction Maintenance & Fire Safety UNIVERSITY COLLEGE LONDON EMERGENCY PLAN Regulatory Reform (Fire Safety) Order 2005 Name & Address of Building: Occupying Department(s)

More information

Open to Below: A Discussion of Allowed Floor Openings. Jay A. Ierardi, Ph.D., P.E., LEED AP. Kevin S. Hastings, P.E., LEED AP

Open to Below: A Discussion of Allowed Floor Openings. Jay A. Ierardi, Ph.D., P.E., LEED AP. Kevin S. Hastings, P.E., LEED AP Open to Below: A Discussion of Allowed Floor Openings Kevin S. Hastings, P.E., LEED AP Jay A. Ierardi, Ph.D., P.E., LEED AP R.W. Sullivan Engineering (617) 523-8227, Fax (617) 523-8016 http://www.rwsullivan.com

More information

campus master plan VIRGINIA STATE UNIVERSITY

campus master plan VIRGINIA STATE UNIVERSITY campus master plan VIRGINIA STATE UNIVERSITY agenda 01 INTRODUCTION & GENERAL OVERVIEW 02 03 04 LAND USE CONCEPT PROGRAM ACCOMMODATION MAXIMIZE EXISTING INFRASTRUCTURE SUMMARY AND NEXT 05 STEPS agenda

More information

Senior Thesis Presentation

Senior Thesis Presentation Senior Thesis Presentation 5th Year Architectural Engineering Lighting/ Electrical Option Advisors: Dr. Mistrick & Prof. Dannerth Building Overview Size: 104, 000 square feet on 4 levels (3 stories above

More information

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN Wold Architects and Engineers 332 Minnesota Street Suite W2000 Saint Paul, MN 55101 651 227 7773 PLANNERS ARCHITECTS ENGINEERS ISD #15 St. Francis Area Schools East Bethel Elementary School Additions and

More information

WORKSHEET 2-1 THE MANITOBA RESIDENTIAL OCCUPANCY FIRE RISK INDEX FIRE SAFETY PARAMETER VALUES

WORKSHEET 2-1 THE MANITOBA RESIDENTIAL OCCUPANCY FIRE RISK INDEX FIRE SAFETY PARAMETER VALUES 1 WORKSHEET 2-1 THE MANITOBA RESIDENTIAL OCCUPANCY FIRE RISK INDEX FIRE SAFETY PARAMETER VALUES TABLE 2.1 CONSTRUCTION OF STRUCTURAL MEMBERS AND FLOOR AND ROOF (1) ASSEMBLIES (Applies to each fire zone)

More information

Issue Date 003C2B-DA VA Project Design Principles Foundation of Design

Issue Date 003C2B-DA VA Project Design Principles Foundation of Design 003C2B-DA-147 09-01-16 VA Project Design Principles Foundation of Design 003C2B-DA-146 09-01-15 Clean Core and Operating Room Pressure Relationship 003C2B-DA-145 08-01-15 Ante Room Requirements 003C2B-DA-144

More information

Chapter 11. Exterior Design Factors. Introduction. House design does not stop once room arrangements are determined

Chapter 11. Exterior Design Factors. Introduction. House design does not stop once room arrangements are determined Chapter 11 Exterior Design Factors Introduction House design does not stop once room arrangements are determined Exterior must also be considered Often a client has a certain style in mind that dictates

More information

Lackawanna Plaza Revitalization Grocery Store Study. Dear Mr. Ross,

Lackawanna Plaza Revitalization Grocery Store Study. Dear Mr. Ross, June 14, 2018 Barton Ross Barton Ross & Partners, LLC 184 S. Livingston Ave, Ste. 9-140 Livingston, NJ 07039 barton@bartonross.com Re: Lackawanna Plaza Revitalization Grocery Store Study Dear Mr. Ross,

More information

STUDIO ONE PORTFOLIO KIEFER SAVAGE HOUSE VI: VIEWING PLATFORM: DRONE HOUSE:

STUDIO ONE PORTFOLIO KIEFER SAVAGE HOUSE VI: VIEWING PLATFORM: DRONE HOUSE: STUDIO ONE PORTFOLIO HOUSE VI: VIEWING PLATFORM: DRONE HOUSE: 1 3 7 HOUSE VI HOUSE VI FORMULATION GRID TRANSLATION INTO INTERIOR SPACES Extrusions Peter Eisenman s house VI was examined in collaboration

More information

Australian National University

Australian National University Study Item/ Area Acton Campus Precinct Building Nos. & Names Department of Earth & Marine Sciences (DEMS), Wes Whitten Building BANKS Precinct 47 (DA Brown Building, DEMS), 133 (Wes Whitten Building) Figure

More information

Walnut Creek Transit Village Design Guidelines. Part Three III - 25

Walnut Creek Transit Village Design Guidelines. Part Three III - 25 C. General Design Criteria Part Three DRAFT 0/6/ III - 5 Frontage Types Frontage is a semi-public transition zone at the ground level where public and private realms meet. An understanding of various frontage

More information

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

Binghamton University Construction SUMMER 2012 HIGHLIGHTS Binghamton University Construction SUMMER 2012 HIGHLIGHTS Binghamton University Construction Summer 2012 Large and small construction projects were completed during the summer 2012 construction season.

More information

Manhattanville Development Proposal: Project Description

Manhattanville Development Proposal: Project Description Manhattanville Development Proposal: Project Description Columbia University Community Board 9 Public Meeting, Tuesday, October 11, 2005 1 A Collaborative Process: Times and Topics Thursday, Oct. 6, 6:30

More information

CORRALES INTERNATIONAL SCHOOL TENANT IMPROVEMENT 5500 WILSHIRE AVE NE ALBUQUERQUE, NM 87113

CORRALES INTERNATIONAL SCHOOL TENANT IMPROVEMENT 5500 WILSHIRE AVE NE ALBUQUERQUE, NM 87113 CORRALES INTERNATIONAL SCHOOL TENANT IMPROVEMENT DRAWING INDEX COVER SHEET G-101 FIRST FLOOR CODE ANALYSIS G-102 SECOND FLOOR CODE ANALYSIS G-103 CAFETERIA CODE ANALYSIS D-101 FIRST FLOOR DEMOLITION PLAN

More information

OPERATIONS & MAINTENANCE PLAN. 571 Vance Ave Memphis, TN

OPERATIONS & MAINTENANCE PLAN. 571 Vance Ave Memphis, TN OPERATIONS & MAINTENANCE PLAN 571 Vance Ave Memphis, TN 38126 www.htimphs.com MISSION STATEMENT To provide educational opportunities to the general public in demand occupations based on outcomes with a

More information

EJB Custom-Built Control Panels

EJB Custom-Built Control Panels EJB Custom-Built Control Panels Cl. I, Div. 1 & 2, Groups B*, C, D Cl. I, Zones 1 & 2 Cl. II, Div. 1, Groups E, F, G Cl. II, Div. 2, Groups F, G Cl. III UL and cul approved Ex d IIB + H2 T6 Certified to

More information

11 February CAMPUS MASTER PLAN UPDATE Focus Group - Design Guidelines

11 February CAMPUS MASTER PLAN UPDATE Focus Group - Design Guidelines 11 February 2016 CAMPUS MASTER PLAN UPDATE Focus Group - Design Guidelines AGENDA Introductions Planning Scope The 2004 Campus Plan Observations Design Guidelines - 2004 Plan SWOT Exercise Analysis Goals

More information

2015 Exhibition of School Planning and Architecture

2015 Exhibition of School Planning and Architecture 2015 Exhibition of School Planning and Architecture Battle Creek Area Mathematics and Science Center Category: Renovation Battle Creek Area Schools Battle Creek, Michigan Battle Creek Area Math & Science

More information

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly Collect & properly dispose of recycling as needed Dust, or wipe all

More information

SMEAL COLLEGE OF BUSINESS BUILDING University Park, PA

SMEAL COLLEGE OF BUSINESS BUILDING University Park, PA SMEAL COLLEGE OF BUSINESS BUILDING University Park, PA Yena K. Han The Pennsylvania State University Architectural Engineering, Lighting/Electrical Faculty Advisor: Richard G. Mistrick, Ph.D., P.E., FIES

More information

room data sheet MARR HOTEL 401 POWELL STREET, VANCOUVER, BC 1/9 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

room data sheet MARR HOTEL 401 POWELL STREET, VANCOUVER, BC 1/9 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT RESIDENTIAL ROOM Window Provide an operable window New pressed metal door, 20 min. FPR, in new metal buck or existing wood frame, made good Proximity access control technology door hardware, closer in

More information

UNIVERSITY COLLEGE LONDON EMERGENCY PLAN. Regulatory Reform (Fire Safety) Order 2005 PART ONE - SPECIFIC INSTRUCTIONS & OTHER RELEVANT INFORMATION:

UNIVERSITY COLLEGE LONDON EMERGENCY PLAN. Regulatory Reform (Fire Safety) Order 2005 PART ONE - SPECIFIC INSTRUCTIONS & OTHER RELEVANT INFORMATION: UCL ESTATES & FACILITIES DIVISION Construction Maintenance & Fire Safety UNIVERSITY COLLEGE LONDON EMERGENCY PLAN Regulatory Reform (Fire Safety) Order 2005 Name & Address of Building: Occupying Department(s)

More information

The University of Hong Kong s Centennial Campus: Growth and Sustainability in a City Environment

The University of Hong Kong s Centennial Campus: Growth and Sustainability in a City Environment The University of Hong Kong s Centennial Campus: Growth and Sustainability in a City Environment Dr. Sarah Liao Senior Advisor to the Vice Chancellor The University of Hong Kong ISCN Symposium Shanghai

More information

Gateway Corridor Standards

Gateway Corridor Standards Gateway Corridor Standards Building design and construction: Bungalow Classical Revival Colonial Revival Frame Vernacular Gothic Revival Italianate Mediterranean Revival Queen Anne Shingle architectural

More information

Video: Form and Space in Architecture

Video: Form and Space in Architecture Arts Teaching Kit for Senior Secondary Curriculum Visual Arts Video: Form and Space in Architecture [Student notes] Organizer Sponsor Research Team Architectural Services Department Contents Preamble Learning

More information

Facility Master Plan

Facility Master Plan Facility Master Plan for COSUMNES RIVER COLLEGE Los Rios Community College District March, 2004 TABLE OF CONTENTS I. Facility Master Plan Process of Development 1. Background Statement 2. Facility Master

More information

CHAPTER FOUR: Alternatives to the Proposed Action

CHAPTER FOUR: Alternatives to the Proposed Action CHAPTER FOUR: Alternatives to the Proposed Action CHAPTER FOUR: ALTERNATIVES TO THE PROPOSED ACTION 4.1 Alternatives to the West Campus Plan The following sections discuss alternatives to the proposed

More information