DESIGN OF QUAY STRUCTURES PORT OF NUUK GEOTEKNIKERNES HVERDAG 2016: DTU - LYNGBY PORT OF NUUK - DESIGN OF QUAY STRUCTURES
|
|
- Anissa Newton
- 5 years ago
- Views:
Transcription
1 DESIGN OF QUAY STRUCTURES PORT OF NUUK GEOTEKNIKERNES HVERDAG 2016: DTU - LYNGBY
2 OVERVIEW LOCATION Nuuk
3 OVERVIEW SCOPE New container terminal, Nuuk Employer: Sikuki Nuuk Harbour A/S Contractor: Per Aarsleff A/S Scope: ~400 m of sheet pile Quay wall Dredging works (blasting) Reclamation works (260,000 m³) Pavements (60,000 m²) Fenders, bollards Buildings and installations
4 OVERVIEW SCOPE New container terminal, Nuuk Employer: Sikuki Nuuk Harbour A/S Reclamation Pavement Contractor: Per Aarsleff A/S Scope: ~400 m of sheet pile Quay wall Dredging works (blasting) Reclamation works (260,000 m³) Pavements (60,000 m²) Fenders, bollards Buildings and installations Buildings Quay 103 Quay 100 Quay 101/102 Dredging
5 PROJECT BASIS BATHYMETRY AND DREDGING REQUIREMENTS
6 PROJECT BASIS GEOTECHNICAL CONDITIONS Profile along the cope line of quay 101/102
7 PROJECT BASIS GEOTECHNICAL CONDITIONS Profile along the cope line of quay 101/102 CH 0+000
8 PROJECT BASIS GEOTECHNICAL CONDITIONS Profile along the cope line of quay 101/102 CH 0+100
9 PROJECT BASIS GEOTECHNICAL CONDITIONS Profile along the cope line of quay 101/102 CH 0+220
10 PROJECT BASIS TENDER REQUIREMENTS QUAY AND TERMINAL
11 PROJECT BASIS TENDER REQUIREMENTS QUAY AND TERMINAL
12 LAYOUT
13 LAYOUT TYPICAL CROSS SECTION QUAY 102
14 LAYOUT TYPICAL CROSS SECTION QUAY 102
15 LAYOUT TYPICAL CROSS SECTION QUAY 102
16 LAYOUT TYPICAL CROSS SECTION QUAY 101
17 LAYOUT CORNERS
18 LAYOUT QUAY 100 AND 103
19 DESIGN
20 DESIGN SHEET PILES D-Sheet Variable loads: - Live load - Heavy vehicle(s) - Bollard pull - Fender - Max water difference Accidental loads: - vehicle impact - loss of scour protection - drainage out of function
21 DESIGN SHEET PILES Utilized roughness of the wall (up to 0.80) adjusted in order to obtain balance of vertical forces
22 DESIGN SHEET PILES AZ 26/700 AZ 28/700 AZ 24/700
23 DESIGN SHEET PILES Passive ressistance of the berm investigated with LimitState:GEO (Discontinuity layout optimisation)
24 DESIGN SHEET PILES FEM model captures influence of actual fillup stages and deformation of the soil surrounding anchor plates D-Sheet vs. Plaxis
25 DESIGN TIE-BACK SYSTEM Bollard anchor one pair per 15.4m connected to capping beam Top anchor per 2.8m connected via wale SAS 670/800 thread bars used for all tie-back anchors Back anchor per 2.8m staggered Bottom anchor per 1.4m via console
26 DESIGN TIE-BACK ANCHORS: BENDING DUE TO SETTLEMENTS Deformed anchor contour Sum phase displacements Structural beam model with imposed deformations
27 DESIGN ANCHOR PLATES: SPACING Overlapping of the mobilized wedges avoided Global sliding controlled by SSR in Plaxis
28 DESIGN ANCHOR PLATES: CORNERS Inter-crossing anchor plates
29 DESIGN ANCHOR BEAM
30 DESIGN ANCHOR BEAM Plaxis model used to estimate moments from vertical component FEM Design model used to combine various anchor loads into single model
31 DESIGN RECLAMATION Type 4 (0-600mm) Rockfill sourced on site by blasting Rockfill placed by grab to avoid segregation (wide gradation) Filter stability maintained between types Type 1 (0-90mm) Type 3 (0-360mm)
32 DESIGN SCOUR PROTECTION Quay102 Quay101
33 THANK YOU FOR ATTENTION
Advanced Foundation Engineering. Sheet-Pile Walls
Shahrood University of Technology Department of Geotechnical Engineering Advanced Foundation Engineering Sheet-Pile Walls Mohsen Keramati, Ph.D. Assistant Professor 1 Introduction Connected or semiconnected
More informationTECH. BULLETIN ISSUE TWENTY
1.0 Scope The scope of this Guideline is to: Define construction techniques associated with cold weather installation of the backfill zone; and, Identify measures that have been used successfully to allow
More informationINSTALLATION OF GEOTEXTILE TUBES USED FOR COASTAL AND RIVERINE STRUCTURES GLOBAL SYNTHETICS PROTUBE GEOTEXTILE TUBE
INSTALLATION OF GEOTEXTILE TUBES USED FOR COASTAL AND RIVERINE STRUCTURES GLOBAL SYNTHETICS PROTUBE GEOTEXTILE TUBE 1. SCOPE This practice provides guidelines for the installation of PROTUBE geotextile
More informationGEOTEXTILE TUBES AS ECONOMICAL AND ENVIRONMENTAL REPLACEMENT OF ROCKFILL FOR CONSTRUCTION OF POLDER DIKE IN SAEMANGEUM PROJECT, KOREA
GEOTEXTILE TUBES AS ECONOMICAL AND ENVIRONMENTAL REPLACEMENT OF ROCKFILL FOR CONSTRUCTION OF POLDER DIKE IN SAEMANGEUM PROJECT, KOREA WEDA 33 rd Technical Conference & Texas A&M 44 th Annual Dredging Seminar
More informationSlope Stability in Harris County
Slope Stability in Harris County Slope Stability in Harris County Slope Stability in Harris County Overview of slope stability. Conditions, causes, and types of slope failures. HCFCD geotechnical investigation
More informationTHE PERFORMANCE OF STRENGTHENING SLOPE USING SHOTCRETE AND ANCHOR BY FINITE ELEMENT METHOD (FEM)
THE PERFORMANCE OF STRENGTHENING SLOPE USING SHOTCRETE AND ANCHOR BY FINITE ELEMENT METHOD (FEM) Tri Harianto 1*, Lawalenna Samang 2, Takenori Hino 3, Fakhriyah Usman 4 and Akbar Walenna 5 1 Associate
More informationPiles subject to excavation-induced soil movement in clay
Piles subject to -induced soil movement in clay Des foundations soumis au mouvement du sol du a l' dans l'argile D.E.L. Ong, C.F. Leung & Y.K. Chow Centre for Soft Ground Engineering, National University
More informationEffect of Placement of Footing on Stability of Slope
Scientific Journal of Impact Factor (SJIF) : 3.134 ISSN (Print) : 2348-6406 ISSN (Online): 2348-4470 International Journal of Advance Engineering and Research Development Effect of Placement of Footing
More informationTransition of soil strength during suction pile retrieval
Maritime Heritage and Modern Ports 415 Transition of soil strength during suction pile retrieval S. Bang 1, Y. Cho 2 & K. Jones 1 1 Department of Civil and Environmental Engineering, South Dakota School
More informationFull Scale Model Test of Soil Reinforcement on Soft Soil Deposition with Inclined Timber Pile
Full Scale Model Test of Soil Reinforcement on Soft Soil Deposition with Inclined Timber Pile Suheriyatna 1, L. Samang 2, M. W. Tjaronge 3 and T. Harianto 4 1 Doctoral Student, Department of Civil Engineering,
More informationEffect of pile sleeve opening and length below seabed on the bearing capacity of offshore jacket mudmats
NGM 2016 Reykjavik Proceedings of the 17 th Nordic Geotechnical Meeting Challenges in Nordic Geotechnic 25 th 28 th of May Effect of pile sleeve opening and length below seabed on the bearing capacity
More informationDESIGN SCENE SUBJECT INDEX
DESIGN SCENE SUBJECT INDEX CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY BRIDGE & APPROACH PLANS CONSTRUCTION PLAN FOR EXCEPTIONS EXCEPTION CLARIFICATION GOVERNING SPECIFICATIONS
More informationModular Drawer Cabinets Installation Instructions
Modular Drawer Cabinets Installation Instructions IMPORTANT PRODUCT LIABILITY INFORMATION Read all instructions before proceeding with installation or drawer loading. Vital product information pertaining
More informationSlope stability assessment
Engineering manual No. 25 Updated: 03/2018 Slope stability assessment Program: FEM File: Demo_manual_25.gmk The objective of this manual is to analyse the slope stability degree (factor of safety) using
More informationSECTION TABLE OF CONTENTS GEOTEXTILE TUBES PARAGRAPH TITLE PAGE NOS.
SECTION TABLE OF CONTENTS SITE WORK GEOTEXTILE TUBES PARAGRAPH TITLE PAGE NOS. PART 1 - GENERAL 1.1 SCOPE OF WORK................................ 1 1.2 REFERENCES.................................. 1 1.3
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 25-5 Problem: Stormwater collected from the neighborhood upstream is released at 9 Muirfield Lane and flows west toward
More informationThis document downloaded from vulcanhammer.net vulcanhammer.info Chet Aero Marine
This document downloaded from vulcanhammer.net vulcanhammer.info Chet Aero Marine Don t forget to visit our companion site http://www.vulcanhammer.org Use subject to the terms and conditions of the respective
More informationRESPONSE OF ANCHOR IN TWO-PHASE MATERIAL UNDER UPLIFT
IGC 29, Guntur, INDIA RESPONSE OF ANCHOR IN TWO-PHASE MATERIAL UNDER UPLIFT K. Ilamparuthi Professor and Head, Division of Soil Mechanics and Foundation Engineering, Anna University, Chennai 25, India.
More informationSoil mixing. An efficient and flexible technology to overcome a variety of soil problems
Soil mixing An efficient and flexible technology to overcome a variety of soil problems The cost-effective way to improve ground Soil mixing is an advanced ground improvement technique requiring considerable
More informationINSTALLATION GUIDELINES. Landfills and mines
INSTALLATION GUIDELINES Landfills and mines Introduction Recommendations This installation manual gives general recommendations for the installation of the drainage geocomposites InterDRAIN and TechDRAIN
More informationSMSHE Southeastern Michigan Society for Healthcare Engineering
SMSHE Southeastern Michigan Society for Healthcare Engineering Presentation on: Pavement Management and Preservation: The Right Fix at the Right Time PRESENTATION OVERVIEW Asset Evaluation (Management)
More informationField tests on the lateral capacity of poles embedded in Auckland residual clay
Proc. 18 th NZGS Geotechnical Symposium on Soil-Structure Interaction. Ed. CY Chin, Auckland Field tests on the lateral capacity of poles embedded in Auckland residual clay Peter Rodgers Mercury Bay Civil
More informationA DETAILED ANALYSIS OF SLOPE STABILITY USING FINITE ELEMENT METHOD (FEM)
A DETAILED ANALYSIS OF SLOPE STABILITY USING FINITE ELEMENT METHOD (FEM) S. Halder 1*, M. O. Imam 2 & M. S. Basir 1 1 Department of Civil & Water Resources Engineering, Chittagong University of Engineering
More informationAPPLICATION BRIEF. Model 4140/4141 Gyratory Compactor Specimen Preparation in Superpave Mix Design. April 2009
APPLICATION BRIEF Model 4140/4141 Gyratory Compactor Specimen Preparation in Superpave Mix Design April 2009 Introduction From 1987 through 1993, the United States Strategic Highway Research Program (SHRP)
More informationvulcanhammer.net Visit our companion site
this document downloaded from vulcanhammer.net Since 1997, your complete online resource for information geotecnical engineering and deep foundations: The Wave Equation Page for Piling Online books on
More informationDIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING
DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING 40.01 SCOPE: The contractor shall furnish all labor, materials, equipment, and supplies; and shall perform all work necessary for the installation of
More informationCHROMOPHARE D650, D660, D530, & D540 PREINSTALLATION MANUAL
CHROMOPHARE D650, D660, D530, & D540 PREINSTALLATION MANUAL Pre-Install Manual: 700000006 Related Publications: 700000088 Operator Manual This manual contains proprietary information of BERCHTOLD Corporation.
More informationFinal Design Activity Descriptions July, 2017
Final Design Activity Descriptions July, 2017 Check the Capital Project Delivery website to ensure this is the current version. Table of Contents Final Design Final Design Initiated (4000)... 7 Initiate
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 362 Featherstone Dr Project ID Number: 27-3 Problem: Anecdotal evidence suggests a natural spring exists in the backyard
More informationRisk assessment and analysis for swing gates
Risk assessment and analysis for swing gates Rev 3.00 In conformity with the Machinery Directive 98/37/EC and applicable parts of the EN standards EN 13241-1; EN 12453; EN 12445; EN 12635 01/09/2007 Note:
More informationCOMPANY PROFILE. Sellhorn Middle East Engineering
COMPANY PROFILE Sellhorn Middle East Engineering Page 1/7 Our Business Activities Sellhorn Middle East s.a.r.l. [Sellhorn ME] is a consultancy practice for civil and structural engineering works. We are
More informationExposed geomembrane covers: Part 1 - geomembrane stresses
Exposed geomembrane covers: Part 1 - geomembrane stresses By Gregory N. Richardson, Ph.D. P.E., principal of GN Richardson and Assoc. During the late 1980s and early 1990s, many mixed-waste disposal areas
More informationTask Force on Water-land Interface
Task Force on Water-land Interface For discussion on 2 June 2016 TFWL/02/2016 An Overview of Railing Design along Victoria Harbourfront PURPOSE This paper gives Members an overview of the design of existing
More informationAmes City Hall Campus: Stormwater Improvements
Ames City Hall Campus: Stormwater Improvements Tracy Warner, Municipal Engineer for the City of Ames, IA Jake Moore, Stormwater Specialist for the City of Ames, IA Ryan Benjegerdes, Water Resources Engineer
More informationSoil-Structure Interaction of a Piled Raft Foundation in Clay a 3D Numerical Study
388 J. Eng. Technol. Sci., Vol. 48, No. 4, 2016, 388-407 Soil-Structure Interaction of a Piled Raft Foundation in Clay a 3D Numerical Study Endra Susila 1,* & Nita Anggraini 2 1 Geotechnical Engineering
More informationREDISTRIBUTION OF LOAD CARRIED BY SOIL UNDERNEATH PILED RAFT FOUNDATIONS DUE TO PILE SPACING AND GROUNDWATER AS WELL AS ECCENTRICITY
International Journal of Civil Engineering and Technology (IJCIET) Volume 9, Issue 3, March 2018, pp. 36 55, Article ID: IJCIET_09_03_005 Available online at http://http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=9&itype=3
More informationjmt.com MARINE Part of a diversified family of solutions
jmt.com MARINE Part of a diversified family of solutions Services Marine & Coastal Engineering Modeling Coastal Initiatives & Techniques Port, Harbor, & Marine Consultancy Small Craft Design Permitting
More informationGEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE
GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of Civil Engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module - 8
More informationThe Process. Phase 1: Detailed Assessment, Design Framework Phase 2: Conceptual Design. Phase 3: Master Plan Document
Background The Ship Point master planning process was initiated in March of 2017 to advance policy direction from Harbour Vitality Principles (2014) Ship Point design and initial implementation a key action
More informationBEACH AND INLET PROJECTS UPDATE
BEACH AND INLET PROJECTS UPDATE USACE DELTA PROJECT USACE Delta Project Project Extents Elevation Elevation (ft NAVD88) (ft NAVD88) USACE Delta Project Project Cross-Section 20 18 20 16 18 14 16 12 14
More informationSubsoil conditions are examined using test borings, provided by soil engineer (geotechnical).
SOIL & FOUNDATION TYPES: Subsurface investigations: Subsoil conditions are examined using test borings, provided by soil engineer (geotechnical). Number of borings and location of borings depends on building
More informationD.P.E. Enviroliner. geotextile protection layer. covering new ground 2016
LEVEL 7 osynthetic clay liner www.gundle.co.za H.D.P.E. Enviroliner geosynthetic clay liner geotextile protection layer D.P.E. Enviroliner solid waste sand (leachate collection) geotextile protection layer
More informationUniversity Park Subdivision Street Assessment Report
University Park Subdivision Street Assessment Report Prepared for: University Park Subdivision TABLE OF CONTENTS Introduction... 3 Existing Conditions Analysis... 4 Street Improvements... 5 Existing:...
More informationDivision of Structural Design Geotechnical Branch
Division of Structural Design Geotechnical Branch Presented By: Bart Asher What is Geotechnical Engineering? The art of molding materials we do not wholly understand into shapes we cannot precisely analyze
More informationSETTLEMENT MEASUREMENTS OPTIMISING CONSTRUCTION OF A BREAKWATER ON SOFT SOIL
SETTLEMENT MEASUREMENTS OPTIMISING CONSTRUCTION OF A BREAKWATER ON SOFT SOIL Verhaeghe Hadewych 1, Van Damme Luc 1, Goemaere Jan 1, Boone Evy 2, De Rouck Julien 3 The need of an improved harbour access
More informationCONSTRUCTION SPECIFICATION FOR RIP RAP, ROCK PROTECTION AND GRAVEL SHEETING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 511 FEBRUARY 1990 CONSTRUCTION SPECIFICATION FOR RIP RAP, ROCK PROTECTION AND GRAVEL SHEETING 511.01 SCOPE 511.02 REFERENCES 511.03 DEFINITIONS 511.04
More informationStudy on Effect of Water on Stability or Instability of the Earth Slopes
International Research Journal of Applied and Basic Sciences 2014 Available online at www.irjabs.com ISSN 2251-838X / Vol, 8 (9): 1482-1487 Science Explorer Publications Study on Effect of Water on Stability
More informationAssessment of Geotextile Reinforced Embankment on Soft Clay Soil
Assessment of Geotextile Reinforced Embankment on Soft Clay Soil M. Siavoshnia*, F. Kalantari and A. Shakiba Corresponding author: Civil Engineering Faculty, Neyaiesh Complex, Tehran Central Branch, Islamic
More informationAppendix B. Tentative Silt Curtain Layouts
Expansion of Hong Kong International Airport into a Three-Runway System Appendix B. Tentative Silt Curtain Layouts 25 February 2017 B.1 Marine Filling Activities Figure B.1: Tentative Layouts of Silt Curtains
More informationGEOMEMBRANE FIELD INSTALLATION
GEOMEMBRANE FIELD INSTALLATION CONTENTS Introduction Quality Control and Quality Assurance Types of lining systems Basic Lining Design Executive Lining Design Basic Lining Design Specification Executive
More informationINTERNATIONAL MARINA AND WATERFRONT CONSULTANTS MDLCONSULTANCY.COM
INTERNATIONAL MARINA AND WATERFRONT CONSULTANTS MDLCONSULTANCY.COM OVER 40 YEARS OF PLANNING AND OPERATING AROUND THE WORLD WE OWN MARINAS. WE KNOW MARINAS. MDLCONSULTANCY.COM /// 002 SOUND ADVICE FROM
More informationDRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.3 STATIC SLOPE STABILITY ANALYSES
DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.3 STATIC SLOPE STABILITY ANALYSES Parsons P:\Honeywell -SYR\444576 2008 Capping\09 Reports\9.3 December 2009_Capping and
More informationEuropean Technical Assessment. ETA-02/0020 of 11 December English translation prepared by DIBt - Original version in German language
European Technical Assessment ETA-02/0020 of 11 December 2014 - Original version in German language General Part Technical Assessment Body issuing the European Technical Assessment: Trade name of the construction
More informationSlope Stability Analysis and Stabilization. New Methods and lnsight Second Edition
Slope Stability Analysis and Stabilization New Methods and lnsight Second Edition Contents Preface 1 Introduction 1.1 Overview 1 1.2 Background 2 1.3 Closed-form solutions 3 1.4 Engineering judgement 4
More informationTABLE OF CONTENTS. Tender Forms Letter of Tender A20 Appendix to Tender A20 A20 Contract Agreement A20
TABLE OF CONTENTS VOLUME I TENDER DOCUMENTS Part 1 Instructions to Tenderers... thru - 27 Part 2 Part 3 A16 Part 4 Tender Forms Letter of Tender A20 Appendix to Tender A20 A20 Contract Agreement A20 Forms
More informationSettlement analysis of Shahid Kalantari highway embankment and assessment of the effect of geotextile reinforcement layer
3 r d International Conference on New Developments in Soil Mechanics and Geotechnical Engineering, 28-3 June 212, Near East University, Nicosia, North Cyprus Settlement analysis of Shahid Kalantari highway
More informationSTANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL
STANDARD SPECIFICATIONS SECTION 01570 TEMPORARY EROSION AND SEDIMENT CONTROL PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements, procedures, and methods related to responsibilities for providing
More informationBroadway Avenue Streetscape Project City of Albert Lea. Streetscape Design Committee Meeting October 29, 2012
Broadway Avenue Streetscape Project City of Albert Lea Streetscape Design Committee Meeting October 29, 2012 1 Presentation Outline Street Widths, Sidewalk Widths and Bump-Out Configuration Decorative
More informationInstallation Instructions. Mira LED Light System
Installation Instructions Mira LED Light System w w w. a m i c o. c o m Contents Symbols Used in This Manual 4 Safety Instructions 5 Variants 7 Scope Of Delivery 8 Installing Mira LED Ceiling Mounted Installing
More informationST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST
St. Mary s Soil Conservation District 26737 Radio Station Way, Suite B Leonardtown, MD 20650 Phone: 301-475-8402 ext. 3 Fax: 301-475-8391 www.stmarysscd.com St. Mary s County Government Department of Public
More information1 Tissue Shoe Presses
1 Tissue Shoe Presses Tissue Shoe Presses Technology and safety in pressing www.toscotec.com TECHNOLOGY BACKGROUND Tissue VS P&B grades shoe press Paper & Board Tissue Mating roll can be hydraulically
More informationThe City of Winnipeg Bid Opportunity No GEOTECHNICAL REPORT - TEST HOLE LOGS
The City of Winnipeg Bid Opportunity No. 88-6 GEOTECHNICAL REPORT - TEST HOLE LOGS The City of Winnipeg Bid Opportunity 88-6 Template Version: C44 TEST HOLE LOGS TABLE OF CONTENTS TEST HOLE LOGS FOR DEARBORN
More informationNumerical Analysis of the Bearing Capacity of Strip Footing Adjacent to Slope
International Journal of Science and Engineering Investigations vol. 4, issue 46, November 25 ISSN: 225-8843 Numerical Analysis of the Bearing Capacity of Strip Footing Adjacent to Slope Mohammadreza Hamzehpour
More informationEFFECT OF CENTRAL PILE IN INCREASING THE BEARING CAPACITY OF BORED PILE GROUPS
EFFECT OF CENTRAL PILE IN INCREASING THE BEARING CAPACITY OF BORED PILE GROUPS Mohamed M. Shahin Department of Civil Engineering, 7 th October University, Misurata,, Libya, E-mail: Mohamed_zubi@yahoo.com
More informationGeotextile Tube Structures: Example Contract Specifications
Geotextile Tube Structures: Example Contract Specifications PURPOSE: This technical note provides an example set of contract specifications for the construction of sediment-filled geotextile tube structures.
More informationShelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN
Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN 2.1 Requirements The City of Shelbyville, KY will require an Erosion Prevention and Sediment Control (EPSC) Plan for most types of development construction.
More informationAberdeen Harbour Expansion Project. Construction Environmental Management Document
Aberdeen Harbour Expansion Project Construction Environmental Management Document 11th May 2017 Contents Chapter 1 Chapter 2 Chapter 3 Chapter 4 Chapter 5 Chapter 6 Chapter 7 Chapter 8 Chapter 9 Chapter
More informationACE Geosynthetics. An Overview of
ACE Geosynthetics An Overview of ACEGrid ACETex ACETube PRODUCT ACETex ACETex is the registered trademark of ACE Geosynthetics for all its geotextile products. ACETex is basically woven geotextile
More informationFRESH FROM THE KITCHEN FRESH FROM THE KITCHEN
PLUMBING SCOPE OF WORK - DRAINS KEC TO PROVIDE: - ALL TWIST WASTE VALVES & BASKET DRAINS, AS REFLECTED ON EQUIPMENT SCHEDULE, - PIPE CONDENSATE DRAIN FOR WALK IN COOLER WITH 3/4" COPPER TUBING, WITH NECESSARY
More informationPerformance of Recycled Plastic Pin (RPP) for Slope Stabilization
Performance of Recycled Plastic Pin (RPP) for Slope Stabilization M.S. Khan 1(&), M. Sahadat Hossain 2, M.A. Khan 2, and Mohammad Faysal 2 1 Department of Civil Engineering, Jackson State University, 1400
More information50 W Laser Concepts for Initial LIGO
50 W Laser Concepts for Initial LIGO Lutz Winkelmann, Maik Frede, Ralf Wilhelm, Dietmar Kracht Laser Zentrum Hannover LSC March 05 Livingston G050161-00-Z Overview: Two concepts for a 50W laser for initial
More informationLandfill Closure, Intermediate Cover & Post-Closure Care. Municipal League Meeting
Landfill Closure, Intermediate Cover & Post-Closure Care Municipal League Meeting 9-7-17 Gated and Closed Landfill Gated means no longer accepting waste. Closed means gated and final cover has been installed
More informationSouth Fraser Perimeter Road (SFPR)
MSE WALLS & SLOPES PROJECT PROFILE South Fraser Perimeter Road (SFPR) Nilex provides multiple solutions for the new four-lane highway along Vancouver s Fraser River. LOCATION: Delta and Surrey, British
More informationStability of Inclined Strip Anchors in Purely Cohesive Soil
Stability of Inclined Strip Anchors in Purely Cohesive Soil R. S. Merifield 1 ; A. V. Lyamin 2 ; and S. W. Sloan 3 Abstract: Soil anchors are commonly used as foundation systems for structures requiring
More informationCHAPTER 8 SLOPE STABILITY ANALYSIS
TM 5-818-1 / AFM 88-3. Chap. 7 CHAPTER 8 SLOPE STABILITY ANALYSIS 8-1. General. This chapter is concerned with characteristics and critical aspects of the stability of excavation slopes; methods of designing
More informationInstallation Guide. Model: IC15- MF Model: IC15- MFSilent Model: IC30- MF Model: IC30- MFSilent
Installation Guide Model: IC15- MF Model: IC15- MFSilent Model: IC30- MF Model: IC30- MFSilent IMPORTANT SAFETY INFORMATION READ AND SAVE THESE INSTRUCTIONS WARNING TO REDUCE THE RISK OF FIRE, ELECTRIC
More informationCONTRACTOR WHS HAZARD STANDARD LASER SAFETY EXTERNAL USE ONLY
CONTRACTOR WHS HAZARD STANDARD LASER SAFETY EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition WHS
More informationSOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL
Standard Operating Procedures Central Massachusetts Regional Stormwater Coalition SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Erosion and sedimentation from land-disturbing
More informationEach course is worth 1 American Institute of Architects CEU/HSW.
Each course is worth 1 American Institute of Architects CEU/HSW. Introduction to Mobile Mapping Attendees will learn the basics of mobile mapping including history, trends, components, and uses. This course
More informationKey elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.
4.4. Filter Strips Filter Strips are densely vegetated lands that treat sheet flow storm water from adjacent pervious and impervious areas. They function by slowing runoff, trapping sediment and pollutants,
More informationRUBBERSIDEWALKS Installation Manual
RUBBERSIDEWALKS Installation Manual Overview 2 1 2 3 4 5 6 7 8 9 10 11 12 1) Break out existing concrete (use jackhammers near trees) and clean out loose soil 2) Conduct tree root inspection (if applicable)
More informationISO INTERNATIONAL STANDARD. Geotechnical investigation and testing Field testing Part 1: Electrical cone and piezocone penetration test
INTERNATIONAL STANDARD ISO 22476-1 First edition 2012-09-15 Geotechnical investigation and testing Field testing Part 1: Electrical cone and piezocone penetration test Reconnaissance et essais géotechniques
More informationSnap Trim and Clips JANUARY, 2017 EC INDEX
JANUARY, 2017 INDEX 1 TWO-PIECE EXTRUDED ALUMINUM SNAP... 3 INTERIOR SNAP... 4 RECTANGULAR... 5 OFFSET... 6 CONTOUR... 7 OFFSET MISCELLANEOUS... 8 EXTENDED LEG... 9 OFFSET AND MISCELLANEOUS... 10 MISCELLANEOUS...
More informationgeotextiles bidim Nonwoven polyester geotextile Made in Australia Designed for performance RECYCLED Quality ISO 9001
geotextiles bidim Nonwoven polyester geotextile Made in Australia Designed for performance Quality ISO 9001 RECYCLED INTRODUCTION The use of geotextiles in construction projects around the world has grown
More informationChilled beam technology overview John Woollett 1, Jonas Åkesson 2 Swegon AB 1,2
Chilled beam technology overview John Woollett 1, Jonas Åkesson 2 Swegon AB 1,2 john.woollett@swegon.se, jonas.akesson@swegon.se SUMMARY The main focus of the paper will be on active beam technology regarding
More informationOverview of fiber optic sensing system: BOTDR and its applications
1 Overview of fiber optic sensing system: BOTDR and its applications Hiroshi Naruse Mie University June 12, 2008 in Santiago, Chile Introduction of Mie University 2 There are about 70 national universities
More informationCHAPTER 14: GUARDRAIL and BARRIERS
CHAPTER 14: GUARDRAIL and BARRIERS If you have any questions regarding guardrail, end treatments and/or pay items included in your plan, please contact the Project Design Services Unit or the Design Standards
More informationWelcome to Voice Permits
Welcome to Voice Permits In an ongoing commitment to improve customer service, your building department has installed an Interactive Voice Response System (IVR) for inspections, 24-hours a day, 7 days
More informationLower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary
TABLE OF CONTENTS Page Executive Summary 1.0 INTRODUCTION...1-1 1.1 Purpose of the Undertaking...1-1 1.2 Study Area Description...1-1 1.3 Description of the Undertaking...1-1 1.4 Rationale for the Undertaking...1-2
More informationEuropean Technical Assessment. ETA-14/0475 of 19 December English translation prepared by DIBt - Original version in German language
European Technical Assessment ETA-14/0475 of 19 December 2014 - Original version in German language General Part Technical Assessment Body issuing the European Technical Assessment: Trade name of the construction
More informationINSTALLATIONGUIDE. HotSeam TM Overview ICE ROOF
INSTALLATION GUIDE forfor HotSeam HotSeam Overview Exposed heat cables with glued down retention clips on metal roofs have been the conventional way to drain ice dams for many years. HotEdge s patented
More informationSECTION 7A: WHAKARONGO RESIDENTIAL AREA
SECTION 7A: WHAKARONGO RESIDENTIAL AREA CONTENTS 7A.1 Introduction 1 7A.2 Resource Management Issues 1 7A.3 Objectives and Policies 1 7A.4 Methods 4 7A.5 Residential Zone 4 7A.5.1 Rules: Controlled Activities
More informationBase resistance of individual piles in pile group
th WSEAS Int. Conf. on ENVIRONMENT, ECOSYSTEMS and DEVELOPMENT, Tenerife, Spain, December 14-16, 27 111 Base resistance of individual piles in pile group MOHAMED M. SHAHIN Department of Civil Engineering
More informationStability analysis of slopes with surcharge by LEM and FEM
International Journal of Advanced Structures and Geotechnical Engineering ISSN 2319-5347, Vol. 04, No. 04, October 2015 Stability analysis of slopes with surcharge by LEM and FEM MD. MONIRUZZAMAN MONI,
More informationManagement of a large scale pit wall failure at Ernest Henry Mine
Outline Management of a large scale pit wall failure at Ernest Henry Mine Alastair Grubb Geotechnical Engineer Tuesday, January 30, 2007 Brief introduction to EHM Development of Failure Keys to Successful
More information205 Control Installation and Maintenance Instructions
0353143/2 IM-P035-08 CH Issue 2 205 Control Installation and Maintenance Instructions 1. General 2. Installation 3. Temperature ranges 4. Temperature adjustment 5. Maintenance Printed IM-P035-08 in the
More informationOverview Frost Heave Prevention for Freezer floors on ground.
PLEASE NOTE The floor sensor MUST be installed such that it may be REMOVED for service if required! The sensor probe should be installed into a conduit with no more than one wide-angle bend. This should
More informationConstruction of a Pilot Project Island in IJ-meer
Construction of a Pilot Project Island in IJ-meer John Kranendonk and Jan Vlak Construction of a Pilot Project Island in IJ-meer Abstract Since 1990 HAM-VOW has been working to develop the technical and
More informationCooling and heating systems. Static cooling ceiling system SKS-5/3 for visible installation
Cooling and heating systems Static cooling ceiling system SKS-/3 DS 10 E 01.010 Static cooling ceiling system SKS-/3 Main features Preliminary remarks / Applications 3 Main dimensions and materials 3 Construction
More informationF4060 RESILIENT SEATED GATE VALVES
F4060 RESILIENT SEATED GATE VALVES BS 5163 AS 2638 EN 1074 FM UL EN 1171 ISO 7259 The Keystone Figure 4060 series is a Tyco manufactured resilient seated gate valve available in a wide variety of configurations
More information