1 PALO ALTO HIGH SCHOOL SCHEMATIC DESIGN TO DESIGN DEVELOPMENT TRANSITION MEETING DATE: SUBJECT: 21 January 2010, 12:30pm-2:00pm Math/Social Sciences Department ATTENDEES: Radu Toma, Paly Math IS Aimee Lopez, OCMI Christopher Ades, DLM Heidi Rank, Gilbane Arne Lim, Paly Erwin Lee, DLM The following are the highlights of the meeting: 1. The purpose of the meeting was to introduce the construction management team, represented by Heidi Rank (HR) of Gilbane Construction, who will be taking over from the program management team. The transition is taking place between the schematic design (SD) phase and the design development (DD) phase of the project. The construction management team will carry the project through completion and building occupancy. 2. A set of the schematic design drawings, approved by the Board of Education (BOE) at the 26 January 2010 meeting, was reviewed by the group. The schematic design set reflects the scope of work that was estimated and reported to the BOE. 3. The design team continued to develop the project beyond the schematic design phase including incorporating more recent comments that were received from the users as well as comments from the local fire authority. 4. The DD phase will have a check point against the budget. At that time, a value engineering exercise will take place to make sure that options are reviewed, evaluated and discussed to make sure that the project remains within budget. 5. The design team is working towards a submittal to the Division of the State Architect (DSA) in June Aimee Lopez (AL) explained that the DD phase is where more detailed design and construction decisions are made. Any comments or thoughts regarding the design can still be sent via to Erwin Lee (EL) at any time. 7. Christopher Ades (CA) presented a set of enlarged floor plans and interior elevations. The group studied them and discussion followed: Office Area (including Staff and Work areas) Arne Lim (Arne) noted that the separate hallway into the Admin area was not a Palo Alto HS Math/History Meeting 21 January 2010 P. 1

2 necessity, the custom now was to enter through the Resource Room, but he could understand why it was added for convenience to students and teachers. Radu Toma (RT) asked that doors to the two offices with angled walls at the Resource Room be changed to provide better space inside. Chris Ades (CA) pointed out that this isn t possible as the walls are too small and doors require space on either side to make them ADA accessible. HR noted that the small Administration Toilet/Shower on the 2 nd floor should be reviewed for accessibility. CA will review and adjust as necessary. HR asked if the gates along the hallway by the Staff Room were to be locked. Erwin Lee (EL) answered that they were on panic hardware for exiting purposes and could not be locked. They were meant to discourage student circulation behind the Staff Room. Arne asked if there would be separate AC controls at the teachers offices. EL answered that there were separate controls for the conference room and work area but not for the individual offices. Classrooms Radu Toma (RT) noted that classrooms along the exterior walls should have the cabinets beneath the exterior windows and would prefer if the counters extend from wall to wall. RT understood that length of base cabinet was limited per the budget and is satisfied with only the countertop continuing. CA agreed to incorporate these changes to the drawings. RT noted the need for long marker boards along adjacent walls and locating the teaching wall by the entry doors at exterior classrooms and by the teacher s office door at the core classrooms. RT reminded the group that at the perimeter classrooms the glass along the hallways should begin at 7-feet height to allow for marker boards below. Both RT and Arne wanted more glass for the core classrooms. They wanted the glass to extend to the floor but EL advised that there should be a one-foot high curb for safety. CA noted that the glass could wrap around the corners by the entry alcoves. Everyone agreed with these ideas. EL noted that the casework and counters for the core classrooms now needs to move to the opposite wall from the teaching wall as the hallway wall is glass. RT and AL agreed with this idea. EL drew some options for glass in a typical entry door and RT and Arne both liked the door design with glass insert in the top half. They also wanted glass transoms above the doors. In order to accommodate the changes, various entry doors and mechanical closets need to change position. Two mechanical closets by a brace frame will need to open into classrooms but RT didn t object as they re rarely used. EL noted that at perimeter classrooms the supply/return air ducts would be hidden in a soffit just above the mechanical closet. AL questioned whether a soffit was necessary as other piping and services were exposed. AL also questioned whether the ceilings should not have a more finished look. EL noted that acoustical deck was meant for the exposed sloped ceilings with clerestory windows. All the other classrooms would have a suspended acoustical ceiling. EL added that a suspended acoustical ceiling might be best for all the classrooms and that there shouldn t be much difference in cost. Palo Alto HS Math/History Meeting 21 January 2010 P. 2

3 Hallways & Exterior CA drew attention to four (4) skylights located over hallway windows with the exception of one which is over the drinking fountains. RT asked if this one could also move above a window area and CA agreed to move it. EL noted that in order to bring light to the first floor a glass floor could be designed directly below the skylights. This would be in lieu of solar tube which requires shaft space. DLM will study this option. RT liked the main stairway better but still thought it could be improved to minimize lost space in the triangular portion. He thinks that this entry plaza will receive a lot use as covered outdoor area. EL noted that DLM will review other possibilities. 8. CA noted that mechanical rooms may need to increase in size, from 4 x 4 to 5 x 5 pending final design from the mechanical engineer. 9. AL stated that the design will be updated and ed to the team for review and comments. DLM will have a revised set of plans that should incorporate all the design decisions made today. This Design Development set of drawings becomes the basis for the final construction documents. These final documents are due to be issued to DSA for approval in June of END Prepared by Christopher Ades of Deems Lewis McKinley. Please advise if you feel that any of the above items are inaccurate or need further clarification or detail. cc: Attendees File Palo Alto HS Math/History Meeting 21 January 2010 P. 3

4

5

6

PALO ALTO HIGH SCHOOL Palo Alto Unified School District MEETING NOTES. DATE: 21 September Palo Alto HS Update

PALO ALTO HIGH SCHOOL Palo Alto Unified School District MEETING NOTES. DATE: 21 September Palo Alto HS Update PALO ALTO HIGH SCHOOL Palo Alto Unified School District MEETING NOTES DATE: 21 September 2010 SUBJECT: Landscape Subcommittee Meeting Palo Alto HS Update The purpose of the meeting was to update the Landscape

More information

PSR-BENEFICIAL OCCUPANCY- T&I TRAINING. Testing & Inspection (T & I) Directive

PSR-BENEFICIAL OCCUPANCY- T&I TRAINING. Testing & Inspection (T & I) Directive PSR-BENEFICIAL OCCUPANCY- T&I TRAINING 03/05/18 Project Status Report (PSR) Presented by Christopher Goodwin Inspection Department Beneficial Occupancy Presented by Carlos Torres Office of Environmental

More information

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

Garfield Elementary School Feasibility Study for New Library Building Project Number A C Larry Teixeira Selma Unified School District 3036 Thompson Avenue Selma, CA 93662 Subject: Feasibility Study for New Library Building Project Number A 12-8581.00 C Dear Mr. Teixeira: At your request, we

More information

H BUTCH BROWNING FIRE MARSHAL BUILDING REHABILITATION

H BUTCH BROWNING FIRE MARSHAL BUILDING REHABILITATION STATE OF LOUISIANA Department of Public Safety and Corrections Office of State Fire Marshal Code Enforcement and Building Safety 8181 Independence Boulevard Baton Rouge, Louisiana 70806 225-925-4920 H

More information

Electronic Safety and Security

Electronic Safety and Security 28 Electronic Safety and Security NOTE: This is a new section, which includes content from previous sections of the KU Design Standards, along with appropriate revisions and updates. Significant revisions

More information

bold/italic items are revisions to the previous program notes

bold/italic items are revisions to the previous program notes bold/italic items are revisions to the previous program notes Future Meetings: - Dr. Caldwell - Students - Industry Partners (Mike Betts? Sam Geil? Kevin Harmon? TBD by SCCCD) A. Specific Room Requirements

More information

Master Project List Report

Master Project List Report Blue Hills Elementary School 01-8215 Site Utilities Replacement $52,835 01-8502 Modernization $3,135,933 01-8525 Exterior Painting $181,478 01-8552 Kindergarden Fencing $13,180 Install new backflow preventer.

More information

Charles W Earle Elementary School

Charles W Earle Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

WRIGHT WAY 31ST HOMES YEAR FOR RENOVATION EDITOR S CHOICE FOR HISTORIC RENOVATION OF THE ANNUAL

WRIGHT WAY 31ST HOMES YEAR FOR RENOVATION EDITOR S CHOICE FOR HISTORIC RENOVATION OF THE ANNUAL HOMES OF THE YEAR 31 31ST ANNUAL EDITOR S CHOICE FOR HISTORIC RENOVATION DESIGNER: ARCHITECT KIM GRANT, AIA CONTRACTOR: TONY E. PARKER, GENERAL BUILDERS, INC. HOMEOWNER: BETTY EDWARDS WRIGHT WAY FOR RENOVATION

More information

Arlington Public Schools Purchasing Office

Arlington Public Schools Purchasing Office Arlington Public Schools Purchasing Office NOTICE OF ADDENDUM NO. 1 Issued on March 30, 2018 TITLE: ITB NO.: YORKTOWN HIGH SCHOOL INTERIOR MODIFICATIONS PROJECT 57FY18 ITB CLOSING DATE PRIOR TO 2:00 P.

More information

Catholic School Master Plan & Playground: Tulsa, Oklahoma

Catholic School Master Plan & Playground: Tulsa, Oklahoma Catholic School Master Plan & Playground: Tulsa, Oklahoma Purpose: Located in Tulsa Oklahoma, the school is a traditional Catholic school that focuses its efforts on outstanding instruction of reading,

More information

PROCTOR TERRACE ELEMENTARY SCHOOL

PROCTOR TERRACE ELEMENTARY SCHOOL SCHL DAA Address: Bryden Lane Santa Rosa, CA 95404 Established: 50 Permanent Classrooms: 3 Portable Classrooms: 9 Building Area: Site Area: 40, sq ft 5 acres Students in 5: 484 Students in (Projected):

More information

Richard Henry Lee Elementary School

Richard Henry Lee Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

RADON PLAN. Eugene School District 4J Facilities Management 715 West Fourth Avenue Eugene, OR

RADON PLAN. Eugene School District 4J Facilities Management 715 West Fourth Avenue Eugene, OR RADON PLAN The 2015 Legislature passed House Bill (HB) 2931 so that if elevated radon levels in Oregon schools existed they would be known. House Bill 2931 later became Oregon Revised Statute (ORS) 332.166-167.

More information

Page 2 University Park CA R 1/

Page 2 University Park CA R 1/ Page 2 University Park CA-1 0-07R 1/13-9500001 0 Subsequent to City Council approval, a demolition permit was issued to raze the existing structures associated with Monier Tile. In July, 2013, a building

More information

TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE

TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE The University of Arizona has implemented a Keyless Access and Security System program to provide a cost effective, efficient, and maintainable means

More information

Standard of Practice - Fire Alarm Systems. NOTE: Significant revisions or additions to the previous standards are highlighted in italics.

Standard of Practice - Fire Alarm Systems. NOTE: Significant revisions or additions to the previous standards are highlighted in italics. A28.1 Standard of Practice - Fire Alarm Systems NOTE: Significant revisions or additions to the previous standards are highlighted in italics. OBJECTIVE OF STANDARD To provide compliant smart addressable

More information

ADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR. RFP No Professional Design Services for CCC Le-Jao Student Resource Center

ADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR. RFP No Professional Design Services for CCC Le-Jao Student Resource Center ADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR RFP No. 2030 Professional Design Services for CCC Le-Jao Student Resource Center COAST COMMUNITY COLLEGE DISTRICT COSTA MESA, CALIFORNIA COUNTY OF ORANGE COAST

More information

SCC BULLETIN DPS/SCC Directive Date of issue: December 4, 2002

SCC BULLETIN DPS/SCC Directive Date of issue: December 4, 2002 SCC BULLETIN DPS/SCC Directive 2002-5 Date of issue: December 4, 2002 Art Work on School Walls Subject: ARTWORK AND TEACHING MATERIALS ON SCHOOL WALLS Reference: NFPA Pamphlet 101; Denver Fire Code (UFC)

More information

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951)

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951) Riverside County Fire Department Office of the Fire Marshal 2300 Market St., Ste. 150, Riverside, CA 92501 Ph. (951) 955-4777 Fax (951) 955-4886 Guideline Title: Residentially Based Care Facilities Group

More information

For additional information regarding R-3.1 residential care facilities please contact (951)

For additional information regarding R-3.1 residential care facilities please contact (951) Riverside County Fire Department Fire/Life Safety Inspection Division Riverside Office: 2300 Market St., Ste. 150, Riverside, CA 92501 Ph. (951) 955-4823 Fax (951) 955-4886 Palm Desert Office: 77-933 Las

More information

Bethel School District Radon Testing Plan

Bethel School District Radon Testing Plan The 2015 Oregon Legislature passed House Bill (HB) 2931 so that elevated radon levels in Oregon schools would be known. House Bill 2931 later became Oregon Revised Statute (ORS) 332.166-167. As directed

More information

CITY OF PASADENA FIRE DEPARTMENT

CITY OF PASADENA FIRE DEPARTMENT Page 1 of 8 CITY OF PASADENA FIRE DEPARTMENT INSTALLATION OF COMMERCIAL SPRINKLERS (Revised 12/10/2014) SCOPE: This standard applies to the design and installation of automatic fire sprinkler systems in

More information

CAC OVERVIEW. CAC Roles and Responsibilities CAC Operations CAC Membership CAC DAC Relations

CAC OVERVIEW. CAC Roles and Responsibilities CAC Operations CAC Membership CAC DAC Relations CAC OVERVIEW CAC Roles and Responsibilities CAC Operations CAC Membership CAC DAC Relations 1 Purpose of This Overview To increase the level of awareness of CAC members so that they know what is expected

More information

Comprehensive Study N A G L E H A R T R A Y A R C H I T E C T U R E GILBANE BUILDING C O M P A N Y P R O J E C T M A N A G E M E N T A D V I S O R S

Comprehensive Study N A G L E H A R T R A Y A R C H I T E C T U R E GILBANE BUILDING C O M P A N Y P R O J E C T M A N A G E M E N T A D V I S O R S N A G L E H A R T R A Y A R C H I T E C T U R E GILBANE BUILDING C O M P A N Y P R O J E C T M A N A G E M E N T A D V I S O R S BOE COW Meeting October 6, 015 Comprehensive Study North Shore School District

More information

School Fire Safety Checklist

School Fire Safety Checklist Community Risk Reduction The (SFSC) includes many of the most common fire prevention and life safety issues found in schools. The SFSC is not intended to be an all inclusive list, but rather highlights

More information

Mark D. Williams Custom Homes, Inc. Total House: Under $250,000. Minneapolis

Mark D. Williams Custom Homes, Inc. Total House: Under $250,000. Minneapolis Mark D. Williams Custom Homes, Inc. Total House: Under $250,000 Minneapolis PROJECT DESCRIPTION: We began working with our clients by meeting them with their realtor as they were shopping for their home.

More information

Thursday, February 28, :15 a.m. - 11:15 a.m. Sacramento Convention Center Room # 306. Workshop #47. DSA Academy Update

Thursday, February 28, :15 a.m. - 11:15 a.m. Sacramento Convention Center Room # 306. Workshop #47. DSA Academy Update C.A.S.H. 29 TH ANNUAL CONFERENCE ON SCHOOL FACILITIES NEW PROGRAMS, NEW PROMISE CALIFORNIA SCHOOL FACILITIES 2008 Thursday, February 28, 2008 10:15 a.m. - 11:15 a.m. Sacramento Convention Center Room #

More information

Heating and Comfort Policy. Reviewed April 2014

Heating and Comfort Policy. Reviewed April 2014 Heating and Comfort Policy Reviewed April 2014 1. INTRODUCTION The University of Worcester endeavours to maintain a comfort temperature of between 19 o and 23 o C throughout all academic, office and residential

More information

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16 1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated

More information

SAFETY DRILLS Lincoln County School District

SAFETY DRILLS Lincoln County School District SAFETY DRILLS Lincoln County School District Lincoln County School District understands the importance of drilling students and staff on emergency procedures in order to prepare them to respond safely

More information

Washington Irving Elementary School

Washington Irving Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

DSA Change Order Submission Program. May 27, 2011

DSA Change Order Submission Program. May 27, 2011 DSA Change Order Submission Program May 27, 2011 Improving the Quality of DSA Change Order Submissions Introduction Overview LAUSD Steven Hooper, PE Access Compliance David Stuber, CASp Fire & Life Safety

More information

Josefa Ortiz De Dominguez Elementary School

Josefa Ortiz De Dominguez Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Edward Jenner Elementary Academy of the Arts

Edward Jenner Elementary Academy of the Arts Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Report to Adhoc Health Code change proposal regarding locking arrangements From John Woestman, BMHA

Report to Adhoc Health Code change proposal regarding locking arrangements From John Woestman, BMHA Report to Adhoc Health Code change proposal regarding locking arrangements From John Woestman, BMHA This report is provided for information only. BMHA is not asking for Adhoc Health Care to sponser as

More information

Some Basics of School Library Design

Some Basics of School Library Design Some Basics of School Library Design Fred Schlipf and Ann Ohms 2018 Pull functional requirements together and put them in print BEFORE building planning begins In addition to the various items listed below,

More information

Lock Department. Ben Riding. Assistant Hardware Supervisor Maintenance and Operations. Voice: Fax:

Lock Department. Ben Riding. Assistant Hardware Supervisor Maintenance and Operations. Voice: Fax: Lock Department Charles Garcia Hardware Supervisor Voice: 213 745-1650 Fax: 213 745-3367 E-Mail: charles.garcia@lausd.net Lock Department Ben Riding Assistant Hardware Supervisor Voice: 818 394-2495 Fax:

More information

New School Construction: Safe School Opening. OAR and IOR Joint Training February 17, 2005

New School Construction: Safe School Opening. OAR and IOR Joint Training February 17, 2005 New School Construction: Safe School Opening OAR and IOR Joint Training February 17, 2005 1 Purpose Provide information on process moving from construction to occupancy and opening schools 2 School Opening

More information

British Columbia Building Code 2006 Division B Part 3 Fire Protection, Occupant Safety and Accessibility Section 3.2 Building Fire Safety

British Columbia Building Code 2006 Division B Part 3 Fire Protection, Occupant Safety and Accessibility Section 3.2 Building Fire Safety Div B 3.2.1.1.(4), (5) & (6) Exceptions in Determining Building Height BCBC1998-3.2.1.1.(4), (5) & (7) replace (harmonize with NBC) - NBC 2005 has significant revisions to provisions for mezzanines. These

More information

SPACE TYPE: JUDICIAL CHAMBER

SPACE TYPE: JUDICIAL CHAMBER SPACE TYPE: JUDICIAL CHAMBER Construction Criteria The unit costs for Judicial Chamber space types are based on the construction quality and design features in the following table. This information has

More information

7/14/2016 CITY HALL ADA ENHANCEMENT/REMODEL ACTION PLAN 1978 Construction

7/14/2016 CITY HALL ADA ENHANCEMENT/REMODEL ACTION PLAN 1978 Construction CITY HALL ADA ENHANCEMENT/REMODEL 2016 ACTION PLAN 1978 Construction 1 HISTORY At the February 2, 2016 Council Workshop Council Motions included: The direction to staff to move forward with the City Hall

More information

Locations must be selected where the detector is not to be disturbed during the measurement period.

Locations must be selected where the detector is not to be disturbed during the measurement period. INSPECT DES MOINES, LLC RESIDENTIAL RADON AGREEMENT (Please Read Carefully) This radon agreement is supplemental to the pre-inspection agreement. Both agreements must be signed in order for a home inspection

More information

SAMUEL CLEMENS ADDITIONS & RENOVATIONS ( )

SAMUEL CLEMENS ADDITIONS & RENOVATIONS ( ) SAMUEL CLEMENS ADDITIONS & RENOVATIONS (10-30-2017) BUDGET - $ 72,000,000 2020 PROJECTED COMPLETION DATE ARCHITECT MARMON MOK GENERAL CONTRACTOR Bartlett Cocke CONSTRUCTION MGMT. AG CM 18% COMPLETE SAMUEL

More information

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 2014-2015 CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 School Item Amount a. Classroom A/R (Increase CR capacity to 804, add l Resource and tutoring spaces needed. Teacher

More information

INFORMATIONAL PUBLICATION SECURITY VS. EXITING... Door Locking Hardware in Schools

INFORMATIONAL PUBLICATION SECURITY VS. EXITING... Door Locking Hardware in Schools INFORMATIONAL PUBLICATION SECURITY VS. EXITING... Door Locking Hardware in Schools DSA Guidelines for Door Locking Hardware in Schools Egress doors shall be readily openable from the egress side without

More information

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification of 4 9/23/2016 10:20 AM Second Revision No. 6501-NFPA 5000-2016 [ Section No. 17.2.2.2.4 ] 17.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked

More information

Calmeca Academy of Fine Arts and Dual Language

Calmeca Academy of Fine Arts and Dual Language Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

2014 Michael G. Meyers Design Competition

2014 Michael G. Meyers Design Competition 2014 Michael G. Meyers Design Competition #College2020MGMC HISTORY - CULTURE - ACADEMIA. This year, the design problem for the MGMC is to design a new academic building for Rice University. The University

More information

SANTA FE COUNTY IFB# PW/KE CONSTRUCTION FOR THE SANTA FE MOUNTAIN CENTER KITCHENETTE AND OFFICE SPACE ADDENDUM #2

SANTA FE COUNTY IFB# PW/KE CONSTRUCTION FOR THE SANTA FE MOUNTAIN CENTER KITCHENETTE AND OFFICE SPACE ADDENDUM #2 Henry P. Roybal Commissioner, District 1 Anna Hansen Commissioner, District 2 Robert A. Anaya Commissioner, District 3 2017-0262-PW/KE Anna T. Hamilton Commissioner, District 4 Ed Moreno Commissioner,

More information

Project phasing plan (if applicable) 12 copies of site plan

Project phasing plan (if applicable) 12 copies of site plan SITE PLAN REVIEW PERMIT APPLICATION City of Grand Haven, 11 N. Sixth Street, Grand Haven, MI 49417 Phone: (616) 847-3490 Fax: (616) 844-2051 Website: www.grandhaven.org 1. Project Information Address/location

More information

LABELING OF FIRE-RATED GLAZING STUDY GROUP REPORT TO CTC MEETING CHICAGO, IL - OCTOBER 13-14, 2011 CODE CHANGES

LABELING OF FIRE-RATED GLAZING STUDY GROUP REPORT TO CTC MEETING CHICAGO, IL - OCTOBER 13-14, 2011 CODE CHANGES LABELING OF FIRE-RATED GLAZING STUDY GROUP REPORT TO CTC MEETING CHICAGO, IL - OCTOBER 3-4, 20 CODE CHANGES Issue : Clarification of when 703.6 can be used rather than 76. 76.2 --rated glazing. --rated

More information

Pre-Bid Meeting Minutes 2018 A & E RFP February 6, :00 a.m.

Pre-Bid Meeting Minutes 2018 A & E RFP February 6, :00 a.m. Attendees: Pre-Bid Meeting Minutes 2018 A & E RFP February 6, 2019 10:00 a.m. Anthony Shomin Sue Martin Architectural & Engineer Professionals KCKHA Modernization Coordinator KCKHA Modernization Admin.

More information

EagleRidge High School. Radon Testing Plan

EagleRidge High School. Radon Testing Plan EagleRidge High School Radon Testing Plan The 2015 Legislature passed House Bill (HB) 2931 so that elevated radon levels in Oregon schools would be known. House Bill 2931 later became Oregon Revised Statute

More information

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting PROJECT MANAGEMENT AGENDA Project: George Keverian School Feasibility Study Project No.: 16049 Re: School Building Committee Meeting Meeting Date: 3/22/2017 Meeting Location: Mayor s Conference Room, City

More information

Facilities Planning & Construction Report nd Quarter Ending December 31, 2016

Facilities Planning & Construction Report nd Quarter Ending December 31, 2016 Facilities Planning & Construction Report 2016 17 2 nd Quarter Ending December 31, 2016 Overview District SRID Spending (MG100) Summary By College By Site District Program Overview Construction Design

More information

PMS 1595 U PMS 547 U PMS 12 U

PMS 1595 U PMS 547 U PMS 12 U PMS 1595 U PMS 547 U PMS 12 U 3 BEDROOM 3 BATH WORKSPACE ENTRY POWDER PANTRY LIVING DINING KITCHEN GARAGE PATIO W DN D LAUNDRY STORAGE LINEN WALK-IN HALLWAY DECK BEDROOM 2 BATH 2 BEDROOM 1 MASTER BATH

More information

MEDIA CENTER September 30, 2010

MEDIA CENTER September 30, 2010 MEDIA CENTER September 30, 2010 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from the prototype

More information

Francis M McKay Elementary School

Francis M McKay Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT PIMKIE APPARELS LTD. PLOT # 328, BLOCK # F, TONGI, INDUSTRAL AREA OTHER FACTORIES: NONE May 25, 2014 Page 2 SUMMARY was surveyed for fire safety on 5/25/2014 by Hughes Associates,

More information

January 1, 2014 Mandatory Effective Date

January 1, 2014 Mandatory Effective Date 2013 Kentucky Building Code Highlights Winnie Blythe, Technical Advisor Dept. of Housing, Buildings, and Construction winnie.blythe@ky.gov www.dhbc.ky.gov 502-573-0373 January 1, 2014 Mandatory Effective

More information

ARCHITECT S FIELD REPORT 02

ARCHITECT S FIELD REPORT 02 ARCHITECT S FIELD REPORT 02 PROJECT Ohio City Town Hall DATE 9/13/2017 Interior and Exterior Rehabilitation, Phase II SHF Project # 2017-01-021 CONDITIONS DATE 9/9/17 TIME 1:00 pm WEATHER Sunny, Warm TEMP

More information

4.0 SERVICES AND SCHEDULE

4.0 SERVICES AND SCHEDULE 4.0 SERVICES AND SCHEDULE 4.1 GENERAL INFORMATION The janitorial services listed below are required at the designated facilities shown in Section 4.3 on the basis of the commencement cleaning times indicated.

More information

835 S. Canyon Blvd., John Day, OR 97845 Phone: (541) 575-1349 Fax: (541) 575-3601 Robert Waltenburg-Superintendent waltenburgr@grantesd.k12.or.us Stacie Holmstrom Deputy Clerk holmstroms@grantesd.k12.or.us

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

Joseph Brennemann Elementary School

Joseph Brennemann Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

LOS ANGELES UNIFIED SCHOOL DISTRICT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY PROCEDURE

LOS ANGELES UNIFIED SCHOOL DISTRICT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY PROCEDURE TITLE: ISSUER: Occupancy Inspections for New Schools and Modernization Projects John Sterritt, Director Office of Environmental Health and Safety ROUTING Office of Environmental Health & Safety Staff DATE:

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST TENANT IMPROVEMENTS Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved; AC-Approved w/comments;

More information

TOM BURNS, PLANNING DIRECTOR

TOM BURNS, PLANNING DIRECTOR ~~ 0 173 COUNTY OF SANTA CRUZ August 4,2005 PLANNING DEPARTMENT 701 OCEAN STREET, qth FLOOR, SANTA CRUZ, CA 95060 (831) 454-2580 FAX: (831) 454-2131 TDD: (831) 454-2123 TOM BURNS, PLANNING DIRECTOR Agenda:

More information

Agustin Lara Elementary Academy

Agustin Lara Elementary Academy Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN Wold Architects and Engineers 332 Minnesota Street Suite W2000 Saint Paul, MN 55101 651 227 7773 PLANNERS ARCHITECTS ENGINEERS ISD #15 St. Francis Area Schools East Bethel Elementary School Additions and

More information

FIRE ALARM APPLICATION CITY OF MADISON HEIGHTS

FIRE ALARM APPLICATION CITY OF MADISON HEIGHTS FIRE ALARM APPLICATION CITY OF MADISON HEIGHTS www.madison-heights.org COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 300 W. THIRTEEN MILE RD. MADISON HEIGHTS, MICHIGAN 48071 (248) 583-0831 FAX (248)

More information

Briar Crest Elementary

Briar Crest Elementary Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary

More information

Emergency Evacuation Plan

Emergency Evacuation Plan Emergency Evacuation Plan Scope and Applicability This procedure applies to a wide variety of emergencies both man-made and natural which may require a workplace to be evacuated. These emergencies include

More information

Sidney Sawyer Elementary School

Sidney Sawyer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0. Branham High School Budget Remaining 1 906030 Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765,473.00 $635,342.00 $635,342.00 $130,131.00 $0.00 2 970205 Branham Interim Housing - 12 Portable

More information

Albany County School District No. 1 New Slade Elementary School Project Preliminary Schematic Design Meeting Minutes October 20, 2015

Albany County School District No. 1 New Slade Elementary School Project Preliminary Schematic Design Meeting Minutes October 20, 2015 Albany County School District No. 1 New Slade Elementary School Project Preliminary Schematic Design Attendees: Organization: Email: Jubal Yennie ACSD#1 Superintendent jyennie@acsd1.org Ed Goetz ACSD#1

More information

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations) AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations) This standard applies to the design and installation of automatic fire sprinkler systems in conjunction with

More information

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content Based on the 2018 International Fire Code, (IFC ) The International Fire Code (IFC ), establishes minimum regulations for fire safety. This handout will identify important changes in the IFC from 2015

More information

John Palmer Elementary School

John Palmer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Alessandro Volta Elementary School

Alessandro Volta Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

LKA Partners. A Professional Corporation for Architecture/Planning. 430 North Tejon Street Colorado Springs, CO /

LKA Partners. A Professional Corporation for Architecture/Planning. 430 North Tejon Street Colorado Springs, CO / LKA Partners A Professional Corporation for Architecture/Planning 430 North Tejon Street Colorado Springs, CO 80903 719/473-8446 C O N F E R E N C E R E C O R D PROJECT: BOULDER VALLEY SCHOOL DISTRICT

More information

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY MUKWONAGO SCHOOL DISTRICT ARCHITECTURE PARK VIEW MIDDLE SCHOOL The original school building was dedicated in 1954 as the High School, with an addition in 1959, a library addition in 1970, and an addition/renovation

More information

WSA120: New Energy Codes and Lighting Controls

WSA120: New Energy Codes and Lighting Controls WSA120: New Energy Codes and Lighting Controls Member Since 2003 1.0 AIA/CES Learning Units (HSW) Partner Since 1998 Brought to you by WattStopper Today s Presenter: Joe McGrath www.wattstopper.com Learning

More information

GARDEN GROVE FIRE DEPARTMENT

GARDEN GROVE FIRE DEPARTMENT GARDEN GROVE FIRE DEPARTMENT PRE-INSPECTION CHECKLIST PROGRAM FOR SCHOOLS The Garden Grove Fire Department provides an annual school life safety inspection each year to protect lives and property in the

More information

Columns REF, RESPONSIBLE and COMPL TD are provided for your numbering, assignments and control. REF ISSUE RESPONSIBLE COMPL TD

Columns REF, RESPONSIBLE and COMPL TD are provided for your numbering, assignments and control. REF ISSUE RESPONSIBLE COMPL TD PREPARING FOR THE DESIGN OF YOUR SCHOOL CAPITAL PROJECT A Checklist of Issues March 2014, v.1 This document can be used in preparing the stakeholder team for decision-making and for documenting the input

More information

2 nd Grade Lesson Plan: Plant Life Cycle

2 nd Grade Lesson Plan: Plant Life Cycle 2 nd Grade Lesson Plan: Plant Life Cycle Objective: Teach students about the different steps of the plant life cycle: seed, germination (sprout), seedling, and growth into an adult plant. Materials: Sandwich

More information

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY ARCHITECTURE ROLLING HILLS ELEMENTARY SCHOOL Rolling Hills Elementary was built in 1999 and is the newest addition to the Mukwonago Area School District. The building contains approximately 64,900 gross

More information

Fire District Dwelling Construction Requirements

Fire District Dwelling Construction Requirements Fire District Dwelling Construction Requirements Includes Sacramento County Fire Marshals Association Standard for Residential Sprinklers City of Rancho Cordova Building & Safety Department 2729 Prospect

More information

PRINCE GEORGE LIBRARY NEW ENTRANCE REPORT Patricia Boulevard Prince George, BC V2L 3V9

PRINCE GEORGE LIBRARY NEW ENTRANCE REPORT Patricia Boulevard Prince George, BC V2L 3V9 #230 177 Victoria Street P rince George, BC V2L 5R8 Tel. (250) 564-7285 F ax. (250) 564-7286 1100 Patricia Boulevard Prince George, BC V2L 3V9 PRINCE GEORGE LIBRARY NEW ENTRANCE REPORT CITY OF PRINCE GEORGE

More information

HILLSIDE BUILDING COMMITTEE PLAN REVIEW DIRECTIONS

HILLSIDE BUILDING COMMITTEE PLAN REVIEW DIRECTIONS HILLSIDE BUILDING COMMITTEE PLAN REVIEW DIRECTIONS 1 1. Review Hillside Regulations to ensure your design is in conformance with current Town Code. 2. Complete page 3 and contact Paul Mood at 480-348-3573,

More information

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY Revision No.: 11 Page 1 of 12 I. PURPOSE This procedure establishes a tool to help maintain a safe environment for all patients, visitors and staff by evaluating the loss of a life safety feature during

More information

Site Plan Review Committee June 5, 2007

Site Plan Review Committee June 5, 2007 CITY OF ANDOVER SITE PLAN REVIEW COMMITTEE June 5, 2007 MINUTES The Site Plan Review Committee met for a regular meeting on Tuesday, June 5, 2007 at the Andover Central Park Lodge located at 1607 E. Central,

More information

Request for Proposals Design Services for Kitchen Remodel and Second Floor Layout

Request for Proposals Design Services for Kitchen Remodel and Second Floor Layout Request for Proposals Design Services for Kitchen Remodel and Second Floor Layout I. About the Agency StopWaste helps Alameda County s businesses, residents and schools waste less, recycle more and use

More information

The Physical Environment Portal: Module 5, LS Leadership

The Physical Environment Portal: Module 5, LS Leadership The Physical Environment Portal: Module 5, LS.02.01.10 - Leadership Fire Safety: Background Fire safety impacts both the lives of the occupants and the physical structures. In the early 1900 s many buildings

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

FACILITIES CONDITION ASSESSMENT WAGNER RANCH NATURE AREA. Orinda Union School District Facilities Master Plan

FACILITIES CONDITION ASSESSMENT WAGNER RANCH NATURE AREA. Orinda Union School District Facilities Master Plan FACILITIES CNDITIN ASSESSMENT WAGNE ANCH NATE AEA 0 30 60 0 AT MAE CL SCI SP INT 4 IT 3 3 BASC BASC INCLSIN SPECIALIST M FW FL IT ADMIN C MP IT Property line shown is estimated. CE Core Curriculum (Language

More information

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan ADDENDUM NO. 2 RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan TO: All Bidders Gentlemen: You are hereby directed to make the following changes in the Project Manual and/or

More information

Brighton Area Fire Authority

Brighton Area Fire Authority 615 W. Grand River Ave. Brighton, MI 48116 o: 810-229-6640 f: 810-229-1619 January 14, 2019 Fire Alarm Contractors RE: Fire Alarm Credential & Submittal Requirements To Whom It May Concern: The following

More information