Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN
|
|
- Randolf McCarthy
- 5 years ago
- Views:
Transcription
1 Wold Architects and Engineers 332 Minnesota Street Suite W2000 Saint Paul, MN PLANNERS ARCHITECTS ENGINEERS ISD #15 St. Francis Area Schools East Bethel Elementary School Additions and Renovations St. Francis Elementary School Additions and Renovations St. Francis Middle School Renovations Design Development Presentation August 13, 2018
2 Referendum Scope Total Referendum Budget : $80,060,000
3 Design Development User Groups
4 EBES - Project Scope East Bethel Elementary School (K-5) (Current Capacity: 700 students) Construction Budget : $6,053,300 Design Overview Improve Pick-up/Drop-off Flow and Safety Secure Entry Office Expansion Reorganize Classrooms (4) Classroom Addition Relocate and Reconfigure Media Center Update Interior Finishes and Lighting Replacement Add Fire Protection
5 EBES - Criteria District Wide: 1. Each building should have one secure entry (with a consistent entry sequence) 2. Lockers will be located inside the classrooms to allow for increased visibility and circulation, as well as potential adjacent collaboration areas. Building Wide: 1. A high-level of visibility should be present throughout the building, using glass, for optimal supervision. 2. Maximize use of daylight throughout the building, especially in classrooms. Administration: 1. Office should have increased and direct visibility to entry and parking. 2. Office should have a staff bathroom (separate from Nurse)
6 EBES - Criteria Common Areas: 1. Spaces for Community Use are as follows: Gym Cafeteria Bathrooms Conference Room One (1) room for optional use 2. The community spaces should include a space for sitting and waiting. 3. Cafeteria should feel and be visually open to common space.
7 EBES - Criteria Classrooms: 1. The classrooms should be organized by grades, in four (4) classroom pods with adjacent breakout space. 2. The staff lounge should be centrally located to the classrooms. 3. Media/tech suite spaces should be flexible, with the ability to open/close the space using operable walls or other devices.
8 EBES - Design Development Building Plan
9 EBES - Exterior View New Entry/Office
10 EBES - Interior View Vestibule Wall
11 EBES - Interior View Branding Wall
12 EBES - Interior View Main Office
13 EBES - Interior View Cafeteria Openings
14 EBES - Interior View Typical Classroom
15 EBES - Interior View Flex Area
16 EBES - Interior View Media Center Open Area
17 EBES - Interior View Media Center Open Area
18 EBES - Interior View Media Center Open Area
19 EBES - Interior View Media Center Secure Area
20 EBES Design and Construction Schedule
21 SFES - Project Scope St. Francis Elementary School (K-5) Construction Budget : $8,403,025 Design Overview Improve Pick-up/Drop-off Flow and Safety (combined site with Middle School) Secure Entry & Main Office Re-organization Create Flex Areas in Classroom Wings (10) Classroom Addition Centralize Media Center & Specialty Classrooms Centralize SPED Suite Update Interior Finishes and Lighting Replacement Add Fire Protection
22 SFES - Criteria District Wide: 1. Each building should have one secure entry (with a consistent entry sequence) 2. Separation of parent drop-off and buses Building Wide: 1. Classrooms should be consistent in size and features in order to facilitate future flexibility. 2. Classroom wings should each incorporate a break-out space and should be visible for supervisory purposes from adjacent classrooms. Administration: 1. Office should have increased and direct visibility to entry and parking.
23 SFES & SFMS Site Diagram
24 SFES - Design Development - Building Plan
25 SFES - Exterior View Main Entry (Cafeteria windows as part of Alternate Bid)
26 SFES - Exterior View Bus Entry
27 SFES - Interior View Vestibule Wall
28 SFES - Interior View Reception
29 SFES - Interior View Branding Wall
30 SFES - Interior View Cafeteria (Alternate Bid) (Cafeteria windows, flooring, acoustic panels, coat hooks as part of Alternate Bid)
31 SFES - Interior View Typical Classroom
32 SFES - Interior View North Flex Area
33 SFES - Interior View North Flex Area
34 SFES - Interior View Media Center Open Area
35 SFES - Interior View Media Center Open Area
36 SFES - Interior View Media from Bus Entry
37 SFES - Interior View Media Center Secure Area
38 SFES - Interior View South Flex Area
39 SFES - Interior View South Flex Area
40 SFES - Design and Construction Schedule
41 SFMS Overview St. Francis Middle School (6-8) Construction Budget : $14,417,615 Design Overview Improve Pick-up/Drop-off Flow and Safety Secure Entry Expand Cafeteria (Create Student Commons) Relocate Music Suite Renovate Science Renovate FACS Reorganize Media Center Reorganize SPED Improve Tech Access Relocate gymnastics to HS to recapture Gym Relocate weights and recapture stage Recapture 4 th /5 th Grade space Update Interior Finishes, Lighting Replacement, and Address Deferred Maintenance Add Fire Protection
42 SFMS Design Guidelines Building Wide: 1. The school should feel modern, clean and updated. 2. Spaces should be easily navigable and pinch points should be eliminated. 3. Spaces should maximize natural light and improve air quality. 4. The design should improve interior circulation and connectivity, utilizing signage and logos to help orient building occupants. 5. The design should implement a cohesive color scheme to relate to other District schools, display school pride and create a sense of branding and uniformity.
43 SFMS Criteria Entrance/Commons: 1. Each building should have one secure entry (with a consistent entry sequence) 2. Develop a wide and open entrance to accommodate the traffic flow of students that is clearly visible from the exterior. 3. Cafeteria should be a student commons, open to adjacent circulation. Building Organization: 1. 6 th Grade shall be organized by discipline/content, similar to 7 th /8 th Grade, but should be located in an area specific to 6 th Grade th /8 th Grade shall be organized by discipline/content. 1. Classes are grouped by either STEAM or Humanities. 3. Design should Masterplan for three (3) sections per grade per Core discipline.
44 SFMS Criteria Building Organization: 4. Science should be cohesive and organized. 1. Seven (7) labs required (Masterplan for ten (10) potential labs with necessary infrastructure in place for future conversion if needed. 5. The Media Center should be open, flexible and able to accommodate more than just reading. 6. One (1) general computer lab required adjacent to or located in the Media Center. 7. Music should remain a cohesive suite. 8. Weights should be adjacent to the Gym. 9. Locker bays should be implemented in lieu of banks along the walls.
45 SFMS Design Development Building Plan Main Level Parent Pickup / Drop off
46 SFMS Design Development Building Plan Upper Level
47 SFMS Exterior View Main Entry
48 SFMS Exterior View South Windows
49 SFMS Interior View Vestibule Wall
50 SFMS Interior View Reception
51 SFMS Interior View Branding Wall
52 SFMS Interior View Open Media
53 SFMS Interior View Open Media
54 SFMS Interior View Circulation / Open Media
55 SFMS Interior View Secure Media Center
56 SFMS Interior View 6 th Grade Flex
57 SFMS Interior View 7/8 th Grade Flex
58 SFMS Interior View Cafeteria
59 SFMS Interior View Cafeteria
60 SFMS Design and Construction Schedule
Design Presentation. Chief Operations Officer Willie Burroughs
Design Presentation Chief Operations Officer Willie Burroughs Agenda Introduction Community Feedback Project updates 2 Feedback Citizens Advisory Committee meetings Growth and Development meetings Community
More informationMaster Facility Planning Update School Board Meeting May 26, 2016
Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility
More informationREPORT CARD TO THE COMMUNITY MAY 15, 2018
REPORT CARD TO THE COMMUNITY MAY 15, 2018 O On May 10, 2014 voters in Greenville ISD approved a $72,275,000 bond election. BOND PROPOSAL PROJECT BOND AMOUNT CONSTRUCT A NEW BOWIE ELEMENTARY SCHOOL $17,600,000
More informationIchabod Crane Central School District 2018 Capital Project Preliminary Estimate
Health & Safety 1,399,000 Academics & Program 17,140,800 Physical Education & Athletics 5,922,000 Building Infrastructure 3,103,800 Site Infrastructure 1,049,600 TOTAL SCOPE OF WORK 28,615,200 PROPOSED
More information5 Year Capital Improvement Plan Update
5 Year Capital Improvement Plan Update Board Approved May 10, 2016 Collierville Schools Board of Education Wanda Chism Wright Cox Mark Hansen, Chairman Cathy Messerly Kevin Vaughan Superintendent John
More information2014 Bond Project Guide
2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center
More informationDesign Review of Facility Improvement Projects
Design Review of Facility Improvement Projects Agenda Board Meeting Schedule Scope of Work Summary Overall Building Plans and Scope Summary Update on Areas of Design Development Programming and Space planning
More informationTALLEY STREET ELEMENTARY SCHOOL CITY SCHOOLS OF DECATUR COMMUNITY PRESENTATION DECEMBER 6, 2017
TALLEY STREET ELEMENTARY SCHOOL CITY SCHOOLS OF DECATUR COMMUNITY PRESENTATION DECEMBER 6, 2017 AGENDA INTRODUCTIONS RECAP OF CONSTITUENT INPUT WHAT WE HEARD SITE PLAN PRECEDENT IDEAS WHERE WE ARE 06.23.17
More informationAllisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767
Allisonville Elementary School Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 ADA improvements are Fire alarms need to be updated Playground equipment needs to be
More informationBriar Crest Elementary
Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary
More informationSAMUEL CLEMENS ADDITIONS & RENOVATIONS ( )
SAMUEL CLEMENS ADDITIONS & RENOVATIONS (10-30-2017) BUDGET - $ 72,000,000 2020 PROJECTED COMPLETION DATE ARCHITECT MARMON MOK GENERAL CONTRACTOR Bartlett Cocke CONSTRUCTION MGMT. AG CM 18% COMPLETE SAMUEL
More informationDraft. Security Study. Germantown School District Germantown, WI. PRA Project # February 2014
Draft Security Study Germantown School District Germantown, WI PRA Project # 114440 February 2014 February 2014 Germantown School District Facilities Security Study Page 1 Facilities Security Study Page
More informationForest Hills Facilities Plan
Forest Hills Facilities Plan Extensive updates to 8 of our 9 schools Replace Wilson Elementary Enhance learning environments across the district Build additional classrooms to accommodate gradual implementation
More informationNYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS
NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS DECEMBER 3, 2013 KEY QUESTIONS 1. What is the time sequence for available funding? (In what years will the funding be available?) 2. What is the
More information2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16
1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated
More informationVOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED
Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological
More informationDoing Business with Bartlett Cocke General Contractors
Doing Business with Bartlett Cocke General Contractors FACTS 59 5 580 $ 700 YEARS OFFICES STATEWIDE EMPLOYEES MILLION IN REVENUE Established in 1959 by Bartlett Cocke, Jr. San Antonio (headquarters) Austin
More informationEmergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools
Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools 143 Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky
More informationMASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW
DISTRICT CAMPUS OVERVIEW Classrooms, CR Special Education Computer Lab INTERSTATE 5 FW - Faculty Work, FL - Faculty Physical Education / Athletics Support Spaces S - Storage, T - Toilets, U - Utility,
More informationLINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016
LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016 PROJECT OVERVIEW PROJECT OVERVIEW + PRE-DESIGN BEGAN IN FALL OF 2015 + EXISTING CONDITIONS ANALYSIS + PROJECTED GROWTH IN HIGH SCHOOL
More informationA NEW AMERICAN HIGH SCHOOL
A NEW AMERICAN HIGH SCHOOL typical American high school trends: large, dense, sprawling MANHATTAN HIGH SCHOOL GOULDEVANS MANHATTAN, KANSAS SANDY HIGH SCHOOL DULL OLSON WEEKES ARCHITECTS SANDY, OREGON
More informationAttendees/Absentees. Derek Gallagher DG. Delano Secondary School Additions and Renovations June 6, 2016 Technology User Group Meeting Minutes
MEMORANDUM To: From: Attendees/Absentees Derek Gallagher DG Date: June 14, 2016 Comm. No: 152235 Subject: Independent School District #879 Delano Secondary School Additions and Renovations June 6, 2016
More informationWhite Bear Lake Area Schools District 624 ENERGY GUIDELINES
White Bear Lake Area Schools District 624 ENERGY GUIDELINES Developed by: White Bear Lake Area Schools Energy Steering Committee as part of the Schools for Energy Efficiency (SEE) Program ISD 624 Energy
More information2012 Exhibition of School Planning and Architecture. Crockett Elementary School. Houston Renovation Lee J Brockway Award
2012 Exhibition of School Planning and Architecture Crockett Elementary School Houston Renovation Lee J Brockway Award Natex Architects Learning Environment: Situated in less than 2 acres, Crockett Elementary
More information30% Design Community Meeting
Monday, September 17, 2018 30% Design Community Meeting Site 85-E-W-4 Please sign in on your mobile device: http//communitymeeting.ocps.net/ Site 85-E-W-4 Meeting Agenda September 17, 2018, 6:45PM Welcome
More information2012 Exhibition of School Planning and Architecture. Carroll Middle School. Construction Project of Distinction Award
2012 Exhibition of School Planning and Architecture Carroll Middle School Southlake, Texas New Construction Project of Distinction Award Natex Architects - Plaza Community Environment: The new Carroll
More informationNew High School Concept
Approved Bond Projects for Alamance-Burlington Schools In November 2018, Alamance County citizens approved a $150 million bond project proposal. Bond funds will pay to construct a new high school and provide
More informationImagine RBC 2010 The Plan
Imagine RBC 2010 The Plan Creation of New Space The creation of a new Student Center will greatly relieve the demands on existing space. Currently 1,700 students, including both RBC and St. James Grammar
More information3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000
1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert
More informationMichigan State University Barrier-Free/Accessibility Project Status Summary March 2017
Projects Completed FY14, FY15 and FY16 (arranged alphabetically) Abrams Planetarium Install automatic door opener on main doors of the Planetarium. Completed: Summer 2016 Cost: $13,000 Akers Hall Renovations
More informationKerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018
Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018 WHAT IS A BOND ELECTION? Provide communities an opportunity to vote to give the Board of Trustees authority
More informationAdopted DEFP FY16 - Amendment. Broward County Public Schools. Amended to Incorporate Board Approved Changes
Adopted DEFP FY16 - Amendment Broward County Public Schools Adopted District Educational Facilities Plan Fiscal 015-16 to 2019-20 Amended to Incorporate Board Approved Changes Robert W. Runcie, Superintendent
More informationElement C Interiors Interior Construction
Fittings and Interior PART 1 - GENERAL 1.01 OVERVIEW A. Includes marker and tack boards, lockers, storage shelving, handrails and wall protection, access doors, aquariums, fire extinguishers, and signage.
More informationProgram Summary: A ,000 SF Program Statement: $46.41 $11,000,000 August 2013
The 55,000 sf expanded office space includes a new 14,000 sf mezzanine for future growth. The office zone houses the administrative functions including management, engineering, marketing, accounting, R&D,
More informationOxford Hills School District Capital Renewal Plan Updated March 2017
Color Coding Guide Recently Completed In Progress FY 2017 Budget in FY 2018 Future Budgets/Projects 3/20/17 Capital Renewal Plan Updated March 2017 Capital Renewal Plan - Harrison Elementary Harrison add
More informationSchool District of Milton 5- Year Capital Maintenance and Improvement Plan
Updated - 02/21/17 School District of Milton 5- Year Capital Maintenance and Improvement Plan 101 East Elementary 1 Parking Lot/Traffic Flow Project 615,175 Includes Construction and Engineering 2 Bathroom
More informationG W C C GREENMOUNT WEST COMMUNITY CENTER GWCA - COMMUNITY CENTER. design recommendations
G W C C GREENMOUNT WEST COMMUNITY CENTER design recommendations GWCA - COMMUNITY CENTER PROGRAM SIDEWALK 1... ENTRANCE/EXIT A... MECHANICAL 2... LOBBY B... ELECTRICAL 1 3... RECEPTION C... MEN S TOILET
More informationSustainable Strategies for School Development in Urbanizing Areas
Sustainable Strategies for School Development in Urbanizing Areas A1 A2 A Corridor School as a part of a mixed- use development in Arlington VA PRECEDENT ANALYSIS Elementary Schools in different contexts
More informationADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR. RFP No Professional Design Services for CCC Le-Jao Student Resource Center
ADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR RFP No. 2030 Professional Design Services for CCC Le-Jao Student Resource Center COAST COMMUNITY COLLEGE DISTRICT COSTA MESA, CALIFORNIA COUNTY OF ORANGE COAST
More informationTRINITY LUTHERAN SCHOOL RENOVATIONS
MASTER PLAN FOR PHASED IMPROVEMENTS AUGUST 26, 2013 WITH DESIGN AND PLANNING GUIDANCE FROM WIGHT & COMPANY` Recognizing the importance of its school facility s general appearance, school officials initiated
More informationE-SPLOST V. Facts and Information. August 2018
E-SPLOST V Facts and Information August 2018 Education Special Purpose Local Option Sales Tax What is E-SPLOST? It is a one penny sales tax that allows for shared contribution to education, including visitors
More informationNECC Strategic Plan Goal Team 1: Develop a Comprehensive Campus in Downtown Lawrence
NECC Strategic Plan Goal Team 1: Develop a Comprehensive Campus in Downtown Lawrence Meeting Minutes April 9, 2014 Lawrence Campus Backfill Subcommittee Updates Martha Leavitt/Dick Goulet Revised goal
More informationLOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES
LOS ANGELES MISSION COLLEGE MASTER PLAN DESIGN & DEVELOPMENT PRINCIPLES 34 Quality Learning Along the Arroyo PROGRAM SUMMARY BY PROJECT The following are program summaries for each of the projects planned
More informationFederal Way Public Schools Support Services Center 1211 S 332 nd Street Federal Way, WA Federal Way Public Schools Completion Fall 2012
Project Info: Federal Way Public Schools Support Services Center 1211 S 332 nd Street Federal Way, WA 98003 Federal Way Public Schools Completion Fall 2012 PROJECT ATTRIBUTES Responsiveness to program,
More informationSolana Ranch Elementary School
2015 Exhibition of School Planning and Architecture Solana Ranch Elementary School Category: New Construction Solana Beach School District Solana Beach, CA Project name Project name Landscape Plan Community
More information2014 Exhibition of School Planning and Architecture. White Hill Middle School Campus Master Plan & Design. Ross Valley School District Fairfax, CA
2014 Exhibition of School Planning and Architecture White Hill Middle School Campus Master Plan & Design Ross Valley School District Fairfax, CA Main Exterior Image Main Exterior Image Main Site Diagram
More informationSt. Louis Public Library. St. Louis Public Library s Central Library Project Lookbook
St. Louis Public Library St. Louis Public Library s Central Library Project Lookbook When a library as famous and well visited as the St. Louis Central Library (St Louis, MO) undergoes a massive renovation,
More informationPROCEDURE: FURNITURE, ART, & DÉCOR STANDARDS & REQUESTS
Office of Planning, Design, and Construction 2500 North State Street Jackson, Mississippi 39216-4505 Phone (601) 984-1410 Date: July 7, 2017 PROCEDURE: FURNITURE, ART, & DÉCOR STANDARDS & REQUESTS 1.1
More informationChariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)
Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) School/Department FY 16 FY 17 FY18 FY19 FY20 Chariho Regional High School FY 16 FY 17 FY18 FY19 FY20 *Repair Bleachers
More informationSCHOOLS + COMMUNITY rehabs, renovations, new construction
OCV HAS A WEALTH OF EXPERIENCE HELPING S AND COMMU- NITY CENTERS BUILD, MODERNIZE + EXPAND THEIR FACILITIES, PROVIDING THE RIGHT ENVIRONMENT FOR GROWTH 2015 SMILOW CLUBHOUSE, MADISON SQUARE BOYS & GIRLS
More informationMaster Project List Report
Blue Hills Elementary School 01-8215 Site Utilities Replacement $52,835 01-8502 Modernization $3,135,933 01-8525 Exterior Painting $181,478 01-8552 Kindergarden Fencing $13,180 Install new backflow preventer.
More information12 February CAMPUS MASTER PLAN UPDATE Focus Group - Wayfinding & Signage
12 February 2016 CAMPUS MASTER PLAN UPDATE Focus Group - Wayfinding & Signage AGENDA Introductions Planning Scope The 2004 Campus Plan Observations SWOT Exercise Analysis Goals and Advice Questions & Discussion
More informationEMERYVILLE PLANNING COMMISSION STAFF REPORT
EMERYVILLE PLANNING COMMISSION STAFF REPORT Agenda Date: Report Date: April 19, 2012 TO: FROM: SUBJECT: Planning Commission Planning and Building Department Miroo Desai, Senior Planner (ECCL) (UPDR12-001)
More informationSafety & Security Checklist by Layers of Building and Grounds The Church Safety and Security Guidebook (Brotherhood Mutual Insurance)
Appendix D Safety & Security Checklist by Layers of Building and Grounds The Church Safety and Security Guidebook (Brotherhood Mutual Insurance) Assessing Specific Areas Look at each Layer of Security
More informationSagebrush Elementary School East Temple Place Aurora, Colorado 80015
Sagebrush Elementary School 14700 East Temple Place Aurora, Colorado 80015 Year Opened 1977 Current Square Footage 57,100 Site Acreage 7.66 sagebrush.cherrycreekschools.org Asphalt and concrete work; electrical
More informationTillamook High School Bond Projects
Tillamook High School Bond Projects School Project Description All Buildings Upgrade fire alarm H&S All Buildings Add door lock capability from inside rooms Security All Buildings Install card lock entry
More informationSCHEMATIC DESIGN PRESENTATION
August 5, 2014 SCHEMATIC DESIGN PRESENTATION ADDITIONS & RENOVATIONS Greenville Independent School District Acknowledgments 2 Narrative 3-6 Crockett Elementary School 7-12 L.P. Waters Early Childhood Center
More informationAngela M. Bollinger. architecture & interior design project management facilities management PORTFOLIO
Angela M. Bollinger architecture & interior design project management facilities management PORTFOLIO 2016 Outdoor Recreation Sport Complex Create a new Outdoor Recreation Sports Complex for NIU Campus
More informationWorkplace DESIGN & BUILD MADE SIMPLE 1
Workplace DESIGN & BUILD MADE SIMPLE 1 All aspects of workplace design and construction. Whether it s a desk, a signage, or a finish, everything that makes up your office should be well considered to respond
More informationRockwell/Johnson School Renovations Project. Existing Conditions September, 2016
Rockwell/Johnson School Renovations Project Existing Conditions September, 2016 Rockwell School Conditions RS - Custodial Closet Shared w/ Book Room. RS - Aging Telephone Switch Gear/No Growth for Additional
More informationSection 3. Preparedness. Shelton School District Emergency Response Plan
Section 3 Preparedness Preparedness Preparedness: Developing a School-Based Emergency Plan...3.1 Importance of Preparedness...3.1 Organization of this Preparedness Section...3.1 Developing a Site-Specific
More informationSchool District of New London. Community Listening Session & Referendum Consideration
School District of New London Community Listening Session & Referendum Consideration 1 Why? Significant facility, maintenance, safety, energy efficiency needs Independent Facility Study identified millions
More informationEDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016
EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016 Educational Specifications Page 1 Project Overview:
More informationTIFT COUNTY SCHOOLS E-SPLOST HISTORY
TIFT COUNTY SCHOOLS E-SPLOST HISTORY July 1, 1997 June 30, 2002 $28,766,187.16 collected July 1, 2002 June 30, 2007 $39,025,830.10 collected July 1, 2007 June 30, 2012 $41,886,155.46 collected July 1,
More informationNEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL
NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 AGENDA NEIGHBORHOOD MEETING Design Criteria Review 3 Concepts Discussion Q&A DESIGN CRITERIA NEIGHBORHOOD MEETING IMAGE & IDENTITY CIVIC PRESENCE
More informationCampus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111
Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111 Year Opened 1971 Current Square Footage 175,743 Site Acreage (included in CCHS) 87.22 campus.cherrycreekschools.org $2,441,170
More informationStandard Operating Procedure CCTV Guidelines
Purpose To establish clear guidelines that pertain to the use of CCTV Video Surveillance Technology used in the Annapolis Valley Regional School Board. Introduction With the increased use of CCTV systems
More informationMONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION William H. Farquhar Middle School Modernization MCPB Item No. 10 Date: 09-18-2014 Description Summary Fred
More information2. Closed circuit television, design and installation.
Company: AECO Systems, Inc. is a sound and communicator contractor, affiliated with NECA and IBEW. We specialize in commercial fire alarm systems, providing both sales and engineering. We are also involved
More informationGreenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111
Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Year Opened 1958 Current Square Footage 50,504 Site Acreage 8.53 greenwood.cherrycreekschools.org $220,720 Electrical
More informationComprehensive Study N A G L E H A R T R A Y A R C H I T E C T U R E GILBANE BUILDING C O M P A N Y P R O J E C T M A N A G E M E N T A D V I S O R S
N A G L E H A R T R A Y A R C H I T E C T U R E GILBANE BUILDING C O M P A N Y P R O J E C T M A N A G E M E N T A D V I S O R S BOE COW Meeting October 6, 015 Comprehensive Study North Shore School District
More informationATLANTA-FULTON PUBLIC LIBRARY SYSTEM CENTRAL LIBRARY RENOVATION
ATLANTA-FULTON PUBLIC LIBRARY SYSTEM CENTRAL LIBRARY RENOVATION APRIL 11, 2018 VINES ARCHITECTURE AGENDA: CONCEPT DEVELOPMENT EXTERIOR PLAZA STRATEGY PLAN DISTRIBUTION CONCEPT DEVELOPMENT EMERGING PRINCIPLES
More informatione. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)
1. Ground Level Indoor Inspection a. Univents are on and air discharge grills are free of obstructions. If false, send email to building principal and facilities director asking staff to be instructed
More informationNAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX
NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA 18064 610-759-1367 FAX 610-759-7028 TO: FROM: Dr. Riker, Superintendent of Schools Board of School Directors Lewis F.
More information2016 Bond Steering Committee Meeting
2016 Bond Steering Committee Meeting Meeting 4: July 14, 2016 Safety & Security Needs Bond Steering Committee Schedule Thursday, June 23 6:00-8:00 p.m. Spring ISD Boardroom Thursday, June 30 6:00-8 :00
More informationPine Hills Bus Transit Center Community Design Workshop. Presentation April 21, 2018
Pine Hills Bus Transit Center Community Design Workshop Presentation April 21, 2018 1 Today s Workshop Welcome and Overview (10:00-1015 AM) Site Programming (10:15-10:45 AM) InfraWorks Demo (10:45-11:00
More informationimplementation r expression in landscape
6 ubc okanagan implementation campus plan r expression in landscape 68 6 implementation campus plan sections The Campus Plan supports the academic mission, values and commitments of the University by providing
More informationESUHSD Measure G Bond Program Update: November 1, Alterations to Student Services Building and Streetscape Building 1200 (Gym) Modernization
James Lick Track & Field Improvements Bleacher Replacement Alterations to Student Services Building and Streetscape Building 1200 (Gym) Modernization Design Mt Pleasant Bleacher Replacement New Performing
More informationDuke University Medical School. Duke School of Nursing
Duke School of Nursing Lighting and Electrical Depth Proposal and Breadth Topics Proposal for Spring 2008 Semester December 18 th, 2007 Table of Contents Executive Summary....................................
More informationMONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE
MONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE Shady Grove Metro Station Area Charrette Closing Presentation October 25-28, 2000 MONTGOMERY COUNTY, MD M-NCPPC Design Collective, Inc. Architects
More informationSITE FEASIBILITY TEST FIT LAYOUT NORTHERN AREA INTERNATIONAL SCHOOL DECEMBER 2016
SITE FEASIBILITY TEST FIT LAYOUT NORTHERN AREA INTERNATIONAL SCHOOL DECEMBER 2016 OWNER & DESIGN TEAM GENERAL BACKGROUND INFORMATION PGCPS received a Carnegie Corporation Opportunity by Design grant to
More informationCLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN
CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN 04.13.2017 1 MONTICELLO INTERIOR FINISHES PAINT MOULDING WALLS ACCENT DOORS DOOR TRIM/STAIRS
More informationMEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.
MEMORANDUM Date: August 28, 2015 Our File: 1010-20-15-062 To: Design Review Committee From: Lisa Berg, Senior Community Planner Re: Amendment to Development Permit for Park Royal North This memo deals
More informationTHEODORE ROOSEVELT SENIOR HIGH SCHOOL WASHINGTON,DC
THEODORE ROOSEVELT SENIOR HIGH SCHOOL WASHINGTON,DC PROJECT SUMMARY Project Name: Theodore Roosevelt Senior High School Modernization Client: DC Department of General Services Program: Roosevelt Senior
More informationPreserve the past. Learn outside. Homelike features
bethany school Glendale meeting 8/28/2017 Bethany Values: Walking outside between classes Handicap accessibility Improved security and safety Identity awareness - distinct and obvious entries Natural daylight
More informationADAPT CONFIGURABLE SPACE DIVIDERS
ADAPT CONFIGURABLE SPACE DIVIDERS The Adapt Configurable Space Dividers are a collection of easily movable dividers that allow you to create new spaces without constructing permanent walls. They are easily
More informationKenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2
Kenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2 Adams Field Kenmore East High School Kenmore West High School Crosby Field Charles Lindbergh Elementary Thomas
More informationMOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School
MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water
More informationMeadow Point Elementary School East Grand Avenue Aurora, Colorado 80015
Meadow Point Elementary School 17901 East Grand Avenue Aurora, Colorado 80015 Year Opened 1982 Current Square Footage 53,100 Site Acreage 7.48 meadowpoint.cherrycreekschools.org $2,081,600 Electrical system,
More informationCENTRAL KITSAP SCHOOL DISTRICT BOARD PROCEDURE
MANAGEMENT SUPPORT SERVICES Utilities Management Introduction In support of Central Kitsap School District (CKSD) Utilities Conservation Policy, the following procedure is set forth to establish operating
More informationThe 20 Bedford Way Masterplan
The 20 Bedford Way Masterplan 20 Bedford Way is a Grade II* listed building designed by Architect Sir Denys Lasdun and Partners in the 1960 s. The building is considered an exemplar of Lasdun s work, characterised
More informationLock Department. Ben Riding. Assistant Hardware Supervisor Maintenance and Operations. Voice: Fax:
Lock Department Charles Garcia Hardware Supervisor Voice: 213 745-1650 Fax: 213 745-3367 E-Mail: charles.garcia@lausd.net Lock Department Ben Riding Assistant Hardware Supervisor Voice: 818 394-2495 Fax:
More informationLaney College 2012 Facilities Master Plan
laney college 2012 Facilities Master Plan Purpose of the master plan The purpose of the 2012 Long Range Facilities Master Plan is to create a roadmap for facilities development that addresses the educational
More informationr.i.s.e demonstration center
r.i.s.e demonstration center washington, dc r.i.s.e. demonstration center site context R.I.S.E. Demonstration Center is the adaptive reuse of the historic St. Elizabeths East Chapel to create an interim
More informationFACILITIES FOR 21 ST CENTURY LEARNING
FACILITIES FOR ST CENTURY Ideas for st Century Facilities Aesthetics The indoor and outdoor structures and spaces of the school should be aesthetically pleasing and healthful settings. The facility should
More informationr.i.s.e demonstration center washington, dc project category: architecture
r.i.s.e demonstration center washington, dc project category: architecture R.I.S.E. Demonstration Center is the adaptive reuse of the historic Chapel at St. Elizabeths East Campus to create an interim
More informationUNIVERSITY OF WISCONSIN-PLATTEVILLE REQUEST FOR ARCHITECTURE & ENGINEERING PRE-PLANNING & DESIGN SERVICES. for. Williams Fieldhouse - Phase I
UNIVERSITY OF WISCONSIN-PLATTEVILLE REQUEST FOR ARCHITECTURE & ENGINEERING PRE-PLANNING & DESIGN SERVICES for Williams Fieldhouse - Phase I 2007-2009 August 2007 DSF # 07E2H TABLE OF CONTENTS Scope of
More informationF. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17
ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:... 2 2. EMERGENCY POWER... 3 B. LIGHTING...4 1. GENERAL... 4 2. AVERAGE MAINTAINED
More informationGOW HASTINGS ARCHITECTS ENVIRONMENTAL GRAPHICS GOWHASTINGS.COM
GOW HASTINGS ARCHITECTS ENVIRONMENTAL GRAPHICS GOWHASTINGS.COM branding wayfinding signage Environmental graphic design is the visual communication of a built environment for the purpose of connecting
More informationExisting Facilities Assessment
DRAFT Patrick Henry Elementary School 4643 Taney Ave, Alexandria, VA 22304 Existing Facilities Assessment Alexandria City Public Schools Planning, Design & Construction Office 1340 Braddock Place Alexandria,
More information