INSTALLATION QUALITY-ASSURANCE GUIDE FOR SOLMAX-GSE S CONDUCTIVE LINER
|
|
- Lesley Henry
- 5 years ago
- Views:
Transcription
1 INSTALLATION QUALITY-ASSURANCE GUIDE FOR SOLMAX-GSE S CONDUCTIVE LINER These instructions present some general guidelines for installing and surveying Solmax-GSE s smooth edged conductive backed geomembranes for leaks. How to identify the conductive side: It is the outside surface of the roll. It is the opposite side of the printing line. Use a multi-meter to verify the continuity. Put the 2 wires on the same face. If there is continuity, this side is conductive. Use the spark tester: put the grounding pad and the electrode on the same face, away from the edges. If the alarm goes on, the conductive face is on top. General attributes of Solmax-GSE s conductive backed geomembranes 1. A co-extruded conductive surface: A layer of electrically conductive skin is coextruded with the geomembrane during the manufacturing process. Hence, one surface of the geomembrane is always electrically conductive, making it possible to use the geomembrane for leak detection and liner integrity surveys without the need for an external conductive underlay or subgrade beneath the geomembrane 2. Nonconductive smooth edges: Solmax-GSE s conductive backed geomembranes now have smooth edges that are nonconductive. The nonconductive smooth edges will reduce the hassles with installing conductive backed geomembranes, improve the overall efficiency of the welding process and improve leak location surveys with conductive backed geomembranes by eliminating the issue of false positives along the welded seams. INSTALLATION 1. Install the geomembrane with the conductive face down. Extra care must be taken when unrolling to ensure that conductive surface is facing down. On a patch, or a piece of geomembrane left on site, label each side visibly marking the conductive and non conductive sides. At the corners, do not flip (turn up side down). 1
2 2. Seams should be performed as per standard industry practices: No specific welding machine is needed. Special welding machines have been specified with some conductive geomembranes to scrape off conductive material from the seams during welding for good quality welds and to break conductivity across the welded seams. Solmax-GSE s conductive geomembranes now come with non conductive smooth edges, as such they can be welded without the need for a special welding machine to scrape off conductive material. Double channel hot wedge and extrusion fillet seams can be performed. Calibration of the welding machine should be done with the conductive layer facing down, using standard calibration procedures. Seam testing for leaks should be done in accordance with industry practices, such as ASTM D4437 not using the spark test. 3. It is possible to perform leak location surveys such as the water puddle (ASTM D7002) and dipole survey (ASTM D7007) on Solmax-GSE s conductive backed geomembranes. Tests have been realised with a third party consultant. Should you require more details, please feel free to contact Solmax-GSE. GETTING STARTED WITH THE HOLIDAY DETECTOR EQUIPMENT: Tinker & Rasor (contact your sales representative for more information.) Grounding pad Holiday detector Narrow rubber electrode Wide rubber electrode Wide brush electrode Accessories might change according to your application. 2 Rev
3 There is a high risk of electrical shock. Make sure to use the spark tester properly. These instructions do not address all the safety concerns with the use of the holiday detector. Please read the operating manual carefully. Wear safety shoes/boots. Assemble the equipment as per manufacturer instructions. Make sure no connection is loose. Make sure the device is in good working condition. Do not use a broken device. Only one person at the time should operate the holiday detector. Do not use if there is water on the geomembrane. When the holiday detector is ON: Do not walk on the grounding pad. Do not touch the electrode. CALIBRATION AND ADJUSTMENT OF THE HOLIDAY DETECTOR STEP 1. Cut a piece of geomembrane of at least 3 m x roll width, and lay it flat on the ground with the conductive layer facing down. STEP 2. Make a pin hole with a diameter of not less than 1 mm in the geomembrane, at least one meter away from any edge. STEP 3. Lay the grounding pad on the geomembrane piece (intimate contact is important). STEP 4. Mount the wide electrode. STEP 5. Turn on the spark tester and put the spark tester on the high voltage scale. STEP 6. Adjust the voltage to 35 kv with the screwdriver provided by Tinker&Rasor. ON/OFF adjustment button Hight voltage scale Voltage adjustment 3
4 STEP 7. Adjust the sensitivity to detect the hole and to avoid false alarms. Always walk at normal speed when doing the calibration Once in a while, it is normal to have a false alarm a. Adjust the sensitivity in order to have a lot of false alarms b. Reduce the sensitivity and walk c. Note the number of false alarms d. Repeat steps b. and c. until there are almost no false alarms e. Once adjusted, move the electrode swiftly or run. It should provoke a false alarm. If it doesn t, it means the sensitivity is too low. Go back to step a. STEP 8. Walk on the pin hole. The alarm should be triggered and the spark should be visible. NOTE: Each time the spark tester is started, make sure to verify the voltage (35 kv) and adjust if necessary. When the spark tester is off for more than 5 minutes, it goes back automatically to low voltage scale. Listening to the electricity noise (not alarm) is another indication of the voltage. The lower the voltage, the lower the noise. If the voltage is too low even after adjustment: Make sure the equipment is fully charged. Verify that the charger is giving the right voltage. Verify the voltage of the battery. If it is lower than the manufacturer specification, it should be replaced immediately. NOTE: Electromagnetic field may affect the hole detection survey. The voltage and/or the sensitivity of the holiday detector may need to be adjusted in specific areas (example: near high voltage power lines). 4
5 SURVEYING THE WELDED CONDUCTIVE BACKED GEOMEMBRANE PANEL FOR LEAKS BY SPARK TESTING AS PER ASTM D7240 STEP 1. Connect the wide brush electrode to the holiday detector. STEP 2. Lay the grounding pad on the geomembrane (intimate contact) and hold the electrode. Ensure that the grounding pad and the electrode are within the limits of a panel s seams. If the soil/ under layer is conductive, it may connect the panels together, and the system may work even if the grounding pad and the electrode are not on the same panel. However, it is not recommended to make that assumption, as the conductivity of soils varies a lot. STEP 3. Walk the whole surface of each panel. Make sure that the electrode is touching the geomembrane on the full width. A hole in the hollow of a wrinkle cannot be detected if the electrode is not in direct contact with the geomembrane in that hollow. Even if the length of the electrical arc can reach up to 2 inches, we cannot assume that a hole will be detected 2 inches away from the electrode. Marking of the pin hole The wide brush electrode is too far from the pin hole It is easier to perform the spark test when there are no wrinkles. It is suggested to monitor the environmental conditions and choose the appropriate moment to perform the test. For this reason, it is recommended to do the spark test in the morning, when there is no more morning dew. When you need to move the grounding pad, stop walking. It will reduce the chances to of having false alarms. Each time, make sure it is in intimate contact with the geomembrane. Dust or debris may generate false alarms. It is easier to perform the spark test on a clean geomembrane. It is recommended to verify the cleanliness of the brush electrode periodically. 5 Patches can be inspected using the spark test, with the exception of the extrusions.
6 STEP 4. If the holiday detector beeps/sparks, find the defect under the electrode. Going backward and forward, changing the angle of the electrode will help locating the hole. While doing this, if the alarm did not trigger again, it was a false alarm. NOTE: To avoid false positive signals, do not cross the seams with the electrode. TESTING OF THE GEOMEMBRANE BELOW THE WELDING FLAP STEP 1. Testing beneath the flaps of welded seams should be completed in accordance with industry practices for non conductive backed geomembranes. The spark tester cannot be used for testing beneath the flaps since the the edges of the geomembrane are nonconductive Seam ADDITIONAL NOTES: The non conductive smooth edges are 6 inches wide. Hence, when welding two sheets of the geomembranes together, if the sheets are not aligned perfectly, the overlap may be too big. The excess overlap may have to be trimmed off to weld the two geomembrane pieces properly. Extra care should be taken not to trim off too much material when trimming the overlap. Trimming off more than 6 inches of overlap will remove the non conductive smooth edge completely, and welding will commence into conductive material. If the welding machine has been calibrated using non-conductive with non-conductive, when overlap greater than 6 inches is cut off from the edges, there may not be sufficient welding pressure to squeeze out all the conductive material and the welds might be deficient. It is therefore recommended to calibrate the welding equipment at the start for conductive on non-conductive. It is also important to note that smooth conductive backed geomembranes also have the smooth non conductive edges, as such, the notes above will apply to both smooth and textured conductive backed geomembranes. 6
Nondestructive Testing of Geomembranes
From NDT Technician, Vol. 11, No. 2, pp: 1 5. Copyright 2012 The American Society for Nondestructive Testing, Inc. The American Society for Nondestructive Testing www.asnt.org FOCUS Nondestructive Testing
More informationOctober 7, 2016 Meeting Landfill Liner Regulations with Conductive Backed Geomembranes by Doyin Adesokan B.Eng Msc. Technical Manager - Solmax
Covering the world. Protecting the earth. October 7, 2016 Meeting Landfill Liner Regulations with Conductive Backed Geomembranes by Doyin Adesokan B.Eng Msc. Technical Manager - Solmax Outline Quote What
More informationGEOMEMBRANE FIELD INSTALLATION
GEOMEMBRANE FIELD INSTALLATION CONTENTS Introduction Quality Control and Quality Assurance Types of lining systems Basic Lining Design Executive Lining Design Basic Lining Design Specification Executive
More informationLeak Location Geosynthetic Materials in Base Liner Systems. NY Federation SWANA. May, 2014
Leak Location Geosynthetic Materials in Base Liner Systems NY Federation SWANA May, 2014 Different ELI Surveys A. Covered Electrical Liner Integrity (ELI) Survey Dipole Method Suitable for water or soil
More informationSPECIAL SPECIFICATION 3687 Impermeable Liner
1993 Specifications CSJ s 0569-01-043 & 0945-04-025 SPECIAL SPECIFICATION 3687 Impermeable Liner 1. Description. This Item shall govern for the furnishing and installation of the impermeable liner (geomembrane)
More information1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Impermeable Liner
1993 Specifications CSJ 0128-01-085 SPECIAL SPECIFICATION ITEM 5327 Impermeable Liner 1. Description. This Item shall govern for the furnishing and installation of the impermeable liner (geomembrane) shown
More informationINSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS
INSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS Prepared by TenCate Geosynthetics North America 365 South Holland Drive Pendergrass, GA 30567 Tel: (706) 693-2226 Fax:
More information!!!!!!!!!!!!!!!! INSTALLATION!GUIDELINES!MANUAL! January!2018,!Revision!3.0! Advanced!Revetment!Technology!
INSTALLATIONGUIDELINESMANUAL January2018,Revision3.0 Beforeutilizingthisdocumentas aninstallationtool,installers shoulddownloadthelatestversion oftheinstallationguidelines Manualfromthetechnical downloadssectionofourwebsite
More informationELECTRICAL LEAK LOCATION SURVEY GENERAL GUIDE AUGUST 2017
ELECTRICAL LEAK LOCATION SURVEY GENERAL GUIDE AUGUST 2017 Leak Location Survey General Guide TABLE OF CONTENTS 1.0 HANDBOOK INSTRUCTIONS... 2 2.0 EXPOSED GEOMEMBRANE SURVEYS... 2 2.1 Water Puddle Method
More informationGEOMEMBRANE WELDING PROCEDURES AND IMPERVIOUSNESS ASSESSMENT
Bulletin of the Transilvania University of Braşov CIBv 2015 Vol. 8 (57) Special Issue No. 1-2015 GEOMEMBRANE WELDING PROCEDURES AND IMPERVIOUSNESS ASSESSMENT L.I. DIACONU 1 D. PLIAN 1 M. RUJANU 1 Abstract:
More informationSPECIFICATIONS AND TECHNICAL REQUIREMENTS FOR THE MANUFACTURING AND INSTALLATION OF POLYETHYLENE GEOMEMBRANES
SPECIFICATIONS AND TECHNICAL REQUIREMENTS FOR THE MANUFACTURING AND INSTALLATION OF POLYETHYLENE GEOMEMBRANES The following specification constitutes a guideline for the preparation of site specific geomembrane
More informationAcronyms. TRI TRI Environmental, Inc. Table of Contents. iii
Table of Contents Acronyms AEG American Environmental Group, Ltd. AMEC American Environmental & Infrastructure, Inc. CAT I Category I CES ARCADIS Construction and Environmental Services Group CQA Construction
More informationPRODUCT INSTRUCTIONS MODEL M/1 WET SPONGE HOLIDAY DETECTOR. Unpacking Checklist. The Model M/1 Holiday Detector Kit includes the following:
MODEL M/1 WET SPONGE HOLIDAY DETECTOR Unpacking Checklist The Model M/1 Holiday Detector Kit includes the following: (1) Model M/1S Unit (085-016) (1) Battery, 9v (010-007) (1) Cable, Ground, 15 (026-017)
More informationGEOMEMBRANE AND DRAINAGE INSTALLATION SPECIFICATION
GEOMEMBRANE AND DRAINAGE INSTALLATION SPECIFICATION The information provided in this manual uses current quality control and quality assurance standards within the geomembrane industry. It is the sole
More informationLINER INTEGRITY SURVEY GENERAL GUIDE JULY 2013
LINER INTEGRITY SURVEY GENERAL GUIDE JULY 2013 Liner Integrity Survey TABLE OF CONTENTS 1.0 HANDBOOK INSTRUCTIONS... 1 2.0 BARE GEOMEMBRANE SURVEYS... 1 2.1 Water Puddle Method (ASTM D7002)... 1 2.2 Water
More informationOWNER S MANUAL CAVS SERIES SELF CONTAINED RETRACTABLE NOZZLE VACUUM SEALER
OWNER S MANUAL CAVS SERIES SELF CONTAINED RETRACTABLE NOZZLE VACUUM SEALER WHAT S IN THE PACKAGE? This Operation Manual. (1) Vacuum Sealer. (1) E-(unit size) Heating Element, inside the manual sheet protector.
More informationDrop-In Specifications INTEGRATED DRAINAGE SYSTEM GEOMEMBRANE
Drop-In Specifications INTEGRATED DRAINAGE SYSTEM GEOMEMBRANE The following specification is a sample guideline to be customized by the engineer for preparing site specific specification. This information
More informationOWNER S MANUAL AVN SERIES RETRACTABLE NOZZLE VACUUM SEALER WITH GAS PURGE
OWNER S MANUAL AVN SERIES RETRACTABLE NOZZLE VACUUM SEALER WITH GAS PURGE WHAT S IN THE PACKAGE? This Operation Manual. (1) Vacuum Sealer. (1) E-(unit size) Heating Element, inside the manual sheet protector.
More informationAQUAMASTER INSTALLATION GUIDE
AQUAMASTER INSTALLATION GUIDE PROUD MEMBER Geosynthetic Materials Association PROUD MEMBER Industrial Fabrics Association International TABLE OF CONTENTS 1. GENERAL...1 1.1. Scope...1 1.2. Applications...1
More information2 (Section 1.0) & Yellow Book
LAST REVIEW DATE: 6/30/14 EFFECTIVE DATE: 6/30/14 REVIEW CYCLE: 5 Years SPECIFICATION: G-8201-3b TITLE: ELECTRICAL SPARK INSPECTION OF VOLUME: 2 (Section 1.0) & Yellow Book REGISTRATION NO: GAS0302 CORE
More informationAPPENDIX A POND LINING TECHNICAL SPECIFICATIONS
APPENDIX A POND LINING TECHNICAL SPECIFICATIONS City of Albany WTP-17-01, Backwash Ponds Improvements Project Seals Page For specification sections: 02227,02263,02676,02680 SEALS PAGE - 1of1 SECTION 02227
More informationSENSOR DDS MIT. Dry Geomembrane Mobile Integrity Arc Tester. ASTM D7953 approved. SENSOR - Inventors of Geomembrane Leak Detection Systems SENSOR
SENSOR ASTM D7953 approved SENSOR DDS MIT Dry Geomembrane Mobile Integrity Arc Tester Introduction was established in 1990 and since then has become the world s leader in leak detection systems. With over
More informationGEOMEMBRANE INSTALLATION GUIDELINES AND SPECIFICATIONS FOR LLDPE 20, 30, AND 40 MIL UNREINFORCED & GEO-SKRIM SERIES REINFORCED LINERS.
GEOMEMBRANE INSTALLATION GUIDELINES AND SPECIFICATIONS FOR LLDPE 20, 30, AND 40 MIL UNREINFORCED & GEO-SKRIM SERIES REINFORCED LINERS. TABLE OF CONTENTS SECTION PAGE 1.0 SUBGRADE PREPARATION 3 2.0 PANEL
More informationOWNER S MANUAL CAVN SERIES SELF CONTAINED RETRACTABLE NOZZLE VACUUM SEALER WITH GAS PURGE
OWNER S MANUAL CAVN SERIES SELF CONTAINED RETRACTABLE NOZZLE VACUUM SEALER WITH GAS PURGE WHAT S IN THE PACKAGE? This Operation Manual. (1) Vacuum Sealer. (1) E-(unit size) Heating Element, inside the
More informationINTERNATIONAL ASSOCIATION OF GEOSYNTHETICS INSTALLERS (IAGI) AND FABRICATED GEOMEMBRANE INSTITUTE (FGI)
INTERNATIONAL ASSOCIATION OF GEOSYNTHETICS INSTALLERS (IAGI) AND FABRICATED GEOMEMBRANE INSTITUTE (FGI) GUIDELINES FOR INSTALLATION OF: FACTORY FABRICATED LIGHTWEIGHT (
More informationPVC GEOMEMBRANE FABRICATION AND INSTALLATION SPECIFICATION
PVC GEOMEMBRANE FABRICATION AND INSTALLATION SPECIFICATION August 20, 2006 PVC Geomembrane Institute Technology Program 2215 Newmark Civil Engineering Laboratory 205N. Mathews Ave. Urbana, IL 61801 217-333-3929
More informationSPECIFICATIONS AND TECHNICAL REQUIREMENTS FOR THE MANUFACTURING AND INSTALLATION OF POLYETHYLENE GEOMEMBRANES
SPECIFICATIONS AND TECHNICAL REQUIREMENTS FOR THE MANUFACTURING AND INSTALLATION OF POLYETHYLENE GEOMEMBRANES The following specification constitutes a guideline for the preparation of site specific geomembrane
More informationWALLCOVERINGS WALLCOVERINGS
09950 - WALLCOVERINGS 09950-1 PART ONE: GENERAL 1.1 Description WALLCOVERINGS 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance
More informationButyl Products Ltd. Pond Guide
Butyl Products Ltd. Pond Guide Page 2 BUTYL PRODUCTS LIMITED For beautiful garden pools.. Butyl Products Pond Liner division has been manufacturing Butyl pond liners for over 35 years, and is the longest
More informationUpholstery and Drapery Cleaner. Operator and Parts Manual. Model No.: gal Extractor. MNL32506 Rev. 00 (08-98)
32506 Upholstery and Drapery Cleaner Model No.: 32506 3 gal Extractor Operator and Parts Manual KLEENRITE 1122 MAPLE STREET MADERA CA 93637 U.S.A. FAX: 1-559-673-5725 CUSTOMER SERVICE: 1-800-241-4865 MNL32506
More informationRG1,5SA Self Adhesive
Description of Product: Self adhesive membrane with a thickness of 1.5mm, consisting of rubberized bitumen with adhesive additives, glassfiber carrier, removable PP film at bottom and high density polyethylene
More informationTrouble Shooting and Help Guide TT / TTB 1840
FloorCare Trouble Shooting and Help Guide TT / TTB 1840 Make sure you read and fully understand your 1840 manual before using the machine. The 1840 has been designed to scrub and dry a variety of hard
More informationFull Size Canister Service Manual Riccar Models 1700 / 1800 Power Nozzles RPB-100 / RPB-220 / RPB-224 / RPB-250
Full Size Canister Service Manual Riccar Models 1700 / 1800 Power Nozzles RPB-100 / RPB-220 / RPB-224 / RPB-250 Table of Contents I. General Full Size Canister Issues...2 A. Full Bag Indicator...2 1. General
More informationSECTION 02230BP AGGREGATE BASE
SECTION 02230BP AGGREGATE BASE This page is intentionally left blank. Fluor-B&W Portsmouth, LLC (FBP) SITE PREPARATION INFRASTRUCTURE PHASE 1 SPECIFICATION COVER SHEET Client: U.S. Department of Energy
More informationCONSTRUCTION SPECIFICATION FOR RIP RAP, ROCK PROTECTION AND GRAVEL SHEETING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 511 FEBRUARY 1990 CONSTRUCTION SPECIFICATION FOR RIP RAP, ROCK PROTECTION AND GRAVEL SHEETING 511.01 SCOPE 511.02 REFERENCES 511.03 DEFINITIONS 511.04
More informationAir-channel testing landfill geomembrane seams
Air-channel testing landfill geomembrane seams Results from a recent workshop help minimize destructive testing By Timothy D. Stark, John Heap, Stuart Lange, Dave McLaury and Stanford Slifer Thermal welding
More information3/4 HP Model Trimmer Operating Instructions
3/4 HP Model Trimmer Operating Instructions Whip Mix Corporation 361 Farmington Ave. P.O. Box 17183 Louisville, KY 40217-0183 USA 502-637-1451 800-626-5651 Fax 502-634-4512 www.whipmix.com Technical Specifications
More informationSPINWAVE USER GUIDE 2039 SERIES
SPINWAVE USER GUIDE 2039 SERIES IMPORTANT SAFETY INSTRUCTIONS READ ALL INSTRUCTIONS BEFORE USING YOUR SPINWAVE. When using an electrical appliance, basic precautions should be observed, including the following:
More informationTRAINING AND EQUIPMENT MANUAL 311 PERSONAL PROTECTIVE EQUIPMENT FIREFIGHTER PROTECTIVE CLOTHING CLEANING PROCEDURES EFFECTIVE: OCTOBER 2007
TRAINING AND EQUIPMENT MANUAL 311 PERSONAL PROTECTIVE EQUIPMENT 311.005 FIREFIGHTER PROTECTIVE CLOTHING CLEANING PROCEDURES EFFECTIVE: OCTOBER 2007 These procedures are written to prevent repeated exposure
More informationSOUTH AFRICAN NATIONAL STANDARD
ISBN 978-0-626-26239-6 SOUTH AFRICAN NATIONAL STANDARD Design, selection and installation of geomembranes Published by SABS Standards Division 1 Dr Lategan Road Groenkloof Private Bag X191 Pretoria 0001
More information45 Wide Format Hot and Cold Laminator
45 Wide Format Hot and Cold Laminator 1 IMPORTANT SAFEGUARDS OPERATING INSTRUCTIONS TCC1200 When using electrical machines, basic precautions should always be followed to reduce the risk of electric shock
More informationINSTALLATION. For more information on this product or to order samples call or visit our website at builddirect.com.
Page 1 Page 2 Section 1. Introduction The Perfectly Warm Floating Floor Heat Heating System (PWF) is a unique heating system that is installed below floating flooring materials to create warm, comfortable
More informationOPERATOR S MANUAL STANDARD BALL BEARING CHESTS & ROLLER CABINETS
OPERATOR S MANUAL STANDARD BALL BEARING CHESTS & ROLLER CABINETS Some instructions and drawings may not apply to your specific unit. SERVICE PARTS LOCATING MODEL # INFORMATION Model number and other information
More informationINSTALLATION INSTRUCTIONS. WOOD BLINDS 1-3/8, 2 and 2-3/8 SLAT SIZES. COMPOSITE FAUX WOOD BLINDS 2 and 2-1/2 SLAT SIZES
INSTALLATION INSTRUCTIONS WOOD BLINDS 1-3/8, 2 and 2-3/8 SLAT SIZES COMPOSITE FAUX WOOD BLINDS 2 and 2-1/2 SLAT SIZES POLYMER FAUX WOOD BLINDS 2 and 2-1/2 SLAT SIZES STANDARD CORDLESS LIFT Thank you for
More informationChesapeake Energy Center. Submitted To: Chesapeake Energy Center 2701 Vepco Street Chesapeake, VA 23323
NOTICE OF INTENT TO CLOSE INACTIVE CCR SURFACE IMPOUNDMENT NOTICE OF INTENT Chesapeake Energy Center Submitted To: Chesapeake Energy Center 2701 Vepco Street Chesapeake, VA 23323 Submitted By: Golder Associates
More informationSURFACE PREPARATION AND APPLICATION GUIDE
TABLE OF CONTENTS Introduction...1 Products & Packaging...1 General Requirements for the Work Site...1 Steel Surface Preparation...1-2 Mixing...2-3 SURFACE PREPARATION AND APPLICATION GUIDE SERIES 391
More informationSAFETY PERSONAL AC VOLTAGE (50 or 60Hz) PROXIMITY DETECTOR
SAFETY PERSONAL AC VOLTAGE (50 or 60Hz) PROXIMITY DETECTOR INSTRUCTION MANUAL Index 1. Safety rules... 2. General description... 3. Principle of how it works... 4. Check it and get it going... a. Check
More informationGRI White Paper #8. - on - Construction Quality Assurance-Inspectors Certification Program (CQA-ICP)
Geosynthetic Certification Institute 475 Kedron Avenue Folsom, PA 19033-1208 USA TEL (610) 522-8440 FAX (610) 522-8441 GEI GRI GSI GAI GCI GII GRI White Paper #8 - on - Construction Quality Assurance-Inspectors
More informationGuidelines for Installation of: Factory Fabricated Compounded 0.25 to 1.52 mm (10 to 60 mil) Thickness Unsupported Geomembranes
Factory Fabricated Compounded 0.25 to 1.52 mm (10 to 60 mil) Thickness Unsupported Geomembranes Factory Fabricated Compounded 0.25 to 1.52 mm (10 to 60 mil) Thickness Unsupported Geomembranes Prepared
More informationThis section applies to the use of cord- and plug-connected equipment, including cord sets (extension cords).
(B) Portable Electric Equipment. This section applies to the use of cord- and plug-connected equipment, including cord sets (extension cords). (1) Handling. Portable equipment shall be handled in a manner
More informationSection Specification for Geotextile Used in Permanent Erosion Control Application
Project Name: Project Number: 1 GENERAL Section 02370 Specification for Geotextile Used in Permanent Erosion Control Application 1.1 SECTION INCLUDES A. Geotextile to prevent soil loss resulting in excessive
More informationBliss Box Former Troubleshooting. 6.1 Troubleshooting Chart. Troubleshooting INTRODUCTION SAFETY PROCEDURES
6.0 Bliss Box Former 1.0 INTRODUCTION Table 6-1 provides a logical sequence of tests that are designed to isolate problems with the Bliss Box Former machines. This table includes a list of probable causes
More informationPOLYETHYLENE GEOMEMBRANE SPECIALIST. For environmental lining solutions. the world comes to GSE
POLYETHYLENE GEOMEMBRANE SPECIALIST For environmental lining solutions. the world comes to GSE ISO 9001: 2000 & ISO 14001: 2004 Certified RECREATIONAL LAKE WATER RESERVOIR CANAL LINING WASTE WATER POND
More informationPastaMazing POWERED PASTA MACHINE MODEL# GMP500 USER MANUAL
PastaMazing POWERED PASTA MACHINE MODEL# GMP500 USER MANUAL Contents Safety Precautions Introduction Components Disclaimer: Manual instructions should always be read and implemented prior to product use.
More informationElectric Fireplace Instruction Manual
Electric Fireplace Instruction Manual Wall- Mount Fireplace Yosemite Home Décor 1-800-305-9872 www.yosemitehomedecor.com Quick Reference Guide 1. Prior to installation, please ensure the rated voltage
More informationRevision B Printed Fall Elston Manufacturing HC Heater Owners Manual
Revision B Printed Fall 2007 Elston Manufacturing HC Heater Owners Manual Table of Contents Important Safety Information... ii 1) Description of Heater... 1 General information about your heater including
More informationTAG MR VOLTAGE DETECTORS AND ACCESSORIES. Instruction & Operation Manual
TAG 200 200MR 2000 330 VOLTAGE DETECTORS AND ACCESSORIES Instruction & Operation Manual TAG-200, TAG-200MR and TAG-2000 (Distribution Voltages) and TAG-330 (Transmission Voltages) units are shown with
More informationWrite Walls Dry Erase Specification Data (Section 09720)
Write Walls Dry Erase Specification Data (Section 09720) Section 1 Part 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Dry Erase Wallcovering 2. Accessories B. Related Sections / Items 1. Section 09250
More informationNOTICE OF INTENT. Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff, VA 23022
NOTICE OF INTENT TO CLOSE INACTIVE CCR SURFACE IMPOUNDMENTS NOTICE OF INTENT Bremo Power Station Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff, VA 23022 Submitted By: Golder Associates
More informationIdealFILM. Do-It-Yourself Installation Manual
IdealFILM Do-It-Yourself Installation Manual Comfortable Warm Floors Benefits of using RSG Idealfilm Heats from the floor up for better heat distribution throughout the room No dust or allergens blown
More informationLeader s Guide 2007 CLMI Training
C3585 FIRE EXINGUISHERS: Ready To Respond Leader s Guide 2007 CLMI Training FIRE EXTINGUISHERS:Ready To Respond This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation.
More informationElectric Fireplace Instruction Manual
Electric Fireplace Instruction Manual Built-in Fireplaces DF-EFP1313-BLT Yosemite Home Décor 1-800-305-9872 www.yosemitehomedecor.com Quick Reference Guide 1. Prior to installation, please ensure: a. The
More informationD.P.E. Enviroliner. geotextile protection layer. covering new ground 2016
LEVEL 7 osynthetic clay liner www.gundle.co.za H.D.P.E. Enviroliner geosynthetic clay liner geotextile protection layer D.P.E. Enviroliner solid waste sand (leachate collection) geotextile protection layer
More information36 WALL MOUNTED FIREPLACE
**WARNING: READ THIS INSTRUCTION MANUAL CAREFULLY BEFORE USE. www.dellaproductsusa.com 909. 344. 2588 36 WALL MOUNTED FIREPLACE INSTRUCTION MANUAL Item No: 050-HA-50139 2 OUR BRAND Thank you for choosing
More informationELECTRIC FIREPLACE INSERT MODEL EF-BLT10 OWNER S MANUAL
ELECTRIC FIREPLACE INSERT MODEL EF-BLT10 OWNER S MANUAL NO VENTING REQUIRED PRODUCES SAFE EFFICIENT HEAT 110-120-VOLT / 1500-WATT READ ENTIRE MANUAL BEFORE USING SAVE THIS MANUAL FOR FUTURE USE 1 SAFETY
More informationGeosynthetic Institute GSI GRI GT13(b) ISO Version
Geosynthetic Institute 475 Kedron Avenue Folsom, PA 19033-1208 USA TEL (610) 522-8440 FAX (610) 522-8441 GEI GRI GSI GAI GCI GII Revision 1: December 19, 2012 Revision Schedule on pg. 9 GRI GT13(b) ISO
More informationBAG ON A ROLL SYSTEM USING THIS MANUAL UNPACK AND INSPECT uline.com READ MANUAL FIRST SAFETY INFORMATION
BAG ON A ROLL SYSTEM 18002955510 ulinecom USING THIS MANUAL READ MANUAL FIRST IMPORTANT: Please read this manual and familiarize yourself with the equipment before use The manual contains valuable information
More informationESS. Environmental. Shield System. Instruction Manual. Environmental Shield System - ESS
Instruction Manual Environmental Shield System - ESS Environmental ESS Shield System ESS Specifications ESS Components 10 Mintie Shields 1 Roll of Mintie Tape (sample) 1 short 30-60 extendable pole 1 Mintie
More informationSPIDER P SPIDER P mineral
The leader in the selfadhesive technology! SPIDER P SPIDER P mineral SPIDER P and SPIDER P MINERAL are excellent quality self-adhesive waterproofing membranes made with ADESO technology, the new compound
More informationROOFING TECHNICAL BULLETIN #07-12
Sika Sarnafil World Class Roofing and Waterproofing ROOFING TECHNICAL BULLETIN #07-12 To: Authorized Roofing Applicators Sika Sarnafil Sales Staff & Sales Representatives Sika Sarnafil Regional Technical
More informationSpy Jeepmeter ope rati ng instructions
Spy Jeepmeter ope rati ng instructions picltd.com PIPELINE INSPECTION COMPANY welcome Thank you for purchasing the SPY Model JM JeepMeter. Pipeline Inspection Company and our SPY brand of Coating Inspection,
More informationSeries 8920, 9200, 9300, 9400 Service Center Guide
Series 8920, 9200, 9300, 9400 Service Center Guide 2005 BISSELL Homecare, Inc. Page 1 of 22 TABLE OF CONTENTS Product overview Page 3 Quick reference troubleshooting chart Page 4 UL recommended high voltage
More informationSKAPS GEOTEXTILE SUBSURFACE DRAINAGE
SKAPS INDUSTRIES 335 Athena Drive, Athens, GA 30601 Ph: (706)-354-3700 Fax: (706)-354-3737 Email: contact@skaps.com DROP-IN SPECIFICATIONS SKAPS GEOTEXTILE SUBSURFACE DRAINAGE The following drop-in specification
More informationReference Manual. Ionizer Module for XPR Analytical Balances
Reference Manual Ionizer Module for XPR Analytical Balances Ionizer Module 3 1 Introduction Your Ionizer Module is an accessory for METTLER TOLEDO analytical balances. The ionizer produces a corona of
More informationUse 1/2" plexiglass stock. Grooves (3/64 deep) 1/2" 1/32-1/16" Copper or Phosphate 3 x 3" Copper (optional) 1/2" 1/4" Copper 1/2"
2" Use plexiglass stock 1/16" 1/8" 2 Grooves (3/64 deep) [Parafilm layer goes here] 1/32-1/16" Copper or Phosphate 3 x Copper (optional) [Peltier goes here] 1/4" Copper 4-40 thread size 1 1/4 Double Peltier
More informationCordless Electric Broom
5328 Series Cordless Electric Broom December 2013 Version 2.05 General Warnings IMPORTANT SAFETY INSTRUCTIONS! When using an electrical appliance, basic precautions should always be followed, including
More informationOPERATION MANUAL. RUSTIBUS 400 ELECTRIC 3 Phase 220/380/440 V - 50 or 60/50/60 Hz. 3 x 380/440 V - 50/60 Hz.
OPERATION MANUAL 040-1000 RUSTIBUS 400 ELECTRIC 3 Phase 220/380/440 V - 50 or 60/50/60 Hz 3 x 380/440 V - 50/60 Hz 3 x 220 V - 50 Hz 3 x 220 V - 60 Hz DECLARATION OF CONFORMITY Manufacturer: Dalseide Shipping
More informationPOWER CUT Cordless Hedge Trimmer Model No. 101HT18V
POWER CUT Cordless Hedge Trimmer Model No. 101HT18V Operator s Manual WARNING To reduce the risk of injury, the user must read and understand the Operator s Manual. Keep these instructions for future reference.
More informationCom-Pak Heater Benefits You Can Depend On Com-Pak Models Line Model w/o Model w/ Voltage Thermostat Thermostat Watts Amps (1) (2)
Benefits You Can Depend On Dual safety features Primary: power reset thermal switch Secondary: over temperature thermal fuse Heating element style quickly warms your room, and quickly cools when heater
More informationFTTHARCFUSIONSPLICER AD620
FTTHARCFUSIONSPLICER AD620 Read this instruction manual carefully before operating the equipment. Adhere to all safety instructions and warnings contained in this manual. Keep this manual in a safe place.
More informationLITHIUM ION STUBBLE TRIMMER INSTRUCTIONS
LITHIUM ION STUBBLE TRIMMER INSTRUCTIONS Please read all instructions carefully to familiarise yourself with your new Wahl Lithium Ion Stubble Trimmer before using. Save these instructions for further
More informationTECHNICAL DROP-IN SPECIFICATIONS
TECHNICAL DROP-IN SPECIFICATION Dura-Skrim N-Series & NT-Series Reinforced Polyethylene ISSUED DATE 25 AUGUST 2014 VALID DATE 25 SEPTEMBER 2014 The following technical drop-in specifications are provided
More informationELECTRIC FLAT PANEL FIREPLACE HEATER
ELECTRIC FLAT PANEL FIREPLACE HEATER Model Numbers: 80-2000A-42 OWNER S MANUAL AC 120V 60Hz 1500W WARNING Read and understand this entire owner s manual, including all safety information, before plugging
More informationENRGY CURB APPLICATION GUIDE FOR TPO ROOFING SYSTEMS
1. Introduction The ENRGY Curb mounting system is a lightweight, nonpenetrating, roof-integrated, photovoltaic (PV) mounting system designed to maintain roof integrity and maximize power density. This
More informationOPERATING MANUAL. BAK Thermoplastic Welding Technology AG 1
OPERATING MANUAL BAK Thermoplastic Welding Technology AG SAFETY Danger to life Unplug the tool before opening it as live components and connections are exposed. Danger of fire and explosion in case of
More informationAPPE NDIX E TY PE 1 ASBE STOS WOR K PROCEDURES
APPE NDIX E TY PE 1 ASBE STOS WOR K PROCEDURES TY PE 1 ASBE STOS WOR K PROCEDURES These procedures are to be followed by workers and contractors performing the following work at KPDSB buildings. Installing
More informationI N D U S T R I A L Y A R D S
I N D U S T R I A L Y A R D S GEOTEXTILES INDUSTRIAL YARDS 1.0 Features of INDUSTRIAL PG 2 YARDS 2.0 How Typar geotextiles PG 2 work 4.0 Installation guide PG 7 5.0 Overlap and joining PG 8 6.0 Setting
More informationWhen to Wash BACK T O CLEANING BASICS. laundry guide
CARING FOR YOUR CLOTHES BACK T O CLEANING BASICS Imagine snuggling with a freshly laundered cotton t-shirt.warm and soft. It s a cozy pleasant moment. Then flash to removing your favorite piece of clothing
More informationBLT-999W-2 Item # 60757
BLT-999W-2 Item # 60757 2 Read these instructions completely before beginning installation. Failure to follow them could cause a heater malfunction resulting in serious injury and/or property damage. WARNING:
More informationTwo Tier Illumifalls Patio Pond
Two Tier Illumifalls Patio Pond REMINDER CALL 1-888-755-4497 BEFORE RETURNING TO STORE. Questions, problems, missing parts? Before returning to your retailer, call our customer service department at 1-888-755-4497,
More informationDAVIS PACKAGING. TD-362 Dual Roll Console Reference Guide.
DAVIS PACKAGING www.davispackaging.net E-mail: contact@davispackaging.net TD-362 Dual Roll Console Reference Guide SPECIFICATIONS Overall Dimensions: Working Height: Power Requirement: Wattage: Unit Weight:
More informationLong Barrel Curling Tong
1 Please read all instructions carefully to familiarize yourself with the Wahl Long Barrel Curling Tong before using. Save these instructions for further reference. For any further assistance or information
More informationINSTALLATION GUIDE AND CHECKLIST
INSTALLATION GUIDE AND CHECKLIST CLOCK SPRING SNAP WRAP November 2017 Copyright Clock Spring Company, L.C. TABLE OF CONTENTS a Snap Wrap Information...i Inspection Checklist...iii Snap Wrap Contents...1
More informationBest Practices ProJet X60 Series ZPrinter Series 2013 年 6 月 25 日
Best Practices ProJet X60 Series ZPrinter Series 1 2013 年 6 月 25 日 Overview ProJet 160, 260C, 360, 460 Plus, 660 Pro, 860 Pro ZPrinters 150, 250, 350, 450, 650 and 850 Materials Software Best practices
More informationOPERATING & SERVICE PARTS MANUAL 700ES ENERGY SMART WRAPPER SERIES B
OPERATING & SERVICE PARTS MANUAL 700ES ENERGY SMART WRAPPER SERIES B READ ALL INSTRUCTIONS CAREFULLY BEFORE OPERATING EQUIPMENT TABLE OF CONTENTS Machine Components & Electrical Requirement... 3 Preliminary
More informationParts and Service Manual BURNISHER MODEL: MR , MR , MR , MR
Parts and Service Manual BURNISHER MODEL: MR2000-115, MR1500-115, MR2000-220, MR1500-220 TABLE OF CONTENTS RECEIVING YOUR EQUIPMENT... 3 WARNINGS AND SAFETY... 3 ELECTRICAL INFORMATION... 4 GROUNDING INSTRUCTIONS...
More informationGRI White Paper #3. - on - Providing Flexibility in Destructive Seam Sampling/Testing. Robert M. Koerner and George R. Koerner
Geosynthetic Institute 475 Kedron Avenue Folsom, PA 19033-1208 USA TEL (610) 522-8440 FAX (610) 522-8441 GEI GRI GSI GAI GCI GII GRI White Paper #3 - on - Providing Flexibility in Destructive Seam Sampling/Testing
More informationEquipment Needed to Install Mule-Hide Heat-Weld Membranes
Equipment Needed to Install Mule-Hide Heat-Weld Membranes Introduction - This section is intended to serve as a general guideline of the equipment that the contractor may need to successfully install a
More informationOPERATING & SERVICE PARTS MANUAL HDS-215 COMBINATION SHRINK SYSTEM
OPERATING & SERVICE PARTS MANUAL HDS-215 COMBINATION SHRINK SYSTEM FOR HOT KNIFE AND IMPULSE MACHINES READ ALL INSTRUCTIONS CAREFULLY BEFORE OPERATING EQUIPMENT TABLE OF CONTENTS Electrical Requirements
More informationMuskogee Public Schools Custodial Procedures for Floor Care
FLOOR CARE ENTRANCE MATS PURPOSE OF ENTRANCE MATS A. Exterior Mats a. Remove sand and gravel from shoes prior to entering the building. b. Minimize the amount of abrading material that will scratch and
More information