1 Planning Projects: Highlights In Process, Under Review, and Under Construction. Transportation Advisory Commission October 23, 2014

2 Overview of Planning Process PPR Entitlement Design Review Building Permit PPR Entitlement Design Review Building Permit Interdepartmental Review Meeting with Applicant City Council CEQA Clearance Public Hearing Conditions of Approval CEQA Clearance Public Hearings Conditions of Approval Review for Compliance Permit Issuance Building Inspections 2

3 Overview of Planning Process Predevelopment Plan Review Preliminary Consultation Entitlements > Conditional Use Permit, Variance, etc. > Master Plan > Planned Development > Design Review Building Permit 3

4 Overview of Planning Process Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 4

5 Predevelopment Plan Review (PPR) Purpose > Achieve better projects through early consultation; > Inform applicants of regulations and procedures; > Avoid significant investment in project without preliminary City review; > Identify issues that may arise during review of the projects; and > Inform the Council and public of proposed projects. Projects of communitywide significance.» Greater than 50,000 s.f. with one discretionary action; or» 50 or more housing units; or» Any other project determined by the Director to be of major importance to the City. 5

6 Predevelopment Plan Review (PPR) Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 6

7 Predevelopment Plan Review (PPR) In process: > 123 & 127 Hurlbut St. (multi-family) 29 units. 7

8 123 & 127 Hurlbut St. Predevelopment Plan Review (PPR) PPR Completed, not yet submitted for entitlement: > N. Fair Oaks Ave. Demolition of two commercial buildings totaling 16,178 s.f. Construct seven-story, 49,000 square foot, mixed-use building with 39 residential units over two parking levels. 8

9 123 & 127 Hurlbut St. Predevelopment Plan Review (PPR) PPR Completed, not yet submitted for entitlement: > N. Fair Oaks Ave. Demolition of two commercial buildings totaling 16,178 s.f. Construct seven-story, 49,000 square foot, mixed-use building with 39 residential units over two parking levels. 9

10 Predevelopment Plan Review (PPR) Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 10

11 Predevelopment Plan Review (PPR) In process: > 55 E. Fillmore St. (Huntington Rehabilitation) Construct four-story rehabilitation hospital with 90 beds» 40 skilled nursing facility;» 40 rehabilitation; and» 10 assisted living. To be presented to City Council (date TBD). 11

12 55 E. Fillmore St. Predevelopment Plan Review (PPR) PPR Completed, not yet submitted for entitlement: > N. Fair Oaks Ave. Demolition of two commercial buildings totaling 16,178 s.f. Construct seven-story, 49,000 square foot, mixed-use building with 39 residential units over two parking levels. 12

13 55 E. Fillmore St. Predevelopment Plan Review (PPR) PPR Completed, not yet submitted for entitlement: > N. Fair Oaks Ave. Demolition of two commercial buildings totaling 16,178 s.f. Construct seven-story, 49,000 square foot, mixed-use building with 39 residential units over two parking levels. 13

14 Predevelopment Plan Review (PPR) Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 14

15 Predevelopment Plan Review (PPR) In process: > 245 S. Los Robles Ave. (multi-family) 58 units. To be presented to City Council (date TBD). 15

16 245 S. Los Robles Ave. Predevelopment Plan Review (PPR) PPR Completed, not yet submitted for entitlement: > N. Fair Oaks Ave. Demolition of two commercial buildings totaling 16,178 s.f. Construct seven-story, 49,000 square foot, mixed-use building with 39 residential units over two parking levels. 16

17 245 S. Los Robles Ave. Predevelopment Plan Review (PPR) PPR Completed, not yet submitted for entitlement: > N. Fair Oaks Ave. Demolition of two commercial buildings totaling 16,178 s.f. Construct seven-story, 49,000 square foot, mixed-use building with 39 residential units over two parking levels. 17

18 Predevelopment Plan Review (PPR) Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 18

19 Predevelopment Plan Review (PPR) In process: > 2490 Mohawk St. (multi-family) 18 units. 19

20 2490 Mohawk St. Predevelopment Plan Review (PPR) PPR Completed, not yet submitted for entitlement: > N. Fair Oaks Ave. Demolition of two commercial buildings totaling 16,178 s.f. Construct seven-story, 49,000 square foot, mixed-use building with 39 residential units over two parking levels. 20

21 Predevelopment Plan Review (PPR) PPR Completed, not yet submitted for entitlement: > N. Fair Oaks Ave. Demolition of two commercial buildings totaling 16,178 s.f. Construct seven-story, 49,000 square foot, mixed-use building with 39 residential units over two parking levels. North (Mohawk) elevation 2490 Mohawk St. East (Altadena) elevation 21

22 PPR Completed; Entitlement Not Submitted Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 22

23 PPR Completed; Entitlement Not Submitted Mixed-Use Project: > N. Fair Oaks Ave. Demolition of two commercial buildings totaling 16,178 s.f. Construct seven-story, 49,000 square foot, mixed-use building with 39 residential units over two parking levels. 23

24 N. Fair Oaks Ave. Predevelopment Plan Review (PPR) PPR Completed, not yet submitted for entitlement: > N. Fair Oaks Ave. Demolition of two commercial buildings totaling 16,178 s.f. Construct seven-story, 49,000 square foot, mixed-use building with 39 residential units over two parking levels. 24

25 PPR Completed; Entitlement Not Submitted Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 25

26 PPR Completed; Entitlement Not Submitted Julia Morgan Building/Kimpton Hotel: > 78 N. Marengo Avenue > Project Description: Construction of a four-to-six-story addition (88,740 s.f.) with a total of 180 guest rooms. 26

27 Julia Morgan Building/Kimpton Hotel Predevelopment Plan Review (PPR) Looking northeast at Marengo & Union 27

28 Julia Morgan Building/Kimpton Hotel Predevelopment Plan Review (PPR) Looking southwest at Garfield & Holly 28

29 PPR Completed; Entitlement Not Submitted Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 29

30 PPR Completed; Entitlement Not Submitted Urban Housing Project > 262 N. Los Robles Ave., 410 E. Corson St. & N. Oakland Ave. Demolish 172 units in six buildings; Construct five-to-seven-story, multi-family residential project:» 432 units Subterranean parking for 736 cars. 30

31 Predevelopment Plan Review (PPR) PPR Completed, not yet submitted for entitlement: > N. Fair Oaks Ave. Demolition of two commercial buildings totaling 16,178 s.f. Construct seven-story, 49,000 square foot, mixed-use building with 39 residential units over two parking levels. North (Corson) elevation Urban Housing Project West (Los Robles) elevation 31

32 PPR Completed; Entitlement Not Submitted Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 32

33 PPR Completed; Entitlement Not Submitted St. Luke Medical Center: > 2632 E. Washington Blvd. > Project Description: Occupy former hospital with medical offices; Demolish Annex Building and a one-story office building; and Construct of three-story, 280-space, parking structure. 33

34 St. Luke Medical Center Predevelopment Plan Review (PPR) 34

35 St. Luke Medical Center Predevelopment Plan Review (PPR) 35

36 PPR Completed; Entitlement Not Submitted Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 36

37 Predevelopment Plan Review (PPR) Urban Housing Project > 170 N. Halstead Ave. Demolish three manufacturing buildings totaling 5,200 s.f.; Construct five-story, multi-family residential project:» 24 units Surface parking for 30 cars. 37

38 170 N. Halstead Ave. Predevelopment Plan Review (PPR) PPR Completed, not yet submitted for entitlement: > N. Fair Oaks Ave. Demolition of two commercial buildings totaling 16,178 s.f. Construct seven-story, 49,000 square foot, mixed-use building with 39 residential units over two parking levels. West (Halstead) elevation 38

39 Entitlement Phase Major Projects: > Non-residential project, or non-residential portion of a mixed-use project, that exceeds 25,000 square feet of gross floor area. > Residential project with 25 or more units. 39

40 Entitlement in Process (Major Project) Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 40

41 Major Projects Shriners for Children Medical Center: > S. Fair Oaks Avenue > Project Description: Construction of a three-story, 74,800 s.f., medical office building (ambulatory surgery center, medical clinic, and medical offices) over three levels of subterranean parking. > Status:» Facility would be used for out-patient (i.e. same day) medical services. In-patient (i.e. over-night) medical services would be provided by Shriners medical staff at Huntington Hospital. Environmental review complete. Hearing Officer (November 5). 41

42 Shriners for Children Medical Center Predevelopment Plan Review (PPR) Looking southwest at Colorado & Los Robles 42

43 Entitlement in Process (Major Project) Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 43

44 Major Projects Paseo Colorado Redevelopment Project: > Project Description: Demolition of 160,000 s.f. former Macy s/adjacent tenant spaces along Colorado Blvd.; Construction/operation of 6-story hotel (179-rooms): Construction of 6-story mixed-use building: > Status:» 25,000 s.f. of ground-floor retail/restaurant space; and» 71 for-sale residential units on 2nd-6th floors. Approved by Planning Commission (September 10). Appealed to City Council (November 17). 44

45 Predevelopment Plan Review (PPR) PPR Completed, not yet submitted for entitlement: N Marengo Ave Paseo Colorado Redevelopment Project > N. Fair Oaks Ave. E Colorado Bl Demolition of two commercial buildings totaling 16,178 s.f. Construct seven-story, 49,000 square foot, mixed-use building with 39 residential units over two parking levels. N Los Robles Ave E Green St 45

46 Paseo Colorado Redevelopment Project Predevelopment Plan Review (PPR) Looking southwest at Colorado & Los Robles 46

47 Paseo Colorado Redevelopment Project Predevelopment Plan Review (PPR) Looking northwest at Green & Los Robles 47

48 Entitlement in Process (Major Project) Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 48

49 Major Projects Urban Housing Project: > 277 N. Molino Ave. Demolition of two two-story buildings, including Pasadena Church of Religious Science, and surface parking lot. Construct six-story, 75-foot, urban housing building with 105 units over one level of at-grade parking and one level of subterranean parking. > Status:» 159 parking spaces. Environmental review underway. 49

50 277 N. Molino Ave. Predevelopment Plan Review (PPR) Looking southwest at Corson & El Molino 50

51 Entitlement Phase (in process) Planned Developments > Intended for large sites (>2 acres) where a particular mix of uses is desired, as well as high quality appearance, land use compatibility, or special sensitivity to neighborhood character; > Ensure orderly and thorough procedures to result in quality urban design. 51

52 Planned Development Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 52

53 Entitlement Phase (in process) Planned Developments > Desiderio (655 Westminster St.) Former Desiderio Army Reserve Center to be converted to Desiderio Neighborhood Park and Desiderio Homes.» Nine single-family detached bungalows in a courtyard formation.» Includes demolition of historic Desiderio Hall. Upcoming hearings:» Planning Commission (September 10)» Recommended approval.» City Council (October 27) 53

54 Desiderio Predevelopment Plan Review (PPR) Looking southwest at Colorado & Los Robles 54

55 Planned Development Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 55

56 Entitlement Phase (in process) Planned Developments > Lincoln/Parsons (100 W. Walnut St.) 620,000 s.f. of office uses:» Includes 30,000 s.f. of ancillary retail uses. 10,000 s.f. of restaurant uses; and 475 residential units:» Includes 12 work/live units. Status:» Environmental Impact Report:» Responses to comments underway.» Planning Commission:» November

57 Lincoln/Parsons Predevelopment Plan Review (PPR) 57

58 Planned Development Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 58

59 Entitlement Phase (in process) Planned Developments > Hill-Colorado Hotel Projects (1336 & 1347 E. Colorado Blvd.) Construction of eight-story 375 room hotel and 35,000 s.f. of commercial on northern property; and Construction of a four-story 150 room hotel on southern property. Status:» Environmental review in progress:» Environmental Impact Report. 59

60 Hill-Colorado Hotel Projects Predevelopment Plan Review (PPR) 60

61 Hill-Colorado Hotel Projects Predevelopment Plan Review (PPR) 61

62 Entitlement Phase (in process) Master Plans > Establish procedure for public or semi-public and open space uses to reduce processing time and uncertainty by consolidating several Conditional Use Permit hearings over an extended period of time. 62

63 Master Plans Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 63

64 Entitlement Phase (in process) Master Plans > Hillsides Home for Children (940 Avenue 64) Demolish 6,000 s.f. recreation facility and swimming pool; and Construct multi-purpose building with 52 parking spaces in the lower level.» No change in enrollment or staff. Status:» Environmental review in progress.» Initial Study & Mitigated Negative Declaration. 64

65 Hillsides Home for Children Predevelopment Plan Review (PPR) 65

66 Hillsides Home for Children Predevelopment Plan Review (PPR) 66

67 Master Plans Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 67

68 Entitlement Phase (in process) Master Plans > Maranatha High School (169 S. St. John Ave.) 29,000 s.f. of new administration, classroom, planetarium, athletic, and greenhouse facilities. Hearings:» Historic Preservation Commission (November 18, 2013).» Design Commission (January 14).» Planning Commission (May 28):» Continued to date uncertain for additional analysis and project modification. Upcoming hearings:» Planning Commission (October 22)» City Council (date TBD) 68

69 Maranatha High School Predevelopment Plan Review (PPR) 69

70 Master Plans Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 70

71 Entitlement Phase (in process) Master Plans > Huntington Hospital (100 W. California Blvd.) Amendment to Master Plan (20 years)» Reconfigure boundary of Master Plan;» Demolish buildings (240,000 s.f.);» Rehabilitate existing buildings; and» Construct additions and new buildings (190,000 s.f.). Status:» Environmental review in progress:» Environmental Impact Report. 71

72 Huntington Hospital Predevelopment Plan Review (PPR) 72

73 Master Plans Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 73

74 Entitlement Phase (in process) Master Plans > Fuller Seminary (135 N. Oakland Ave.) Amendment to Master Plan» Amend boundaries to exclude properties sold to private developer and exclude development on those properties.» No new development. Modification of Development Agreement. Status:» Application incomplete. 74

75 Master Plans Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 75

76 Entitlement Phase (in process) Master Plans > Villa Esperanza (2116 E. Villa St.) Demolish 12 of 13 structures on site (~30,000 s.f.) Construct two-story administration building Construct two one-story classroom buildings, along with outdoor play area and landscaping. New buildings will total 42,300 s.f. Hearings:» Design Commission (May 27)» Planning Commission (August 13).» Recommended approval to City Council.» City Council (September 29).» Approved project. 76

77 Villa Esperanza Predevelopment Plan Review (PPR) 77

78 Master Plans Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 78

79 Entitlement Phase (in process) Master Plans > Walden School (50-72 S. San Gabriel Blvd.) Construction of two-story classroom (12,910 s.f.), along with several smaller buildings. No increase in enrollment. Hearings:» Planning Commission (March 26)» Continued to date uncertain in order to perform noise study. Upcoming hearings:» Planning Commission (date TBD)» City Council (date TBD) 79

80 Walden School Predevelopment Plan Review (PPR) 80

81 Master Plans Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 81

82 Entitlement Phase (in process) Master Plans > La Salle High School (3880 E. Sierra Madre Blvd.) Project Description:» Remove baseball field.» Construct aquatic complex, athletic building, practice gymnasium, and parking lot with 63 parking spaces.» Construct theatre and performing arts complex.» Construct classroom and administrative office addition to main classroom building.» Construct field house on north side of sports field. Status:» Completing Environmental Upcoming hearings:» Planning Commission (date TBD)» City Council (date TBD) 82

83 La Salle High School Predevelopment Plan Review (PPR) 83

84 La Salle High School Predevelopment Plan Review (PPR) 84

85 Entitlement Phase Design Review: > Purpose: Apply Citywide urban design principles; Encourage new structures that show creativity and imagination; Avoid nostalgic misrepresentations that may confuse the relationships among structures over time; and Promote the conservation, enhancement, preservation, and protection of historic resources. > Process: Concept, 50%, and Final, or Consolidated 85

86 Entitlement Phase Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 86

87 Entitlement Phase Design Review: > Mixed Use Project (25 W. Walnut St.) Construct a 5-story mixed-use project:» 201 apartments; and» 10,000 s.f. of ground floor retail and. Hearings:» Design Commission (July 22)» Approval of Concept Design Review. 87

88 25 W. Walnut St. Predevelopment Plan Review (PPR) South (Walnut) elevation 88

89 Entitlement Phase Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 89

90 Entitlement Phase (in process) Design Review: > Mixed-Use Project (33-45 W. Green St.) Construct a four-story mixed-use building including addition of three to four stories above the existing building at 33 W. Green Street and ground-level parking for nine cars» 9 units. Hearings:» Design Commission (July 22)» Approval of Concept Design Review. 90

91 33-45 W. Green St. Predevelopment Plan Review (PPR) South (Green) elevation 91

92 Entitlement Phase Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 92

93 Entitlement Phase (in process) Design Review: > Green Hotel Apartments (86 S. Fair Oaks Ave.) Construction of a six-story mixed-use building:» 64 residential units; and» 5,000 square feet of commercial space. Upcoming Hearing:» Design Commission (December 8). 93

94 Green Hotel Apartments Predevelopment Plan Review (PPR) South (Dayton) elevation 94

95 Green Hotel Apartments Predevelopment Plan Review (PPR) South (Dayton) elevation 95

96 Entitlement Phase (in process) Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 96

97 Entitlement Phase Design Review: > Crown City Medical Center ( E. Colorado Blvd.) Construction of a 112,000 s.f., five-story medical office and retail building.» Includes 16,000 s.f. of ground floor retail. Hearings:» Planning Commission (July 7, 2013)» Approval.» Design Commission (July 9, 2014)» Approval of Concept Design Review.» 50% Advisory Review (October 28). 97

98 Crown City Medical Center Predevelopment Plan Review (PPR) Looking southwest at Colorado & Madison 98

99 Crown City Medical Center Predevelopment Plan Review (PPR) Looking southwest at Colorado & Madison 99

100 Entitlement Phase Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 100

101 Entitlement Phase Design Review: > Multi-Family Project (60-80 S. Vinedo Ave.) Construct one-to-three-story multi-family project:» 26 units. Hearings:» Design Commission (July 22)» Approval of Concept Design Review. 101

102 60-80 S. Vinedo Ave. Predevelopment Plan Review (PPR) 102

103 Building Permit Submitted Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 103

104 Building Permit Submittal All-Saints Church > Demolition: Scott Hall (used for Sunday school/day care); and Office trailer. > Interior remodel: Regas House and Rectory buildings; > Construction: Three building complex (~39,000 s.f.);» Offices, conference rooms, forum building, and youth programs. One level of subterranean parking (120 cars) and storage, offices, and mechanical equipment; 104

105 All-Saints Church Predevelopment Plan Review (PPR) West (Euclid) elevation 105

106 All-Saints Church Predevelopment Plan Review (PPR) North (Walnut) elevation 106

107 Building Permit Submitted Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 107

108 Building Permit Submittal 700 E. Walnut Street > Five-story mixed use building: 82 condominiums; 6,350 s.f. of ground floor retail; and One level of subterranean parking with 143 parking spaces. 108

109 700 E. Walnut Street Predevelopment Plan Review (PPR) Looking southeast at Walnut & El Molino 109

110 Building Permit Submitted Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 110

111 Building Permit Submittal 770 E. Walnut Street > Five-story mixed use building: 91 apartments; 6,100 s.f. of ground floor retail; and One level of subterranean parking with 139 parking spaces. 111

112 770 E. Walnut Street Predevelopment Plan Review (PPR) Looking southwest at Walnut & Hudson 112

113 Building Permit Submitted Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 113

114 Building Permit Submittal Hampton Inn & Suites > Demolish existing 54-room Vagabond Inn ; and > Construct five-story, 80-room hotel. 114

115 Hampton Inn & Suites Predevelopment Plan Review (PPR) Looking northeast at Colorado & Michigan 115

116 Building Permit Submitted Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 116

117 Building Permit Submittal Allen-Walnut Mixed Use > Construction of two buildings over one level of subterranean parking. 131 apartment units; and 5,000 s.f. of retail/restaurant space. 117

118 Allen-Walnut Mixed Use Predevelopment Plan Review (PPR) Looking northwest at Walnut & Allen 118

119 Under Construction Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 119

120 Building Permit Submittal Marriott Extended Stay Hotel > Five-story hotel with 144 rooms. 120

121 Marriott Extended Stay Hotel Predevelopment Plan Review (PPR) Looking northwest at Walnut & Fair Oaks 121

122 Under Construction Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 122

123 Under Construction Office Building > 680 E. Colorado Boulevard Five-stories. 160,000 s.f. office building.» Includes 14,000 s.f. of ground-floor retail. 123

124 680 E. Colorado Blvd. Predevelopment Plan Review (PPR) Looking southeast at Colorado & El Molino 124

125 680 E. Colorado Blvd. Predevelopment Plan Review (PPR) Looking southeast at Colorado & El Molino 125

126 Under Construction Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 126

127 Under Construction Mixed Use Project > 680 E. Union Street ( Union Village ): Four to five-stories. 118 residential units. 10,000 s.f. of ground floor commercial space. Includes 14,000 s.f. of ground-floor retail. 229 subterranean parking spaces. 127

128 686 E. Union Blvd. Predevelopment Plan Review (PPR) Looking southeast at Union & El Molino 128

129 686 E. Union Blvd. Predevelopment Plan Review (PPR) West (El Molino) elevation 129

130 Under Construction Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 130

131 Under Construction Mixed Use Project > 880 E. Colorado Boulevard Phase 1: Renovation and re-use of the Constance Hotel building and historic one-story buildings with hotel, restaurant, and retail uses; and construction of an above-grade parking garage with 125 spaces. Phase 2: Construction of a rear addition to the hotel including five residential units; and construction of a new office building with restaurant and retail uses and a subterranean parking garage with 320 spaces. 131

132 880 E. Colorado Blvd. Predevelopment Plan Review (PPR) North (Colorado) elevation 132

133 Under Construction Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 133

134 Under Construction Urban Housing Project > 3330 E. Foothill Boulevard Four-stories 212 apartments One level of subterranean parking. 134

135 3330 E. Foothill Blvd. Predevelopment Plan Review (PPR) Looking southeast at Foothill & Sierra Madre Villa 135

136 Overview of Planning Process Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Building Permit Submitted Under Construction 136

137 Summary of Cases in Process Predevelopment Plan Review (4) Planned Developments (3) Master Plans (7) Use Permits (45) Variances (11) Design Review (54) > Certificates of Appropriateness. > Signage. > New Construction. 137

138 Planning Projects: Highlights In Process, Under Review, and Under Construction. Transportation Advisory Commission October 23, 2014

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER')

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER') TO: FROM: Honorable Mayor and City Council Planning & Community Development Department SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER')

More information

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO)

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO) TO: FROM: Honorable Mayor and City Council Planning & Community Development Department SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 260-400 E. COLORADO BOULEVARD (PASEO COLORADO) RECOMMENDATION:

More information

TO: CITY COUNCIL DATE: MARCH 23,2009

TO: CITY COUNCIL DATE: MARCH 23,2009 Report TO: CITY COUNCIL DATE: MARCH 23,2009 FROM: CITY MANAGER SUBJECT: MASTER DEVELOPMENT PLAN AMENDMENT FOR PASADENA CHRISTIAN SCHOOL AT 1515 NORTH LOS ROBLES AVENUE AND GENERAL PLAN AMENDMENT AND ZONE

More information

RESOLUTION NO. WHEREAS, the proposed Master Plan for Villa Esperanza (VE), located at 2116

RESOLUTION NO. WHEREAS, the proposed Master Plan for Villa Esperanza (VE), located at 2116 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PASADENA APPROVING A MASTER PLAN FOR VILLA ESPERANZA WHEREAS, the proposed Master Plan for Villa Esperanza (VE), located at 2116 Villa Street

More information

- INVITATION - COURTESY INFORMATIONAL MEETING

- INVITATION - COURTESY INFORMATIONAL MEETING - INVITATION - COURTESY INFORMATIONAL MEETING Hosted by the Property Owner and Project Developer CAMELLIA COURT DEVELOPMENT WEDNESDAY, JANUARY 25, 2017, 7:00 9:00 P.M. BLOY CENTER 1441 S. BENITO AVE, ALHAMBRA,

More information

March 29, Angels Landing Project Angels Landing Partners, LLC

March 29, Angels Landing Project Angels Landing Partners, LLC March 29, 2019 ENVIRONMENTAL CASE NO.: ENV-2018-3273-EIR PROJECT NAME: PROJECT APPLICANT: Angels Landing Project Angels Landing Partners, LLC PROJECT ADDRESS: 361 S. Hill Street (332-358 S. Olive Street,

More information

RESOLUTION NO: WHEREAS, the subject property has a Public, Semi-Public (PS) zoning designation and a General Plan designation of Institutional; and

RESOLUTION NO: WHEREAS, the subject property has a Public, Semi-Public (PS) zoning designation and a General Plan designation of Institutional; and RESOLUTION NO: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PASADENA APPROVING A 14-YEAR, EIGHT-PHASE MASTER PLAN AMENDMENT FOR HUNTINGTON MEMORIAL HOSPITAL LOCATED AT 100 WEST CALIFORNIA BOULEVARD

More information

ENVIRONMENTAL INITIAL STUDY BERKELEY CITYWIDE POOLS MASTER PLAN

ENVIRONMENTAL INITIAL STUDY BERKELEY CITYWIDE POOLS MASTER PLAN ENVIRONMENTAL INITIAL STUDY FOR THE BERKELEY CITYWIDE POOLS MASTER PLAN CITY OF BERKELEY PARKS RECREATION AND WATERFRONT DEPARTMENT SEPTEMBER 1, 2009 ENVIRONMENTAL INITIAL STUDY BERKELEY CITYWIDE POOLS

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: AUGUST 2, 2017 TO: THRU: FROM: SUBJECT: Chair Imboden and Members of the Design Review Committee Anna Pehoushek, Assistant Community Development Director

More information

SUBJECT: ZONE CHANGE TO DESIGNATE A LANDMARK DISTRICT OVERLAY FOR THE CRAWFORDS VISTA LANDMARK DISTRICT

SUBJECT: ZONE CHANGE TO DESIGNATE A LANDMARK DISTRICT OVERLAY FOR THE CRAWFORDS VISTA LANDMARK DISTRICT Report TO: FROM: CITY COUNCIL CITY MANAGER DATE: FEBRUARY 7,2005 SUBJECT: ZONE CHANGE TO DESIGNATE A LANDMARK DISTRICT OVERLAY FOR THE CRAWFORDS VISTA LANDMARK DISTRICT RECOMMENDATION It is recommended

More information

EMERYVILLE PLANNING COMMISSION STAFF REPORT

EMERYVILLE PLANNING COMMISSION STAFF REPORT EMERYVILLE PLANNING COMMISSION STAFF REPORT Agenda Date: Report Date: April 19, 2012 TO: FROM: SUBJECT: Planning Commission Planning and Building Department Miroo Desai, Senior Planner (ECCL) (UPDR12-001)

More information

PUBLIC EIR SCOPING MEETING

PUBLIC EIR SCOPING MEETING MIRAMAR HOTELPROJECT PUBLIC EIR SCOPING MEETING PCR Services Corporation May 16, 2013 1 INTRODUCTION & MEETING PURPOSE Welcome and introductions City staff / PCR Services Corp., environmental consultant

More information

.+-M,.-,.+*,,A,--< ;:--t fi. ;,==: r ) i Q ; ',,(.:,*> 8 I-="' e$ ,; \!!&,,u

.+-M,.-,.+*,,A,--< ;:--t fi. ;,==: r ) i Q ; ',,(.:,*> 8 I-=' e$ ,; \!!&,,u fv :.,; \!!&,,u.+-m,.-,.+*,,a,--< ;:--t fi. ;,==: r ) i Q ; ',,(.:,*> 8 -="' e$ r,ct,, -; ;: \$ il!!,y.;;., $..L,: [i October 18, 201 0 TO: FROM: Honorable Mayor and City Council Planning Department SUBJECT:

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of September 19, 2015 DATE: September 11, 2015 SUBJECTS: Outdoor Café at Citizen Burger Bar A. SP# 418 Site Plan Amendment to modify an approved

More information

Notice of Preparation

Notice of Preparation Notice of Preparation OF ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING August 23, 2017 CASE NO.: ENV-2017-506-EIR PROJECT NAME: 8th, Hope, and Grand PROJECT APPLICANT: MFA 8th Grand and Hope LLC

More information

STAFF REPORT. April 30, 2018 May 9, 2018

STAFF REPORT. April 30, 2018 May 9, 2018 PATRICK J. SULLIVAN DIRECTOR City of New Bedford Department of Planning, Housing & Community Development 608 Pleasant St, New Bedford, Massachusetts 02740 Telephone: (508) 979.1500 Facsimile: (508) 979.1575

More information

4.8 LAND USE AND PLANNING

4.8 LAND USE AND PLANNING 4.8 LAND USE AND PLANNING 4.8.1 INTRODUCTION This section describes existing and planned land uses at the Hayward campus and analyzes the impact of implementation of the proposed Master Plan on land uses

More information

City of Del Mar. Del Mar Resort Specific Plan Environmental Impact Report Notice of Preparation

City of Del Mar. Del Mar Resort Specific Plan Environmental Impact Report Notice of Preparation City of Del Mar Del Mar Resort Specific Plan Environmental Impact Report Notice of Preparation Date: September 9, 07 To: From: Subject: State Clearinghouse, Responsible Agencies, Trustee Agencies, Interested

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 21, 2012 DATE: July 12, 2012 SUBJECT: SP #416 SITE PLAN AMENDMENT to modify condition #6 to eliminate requirement to provide a pedestrian

More information

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH 12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH STAFF PLANNER: Faith Christie REQUEST: Conditional Change of Zoning (from PD-H1 Planned

More information

September 20, 2017 ENV EIR

September 20, 2017 ENV EIR September 0, 07 CASE NO.: ENV-07-470-EIR PROJECT NAME: 4 th and Hewitt Project PROJECT APPLICANT: LIG 900, 90 and 96 E. 4th St., 40-4 S. Hewitt St., LLC PROJECT ADDRESS: 900, 90, 904, 906-90, and 96 E.

More information

A. OVERVIEW OF ENVIRONMENTAL SETTING

A. OVERVIEW OF ENVIRONMENTAL SETTING IV. A. OVERVIEW OF The proposed site is comprised of three parcels totaling approximately 4.24 acres, situated southwesterly of the intersection of Weyburn and Tiverton Avenues. Parcel A is 2.72 acres

More information

Architectural Review Board Report

Architectural Review Board Report Architectural Review Board Report Architectural Review Board Meeting: February 3, 2014 Agenda Item: 7.9 To: From: Subject: Architectural Review Board Steve Traeger, Principal Urban Designer Scott Albright,

More information

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Notice is hereby given that the City of Alameda, Lead Agency, will prepare an Environmental Impact Report

More information

NOTICE OF PREPARATION ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING

NOTICE OF PREPARATION ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING City of Alhambra October 10, 2017 Development Services Department 111 South First Street Alhambra, CA 91801 NOTICE OF PREPARATION ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING CASE NO.: Residential

More information

FY Capital Improvement Program Parks and Landscaping - Park Projects

FY Capital Improvement Program Parks and Landscaping - Park Projects PARK PROJECTS FY 219-223 Capital Improvement Program FY 218 FY 219 FY 22 FY 221 FY 222 FY 223 1 2 3 4 5 6 7 8 9 1 11 12 13 14 15 16 17 Robinson Park - Recreation Center Renovation Project (7843) Desiderio

More information

LOS ANGELES CITY PLANNING DEPARTMENT STAFF REPORT

LOS ANGELES CITY PLANNING DEPARTMENT STAFF REPORT LOS ANGELES CITY PLANNING DEPARTMENT STAFF REPORT LOS ANGELES CITY PLANNING COMMISSION CASE NO: CPC 2006-9374 CRA CEQA: Exempt DATE: December 21, 2006 Location: Valley Plaza and Laurel Plaza TIME: after

More information

Moreno Valley College: Conceptual Master Planning - Site Analysis Lasselle Street, Moreno Valley, CA 92551

Moreno Valley College: Conceptual Master Planning - Site Analysis Lasselle Street, Moreno Valley, CA 92551 Master Plan Architect School Name Moreno Valley College District Riverside Community College District Architecture and Urban Design 5898 Blackwelder Street Ground Floor Culver City, CA 90232 T: 310.559.5720

More information

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018 Rezoning Petition 2018-018 Pre-Hearing Staff Analysis May 21, 2018 REQUEST Current Zoning: R-5 (single family residential), R-5 HD-O (single family residential, historic district overlay) and B-2(CD) HD-O

More information

IV.B. VISUAL RESOURCES

IV.B. VISUAL RESOURCES IV.B. VISUAL RESOURCES ENVIRONMENTAL SETTING Existing Visual Character Project Site The project site is located at 17331-17333 Tramonto Drive in the Pacific Palisades community of the City of Los Angeles

More information

2 Project Description

2 Project Description Project Description 2 Project Description The proposed project would involve the demolition of the existing church and the construction of 40 twostory single family residences. The residential lots would

More information

Notice of Preparation

Notice of Preparation Notice of Preparation OF ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING August 7, 2017 CASE NO.: ENV-2016-3631-EIR PROJECT NAME: 6400 Sunset Boulevard Project PROJECT APPLICANT: 6400 Sunset, LLC

More information

MEMORANDUM HONORABLE MAYOR AND CITY COUNCIL MEMBERS. SHERI REPP LOADSMAN, DEPUTY CITY MANAGER/ PLANNING & BUILDING DIRECTOR /s/

MEMORANDUM HONORABLE MAYOR AND CITY COUNCIL MEMBERS. SHERI REPP LOADSMAN, DEPUTY CITY MANAGER/ PLANNING & BUILDING DIRECTOR /s/ MEMORANDUM Agenda Item #: 13 Meeting Date: 9/12/17 TO: THRU: FROM: SUBJECT: HONORABLE MAYOR AND CITY COUNCIL MEMBERS ANTON DAHLERBRUCH, CITY MANAGER /s/ SHERI REPP LOADSMAN, DEPUTY CITY MANAGER/ PLANNING

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of October 17, 2015 DATE: October 6, 2015 SUBJECT: SP #1 SITE PLAN AMENDMENT REVIEW to modify Zoning Ordinance sign requirements and facade modifications

More information

REQUEST FOR CHANGE TO APPROVED AMBASSADOR WEST PROJECT AND VARIANCE #I 1669 FOR 182 SOUTH ORANGE GROVE BOULEVARD (MAYFAIR MANSION)

REQUEST FOR CHANGE TO APPROVED AMBASSADOR WEST PROJECT AND VARIANCE #I 1669 FOR 182 SOUTH ORANGE GROVE BOULEVARD (MAYFAIR MANSION) Agenda Report TO: FROM: SUBJECT: Honorable Mayor and City Council Planning & Development Department REQUEST FOR CHANGE TO APPROVED AMBASSADOR WEST PROJECT AND VARIANCE #I 1669 FOR 182 SOUTH ORANGE GROVE

More information

Request Modification of Conditions of a Conditional Use Permit approved October 14, Staff Recommendation Approval. Staff Planner Stephen White

Request Modification of Conditions of a Conditional Use Permit approved October 14, Staff Recommendation Approval. Staff Planner Stephen White Applicant Property Owner Public Hearing September 13, 2017 City Council Election District Lynnhaven Agenda Item 3 Request Modification of Conditions of a Conditional Use Permit approved October 14, 2003.

More information

2.0 PROJECT DESCRIPTION

2.0 PROJECT DESCRIPTION 2.0 PROJECT DESCRIPTION The proposed project involves the redevelopment of an approximately 6.3-acre site in the City of Long Beach with a mixed-use village center project. This section describes the project

More information

M E M O R A N D U M November 9, 2018

M E M O R A N D U M November 9, 2018 M E M O R A N D U M November 9, 2018 To: Southlake 2035 Corridor Planning Committee From: Kenneth Baker, Sr. Director of Planning and Development Services Subject: Item #8 Up to thirteen (13) residential

More information

Institutional Overlay Zone (IOZ) Regulatory Framework

Institutional Overlay Zone (IOZ) Regulatory Framework Institutional Overlay Zone (IOZ) Regulatory Framework Approved by Portland City Council November 20, 2017 APPLICABILITY All development proposed by Maine Medical Center (MMC) within the boundary of the

More information

Carlsbad Village Redevelopment Concept Summary of Features

Carlsbad Village Redevelopment Concept Summary of Features Carlsbad Village Redevelopment Concept Summary of Features Calthorpe Associates November 5, 2003 The Redevelopment Concept illustrates a vision for the future of Carlsbad Village. The overall vision of

More information

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER CEQA scoping Meeting March 19 th, 2014 Winters City Council Chambers - 6:30 pm AGENDA FOR THE MEETING 6:30 Welcome (John Donlevy) 6:40 Overview

More information

III. PROJECT DESCRIPTION

III. PROJECT DESCRIPTION III. PROJECT DESCRIPTION LOCATION AND BOUNDARIES The City of Manhattan Beach is located in the South Bay region of Los Angeles County, California, approximately 2 miles south of the Los Angeles International

More information

Town of Poughkeepsie Planning Department

Town of Poughkeepsie Planning Department Town of Poughkeepsie Planning Department 1 Overocker Road 845-485-3657 Phone Poughkeepsie, NY 12603 845-486-7885 Fax A) PUBLIC HEARINGS NOTICE OF PLANNING BOARD REGULAR MEETING 5:00 PM DECISION AGENDA

More information

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT TO: State Clearinghouse, Responsible and Trustee Agencies, and Other Interested Parties DATE: May 18, 2017 SUBJECT: Notice of Preparation of Environmental

More information

AGENDA 07/14/11 PLANNING COMMISSION Meeting

AGENDA 07/14/11 PLANNING COMMISSION Meeting AGENDA 07/14/11 PLANNING COMMISSION Meeting MEETING DATE: Thursday, July 14, 2011 MEETING TIME: MEETING PLACE: VIDEO: 5:30 p.m. City Council Chambers, City Hall 350 Main Street El Segundo, California 90245-0989

More information

REPORT TO PLANNING COMMISSION

REPORT TO PLANNING COMMISSION CITY OF Meeting Date: October 25, 2011 Agenda Item: Community Development Department Planning Division P. O. Box 151560, San Rafael, CA 94915-1560 PHONE: (415) 485-3085/FAX: (415) 485-3184 Case Numbers:

More information

PLANNING COMMISSION STAFF REPORT

PLANNING COMMISSION STAFF REPORT OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE CUPERTINO, CA 95014-3255 (408) 777-3308 FAX (408) 777-3333 planning@cupertino.org PLANNING COMMISSION STAFF REPORT Agenda Item No. Agenda Date:

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of October 23, 2004 DATE: October 6, 2004 SUBJECT: SP #106-3 Site Plan Amendment for changes to façade, plaza deck, landscaping, number of units,

More information

City of Walnut Creek. North Downtown. Specific Plan Process. Community Advisory Committee: Meeting #3. September 26, 2016

City of Walnut Creek. North Downtown. Specific Plan Process. Community Advisory Committee: Meeting #3. September 26, 2016 City of Walnut Creek North Downtown Specific Plan Process Community Advisory Committee: Meeting #3 September 26, 2016 Introduction Where we are in the process City showcase in August We ve started existing

More information

Los Angeles Department of City Planning RECOMMENDATION REPORT

Los Angeles Department of City Planning RECOMMENDATION REPORT Los Angeles Department of City Planning RECOMMENDATION REPORT CULTURAL HERITAGE COMMISSION HEARING DATE: April 7, 2011 TIME: 10:00 AM PLACE: City Hall, Room 1010 200 N. Spring Street Los Angeles, CA 90012

More information

Presentation of the Staff Draft. July 17, 2014 SSRVP Team, Area 3

Presentation of the Staff Draft. July 17, 2014 SSRVP Team, Area 3 Presentation of the Staff Draft July 17, 2014 SSRVP Team, Area 3 Presentation Overview Introduction Plan Framework Plan Recommendations Implementation Next Steps and Request for Public Hearing on September

More information

EXHIBIT "A" PROJECT DESCRIPTION Vibiana Development Project

EXHIBIT A PROJECT DESCRIPTION Vibiana Development Project EXHIBIT "A" PROJECT DESCRIPTION Vibiana Development Project A. PROJECT CHARACTERISTICS 228 S. Main Street, LLC, (the Applicant ) is requesting a Conditional Use Permit ( CUP ) for Floor Area Ratio Averaging

More information

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE LAND PARK COMMERCIAL CENTER PROJECT

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE LAND PARK COMMERCIAL CENTER PROJECT NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE LAND PARK COMMERCIAL CENTER PROJECT PUBLIC COMMENT PERIOD November 12, 2015 to December 14, 2015 INTRODUCTION The City

More information

City Council Special Meeting AGENDA ITEM NO. C.

City Council Special Meeting AGENDA ITEM NO. C. City Council Special Meeting AGENDA ITEM NO. C. DATE: 01/04/2019 TO: Honorable Mayor and City Council Members SUBJECT: Transit Villages Specific Plan project Study Session (Development Services Director

More information

Staff Report and Recommendation

Staff Report and Recommendation Community Planning and Development Planning Services 201 W. Colfax Ave., Dept. 205 Denver, CO 80202 p: 720.865.2915 f: 720.865.3052 www.denvergov.org/cpd TO: City Council Neighborhoods and Planning Committee

More information

The subject site plan amendment proposes the following revisions to the approved site plan:

The subject site plan amendment proposes the following revisions to the approved site plan: PROPOSED AMENDMENT The subject site plan amendment proposes the following revisions to the approved site plan: 1. The building footprint was modified to accommodate the revised architectural design. 2.

More information

NOTICE OF AVAILABILITY (NOA) OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC HEARING 2190 Shattuck Avenue Mixed-Use Project

NOTICE OF AVAILABILITY (NOA) OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC HEARING 2190 Shattuck Avenue Mixed-Use Project Planning and Development Department Land Use Planning Division NOTICE OF AVAILABILITY (NOA) OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC HEARING 2190 Shattuck Avenue Mixed-Use Project Notice

More information

FY Capital Improvement Program Parks and Landscaping. 8 - Summary

FY Capital Improvement Program Parks and Landscaping. 8 - Summary PARK PROJECTS FY 211-215 Capital Improvement Program Description FY 21 FY 211 FY 212 FY 213 FY 214 FY 215 1 Restroom Bldgs (Replace or Construct)-Jefferson, McDonald, 5,774,623 4,669,623 1,15, Allendale,

More information

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT http://www.edcgov.us/devservices/ PLACERVILLE OFFICE: 2850 Fairlane Court, Placerville, CA 95667 BUILDING (530) 621-5315 / (530) 622-1708

More information

Summary of Planning Commission Votes Regular Meeting of the Aurora Colorado Planning Commission February 14, 2018

Summary of Planning Commission Votes Regular Meeting of the Aurora Colorado Planning Commission February 14, 2018 Summary of Planning Commission Votes Regular Meeting of the Aurora Colorado Planning Commission February 14, 2018 Agenda Item # Item Description 5a. PROPOSED AMENDMENT TO THE AURORA COMPREHENSIVE PLAN

More information

Agenda Item. Applicant Logan Virginia Properties, LLC Property Owners Byler Azalea, LLC & Gateway Free Will Baptist Chuch

Agenda Item. Applicant Logan Virginia Properties, LLC Property Owners Byler Azalea, LLC & Gateway Free Will Baptist Chuch Applicant Property Owners Byler Azalea, LLC & Gateway Free Will Baptist Chuch Public Hearing March 14, 2018 City Council Election District Kempsville Agenda Item 6 Request Conditional Rezoning (B-2 Community

More information

- INVITATION - COURTESY INFORMATIONAL MEETING

- INVITATION - COURTESY INFORMATIONAL MEETING City of Alhambra DEVELOPMENT SERVICES - INVITATION - COURTESY INFORMATIONAL MEETING ALHAMBRA COURT COMMERCIAL DEVELOPMENT TUESDAY, DECEMBER 13, 2016, 7 9 P.M. EMERY PARK YOUTH CENTER 2709 MIMOSA STREET,

More information

2.1 INTRODUCTION 2.2 EXISTING CONDTIONS

2.1 INTRODUCTION 2.2 EXISTING CONDTIONS Chapter 2: Land Use and Zoning 2.1 INTDUCTION This chapter identifies land uses and zoning on the project site and in the surrounding study area in order to establish the context in which the Proposed

More information

MINUTES OF THE TOWN COUNCIL MEETING SEPTEMBER 1, 2016

MINUTES OF THE TOWN COUNCIL MEETING SEPTEMBER 1, 2016 MINUTES OF THE TOWN COUNCIL MEETING SEPTEMBER 1, 2016 Town Council Meeting 09/20/16 Item #1 The Town Council of the Town of Los Gatos conducted a Special Meeting on Thursday, September 1, 2016, at 6:00

More information

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1 Chapter 1 Introduction Lakewood 2025: Moving Forward Together Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1 Purpose of the Comprehensive Plan The Comprehensive

More information

Downtown / Ballough Road Redevelopment Board

Downtown / Ballough Road Redevelopment Board Agenda Item 5 CONDITIONAL USE DEV2014-095 Pai in the Sky Downtown / Ballough Road Redevelopment Board Staff Report TO: Downtown / Ballough Road Board Members FROM: Jason Jeffries, Project Manager DATE:

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION DATE: January 6, 2016 TO: LEAD AGENCY: Responsible Agencies, Organizations, and Interested Parties Contact: Tyler Barrington, Principal Planner Planning Department Community Development

More information

Hudson Group North America LLC

Hudson Group North America LLC Hudson Group North America LLC Mr. John Palmieri, Director Boston Redevelopment Authority One City Hall Square Boston, MA 02201 August 30, 2010 RE: 120 Kingston Street Development, Notice of Project Change

More information

CITY COUNCIL STAFF REPORT

CITY COUNCIL STAFF REPORT COUNCIL AGENDA: 04/11/17 ITEM: W\0^ CITY OF e: :SS SAN JOSE CAPITAL OF SILICON VALLEY CITY COUNCIL STAFF REPORT File No. C16-030 Applicant: Alex Rubashevsky Location Northwest corner of Oakland Road and

More information

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT PLACERVILLE OFFICE:

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT   PLACERVILLE OFFICE: COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT http://www.edcgov.us/devservices/ PLACERVILLE OFFICE: LAKE TAHOE OFFICE: 2850 Fair Lane Court, Placerville, CA 95667 924 B Emerald Bay Rd.

More information

Town of Poughkeepsie Planning Department

Town of Poughkeepsie Planning Department Town of Poughkeepsie Planning Department 1 Overocker Road 845-485-3657 Phone Poughkeepsie, NY 12603 845-486-7885 Fax A) PUBLIC HEARINGS NOTICE OF PLANNING BOARD REGULAR MEETING 5:00 PM DECISION AGENDA

More information

County of Los Angeles

County of Los Angeles SACHI A. HAMAI Chief Executive Officer County of Los Angeles CHIEF EXECUTIVE OFFICE Kenneth Hahn Hall of Administration 500 West Temple Street, Room 713, Los Angeles, California 90012 (213) 974-1101 http://ceo.lacounty.gov

More information

Town of Poughkeepsie

Town of Poughkeepsie Town of Poughkeepsie Planning Department 1 Overocker Road 845-485-3657 Phone Poughkeepsie, NY 12603 845-486-7885 Fax NOTICE OF PLANNING BOARD REGULAR MEETING 6:30 PM DECISION AGENDA A) PUBLIC HEARINGS

More information

December 18, January 14, 2019, 5:00 P.M. 7:00 P.M. See below for additional information.

December 18, January 14, 2019, 5:00 P.M. 7:00 P.M. See below for additional information. December 8, 208 ENVIRONMENTAL CASE NO.: ENV-208-6667-EIR PROJECT NAME: Reese Davidson Community Project PROJECT APPLICANT: Venice Community Housing Corp./ Hollywood Community Housing Corp. PROJECT ADDRESS:

More information

Section 3.3 Land Use and Planning

Section 3.3 Land Use and Planning Section 3.3 Land Use and Planning 3.3.1 Introduction This section describes the existing land uses and land use setting of the project site and adjacent areas, and analyzes potential land use-related environmental

More information

M E M O R A N D U M PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA CITY PLANNING DIVISION

M E M O R A N D U M PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA CITY PLANNING DIVISION M E M O R A N D U M PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA CITY PLANNING DIVISION DATE: March 12, 2018 TO: FROM: SUBJECT: The Honorable Landmarks Commission Roxanne Tanemori,

More information

OCEANSIDE DEVELOPER S CONFERENCE

OCEANSIDE DEVELOPER S CONFERENCE 1 AGENDA OCEANSIDE DEVELOPER S CONFERENCE Tuesday, November 15th, 2016, 8:30 a.m. City Hall South, 1 st Floor, Guajome Room 1. 8:30-9:30 a.m. Proposed 57 lot residential subdivision of an approximately

More information

DRAFT ENVIRONMENTAL IMPACT REPORT NORTH HOLLYWOOD-VALLEY VILLAGE COMMUNITY PLAN AREA

DRAFT ENVIRONMENTAL IMPACT REPORT NORTH HOLLYWOOD-VALLEY VILLAGE COMMUNITY PLAN AREA Environmental Review City Hall 200 N. Spring Street, Room 750 Los Angeles, CA 90012 DRAFT ENVIRONMENTAL IMPACT REPORT NORTH HOLLYWOOD-VALLEY VILLAGE COMMUNITY PLAN AREA The Plaza at The Glen Mixed Use

More information

March 30, Keyes Van Nuys Honda Dealership Keyes Motor, Inc.

March 30, Keyes Van Nuys Honda Dealership Keyes Motor, Inc. March 30, 08 ENVIRONMENTAL CASE NO.: ENV-07-77-EIR PROJECT NAME: PROJECT APPLICANT: Keyes Van Nuys Honda Dealership Keyes Motor, Inc. PROJECT ADDRESS: 600, 6007, 605, 6053, and 6059 N. Van Nuys Boulevard;

More information

4.8 Land Use and Planning Environmental Setting Impacts and Mitigation Measures References...4.

4.8 Land Use and Planning Environmental Setting Impacts and Mitigation Measures References...4. TABLE OF CONTENTS 4.8 Land Use and Planning...4.8-1 4.8.1 Environmental Setting...4.8-1 4.8.2 Impacts and Mitigation Measures...4.8-5 4.8.3 References...4.8-11 FIGURES Figure 4.8-1 Figure 4.8-2 Figure

More information

Corridor Investment Projects (FY FY2012)

Corridor Investment Projects (FY FY2012) City of Long Beach, California Department of Development Services Corridor Investment Projects (FY1980 - FY2012) Building A Better Long Beach North Long Beach Corridor Investments Bixby Knolls on Long

More information

I Street, Sacramento, CA

I Street, Sacramento, CA REPORT TO PLANNING COMMISSION City of Sacramento 12 915 I Street, Sacramento, CA 95814-2671 To: Members of the Planning Commission PUBLIC HEARING March 10, 2011 Subject: El Dorado Savings Sign Variance

More information

2900 Steeles Avenue East at Don Mills Road in the Town of Markham

2900 Steeles Avenue East at Don Mills Road in the Town of Markham STAFF REPORT INFORMATION ONLY 2900 Steeles Avenue East at Don Mills Road in the Town of Markham Date: January 23, 2008 To: From: Wards: Reference Number: North York Community Council Director, Community

More information

PLANNING AND ZONING COMMISSION AGENDA MEMORANDUM

PLANNING AND ZONING COMMISSION AGENDA MEMORANDUM PLANNING AND ZONING COMMISSION AGENDA MEMORANDUM City and County of Broomfield, Colorado To: Planning and Zoning Commission From: John Hilgers, Planning Director Anna Bertanzetti, Principal Planner Meeting

More information

Jason D. Sutphin, Community Development Division Chief. Through: Brooke Hardin, Director of Community Development and Planning

Jason D. Sutphin, Community Development Division Chief. Through: Brooke Hardin, Director of Community Development and Planning Meeting Date: 12/18/2017 Agenda Item: 9a. MEMORANDUM To: Chairman Cunningham and Members of the Planning Commission From: Jason D. Sutphin, Community Development Division Chief Through: Brooke Hardin,

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION To: Agencies, Organizations, and Interested Parties From: City of Alameda, Community Development Services Department Subject: Notice of Preparation of a Draft Environmental Impact

More information

SECTION 2.0 INTRODUCTION

SECTION 2.0 INTRODUCTION SECTION 2.0 INTRODUCTION 2.1 PURPOSE AND SCOPE OF THE EIR Environmental Impact Reports (EIR) are informational documents which wil inform public agency decision-makers and the public generally of the significant

More information

II. PROJECT DESCRIPTION

II. PROJECT DESCRIPTION II. PROJECT DESCRIPTION II. PROJECT DESCRIPTION A. LOCATION AND BOUNDARIES The proposed Project consists of two components; the development of a mixed use project consisting of residential and retail uses

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of December 16, 2017 DATE: December 7, 2017 SUBJECT: SP#105-8 SITE PLAN AMENDMENT to remove a retail kiosk and add outdoor café seating in ;

More information

Request Modification of Conditions (Conditional Use Permit for a Church approved by City Council in 1989 & modified in 1990, 2010, and 2014)

Request Modification of Conditions (Conditional Use Permit for a Church approved by City Council in 1989 & modified in 1990, 2010, and 2014) Applicant Property Owner Catholic Diocese of Richmond Public Hearing June 13, 2018 (Deferred by Planning Commission, May 9, 2018) City Council Election District Princess Anne Agenda Item D3 Request Modification

More information

3.0 LAND USE PLAN. 3.1 Regional Location. 3.2 Existing Conditions Existing Uses. Exhibit Regional Location Map

3.0 LAND USE PLAN. 3.1 Regional Location. 3.2 Existing Conditions Existing Uses. Exhibit Regional Location Map 3.0 LAND USE PLAN 3.1 Regional Location The Anaheim Resort Specific Plan (ARSP) area is located in the City of Anaheim, which is 35 miles southeast of downtown Los Angeles and 7 miles northwest of Santa

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 23, 2016 DATE: January 12, 2016 SUBJECT: SP #335 SITE PLAN AMENDMENT to permit modifications to the outdoor cafe and transportation

More information

STAFF REPORT. December 20, North York Community Council. Director, Community Planning, North York District

STAFF REPORT. December 20, North York Community Council. Director, Community Planning, North York District STAFF REPORT December 20, 2005 To: From: Subject: North York Community Council Director, Community Planning, North York District Preliminary Report Application to Amend the Official Plan and Zoning By-law

More information

Joint Design Review Body Report

Joint Design Review Body Report Joint Design Review Body Report To: From: Cc: Subject: Joint Design Review Body Joint Design Review Body Meeting: October 12, 2017 Agenda Item: 6-A and 6-B Stephanie Reich, AIA. LEED AP, Design & Historic

More information

Fort McPherson Master Plan

Fort McPherson Master Plan Fort McPherson Master Plan Fort McPherson In 1885, Fort McPherson became the first permanent Army installation in the Southeast. Located on 488 acres in the City of Atlanta halfway between the airport

More information

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES LOS ANGELES MISSION COLLEGE MASTER PLAN DESIGN & DEVELOPMENT PRINCIPLES 34 Quality Learning Along the Arroyo PROGRAM SUMMARY BY PROJECT The following are program summaries for each of the projects planned

More information

5959 Yonge Street Rezoning Application - Preliminary Report

5959 Yonge Street Rezoning Application - Preliminary Report STAFF REPORT ACTION REQUIRED 5959 Yonge Street Rezoning Application - Preliminary Report Date: February 23, 2011 To: From: Wards: Reference Number: North York Community Council Director, Community Planning,

More information

6 November 10, 2010 Public Hearing APPLICANT: ZION TEMPLE MINISTRIES COGIC

6 November 10, 2010 Public Hearing APPLICANT: ZION TEMPLE MINISTRIES COGIC REQUEST: Conditional Use Permit (religious use) 6 November 10, 2010 Public Hearing APPLICANT: ZION TEMPLE MINISTRIES COGIC PROPERTY OWNER: PHYLLIS A. & ERNEST L. HUDSON TRUST STAFF PLANNER: Karen Prochilo

More information

Glenborough at Easton Land Use Master Plan

Glenborough at Easton Land Use Master Plan Implementation 114 9.0 IMPLEMENTATION 9.1 OVERVIEW This chapter summarizes the administrative procedures necessary to implement the proposed land use plan, infrastructure improvements, development standards,

More information

Proposed Major Institution Master Plan Street Vacation. March 19, 2009

Proposed Major Institution Master Plan Street Vacation. March 19, 2009 Presentation to Seattle Design Commission Proposed Major Institution Master Plan Street Vacation March 19, 2009 1 Why We Need to Grow More children surviving with chronic disease increasing the demand

More information