SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

Size: px
Start display at page:

Download "SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference"

Transcription

1 Scarborough Subway Extension Final Terms of Reference 1

2 1.0 Introduction and Background 1.1 Introduction Toronto City Council recently confirmed support for an extension of the Bloor-Danforth Subway from Kennedy Station to Scarborough Centre and Sheppard Avenue. This subway extension will replace the aging Scarborough Rapid Transit (SRT) line. The City of Toronto with support from the Toronto Transit Commission (TTC) is undertaking the Scarborough Subway Extension Project Assessment (SSEPA) to determine key aspects of this rapid transit project such as route alignment, station locations, construction methods, maximizing benefits to local communities and strategies for mitigating adverse impacts. A recommended alignment and station locations will be presented to the TTC Board and City Council for approval at the conclusion of this study. A Transit Project Assessment Process (TPAP) is required before the City and TTC may proceed with implementation and construction. The TPAP is a streamlined self-assessment process for transit projects to satisfy the requirements of the Environmental Assessment Act; which is administered by the Ministry of the Environment and Climate Change. The TPAP is a final project review which will assess potential environmental impacts and identify proposed mitigation strategies to be employed during the design, construction and operation of the project. 1. Project Background The SRT line opened for service in 1985 and it operates between Kennedy Station on the Bloor- Danforth Subway and McCowan Station. After almost 30 years of continuous operation, the SRT s vehicles are reaching the end of their normal lifespan. The SRT would need significant rehabilitation, new vehicles, and updated technology in order to support existing and future transit service needs and address the problems associated with the aging SRT Line. There has been considerable study and discussion in recent years about the preferred manner in which to address the problems on the aging SRT line. In 006, the TTC evaluated options to upgrade or replace the SRT; completing the SRT Strategic Plan a comprehensive study of options for replacing the aging vehicles, upgrading the system s infrastructure as necessary, and potentially expanding the line. The initial recommendation was to purchase larger, new generation SRT vehicles, and make the physical modifications at SRT stations that were necessary to accommodate the new, longer vehicles. In 007, one year after the SRT Strategic Plan the Transit City Light Rail Plan was introduced, which called for the implementation of seven light rail lines throughout the City of Toronto. In that context, it was recommended that the SRT rehabilitation adopt light-rail technology in order to take advantage of the economies-of-scale cost savings which would result from the acquisition of a large fleet of light-rail vehicles to operate on the proposed City-wide network. An Environmental Assessment (EA) for the replacement of the SRT with light rail vehicles, including a complete rehabilitation / reconstruction of the existing elevated structure, was completed in 010. The proposal was to extend the new line beyond its current terminus at McCowan Station to Centennial College and then north to Sheppard Avenue. The EA also addressed a second, future extension north of Sheppard Avenue, to the Malvern Town Centre. Most recently, in 013, the TTC Board, and subsequently, City Council, confirmed support for replacing the SRT with an extension of the Bloor-Danforth Subway, with stations at Lawrence Avenue,

3 Scarborough Centre and Sheppard Avenue where the subway would interconnect with the future Sheppard East LRT line. Council s decision to extend the Bloor-Danforth subway north and east into Scarborough is based on the following benefits: Higher speed; Most-reliable, highest-quality rapid transit service; Elimination of the transfer at Kennedy Station; Higher ridership; and Consideration of alignments other than the existing SRT routing, which would then not require shutting down the SRT during construction of a subway extension. All decisions relating to the alignment and station locations are subject to a further EA. The SRT service has been very successful in attracting ridership and has been operating overcapacity for a decade. For many years its peak-period passenger volumes have been maxed-out at 4,000 passengers per hour, with no ability to improve the capacity because of the limited number of vehicles in the fleet and limited station size. Analysis to date has shown if the SRT were replaced by a continuation and extension of the Bloor-Danforth Subway north to Sheppard Avenue, it would carry passenger volumes of upwards of 9,500 passengers per hour per direction (pphpd) in the busiest hour of travel. The additional ridership results from the higher operating speeds between the key points of Sheppard Avenue, the Scarborough Centre and Kennedy Road. The elimination of the existing SRT/subway transfer at Kennedy Station also contributes to increased passenger convenience which in turns increases trip attractiveness and ridership. 1.3 Planning Context The planning framework for the Study Area is established under the Province s Growth Plan for the Greater Golden Horseshoe, The Big Move regional transportation plan by Metrolinx and the Toronto Official Plan. Key growth areas within the Study Area include Scarborough Centre, sections of Lawrence Avenue and Sheppard Avenue, and existing and planned transit stations. Locally and provincially, Scarborough Centre is identified as a major focal point for growth. It is a locally-designated Centre under the Toronto Official Plan, and a provinciallydesignated urban growth centre under the Growth Plan. Scarborough Centre is targeted to achieve a minimum density of 400 residents and jobs per hectare by 031, and is subject to a Secondary Plan and complementary precinct-level plans that provide direction for future development. Major transit station areas are also identified under the Growth Plan for the Greater Golden Horseshoe as important nodes where transit supportive development will be encouraged. The most important station areas are identified as Mobility Hubs under The Big Move. Within the study area, the area around Kennedy Station is identified as a Gateway Mobility Hub and Scarborough Centre as an Anchor Mobility Hub. Under the Toronto Official Plan, the designated Avenues in the Study Area are also intended to accommodate significant growth. These areas include sections of Lawrence Avenue and Sheppard Avenue East. 3

4 1.4 Transit Planning in Toronto A comprehensive, high quality, affordable transit system that lets people move quickly and conveniently throughout the City is key to high quality of life as envisioned in the Toronto Official Plan. The Scarborough Subway Extension is being planned in the context of the overall transit network. As part of the Feeling Congested? Official Plan Review Process, 5 Rapid Transit Projects are being reviewed and prioritized. The principles of "Feeling Congested?" guide the City's work on the full range of transit projects. Figure 1-1: Rapid transit projects currently being reviewed and prioritized, plus SmartTrack. Related Projects Three important projects the Scarborough Subway Extension, SmartTrack and Relief Line - are very closely related and are currently being studied in a coordinated fashion by City Planning in partnership with the TTC. Work on the Scarborough Subway Extension will inform the other projects and work on SmartTrack and Relief Line will inform work on the Scarborough Subway Extension. Aligned recommendations will be presented to the TTC Board and Toronto City Council. Regional Express Rail (RER) is an enhanced service concept providing at least 15-minute all-day service on all existing GO Rail corridors. RER is currently being developed by Metrolinx and the Province. SmartTrack builds on RER, comprising 3 of the 7 existing GO Rail corridors. The impact of RER and SmartTrack on how the Scarborough Subway Extension meets its objectives will be a key consideration and will be carefully and thoroughly studied as part of the Project Assessment. 4

5 1.5 Purpose of This Document This Terms of Reference document has been prepared to publicly outline the framework for completing this study. The Terms of Reference outlines the study purpose, objectives, and approach to the technical analysis and public involvement, as well as other planning work that the City of Toronto and TTC will undertake, all leading to the preparation of the environmental assessment under the TPAP. This document outlines the Study Team s approach to determine the recommended alignment and station locations for the Scarborough Subway Extension. Enhancements and modifications to the process and work tasks will be confirmed as the study progresses to reflect new information, study findings and the consultation input received throughout the study. 1.6 Study Team Organization A Study Team has been formed to direct and lead the project. The Study Team will be led by the City of Toronto's City Planning Division and the TTC, and will include key staff from both organizations. The SSEPA is guided by the Transit Executive Committee, which is co-chaired by the City Manager and the TTC CEO. A team of external technical experts has been selected to provide advice and expertise to the City and the TTC. A Technical Advisory Committee (TAC) comprised of staff from relevant City Divisions and TTC groups will advise the Study Team and ensure cross-division cooperation leading to the successful completion of the planning phase of the project. The City will also work closely with Metrolinx and other agencies to ensure the SSEPA achieves its objectives in a timely manner..0 Project Description.1 Purpose of the Study The purpose of the SSEPA is to identify the preliminary design of the preferred alignment and station locations for the extension of the Bloor-Danforth Subway from Kennedy Station through Scarborough Centre to Sheppard Avenue. The recommended subway extension will be documented in an Environmental Project Report, in accordance with the Province s TPAP (Ontario Regulation 31/08).. Project Objectives Specific objectives to guide the planning process in determining a recommended plan for the subway extension are: 1. Support the City-building principles outlined in the City s Official Plan and Provincial Policy Statement: A. Design and integrate subway stations to complement the existing and planned land uses. B. Use high quality transit as a catalyst for economic development, intensification and new transit-supportive development in designated growth areas. C. Encourage transit oriented development in the vicinity of all station sites. 5

6 D. Improve the public realm at access points and within subway station areas.. Make transit as attractive a travel option as practically possible in this area of Scarborough: A. Provide fast, efficient, reliable, safe and enjoyable subway service to address existing and future travel demands and enhance transit service. B. Locate and design subway stations in a manner that improves access and integration with the existing and planned transportation network including local and regional bus services, and other rapid transit planned for the area. C. Locate and design subway stations in a manner that promote seamless pedestrian connections (including below-ground, at surface, and/or above ground pedestrian connections). D. Locate and design subway stations in a manner that promotes seamless connections for customers cycling to the stations. 3. Minimize Adverse Environmental Impacts: A. Identify positive effects on or opportunities for the natural, socio-economic and cultural environments associated with the construction and operation of the project. B. Identify and to the extent possible, mitigate, any adverse effects on the natural, socio-economic and cultural environments associated with the construction and operations of the project. 4. Achieve Cost-Effectiveness A. Optimize cost effectiveness in terms of both capital and operating costs..3 Study Area The Study Area is illustrated in Figure -1. A wide range of reasonable alternatives to be considered will fall within this area. The SSEPA will consider all effects on the entire transit network. Potential impacts outside of the primary Study Area are also very important and will be examined as part of this study (where appropriate). The full suite of potential impacts that will be carefully considered by the SSEPA, which include but are not limited to: effects on the natural environment, existing and planned infrastructure, and built form and neighbourhoods within the Study Area. 6

7 Figure -1: Scarborough Subway Extension Study Area.4 Overall Study Approach The SSEPA will be completed through the following four key study phases: Phase 1 Setting the Stage Work to be completed in Phase 1 will include the following: Finalize the study purpose and objectives; Identify the study area; Finalize the study process including approach to consultation; Establish the existing conditions and assumptions; Determine the long list of reasonable alternatives; and Identify the evaluation criteria. Key elements for the public to provide comment and input on will include: 7

8 Project objectives; Study process including approach to consultation; Existing conditions and assumptions; Long list of reasonable alternatives; and Evaluation criteria. Following consultation on Phase 1, this document has been finalized and guides the subsequent study phases. Phase Choosing the Corridor Work to be completed in Phase will include the following: Finalize evaluation criteria; Apply the evaluation criteria to reasonable options to develop a short list of possible corridors Within the short list of possible corridors: Develop alternative station location options Develop a list of possible alignments Apply the evaluation criteria to the short list of possible corridors to select a preferred corridor Key elements for the public to provide comment and input on will include: Application of the evaluation criteria to short list corridors; and Station location options and alternative alignments within the short list of possible corridors. Phase 3 Recommending the Alignment and Station Locations Work to be completed in Phase 3 will include the following: Apply evaluation criteria to select preferred station locations and alignment; Create a functional design for the recommended alternative; and Identify potential impacts and appropriate mitigation strategies associated with the recommended design. Key elements for the public to provide comment and input on will include: Recommended station locations and alignment; Functional design of stations; and Potential impacts and proposed mitigation strategies. At the end of Phase 3, a draft Environmental Project Report identifying the recommended station locations and route will be prepared. Authority will be sought to commence the TPAP for final project review from the TTC Board and Toronto City Council at the end of Phase 3. Figure - below illustrates the phased approach being used to determine the alignment and station locations for the Scarborough Subway Extension. 8

9 FIGURE -: Phases 1-3 FIGURE -3: Key Consultation Events Phase 4 Final Project Review - Transit Project Assessment Process Phase 4 of the project assessment will satisfy the requirements of the Environmental Assessment Act and TPAP: Summarize and review the analysis and decision-making of the project assessment; Finalize the Environmental Project Report; and, Seek authority to proceed with construction of the Scarborough Subway Extension from Toronto City Council and the Province of Ontario. It is anticipated that the TPAP will be undertaken in early 016. The process will provide opportunity for the public to review the work of the project assessment and provide any additional input. Based on this further input, the Environmental Project Report will be finalized and a Statement of Completion will be published and submitted to the Minister of Environment and Climate Change. After a review period of 9

10 approximately three months, the City will be able to proceed with implementation of the subway extension as per direction of the Minister. More information about Ontario's TPAP can be found by accessing the following links: Ontario Regulation 31/08 Guide to Environmental Assessment Requirements for Transit Projects.5 Appropriate Timelines The SSEPA will be expedited in all reasonable ways while including appropriate opportunities for community involvement and public input. We anticipate that the planning and preliminary engineering work (Phases 1-3) will be complete by late 015/early 016, but recognize that this work is partially dependent on findings of studies related to SmartTrack and the Relief Line as per Section 1.4. Aligned recommendations to the TTC Board and City Council are critical for effective transit planning and will require careful coordination of all three projects. Decisions made through the project assessment will lead to a Transit Project Assessment Process (TPAP); a focussed and streamlined approvals process that satisfies the requirements of the Environmental Assessment Act. The project schedule has been set up to complete the necessary work to meet TPAP requirements. The TPAP itself will take no more than six months, and is anticipated to be complete be the mid-016. The City and the TTC will seek to expedite detailed design and construction processes once authority to construct has been received. Construction is anticipated to commence in 018 and the subway is expected to be in operation in Evaluation Approach and Criteria The development of the Evaluation Criteria is based on the City s list of 8 decision-making criteria that have been identified through the Official Plan review of transportation policies to guide Toronto s decisions on transportation investments. The intent of adopting these factors for the evaluation of the Scarborough Subway Extension's alignment and station location options is to have an aligned vision and to employ similar criteria in making investment decisions about transportation projects. The evaluation of alternatives will be comprehensive (relative to the City's 8 decision-making criteria, study objectives and Study Area), understandable, replicable, traceable and participatory (involving input from interested and potentially affected stakeholders). The process of selecting the recommended alignment will be based on the identification of the alternative that best serves the City's list of 8 decisionmaking criteria, project objectives and sub-objectives. In order to focus the analysis, specific measurable criteria have been created to correspond to each objective. 10

11 3.0 Public Consultation 3.1 Public Consultation Guiding Principles The goal of the project s proposed public consultation program is to generate broad participation and solicit input from community leaders, stakeholders and the public. Participation by those with local, citywide and regional interests will strengthen the project and lead to the successful implementation of the subway extension. The public consultation will be guided by the following principles: Inclusiveness...engage the widest possible audience through multiple consultation opportunities; Timeliness...offer early and ongoing opportunities for participation well before decisions are made; Transparency...participation will be widely communicated through multiple communications channels; Balance...provide opportunities for a diversity of perspectives and opinions to be raised and considered; Flexibility...adapt as required to meet the needs of participants; and Traceability...demonstrate the impact of participant input on decision making. 3. Public Consultation Plan A draft Public Consultation Plan will be developed to outline the engagement methods and approach that will be used in all phases of the SSEPA. The plan will be finalized after receiving input from the public during Phase 1. In each phase of the project, engagement will consist of four main communication approaches: The City will design a community engagement program that will work collaboratively with the community, local businesses, agencies and other affected stakeholders to seek input throughout the project assessment and the TPAP. While the proposed public consultation process follows a structured approach, it will also allow for flexibility in engaging stakeholders and encouraging dialogue with the public around key issues related to the project. information sharing; online consultation; live events; and community outreach. 1. Information Sharing The City will share information about the project throughout the study process. Regular updates will be shared through the project list, City social media accounts and print material such as project briefs. The project website will be regularly updated and will act as the hub for information 11

12 about the project. Key documents produced will also be made available through the project website. The Study Team will look to translate key documents when appropriate throughout the study.. Online Consultation The City will solicit comments and feedback on key decisions during each phase of the project through the website. Online consultation will be one of the primary foci of consultation because it has the ability to engage a large number of people from many different areas in a short period of time. 3. Live Events Open houses, public meetings, Stakeholder Advisory Group meetings and workshops will be held at various key points in the study for interested stakeholders and residents throughout the City to learn and provide their input into key decisions of the project. 4. Community Outreach The City will host community group meetings to proactively educate and solicit feedback from the community. Community outreach will focus on the local areas where the Scarborough Subway Extension will be located. 1

Relief Line Project Assessment

Relief Line Project Assessment Relief Line Project Assessment Public Information Centre April 5, 2017 Tonight s Meeting PURPOSE To review the preferred alignment for the Local Segment. AGENDA 6:30 Open House 7:00 Presentation / Discussion

More information

Coordinated Transit Planning in Toronto SmartTrack GO RER Scarborough Relief Line Waterfront Transit

Coordinated Transit Planning in Toronto SmartTrack GO RER Scarborough Relief Line Waterfront Transit Coordinated Transit Planning in Toronto SmartTrack GO RER Scarborough Relief Line Waterfront Transit Public Information Centres February 2016 Transportation Planning Section City Planning Division Toronto

More information

Niagara GO Hub and Transit Stations Study

Niagara GO Hub and Transit Stations Study Niagara GO Hub and Transit Stations Study Public Open House #2 June 2017 Study Purpose The purpose of this study is to prepare four key deliverables for each station area: 1. Work with Metrolinx to provide

More information

APPENDIX 6 TRANSIT NETWORK ANALYSIS

APPENDIX 6 TRANSIT NETWORK ANALYSIS APPENDIX 6 TRANSIT NETWORK ANALYSIS 1. COORDINATED TRANSIT PLANNING Transit in Toronto Toronto's transit system is critical to the functioning of the Toronto city region. With the Toronto region population

More information

SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies

SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies Page 1 of Report PB-81-17 SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies TO: FROM: Committee of the Whole Planning and Building Department Report Number: PB-81-17

More information

Finch Avenue West and Sheppard Avenue East Corridors - Planning Study Approach. Planning and Growth Management Committee

Finch Avenue West and Sheppard Avenue East Corridors - Planning Study Approach. Planning and Growth Management Committee PG8.9 STAFF REPORT ACTION REQUIRED Finch Avenue West and Sheppard Avenue East Corridors - Planning Study Approach Date: October 13, 2015 To: From: Planning and Growth Management Committee Chief Planner

More information

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED 9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO. 631 - BOCA EAST INVESTMENTS LIMITED The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016 Item 11, Report No. 38, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on November 15, 2016. Regional Councillor Di Biase declared an interest

More information

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

1.0 Purpose of a Secondary Plan for the Masonville Transit Village Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village

More information

Relief Line Project Assessment

Relief Line Project Assessment 6/9/2015 Relief Line Project Assessment Stakeholder Advisory Meeting #2 June 9, 2015 Meeting Purpose Report on the Evaluation Results for Potential Station Locations Seek your Input on Potential Corridors

More information

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Welcome. Walk Around. Talk to Us. Write Down Your Comments Welcome This is an information meeting introducing the applications for proposed redevelopment of the Yorkdale Shopping Centre site at 3401 Dufferin Street and 1 Yorkdale Road over the next 20+ years,

More information

Eglinton West LRT Update

Eglinton West LRT Update Eglinton West LRT Update Community Consultation Update May 16, 2016 Background Rapid transit along Eglinton Ave between Kennedy Station and Pearson Airport was included in the Metrolinx Regional Transportation

More information

Agincourt Mall Planning Framework Review Status Report

Agincourt Mall Planning Framework Review Status Report STAFF REPORT ACTION REQUIRED Agincourt Mall Planning Framework Review Status Report Date: May 16, 2018 To: From: Scarborough Community Council Director, Community Planning, Scarborough District Wards:

More information

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1 ~!VAUGHAN NOV Z 5 2016 November 21, 2016 Mr. Denis Kelly, Regional Clerk The Regional Municipality of York 17250 Yonge Street Newmarket, ON L3Y 6Z1 Dear Mr. Kelly: RE: NEW KIRBY GO STATION IN BLOCK 27

More information

MOBILITY HUB GUIDELINES 2012 TAC Sustainable Urban Transportation Award Submission BACKGROUND MOBILITY HUB GUIDELINES

MOBILITY HUB GUIDELINES 2012 TAC Sustainable Urban Transportation Award Submission BACKGROUND MOBILITY HUB GUIDELINES MOBILITY HUB GUIDELINES 2012 TAC Sustainable Urban Transportation Award Submission BACKGROUND Rapid population growth, increasing congestion, and years of under investment in transit in the Greater Toronto

More information

3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE

3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE 3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the adoption of the recommendations

More information

Subject: Transit Planning in Toronto: roles, priorities and our decision making framework

Subject: Transit Planning in Toronto: roles, priorities and our decision making framework INFORMATION ONLY Subject: Transit Planning in Toronto: roles, priorities and our decision making framework Date: July 29, 2015 At the TTC Board meeting on July 29, 2015, Jennifer Keesmaat, Chief Planner,

More information

Official Plan Amendment for Scarborough Rapid Transit (SRT) Extension Final Report

Official Plan Amendment for Scarborough Rapid Transit (SRT) Extension Final Report STAFF REPORT ACTION REQUIRED Official Plan Amendment for Scarborough Rapid Transit (SRT) Extension Final Report Date: April 27, 2010 To: From: Wards: Reference Number: Planning and Growth Management Committee

More information

Employment and Commercial Review Analysis of Policy Directions

Employment and Commercial Review Analysis of Policy Directions Employment and Commercial Review Analysis of Policy Directions Appendix A The following analysis is town staff s response to the policy directions provided by the consultants who prepared the Employment

More information

GO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018

GO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018 GO Station Mobility Hubs: Draft Precinct Plans Committee of the Whole July 12, 2018 Purpose of this Workshop Present Draft Precinct Plans for the 3 GO Station Mobility Hubs Continue the conversations that

More information

SCARBOROUGH RAPID TRANSIT ENVIRONMENTAL PROJECT REPORT CHAPTER 2 PROJECT DESCRIPTION. Table 2-4: North Segment Alignment Analysis 2-21

SCARBOROUGH RAPID TRANSIT ENVIRONMENTAL PROJECT REPORT CHAPTER 2 PROJECT DESCRIPTION. Table 2-4: North Segment Alignment Analysis 2-21 Table 2-4: North Segment Alignment Analysis 2-21 SCARBOROUGH RAPID TRANSIT Based on the above analysis (detailed analysis is contained in Appendix A-4), North Alignment 3 is preferred because it: Has the

More information

Transit-supportive development and city-building

Transit-supportive development and city-building Photo: Michael Hiemstra (CC BY 2.0) Transit-supportive development and city-building Brief 3: Tools for building infrastructure and policy conditions Building the policy and infrastructure conditions Municipalities

More information

Scarborough Centre Transportation Master Plan Final Report

Scarborough Centre Transportation Master Plan Final Report REPORT FOR ACTION Scarborough Centre Transportation Master Plan Final Report Date: April 11, 2018 To: Scarborough Community Council From: Director Transit and Transportation Planning and Director Community

More information

Relief Line Project Assessment

Relief Line Project Assessment Relief Line Project Assessment Stakeholder Advisory Meeting #4 May 30, 2016 Tonight s Meeting PURPOSE To present and discuss: Results of the evaluation of potential alignments Emerging preferred alignment

More information

Official Plan Review: Draft Built Form Policies

Official Plan Review: Draft Built Form Policies PG.30.1 REPORT FOR ACTION Official Plan Review: Draft Built Form Policies Date: May 15, 2018 To: Planning and Growth Management Committee From: Chief Planner and Executive Director, City Planning Division

More information

1.3 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community planning

1.3 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community planning TRANSIT VISION 2040 FROM VISION TO ACTION TRANSIT VISION 2040 defines a future in which public transit maximizes its contribution to quality of life with benefits that support a vibrant and equitable society,

More information

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference Report to Planning and Environment Committee To: From: Subject: Chair and Members Planning & Environment Committee John M. Fleming Managing Director, Planning and City Planner Old East Village Dundas Street

More information

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008 Atlanta BeltLine Corridor Environmental Study Scoping Meeting August 2008 What Will We Be Discussing Today? Study Overview - How Did We Get Here? - What Is the Study About? - Who Is Involved? - Where Is

More information

Edward R. Sajecki Commissioner of Planning and Building

Edward R. Sajecki Commissioner of Planning and Building Corporate Report Clerk s Files Originator s Files CD.04.HUR DATE: TO: FROM: Chair and Members of Planning and Development Committee Meeting Date: April 14, 2014 Edward R. Sajecki Commissioner of Planning

More information

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018 Public Open House Overview of the Downtown Plan Official Plan Amendment April 23, 2018 1 A 25-Year Plan for Downtown To ensure growth contributes positively to Toronto s Downtown as a great place to live,

More information

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting Page 1 of Report PB-76-17 SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO TO: FROM: Planning and Development Committee - Public Meeting Planning and Building

More information

Eglinton Avenue East & 50 Thermos Road - Official Plan Amendment Application Preliminary Report

Eglinton Avenue East & 50 Thermos Road - Official Plan Amendment Application Preliminary Report STAFF REPORT ACTION REQUIRED 1966 2050 Eglinton Avenue East & 50 Thermos Road - Official Plan Amendment Application Preliminary Report Date: March 15, 2016 To: From: Wards: Reference Number: Scarborough

More information

PART 1. Background to the Study. Avenue Study. The Danforth

PART 1. Background to the Study. Avenue Study. The Danforth The Danforth 1.1/ Study Purpose & Key Municipal Goals 1.2/ The Local Advisory Committee 1.3/ The Project Team 1.4/ Study Process/Summary of Method 1.5/ Summary of Consultation 1.1 Study Purpose and Key

More information

Elfrida Growth Area Study

Elfrida Growth Area Study Elfrida Growth Area Study Public Information Centre #2 December 6, 2017 6:00-8:30 pm PLANNING & ECONOMIC DEVELOPMENT DEPARTMENT Purpose of the Study The Elfrida Area has been identified as the preferred

More information

NEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK

NEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK NEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK Why A New Official Plan Originally the role of Regionally Planning and content of Regional Official Plan (1970s) primarily focused on protecting

More information

Trafalgar Road Corridor Planning Study Open House

Trafalgar Road Corridor Planning Study Open House Trafalgar Road Corridor Planning Study Open House June 24, 2013 6:30-8:30 p.m. Oakville & Trafalgar Rooms Overview The Livable Oakville Plan identifies the lands along Trafalgar Road, between the QEW and

More information

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement: CORPORATE REPORT NO: R038 COUNCIL DATE: February 20, 2017 REGULAR COUNCIL TO: Mayor & Council DATE: February 16, 2017 FROM: General Manager, Engineering FILE: 8740-01 SUBJECT: Surrey Light Rail Transit

More information

WELCOME and introduction

WELCOME and introduction 1 WELCOME and introduction Mobility Hub Locations within Burlington STUDY OVERVIEW STUDY OBJECTIVES The City of Burlington is developing four Area Specific Plans, one for each of Burlington s Mobility

More information

Port Credit Local Advisory Panel October 20 th Meeting

Port Credit Local Advisory Panel October 20 th Meeting Port Credit Local Advisory Panel October 20 th Meeting Focus Of This Evening s Meeting: 1. Hurontario Main Street Higher Order Transit Study 2. Port Credit Mobility Hub & GO Station Parking Structure Study

More information

Bloor St. W. Rezoning - Preliminary Report

Bloor St. W. Rezoning - Preliminary Report STAFF REPORT ACTION REQUIRED 1638-1644 Bloor St. W. Rezoning - Preliminary Report Date: April 1, 2008 To: From: Wards: Reference Number: Toronto and East York Community Council Acting Director, Community

More information

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN 5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN The Planning and Economic Development Committee recommends the following: 1. The communication from Brendan O Callaghan,

More information

1 Introduction. Chapter. In this chapter:

1 Introduction. Chapter. In this chapter: Chapter 1 Introduction In this chapter: 1.1 A Snapshot of the Region 1.2 Towards a Sustainable Region 1.3 The Provincial Context 1.4 Purpose and Organization The Regional Municipality of York Official

More information

WELCOME. The Yonge-Eglinton area has experienced significant growth and change in the last decade.

WELCOME. The Yonge-Eglinton area has experienced significant growth and change in the last decade. WELCOME DID YOU KNOW? MIDTOWN IS REPRESENTED BY 3 CITY COUNCILLORS: WARD 16 EGLINTON-LAWRENCE WARD 22 ST. PAUL S WARD 25 DON VALLEY WEST Midtown in Focus: Building a Livable Yonge-Eglinton The Yonge-Eglinton

More information

Figure 1- Site Plan Concept

Figure 1- Site Plan Concept Figure 1- Site Plan Concept Parking will be provided underground on three levels at rate of 1.0 space/ unit; this rate includes all visitors parking. MMM Group has prepared a parking assessment (April,

More information

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

Town of Cobourg Heritage Master Plan. Statutory Public Meeting Town of Cobourg Heritage Master Plan Statutory Public Meeting April 25 th 2016 Presentation Overview 1. Introduction 2. Project background and schedule overview 3. Review of strategic direction content

More information

CONTENTS 2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH 2.1 MANAGING SUSTAINABLE GROWTH THE VISION TO GOALS AND OBJECTIVES 2.3 MARKHAM STRUCTURE

CONTENTS 2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH 2.1 MANAGING SUSTAINABLE GROWTH THE VISION TO GOALS AND OBJECTIVES 2.3 MARKHAM STRUCTURE 2 A Framework for Sustainable Growth 2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS 2.1 MANAGING SUSTAINABLE GROWTH THE VISION TO 2031 2.2 GOALS AND OBJECTIVES 2.2.1 Protecting the Natural Environment

More information

PILLAR FOUR INTEGRATE LAND USE & TRANSPORTATION

PILLAR FOUR INTEGRATE LAND USE & TRANSPORTATION PILLAR FOUR INTEGRATE LAND USE & TRANSPORTATION 8 Scarborough Centre on the Move Transportation Master Plan 123 8 Transportation Pillar Four Integrate Land Use & The fourth pillar focuses on the relationship

More information

Planning Department. Director of Planning. Manager of Planning. Planning Technician/ Sustainability Coordinator. Planner II/ Heritage Coordinator

Planning Department. Director of Planning. Manager of Planning. Planning Technician/ Sustainability Coordinator. Planner II/ Heritage Coordinator Department Director of Manager of Policy Planner Planner II (2) Planner II/ Heritage Coordinator Technician/ Sustainability Coordinator Technician Administrative Clerk March 2017 Department 2018 Business

More information

Edward R. Sajecki Commissioner of Planning and Building

Edward R. Sajecki Commissioner of Planning and Building Corporate Report Clerk s Files Originator s Files CD.03.POR DATE: TO: FROM: SUBJECT: Chair and Members of Planning and Development Committee Meeting Date: February 27, 2012 Edward R. Sajecki Commissioner

More information

APPENDIX L3. Table of Contents. SWP EA Information Sheets

APPENDIX L3. Table of Contents. SWP EA Information Sheets E N V I R O N M E N T A L A S S E S S M E N T APPENDIX L3 SWP EA Information Sheets Table of Contents EA Info Sheet 1... L3-1 EA Info Sheet 2... L3-3 EA Info Sheet 3... L3-5 EA Info Sheet 4... L3-7 SCARBOROUGH

More information

GOLDEN MILE SECONDARY PLAN STUDY BACKGROUND REPORT. January 22, 2018

GOLDEN MILE SECONDARY PLAN STUDY BACKGROUND REPORT. January 22, 2018 GOLDEN MILE SECONDARY PLAN STUDY BACKGROUND REPORT January 22, 2018 GOLDEN MILE SECONDARY PLAN STUDY GOLDEN MILE SECONDARY PLAN STUDY BACKGROUND REPORT Version Control Version: Final Reviewed by: Jason

More information

Planning for the Future Urban Area. in north Markham. Update. Development Services Committee. December 9, De Development Services Committee

Planning for the Future Urban Area. in north Markham. Update. Development Services Committee. December 9, De Development Services Committee Planning for the in north Markham 1 Update De December 9, 2014 Overview - Growth Management Strategy and new Official Plan 2014 Status - Official Plan 2014 and ROPA3 Update - Planning for the Future Urban

More information

Local Growth Planning in North Central Green Line Communities

Local Growth Planning in North Central Green Line Communities 2018 April 30 Page 1 of 6 EXECUTIVE SUMMARY This report outlines a high-level scope for local growth planning for north central Green Line communities. The catalyst for this review is the significant investments

More information

South of Eastern Strategic Direction Status Update

South of Eastern Strategic Direction Status Update STAFF REPORT ACTION REQUIRED South of Eastern Strategic Direction Status Update Date: July 10, 2014 To: From: Planning and Growth Management Committee Chief Planner and Executive Director, City Planning

More information

1 Introduction. 1.1 Background and Project Rationale Chronology of Rapid Transit Planning for Downtown Toronto

1 Introduction. 1.1 Background and Project Rationale Chronology of Rapid Transit Planning for Downtown Toronto 1 Introduction Providing additional rapid transit capacity into and within the downtown Toronto area has long been an objective for the City of Toronto. Downtown Toronto is the economic, social, and cultural

More information

The Commissioner of Engineering and Public Works recommends that this report be received for information purposes.

The Commissioner of Engineering and Public Works recommends that this report be received for information purposes. COMMITTEE OF THE WHOLE FEBRUARY 1, 2011 407 TRANSITWAY - ENVIRONMENTAL PROJECT REPORT MINISTRY OF TRANSPORTATION CITY WIDE Recommendation The Commissioner of Engineering and Public Works recommends that

More information

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose: Page 1 of Report PB-23-18 SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building Report Number: PB-23-18 Wards Affected: 2 File Numbers:

More information

Shift Rapid Transit Public Participation Meeting May 3, 2017

Shift Rapid Transit Public Participation Meeting May 3, 2017 Shift Rapid Transit Public Participation Meeting May 3, 2017 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public

More information

SUBJECT: Revised proposed new official plan recommended for adoption

SUBJECT: Revised proposed new official plan recommended for adoption Page 1 of Report PB-04-18 SUBJECT: Revised proposed new official plan recommended for adoption TO: FROM: Planning and Development Committee Department of City Building Report Number: PB-04-18 Wards Affected:

More information

Official Plan Review

Official Plan Review Official Plan Review Summary Report - The Built Environment August 2014 Part 1: Introduction Planning for a healthy, prosperous and sustainable community is an important goal for our municipality. From

More information

38 Queen s University Campus Master Plan Part 1

38 Queen s University Campus Master Plan Part 1 38 Queen s University Campus Master Plan Part 1 46 The Campus at the City Scale Chapter 4 The Campus at the City Scale 39 Queen s is an urban University centrally located in Kingston. Decisions made by

More information

The Corporation of the Town of Milton

The Corporation of the Town of Milton Report To: From: Council Barbara Koopmans, Commissioner, Planning and Development Date: May 7, 2018 Report No: Subject: Making it Possible Positioning the Town s Strategy for Growth and Economic Development

More information

WITNESS STATEMENT Of. Ronald Blake. On behalf of the Intervenor The Corporation of the City of Markham

WITNESS STATEMENT Of. Ronald Blake. On behalf of the Intervenor The Corporation of the City of Markham Filed: 2013-06028 EB-2012-0451 Exhibit L.EGD.COM.2 Page 1 of 7 WITNESS STATEMENT Of Ronald Blake On behalf of the Intervenor The Corporation of the City of Markham In the matter of an application by Enbridge

More information

ONTARIO MUNICIPAL BOARD

ONTARIO MUNICIPAL BOARD PL 120483 ONTARIO MUNICIPAL BOARD Applicant/Appellant: 2124123 Ontario Limited Subject: OPA, Rezoning and Draft Plan of Subdivision Municipal Address: 3940 Highway 7 East Municipality: City of Markham

More information

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions Consultation Summary Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions This report is not intended to provide a verbatim transcript

More information

Mobility Hub Guidelines: Tools for Achieving Successful Station Areas

Mobility Hub Guidelines: Tools for Achieving Successful Station Areas Mobility Hub Guidelines: Tools for Achieving Successful Station Areas This paper introduces Metrolinx s recently released Mobility Hub Guidelines and highlights two key aspects of the document: the importance

More information

Sustainable Growth. Sustainable Growth

Sustainable Growth. Sustainable Growth 2 Sustainable Growth Sustainable Growth SUSTAINABLE GROWTH 2.1 COMMUNITY VISION... 2-5 2.2 THE CITY SYSTEM... 2-7 2.2.1 AREAS... 2-7 2.2.2 CITY-WIDE SYSTEMS... 2-8 2.2.3 PROVINCIAL PLAN BOUNDARIES AND

More information

MAYFIELD WEST SECONDARY PLAN PHASE 2

MAYFIELD WEST SECONDARY PLAN PHASE 2 MAYFIELD WEST SECONDARY PLAN PHASE 2 Council Information Workshop February 16, 2010 Draft Preferred Land Use Plan TOWN OF CALEDON PLANNING & DEVELOPMENT DEPARTMENT Workshop Agenda TOWN OF CALEDON 1. Welcome

More information

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd. PART A: PREAMBLE 1.0 PURPOSE The purpose of this Secondary Plan is to provide a development framework for intensification of the Yonge/ Steeles corridor including the north side of Steeles Avenue West

More information

2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS

2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS 2-2 A Framework for Sustainable Growth 2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS 2.1 MANAGING SUSTAINABLE GROWTH THE VISION TO 2031 2.2 GOALS AND OBJECTIVES 2.2.1 Protecting the Natural Environment

More information

Town of Oakville Streetscape Strategy

Town of Oakville Streetscape Strategy Town of Oakville Streetscape Strategy Endorsed by PDC on February 10, 2014 (PD-011-14) Town of Oakville Streetscape Strategy [endorsed by PDC February 10, 2014] 0 Town of Oakville Streetscape Strategy

More information

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN Page 1 1. INTRODUCTION AND BACKGROUND 1.1 THE PROJECT VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN TERMS OF REFERENCE The Town of Caledon (Town) is a large, predominantly rural municipality with

More information

Emery Village Road 2A Municipal Class Environmental Assessment Study

Emery Village Road 2A Municipal Class Environmental Assessment Study PW12.11 STAFF REPORT ACTION REQUIRED Emery Village Road 2A Municipal Class Environmental Assessment Study Date: March 30, 2016 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY 1. Introduction WORK PROGRAM The Town of Caledon is a large, local municipality located in the Greater Toronto

More information

AGINCOURT SECONDARY PLAN

AGINCOURT SECONDARY PLAN 1 AGINCOURT SECONDARY PLAN 1. AGINCOURT SECONDARY PLAN The following policies and principles apply to the area herein referred to as Agincourt, as outlined on Map 1-1. 1. GENERAL POLICIES 1.1 This Secondary

More information

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN Tuesday, February 28, 2012 6pm 9pm 1 st Floor Atrium, City Hall 2 Wellington Street West, Brampton 1 POLICY FRAMEWORK The 2006 Provincial Growth

More information

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 The Planning and Economic Development Committee recommends the adoption of the recommendations contained

More information

Public Open House. YWCA, 87 Elm Street December 2nd, 2017, 10 a.m. 2 p.m.

Public Open House. YWCA, 87 Elm Street December 2nd, 2017, 10 a.m. 2 p.m. Public Open House YWCA, 87 Elm Street December 2nd, 2017, 10 a.m. 2 p.m. 1 A 25-Year Downtown Plan A blueprint for future growth and infrastructure in the heart of Toronto Ensuring growth contributes positively

More information

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JULY 17, 2017

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JULY 17, 2017 TO: FROM: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JULY 17, 2017 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES AND CITY ENGINEER SUBJECT: HIGH SPEED RAIL

More information

Welcome to the Oakridge Centre Open House

Welcome to the Oakridge Centre Open House Welcome to the Oakridge Centre Open House Why is the City hosting this event? This open house is to inform you of a rezoning application submitted to the City of Vancouver to amend the existing CD-1 (Comprehensive

More information

Rail Deck Park - City-initiated Official Plan Amendment Final Report

Rail Deck Park - City-initiated Official Plan Amendment Final Report STAFF REPORT ACTION REQUIRED Rail Deck Park - City-initiated Official Plan Amendment Final Report Date: October 30, 2017 To: From: Wards: Reference Number: Toronto and East York Community Council Acting

More information

CITY COUNCIL AGENDA REPORT

CITY COUNCIL AGENDA REPORT CITY COUNCIL AGENDA REPORT Subject: COUNCIL MOTION LRT ALIGNMENT REMOVAL FROM THE TRANSPORTATION MASTER PLAN On February 10, 2016 Councillor Hughes provided notice in accordance with Section 23 of Procedure

More information

Report to: Development Services Committee Report Date: September 11, 2017

Report to: Development Services Committee Report Date: September 11, 2017 ~RKHAM Report to: Development Services Committee Report Date: September 11, 2017 SUBJECT: PREPARED BY: Conceptual Master Plan for the Future Urban Area - Community Structure Plan and Key Policy Direction

More information

3 TOWN OF WHITCHURCH-STOUFFVILLE OFFICIAL PLAN AMENDMENT NOS. 116 & 117

3 TOWN OF WHITCHURCH-STOUFFVILLE OFFICIAL PLAN AMENDMENT NOS. 116 & 117 3 TOWN OF WHITCHURCH-STOUFFVILLE OFFICIAL PLAN AMENDMENT NOS. 116 & 117 The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following report,

More information

Plan Overview. Manhattan Area 2035 Reflections and Progress. Chapter 1: Introduction. Background

Plan Overview. Manhattan Area 2035 Reflections and Progress. Chapter 1: Introduction. Background Plan Overview The Manhattan Urban Area Comprehensive Plan (the Comprehensive Plan) is a joint planning initiative of the City of Manhattan, Pottawatomie County, and Riley County. The 2014 Comprehensive

More information

planning toronto s downtown Parks and Public Realm Plan Request for Proposals Information Meeting Andrew Farncombe, Project Manager August 19, 2015

planning toronto s downtown Parks and Public Realm Plan Request for Proposals Information Meeting Andrew Farncombe, Project Manager August 19, 2015 planning toronto s downtown Parks and Public Realm Plan Request for Proposals Information Meeting Andrew Farncombe, Project Manager August 19, 2015 BATHURST ST Keeping Downtown a great place to live, work,

More information

Streets for People, Place-Making and Prosperity. #TOcompletestreets

Streets for People, Place-Making and Prosperity.  #TOcompletestreets COMPLETE STREETS FOR TORONTO Streets for People, Place-Making and Prosperity COMPLETE STREETS: A NEW APPROACH A Complete Streets design approach considers the needs of all users people who walk, bicycle,

More information

6 Growth Management Challenges and Opportunities

6 Growth Management Challenges and Opportunities 6 Growth Management Challenges and Opportunities The Town has established a goal of attaining a 50% participation rate with respect to employment opportunities versus residential population. The Town s

More information

Hurontario/Main Street Corridor Master Plan Mississauga and Brampton Building a new and integrated vision for the corridor

Hurontario/Main Street Corridor Master Plan Mississauga and Brampton Building a new and integrated vision for the corridor Hurontario/Main Street Corridor Master Plan Mississauga and Brampton Building a new and integrated vision for the corridor Martin Powell, Commissioner of Transportation and Works, City of Mississauga Paper

More information

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas 111111 PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction The ION rapid transit system will link Waterloo, Kitchener and Cambridge through a central transit corridor (CTC). There are a number

More information

Planning for a Strong and Diverse Economy: Official Plan/Municipal Comprehensive Reviews - Draft Policies and Designations for Employment

Planning for a Strong and Diverse Economy: Official Plan/Municipal Comprehensive Reviews - Draft Policies and Designations for Employment STAFF REPORT ACTION REQUIRED Planning for a Strong and Diverse Economy: Official Plan/Municipal Comprehensive Reviews - Draft Policies and Designations for Employment Date: October 23, 2012 To: From: Wards:

More information

MAYFIELD WEST SECONDARY PLAN PHASE 2

MAYFIELD WEST SECONDARY PLAN PHASE 2 MAYFIELD WEST SECONDARY PLAN PHASE 2 Public Open House #3 February 25, 2010 Draft Preferred Land Use Scenario TOWN OF CALEDON PLANNING & DEVELOPMENT DEPARTMENT Open House Agenda TOWN OF CALEDON 1. Welcome

More information

The West Vaughan Employment Area Secondary Plan Policies

The West Vaughan Employment Area Secondary Plan Policies Part 2: The West Vaughan Employment Area Secondary Plan Policies 2.1 General Policies It is the policy of Council: 2.1.1. That the West Vaughan Employment Area (the WVEA), identified on Schedule 1, will

More information

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014 [PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue May 23, 2014 Contents 1.0 Introduction... 2 2.0 Site Context... 2 2.1 Adjacent Uses... 2 Figure 1: Site

More information

Rapid Transit Implementation Working Group September 14, 2017

Rapid Transit Implementation Working Group September 14, 2017 Rapid Transit Implementation Working Group September 14, 2017 BACKGROUND Council approved the Rapid Transit Master Plan and Updated Business Case on July 25, 2017. Approval of the RTMP confirmed the BRT

More information

UTSC SECONDARY PLAN COMMUNITY OPEN HOUSE

UTSC SECONDARY PLAN COMMUNITY OPEN HOUSE WELCOME TO THE UTSC SECONDARY PLAN COMMUNITY OPEN HOUSE 1 Welcome to the first Community Open House for the UTSC Secondary Plan. Hosted by the University of Toronto Scarborough (UTSC), the following panels

More information

THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER A By-law to adopt Amendment Number 1 to the Official Plan of the Vaughan Planning Area.

THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER A By-law to adopt Amendment Number 1 to the Official Plan of the Vaughan Planning Area. THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER 015-2014 A By-law to adopt Amendment Number 1 to the Official Plan of the Vaughan Planning Area. NOW THEREFORE the Council of the Corporation of the City of Vaughan

More information

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE Adopted April 16, 2016 Amended July 19, 2016 Overview of Integrated Effort The overall goal of the Four Mile Run Valley (4MRV) initiative is to develop a comprehensive

More information

2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS

2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS 2-2 A Framework for Sustainable Growth 2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS 2.1 MANAGING SUSTAINABLE GROWTH THE VISION TO 2031 2.2 GOALS AND OBJECTIVES 2.2.1 Protecting the Natural Environment

More information

TOcore: Downtown Plan Official Plan Amendment

TOcore: Downtown Plan Official Plan Amendment PG29.4 REPORT FOR ACTION TOcore: Downtown Plan Official Plan Amendment Date: April 17, 2018 To: Planning and Growth Management Committee From: Chief Planner and Executive Director, City Planning Wards:

More information