1 Green-Sea Attendance Area

2 Green Sea Floyds Elementary Asset Summary and History Report Hierarchy Green Sea Floyds Elementary Inspection Date N/A Asset 23 Green Sea Floyds Elementary Deficiencies Count 9 Category Code Dependent School Sum of Deficiency Costs $1,780,924 Asset Size 86, sq. ft FCI PRV $15,402,713 FCI (100-1) 89.5 Year Built 1991 Asset Summary With an FCI of 89.5 this facility is considered FAIR where system components serviceability or reliability is degraded but adequate. Very few major (critical) subcomponents may suffer from moderate deterioration with perhaps a few minor (non-critical) subcomponents with suffer from sever deterioration. Sustainment or restoration consists of minor repairs to several subcomponents, significant repair or replacement of one or more subcomponents, but not enough to encompass the total system as a whole. 168 Asset History Green Sea Floyds Elementary serves as a model school for at least one other elementary school in the county. The school was constructed in It features CMU construction with exterior brick veneer. Unspecified building renovations were performed in Forecasting FCI FORECAST TABLE YEAR DEFMNT FOREPRV ANNUALINVEST REMDEFMNT FORECAST FCI 2013 $1,596,609 $15,402,713 $0 $ 1,596, $0 $15,941,808 $0 $1,596, $0 $16,499,771 $0 $1,596, $398,570 $17,077,263 $0 $1,995, $176,135 $17,674,967 $0 $2,171, $264,979 $18,293,591 $0 $2,436, $52,581 $18,933,867 $0 $2,488, $31,082 $19,596,552 $0 $2,519, $497,127 $20,282,432 $0 $3,017, $176,135 $20,992,317 $0 $3,193,

3 Horry County Public Schools Educational Adequacy Assessment Green Sea Floyds Elementary (1991) 5000 Tulip Grove Road Green Sea, South Carolina Green Sea Floyds attendance zone date visited / assessers : October 9, 2012 Bill Bradley Ginny Webb B General assessment : Green Sea Floyds is the first of the Conway, Burgess, Kingston elementary school prototype. It is typical of the "factory" model with classrooms aligned on either side of double-loaded corridors. In general the facility is adequate - the principal noted that the school was generally liked - but flexibility is limited and some programs are housed in spaces designed for other uses. Hallways are long and (because they lack differentiation) disorienting. The canopy in front was deemed too small by the principal. 169 Supporting observations : As with most schools, the "punched openings" and classroom wing orientation combine to create glare conditions as evidenced by the drawn blinds visible in most windows. Occupants are therefore required to rely on more costly (and less effective) artifical lighting. Teachers in some classrooms are required to run noisy dehumidifers to address humidty extremes. Because the canopy is small students are forced into the weather on rainy or inclement days. Entrance lacks a security vestibule. Recommendations : 1. install exterior light shelves and interior light tubes 2. install a security vestibule 3. paint "theme" hallways 4. increase size of canopies 5. address humidy issues hallway(s) at Green Sea Floyds Elementary School 2012

4 Horry County Schools Facility Condition Assessment School Name: Green Sea Floyds Elementary (K-5) UWPD ARCHITECTURE, INC./CHA SPORTS Green Sea Floyds Elementary has limited, but good condition multicomponent play equipment. The site has generous outdoor space with a 4-lane asphalt walking track, a multipurpose field within it, and three separate play areas with minimal shade. A large asphalt basketball court is in poor condition; the fire lane is gravel and does not encompass the building. At the time of this report, plans were being made for improvements to the playgrounds, drainage, and asphalt areas. The general assessment for this school is considered to be in fair condition. Multipurpose Field Condition: Size 120' X 260' Grass Type/Condition Centipede (Good condition) Proper Grading Good Irrigation / Well ne Child Development/Kindergarten Playground Equipment Condition: Four Individual Spring Riders (2) Tunnel Slide Loop Climber Crawl Tunnel Elbow Slide Double Wide Fiberglass Slide Arched Chain Climber Tic-Tac-Toe Panel Below Deck Village Seat Panel Ladder Panel Village Counter Panel Safety Panel w/wheel Above; Mirror Panel Below Wheel only Transfer Station Wheelchair Turning Area Chips 12" Min Depth (ASTM) ADA Access Entry Ramp ( walkway to it) Plastic Border Timbers 3'x3'x2" Wear Mats at Slides 40'x70' Covered Conc. Play Area 170 Comments backstop 120' x 260' track grassed area Comments CMU condition Pictures:

5 Primary Playground Equipment (1-2) Condition: Grades 1+2 Comments Swings (8) std swings Beam Run Stretch Pole Vertical Ladder Balance Beam Challenge Ladder Spring-up Bars Parallel Bars (rails on step stones) Jump Touch Beam Pull-Up Bars Sit-up Bench Spiral Slide ( + 2 straight slides) Arch Climber Bubble Panel Snake Pole Faces Panel Transfer Station Wheelchair Turning Area Double Wide Plastic Slide Chips 12" Min Depth (ASTM) ADA Access Entry Ramp Plastic Border Timbers / Wear mats at slides ( walk to it) / mats Elementary Playground Equipment (3-5) Condition: Comments Swings (8) std swings Beam Run Stretch Pole Vertical Ladder (vertical climber) Balance Beam Sit-up Bench Challenge Ladder Spring-up Bars Parallel Bars (Double rails on step stones) Jump Touch Beam Pull-Up Bars See Saw Snake set) Track Ride Double Ring Trek (1) asphalt basketball court 100' x 100' Turning Bar Poor condition Log Roll Painted for basketball - faded Chinning Bar (4) double steel poles with backboard + rims - no nets Trapeze Ladder Chips 12" Min Depth (ASTM) ADA Access Entry Ramp Plastic Border Timbers 3'x3'x2" Wear Mats at Slides swings 171

6 VEHICULAR PAVEMENT ASSESSMENT Green Sea Floyds Elementary School Edge deterioration. Area of asphalt to be removed. Short Term Recommendations: 1. Bus Drop Off: Area outlined in aerial should be removed and replaced. Edge of asphalt that is deteriorating should be resurfaced with a wider radius. Long Term Recommendations: 2. Asphalt surfaces should be sealed every three (3) years. 172 Landscaping & Irrigation: There is no irrigation at the front of the school and the overall condition of the landscaping is good. FEBRUARY 2013

7 VEHICULAR PAVEMENT ASSESSMENT Green Sea Floyds Elementary School Overall Condition of Pavement Condition of Surface Markings Identification of Pavement Deficiencies in Pictures Below Surface: Good Fair Poor Surface: Good Fair Poor Surface: Rutting Entrance Road x Entrance Road x Entrance Road Driveway Aprons x Driveway Aprons x Driveway Aprons Faculty Parking x Faculty Parking x Faculty Parking x Parent Drop Off x Parent Drop Off x Parent Drop Off Bus Drop Off x Bus Drop Off x Bus Drop Off x x x Loading Dock x Loading Dock Loading Dock Improper Patching Failures/ Potholes Raveling Longitudinal Transverse Fatique Comments 173 FEBRUARY 2013

8 Green Sea Floyds High Asset Summary and History Report Hierarchy Green Sea Floyds High Inspection Date N/A Asset 6 Green Sea Floyds High Deficiencies Count 6 Category Code Dependent School Sum of Deficiency Costs $5,912,523 Asset Size 202, sq. ft FCI PRV $36,028,735 FCI (100-1) 79.3 Year Built 1988 Asset Summary With an FCE of 79.3 this facility is considered SEVERE where system components have severe serviceability or reliability reduction such that it is barely able to perform. Most subcomponents are severely degraded. Sustainment or restoration is required consisting of major repair, rehabilitation, or replacement to the system as a whole. 174 Asset History Green Sea Floyds High is a model school for several other high schools in the county. The school was constructed in It features CMU construction with exterior brick veneer. A second gymnasium was added in 2007 which serves both the middle and high schools. Forecasting FCI FORECAST TABLE YEAR DEFMNT FOREPRV ANNUALINVEST REMDEFMNT FORECAST FCI 2013 $7,454,410 $36,028,735 $0 $ 7,454, $0 $37,289,741 $0 $7,454, $0 $38,594,882 $0 $7,454, $454,630 $39,945,703 $0 $7,909, $0 $41,343,802 $0 $7,909, $385,851 $42,790,835 $0 $8,294, $622,447 $44,288,514 $0 $8,917, $0 $45,838,612 $0 $8,917, $454,630 $47,442,964 $0 $9,371, $3,924,285 $49,103,468 $0 $13,296,

9 Horry County Public Schools Educational Adequacy Assessment Green Sea Floyds Middle / High (88) 4990 Tulip Grove Road Green Sea, South Carolina Green Sea Floyds attendance zone date visited / assessers : October 9, 2012 Bill Bradley Ginny Webb B General assessment : Green Sea Floyds Middle and High School facility serves two distinct populations - middle schoolers and high schoolers. Economies of scale are realized through shared resources, but unlike other middle schools in the District this facility does not support the middle school concept per se. The facility is a variation on the Loris High School prototype and follows the "factory" model. Flexibility is therefore limited. Because of the sheer size of the building and the combined program, wayfinding is not intuitive. 175 Supporting observations : The classroom plan in this facility is akin to a departmentalized junior high school concept. This is in contrast to elsewhere in the District where the middle school concept calls for the cultivation of small communities of learners in cohorts grouped within grade-level houses. In general, there is insufficient natural lighting within the interior of the building, which adds to wayfinding issues. Addressing "poor bus and parking circulation" was deemed a priority. Recommendations : 1. remove portable classrooms 2. install light tubes to bring lighting into interior 3. consider renovating the middle school portion to be consistent with the middle school concept Green Sea Floyds Middle / High cafeteria 2012

10 Horry County Schools Facility Condition Assessment School Name: Green Sea Floyds High / Middle School UWPD ARCHITECTURE / CHA SPORTS Class: A Green Sea Floyds High School / Middle School facility is grouped together for this assessment because outdoor athletic facilities are in a common area. The facility is considered to be in overall poor to fair condition, primarily due to practice facility needs and the absence of many track and field events. The stadium field was scheduled to be reconstructed at this writing to improve drainage and playability. Baseball and softball have no pressboxes and seating is needed in many locations. Accessibility from parking to seating including walkways are also needed as is a proper middle school multipurpose field and outdoor court areas. Pictures: Practice Fields - (1) Multi Purpose / (1) Middle School Field Comments Fencing ne Grading / Drainage Fair Irrigation ne located Seating ne Baseball Practice infield ne Stadium Field Fencing 4' and 6'; good condition Grading / Drainage Flat w/ no crown; poor drainage w/ ponding at end zones Irrigation Fair condition; full coverage Lighting/Electrical Lighted / new scoreboards w/ play clocks being installed at time of visit Goal Posts n removable Press Box 8'-4" x 24' Rest Rooms/Concessions New restrooms/concession 2012; shared w/ baseball and softball also Seating 1200 / 600; needs accessibility improvements from parking and visitor's Field House New fieldhouse in 2011 Baseball Facility Fencing Backstop 30' w/ 20' sides; 6' perimeter Dugouts 10' x 30' w/ 10' storage at each Grading / Drainage Fair to poor drainage; Irrigation Good condition Lighting/Electrical Lighted field; Old bulb-type scoreboard Batting cage/bullpens covered cage, netting only; 3 bullpens Press Box ne Rest Rooms/Concessions New in 2011; shared with softball and football Seating 200; does not meet current code Softball Facility Fencing Backstop 20' w/ 15' sides; 6' perimeter Dugouts 10' x 30' w/ 10' storage at each Grading / Drainage Fair to poor throughout Irrigation Good condition Lighting/Electrical Musco lighting; old bulb type scoreboard Press Box ne Rest Rooms/Concessions New in 2011; shared with baseball and football Seating 200; poor condition; do not meet current code 176 protective fencing on roof water (overgrown and in disrepair)

11 Tennis Facility Court # / Condition Fencing Lighting/Electrical Seating 4 courts; Good condition, recently resurfaced 10'; fair condition, minor repairs needed 8 poles, 2 lights each, good condition 150; old, do not meet current code Track and Field Facility Track Jump Events Throw Events Fencing Grading/Drainage Seating 8 lanes; fair condition; needs restriping 1 inboard runway w/ overgrown sand pit; 1 inboard high jump ne located (Same as stadium) Good; only minor wate stains observed, mostly due to grass buildup (Same as stadium) 177

12 VEHICULAR PAVEMENT ASSESSMENT Green Sea Floyds Middle School Short Term Recommendations: 1. Bus Drop Off The entire bus loop should be milled and resurfaced with a wider radius. 2. Cut through Road This road should be paved to prevent further edge deterioration of the intersecting paved roads. Long Term Recommendations: 5. Asphalt surfaces should be sealed every three (3) years. Pothole. Landscaping & Irrigation: There is no irrigation at the front of the school and the overall condition of the landscaping is fair. Severe edge deterioration. 178 Unpaved cut through road. Improper patching and cracking. See Figures 1,2 and 3. Pothole. Improper patching and cracking. See Figures 1,2 and 3. FEBRUARY 2013

13 VEHICULAR PAVEMENT ASSESSMENT Green Sea Floyds Middle School 179 Overall Condition of Pavement Condition of Surface Markings Identification of Pavement Deficiencies in Pictures Below Improper Patching Failures/ Potholes Longitudinal Surface: Good Fair Poor Surface: Good Fair Poor Surface: Rutting Raveling Entrance Road x Entrance Road x Entrance Road Driveway Aprons x Driveway Aprons x Driveway Aprons x Faculty Parking x Faculty Parking x Faculty Parking Bus Drop Off x Bus Drop Off x Bus Drop Off x x x x x Transverse Fatigue Comments FEBRUARY 2013

14 VEHICULAR PAVEMENT ASSESSMENT Green Sea Floyds High School Short Term Recommendations: 1. Mobile unit parking: Asphalt should be milled to depth of cracking, leveled to eliminate ponding and resurfaced. Student Parking: Longitudinal cracking along centerline, both lanes. Visitor Loop: Fair condition, raveling and cracking at inside edge of asphalt. Poor cut and patch for pipe crossing. 180 Landscaping/ Irrigation: There is no irrigation at this site and the condition of landscaping is good. Bus Parking: Area of improper patching. Entrance road: Good condition except two areas of improper patching. Parking for mobile units: Severe deterioration of asphalt, potholes and ponding. FEBRUARY 2013 Long Term Recommendations: 2. Entrance/ Driveway There are two areas of improper patching on Jay Road. These two areas do not currently affect the structural integrity of the road but will need to be resurfaced in the future. 3. Student Parking: The entire lot has transverse and longitudinal cracking that should be milled and resurfaced in the future. 4. Bus Parking: Mill and resurface area of improper patching. 5. Asphalt surfaces should be sealed every three (3) years.

15 VEHICULAR PAVEMENT ASSESSMENT Green Sea Floyds High School Overall Condition of Pavement Condition of Surface Markings Identification of Pavement Deficiencies in Pictures Below Surface: Good Fair Poor Surface: Good Fair Poor Surface: Rutting Improper Patching Failures/ Potholes Raveling Longitudinal Transverse Fatique Entrance Road x Entrance Road x Entrance Road x Driveway Aprons x Driveway Aprons x Driveway Aprons x Faculty Parking x Faculty Parking x Faculty Parking Student Parking x Student Parking x Student Parking x x Bus Parking x Bus Parking x Bus Parking x Parent Drop Off x Parent Drop Off x Parent Drop Off x Bus Drop Off x Bus Drop Off x Bus Drop Off Comments 181 FEBRUARY 2013

Burrus Old Mill Park

Burrus Old Mill Park Burrus Old Mill Park Park Location: 112 NW Woods Chapel Rd. Park Land Established: 1969 Park Size: 14 acres Developed Acres: 14 acres Undeveloped Acres: 0 acres Park Type: Neighborhood Park Amenities:

More information

Wilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres

Wilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres Wilbur Young Park Park Location: 1100 SE Adams Dairy Parkway Park Land Established: 1987 Park Size: 40 acres Developed Acres: 15 acres Undeveloped Acres: 25 acres Park Type: Community Park Amenities: Shelter

More information

Blue Springs Park. Park Land Established: Developed Acres: 12 acres Undeveloped Acres: 2 acres

Blue Springs Park. Park Land Established: Developed Acres: 12 acres Undeveloped Acres: 2 acres Blue Springs Park Park Location: 2204 SW South Ave. Park Land Established: 1975 Park Size: 14 acres Developed Acres: 12 acres Undeveloped Acres: 2 acres Park Type: Neighborhood Park Amenities: Softball

More information

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining. Project Updates January 11, 2018 CENTERVILLE CHESAPEAKE ARBORETUM BELLS MILL CITY CREEKWOOD SOUTH DEEP CREEK LOCK WORK TO BE PERFORMED/UPDATES Improvements to the parking lot include installation of a

More information

NYC Department of Education

NYC Department of Education Asset: COLUMBUS AF - BRONX, 925 ASTOR AVENUE, New York, 10469 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 9:21 AM 2017-11-29 8:45 AM AA : Architectural - Associate

More information

Ward Park. Park Land Established: Developed Acres: 9 acres Undeveloped Acres: 4 acres

Ward Park. Park Land Established: Developed Acres: 9 acres Undeveloped Acres: 4 acres Ward Park Park Location: 1000 SW 22 nd St Park Land Established: 1979-80 Park Size: 13 acres Developed Acres: 9 acres Undeveloped Acres: 4 acres Park Type: Neighborhood Park Amenities: 2 Shelters, tennis

More information

NYC Department of Education

NYC Department of Education Asset: NEW UTRECHT AF - BROOKLYN, 1601 80 STREET, New York, 11214 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 4:06 PM 2018-06-13 10:51 AM AA : Architectural

More information

Athletic Facilities Needs Assessment

Athletic Facilities Needs Assessment PARKS AND RECREATION DEPARTMENT Athletic Facilities Needs Assessment Fiscal Year 2014 PROPOSED Needs Assessment Index 1. Andrew s Fields located at Margate Middle School pg. 2 2. Firefighters Park pg.

More information

Briar Crest Elementary

Briar Crest Elementary Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary

More information

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert

More information

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition Park Name: Is Your Park an A or an F? Your Name: Contact Information Optional: Date: General Instructions: Phone: Email:

More information

Woods Chapel Park. Park Amenities: Playground, basketball court, single table shelter, small pond and multi-use trail.

Woods Chapel Park. Park Amenities: Playground, basketball court, single table shelter, small pond and multi-use trail. Woods Chapel Park Park Location: 3925 NW Dogwood Park Land Established: 1979 Park Size: 10 acres Developed Acres: 6 acres Undeveloped Acres: 4 acres Park Type: Neighborhood Park Amenities: Playground,

More information

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 AREAS OF IMPROVEMENT E A POOL HOUSE POOL DECK B B MAIN BUILDING UPPER PLAZAS A D F G C MAJOR BLEACHERS DUGOUTS FIELD MAIN COURTYARD D REGGIE PARK C E SPORT COURT ADA RAMP H F G H TENNIS COURTS KITCHENETTE

More information

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

TIFT COUNTY SCHOOLS E-SPLOST HISTORY TIFT COUNTY SCHOOLS E-SPLOST HISTORY July 1, 1997 June 30, 2002 $28,766,187.16 collected July 1, 2002 June 30, 2007 $39,025,830.10 collected July 1, 2007 June 30, 2012 $41,886,155.46 collected July 1,

More information

Littleton Fields Master Plan

Littleton Fields Master Plan Town of Littleton Littleton Fields Master Plan September 25, 2017 Gale Associates, Inc. John M. Perry, P.E. Jeffrey F. Georges, MRLA About Gale Agenda Introduction and Purpose Background Investigation

More information

SPACE TYPES & REQUIREMENTS

SPACE TYPES & REQUIREMENTS 28 October 2011 SPACE TYPES & REQUIREMENTS Outdoor Learning School Type: E M H K 1 2 3 5 6 7 8 9 10 11 12 Functional Area Descriptions Outdoor learning, bringing the outdoors in and the indoors out, making

More information

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0. Branham High School Budget Remaining 1 906030 Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765,473.00 $635,342.00 $635,342.00 $130,131.00 $0.00 2 970205 Branham Interim Housing - 12 Portable

More information

Ohlone College Measure G Project Scope Revisions

Ohlone College Measure G Project Scope Revisions Scope Revisions Current Title Revised Title Current Scope Revised Scope 6101 Relocated Baseball Field Athletic Fields Create new sustainable baseball field with synthetic turf, bleacher seating and batting

More information

Moreno Valley College: Conceptual Master Planning - Site Analysis Lasselle Street, Moreno Valley, CA 92551

Moreno Valley College: Conceptual Master Planning - Site Analysis Lasselle Street, Moreno Valley, CA 92551 Master Plan Architect School Name Moreno Valley College District Riverside Community College District Architecture and Urban Design 5898 Blackwelder Street Ground Floor Culver City, CA 90232 T: 310.559.5720

More information

Recreation Facility Evaluation - Conclusions

Recreation Facility Evaluation - Conclusions 2015 Parks Report Upon initial assessment of the Village parks it was evident that the inventory of the Village s park land, athletic fields, recreational facilities, playgrounds, trails, etc., was substantial,

More information

(SCHOOL DISTRICT NAME) MAINTENANCE/MANAGEMENT SPECIFICATIONS FOR ATHLETIC FIELDS AND OUTDOOR FACILITIES (SUGGESTED TEMPLATE)

(SCHOOL DISTRICT NAME) MAINTENANCE/MANAGEMENT SPECIFICATIONS FOR ATHLETIC FIELDS AND OUTDOOR FACILITIES (SUGGESTED TEMPLATE) (SCHOOL DISTRICT NAME) MAINTENANCE/MANAGEMENT SPECIFICATIONS FOR ATHLETIC FIELDS AND OUTDOOR FACILITIES (SUGGESTED TEMPLATE) I. ATHLETIC FACILITIES: PROFESSIONAL FIELDS A. Turf 1. Mow baseball outfield

More information

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 2014-2015 CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 School Item Amount a. Classroom A/R (Increase CR capacity to 804, add l Resource and tutoring spaces needed. Teacher

More information

PARK M A I N T E N A N C E REPORT CARD

PARK M A I N T E N A N C E REPORT CARD PARK M A I N T E N A N C E REPORT CARD Park Name: Date: General Instructions: Your Name: Phone: Contact Information Optional: Email: SAMPLE The Report Card consists of six specific park areas to be graded.

More information

29 Bella Fontaine Park

29 Bella Fontaine Park 29 Bella Fontaine Park 9565 Bellefontaine Road St. Louis County Parks Master Plan Planning Zone 2 Visit Date: July 2016 Page 1 129 Bella Fontaine Park 9565 Bellefontaine Road St. Louis County Parks Master

More information

School District of Milton 5- Year Capital Maintenance and Improvement Plan

School District of Milton 5- Year Capital Maintenance and Improvement Plan Updated - 02/21/17 School District of Milton 5- Year Capital Maintenance and Improvement Plan 101 East Elementary 1 Parking Lot/Traffic Flow Project 615,175 Includes Construction and Engineering 2 Bathroom

More information

2014 Bond Project Guide

2014 Bond Project Guide 2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center

More information

Rotary Park / Railroad Lake

Rotary Park / Railroad Lake Rotary Park / Railroad Lake Park Location: 600 NW Vesper St. Park Land Established: 1975 Park Size: 12 acres Developed Acres: 12 acres Undeveloped Acres: 0 acres Park Type: Community Park Amenities: 2

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: LEHMAN AF - BRONX, 3000 EAST TREMONT AVENUE, New York, 10461 Inspection Id Inspection Type Time In Last Edited SA : Architectural -

More information

APPENDIX F: DETAIL DRAWINGS

APPENDIX F: DETAIL DRAWINGS APPENDIX F: DETAIL DRAWINGS DRAWING DIVISION 100 GENERAL NOTES 200 ROAD WAYS 300 TRAFFIC CONTROL 400 FENCES 500 SEDIMENT CONTROL 600 SANITARY AND STORM SEWERS 700 WATERMAIN 800 PARKS AND LANDSCAPING 900

More information

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) School/Department FY 16 FY 17 FY18 FY19 FY20 Chariho Regional High School FY 16 FY 17 FY18 FY19 FY20 *Repair Bleachers

More information

FY Capital Improvement Program Arroyo Projects - Central Arroyo Summary

FY Capital Improvement Program Arroyo Projects - Central Arroyo Summary CENTRAL ARROYO FY 214-218 Capital Improvement Program Description FY 213 FY 214 FY 215 FY 216 FY 217 FY 218 1 Trail and Rubble Wall Restoration - Central Arroyo (77371) 1,94,66 543,848 55,812 2 Brookside

More information

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION Lake Erie Corridor Secondary Schools Accommodation Review November 2012 LAKE ERIE CORRIDOR SECONDARY SCHOOLS ACCOMMODATION REVIEW Fort Erie Secondary School

More information

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN LEGAL PROPERTY DESCRIPTION SEE NOTES SHEET FOR LEGAL PROPERTY DESCRIPTIONS THE CITY OF PLEASANT RIDGE GAINSBORO PARK IMPROVEMENT PROJECT CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN 4444 Second Avenue

More information

2014 Bond District-wide Facility Repairs

2014 Bond District-wide Facility Repairs Elementary Schools Aloha-Huber Park Fire Detector upgrade Replace electric backboard winches in gym Heating/cooling system controls upgrade Barnes Replace exterior windows Heating/cooling system and controls

More information

campus master plan VIRGINIA STATE UNIVERSITY

campus master plan VIRGINIA STATE UNIVERSITY campus master plan VIRGINIA STATE UNIVERSITY agenda 01 INTRODUCTION & GENERAL OVERVIEW 02 03 04 LAND USE CONCEPT PROGRAM ACCOMMODATION MAXIMIZE EXISTING INFRASTRUCTURE SUMMARY AND NEXT 05 STEPS agenda

More information

Community Meeting #2. Cabrillo Playground Renovation A 2008 Clean and Safe Neighborhood Parks Bond Project

Community Meeting #2. Cabrillo Playground Renovation A 2008 Clean and Safe Neighborhood Parks Bond Project Cabrillo Playground Renovation A 2008 Clean and Safe Neighborhood Parks Bond Project Community Meeting #2 September 22, 2010 District Supervisor Eric Mar Paulina Araica, Project Manager Andy Maloney, Architect

More information

Master Plan Presentation August 12, 2015

Master Plan Presentation August 12, 2015 Master Plan Presentation August 12, 2015 A vision for tomorrow... May, 13 2015 prepared for: prepared by: SITE LOCATION SITE NTS SITE ANALYSIS +/- 17.8 Ac. RESIDENTIAL HOMES 1 2 RAIL ROAD (SAFETY CONCERNS)

More information

Pukerua Bay School Landscape Masterplan

Pukerua Bay School Landscape Masterplan BRIEFING NOTES Overriding Principles: Recognise and protect the school s landscape assets. Create unity and cohesion throughout the school. Recognise and develop the school s unique identity. Reduce maintenance.

More information

2014 Bond District-wide Facility Repairs

2014 Bond District-wide Facility Repairs Elementary Schools Aloha-Huber Park Fire Detector upgrade Replace electric backboard winches in gym Heating/cooling system controls upgrade Barnes Replace exterior windows Heating/cooling system and controls

More information

Community Response Buchanan Elementary. December 13, 2016

Community Response Buchanan Elementary. December 13, 2016 Community Response Buchanan Elementary December 13, 2016 SITE EVALUATION FOLLOWING INITIAL COMMUNITY INPUT BUCHANAN ELEMENTARY SCHOOL Design Concepts for the new Buchanan Elementary School have been shared

More information

Appendix A. Park Land Definitions

Appendix A. Park Land Definitions Appendix A Park Land Definitions Mini Park May serve specific function for any and all ages, depending on need of the user area. Size range 1-5 acres with optimum size being 3 acres. Service area is sub-neighborhood

More information

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY ARCHITECTURE ROLLING HILLS ELEMENTARY SCHOOL Rolling Hills Elementary was built in 1999 and is the newest addition to the Mukwonago Area School District. The building contains approximately 64,900 gross

More information

Design Presentation. Chief Operations Officer Willie Burroughs

Design Presentation. Chief Operations Officer Willie Burroughs Design Presentation Chief Operations Officer Willie Burroughs Agenda Introduction Community Feedback Project updates 2 Feedback Citizens Advisory Committee meetings Growth and Development meetings Community

More information

SALEM FOREST RIVER PARK PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY. For the City of Salem

SALEM FOREST RIVER PARK PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY. For the City of Salem SALEM PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY For the City of Salem 6-13-17 This process undertaken by Weston & Sampson is to outline preliminary ideas only of what possibilities exist for

More information

Edith Wolford Elementary School Site Improvement Committee

Edith Wolford Elementary School Site Improvement Committee Edith Wolford Elementary School Site Improvement Committee School Site Improvement Committee Members Bob Wedel Principal Robin Lowery Assistant Principal Toby Williams Building Manager Amalia De Ramon

More information

WESTERN ILLINOIS UNIVERSITY

WESTERN ILLINOIS UNIVERSITY WESTERN ILLINOIS UNIVERSITY Quad Cities Riverfront Campus Master Plan March 1, 2006 Preliminary Master Plan Total Site Build Out Western Illinois University Quad Cities Municipal Park Mississippi River

More information

Special Revenue Funds

Special Revenue Funds Special Revenue Funds Special Revenue Funds account for the proceeds of specific revenue sources (other than special assessments for major capital projects) that are legally restricted to expenditures

More information

Kenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2

Kenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2 Kenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2 Adams Field Kenmore East High School Kenmore West High School Crosby Field Charles Lindbergh Elementary Thomas

More information

MetroParks Board Meeting 2018 Capital Improvement Projects

MetroParks Board Meeting 2018 Capital Improvement Projects MetroParks Board Meeting 2018 Capital Improvement Projects Stephen L. Avery Planning & Operations Director Last Edited: 3.12.18 Presentation Outline MetroParks Mission Statement Strategic Master Plan MetroParks

More information

Maitland Garden Village Perseverance Park Design Plan

Maitland Garden Village Perseverance Park Design Plan Maitland Garden Village Perseverance Park Design Plan City of Cape Town City Parks Department 2013 Cape Town Project Centre Contents Introduction... 2 Park Design... 3 Phase 1... 5 1. Border Design Options...

More information

Long Branch-Wayne Local Park Renovation Project

Long Branch-Wayne Local Park Renovation Project Montgomery Parks Long Branch-Wayne Local Park Renovation Project Community Meeting #2 September 20, 2016 Oak View Elementary School 7:00-9:00 PM Welcome / Team Introductions M-NCPPC (Montgomery Parks)

More information

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students FACILITY NEEDS THE CHALLENGE Deerfield Middle School/High School building has served the community for

More information

Landscape and Streetscape Design 2.5

Landscape and Streetscape Design 2.5 Landscape and Streetscape Design 2.5 2.5.1 Goals 2.5.2 Planting 2.5.3 Sidewalks and Pavement 2.5.4 Furnishings 2.5.5 Walls 2.5.6 Lighting 2.5.7 Stormwater 2.5.8 Street Cross Sections 2.5 LANDSCAPE AND

More information

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist Applicant s Name: Project Address: Phone: Email: Applicant shall fill out the design guidelines checklist for all guidelines applicable

More information

VILLAGE OF NORTH SYRACUSE

VILLAGE OF NORTH SYRACUSE VILLAGE OF NORTH SYRACUSE Prepared for: Village of North Syracuse North Syracuse, New York Prepared by: Clough Harbour & Associates LLP 441 South Salina Street Syracuse, New York 13202 November 1, 2006

More information

Montgomery Park Revitalization Plan

Montgomery Park Revitalization Plan Montgomery Park Revitalization Plan December 22, 2015 Prepared by: Rick Manning, ASLA Maggie Soulstein Prepared by: Montgomery Park Revitalization Committee Table of Contents Background... 1 Description

More information

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement Durham-Orange Light Rail Transit Project October 2016 1. Introduction The Combined FEIS/ROD summarizes the effects of the D-O LRT

More information

Catholic School Master Plan & Playground: Tulsa, Oklahoma

Catholic School Master Plan & Playground: Tulsa, Oklahoma Catholic School Master Plan & Playground: Tulsa, Oklahoma Purpose: Located in Tulsa Oklahoma, the school is a traditional Catholic school that focuses its efforts on outstanding instruction of reading,

More information

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project What is the Main Street Project? The Main Street Project is a roadway project that addresses pavement, infrastructure and safety issues

More information

Benedict Fountain Park Meeting Notes Wednesday, February 15, 2012

Benedict Fountain Park Meeting Notes Wednesday, February 15, 2012 Benedict Fountain Park Meeting Notes Wednesday, February 15, 2012 ALTERNATIVE #1 Like the big open lawn space in alternative 1. Like cohesiveness of sidewalk walk and play areas shown on alternative 1

More information

1999 Approval to replace World War I monument and relocate plaques Approval to rehabilitate the Chase Mill building and surrounding site

1999 Approval to replace World War I monument and relocate plaques Approval to rehabilitate the Chase Mill building and surrounding site Memorandum PLANNING DIVISION DEPARTMENT OF COMMUNITY AND NEIGHBORHOODS To: Historic Landmark Commission From: Katia Pace, Principal Planner Date: October 26, 2016 Re: Liberty Park Improvements The purpose

More information

PARK AND FACILITY ASSESSMENT

PARK AND FACILITY ASSESSMENT PARK AND FACILITY ASSESSMENT Park properties and facilities are the physical backbone of the parks and recreation system which support and facilitate all programming, user experiences, and access to recreational

More information

Report or technical documentations of the target areas in Siauliai

Report or technical documentations of the target areas in Siauliai WP 4 Energy Supply Report or technical documentations of the target areas in Siauliai 2011.10.27 Summary of the draft version of technical documentation for two target areas Lieporiai park 1.1. Works basis

More information

BOARD OF TRUSTEE MEMORANDUM

BOARD OF TRUSTEE MEMORANDUM 1 15 17 2 12 14 19 18 13 11 3 10 6 16 5 4 9 8 7 BOARD OF TRUSTEE MEMORANDUM TO: HONORABLE MAYOR & BOARD MEMBERS FROM: JANET ALUISE, COMMUNITY DEVELOPMENT DIRECTOR DATE: OCTOBER 2, 2012 RE: MASTERPLANNING

More information

HALF MOON BAY CATHOLIC ELEMENTARY SCHOOL SITE PLAN CONTROL DESIGN BRIEF

HALF MOON BAY CATHOLIC ELEMENTARY SCHOOL SITE PLAN CONTROL DESIGN BRIEF HALF MOON BAY CATHOLIC ELEMENTARY SCHOOL SITE PLAN CONTROL DESIGN BRIEF February 12, 2015 BRYDEN MARTEL ARCHITECTS INCORPORATED 1066 somerset street west, suite 200, ottawa, ontario K1Y 4T3 tel: (613)

More information

MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals

MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals Purpose: The Midlothian Road entrance to Mundelein Park & Recreation District s (MPRD s) Keith Mione (Community) Park would

More information

Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016

Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016 Rockwell/Johnson School Renovations Project Existing Conditions September, 2016 Rockwell School Conditions RS - Custodial Closet Shared w/ Book Room. RS - Aging Telephone Switch Gear/No Growth for Additional

More information

Master Facility Planning Update School Board Meeting May 26, 2016

Master Facility Planning Update School Board Meeting May 26, 2016 Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility

More information

Amenity Guidelines For Medium and High Density Residences

Amenity Guidelines For Medium and High Density Residences Amenity Guidelines For Medium and High Density Residences Corporation of the Municipality of Clarington Planning Services Department Approved by Council on January 25, 1993 I:\Administration\Publications\GUIDELINES

More information

Access Specifications

Access Specifications Access Specifications 1 Introduction At Waddesdon, we welcome all visitors and strive to make everyone s visit as comfortable and enjoyable as possible. This Access Specifications Guide provides detailed

More information

WESTERN ILLINOIS UNIVERSITY

WESTERN ILLINOIS UNIVERSITY WESTERN ILLINOIS UNIVERSITY Quad Cities Riverfront Campus Preliminary Master Plan Presentation 2 February 1, 2006 Achieving Future Flexibility 1. Monitor space needs as the new buildings come on line and

More information

Hardy s Cottage Access Statement

Hardy s Cottage Access Statement Hardy s Cottage Access Statement Hardy s Cottage Higher Bockhampton Dorchester Dorset DT2 8QJ T: 01305 262366 E: hardyscottage@nationaltrust.org.uk Introduction 1. The cottage is situated 700 yards from

More information

If there are emergency situations they should be reported to Maintenance Department immediately.

If there are emergency situations they should be reported to Maintenance Department immediately. To: From: Re: Mercer County Schools Principals Mercer County Schools Safety Committee Required Safety Reports Date: October 30, 2010 In order to work toward safer schools, two reports are required to be

More information

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological

More information

REVISED DRAFT. Malone Memorial Recreational Park and West Street Park Facilities Enhancement Master Plan. Village of Malone, New York.

REVISED DRAFT. Malone Memorial Recreational Park and West Street Park Facilities Enhancement Master Plan. Village of Malone, New York. West Street Park Salmon River REVISED DRAFT Malone Memorial Recreational Park and West Street Park Facilities Enhancement Master Plan Village of Malone, New York Revised Draft Date: February 24, 2014 DOS

More information

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek General Information: - Instructional, Child Care Development Center (West Wing) o (2) Infant/Toddler

More information

Spring 2018 Construction Update

Spring 2018 Construction Update Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the

More information

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B

More information

Butler Junior High School

Butler Junior High School 150042 Butler Junior High School Site Plan of Butler Junior High Floor Plan of Butler Junior High 2 150042; Butler Junior High School. This school is located on East North Street, Butler, Pennsylvania

More information

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537 LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537 Buildings and Grounds Committee Minutes March 20, 2017 The meeting was called to order at 6:30 p.m. PRESENT: Board Members, Mr. Jeffrey A.

More information

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

Binghamton University Construction SUMMER 2012 HIGHLIGHTS Binghamton University Construction SUMMER 2012 HIGHLIGHTS Binghamton University Construction Summer 2012 Large and small construction projects were completed during the summer 2012 construction season.

More information

Heritage Park Master Plan. Heritage Park Master Plan

Heritage Park Master Plan. Heritage Park Master Plan November 03, 2008 Presentation Objectives 1. Seek Council s endorsement on the design concept 2. Seek pre-budget approval for Phase 1 construction 3. Approve schedule for Phase 1 construction 3 Actions

More information

Facilities Management Services

Facilities Management Services Facilities Management Services Operating Budget Facilities Management (FM) receives an Operating Budget each year predicated on funding the routine, predictable costs of cleaning, maintaining,, and repairing,

More information

El Cerrito High School Community Meeting Minutes El Cerrito High School Cafeteria, May 26 th, 2015

El Cerrito High School Community Meeting Minutes El Cerrito High School Cafeteria, May 26 th, 2015 El Cerrito High School Community Meeting Minutes El Cerrito High School Cafeteria, May 26 th, 2015 1) WELCOME AND INTRODUCTIONS Luis Freese, WCCUSD: District Engineering Officer. Head of the Facilities

More information

Fall 2017 Construction Update

Fall 2017 Construction Update Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,

More information

th Street Wyoming, MN (800) xccentplay.com

th Street Wyoming, MN (800) xccentplay.com 5240 257th Street Wyoming, MN 55092 (800) 933-4748 www. f MADE IN THE U.S.A. Our products are proudly developed and manufactured in our 100,000 square foot facility in W Minnesota. Since 1976, we ve maintained

More information

Worthington Scranton. Campus Exterior Architectural Plan

Worthington Scranton. Campus Exterior Architectural Plan Contents Introduction and Purpose Existing Conditions Inventory s Introduction and purpose The stated mission, vision and strategic goals of Penn State clearly define the University s responsibility to

More information

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018 Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018 WHAT IS A BOND ELECTION? Provide communities an opportunity to vote to give the Board of Trustees authority

More information

RPD GEORGE CHRISTOPHER PLAYGROUND COMMUNITY MEETING 1 SEPTEMBER 24, Duncan St

RPD GEORGE CHRISTOPHER PLAYGROUND COMMUNITY MEETING 1 SEPTEMBER 24, Duncan St RPD GEORGE CHRISTOPHER PLAYGROUND COMMUNITY MEETING 1 SEPTEMBER 24, 2015 Duncan St Supervisorial District 8 Supervisor Scott Wiener 1 Agenda Welcome & Introductions Purpose of Meeting Ground Rules Project

More information

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16 1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated

More information

5 Year Capital Improvement Plan Update

5 Year Capital Improvement Plan Update 5 Year Capital Improvement Plan Update Board Approved May 10, 2016 Collierville Schools Board of Education Wanda Chism Wright Cox Mark Hansen, Chairman Cathy Messerly Kevin Vaughan Superintendent John

More information

Terrace View Park. Master Plan

Terrace View Park. Master Plan Terrace View Park Master Plan Table of Contents Terrace View Park Master Plan Page Executive Summary 1 Project Background 3 Master Planning Process Existing Conditions Master Plan 9 Park Zones and Amenities

More information

EPDM WET POUR RUBBER SURFACING Specialist Safety Surfaces for Children s Playground Flooring

EPDM WET POUR RUBBER SURFACING Specialist Safety Surfaces for Children s Playground Flooring EPDM WET POUR RUBBER SURFACING Specialist Safety Surfaces for Children s Playground Flooring SSP WET POUR RUBBER SAFETY SURFACE... is a bonded rubber surface designed for children s playgrounds and safety

More information

F. Driveways. Driveways which provide access to off-street parking or loading from public streets shall comply with the following:

F. Driveways. Driveways which provide access to off-street parking or loading from public streets shall comply with the following: Section 20.945.040 General Design Standards for Surface Parking Areas. A. Review Authority. Parking lot design and drainage shall be subject to review and approval of the City Transportation Manager. B.

More information

Barrie Park Site Master Plan

Barrie Park Site Master Plan Barrie Park Site Master Plan Community Meeting Number 4 May 13th, 2015 Barrie Park Site Master Plan: Process A Blue Print for the Future Already taken place: Site walkthrough, Focus Groups, 3 Community

More information

Cherry Hill Public Schools BUILDING A SOLID FUTURE

Cherry Hill Public Schools BUILDING A SOLID FUTURE Cherry Hill Public Schools BUILDING A SOLID FUTURE Who We Are The Cherry Hill School District is the 12 th largest in the state, serving 11,500 students 19 Locations 2 High Schools, 3 Middle Schools, 12

More information

Memo Preliminary. City of Miamisburg Parks Site Reconnaissance

Memo Preliminary. City of Miamisburg Parks Site Reconnaissance Memo Preliminary To: From: Ms. Rebecca Benna Woolpert, Inc. Date: Subject: City of Miamisburg Parks Site Reconnaissance The consultant team toured the existing Miamisburg Parks to assess current levels

More information

CITY OF GAINESVILLE PARKS, RECREATION AND CULTURAL AFFAIRS DEPARTMENT VISION 2020

CITY OF GAINESVILLE PARKS, RECREATION AND CULTURAL AFFAIRS DEPARTMENT VISION 2020 CITY OF GAINESVILLE PARKS, RECREATION AND CULTURAL AFFAIRS DEPARTMENT VISION 2020 A BLUE PRINT FOR THE NEXT 20 YEARS The PRCA Vision 2020 Master Plan, adopted in November 2012, addresses the current state

More information

3.4 REL: Religious Use District

3.4 REL: Religious Use District 3.4 Intent - The s are established to promote and maintain the development facilities for divine worship within the Town of Plainfield. The development of religious facilities or the major expansion of