Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT.
|
|
- Willis Wells
- 5 years ago
- Views:
Transcription
1 ITEM 9 Application Number: 18/00266/DISCON Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT. AT The Point, 602 Midsummer Boulevard, Central Milton Keynes, Milton Keynes, MK9 3NB FOR Richard Haynes Target: 18 May 2018 Extension of Time: No Ward: Central Milton Keynes Report Author/Case Officer: Parish: Central Milton Keynes Town Council Duncan Law, Senior Planning Officer Contact Details: duncan.law@milton-keynes.gov.uk Team Manager: Sarah Hine sarah.hine@milton-keynes.gov.uk 1.0 RECOMMENDATION (The decision that officers recommend to the Committee) It is recommended that the Design Code be approved and the condition be discharged. 2.0 INTRODUCTION (A brief explanation of what the application is about) 2.1 The Site The Point site is located between Midsummer Boulevard, Lower 9th Street, Lower 10th Street and a multi-storey car park (which has been excluded from the proposed redevelopment) on Avebury Boulevard. The site is located within the primary shopping area and city core quarter of Central Milton Keynes. To the north is the grade II listed Shopping Building the centre:mk, to the west is Midsummer Place Shopping Centre and to the east a temporary surface car park. The existing buildings contain a gross internal area of 7,428 square metres including 5,340 square metres of leisure (use class D2), 11 square metres of retail (use class A1), 342 square metres of restaurant (use class A3) and 1,735 square metres of office (use class B1).
2 2.2 The Proposal Application 13/01729/OUT gave Outline planning permission for the demolition of The Point and redevelopment of the site to provide a range of retail (use classes A1, A2, A3, A4 and A5) and leisure (use class D2) uses and incorporating a maximum of 20,600 square metres (GIA - Gross Internal Area) floorspace. Condition 5 (Design Codes) of Planning application 13/01729/OUT (subsequently amended under 17/03398/NMA - Non material amendment to planning application 13/01729/OUT to the wording of Condition 5 (Design Codes)) states: 'Notwithstanding the submitted illustrative scheme and prior to the submission of any applications relating to the Reserved Matters, a Design Code shall be submitted to the Local Planning Authority for approval in writing. The submitted Design Code shall set out the proposed vision and key design principles for the Development to include (but not limited to) the following details: building height, building massing, building materials, key elevational and architectural principles, sustainable construction, access and servicing, location of entrances, weather protection, extent of active and/or animated frontage, public realm materials including footways, landscaping, street furniture, and linkages to the surrounding public realm. The Design Code shall include an assessment of how it has taken into account: existing and emerging national, local and neighbourhood planning policy and supplementary planning guidance and documents; the approved Parameters Plans; and the Site's location at a prominent location within Central Milton Keynes and the setting of the grade II listed Shopping Building. The details submitted for the Reserved Matters shall be in accordance with the submitted Design Code. The Development shall not commence until the Design Code has been approved in writing by the Local Planning Authority and the Development hereby permitted shall be carried out in accordance with the approved Design Code.' In addition, paragraph 5.2 of Schedule 3 of the Section 106 Agreement for The Point required the developers to submit a Design Code for the development for approval in writing and a requirement to carry out consultation including a least one design workshop. 2.3 Reason for referral to committee Design Codes cannot be determined under delegated powers, however as this design code is to meet a Section 106 obligation it can be determined at a DCC Meeting. 3.0 RELEVANT POLICIES (The most important policy considerations relating to this application) National Planning Policy Framework paragraphs: 14: Presumption in favour of sustainable development 17: Core planning principles 18 21: Building and strong, competitive economy 23 24: Ensuring the vitality of town centres 30, 32, and 39 41: Promoting sustainable transport 56 66: Requiring good design 69 70: Promoting healthy communities
3 93 and 96: meeting the challenge of climate change 109, 111, 118, 121, 123 and 125: Conserving and enhancing the natural environment and : Conserving and enhancing the historic environment : Determining applications : Planning conditions and obligations Local Policy: Core Strategy CSA: NPPF Presumption in favour of sustainable development CS4: Retail and Leisure Development CS7: Central Milton Keynes CS11: A Well Connected Milton Keynes CS12: Developing Successful Neighbourhoods CS13: Ensuring High Quality, Well Designed Places CS15: Delivering Economic Prosperity CS18: Healthier and Safer Communities CS19: The Historic and Natural Environment CMK Alliance Plan 2026 CMKAP S1: Strategic Objectives CMKAP G1: Public Realm Infrastructure CMKAP G2: Heritage Buildings and Public Art CMKAP G3: Landscaping and Open Space CMKAP G6: Mixed Use CMKAP G7: Active Frontages CMKAP G8: Block Structure CMKAP G9: Design of Buildings CMKAP SS2: Shopping Area CMKAP SS3: Midsummer Boulevard East CMKAP SS4: Indicative Land Use Proposals CMKAP T1: Access and Design CMKAP T2: Public Transport CMKAP T3: Cycling CMKAP T4: Parking 4.0 MAIN ISSUES (The issues which have the greatest bearing on the decision) Whether the details of The Point Design Code are acceptable and in accordance with the Development Plan. 5.0 CONSIDERATIONS (An explanation of the main issues that have led to the officer recommendation) 5.1 Principle The principle of retail/leisure development within this location has previously been approved as an outline planning permission in accordance with the National Planning
4 Policy Framework (NPPF). The submission of a design code is a requirement set out in a condition attached to the Outline approval for the site and through a s106 obligation. Design Codes provide the final piece of site specific guidance and consist of a set of illustrated design rules and requirements which guide developers on how a site should be developed to ensure that the development permitted suitably addresses its location and that the development is of sufficient quality and standing to offset the loss of the existing structure at this location. Paragraph 59 of the NPPF states that "Local planning authorities should consider using design codes where they could help deliver high quality outcomes. However, design policies should avoid unnecessary prescription or detail and should concentrate on guiding the overall scale, density, massing, height, landscape, layout, materials and access of new development in relation to neighbouring buildings and the local area more generally." The structure of the Point Design Code, builds upon the context of the outline planning permission and national and local policy. The applicant has outline planning permission to demolish the current buildings on site and through the submission of this Design Code and reserved matters, is working within this permission. The Reserved Matters will only be approved if they accord with an approved Design Code and can be amended in line with the code during the Reserved Matters determination period. The structure of the code is as follows: 5.2 The Vision The development of the The Point Site is a key catalyst for the transformation of Midsummer Boulevard East. The vision for the redevelopment of the Point is to create a new building which fulfils an appropriate landmark role within the city centre. 5.3 Land Uses & Layout The code states that the proposal should create a range of uses that support the primary shopping area and ensure the layout reinforces the CMK grid. The design proposes a mix of uses to include new modern retail and leisure facilities. The Proposal will look to maximise the potential of the site incorporating the following use classes Retail (A1, A2, A3, A4, A5) & Leisure (D2). The outline application provided the quantum of the development which ranges from 20,600sqm to 11,915 square metres of GIA. 5.4 Scale & Massing The parameters of scale and massing were set though the outline application. The proposed building must create a strong visual landmark to assist with orientation along Midsummer Boulevard East and the Primary Shopping Area, replicating the function that the point fulfilled. The parameter plans set out the variation in size of the building form, from 116 metres 100 metres long by 66 metres 59 metres wide, with a height of between 9.25 metres -25 metres high.
5 5.5 Active Frontage The Code states that the design should provide active frontages that will help animate and enliven the public realm along Midsummer Boulevard, the top end of Lower 9 th Street and Lower 10th Street. Ground floor frontages facing the public realm will provide predominantly active frontages including shops, retail showcases, cafés, restaurants, leisure offers, service providers and artistic installations. Active frontages along the North- West edge will help to reinforce the creation of new civic space on Midsummer Boulevard. A Public Art Work element will be integrated into the lighting strategy of the buildings façades and engage with the public realm. The area of public realm immediately in front of the proposed development, adjacent to Midsummer Boulevard, could facilitate a community meeting and gathering point. 5.6 Weather Protection In line with the CMK Alliance Plan; weather protection is required which must be included within the red line boundary of the site. Weather protection will be allocated to Midsummer Boulevard, Lower 10 th Street and a smaller portion along Lower 9th Street and will be in the form of structural glazed canopies fixed to unit frontages and feature corners. 5.7 Access / Ease of Movement The proposal shall achieve inclusive design and easy access for pedestrians on Lower 10th Street and Midsummer Boulevard East. The design must create inclusive access as required in compliance with Part M of the Building Regulations. The design must be DDA compliant (to ensure compliance with the Disability Discrimination Act 1995). The design will respect connections to existing routes and surrounding neighbourhoods. 5.8 Landscape & Public Realm Key objectives for the landscape and public realm plan are: Follow a landscape approach that complements the existing context To protect the historic setting and context To guide provision for new Public Realm spaces Lighting of the building will contribute towards the surrounding street lighting strategy to facilitate a safe and secure environment. The design will incorporate public art or establish a public art strategy into the development as advised in CMK Handbook. A Public Art Work element will be integrated into the lighting strategy of the building and should reference the heritage of the site and take consideration of its context. 5.9 Visual Appearance & Architectural Principles The layout, form and appearance of the proposals will provide a positive contribution to local character and seek to contribute towards a distinctive sense of place. The design will consider how it makes reference to the previous building and its prominent nature, elements of the intent should be seen on proposed design option which creates a prominent prow on the active edge.
6 The design will use high quality materials to create a unified expression across the design Security The design must follow the guidance set out in the Secure by Design recommendations which assists in the creation of safe, well lit, welcoming environment around the building with good sight lines overlooking from active frontages and extended opening times for the leisure and food and beverage offer Sustainability The development should achieve a minimum BREEAM (Building Research Establishment Environmental Assessment Method) rating of Very good and Sustainable construction practices will be followed. The development will integrate green infrastructure as part of its design will encourage active lifestyle for all the users Engagement Clause 5.2 of the s106 agreement stated: 'Prior to submission of the Design Code the Owner shall carry out consultation (including at least one design workshop) with local stakeholder groups including (but not necessarily limited to) the Council and Central Milton Keynes Town Counci'l. Consequently, two workshops were held with local stakeholder groups in attendance including the Council, Central Milton Keynes Town Council, the Town Forum, Xplain and Milton Keynes Development Partnership. Through these events and internal consultations, amendments were made that addressed points raised through the events and responses. The Design Code outlines the mandatory elements within the above sections to ensure a co-ordinated approach to the development of the entire site is taken and that the design vision for the area is adhered to. Any departure from the mandatory elements of the Design Code will require significant justification by the designers. The Design Code will be used in the consideration of reserved matters applications by the Local Planning Authority. Overall, the developer is considered to have addressed all the general and detailed comments made by Officers. The document has been reviewed for its consistency, quality of outcomes and design principles and for its application in assessing planning applications. The Design Code provides a set of design controls to ensure the creation of high quality and sustainable redevelopment of The Point site. 6.0 CONCLUSIONS The developer has amended the draft Design Code to address the comments received by Officers and through consultation events. The finalised document is consistent with National and Local Planning Policy and the extant outline planning permission.
7 The document provides robust direction and guidance for the preparation of reserved matters application and will ensure that development at 602 Midsummer Boulevard is consistent within the site. It is therefore recommended that the Design Code is approved.
8
9 Appendix to 18/00266/DISCON A1.0 RELEVANT PLANNING HISTORY (A brief outline of previous planning decisions affecting the site this may not include every planning application relating to this site, only those that have a bearing on this particular case) 13/01729/OUT Outline planning permission for the demolition of The Point and redevelopment of the site to provide a range of retail (use classes A1, A2, A3, A4 and A5) and leisure (use class D2) uses and incorporating a maximum of 20,600 sq. m (Gross Internal Area) floorspace 17/03398/NMA Non material amendment to planning application 13/01729/OUT to the wording of Condition 5 (Design Codes) A2.0 ADDITIONAL MATTERS (Matters which were also considered in producing the Recommendation) None A3.0 CONSULTATIONS AND REPRESENTATIONS (Who has been consulted on the application and the responses received. The following are a brief description of the comments made. The full comments can be read via the Council s web site) A3.1 The overall consultation expiry ends The following have been consulted and an update will be provided to Members with any representations received: Landscape Architect Urban Design CMK Parish Council MK Forum Highways Engineer
D4.4N Site, CMK Planning Brief
D4.4N Site, CMK Planning Brief Adopted June 2013 (Updated March 2017) D4.4N Site, CMK Planning Brief This document has been prepared by Milton Keynes Council s Urban Design and Landscape Architecture Team
More informationReport Author/Case Officer: Paul Keen Senior Planning Officer (Dev Control) Contact Details:
APP 03 Application Number: 17/02060/FUL Description A full planning application for the demolition of an existing bungalow (C3 use class) and associated out buildings and the erection of two, two storey
More informationAT Block B4 Bounded By Avebury Boulevard, Childs Way, Witan Gate And Grafton Gate And Part Block B3, Avebury Boulevard, Central Milton Keynes.
APP 05 Application Number: 13/00967/REM Major Reserved matters pursuant to outline planning permission 04/00028/OUT regarding development of 400 dwellings (56 x one bed apartments, 207 x two bed apartments
More informationReport Author/Case Officer: Joanne Horner Contact Details:
APP 04 Application Number: 16/00140/FUL Other Two storey side extension to existing dwelling and formation of hard standing to provide parking for number 54 (Resubmission of withdrawn application 15/02852/FUL)
More informationSchedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:
Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the
More informationReserved Matters application for a site that straddles the boundary between CBC and BBC
BBC APPLICATION 15/02682/MAR NUMBER CBC APPLICATION CB/15/04294/RM NUMBER LOCATION Wixams Land at former storage depot, Bedford Road, Wilstead Bedfordshire PROPOSAL Reserved Matters Application for Strategic
More informationChapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17
Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS A New Garden Neighbourhood Matford Barton 17 2.1. SUMMARY AND STATUS OF THE PROPOSALS 2.1.1. The parameter plans and associated wording in this chapter
More informationWard: West Wittering. Proposal Change of use from public highway pavement to residential garden use.
Parish: West Wittering Ward: West Wittering WW/17/03295/FUL Proposal Change of use from public highway pavement to residential garden use. Site Izora 1 Watersedge Gardens West Wittering PO20 8RA Map Ref
More information1 The development hereby permitted shall be carried out in accordance with the following approved plans:
Location 59 Greenway Close London N20 8ES Reference: 16/00011/HSE Received: 30th December 2015 Accepted: 7th January 2016 Ward: Totteridge Expiry 3rd March 2016 Applicant: Mr Ankit Shah Proposal: Part
More informationParish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN
Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN BASIC CONDITIONS STATEMENT December 2018 CEF 4 Legal Requirements This statement has been produced by the NDP Working Group on behalf of Repton Parish Council
More informationStantonbury Neighbourhood Plan
Stantonbury Neighbourhood Plan 2018-2031 Basic Conditions Statement October 2018 Intentionally blank 1.0 Basic Conditions Statement Introduction 1.1 This statement has been prepared by Stantonbury Parish
More informationParish: Bradwell Parish Council
APP 02 Application Number: 16/01475/FUL Demolition of existing public house and erection of 27 dwellings, two storey D1 use building for a nursery and associated car parking to east of St Augustines Church
More informationDeparture from the Development Plan. Town Council objection to a major application. DETERMINE
Item No. 9 APPLICATION NUMBER CB/17/01642/OUT LOCATION Land rear of 43 to 91 Silver Birch Avenue South of Alder Green and Aspen Gardens, Aspen Gardens, Stotfold PROPOSAL Outline application for up to 95
More informationDemolition of The Suffolk Punch Public House and clearing of the site including the car park and associated works. Parish: Bradwell Parish Council
APP 01 Application Number: 15/01914/FUL Demolition of The Suffolk Punch Public House and clearing of the site including the car park and associated works. AT The Suffolk Punch, 1 Langcliffe Drive, Heelands
More informationNewcourt Masterplan. November Exeter Local Development Framework
Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up
More informationProposed Student Accommodation Development
Statement of Response to the Notice of Pre- Application Consultation Opinion Former "Matts of Cabra" public house and lands to the rear, Fassaugh Avenue, Cabra, Dublin 7 Proposed Student Accommodation
More informationURBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018
URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 DESIGN BRIEF CONTENTS PART A 1.0 INTRODUCTION 2.0 DESCRIPTION & ANALYSIS OF SITE CONTEXT 3.0 DESIGN CONSTRAINTS AND OPPORTUNITIES
More informationPLANNING COMMITTEE. 14 October 2014
AGENDA ITEM NO 8 PLANNING COMMITTEE 14 October 2014 APPLICATION NUMBER : CA//14/01744/FUL PROPOSAL : Extension and conversion of roof space of an existing detached bungalow together with enhanced parking
More informationDEVELOPMENT MANAGEMENT REPORT
ITEM A08-1 DEVELOPMENT MANAGEMENT REPORT TO: BY: DATE: DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Development Management Committee Development Manager Proposed live/work unit in connection with existing
More information2. The application, which is a full plans application, is for a commercial development comprising B1, D1, D2 and A3 uses.
Former Taff Vale Shopping Centre, Taff Street, Pontypridd, CF37 4TR PLANNING APPLICATION SUPPORTING STATEMENT May 2017 Ref.11431/1 INTRODUCTION AND APPLICATION CONTEXT 1. This planning application statement
More informationEastbourne Borough Council. Summary Proof of Evidence Of Barry John Cansfield BA (Hons), BTP, MRTPI on behalf of PRLP
Eastbourne Borough Council (Arndale Centre and surrounding Land at Terminus Road, Sutton Road and Ashford Road) (Compulsory Purchase Order 2015) Section 226 (1)(a) of the Town and Country Planning Act
More informationCase Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1
Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) 345786 Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1 APPROVAL OF RESERVED MATTERS FROM APPLICATION CHE/12/00234/OUT (1) LAYOUT,
More informationURBAN DESIGN BRIEF. Terms of Reference. Purpose. When is an Urban Design Brief Required
Purpose An Urban Design Brief (UDB) is intended to describe and illustrate proposed designs for new development projects and demonstrate how the City s Urban Design Guidelines and other City policies have
More information08 MARCH 2016 PLANNING COMMITTEE. 6N 15/1330 Reg d: Expires: Ward: GE. of Weeks on Cttee Day:
6N 15/1330 Reg d: 03.12.2015 Expires: 08.03.16 Ward: GE Nei. Con. Exp: 06.01.15 BVPI Target Minor (15) Number of Weeks on Cttee Day: 13/8 On Target? Yes LOCATION: PROPOSAL: TYPE: Units 1 to 3, Goldsworth
More informationLand Adj. 63 Sunny Bank Road, Sutton Coldfield, Birmingham, B73 5RJ
Committee Date: 11/07/2013 Application Number: 2013/03520/PA Accepted: 20/05/2013 Application Type: Full Planning Target Date: 15/07/2013 Ward: Sutton Vesey Land Adj. 63 Sunny Bank Road, Sutton Coldfield,
More informationGreat Easton Neighbourhood Plan Statement of Basic Conditions
Great Easton Neighbourhood Plan 2017-2031 Statement of Basic Conditions OCTOBER 2016 GREAT EASTON PARISH COUNCIL Contents 1.0 Introduction....Page 2 2.0 Summary of Submission Documents and Supporting Evidence..
More informationFormer Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT.
OPEN SPACE TEMPLE COWLEY LIBRARY library beyond Proposed apartments Proposed apartments Proposed houses Temple Road * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT. * Welcome
More informationWelcome to the Queen s Square, Croydon Consultation
Welcome to the Queen s Square, Croydon Consultation 02 PARK STREET 1-27 ST GEORGE S WALK 03 05 04 06 01 Croydon Town Hall The Queen s Gardens Thank you for coming to the public consultation about our proposed
More informationApplication Recommended for Approval Hapton with Park Ward
Application Recommended for Approval Hapton with Park Ward APP/2017/0036 Outline Planning Application Outline application for the construction of a new 3 bedroom dwelling (with all matters reserved for
More informationI615. Westgate Precinct
I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct
More informationSouth Worcestershire Development Plan. South Worcestershire Design Guide Supplementary Planning Document
South Worcestershire Development Plan South Worcestershire Design Guide Supplementary Planning Document Statement of Consultation: Early Engagement Scoping Paper February 2017 1. Introduction 1.1 This
More informationTest Valley Borough Council Southern Area Planning Committee 8 January 2019
ITEM 11 APPLICATION NO. 18/02218/FULLS APPLICATION TYPE FULL APPLICATION - SOUTH REGISTERED 23.08.2018 APPLICANT Rugby Football Union SITE The Trojans Club, Stoneham Lane, Eastleigh, SO50 9HT, CHILWORTH
More informationPHASE III: Reserved Matters Submission
Statement of Compliance with the outline approval for the proposed residential development of land at: BURGES LANE, WIVELISCOMBE PHASE III: Reserved Matters Submission Foreword Contents: This Statement
More informationWelcome to the Oakridge Centre Open House
Welcome to the Oakridge Centre Open House Why is the City hosting this event? This open house is to inform you of a rezoning application submitted to the City of Vancouver to amend the existing CD-1 (Comprehensive
More informationDraft Hailey Neighbourhood Plan
Persimmon Homes (Wessex) Draft Hailey Neighbourhood Plan Representations to West Oxfordshire District Council s Regulation 16 Consultation December 2018 2 Copyright 2018 Persimmon Homes Ltd. All rights
More informationREFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016
LOCATION: Land North Of Charcot Road, Colindale REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016 WARD: Colindale APPLICANT: PROPOSAL: Fairview New Homes (Colindale) Ltd Erection
More informationDONCASTER METROPOLITAN BOROUGH COUNCIL. PLANNING COMMITTEE - 15th October Expiry Date:
DONCASTER METROPOLITAN BOROUGH COUNCIL PLANNING COMMITTEE - 15th October 2013 Application 3 Application Number: 13/01158/FUL Application Expiry Date: 31st July 2013 Application Type: Full Application Proposal
More informationReport Author/Case Officer: Debbie Kirk Contact Details:
APP 01 Application Number: 14/00350/OUTEIS MAJOR A residential development for up to 400 dwellings, together with formal and informal open space, amenity space, retained vegetation, structural landscaping,
More information3 Tretawn Gardens London NW7 4NP
Location 3 Tretawn Gardens London NW7 4NP Reference: 16/7886/HSE Received: 12th December 2016 Accepted: 19th December 2016 Ward: Mill Hill Expiry 13th February 2017 Applicant: Proposal: Mr Murray Two storey
More informationNeighbourhood Planning Local Green Spaces
Neighbourhood Planning Local Green Spaces Introduction... 2 1. Why green space is important... 4 2. Neighbourhood plans and green space... 6 3. Evidence... 8 Statutory designations... 9 Green space audit...
More informationAT Land North And West of Wavendon Business Park, Ortensia Drive, Wavendon Gate
APP 02 Application Number: 15/02337/OUT Major Outline application for up to 134 residential units, 75-100 sqm of A1 (retail use) for the provision of a local convenience store with access from Ortensia
More informationSOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director
SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 1 April 2015 AUTHOR/S: Planning and New Communities Director Application Number: Parish(es): Proposal: Site address: Applicant(s): Recommendation:
More informationTennis Court Rear Of 3-5 Corringway London NW11 7ED
Location Tennis Court Rear Of 3-5 Corringway London NW11 7ED Reference: 18/4122/FUL Received: 3rd July 2018 Accepted: 3rd July 2018 Ward: Garden Suburb Expiry 28th August 2018 Applicant: Ms Sarah Robinson
More informationLong Branch Neighbourhood Character Guidelines Final Report
STAFF REPORT ACTION REQUIRED Long Branch Neighbourhood Character Guidelines Final Report Date: October 26, 2017 To: From: Wards: Reference Number: Etobicoke York Community Council Director, Community Planning,
More informationGarages To Rear Of The Willows 1025 High Road London N20 0QE
Location Garages To Rear Of The Willows 1025 High Road London N20 0QE Reference: 15/03944/FUL Received: 25th June 2015 Accepted: 2nd July 2015 Ward: Totteridge Expiry 27th August 2015 Applicant: Mr Alex
More informationPLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS
PLANNING STATEMENT To support planning and listed building consent applications for change of use from Class A1 shop and Class A3 cafe to Class A3 restaurant at: Market House Market Place Kingston upon
More informationTown Council. Report Author/Case Officer: Alex Harrison Contact Details:
Application Number: 09/00330/FUL ERECTION OF TWO STOREY SIDE EXTENSION AT The Pink Punters, 2 Watling Street, Fenny Stratford FOR Mr F McMahon Target: 27th April 2009 Ward: Bletchley And Fenny Stratford
More informationSCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN
DD/MM/YY Proposed C120 SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY Shown on the planning scheme map as DDO12. GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN 1.0 Design objectives DD/MM/YY Proposed
More informationClairtrell Area Context Plan
Clairtrell Area Context Plan March 2005 Urban Development Services City Planning Contents 1. Introduction... 4 2. Development Structure... 6 2.1 Streets... 7 2.1.1 Sheppard Avenue and Bayview Avenue...
More informationApplicant s partner is an employee of the Council COMMITTEE TO DETERMINE
Item No. 13 APPLICATION NUMBER CB/13/02360/FULL LOCATION Land adj to 2 Sandy Lane, Leighton Buzzard, LU7 3BE PROPOSAL Demolition of existing garages & construction of a new 2 bed bungalow, together with
More informationMr & Mrs Connolly per Pump House Designs Pump House Yard The Green SEDLESCOMBE, East Sussex. TN33 0QA
AGENDA ITEM NO: 5 (c) Report to: PLANNING COMMITTEE Date: 03 June 2015 Report from: Head of Housing and Planning Services Application Address: Proposal: Application No: Recommendation: Ward: File No: Applicant:
More information1 The development hereby permitted shall be carried out in accordance with the following approved plans:
Location Victoria Park Ballards Lane London N3 Reference: 17/1030/FUL Received: 20th February 2017 Accepted: 20th February 2017 Ward: West Finchley Expiry 17th April 2017 Applicant: Mrs Mia Freedman Proposal:
More informationDRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to:
AUGUST 29, 2017 12.15 Northeast Quadrant of Kipling Avenue and Highway 7 12.15.1 Goals 12.15.2 Land Use The goals of this Plan are to: 12.15.2.1 General Provisions: a) Ensure the development of a compact
More informationPlanning Proposal Charlestown Swim and Leisure Centre LEP Amendment
Planning Proposal Charlestown Swim and Leisure Centre LEP Amendment Amendment No. 4 to Lake Macquarie Local Environmental Plan 2014 (PP_2014_LAKEM_005_00) Local Government Area: Name of Draft LEP: Lake
More informationREFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012.
LOCATION: 15A Pyecombe Corner, London, N12 7AJ REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012 Final Revisions: APPLICANT: PROPOSAL:
More informationComplete Neighbourhood Guidelines Review Tool
Complete Neighbourhood Guidelines Review Tool Prepared By: City of Regina Planning Department October 2014 Page 1 of 14 Community Development Review Checklist for Secondary Plans and Concept Plans The
More informationWelcome. Walk Around. Talk to Us. Write Down Your Comments
Welcome This is an information meeting introducing the applications for proposed redevelopment of the Yorkdale Shopping Centre site at 3401 Dufferin Street and 1 Yorkdale Road over the next 20+ years,
More information6 Site Framework Strategies
6 Site Framework Strategies 6.1 Introduction Section 6 identifies a number of specific areas which are considered to be key sites within the Plan area and which may have potential for development / redevelopment.
More informationReference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016
Location 374B Long Lane London N2 8JX Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016 Applicant: Ms Katrin Hirsig Proposal: Single storey
More informationPoolbeg West SDZ Draft Planning Scheme
Poolbeg West SDZ Draft Planning Scheme Introduction/vision Housing Community Economy/Employment Movement/transport Infrastructure green infrastructure /open space Land-use and phasing Public Realm Urban
More informationWEST BLACKHALL STREET PUBLIC REALM + TOWN CENTRE CONNECTIONS Public Exhibition 28 th June 2018
WEST BLACKHALL STREET PUBLIC REALM + TOWN CENTRE CONNECTIONS Public Exhibition 28 th June 2018 Welcome Introduction Design Your Involvement Thank you for coming Engagement We would like to gather to this
More information1.0 Purpose of a Secondary Plan for the Masonville Transit Village
Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village
More informationHorwood Map of London, Westminster & Southwark First edition
Barratt London is developing plans in tandem with Southwark Council and TfL to transform the southern end of Blackfriars Road. The residential-led, mixed-use scheme will deliver new private and affordable
More informationPaignton Neighbourhood Plan (Submission version 2017)
Paignton Neighbourhood Plan (Submission version 2017) Introduction This brief statement covers the views of the TDA, only in relation to its role as adviser to the Council on delivery of town centre regeneration.
More informationK. SMART ASSOCIATES LIMITED
Planning Justification Report Zoning By-Law Amendment 185 King Street North Waterloo, Ontario April 7th, 2017 Project Reference Number 16-245 K. SMART ASSOCIATES LIMITED CONSULTING ENGINEERS AND PLANNERS
More informationRepton Parish Neighbourhood Development Plan - Consultation March 2017
Repton Parish Neighbourhood Development Plan - Consultation March 2017 25 replies Policy No Comments Response H1 Agree 22 Amend to include Milton Road & footpath but exclude above footpath. Neither agree
More informationWHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014
WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to
More informationCranfield University Masterplan
Central Bedfordshire Council EXECUTIVE Tuesday, 5 December 2017 Cranfield University Masterplan Report of: Cllr Nigel Young, Executive Member for Regeneration, (nigel.young@centralbedfordshire.gov.uk )
More information2.0 Strategic Context 4
2.0 Strategic Context 4 2.1 The Area Action Plan is a non-statutory plan, which forms a corporate policy document, expressing particular issues and areas of concern while also providing a vision for the
More information1296 Kennedy Road - Zoning Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 1296 Kennedy Road - Zoning Amendment Application - Preliminary Report Date: January 15, 2016 To: From: Wards: Reference Number: Scarborough Community Council Acting Director,
More informationPlanning and Regulatory Committee 20 May Applicant Local Councillor Purpose of Report
Planning and Regulatory Committee 20 May 2014 7. APPLICATION FOR PLANNING PERMISSION FOR THE CARRYING-OUT OF DEVELOPMENT PURSUANT TO PLANNING PERMISSION REFERENCE NUMBER 603451 DATED 28 FEBRUARY 2007 WITHOUT
More informationNew-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario
URBAN DESIGN BRIEF New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario TABLE OF CONTENTS: 1.0 Executive Summary 2.0 Creating Vibrant and Sustainable Urban Places: Excerpts from
More information599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report Date: March 7, 2017 To: From: Wards: Reference Number: Scarborough Community
More informationPolicy and Resources Committee 10 th October Green Infrastructure Supplementary Planning Document (SPD) Summary. Title
Policy and Resources Committee 10 th October 2017 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Green Infrastructure Supplementary Planning Document (SPD) Deputy Chief Executive
More informationCroxley Rail Link Watford Vicarage Road Station Reference Number :
PART A Report to: Development Management Section Head To Committee: Date of Committee: 3 rd April 2014 Site address: Croxley Rail Link Watford Vicarage Road Station Reference Number : 14/00101/DISCON Description
More informationPlace Brief. National Collections Facility (NCF site)
Place Brief. National Collections Facility (NCF site) Contents 1.0 Purpose 2.0 Location and Proposal 3.0 Vision and Aim 4.0 Placemaking Principles 5.0 Conclusion Plan 1 Location Plan Plan 2 Placemaking
More informationOfficial Plan Review: Draft Built Form Policies
PG.30.1 REPORT FOR ACTION Official Plan Review: Draft Built Form Policies Date: May 15, 2018 To: Planning and Growth Management Committee From: Chief Planner and Executive Director, City Planning Division
More informationINTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB
INTRODUCTION This event is being hosted by the promoters of the proposed North Heybridge Garden Suburb who are working with Maldon District Council and other key stakeholders on the preparation of a comprehensive
More information2136 & 2148 Trafalgar Road Town of Oakville Region of Halton
PLANNING JUSTIFICATION REPORT 2136 & 2148 Trafalgar Road Town of Oakville Region of Halton Zoning By-Law Amendment Application 2500674 Ontario Inc. November 2016 Table of Contents Page 1.0 Location/Summary
More informationTHAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.
COMMITTEE OF THE WHOLE AUGUST 18, 2003 THORNHILL CENTRE STREET STUDY PLANNING FILE: 15.92 Recommendation The Commissioner of Planning recommends: THAT the attached Terms of Reference for the Thornhill
More informationYMCA Erdington (Phase 2), 300 Reservoir Road, Erdington, Birmingham, B23 6DB
Committee Date: 13/06/2013 Application Number: 2013/03011/PA Accepted: 30/04/2013 Application Type: Full Planning Target Date: 30/07/2013 Ward: Stockland Green YMCA Erdington (Phase 2), 300 Reservoir Road,
More informationDunboyne/Dunboyne North/ Clonee/ Local Area Plan
Dunboyne/Dunboyne North/ Clonee/ Local Area Plan Strategic Policy SP 1 To operate an Order of Priority for the release of residential lands in compliance with the requirements of CS OBJ 6 of the County
More informationPORT WHITBY COMMUNITY
PORT WHITBY COMMUNITY SECONDARY PLAN UPDATE COMMUNITY IMPROVEMENT PLAN URBAN DESIGN GUIDELINES September 2015 DRAFT PROPOSED AMENDMENT NUMBER # to the Whitby Official Plan PURPOSE: The intent of this Amendment
More informationWarren Farm, Ampthill
1 Welcome The developers of the Warren Farm site, Bloor Homes and Connolly Homes, are holding this exhibition on the emerging Design Codes for the development prior to their formal submission to Central
More informationGround Floor Flat 15 Redbourne Avenue London N3 2BP
Location Ground Floor Flat 15 Redbourne Avenue London N3 2BP Reference: 17/4160/FUL Received: 28th June 2017 Accepted: 29th June 2017 Ward: West Finchley Expiry 24th August 2017 Applicant: Proposal: Mr
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting October 15, 2005 DATE: September 28, 2005 SUBJECT: Request to Advertise the adoption of the 2005 Clarendon Sector Plan C. M. RECOMMENDATION:
More informationFinal Revisions: Provision of single storey modular classroom and associated works.
LOCATION: St Catherines Catholic Primary School, Vale Drive, Barnet, Herts, EN5 2ED REFERENCE: B/01924/12 Received: 17 May 2012 Accepted: 28 May 2012 WARD(S): Underhill Expiry: 23 July 2012 Final Revisions:
More informationUptown Rideau Street Secondary Plan [Amendment #166, January 12, 2016]
[Amendment #166, January 12, 2016] The policies of this Secondary Plan are in effect, save and except for the property at 560 Rideau Street, for which there remains a site specific appeal to this Secondary
More informationReport Author/Case Officer: Samantha Taylor Planning Officer Contact Details:
APP 01 Application Number: 16/03023/FUL Major Demolition of existing B8 storage and distribution warehouse, and erection of a new B8 storage and distribution warehouse with ancillary B1 floorspace and
More informationCroxley Rail Link - Cassiobridge Station, Ascot Road Reference Number :
PART A Report of: Development Management Section Head Date of Committee 3 rd April 2014 Site address: Croxley Rail Link - Cassiobridge Station, Ascot Road Reference Number : 14/00097/DISCON Description
More information3 Abbey View Mill Hill London NW7 4PB
Location 3 Abbey View Mill Hill London NW7 4PB Reference: 15/03203/HSE Received: 26th May 2015 Accepted: 16th June 2015 Ward: Mill Hill Expiry 11th August 2015 Applicant: Proposal: Mr Richard Benson Alterations
More informationBloor St. W. Rezoning - Preliminary Report
STAFF REPORT ACTION REQUIRED 1638-1644 Bloor St. W. Rezoning - Preliminary Report Date: April 1, 2008 To: From: Wards: Reference Number: Toronto and East York Community Council Acting Director, Community
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 12, 2014 DATE: April 2, 2014 SUBJECT: to the Arlington County Zoning Ordinance, Article 11.1 "CP-FBC" Columbia Pike Form Based Code
More informationLimerick Chamber Submission with respect to the Design Brief for the development of the Opera Site in Limerick city
Limerick Chamber Submission with respect to the Design Brief for the development of the Opera Site in Limerick city April 2018 April 2018 1 Limerick Chamber s Submission re Opera Site 1. Introduction At
More informationOKEFORD FITZPAINE NEIGHBOURHOOD PLAN
OKEFORD FITZPAINE NEIGHBOURHOOD PLAN Dear Parishioner, The Neighbourhood Plan Project Team have prepared this leaflet to summarise the full Neighbourhood Plan document. It provides a summary of the Vision,
More informationStatement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE
LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback
More information1. Listed Building and Conservation Area considerations 2. Protection of Known Archaeological Remains 3. Parking
08/01222/FUL ERECTION OF SINGLE STOREY SIDE EXTENSION TO CHURCH TO PROVIDE FOR PARISH HALL (RESUBMISSION OF 08/00206/FUL) AT St Mary And St Giles Church, Church Street, Stony Stratford FOR Rev R Northing
More informationPerth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager
Perth and Kinross Council Development Management Committee 8 June 2016 5(3)(i) 16/259 Pre-Application Report by Development Quality Manager Residential development at St Martins Road, Land 120 metres West
More informationItem No. 10. RECOMMENDED Regulation 3 - Approval. Reasons for Granting
Item No. 10 APPLICATION NUMBER CB/13/01924/REG3 LOCATION Land Adj to Goldfinch Road Leighton Buzzard LU7 4BT PROPOSAL Construction of a pedestrian and cycle bridge across the Swale channel PARISH Leighton-Linslade
More informationUllswater Court 92 Holders Hill Road London NW4 1LN
Location Ullswater Court 92 Holders Hill Road London NW4 1LN Reference: 17/5396/CON Received: 18th August 2017 Accepted: 18th August 2017 Ward: Finchley Church End Expiry 13th October 2017 Applicant: IBSA
More information