WILMINGTON WATERFRONT Approved Project
|
|
- Mildred Welch
- 5 years ago
- Views:
Transcription
1 LA Waterfront WILMINGTON WATERFRONT Approved Project pp j Approved Project Annual Program Update February 28, 2011
2 AGENDA Welcome Update on the LA Waterfront Program Projects Underway Upcoming Projects Warehouse Nos. 9 & 10 Event Planner Q & A
3 22 nd St. Park American Public Works Association 2010 B.E.S.T. Award
4 Cabrillo Way Marina
5 Cabrillo Way Marina Public Art The unveiling of Ship in the Bottle by Mark Dion
6 BIKEWAYS DRAFT Sharrows Sharrows Along Shoshonean Way
7 Berth 93 Cruise Terminal Improvements
8 Berth 93 Cruise Terminal Improvements Concourse Panel Graphics
9 Berth 93 Cruise Terminal Improvements Solar Panels AMP Mobile
10 Wilmington Waterfront Park (formerly known as the Wilmington Buffer) Ribbon Cutting Ceremony g y June 4, 2011
11 Wilmington Waterfront Park (formerly known as the Wilmington Buffer)
12 Wilmington Waterfront Park (formerly known as the Wilmington Buffer)
13 Wilmington Waterfront Park Public Art
14 Harry Bridges Boulevard Improvements
15 Southern Pacific Slip & Ghost Fish Carl Cheng Harold Greene
16 Avalon Triangle Park Today Future
17 Wilmington Waterfront
18 Wilmington Waterfront South Phase 1A
19 Catalina Freight Relocation
20 Bekins Building Red Car Museum & POLA Archives Van Kamp Building A Conceptual Design of Bekin s Building
21 Cabrillo Beach Restrooms
22 Maritime Museum Happy 75 th Birthday!
23 Westways Site Tank Demolition
24 Downtown Harbor - Phase 1
25 Downtown Harbor - Phase 1 Project Elements Downtown Harbor Promenade Downtown Harbor Town Square View from inside Ralph J. Scott towards City Hall Ralph J. Scott Fire Boat Museum
26 Workshops: March 18, 2010 September 16, 2010 Downtown Harbor - Phase I Design Workshop
27 Downtown Harbor - Phase 1 Public Art The Ship Chandler By Mark Dion
28 Sampson Way Project Sampson Way Improvement Project Alternative 1 EIR Project Representative Comments Responses Resolution This alternative, particularly the Intersection at 7 th Street, is not pedestrian friendly Maximizes traffic flow, best vehicle flow, space between streets is ugly Address access to the waterfront after crossing the street at the 7 th Street intersection Should include wide sidewalks Make sure the Promenade is continuous Maintain a walkway along the waterfront Parking garages should have Greenspace and walkways on top If signal timing is correct it shouldn t be a problem for pedestrians Provides direct access to Miner for truck traffic Best for truck traffic and access to new cruise ship terminal Do not want trucks on Sampson Way The final design will include clear pedestrian access to and from the waterfront Traffic data from EIR will be reviewed to determine adequacy of design to handle future traffic projections, final design will consider themes established in the Downtown Harbor Study for open spaces The final design will include clear pedestrian access to and from the waterfront Sidewalks will be user friendly, but will need to fit within existing Right of Way The promenade will be continuous The promenade, walkway and bike lanes will be continuous from Swinford to 22 nd Street The EIR calls for solar panels and landscaping on the parking garages, the final design will consider both Correct, signal timing will be adjusted so pedestrians have plenty of time to cross the street Truck access will be reviewed and addressed in all alternatives Truck access will be reviewed and addressed in all alternatives Truck access will be reviewed and addressed in all alternatives The Port will carry this alternative forward in study The Port will evaluate shifting alignment to the east (closer to the waterfront) The Port will also evaluate a roundabout at the 7th Street Intersection location
29 USS IOWA
30 City Dock No.1 Marine Research Center Schedule: NOP Completed in December 2011 Project Scoping Completed in January 2011 Environmental Report Dec 2011 Project Elements: Structural & Architectural Improvements & Upgrades to Warehouse B. 57 Wharf Improvements Waterfront Promenade
31 Waterfront Commercial Development Update
32 The Strategy Build a sense of place along the waterfront and set the stage for future development Ports O Call Cabrillo Marina Initial focus is on reuse of Warehouses 9 & 10 and waterfront sites for temporary events
33 Warehouse Interiors
34 Adaptive Reuse of Warehouses Nos.9 & 10 Port released Request For Interest (RFI) for adaptive reuse of warehouses in November RFI received three responses Arts and Crafts Center Creative office/light industrial space (multi-tenant mixed use) Specialty retail with a big box anchor
35 Port of LA Arts and Crafts Center LLC Arts and Crafts Center that will feature A public arts & crafts marketplace Artisan work spaces Restaurants/cafes Programmed events in the courtyard and surrounding site
36 Port of LA Arts and Crafts Center LLC Project
37 Bergamot Gallery Space
38 Arts And Crafts Center Marketplace Artisan work spaces Cafe Classes and events
39 Genton Property Group Creative Office/Industrial Space Multi-tenant mixed use project Creative office space (film post production, software development, design studios, etc.) Light industrial, i visitor it serving retail Campus environment Project would be LEED-certified (minimum silver) incorporating green energy systems
40 Blackwelder Creative Office Campus Culver City Genton Property Group Project
41 Burns & Bouchard Specialty and Big Box Retail Site would be programmed with a big box retailer (i.e. Costco or Kohls), restaurant and creative retail Programming g would include seasonal a outdoor activities such as farmers market, Oktoberfest, es etc. Serves local residents, waterfront visitors and cruise ship passengers and crew
42 Burns and Bouchard Project Royal Laundry Adaptive Reuse Pasadena, CA
43 Proposal Evaluation Process Written submittals evaluated by staff (completed) Tours of comparable projects (completed) Developer interviews Recommendation to Board to enter into negotiations
44 Special Events Promoter/Organizer RFI released in December for event promoter/organizer for waterfront sites Received five responses - Outdoor cinema & food fest; Sidewalk art - Container art program, food truck taste-off - Electronic music Halloween event - Wine & international music festival - Holiday light festival, various sporting events
45 Waterfront Event Sites
46 Types of Special Events Sidewalk Art Festival
47 Shipping Container Art Program
48 Summer Film Series Food dfestivals
49 Special Events Promoter/Organizer Review responses Promoter interviews Recommendation to the Board Seeking to begin programming this summer
50 Q & A 2011 Calendar of Events: March 24 Sampson Way Workshop #2 June 4 - Wilmington Waterfront Park Ribbon Cutting June 7 Bekin s Building Workshop #1 July 1 Cars & Stripes Sept Cabrillo Marina Ribbon Cutting Oct 29 Happy Halloween Dec 2 Holiday Fountain Event
The San Pedro Public Market. Redefining the Los Angeles Waterfront March 20th LA Waterfront Town Hall
The San Pedro Public Market Redefining the Los Angeles Waterfront March 20th LA Waterfront Town Hall l JAMES CORNER FIELD OPERATIONS l ADAMSON ASSOCIATES ARCHITECTS 2018 1 The Team l JAMES CORNER FIELD
More informationLos Angeles Harbor Commission Approves a New Wilmington Waterfront
At the Port of Los Angeles Los Angeles Harbor Commission Approves a New Wilmington Waterfront In June, the Los Angeles Harbor Commission approved the Wilmington Waterfront Development Project. The project
More information2.1 Location and Size
2.0 Context 7 2.1 Location and Size The Saanich Penninsula The study area is centrally located within the Town boundaries on the east side of Highway 17, which runs through Sidney in a north-south direction.
More informationLynn Waterfront Master Plan
Lynn Waterfront Master Plan Public Meeting #2 December 10th, 2018 1 Project Schedule Update September 26, 2018 December 10, 2018 Development of the Master Harbor Plan Amendment and Revised Waterfront Master
More informationThank you! Events and Entertainment in Northeast False Creek. Tuesday, March 7, 2017
Events and Entertainment in Northeast False Creek Tuesday, March 7, 2017 Thank you! Thank you for taking the time to attend the Events and Entertainment in Northeast False Creek (NEFC) workshop in partnership
More informationAvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation
AvalonBay Communities + BRIDGE Housing Mission Housing Habitat for Humanity Pacific Union Development Corporation Tonight s Agenda Recap of discussion from last CAC meeting Updates on meetings with Stakeholders
More informationParker Pine Curve Master Plan January 28th, 2009, Public Workshop Comments
Group 1 Big Ideas Pedestrian friendly within and to development - bridge over Main Street from downtown. Campus feel. Parking garage like Castle Rocks - Taj garage may be tucked in hillside. Large (big
More informationCouncil Agenda Report
Agenda Item #5.4. Council Agenda Report SUBJECT: BRIDGE TO BEACH MULTI-USE PATHWAY PROJECT SIGNAGE, KIOSKS AND MAP DESIGN APPROVAL MEETING DATE: JUNE 21, 2012 RECOMMENDATION Staff recommends that the City
More informationCentennial Hall Planning Comments Public Meetings, 9/19/2011. General Comments
Centennial Hall Planning Comments Public Meetings, 9/19/2011 General Comments Space/Location Too tight. Acquire more space (Women s Club?) Is there a more central visitor center site? Site very important
More informationCurrent City Warehouse Facility. City Market Re-Use Concept. Indoor Market/ Maker s Incubator 1.06 acres +/- Open Air Market 1.
Current City Warehouse Facility City Market Re-Use Concept Indoor Market/ Maker s Incubator 1.06 acres +/- Open Air Market Open 1.63 acres Air Market +/- 1.63 acres +/- 4.59 acres +/- Artists Workshops/
More information2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016
2035 General Plan Update and Belmont Village Specific Plan Joint Study with the City Council and Planning Commission April 12, 2016 Agenda 1. Welcome and Introductions 2. General Plan Update Status of
More informationLower South Street/Louisa Street Charrette Final Presentation. September 22, 2009
Lower South Street/Louisa Street Charrette Final Presentation September 22, 2009 Recap Mayor and Council called for a Charrette to engage the public on creating a vision for the Lower South Street area.
More informationVision Plan for Downtown & Lakeside Improvements
Vision Plan for Downtown & Lakeside Improvements Hightstown, New Jersey September 30, 2015 In your words: Recognize that Peddie Lake is Hightstown s Central Park treat it as such Design a plan that is
More informationWorkshop #3 June 13, 2016
Downtown Ocoee Master Plan Workshop #3 June 13, 2016 Our Team Our Team and Tonight s Goal Quick Recap: Why a Downtown Plan? How are we developing the plan? How can you still be involved? What s left to
More information4/8/2015 Item #10D Page 1
MEETING DATE: April 8, 2015 PREPARED BY: Christy Villa, Associate Civil Engineer DEPT. DIRECTOR: Glenn Pruim DEPARTMENT: Public Works CITY MANAGER: Larry Watt SUBJECT: NORTH COAST HIGHWAY 101 STREETSCAPE
More informationWaterfront Development Master Plan
PORT of VANCOUVER USA Vancouver, WA Waterfront Development Master Plan DRAFT - FINAL CONCEPTUAL MASTER PLAN PROJECT TEAM NBBJ Heritage Research Associates JLA Kittelson Associates Leland Consulting Group
More informationTASK FORCE MEETING #6 SUMMARY
TASK FORCE MEETING #6 SUMMARY CITY OF REDWOOD CITY INNER HARBOR SPECIFIC PLAN Tuesday, January 14, 2013 7:00 P.M. 9:30 P.M. Seaport Conference Center, 459 Seaport Court, Redwood City, CA 94063 I. WELCOME
More informationFebruary 2014, Version 2 LA WATERFRONT DESIGN GUIDELINES
February 2014, Version 2 LA WATERFRONT DESIGN GUIDELINES TABLE OF CONTENTS TABLE OF CONTENTS DETAILED TABLE OF CONTENTS 1 INTRODUCTION 1 1 INTRODUCTION OPEN SPACE OPEN SPACE 19 Introduction 1 Introduction
More informationPLACEMAKING & MOBILITY WORKSHOP. January 27, 2016
PLACEMAKING & MOBILITY WORKSHOP January 27, 2016 Boston needs more housing. But there is no one-size fitsall solution. Every neighborhood has its own character. In some places, density is not only appropriate
More informationIMAGINE CLEARWATER. Community Workshop 3. November 2016
IMAGINE CLEARWATER Community Workshop 3 November 2016 Imagine Clearwater has been a 6-month community-focused process to re-envision the downtown waterfront. VISIONING FRAMEWORK MASTER PLAN HOW CAN WE
More informationVIRGINIA KEY CONSENSUS MASTER PLAN
VIRGINIA KEY CONSENSUS MASTER PLAN JULY 2010 Existing Conditions JULY 2010 STAKEHOLDER INTERVIEW PROCESS, January 18-22, 2007 PUBLIC MEETING #1: SITE INVENTORY AND ANALYSIS, March 29, 2007 PUBLIC MEETING
More informationPort of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018
Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3. September 18, 2018 Agenda Welcome Introductions Rules of the Ad-Hoc Presentation Background Vulnerability Assessment Results Non-Agenda
More information1.0 INTRODUCTION. 1.1 Final EIR Organization
.0 INTRODUCTION 0 0. Final EIR Organization This chapter presents background and introductory information for the proposed (proposed Project) and provides a description of the proposed elements. Additionally,
More informationNorth Hutchinson Island 7.55 Acres Vacant Land Approved for 30 Townhome Units
OFFERING MEMORANDUM Contact: Yates & Company Realty, LLC 255 Alhambra Circle Suite 325, Coral Gables, FL 33134 Phone: 305-446-0406 Cell: 786-258-6500 Email: brendayates@bellsouth.net Website: www.yatesandcompany.net
More informationTOWN COUNCIL / PLANNING COMMISSION
Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011 Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L.
More informationPLANNING ADVISORY BOARD AGENDA OCTOBER
! City of Langley PLANNING ADVISORY BOARD AGENDA OCTOBER 1, 2014 3-5pm LANGLEY CITY HALL - 112 2 nd Street, Langley WA 1) Call to Order and Roll Call 2) Approval of the Minutes September 10, 2014 3) Public
More informationSTUART MASTER PLAN. The Town on its Western Waterfront. Treasure Coast Regional Planning Council/City of Stuart TCRPC/Tom Spain
STUART MASTER PLAN C i t y O f S t u a r t F l o r i d a 1998 TCRPC/Tom Spain The Town on its Western Waterfront Treasure Coast Regional Planning Council/City of Stuart STUART MASTER PLAN A WATERFRONT
More informationSBPO BOARD MEETING MARCH 20, 2018
SBPO BOARD MEETING MARCH 20, 2018 TODAY'S AGENDA > Booker Middle School Outreach > Property Information > Schedule > Guiding Principles > Three Concepts Booker Middle School Outreach Property Information
More informationHighest & Best Use Study Marina Park Lands
Executive Summary of Report MARCH 2006 TABLE OF CONTENTS 1. Introduction...1 2. Study Process...2 3. Highest And Best Use Program...3 4. Concept Plan...8 5. Public Area Animation...9 6. Marina Park Implementation
More informationPalm Jebel Ali - Dubai, United Arab Emirates
Palm Jebel Ali - Dubai, United Arab Emirates LOCATION: CLIENT: Dubai Tony Perrin Senior Development Manager Dubai Waterfront Co LLC PROJECT SIZE: 1000 acres SCOPE OF WORK: Urban Design and Landscape Architecture
More informationEmerson Park Master Plan Update. Public Meeting III August 27, 2014
Emerson Park Master Plan Update Public Meeting III August 27, 2014 Meeting Agenda: Project Update Presentation of Master Plan Components Discussion and Feedback The Path Forward: Building on the Concept
More informationRiverfront Development Plan
Planning Studies Project Overview: Continuity Developing Fort Myers underused riverfront was the final step in Downtown redevelopment. To mine all facets of the riverfront, the Plan had to be created cohesively
More informationMississippi Drive Corridor Revitalization. A DestinationTransportation Project...
Mississippi Drive Corridor Revitalization A DestinationTransportation Project... Mississippi Drive Corridor Revitalization Welcome! Tonight s Agenda: Further define the Scope of the Project Discuss the
More information12 th Street Connector Alignment Study VISIONING PUBLIC WORKSHOP - JUNE 25, :00PM TO 8:00PM
12 th Street Connector Alignment Study VISIONING PUBLIC WORKSHOP - JUNE 25, 2018 6:00PM TO 8:00PM Goals for Today s Workshop Agenda: Project Introduction, Purpose, and Goals Existing Conditions Traffic
More informationPINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park
PINE CURVE REZONING BACKGROUND Purchased as two parcels in 2001 and 2002 Annexed and Zoned Greater Downtown District Historic Center September 25, 2002 and October 7, 2002 WHAT THE PROJECT IS AND IS NOT
More informationOld Town Neighborhoods Plan. Choices Event Wednesday, December 9, 2015
Old Town Neighborhoods Plan Choices Event Wednesday, December 9, 2015 Agenda 6:00 6:10 p.m. Welcome + Sign In 6:10 6:30 p.m. Presentation 6:30 8:00 p.m. Workshop + Open House Seeking your input on: Neighborhood
More informationIII. PROJECT DESCRIPTION
III. PROJECT DESCRIPTION LOCATION AND BOUNDARIES The City of Manhattan Beach is located in the South Bay region of Los Angeles County, California, approximately 2 miles south of the Los Angeles International
More informationOnline Survey Results 1 Port Street East
Online Survey Results 1 Port Street East Inspiration Port Credit is about envisioning a bright, new future for the Port Credit waterfront. Through an online survey in the fall of 2014, we asked what the
More informationLehigh Acres Land Development Regulations Community Planning Project
Lehigh Acres Land Development Regulations Planning Effort Summary In July, 2010 Commissioner Frank Mann invited the Lehigh Acres community to start discussing how to achieve their recently adopted community
More informationChelsea Creek Municipal Harbor Plan
Chelsea Creek Municipal Harbor Plan Public Meeting #1 June 11th, 2018 1 Presentation outline I. Introduction: Why are we doing this plan? II. Evolution of Chelsea Creek III. State of Chelsea Creek IV.
More informationchapter DESIGN GUIDELINES NEW RIVER MASTER PLAN REPORT
chapter DESIGN GUIDELINES NEW RIVER MASTER PLAN REPORT .76 DESIGN GUIDELINES An Overview design guidelines NEW RIVER MASTER PLAN Design Guidelines can transform the image of a city. Specific, design-based
More informationWilmington Waterfront Overview
Agenda Introduction Wilmington Waterfront Overview and Objectives Avalon Promenade & Gateway Project Description Site Layout Project Components Entry Plaza Avalon Promenade and Open Space Pedestrian Bridge
More informationNAPA COUNTY HEALTH AND HUMAN SERVICES AGENCY MASTER PLAN UPDATE BOARD OF SUPERVISORS MEETING MARCH 20, 2012
NAPA COUNTY HEALTH AND HUMAN SERVICES AGENCY MASTER PLAN UPDATE BOARD OF SUPERVISORS MEETING MARCH 20, 2012 PROJECT DESCRIPTION Programming and Master Plan for the Expansion and Consolidation of the Napa
More informationNOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE LAND PARK COMMERCIAL CENTER PROJECT
NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE LAND PARK COMMERCIAL CENTER PROJECT PUBLIC COMMENT PERIOD November 12, 2015 to December 14, 2015 INTRODUCTION The City
More informationMARINA MARKET & WATERFRONT DEVELOPMENT STUDY PORT ARANSAS, TEXAS
MARINA MARKET & WATERFRONT DEVELOPMENT STUDY PORT ARANSAS, TEXAS FEBRUARY 2015 PRESENTATION OUTLINE 1 2 3 4 5 6 7 REGIONAL POSITIONING SITE IMPRESSIONS PLANNING & DESIGN PRINCIPLES EXISTING IMPROVEMENTS
More informationCENTRAL ESTUARY PLAN AVISION FOR OAKLAND S WATERFRONT
Central Estuary Plan A VISION FOR OAKLAND S WATERFRONT Specific Plan and Environmental Assessment Presentation to the Parks and Recreation Advisory Commission December 9, 2009 This Afternoon s Presentation
More informationSTUDY AREA. Tonight s Agenda. Project Tasks Completed. Next Steps. Town of Oyster Bay Eastern Waterfront Community Vision & Revitalization Plan
Town of Oyster Bay Eastern Waterfront Community Vision & Revitalization Plan Public Meeting January 27, 2009 Opening Remarks Presentation Tonight s Agenda Introduction Study Area Overview Public Participation
More informationCarlsbad Village Redevelopment Concept Summary of Features
Carlsbad Village Redevelopment Concept Summary of Features Calthorpe Associates November 5, 2003 The Redevelopment Concept illustrates a vision for the future of Carlsbad Village. The overall vision of
More informationCOMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT
COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT http://www.edcgov.us/devservices/ PLACERVILLE OFFICE: 2850 Fairlane Court, Placerville, CA 95667 BUILDING (530) 621-5315 / (530) 622-1708
More informationNew Rochelle Arts + Cultural District Master Plan Conceptual Plan. February 4, 2015
New Rochelle Arts + Cultural District Master Plan Conceptual Plan February 4, 2015 Arts Districts What s It All About? What is an Arts + Cultural District? Designated area Set of policies that support
More informationA L F O N S O A R C H I T E C T S
A L F O N S O A R C H I T E C T S A L M A T H E P I E R O F S T. P E T E R S B U R G A L F ALFONSO O N S O A R ARCHITECTS C H I T E C T S ALMA 1. Please demonstrate how the project fits within the Pinellas
More informationDOWNTOWN VISIONING FORUM AGENDA JUNE 5, 2014
DOWNTOWN VISIONING FORUM AGENDA JUNE 5, 2014 Welcome and Introductions Evolution of the Downtown Proposed Downtown Plan Overview and Process Have Your Say! Next Steps Closing Comments 1 WELCOME & INTRODUCTIONS
More informationLynn Waterfront Master Plan
Lynn Waterfront Master Plan DECEMBER ALTERNATIVES PRESENTATION City of Lynn / EDIC ZHA / GEI Work Schedule June Kick-Off June September Site Analysis & Property Owner / Stakeholder Meetings September Analysis
More informationFour Big Ideas. Three Key Opportunities. Principles. Draft Place Making Master Plan. 1. The Foreshore 2. Green Links. 3.
project background Four Big Ideas 1. The Healthy Thriving Place. An International Focus 3. Reclaiming Mooloolaba 4. The Resort Heart of the Coast In November 01 a big ideas workshop was held involving
More informationDenver Moves: Transit Task Force
Insert transit picture Denver Moves: Transit Task Force Meeting #8 October 5, 2017 1. Welcome & Introductions Opening remarks and housekeeping Task Force and audience introductions Upcoming events and
More informationTask Force Meeting #8
March 11, 2014 AGENDA 7:00 Welcome/Housekeeping Laura Stetson 7:05 Public Comment 7:20 Presentations BIAC 101/84 Interchange InnVision Shelter Network Redwood City Update 7:35 Revised Guiding Principles
More informationPLANNING COMMISSION STAFF REPORT
OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE CUPERTINO, CA 95014-3255 (408) 777-3308 FAX (408) 777-3333 planning@cupertino.org PLANNING COMMISSION STAFF REPORT Agenda Item No. Agenda Date:
More informationPlanning Commission March 14, Presented by: City of Bellingham Port of Bellingham
Planning Commission March 14, 2013 Presented by: City of Bellingham Port of Bellingham 1 Agenda Waterfront District Background Waterfront District Proposal Overview Sub-area Plan Development Regulations
More informationWaterfront West December 6, 2016
1 Waterfront West December 6, 2016 Agenda 1. Development Team 2. Waterfront History As Our Guide. A Compelling Site Idea 4. Community Benefits 5. Zoning 6. Architectural Context 7. Project Renderings 8.
More informationNaomi Weiss, Executive Director, DBPA Jason Jeffries, Project Manager, City of Daytona Beach
Naomi Weiss, Executive Director, DBPA Jason Jeffries, Project Manager, City of Daytona Beach Nottingham Plan 2002 Adopted Redevelopment Plan 2002 Riverfront Action Plan 2004 Downtown Vision Plan 2007
More informationSUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO)
TO: FROM: Honorable Mayor and City Council Planning & Community Development Department SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 260-400 E. COLORADO BOULEVARD (PASEO COLORADO) RECOMMENDATION:
More informationUniversity of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010
University of the District of Columbia Van Ness Campus Master Plan Open House 3 December 8, 2010 Introductions Sequence of Work: Campus Master Plan BEGIN: INTRODUCE AND START WORK Project Initiation Team
More informationPINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002
BACKGROUND Purchased as two parcels in 2001 and 2002 WHAT THE PROJECT IS AND IS NOT A Rezoning establishes the land use standards for Annexed and Zoned Greater Downtown District Historic Center September
More informationA.1. REDEVELOP THE PORT WITHIN ITS EXISTING BOUNDARIES Space SPACE Worldwide, many ports are faced with a lack of available space as a result of diffe
A. A.1. REDEVELOP THE PORT WITHIN ITS EXISTING BOUNDARIES A.2. SHARE THE USE OF THE WATER AND WATERFRONT BETWEEN URBAN AND PORT FUNCTIONS A.3. MIX URBAN AND PORT FUNCTIONS A.4. MOVE THE CITY TO THE WATER
More informationSTAFF REPORT NATIONAL MEDAL OF HONOR MUSEUM
STAFF REPORT NATIONAL MEDAL OF HONOR MUSEUM For reference, the Zoning Code and Land Development Regulations are available online. AGENDA ITEM: 5.b. Case #: Request: Location: Type of Request: Public Hearing:
More informationSOUTHEAST AREA SPECIFIC PLAN. Planning Commission Study Session August 18, 2016
SOUTHEAST AREA SPECIFIC PLAN Planning Commission Study Session August 18, 2016 Background: How did we get here? Directed by City Council to prepare Specific Plan (2012) Sustainability focused grant from
More informationThe Van Ness Campus. Weekly Construction Bulletin #259
The Van Ness Campus Weekly Construction Bulletin #259 Construction Update Week of September 24, 2018 The Van Ness Campus Weekly Bulletins are intended to help inform members of the community about upcoming
More informationPromoting Economic Development Through Upfront SEPA Review: Lessons from South Downtown Tacoma
Promoting Economic Development Through Upfront SEPA Review: Lessons from South Downtown Tacoma 1 This session will focus on the City of Tacoma s South Downtown Subarea Plan and associated Non-Project SEPA
More informationIllustrative Campus Plan with Proposed Development
Illustrative Campus Plan with Proposed Development Approved Compiled Plan January 2003 Figure IV-52 89 The supportive relationship and interaction between the campus and the surrounding community is an
More informationVillage of Pemberton DOWNTOWN ENHANCEMENT INITIATIVE FRONTIER STREET PILOT PROJECT WE NEED YOUR HELP TO REVIEW THE PLAN
Village of Pemberton DOWNTOWN ENHANCEMENT INITIATIVE FRONTIER STREET PILOT PROJECT WELCOME TO THE NEW FRONTIER STREET! WE NEED YOUR HELP TO REVIEW THE PLAN The Village of Pemberton would like your feedback
More informationMountain View & Old Dixie Master Plans DACC Meeting. July 10, 2018
Mountain View & Old Dixie Master Plans DACC Meeting July 10, 2018 Agenda I. Project Schedule II. Goals III. Design Workshop Our Team Sizemore Group: Award-Winning Planning and Architecture Principal: Bill
More informationThe City of Poway Creating a Town Center. Patti Brindle, AICP City Planner, City of Poway APA Luncheon September 28, 2006
The City of Poway Creating a Town Center Patti Brindle, AICP City Planner, City of Poway APA Luncheon September 28, 2006 1 The City in the Country Population: 50,542 Area: 25,047 acres Incorporated December
More informationPublic Consultation Summary: Lakeview Place Making Workshop January 30, 2008.
Page 1 of 11 Public Consultation Summary: Lakeview Place Making Workshop January 30, 2008. 1.0 Introduction: On January 30, 2008 the City of Mississauga, in conjunction with the consulting team of Brook
More informationWentworth Point July Community Information Session Feedback Summary
Wentworth Point July Community Information Session Feedback Summary Introduction On Saturday, 28 July 2018, Landcom held a community information session from 11am to 1pm, at the Pulse Club, Wentworth Point,
More informationDallas Complete Streets Initiative and Design Manual. City Council Briefing December 2, 2015
Dallas Complete Streets Initiative and Design Manual City Council Briefing December 2, 2015 1 Purpose Update the Dallas City Council on the Draft Complete Streets Design Manual Discuss Upcoming Work Plan
More informationOur Legacy Projects DOWNTOWN JACKSONVILLE MASTER PLAN
DOWNTOWN JACKSONVILLE MASTER PLAN A major component of our master plan is the creation of a strong and accessible open space and recreation system. The four most vital links in that system are our legacy
More informationCRA Five Year Capital Improvement Plan. September 2, 2015
CRA Five Year Capital Improvement Plan September 2, 2015 Downtown CRA Recap Introduction Downtown Capital Improvement Projects: $2.6M available for FY 2016. Includes the recent loan of $2.0M. DOWNTOWN
More informationKey Themes and Responses May 2016
King and Victoria Transit Hub and Waterloo Street Pedestrian Access Key Themes and Responses May 2016 The following summarizes what Regional staff heard about the King Victoria Transit Hub and Waterloo
More informationLeonard s Beach Secondary Plan (Alcona North) Official Plan Amendment
Leonard s Beach Secondary Plan (Alcona North) Official Plan Amendment Public Meeting Presentation August 14, 2013 Note: This document is for presentation purposes only. Please see Staff Report DSR-135-13
More informationDraft Bergamot Area Plan
ATTACHMENT 1 Draft Bergamot Area Plan Taskforce on the Environment April 15, 2013 www.bergamotplan.net 1 Overview WHAT IS THE BERGAMOT AREA PLAN? A Community-Based Planning Document Guiding the Future
More informationPLAN ELEMENTS WORKSHOP. April 5, 2016
PLAN ELEMENTS WORKSHOP April 5, 2016 needs more housing. But there is no one-size fits-all solution. Every neighborhood has its own character. In some places, density is not only appropriate it is badly
More informationPrevious Stakeholder Meetings
Titusville Tomorrow Previous Stakeholder Meetings Workshop 1 SWOT CVS Workshop 2 SWOT and CVS Results Value of Place Based Design 3 Table Top Designs The Waterfront The Gateways The Downtown Key Points
More informationRt 29 Solutions Hydraulic Planning Advisory Panel. September 28, 2017
Hydraulic Planning Advisory Panel September 28, 2017 Agenda Item 1: Introductions Hydraulic Planning Advisory Panel members Technical Team members 2 Agenda item 2: Public Interaction and Feedback Live
More informationWelcome & Introductions
Charrette Week Report Back - Thursday Evening April 25, 2013 Welcome & Introductions A New Master Plan Land Use and Circulation Putting data and information to work to create solutions for the master plan
More informationStrategies/Actions Priority List
Strengthening the Creative Sector: Build stronger relationships with, and between, cultural organizations and businesses and increase opportunities for working together to build capacity within organizations.
More informationCommunity Workshop November 19, 2014
Community Workshop November 19, 2014 Agenda Welcome and Introduction What is a General Plan? About the General Plan Update Our General Plan Topics to be included in the Update Update process Opportunities
More informationCITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT February 21, 2012 BRIGHTON LANDING SPECIFIC PLAN & DEVELOPMENT PROJECT
CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT February 21, 2012 Staff Contact: Fred Buderi (707) 449-5307 TITLE: PURPOSE: BRIGHTON LANDING SPECIFIC PLAN & DEVELOPMENT PROJECT INFORMATIONAL
More information3.1 Existing Land Use
3.0 Land Use This strategy has been developed taking into account the position of the Town of Sidney as the economic center of the Saanich Peninsula. It acknowledges existing land use patterns in the downtown
More informationIn partnership with: Harbor Corridor Plan Bali Hi Mobile Home Park July 24, 2013
In partnership with: Harbor Corridor Plan Bali Hi Mobile Home Park July 24, 2013 Project Intro 2-miles of Harbor Boulevard Westminster/17 th Street to just north of Edinger Avenue Many people use the corridor
More informationWESTERN ILLINOIS UNIVERSITY
WESTERN ILLINOIS UNIVERSITY Quad Cities Riverfront Campus Preliminary Master Plan Presentation 2 February 1, 2006 Achieving Future Flexibility 1. Monitor space needs as the new buildings come on line and
More informationENVISIONING TOMORROW S FORT MYERS BEACH
ENVISIONING TOMORROW S FORT MYERS BEACH NATURAL ENVIRONMENT... 2-1 MOBILITY... 2-1 TIMES SQUARE... 2-1 AVENUE OF PALMS... 2-2 RESIDENTIAL NEIGHBORHOODS... 2-2 A SECOND MAIN STREET... 2-4 FORT MYERS BEACH,
More informationPublic Workshop 2 December 11, 2014 OLIN
Public Workshop 2 December 11, 2014 OLIN TRIPLE IMAGE PANORAMA A NEW VISION FOR THE RIVERFRONT PROMENADE Burlington s Riverfront has historically been a defining character of the City s identity. This
More informationCold Lake Marina Master Plan
Cold Lake Marina Master Plan Intro to Team Moffatt & Nichol is recognized throughout the world for our role in the revitalization and redevelopment of urban waterfronts, including the evolution of modern
More informationThe Warehouse District in West Palm Beach is comprised of approximately 85,000 square of previously underutilized warehouse / industrial buildings in
The Warehouse District in West Palm Beach is comprised of approximately 85,000 square of previously underutilized warehouse / industrial buildings in downtown being reimagined and redeveloped into a thriving
More informationmilano santa giulia Our Project, Your Retail
milano santa giulia Our Project, Your 2 A new city district for a global city population density 3 Milan is the most populous city in Italy and the country s main industrial, financial and commercial centre,
More informationSFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE
SFMTA Municipal Transportation Agency Image: a bus in front of the Palace of the Legion of honor SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN AVENUE @ OCEAN AVENUE Community Meeting May 23, 2012 San Francisco,
More informationPhase I Redevelopment Plan. First Community Meeting
Hoboken Terminal and Yard Phase I Redevelopment Plan First Community Meeting May 31, 2011 One Hudson Place Phase I Redevelopment Plan Redevelopment Plan First Community Meeting Agenda 1. Redevelopment
More informationINTRODUCTION TO THE CONCEPTUAL SITE PLANS
INTRODUCTION TO THE CONCEPTUAL SITE PLANS At this stage in the planning process, we are seeking your feedback on the draft Guiding Principles and input in evaluating three conceptual site plans. Each of
More informationRedmond Central Connector
Redmond Central Connector Redmond Central Master Connector Plan Master Plan Arts Commission Master Plan Development March 10, 2011 By Carolyn Hope, Senior Planner Guy Michaelsen Dave Knight The Berger
More informationCITY OF BOCA RATON GOVERNMENTAL CAMPUS Master Plan Progress August 22, 2017
CITY OF BOCA RATON GOVERNMENTAL CAMPUS Master Plan Progress August 22, 2017 This is a rare moment in the City s history which affords us the opportunity to create a civic landmark born of comprehensive
More information