1 CITY OF SIMI VALLEY MEMORANDUM AGENDA ITEM NO. Consent (3) August 15, 2016 TO: FROM: City Council Department of Public Works SUBJECT: ADOPTION OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO SOLICIT CONSTRUCTION BIDS FOR THE ARROYO SIMI GREENWAY BIKE TRAIL PHASE 3, SPECIFICATION NO. SV 16-06, FEDERAL AID PROJECT NO. ATPL 5405 (082) STAFF RECOMMENDATION It is recommended that the City Council adopt the plans and specifications on file with the City Clerk s Office and authorize the Department of Public Works to solicit construction bids for the Arroyo Simi Greenway Bike Trail Phase 3, Specification No. SV 16-06, Federal Aid Project No. ATPL 5405 (082) CITY MANAGER S RECOMMENDATION The City Manager recommends that the City Council authorize Public Works to solicit construction bids for the Phase 3 Arroyo Simi Greenway Bike Trail project. BACKGROUND AND OVERVIEW City Council authorization is requested to solicit construction bids for the Arroyo Simi Greenway Bike Trail Phase 3, Specification No. SV 16-06, Federal Aid Project No. ATPL 5405 (082) (Location Map, Attachment A, page 4). This project primarily consists of improving the existing unpaved maintenance road located along the south side of the Arroyo Simi between Madera Road and First Street to a paved pedestrian and bicycle path with associated fencing, gates, interpretive signs, benches, and drainage improvements; installation of a pedestrian/bicycle bridge over the Arroyo Simi near Fifth Street to provide access between the existing north side trail and the new south side trail; and construction of a trail spur south along Fifth Street between Los Angeles Avenue and Royal Avenue to connect the bike trail to Sinaloa Middle School. The FY Streets and Roads budget contains $1,644,000 for this project ($150,000 for engineering services and $1,494,000 for construction). The funding is comprised of $1,197,000 of state and federal Active Transportation Program (ATP) funds, $50,000 Article 3 funds, $66,500 Rancho Simi Recreation and Park District (RSRPD) contribution, and $330,500 Air Quality Trust Funds).
2 2 FINDINGS AND ALTERNATIVES The plans, specifications, and cost estimate for this project have been completed, and a bid package is available for review in the City Clerk's Office and the Department of Public Works. In addition to the cost of construction, consulting services will be required for materials testing and surveying services. Public Works staff will perform contract administration and construction inspection services. The construction time schedule has been developed as follows: Authorization to Solicit Bids... August 15, 2016 Open Bids... September 20, 2016 Award of Construction Contract... October 17, 2016 Commence Construction... October 26, 2016 Complete Construction... February 27, 2017 This project has been found to be Categorically Exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301(c) of the State CEQA Guidelines. Also, the project has been found to qualify for a Programmatic Categorical Exclusion under the National Environmental Policy Act (NEPA) (Attachment B, page 5). Upon the City Council's approval, a number of contractors, including local contractors from the City s current Contractor s List, will be invited to submit bids for this project. In addition, a Notice Inviting Bids will be published in the Ventura County Star, posted on the City s website, and will also be submitted to the City s list of construction publications. The following alternatives are available for City Council consideration: 1. Adopt the plans and specifications on file with the City Clerk s Office and authorize the Department of Public Works to solicit construction bids for the Arroyo Simi Greenway Bike Trail Phase 3, Specification No. SV 16-06, Federal Aid Project No. ATPL 5405 (082); 2. Provide staff with other direction. Staff recommends Alternative No. 1. SUGGESTED CITY COUNCIL MOTION I move to adopt the plans and specifications on file with the City Clerk s Office and authorize the Department of Public Works to solicit construction bids for the Arroyo Simi Greenway Bike Trail Phase 3.
3 3 SUMMARY State and Federal funding has been approved for this project under the Active Transportation Program (ATP). The plans, specifications, and cost estimates have been completed, and a bid package is available for review in the City Clerk s Office and the Department of Public Works. It is recommended that the City Council authorize the Department of Public Works to solicit construction bids for this project. Prepared by: Fuad Shamout, Senior Engineer Ronald K. Fuchiwaki, Director Department of Public Works INDEX Page Attachment A Location Map... 4 Attachment B Notice of Exemption... 5
4 4 ATTACHMENT A
5 To: ATTACHMENT B 5 NOTICE OF EXEMPTION From: County Clerk County of Ventura 800 S. Victoria Avenue Ventura, CA City of Simi Valley 2929 Tapo Canyon Road Simi Valley, CA Project Title: Arroyo Simi Greenway Bike Trail Phase 3 Project Location - Specific: The existing pedestrian and bicycle trail on the south side of the Arroyo Simi from Madera Road to First Street as well as a portion of right-of-way along Fifth Street. Project Location - City: Simi Valley Project Location - County: _V _ e_ nt_u_ra Description of Project: The scope of work for this project includes (1) construction of a 0.91 mile section of new paved trail along the south side of the Arroyo Simi between Madera Road and First Street; (2) installation of a pedestrian bridge across the Arroyo Simi west of First Street to provide access between the existing north-side trail and the new south-side trail and allow patrons to utilize the existing grade-separated undercrossing at First Street; (3) construction of a new bike trail spur along Fifth Street between Los Angeles Avenue and Royal Avenue that will connect to Sinaloa Middle School by combining an existing on-street bicycle route with a 0.36-mile section of new paved trail; (4) installation of five new trail entrances that will improve access to and awareness of the Greenway; (5) installation of related fencing, gates, and landscaping; and (6) installation of educational interpretive exhibits. Name of Public Agency Approving Project: --= C..:..:it.L..y..o..;:;.f:.. =S..:. :. im.:.. :. ;_V i.a..a ;=l=le;..,.y _~ - - ~ Date of Approval Name of Person or. Agency Carrying Out Project: _C=ity,.<...-;::;.o.f.:.. = S=im=i'--V;;_;a=IJ=ec.,. y Exempt Status: (check one) _ Ministerial [Sec (b)(1 ); 15268]; Declared Emer~encx [Sec (b)(3); 15269(a)]; Emergency ProJect ~Sec (b)(4) ; 15269(b)(c)]; ~ ec"""'t"""' io;..;..n;._1.;;..;5;;_;3"-"0""""4' X Categorical Exemption - State type and section number _S Statutory Exemptions - State code number General Rule [Sec (b)(3)] Text of exemption and reasons why project is exempt: Section of the State CEQA guidelines, titled "Minor Alterations to Land," reads as follows: "Class 4 consists of minor public or private alterations in the condition of land, water, and/or vegetation which do not involve removal of healthy, mature. scenic trees except for forestry or agricultural purposes. Examples include, but are not limited to:... (h) The creation of bicycle lanes on existing rights-of-way." The bicycle trail improvements will be along existing right-of-way. The pedestrian bridge will suspend over the waterway and will not alter any vegetation. No existing trees would be removed by the project. Therefore, the project is exempt from further review under CEQA. Lead Agency Contact Person: Fuad Shamout Area Code/Telephone Signatur~ ~ate: Lauren Funa1ole ~ X Signed by Lead Agency 7 / ~ J,' (805) Title: Senior Planner ept. of Environmental Services
CITY OF SIMI VALLEY MEMORANDUM
CITY OF SIMI VALLEY MEMORANDUM AGENDA ITEM NO. Consent (10) November 14, 2016 TO: FROM: City Council Department of Environmental Services SUBJECT: ADOPTION OF A RESOLUTION TO RATIFY VENTURA COUNTY FIRE
More informationCITY OF SIMI VALLEY MEMORANDUM
CITY OF SIMI VALLEY MEMORANDUM AGENDA ITEM NO. 9.1 May 18, 2016 TO: FROM: Planning Commission Department of Environmental Services SUBJECT: REVIEW OF POTENTIAL FISCAL YEAR (FY) 2016-17 CAPITAL IMPROVEMENT
More informationREPORT TO COUNCIL City of Sacramento
REPORT TO COUNCIL City of Sacramento 915 I Street, Sacramento, CA 95814-2604' www.cityofsacramento.org CONSENT August 25, 2009 Honorable Mayor and Members of the City Council Title: Contract: Valley Hi
More informationREPORT TO COUNCIL City of Sacramento
REPORT TO COUNCIL City of Sacramento 5 9151 Street, Sacramento, CA 95814-2604 www.cityofsacramento.org CONSENT May 4, 2010 Honorable Mayor and Members of the City Council Title: Contract: Rea Park Improvements
More informationNOTICE OF PREPARATION
NOTICE OF PREPARATION To: All Interested Parties Subject: Notice of Preparation of an Environmental Impact Report From: City of Petaluma Address: 11 English Street, Petaluma, CA 94952-2610 Contact: Heather
More informationCalifornia Environmental Quality Act (CEQA) Environmental Review Process
California Environmental Quality Act (CEQA) Environmental Review Process Los Angeles Union Station Forecourt and Esplanade Improvements constitute a Project Los Angeles County Metropolitan Transportation
More informationRosecrans/Marquardt Grade Separation Project. Community Open House Meeting
Rosecrans/Marquardt Grade Separation Project Community Open House Meeting October 17, 2017 Rosecrans/Marquardt Presentation Agenda 1. Welcome Remarks & Introductions 2. Community Outreach 3. Project Goals
More informationGrand River Ravines Georgetown Township
Grand River Ravines Georgetown Township Project Description: The Grand River Ravines County Park property is composed of the 68-acre former Fillmore at the Bend Open Space purchased in 1999 and two more
More informationAGENDA ITEM NO. 17. Interim City Manager: Arnold Shadbehr Dir. Of Planning: Brian James
AGENDA ITEM NO. 17 CITY OF HAWTHORNE CITY COUNCIL AGENDA BILL For the meeting of October 23, 2018 Originating Department: Planning and Community Development Interim City Manager: Arnold Shadbehr Dir. Of
More informationCity of Sacramento City Council 915 I Street, Sacramento, CA,
City of Sacramento City Council 915 I Street, Sacramento, CA, 95814 www.cityofsacramento.org 7 Meeting Date: 3/22/2011 Report Type: Consent Title: Contract: Power Inn Streetscape Project (T15078000) Report
More informationCOASTAL CONSERVANCY. Staff Recommendation June 5, 2008 SAN DIEGO RIVER TRIBUTARY CANYONS PROJECT. File No Project Manager: Megan Johnson
COASTAL CONSERVANCY Staff Recommendation June 5, 2008 SAN DIEGO RIVER TRIBUTARY CANYONS PROJECT File No. 08-059 Project Manager: Megan Johnson RECOMMENDED ACTION: Authorization to disburse an amount not
More informationDATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer
DATE: January 19, 2016 TO: FROM: THROUGH: SUBJECT: WCA Governing Board Johnathan Perisho, Project Manager Mark Stanley, Executive Officer Item 18: Consideration of a resolution to approve contract amendment
More informationMEMORANDUM. 1. Award a contract for construction of the subject project to Apodaca Paving, Inc. in the amount of $324,375;
MEMORANDUM TO: FROM: BY: SUBJECT: GEOFF ENGLISH, PUBLIC WORKS DIRECTOR MIKE LINN, ASSISTANT CITY ENGINEER CONSIDERATION OF AN AWARD OF CONTRACT TO APODACA PAVING, INC. FOR CONSTRUCTION OF THE 2014 CITYWIDE
More informationIMPACT ON FINANCIAL AND PERSONNEL RESOURCES:
MEMORANDUM TO: FROM: CITY COUNCIL GEOFF ENGLISH, PUBLIC WORKS DIRECTOR SUBJECT: CONSIDERATION OF ADOPTION OF RESOLUTIONS ORDERING THE PREPARATION AND FILING OF ANNUAL ENGINEER S REPORTS FOR THE PARKSIDE
More informationADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN
TO: FROM: SUBJECT: Honorable Mayor and City Council Planning Department ADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN RECOMMENDATION: It is recommended that the City Council:
More information4/8/2015 Item #10D Page 1
MEETING DATE: April 8, 2015 PREPARED BY: Christy Villa, Associate Civil Engineer DEPT. DIRECTOR: Glenn Pruim DEPARTMENT: Public Works CITY MANAGER: Larry Watt SUBJECT: NORTH COAST HIGHWAY 101 STREETSCAPE
More informationAgenda Report. TO: CITY COUNCIL April 6, 2009 FROM: RECOMMENDATION: BACKGROUND: CITY MANAGER
Agenda Report TO: CITY COUNCIL April 6, 2009 FROM: CITY MANAGER SUBJECT: AUTHORIZATION TO ENTER INTO A CONTRACT WITH PETER TOLKIN ARCHITECTURE FOR PROFESSIONAL SERVICES FOR THE DESIGN AND CONSTRUCTION
More informationCONSENT CALENDAR September 27, 2005
Office of the Executive Officer September 27, 2005 To: From: Submitted By: Subject: Honorable Chairperson and Members of the Redevelopment Agency Phil Kamlarz, Executive Officer Dan Marks, Director, Planning
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.3 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving the removal of Municipal Railway bus zones at various
More information- INVITATION - COURTESY INFORMATIONAL MEETING
- INVITATION - COURTESY INFORMATIONAL MEETING Hosted by the Property Owner and Project Developer CAMELLIA COURT DEVELOPMENT WEDNESDAY, JANUARY 25, 2017, 7:00 9:00 P.M. BLOY CENTER 1441 S. BENITO AVE, ALHAMBRA,
More informationDesign Review Commission Report
City of Beverly Hills Planning Division 455 N. Rexford Drive Beverly Hills, CA 90210 TEL. (310) 285-1141 FAX. (310) 858-5966 Design Review Commission Report Meeting Date: Thursday, March 2, 2017 Subject:
More informationMayor Dave Netterstrom and Members of the City Commission. Anthony Caravella, AICP, Director of Development Services
CITY COMMISSION BRIEFING & DOWNTOWN COCOA BEACH COMMUNITY REDEVELOPMENT AGENCY Planning Board and Landscape Committee Report For Meeting Scheduled for February 7, 2013 Minutemen Causeway Low Impact Design
More informationDATE: May 25, Watershed Conservation Authority Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer
DATE: May 25, 2017 TO: FROM: THROUGH: SUBJECT: Watershed Conservation Authority Governing Board Johnathan Perisho, Project Manager Mark Stanley, Executive Officer : Consideration of a resolution to approve
More informationGUIDE FOR PROCESSING A SUPPLEMENTAL ZONING CLEARANCE
GUIDE FOR PROCESSING A SUPPLEMENTAL ZONING CLEARANCE A Supplemental Zoning Clearance ensures that all required fees and any special plan checks and/or conditions of the various departments and agencies
More informationPROJECT BACKGROUND. Preliminary Design Scope and Tasks
PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of
More informationThe maximum amounts shown in the Engineer s Report for each of those categories for FY 2008/09 are as follows (per house/per year):
Agenda Item No. August 28, 2007 TO: FROM: SUBJECT: Honorable Mayor and City Council Attention: David J. Van Kirk, City Manager Dale I. Pfeiffer, Director of Public Works RESOLUTION INITIATING PROCEEDINGS,
More informationREPORT TO COUNCIL City of Sacramento
REPORT TO COUNCIL City of Sacramento 915 I Street, Sacramento, CA 95814-2604 www. CityofSacramento.org 9 CONSENT February 12, 2008 Honorable Mayor and Members of the City Council Title: Park Name and Master
More informationPlanning Commission Report
Planning Commission Report To: From: Subject: Planning Commission Meeting: January 6, 2016 Agenda Item: 8-B Planning Commission David Martin, Planning & Community Development Director Introduction to the
More informationMEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR
MEMORANDUM TO: FROM: BY: CITY COUNCIL TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR KELLY HEFFERNON, ASSOCIATE PLANNER SUBJECT: CONSIDERATION OF ADOPTION OF AN ORDINANCE AMENDING CHAPTER 16.84 OF THE
More informationLOS ANGELES CITY PLANNING DEPARTMENT STAFF REPORT
LOS ANGELES CITY PLANNING DEPARTMENT STAFF REPORT LOS ANGELES CITY PLANNING COMMISSION CASE NO: CPC 2006-9374 CRA CEQA: Exempt DATE: December 21, 2006 Location: Valley Plaza and Laurel Plaza TIME: after
More informationCITY OF MANHATTAN BEACH STAFF REPORT. THROUGH: Marisa Lundstedt, Director of Community Development
CITY OF MANHATTAN BEACH STAFF REPORT TO: Planning Commission THROUGH: Marisa Lundstedt, Director of Community Development FROM: Tony Olmos, Director of Public Works DATE: April 29, 2015 SUBJECT: Determination
More informationRESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension
RESOLUTION NO. R2018-32 Refining the route, profile and stations for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 09/13/2018
More informationCOASTAL CONSERVANCY. Staff Recommendation December 13, 2007 COASTAL TRAIL AT LAND S END. File No Project Manager: Joan Cardellino
COASTAL CONSERVANCY Staff Recommendation December 13, 2007 COASTAL TRAIL AT LAND S END File No. 07-086-01 Project Manager: Joan Cardellino RECOMMENDED ACTION: Authorization to disburse up to eight hundred
More informationM E M O R A N D U M February 21, 2018
M E M O R A N D U M February 21, 2018 Project: Action Requested: Background Information: CP18-001, Ordinance No. 1060-A, Amendment to the City of Southlake Parks, Recreation & Open Space / Community Facilities
More information:JI!fn Siegel, City Manager
3/21/2017 E14 TO: FROM: Honorable Mayor and Members of City Council :JI!fn Siegel, City Manager SUBMITTED BY: DATE: SUBJECT: Dori Budde, Community Services Director March 21, 2017 Acceptance of Plant Identification
More informationAgenda Report DESIGNATION OF 1855 E. COLORADO BOULEVARD (FORMER DRAPER'S BUILDING) AS A LANDMARK
Agenda Report TO: CITY COUNCIL DATE: OCTOBER 16,2006 FROM: SUBJECT: CITY MANAGER DESIGNATION OF 1855 E. COLORADO BOULEVARD (FORMER DRAPER'S BUILDING) AS A LANDMARK RECOMMENDATION It is recommended that
More informationCITY OF LARKSPUR Staff Report. August 21, 2013 Council Meeting UPDATE ON TRANSPORTATION AUTHORITY OF MARIN (TAM) GREENBRAE CORRIDOR WORKING GROUP
AGENDA ITEM 7.1 CITY OF LARKSPUR Staff Report August 21, 2013 Council Meeting DATE: August 16, 2013 TO: FROM: SUBJECT: Honorable Mayor Hillmer and Members of the City Council Dan Schwarz, City Manager
More informationSTAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001
STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP 2014-0030 FEBRUARY 26, 2015 CPA - 1 OWNER/APPLICANT: AGENT: REQUEST: HANS HEIM PO BOX 238 APTOS, CA 94001 JAMES HAY PO BOX 762 MENDOCINO, CA 95460
More informationProposed Walkability Ordinance for City of Knoxville (6/16/17)
Proposed Walkability Ordinance for City of Knoxville (6/16/17) New or revised text is highlighted Section 1: Purpose The purpose of this ordinance is to set requirements for walkability and pedestrian
More informationCity of Sacramento City Council 915 I Street, Sacramento, CA,
City of Sacramento City Council 915 I Street, Sacramento, CA, 95814 www.cityofsacramento.org 14 Meeting Date: 7/24/2012 Report Type: Consent Title: Contract: Utility Pull Box Security Lids Report ID: 2012-00655
More informationCouncil Agenda Item Meeting Date: May 18, 2015 Action Requested: Prepared By: Approve Change Order 1 for Paul Bunyan/Library Park and additional Desig
Council Agenda Item Meeting Date: May 18, 2015 Action Requested: Prepared By: Approve Change Order 1 for Paul Bunyan/Library Park and additional Design Work for the Northern Shoreland Improvements Marcia
More informationSacramento Public Library Authority
Sacramento Public Library Authority February 25, 2016 Agenda Item 3.0: Architecture Plan for New Orangevale Library: Concept Presentation by Group 4 Architecture TO: FROM: RE: Sacramento Public Library
More informationFY Capital Improvement Program Arroyo Projects
FY 219-223 Capital Improvement Program FY 218 FY 219 FY 22 FY 221 FY 222 FY 223 1 2 3 4 5 6 7 8 9 1 Hahamongna - Implement Master Plan - Oak Grove Area Improvements (7756) Hahamongna - Implement Master
More informationPLANNING AND NATURAL RESOURCES COMMITTEE. Public Access Conceptual Design Alternatives for the Red Barn Area of La Honda Creek Open Space Preserve
PLANNING AND NATURAL RESOURCES COMMITTEE R-17-56 May 9, 2017 AGENDA ITEM AGENDA ITEM 2 Public Access Conceptual Design Alternatives for the Red Barn Area of La Honda Creek Open Space Preserve GENERAL MANAGER
More informationRFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015
RFP 2018-02 DRAINAGE OUTFALL DESIGN AND PERMITTING Mandatory Meeting for Proposers August 15, 2015 IMPORTANT DATES August 15 th, 2:00pm August 17 th, 5:00pm August 22 nd, 5:00pm September 5 th, 2:00pm
More informationCITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA
CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 April 2, 2013 AGENDA ITEM TO: FROM: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL STEVE MYRTER, P.E. DIRECTOR OF PUBLIC WORKS SUBJECT:
More informationOF AIRPORT COMMISSIONERS
OY i -401 0*11 oir". 4Los Angeles World Airports REPORT TO THE BOARD. OF AIRPORT COMMISSIONERS Meeting Date: Gvt A. Approved by: Aura Moor Chief In ormation Officer c -A/ / v Reviewed by: Samson Mengistu,
More informationDEPARTMENT OF PUBLIC WORKS BUREAU OF STREET SERVICES REPORT NO.1 Page 1 of 5. Date: October 7,2016 CD# 14
Page 1 of 5 Date: October 7,2016 CD# 14 Honorable Board of Public Work of the City of Los Angeles Commissioners: 700 THRU 900 BLOCK SOUTH LOS ANGELES STREET - BUREAU OF STREET SERVICES (BUREAU) REQUEST
More informationAGENDA 07/14/11 PLANNING COMMISSION Meeting
AGENDA 07/14/11 PLANNING COMMISSION Meeting MEETING DATE: Thursday, July 14, 2011 MEETING TIME: MEETING PLACE: VIDEO: 5:30 p.m. City Council Chambers, City Hall 350 Main Street El Segundo, California 90245-0989
More informationMartin Pastucha, Director of Public Works Karen Ginsberg, Director of Community and Cultural Services
Information Item Date: August 11, 2015 To: From: Subject: Mayor and City Council Martin Pastucha, Director of Public Works Karen Ginsberg, Director of Community and Cultural Services Reed Park Improvement
More informationWatertown City Council
City of Watertown Watertown City Council April 14 th, 2015 Agenda Item: City Comment on Sun Share CUP Application Request for Action: Motion to Approve City Comments regarding CUP Application Department:
More informationARROYO SIMI GREENWAY SPECIFIC PLAN. Winter, 2011
ARROYO SIMI GREENWAY SPECIFIC PLAN Winter, 2011 ARROYO SIMI GREENWAY SPECIFIC PLAN Prepared For: and ACKNOWLEDGMENTS Prepared By: (805) 543-1794 ACKNOWLEDGMENTS ARROYO SIMI GREENWAY SPECIFIC PLAN ACKNOWLEDGMENTS
More informationRESOLUTION NO
RESOLUTION NO. 2016-16 A RESOLUTION PROVIDING FOR THE SUBMISSION TO THE QUALIFIED ELECTORS OF THE CITY OF BELLINGHAM AT AN ELECTION TO BE HELD ON NOVEMBER 8, 2016 OF A PROPOSITION AUTHORIZING THE CITY
More informationADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS
ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS HAHAMONGNA FY 212-216 Capital Improvement Program Priority Description Total Estimated Costs Appropriated Through FY 211 Adopted FY 212 FY 213
More informationLos Angeles Department of City Planning RECOMMENDATION REPORT
Los Angeles Department of City Planning RECOMMENDATION REPORT CULTURAL HERITAGE COMMISSION HEARING DATE: October 16, 2008 TIME: 10:00 AM PLACE: City Hall, Room 1010 200 N. Spring Street Los Angeles, CA
More informationCOASTAL CONSERVANCY. Staff Recommendation March 25, 2004 LOS ANGELES GREEN VISION PLAN. File No.: Project Manager: Marc Beyeler
COASTAL CONSERVANCY Staff Recommendation March 25, 2004 File No.: 04-014 Project Manager: Marc Beyeler RECOMMENDED ACTION: Authorization to disburse up to $50,000 to the University of Southern California
More informationCall to Artists Public Art for Los Angeles Metro Stations
Conceptual Design for Call to Artists Public Art for Los Angeles Metro Stations Artesia Transit Center Union Station/Patsaouras Transit Plaza Los Angeles County Metropolitan Transportation Authority February
More informationGATEWAY BUILDING ELEVATOR AND ESCALATOR SERVICES
29 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 Tel metro.net SYSTEM SAFETY AND OPERATIONS COMMITTEE JANUARY 16, 2014 SUBJECT: ACTION: GATEWAY BUILDING ELEVATOR AND ESCALATOR SERVICES APPROVE
More informationCity of Orange Trails at Santiago Creek Specific Plan Recirculated Draft EIR Appendix C: Notice of Preparation (NOP) and Comment Letters
City of Orange Trails at Santiago Creek Specific Plan Recirculated Draft EIR Appendix C: Notice of Preparation (NOP) and Comment Letters FirstCarbon Solutions Y:\Publications\Client (PN-JN)\2765\27650002\EIR\10
More informationIsabel Neighborhood Plan: Alternatives
Isabel Neighborhood Plan: Alternatives Presented by: Lori Parks, Associate Planner February 2, 2015 Agenda 1. Background on BART to Livermore 2. Isabel Neighborhood Plan 3. Alternative Scenarios 4. General
More informationAgenda Repo~ ' TO: Honorable Mayor and City Council. FROM: Public Works Department RECOMMENDATION:
Agenda Repo~ I -- ' TO: Honorable Mayor and City Council FROM: Public Works Department June 21, 2010 I SUBJECT: AUTHORIZATION TO ENTER INTO CONTRACTS WITH LANDSCAPE STRUCTURES INC. AND BIG BEN, INC. FOR
More information2017 General Obligation Bond
2017 General Obligation Bond Presentation of Public and Council Projects to the Transportation & Mobility Stakeholder Committee April 13, 2017 Agenda Deferred Maintenance Project Development Process Projects
More informationARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET
A RROYO P ROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEARS 214-218 HAHAMONGNA Priority Description 1 Hahamongna Watershed Park - Implement Master Plan 211,6 211,6 (77565) 2 Hahamongna -
More informationGlenborough at Easton Land Use Master Plan
Implementation 114 9.0 IMPLEMENTATION 9.1 OVERVIEW This chapter summarizes the administrative procedures necessary to implement the proposed land use plan, infrastructure improvements, development standards,
More informationCapital Projects impacting Odenton Town Center
Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000
More informationPhilip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Planning and Capital Projects
Date August 5, 2015 To: Through: From: Subject: Recreation and Park Commission Capital Committee Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Planning and Capital Projects Nicole Avril,
More informationCITY OF BEACON NOTICE TO LANDSCAPE ARCHITECTS GENERAL INFORMATION AND REQUEST FOR PROPOSALS
CITY OF BEACON NOTICE TO LANDSCAPE ARCHITECTS GENERAL INFORMATION AND REQUEST FOR PROPOSALS The City of Beacon (the CITY) is issuing this Request for Proposals (RFP) for the selection of a landscape architect
More informationCity Council Special Meeting AGENDA ITEM NO. C.
City Council Special Meeting AGENDA ITEM NO. C. DATE: 01/04/2019 TO: Honorable Mayor and City Council Members SUBJECT: Transit Villages Specific Plan project Study Session (Development Services Director
More informationItem No Halifax Regional Council February 7, 2017
P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 14.1.3 Halifax Regional Council February 7, 2017 TO: Mayor Savage and Members of Halifax Regional Council SUBMITTED BY: Jacques Dubé, Chief Administrative
More informationIn March 2012, the County of Yolo was awarded a grant from the California State Department of Parks
Request for Proposals (RFP) Deadline for Submittal: January 23, 2019 The County of Yolo wishes to expand the public s experience with the visual arts; to make available artwork of the highest quality to
More informationDATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer
DATE: January 9, 0 TO: FROM: THROUGH: SUBJECT: WCA Governing Board Johnathan Perisho, Project Manager Mark Stanley, Executive Officer : Consideration of a resolution to authorize Executive Officer, or
More informationSPECIFIC PLAN Requirements
CITY OF LANCASTER PLANNING DEPARTMENT 44933 Fern Avenue, Lancaster, California 93534 (661) 723-6100 SPECIFIC PLAN Requirements Purpose The purpose of a specific plan is to provide for the logical development
More informationPeppertree Business Park
12.55 Net Acres Corporate/Institution Development Site PEPPERTREE BUSINESS PARK IS A UNIQUELY BEAUTIFUL MASTER PLANNED DEVELOPMENT SITE NESTLED AT THE FOOT OF THE SIMI HILLS WITH MEIER CREEK STREAMBED
More informationCITY OF VACAVILLE PLANNING COMMISSION Item No. 8.A STAFF REPORT July 18, 2016 STAFF CONTACT: Amy Feagans, Contract Planner (707)
CITY OF VACAVILLE PLANNING COMMISSION Item No. 8.A STAFF REPORT July 18, 2016 STAFF CONTACT: Amy Feagans, Contract Planner (707) 449-5140 TITLE: THE FARM AT ALAMO CREEK ENVIRONMENTAL IMPACT REPORT (EIR)
More informationRFP REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH. DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway
RFP 61-18 REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway Sealed Requests for Proposals, plainly marked RFP 61-18 Design Engineering Services
More informationRECOMMENDATION REPORT
DEPARTMENT OF CITY PLANNING RECOMMENDATION REPORT City Planning Commission Case No.: CPC-2012-1165-GPA-ZC Date: August 9, 2012 Time: After 8:30 AM Place: City Hall, Room 350 Public Hearing: Required CEQA
More informationHigher Education Energy Efficiency Partnership Program BEST PRACTICES AWARDS
Higher Education Energy Efficiency Partnership Program BEST PRACTICES AWARDS UC / CSU Sustainability Conference, June 2005 A program created by the UC/CSU/IOU Partnership under the auspices of the California
More informationTO: CITY COUNCIL DATE: MARCH 23,2009
Report TO: CITY COUNCIL DATE: MARCH 23,2009 FROM: CITY MANAGER SUBJECT: MASTER DEVELOPMENT PLAN AMENDMENT FOR PASADENA CHRISTIAN SCHOOL AT 1515 NORTH LOS ROBLES AVENUE AND GENERAL PLAN AMENDMENT AND ZONE
More informationCITY OF ALHAMBRA DEVELOPMENT SERVICES DEPARTMENT 111 S. First Street. Alhambra, CA (626) FAX (626)
CITY OF ALHAMBRA DEVELOPMENT SERVICES DEPARTMENT 111 S. First Street. Alhambra, CA 91801 (626) 570-5030 - FAX (626) 458-4201 NOTICE OF PREPARATION TO: SUBJECT: Agencies, Organizations and Interested Parties
More informationFort Ord Regional Trails Planning
Fort Ord Regional Trails Planning FORA Board July 11, 2014 Josh Metz, Associate Planner Overview Base Reuse Plan (BRP) trails planning context Trails planning in FORA jurisdictions and related entities
More informationPhilip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director
Date: March 7, 2018 To: Through: From: Subject: Recreation and Park Commission Capital Committee Philip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director Dan Mauer,
More informationDon Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions
Consultation Summary Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions This report is not intended to provide a verbatim transcript
More informationCapital Projects in and near Odenton Town Center
Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately
More informationJohnson Street Bridge Public Realm Update
Johnson Street Bridge Public Realm Update August 20, 2015 Background Johnson Street Bridge Replacement Project impacts a diverse range of stakeholders In addition to a new bridge, the project also includes
More informationCALIFORNIA ERIC GARCETTI MAYOR NOTICE OF PREPARATION. Responsible Agencies, Trustee Agencies, Stakeholders, and Interested Parties
BOARD OF PUBLIC WORKS MEMBERS KEVIN JAMES PRESIDENT MONICA RODRIGUEZ VICE PRESIDENT HEATHER MARIE REPENNING PRESIDENT PRO TEMPORE MICHAEL R. DAVIS COMMISSIONER JOEL F. JACINTO COMMISSIONER FERNANDO CAMPOS
More informationPROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.
PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. 67 HEARING LOCATION: ERICKSEN COMMUNITY CENTER 1401 11 TH AVENUE NORTH
More informationCity of San Juan Capistrano PROJECT PRESENTATION NORTHWEST OPEN SPACE COMMUNITY PARK (CIP 09209) March 22, 2016 FOR THE PROJECT PRESENTATION
City of San Juan Capistrano PROJECT PRESENTATION PROJECT PRESENTATION FOR THE NORTHWEST OPEN SPACE COMMUNITY PARK (CIP 09209) PLANNING COMMISSION 1 PROCESS & OBJECTIVES A. Develop a new Concept Plan for
More informationCHAPTER 2 SUMMARY 1. PROJECT SUMMARY DATA
CHAPTER 2 SUMMARY This is an Initial Study format used to determine, pursuant to CEQA Guidelines Section 15177, whether a project 1) is within the scope of a Master EIR (MEIR), 2) may result in additional
More informationCity Commission Agenda Cover Memorandum
City Commission Agenda Cover Memorandum Originating Department: Engineering Services (ENG) Meeting Type: Regular Agenda Date: 02/27/2017 Advertised: Required?: Yes No ACM#: 21260 Subject: Presentation
More informationDESIGN REVIEW COMMITTEE AGENDA ITEM
DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: OCTOBER 17, 2012 TO: Chair Woollett and Members of the Design Review Committee THRU: FROM: SUBJECT: Leslie Aranda Roseberry, Planning Manager Daniel Ryan,
More informationFY Capital Improvement Program Arroyo Projects - Central Arroyo Summary
CENTRAL ARROYO FY 214-218 Capital Improvement Program Description FY 213 FY 214 FY 215 FY 216 FY 217 FY 218 1 Trail and Rubble Wall Restoration - Central Arroyo (77371) 1,94,66 543,848 55,812 2 Brookside
More informationTown of Yucca Valley Capital Improvement Projects Report July 24, 2014
Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 SR 62 Traffic and Pedestrian Improvements from Apache Trail to Palm Avenue (PLHD) The project includes construction of curbs, gutters,
More informationRECREATION AND OPEN SPACE ELEMENT
RECREATION AND OPEN SPACE ELEMENT Last amended August 19, 2008 Table of Contents Objective Page 5.1 Park system defined... 5-1 5.2 Access to parks and recreational facilities... 5-2 5.3 Recreation and
More informationBurrowing Owl Habitat Project at the Albany Plateau. (a component project of the Gilman Street Playing Fields Project City of Berkeley) March 10, 2006
Burrowing Owl Habitat Project at the Albany Plateau (a component project of the Gilman Street Playing Fields Project City of Berkeley) March 10, 2006 Submitted by The City of Berkeley Project history During
More informationRESOLUTIO REGARDI G A THREE YEAR MOWI G SERVICES AGREEME T FOR THE HARTFORD LA DFILL
RESOLUTIO REGARDI G A THREE YEAR MOWI G SERVICES AGREEME T FOR THE HARTFORD LA DFILL RESOLVED: That the President is hereby authorized to execute an agreement with Earthcare Service to provide mowing services
More informationMendota Heights 2040 Comprehensive Plan Draft Vers
4 Parks and Trails The City of Mendota Heights boasts a variety of recreational and open space opportunities. Few cities can claim access to regional trails, riverside and lakeside parks, scenic bluffs
More informationMEMORANDUM HONORABLE MAYOR AND CITY COUNCIL MEMBERS. SHERI REPP LOADSMAN, DEPUTY CITY MANAGER/ PLANNING & BUILDING DIRECTOR /s/
MEMORANDUM Agenda Item #: 13 Meeting Date: 9/12/17 TO: THRU: FROM: SUBJECT: HONORABLE MAYOR AND CITY COUNCIL MEMBERS ANTON DAHLERBRUCH, CITY MANAGER /s/ SHERI REPP LOADSMAN, DEPUTY CITY MANAGER/ PLANNING
More informationREPORT TO MAYOR AND COUNCIL
REPORT TO MAYOR AND COUNCIL AGENDA ITEM NO. 5.a TO THE HONORABLE MAYOR AND COUNCIL: DATE: May 26, 2015 SUBJECT: ADOPT RESOLUTION NOS. 15-33, 15-34, 15-35, AND 15-36, CONFIRMING THE ASSESSMENT DIAGRAMS
More informationCITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA
CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James
More informationCITY OF LOS ANGELES DEPARTMENT OF CITY PLANNING ZONING INFORMATION FILE Z.I. NO POTRERO CANYON
COUNCIL DISTRICT: 11 CITY OF LOS ANGELES DEPARTMENT OF CITY PLANNING ZONING INFORMATION FILE Z.I. NO. 2422 POTRERO CANYON BACKGROUND: The single-family lots that surround the rim of the Potrero Canyon
More information