Figure 1 SSIP Watersheds (Source: SFPUC) North Shore Watershed

Size: px
Start display at page:

Download "Figure 1 SSIP Watersheds (Source: SFPUC) North Shore Watershed"

Transcription

1 LOVE AND HAIGHT - GREENING THE STREETS OF SAN FRANCISCO Thomas M. Sweet, PE, LEED AP BD+C Senior Engineer, AECOM, San Francisco Amir Ehsaei, PhD Project Engineer, AECOM, San Francisco Purpose: Case study of the first green infrastructure (GI) Early Implementation Project (EIP), constructed under the Sewer System Improvement Program (SSIP) by the SF Public Utilities Commission. The SSIP is a 20-year multi-billion dollar citywide investment required to upgrade the aging sewer infrastructure to ensure reliable and seismically safe sewer system. San Francisco has eight distinct urban watersheds; three on the Westside where stormwater flows towards the Pacific Ocean, and five on the Bayside where stormwater flows towards the San Francisco Bay. This paper discussed the Oak Street and Fell Street Streetscape Enhancement Project, which was the first phase of the Wiggle Neighborhood Green Corridor Project located in the Channel Watershed, as illustrated in Figure 1 below. North Shore Watershed Figure 1 SSIP Watersheds (Source: SFPUC) A key part of the SSIP is to use performance-based green infrastructure within the EIPs to demonstrate the ability for GI to attenuate runoff and reduce flows to the combined sewer, especially during the rainy season, when the combined sewer capacity can be exceeded and result in combined sewer discharges (CSDs) to the San Francisco Bay and/or Pacific Ocean. The Oak Street and Fell Street Streetscape Enhancement Project was initially solely a San Francisco Municipal Transit Authority (SFMTA) project, which SFMTA began to envision including GI in response to neighborhood public input. As a result, SFMTA requested SFPUC fast-track design of GI for the project and AECOM was retained to serve as engineer of record. The Oak Street and Fell Street Streetscape Enhancement Project is located at the northwest corner of the SFPUC Wiggle Neighborhood Green Corridor (WNGC) EIP as illustrated in Figure 2 below. 1

2 Figure 2 Phasing of the Wiggle Neighborhood Green Corridor Project (Source: SFPUC) The project area is just east of the Golden Gate Park, which is along the route of Bay to Breakers and is dominated by high traffic streets Oak and Fell. Both streets have some sidewalk trees; down-sloped driveways and stairs at residences; areas of distressed sidewalks; and, adjacent narrow side streets with under-utilized sidewalk areas. Images in the project vicinity are included as Figure 3 below. 2

3 Figure 3 Conditions in the Project Vicinity (early 2014, Source: AECOM) Content: The design team recommended a combination of permeable pavers and raingardens to conform to SFPUC GI guidance on performance (capture of the first ¾ of runoff) and identified 10 candidate areas for GI. The team identified performance metrics and rated each location, which yielded rankings for the sites. Through input from SFMTA and SFPUC, the project ended up with four streets. As part of the broader WNGC project public involvement and internal SFPUC inreach, the team prepared renderings to give the public (and SFPUC staff) an idea of how the raingardens and permeable pavers would look when constructed. Two renderings are included below in Figure 4. Figure 4 Project Renderings (Source: SFPUC) Methodology: Lessons learned from designer's perspective siting GI in urban environments, included: Since project was fast-tracked potholing for existing utilities was not able to be performed. This caused project delays during construction to allow relocation of waterlines and redesign of specific elements of the permeable pavers and raingardens, as illustrated in Figure 5 below. 3

4 Figure 5 Existing Utilities Avoidance (late 2014, Source: AECOM) Looking for opportunities to expand the planned raingardens along parking strip and into sidewalk areas yielded larger raingardens at SW and NW Broderick which improved function, aesthetics and provided additional storage as illustrated in Figure 6 below. Figure 6 Expanded Raingardens into Previously Under-Utilized Sidewalk Areas (2016, Source: AECOM) Deepening the permeable paver underground reservoirs and raingardens as compared to SFPUC GI design guidance yielded on the order of twice the retention volume as compared to similarly sized guidance-compliant features. Setting raingarden outlet elevations to match existing catch basin rim elevations (and opening areas) ensured similar post-project hydraulic performance and reduced potential for changes to street flooding. Performance during heavy rainfall events to date has limited surface ponding to areas outside vehicle travel lanes, as illustrated in Figure 7 below, where inflow depths of on the order of 3-inches were accommodated. 4

5 Figure 7 Winter 2015 Heavy Rainfall Gutter/Inlet Performance (early 2016, Source: AECOM) Reinforced curbing/walls with grade beams to transfer loads allowed curbs to withstand vehicle impact loads as drivers became accustomed to the revised bulb-out configurations as illustrated in Figure 8 below. Figure 8 Damage to Divisadero Railing (early 2015, Source: AECOM) Use of underdrains at raingardens as backup to highly infiltrative soils and segregated infiltration zones under permeable pavers maximized infiltration. Use of low fencing to inhibit pet entry into raingardens also provided an effective means of keeping pedestrians from cutting-through the raingardens, even during the annual Bay to Breakers running race (except as used for daycare) as illustrated in Figure 9 below. 5

6 Figure 9 NW Broderick Raingarden (early 2015, Source: Burt Tanoue) Use of inlet permeable weir allowed for capture of leaf litter and smaller debris prior to entry into the raingardens as illustrated in Figure 10 below. Figure 10 Inlet Detailing and Performance Image (Source: AECOM) Use of piezometers in the inlets, raingarden areas and outlets coupled with v-notch weirs allowed for flow monitoring. Results: Integral to both the pavers and raingardens were features to monitor water levels and measure inflows and outflows to document the effectiveness of the proposed improvements. Construction was completed in early 2015 and overall the GI is performing well. For the 2015/2016 rainy season, the overall system has been attenuating over 90% of inflows. Below, Figures show photos from early 2015, shortly after planting and early 2016 which illustrate the grow-in period improvements in plant coverage and generally improved aesthetics. 6

7 Figure 11 Divisadero Raingarden (Source: AECOM) Figure 12 SW Broderick Raingarden (Source: AECOM) 7

8 Figure 13 NW Broderick Raingarden (Source: AECOM) Figure 14 Baker Raingarden (Source: AECOM) Importance: With the ongoing drought, the installed drip irrigation system has provided the needed moisture for native and adapted plant grow-in. Thankfully the touted El Nino delivered a more typical rainy season and the GI performance has been able to be documented and the percentage of runoff diverted from the combined sewer system exceeded expectations. 8

9 Biosketches: Thomas M. Sweet, PE, LEED AP BD+C, Senior Engineer, AECOM Tom Sweet has more than 30 years of experience in civil and environmental engineering. His work has focused on utility infrastructure evaluation and design, with an emphasis on integrating sustainable features into reuse of existing facilities. His work includes identification and evaluation of alternatives related to upgrading existing water, sanitary sewer, storm drainage, and electrical systems. His passion is working with diverse design teams to include green infrastructure in projects, including permeable pavements, raingardens and other infiltration features. Most recently Tom completed: integrating green infrastructure into a "ready for reuse" SoCal Superfund site that is now being used for utility-scale solar PV; post-construction monitoring of the first full-width permeable paver street in Berkeley, CA Allston Way, which is attenuating upwards of 90% of inflows; and, evaluation of expanding stormwater reuse in a regional park Orange County Great Park, in Irvine, CA. Amir Ehsaei, Ph.D., is a Civil Engineer with the AECOM office in San Francisco and is specialized in Green Infrastructure and Low Impact Development Design. With 7 years of experience working on LID/GI projects across the nation, he has been an active part of multiple projects in different stages (research and pre- and Post- construction monitoring, planning, design, construction inspection, and post construction maintenance planning). Amir has worked on Early Implementation projects for the San Francisco Public Utilities Commission (SFPUC), demonstration project for the Louisville Metropolitan Sewer District (MSD) CSO130 watershed, Chicago HUD Resiliency on quantifying benefits of green infrastructure as part of a benefit cost analysis, and working with County of Los Angeles Department of Public Works on developing a Sustainable Infrastructure Guidelines document. He has been a part of USEPA Office of Research and Development doing extensive research on performance and maintenance of permeable interlocking concrete pavements. 9

GSI Handbook Details Pervious Pavement

GSI Handbook Details Pervious Pavement GSI Handbook Details Workshop April 10, 2018 GSI Handbook Details Pervious Pavement Peter Schultze-Allen, EOA / SCVURPPP Outline of Presentation Pervious pavement basics Types of pervious pavement and

More information

Monitoring and Documenting Green Stormwater Best Management Practices

Monitoring and Documenting Green Stormwater Best Management Practices Monitoring and Documenting Green Stormwater Best Management Practices Steve Wise - Natural Resources Program Manager Bill Eyring - Senior Engineer Illinois Sustainable Technology Center April 6, 2010 The

More information

Green Infrastructure Projects

Green Infrastructure Projects Green Infrastructure Projects Phase 1 of the Sewer System Improvement Program Presentation for the CAC Wastewater Subcommittee Tuesday, April 23, 2013 Saed Toloui and Raphael Garcia SSIP Green Infrastructure

More information

Green Infrastructure and Low-Impact Development Technologies

Green Infrastructure and Low-Impact Development Technologies Green Infrastructure and Low-Impact Development Technologies The guiding principles of these technologies is to manage stormwater at their sources using natural means, and establish conditions so that

More information

SFE Policy Committee Presentation. Rachel Kraai

SFE Policy Committee Presentation. Rachel Kraai SFE Policy Committee Presentation Rachel Kraai February 9, 2015 Today s Agenda Green Infrastructure Overview Biodiversity via SSIP Capital Projects Triple Bottom Line (TBL) Framework and Analysis TBL Criteria

More information

Appendix E: Illustrative Green Infrastructure Examples

Appendix E: Illustrative Green Infrastructure Examples Appendix E: Illustrative Green Infrastructure Examples Integrating LID into San Francisco s Urban Landscape Figure E. High-density Residential Figure E. Low-density Residential Figure E. Mixed Use 7 Figure

More information

Permeable Interlocking Concrete Pavement A Low Impact Development Tool Training for Developers

Permeable Interlocking Concrete Pavement A Low Impact Development Tool Training for Developers Permeable Interlocking Concrete Pavement A Low Impact Development Tool Training for Developers Presented by: Interlocking Concrete Pavement Institute The Low Impact Development Center, Inc. North Carolina

More information

Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA

Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA Development Process of San Francisco s GI Typical Details SCVURPPP GI Workshop April 19, 2017 Outline How to develop GI details

More information

The Benefits and Challenges Associated with Green Infrastructure Practices

The Benefits and Challenges Associated with Green Infrastructure Practices The Benefits and Challenges Associated with Green Infrastructure Practices Thomas M. Evans ASLA, LEED AP Regional Green Infrastructure Design Services Director OWEA Technical Conference, June 20, 2013

More information

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018 COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018 A. California Residential Code Requirement - Construction plans shall indicate how

More information

Monitoring Performance and Effectiveness of Urban Stormwater Best Management Practices. Jim Duncker, USGS Kuldip Kumar, MWRDGC David Leopold, CDOT

Monitoring Performance and Effectiveness of Urban Stormwater Best Management Practices. Jim Duncker, USGS Kuldip Kumar, MWRDGC David Leopold, CDOT Monitoring Performance and Effectiveness of Urban Stormwater Best Management Practices Jim Duncker, USGS Kuldip Kumar, MWRDGC David Leopold, CDOT Stormwater Management Water Efficiency Transportation Energy

More information

Appendix D - Technical Design Criteria for BMPs

Appendix D - Technical Design Criteria for BMPs Appendix D - Technical Design Criteria for BMPs City of Wayzata Page 3 On-site infiltration features Definitions and Scope: Infiltration facilities are constructed basins or depressions located in permeable

More information

Two Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre

Two Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre Two Sides of the Green Infrastructure Coin Jaren Hiller, PE, LEED AP Nathan Guequierre May 5, 2016 Background Citywide Stormwater Planning WinSLAMM Analysis No Control Existing Conditions Proposed Conditions

More information

Sustainable Stormwater Management through Green Infrastructure. Jersey City Public School #5

Sustainable Stormwater Management through Green Infrastructure. Jersey City Public School #5 Green Infrastructure Site Evaluation Friday, October 25 th, 2013 Sustainable Stormwater Management through Green Infrastructure Jersey City Public School #5 FORMAT: (15 minutes) An Introduction to Stormwater

More information

Homeowners Guide to Stormwater BMP Maintenance

Homeowners Guide to Stormwater BMP Maintenance Homeowners Guide to Stormwater BMP Maintenance What You Need to Know to Take Care of Your Property Rain Barrel Dry Well Rain Garden Pervious Asphalt Porous Pavers City of El Monte Stormwater BMP Management

More information

Selecting Appropriate Stormwater Control Measures for Your Development Project

Selecting Appropriate Stormwater Control Measures for Your Development Project Phase II Post-Construction Stormwater Requirements Workshop - February 10, 2014 Selecting Appropriate Stormwater Control Measures for Your Development Project Jill Bicknell, P.E., EOA, Inc. Outline of

More information

FLEET AVENUE GREEN STREET USES VACANT LOT FOR CSO REDUCTION. Thomas M. Evans, AECOM Cleveland, Ohio

FLEET AVENUE GREEN STREET USES VACANT LOT FOR CSO REDUCTION. Thomas M. Evans, AECOM Cleveland, Ohio FLEET AVENUE GREEN STREET USES VACANT LOT FOR CSO REDUCTION Thomas M. Evans, AECOM Cleveland, Ohio INTRODUCTION As part of the Northeast Ohio Regional Sewer District s (Sewer District) Green Infrastructure

More information

Holloway Green Street

Holloway Green Street Holloway Green Street SSIP Phase 1: Green Infrastructure Projects Presentation for the CAC Bicycle Subcommittee Thursday, August 22, 2013 Saed Toloui SSIP Green Infrastructure Project Manager 1 Sewer System

More information

Kittson Parkway / Watershed Park Parking Lot

Kittson Parkway / Watershed Park Parking Lot Kittson Parkway / Watershed Park Parking Lot Date Constructed: Summer 2005 Site Location / Description: Kittson Parkway, North Delta, British Columbia. Permeable parking lot adjacent to Watershed Park;

More information

Third Ave CSO Integrated Green Infrastructure

Third Ave CSO Integrated Green Infrastructure Third Ave CSO Integrated Green Infrastructure Neil Myers Williams Creek Consulting OWEA Annual Conference June 2013 For growing municipalities to be perceived as world class communities, each must move

More information

Program Schedule, Budget and Scope

Program Schedule, Budget and Scope Sewer System Improvement Program + Program Schedule, Budget and Scope Mission & Valencia Green Gateway Presentation: July 9, 2013 San Francisco Public Utilities Commission Mission & Valencia Green Gateway

More information

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN APPENDIX G - Stormwater Study Findings & Stormwater Solutions LSU: MP Narrative July 2017 3.5 Open Space Existing Conditions The

More information

North Street Reconstruction & Integrated Stormwater Management System

North Street Reconstruction & Integrated Stormwater Management System OWEA Watershed Workshop-October 30 th, 2014 North Street Reconstruction & Integrated Stormwater Management System Ted Blahnik, PE Principal-Williams Creek Consulting North Street: A Case Study for Integrated

More information

Reducing New York City s CSOs Using Green Infrastructure

Reducing New York City s CSOs Using Green Infrastructure Reducing New York City s CSOs Using Green Infrastructure Think Blue Maine Conference November 21-22, 2013 Portland, ME Anne Kitchell, LEED AP, Horsley Witten Group John McLaughlin, NYCDEP Matthew Jones,

More information

Green Stormwater Infrastructure Handbook. Kristin Kerr, P.E. EOA / SCVURPPP November 29, 2018

Green Stormwater Infrastructure Handbook. Kristin Kerr, P.E. EOA / SCVURPPP November 29, 2018 Green Stormwater Infrastructure Handbook Kristin Kerr, P.E. EOA / SCVURPPP November 29, 2018 Outline of Presentation Overview Handbook Contents Example Details Overview MRP requires GSI Plans to include

More information

CHAPTER 8. Mrs. Zimman s Class - Central Elementary

CHAPTER 8. Mrs. Zimman s Class - Central Elementary SUSTAINABILITY CHAPTER 8 Mrs. Zimman s Class - Central Elementary 8.1 OVERVIEW Green infrastructure also known as low impact development (LID) and environmental or sustainable site design is an environmentally

More information

4. CONCEPT PLAN DEVELOPMENT

4. CONCEPT PLAN DEVELOPMENT 4. CONCEPT PLAN DEVELOPMENT Concept Plan Step 1: Identify Site Constraints and Opportunities Review the existing site to identify constraints and opportunities for GI Practices to meet the RRv. Constraints

More information

Christopher J. Webb, PE. Chris Webb & Associates, Inc., PS, Bellingham, WA

Christopher J. Webb, PE. Chris Webb & Associates, Inc., PS, Bellingham, WA Christopher J. Webb, PE Chris Webb & Associates, Inc., PS, Bellingham, WA www.chriswebbpe.com THE CHARETTE April 22, 2008 (Earth Day) THE CHARETTE Goals Consider innovative approaches and evaluate application

More information

Rainscaping. Rainscaping includes rain gardens, bioswales, combinations of. A guide to local projects in St. Louis

Rainscaping. Rainscaping includes rain gardens, bioswales, combinations of. A guide to local projects in St. Louis Rainscaping A guide to local projects in St. Louis Rain garden on South Grand Boulevard in the city of St. Louis. Rainscaping includes rain gardens, bioswales, combinations of plantings, water features,

More information

Green Infrastructure Overview

Green Infrastructure Overview Green Infrastructure Overview Christopher C. Obropta, Ph.D., P.E. obropta@envsci.rutgers.edu Jeremiah Bergstrom, LLA, ASLA jbergstrom@envsci.rutgers.edu February 26, 2016 Water Resources Program NJDEP

More information

Appendix G. Detailed Design

Appendix G. Detailed Design Appendix G Detailed Design G1: Construction details Construction detail drawings usually include important details and specifications for required project design elements. This section provides information

More information

DC Clean Rivers Project Green Infrastructure Program

DC Clean Rivers Project Green Infrastructure Program District of Columbia Water and Sewer Authority George S. Hawkins, General Manager Briefing on: DC Clean Rivers Project Green Infrastructure Program Briefing for: American Water Resources Association National

More information

Can Urban Redevelopment Restore Aquatic Resources

Can Urban Redevelopment Restore Aquatic Resources Can Urban Redevelopment Restore Aquatic Resources with Standards for Stormwater Retention and Landscape Performance? Rebecca C. Stack District of Columbia Department of the Environment Industry, Agriculture,

More information

Sustainable Stormwater Retrofit Best Practices

Sustainable Stormwater Retrofit Best Practices Sustainable Stormwater Retrofit Best Practices Presenter Zach Sample, PE Stormwater Products Manager XP Solutions XP Solutions has a long history of Providing original, high-performing software solutions

More information

Planning, Design, and Construction of Green Infrastructure.

Planning, Design, and Construction of Green Infrastructure. Planning, Design, and Construction of Green Infrastructure www.water.rutgers.edu What is Green Infrastructure? an approach to stormwater management that is costeffective, sustainable, and environmentally

More information

Toronto Complete Streets Guidelines

Toronto Complete Streets Guidelines Toronto Complete Streets Guidelines 108 110 7.1 Green Infrastructure Design Principles 112 7.2 Context-Sensitive Green Streets 114 7.3 Key Green Street Elements Green infrastructure refers to natural and

More information

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks 2019 NEORSD GIG Eligibility and Technical Requirements Project must be located in the Sewer District s combined sewer area Location Applicant

More information

3. Are there any projects exempt from the definition of Regulated Projects?

3. Are there any projects exempt from the definition of Regulated Projects? STORMWATER REQUIREMENTS: OVERVIEW OF PROVISION C.3 Background: On October 14, 2009, the Regional Water Quality Control Board, San Francisco Bay Region, issued a municipal regional stormwater permit (MRP)

More information

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association GREEN ON THE HORIZON Challenges of Integrating LID into New Development Southeast Stormwater Association Annual Seminar, Charleston SC October 9, 2014 JENNIFER A. NUNN, PE THE BALMORAL GROUP Acknowledgments

More information

FACT SHEET: Pervious Pavement with Infiltration

FACT SHEET: Pervious Pavement with Infiltration FACT SHEET: Pervious Pavement with Infiltration DESCRIPTION Pervious pavement is a Green Infrastructure (GI) technique that combines stormwater infiltration, storage, and structural pavement consisting

More information

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater) Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious

More information

Green Streets. Sustainable Stormwater Solutions for Greener Communities and a Cleaner Bay

Green Streets. Sustainable Stormwater Solutions for Greener Communities and a Cleaner Bay Green Streets Sustainable Stormwater Solutions for Greener Communities and a Cleaner Bay As the Bay Area continues to grow through development of roads, revitalization of neighborhoods, and construction

More information

In the Plan Area, sustainable principles and strategies should be incorporated into the planning and design of buildings, streets and sidewalks, and

In the Plan Area, sustainable principles and strategies should be incorporated into the planning and design of buildings, streets and sidewalks, and Chapter 5 In the Plan Area, sustainable principles and strategies should be incorporated into the planning and design of buildings, streets and sidewalks, and public and private open spaces. 181 Chapter

More information

Sewer & Storm Drain Systems

Sewer & Storm Drain Systems Sewer & Storm Drain Systems Institute for Facilities Management Sewer & Storm Drain Systems Jay W Becker, PE 1 Course Overview Campus Sewer and Drainage o Sanitary Sewer System o Storm Drain System o Understanding

More information

Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012

Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012 Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012 Overview Brief History: Getting Started to Now GSI Program: What s Working? GSI Program: What needs Improvement?

More information

Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA. February 21, 2018

Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA. February 21, 2018 Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA February 21, 2018 XYZ Corporation Jane Jones, 925-555-1212 prepared by: ABC Consulting Abel Smith, 925-777-0123 TABLE

More information

Dogpatch/22nd Street Greening

Dogpatch/22nd Street Greening TEAM MEMBERS Prepared for: GreenTrustSF Central Waterfront www.gtsfcw.org Prepared by: Fletcher Studio San Francisco, CA www.fletcherstudio.com Landscape Architecture Urban Design Environmental Planning

More information

SCVURPPP Green Infrastructure Handbook. Kristin Kerr, P.E. EOA, Inc. April 19, 2017

SCVURPPP Green Infrastructure Handbook. Kristin Kerr, P.E. EOA, Inc. April 19, 2017 SCVURPPP Green Infrastructure Handbook Kristin Kerr, P.E. EOA, Inc. April 19, 2017 Outline of Presentation Overview Handbook Contents Schedule Overview MRP requires GI Plans to include general guidelines,

More information

BAGBY STREET RECONSTRUCTION PROJECT OCTOBER 2, 2015

BAGBY STREET RECONSTRUCTION PROJECT OCTOBER 2, 2015 BAGBY STREET RECONSTRUCTION PROJECT OCTOBER 2, 2015 CLAIRE HEMPEL, PLA, AICP, LEED GA PREPARED BY Aspen Asheville Austin Chicago Denver Dubai Houston Lake Tahoe Los Angeles MIDTOWN : A MODEL OF URBAN DEVELOPMENT

More information

VEHICULAR AND PEDESTRIAN CIRCULATION

VEHICULAR AND PEDESTRIAN CIRCULATION This perspective sketch communicates the intended character and quality of a proposed streetscape design. Locate benches near a major intersection where people tend to gather. Seating and lighting provide

More information

Low Impact Development Site Design

Low Impact Development Site Design Chapter 4 Low Impact Development Site Design In this Chapter: How site design measures can reduce stormwater treatment measure size Tree preservation and planting Self-treating and self-retaining areas

More information

Green Infrastructure & Low Impact Development

Green Infrastructure & Low Impact Development Green Infrastructure & Low Impact Development CITY OF COVINGTON STORMWATER MANAGEMENT WHAT IS GREEN INFRASTRUCTURE? Green infrastructure uses vegetation, soils and natural processes to manage water and

More information

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design 4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design Specification Bioretention O & M Manual Draft Green

More information

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance Description Grass buffers are densely vegetated strips of grass designed to accept sheet flow from upgradient development. Properly designed grass buffers play a key role in LID, enabling infiltration

More information

Green and Gray Infrastucture

Green and Gray Infrastucture Learning Objectives Make Your Vegetated Roof Work Harder as a Stormwater BMP Richard C. Hayden, RLA ASLA CLARB American Hydrotech, Inc. Brian Taylor, PE AMEC 1. Learn how vegetated roofs can be used as

More information

Designing for Sustainability: A Consultant s Perspective

Designing for Sustainability: A Consultant s Perspective Session 462 Asphalt Pavement Sustainability Designing for Sustainability: A Consultant s Perspective Timothy A. Bevan, P.E. / CH2M HILL Transportation Research Board 87th Annual Meeting January 13-17,

More information

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Potential Impacts of New Development Urban development can significantly increase stormwater runoff Water quality considerations

More information

Putting the Green in Complete Streets Integration of Green Infrastructure & Networks with Complete Streets

Putting the Green in Complete Streets Integration of Green Infrastructure & Networks with Complete Streets Putting the Green in Complete Streets Integration of Green Infrastructure & Networks with Complete Streets Complete Streets: The Road to Safer, Healthier, Livable Communities Phil Erickson July 10, 2009

More information

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT INTRODUCTION In recent years, the University of Cincinnati (University) has demonstrated a commitment to identifying and implementing sustainable goals and objectives throughout University s Uptown Campuses.

More information

Flooding Hearing: Long and Short Term Strategies

Flooding Hearing: Long and Short Term Strategies Services of the San Francisco Public Utilities Commission Flooding Hearing: Long and Short Term Strategies Presentation to San Francisco Board of Supervisors Public Safety and Neighborhood Services Subcommittee

More information

Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA

Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA January 2017 XYZ Corporation Jane Jones, 805-555-1212 This example prepared by Dan Cloak Environmental Consulting for

More information

Retrofitting SuDS. Virginia Stovin. Department of Civil and Structural Engineering Pennine Water Group University of Sheffield.

Retrofitting SuDS. Virginia Stovin. Department of Civil and Structural Engineering Pennine Water Group University of Sheffield. Retrofitting SuDS Virginia Stovin Department of Civil and Structural Engineering Pennine Water Group University of Sheffield Outline Urban stormwater management Conventional approach, problems and costs

More information

Portland, Oregon, (population 551,000) endeavors to maintain

Portland, Oregon, (population 551,000) endeavors to maintain Portland Tries Permeable Interlocking Concrete Street Pavements Known for its leadership in environment stewardship, The City of Portland, Oregon, placed over 19,000 sf (1,765 m 2 ) of permeable interlocking

More information

Incorporating Sustainable Practices and Water Quality into Roadway Design. May 24, 2017

Incorporating Sustainable Practices and Water Quality into Roadway Design. May 24, 2017 Incorporating Sustainable Practices and Water Quality into Roadway Design May 24, 2017 Justin Oswald, P.E., CFM Freese and Nichols, Inc. Presenters Todd Buckingham, P.E., ENV SP Freese and Nichols, Inc.

More information

Planning for Sustainable Infrastructure: A Collaborative Integrated Approach. Background on Berkeley. Background on Paving Needs 8/30/2015

Planning for Sustainable Infrastructure: A Collaborative Integrated Approach. Background on Berkeley. Background on Paving Needs 8/30/2015 Planning for Sustainable Infrastructure: A Collaborative Integrated Approach Andrew Clough, Ray Yep, Margo Schueler, Sean Rose Berkeley Public Works Commission, City of Berkeley, and AB Clough Consulting

More information

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS 5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically

More information

Pavements Built for the Future

Pavements Built for the Future Pavements Built for the Future Main Street Warrenville, IL Permeable Interlocking Concrete Pavement Durable, Sustainable, Attractive Segmental paving dates back to the Roman Empire. Today s version is

More information

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM I. PROJECT DATA Project Name Bay Meadows Development Phase II Project Address 2600

More information

Successful Green Infrastructure Planning: A Micro-Scale Modeling and Field Investigation Approach

Successful Green Infrastructure Planning: A Micro-Scale Modeling and Field Investigation Approach Successful Green Infrastructure Planning: A Micro-Scale Modeling and Field Investigation Approach Hazem Gheith and Vinnie Treatment, Water Division, ARCADIS-US Hunter Kelly, Department of Sewage and Drainage,

More information

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy.

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy. Landscape design is an integral component of Site Planning and Building. The current pattern of walkways, driveways and landscape elements such as fences, hedges, and retaining walls in the neighborhood

More information

Butchers Hill. Greening Feasibility FINAL REPORT MAY 2009 N PORT ST N WOLFE ST S MADEIRA ST. Submitted To: Submitted By:

Butchers Hill. Greening Feasibility FINAL REPORT MAY 2009 N PORT ST N WOLFE ST S MADEIRA ST. Submitted To: Submitted By: S WOLFE ST N CASTLE ST N WASHINGTON ST S WASHINGTON ST S CHAPEL ST S DURHAM ST S DUNCAN ST N MADEIRA ST N MONTFORD AVE Butchers Hill Greening Feasibility N DUNCAN ST MULLIKIN ST N PORT ST N WOLFE ST E

More information

Bioretention cell schematic key

Bioretention cell schematic key Bioretention Cells Bioretention cell schematic key 1 3 Hardwood mulch 2 Curb cut 3 18-30 Modified soil 4 Stone aggregate choker layer 5 Stone aggregate base layer 6 Subdrain 7 Undisturbed soil 8 Overflow/Cleanout

More information

PROP. 84 REMOVING BARRIERS TO LID: MUNICIPAL CODE UPDATE ASSISTANCE CASE STUDY: CODE UPDATES IN ARCATA

PROP. 84 REMOVING BARRIERS TO LID: MUNICIPAL CODE UPDATE ASSISTANCE CASE STUDY: CODE UPDATES IN ARCATA PROP. 84 REMOVING BARRIERS TO LID: MUNICIPAL CODE UPDATE ASSISTANCE CASE STUDY: CODE UPDATES IN ARCATA OCTOBER 7, 2015 CASE STUDY: CODE UPDATES IN ARCATA Arcata is a city located in Humboldt County immediately

More information

Rebecca Dohn October 13, 2017

Rebecca Dohn October 13, 2017 Rebecca Dohn October 13, 2017 Why Green Infrastructure? Population Growth 46,000 45,000 44,000 43,000 42,000 41,000 40,000 39,000 38,000 37,000 36,000 Impervious Acres 2 Why Green Infrastructure? 3 Why

More information

GREEN STREETS. Lessons Learned from Philadelphia and New York City. Maine Stormwater Conference. November 16, 2015

GREEN STREETS. Lessons Learned from Philadelphia and New York City. Maine Stormwater Conference. November 16, 2015 GREEN STREETS Lessons Learned from Philadelphia and New York City November 16, 2015 Maine Stormwater Conference. Acknowledgements Jillian Simmons, PWD Sufian Khondker, Arcadis Mike Moscariello, Arcadis

More information

BARD COLLEGE REGIONAL GREEN INFRASTRUCTURE DEMONSTRATION PROJECT A Case Study Addressing Stormwater Management for a Small Watershed

BARD COLLEGE REGIONAL GREEN INFRASTRUCTURE DEMONSTRATION PROJECT A Case Study Addressing Stormwater Management for a Small Watershed BARD COLLEGE REGIONAL GREEN INFRASTRUCTURE DEMONSTRATION PROJECT A Case Study Addressing Stormwater Management for a Small Watershed Presenter: Barbara Z. Restaino, RLA, ASLA Restaino Design Landscape

More information

Submitted by: Phillip L. Harrington, Director, Department of Public Works. Framework for Green Infrastructure Plan Development

Submitted by: Phillip L. Harrington, Director, Department of Public Works. Framework for Green Infrastructure Plan Development Page 1 of 8 Office of the City Manager CONSENT CALENDAR June 13, 2017 To: From: Honorable Mayor and Members of the City Council Dee Williams-Ridley, City Manager Submitted by: Phillip L. Harrington, Director,

More information

PROJECT DESCRIPTION ENVIRONMENTAL SETTING. Project Site Location FIGURE 1 - REGIONAL LOCATION MAP

PROJECT DESCRIPTION ENVIRONMENTAL SETTING. Project Site Location FIGURE 1 - REGIONAL LOCATION MAP PROJECT DESCRIPTION ENVIRONMENTAL SETTING Project Site Location The proposed project site is located within the City of Camarillo in Ventura County. As shown in Figure 1, the City of Camarillo is located

More information

ADVANTAGES OF USING PERMEABLE PAVERS ABOVE SILVA CELLS. Prepared by:

ADVANTAGES OF USING PERMEABLE PAVERS ABOVE SILVA CELLS. Prepared by: ADVANTAGES OF USING PERMEABLE PAVERS ABOVE SILVA CELLS Prepared by: Using Silva Cells can at the same time: 1. Provide uncompacted tree rooting volume under HS-20 load bearing surfaces, allowing for larger

More information

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater Post Construction BMP Inspection Scott Taylor, P.E. Learning Objectives To Understand: Types of post construction BMPs Typical construction process of BMPs Construction errors that impact BMP operation

More information

PERMEABLE PAVEMENTS. Have been around for a long time, but are poised for a resurgence

PERMEABLE PAVEMENTS. Have been around for a long time, but are poised for a resurgence PERMEABLE PAVEMENTS Have been around for a long time, but are poised for a resurgence Three Broad Types of Pavers PC: Porous Concrete PA: Porous Asphalt IP: Interlocking Concrete Pavers The depth of the

More information

COMPLETE GREEN STREET CHECKLIST

COMPLETE GREEN STREET CHECKLIST COMPLETE GREEN STREET CHECKLIST This document was developed to dissect the structure of an urban street and explore opportunities to make our streets more complete while also integrating green street strategies.

More information

STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70

STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70 STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70 Client: Central Developments 09 April 2018 _ Rev00 Report no: SWMP/410/00 SWMP FOR ERAND GARDENS X70 TABLE OF CONTENTS 1 INTRODUCTION... 1 2 GENERAL INFORMATION...

More information

LID Permit Requirements. Lisa Austin. Geosyntec Consultants

LID Permit Requirements. Lisa Austin. Geosyntec Consultants LID Permit Requirements Lisa Austin Geosyntec Consultants Presentation Outline Types of LID Permit Requirements Specified site design Specified LID BMPs LID performance metrics Specified Site Design (San

More information

Guidelines and Princi les FINANCIAL ACTION SUMMARY

Guidelines and Princi les FINANCIAL ACTION SUMMARY '1 ;i II CITY OF WOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rd Avenue NE, Woodinville, WA 98072 WWW.CI.WOODINVILLE.WA.US To: By: Honorable City Council Thomas E. Hansen, P.E., Public Works Director

More information

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water?

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water? District of Columbia Water and Sewer Authority George S. Hawkins, General Manager Briefing on: DC Clean Rivers Project - Green Infrastructure Program Briefing for: ACEC What s New at DC Water? April 7,

More information

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

Slow it, Spread it, Sink it using Green Stormwater Infrastructure Milly Archer Water Resources Coordinator Becky Tharp Green Infrastructure Collaborative Slow it, Spread it, Sink it using Green Stormwater Infrastructure Overview Defining LID and GSI Hydrology and impacts

More information

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management Introduction to Low Impact Development Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management http://hawaii.gov/dbedt/czm/resource/publication.php A Comprehensive

More information

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook 67 67 General Terms Specific Terms 66 Low Impact Development Approaches Handbook The vocabulary of low impact development is evolving, and many terms are used interchangeably and to describe the same or

More information

Intercept, Detain and Release. Custer Avenue CSO Relief GRESHAM, SMITH AND PARTNERS

Intercept, Detain and Release. Custer Avenue CSO Relief GRESHAM, SMITH AND PARTNERS HOWCASE Intercept, Detain and Release Custer Avenue CSO Relief GRESHAM, SMITH AND PARTNERS CUSTER AVENUE CSO RELIEF CLIENT City of Atlanta LOCATION Atlanta, Georgia MARKET Water Resources Combined sewer

More information

Case Study: City of San Mateo

Case Study: City of San Mateo Published on GreenPlan-IT (http://greenplanit.sfei.org) Home > Archived Materials > GreenPlan-IT Toolkit Demonstration Report > Chapter 2. Case Study: City of San Mateo Case Study: City of San Mateo Chapter

More information

Planning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure

Planning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure Civil Engineering Landscape Architecture Environmental Restoration Planning Planning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure Peg Staeheli, ASLA, LEED AP March

More information

Introduction Post Construction Stormwater Management Performance Requirements

Introduction Post Construction Stormwater Management Performance Requirements Introduction Post Construction Stormwater Management Performance Requirements The primary objective of these Post Construction Stormwater Management Performance Requirements is to minimize the downstream

More information

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018 Example Stormwater Control Plan For a Residential Subdivision Project Whispering Pines Lane Anytown, USA February 21, 2018 XYZ Corporation Jane Jones, 925-555-1212 This example prepared by Dan Cloak Environmental

More information

Lesson 2: Stormwater Best Management Practices (BMPs)

Lesson 2: Stormwater Best Management Practices (BMPs) Lesson 2: Stormwater Best Management Practices (BMPs) Environmental Stewards Class Christopher C. Obropta, Ph.D., P.E. Extension Specialist in Water Resources 732-932-9800 ext. 6209 obropta@envsci.rutgers.edu

More information

Draft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey

Draft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey Draft Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey Prepared for Dunellen Borough by the Rutgers Cooperative Extension Water Resources Program September 22,

More information

South Bismarck Watershed Model Update and Stormwater Improvement Project

South Bismarck Watershed Model Update and Stormwater Improvement Project Preliminary Engineering Report Bismarck Tribune South Bismarck Watershed Model Update and Stormwater Improvement Project City of Bismarck, ND January 2017 14.105.0046 1.0 Executive Summary The focus of

More information

Detroit Stormwater Rules and Drainage Fee Updates

Detroit Stormwater Rules and Drainage Fee Updates 2016 Regional Stormwater Summit Detroit Stormwater Rules and Drainage Fee Updates Dan Christian, PE, D.WRE Tetra Tech INTRODUCTION 10/7/2016 DRAFT - For Discussion Purposes Only 2 Historically No formal

More information

An Integrated Green Infrastructure Plan to Address Combined Sewer Overflow, Stormwater and Nutrient Reductions in Lancaster City, PA

An Integrated Green Infrastructure Plan to Address Combined Sewer Overflow, Stormwater and Nutrient Reductions in Lancaster City, PA An Integrated Green Infrastructure Plan to Address Combined Sewer Overflow, Stormwater and Nutrient Reductions in Lancaster City, PA Charlotte Katzenmoyer American Public Works Association Sustainability

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS HAHAMONGNA FY 212-216 Capital Improvement Program Priority Description Total Estimated Costs Appropriated Through FY 211 Adopted FY 212 FY 213

More information