1 KCROS East Plum Thicket-Manzanita Social Trail Conversion Plan Prepared by Jeff Lyslo and Dan Mullins, Volunteer Trail Coordinators March 2017

2 Overview There are a number of existing social trails between Mountain Laurel, Manzanita and Woodruff Streets. In the Trails Master Plan (TMP), these are identified for upgrading and incorporation into the recognized and sanctioned trail system. This report and study has been assembled to facilitate accomplishing that TMP goal. Summary of There is approximately 3,800 linear feet and 7 different segments of existing social trail in the project area. Some of this trail is in reasonably good shape and only needs to be de-bermed and widened slightly. Elsewhere, trails are sitting on property boundaries and need to be relocated away from boundaries. There are other sections that run along fall line and are eroded and need to be re-located to bring it up to community trail standards.there are multiple connections and possible connections to other existing trails that are addressed as part of this study to create maximum efficiency in the whole trail system. The total length of the trails when implemented as recommended would be approximately 4,325 ft. When completed, the trails should meet the all standards the community has set out for new trail construction. This document represents an analysis of what the current issues / deficiencies are in meeting these standards, along with recommendations for how to remediate these issues and an action plan for implementation. This plan was developed by Jeff Lyslo and Dan Mullins, volunteer trail coordinators, in March of The guiding principles in developing recommendations : Create trails that will conform with community set standards for new trails. Construction of 24 inch wide, hand built, natural trail surfaces. Create trails that will be durable / minimize erosion. Preserve cultural artifacts in the study area. Maximize distance from private property boundaries where practical. Create maximum connectivity with surrounding existing trails Increase trail user safety Better protection of Open Space Resources The existing trails have been broken down into 12 segments that have similar characteristics. For each segment, there is a page describing the current trail conditions, associated photos, recommendations to address problems and an estimate of the time and materials required to implement the recommendations. Summary of Some of the recommended solutions contained herein include: re-routes, de-berming and widening of trails, creation of drainage dips, boardwalks through wet sections and 1 bridge to cross a semi-permanent water feature. General to all segments, Staff will do a walk-through assessment of plants in the project area to be sure there are no biology issues that need to be addressed. Full implementation of the recommendations contained in report will create a sustainable set of trails for many years in the future and create multiple stacked loops with other portions of the existing trail system. Following this overview, there is an index map of the trail segments. At the end of this document, there is a summary spreadsheet of key project metrics, listed by segment.

3 Project Area Index Map Mountain Laurel - Manzanita Trail Area Scale, in feet 12 1 Segment Numbers Drainage Axes Existing Trails, part of the official trail system Existing Social Trails, Not part of the official trail system Proposed re-routes / new alignments 11 Drainage axis Drainage axis jal

4 Segment 1 From west end connection to crusher fine trail to connection with segment 2. This is an efficient alignment for east-west travel on the trail. Approximate Length : 335 feet 1. The segment has good cross slope (photo 1) and good sinuosity (photo 2), creating short, well drained sections. 2. The tread is narrow and slightly cupped in places. 3. The current alignment has good separation from all property boundaries Maintain the existing segment : 1. Keep the current alignment 2. Widen the tread to 24 inches 3. De-berm where tread is cupped 4. Disperse spoils from items 1 and Add 2-4 drainage dips, evenly spread out, along longer straight sections. Details Map and Descriptions : Drainage Segment 1 Crusher fine trail (red) Photos : Photo 1 : Good cross-slope and separation from property lines, looking east. Estimated Time and Resources to Implement 12 man-hours, Trail Club volunteer time No additional resources Photo 2 : Good sinuosity of existing alignment creating short tread sections Photo 3 : West intersection with crusher fine trail, looking east Photo 4 : East intersection with segment 2, looking southwest

5 Segment 2 Details Map and Descriptions : A fall line short cut from the crusher fine trail to the main trail (at the intersection of segments 1 and 3). This segment is present because users traveling north on the crusher fine trail and turning east on the main drainage trail find this route more efficient than continuing to the west end of segment 1. Approximate Length : 100 feet Drainage 1. The segment is fall line over it s entire length, which will lead to erosion with time. 2. Most of the tread grade is in excess of 10% (greater than standards) 3. There is minor erosion but this would increase with greater use when adopted into the system Although this segment has significant technical deficiencies, use patterns indicate it will continue to be used because it is a highly efficient route. It will difficult to close because of this efficiency and there are not any viable and efficient route options, given the proximity to property boundaries to the south and presence of segment 1 to the north. 1. Keep the current alignment 2. Harden the southwest / steepest portion to prevent erosion. This is preferred to wooden water bars because cycling traffic will go across stones but tend to go around water bars. We believe water bars will lead to 2 trail braids and erosion, where as a hardening solution with rocks or masonry pavers will not. 3. Add 1 drainage dip mid way on the hardened section and one dip at the bottom of the hardened section. This will prevent water flow and erosion below the hardened section. 4. In lower section, create short tread segments (~ 25 ft) by building earthen drainage dips. 5. Widen tread to 24 inches as needed Estimated Time and Resources to Implement Photos : Crusher fine trail (red) Segment 2 30 man-hours, trail club volunteers Staff assistance to procure and deliver hardening materials Photo 1 : Steep fall line alignment, looking southwest. Photo 2 : Steep fall line alignment, looking from crusher fine trail northeast. ~ sq. ft of rock or masonry pavers for hardening (2 ft wide x ft long)

6 Segment 3 Details Map and Descriptions : From the intersection of segments 1 and 2, east to the pinch point between the property lines to the south and the stream course to the north. This segment is largely acceptable in its current form. Approximate Length : 215 feet 1. The segment has reasonable cross-slope along most of its length (photo 1) 2. Current grade is less than 10% (within standards, photo 1) 3. There is minor erosion and cupping (photo 1) Segment 3 Drainage The only potential issue with this current alignment is that on the east end, the trail gets fairly close to properties to the south. However, with the stream course to the north, there is very limited room to move the trail north and gain space from the property boundaries. This would also require adding a fall line segment to the west to rejoin segments 1 and 2, which is not desirable. Photos : Crusher fine trail (red) Property Boundaries (dashed magenta) Additionally, the houses sit up considerably higher than the trail and have some large trees between the houses and the trail. This combination leads to minimal viewscape impact of the trail on the houses to the south. Considering these observations, we believe the existing alignment works well. 1. Keep the current alignment 2. Widen the tread to 24 inches 3. De-berm where tread is cupped 4. Add 2-4 drainage dips, evenly spread out, along longer straight sections. Estimated Time and Resources to Implement 8 man-hours, Trail Club volunteer time No additional resources Photo 1 : Slightly cupped and narrow tread Cross-slope from left to right. Looking west.

7 Segment 4 Details Map and Descriptions : From the pinch point between the drainage and property boundaries on the west (east end segment 3) and the Mountain Laurel-Purple Ash connector crusher fine trail on the east. The trail is composed of 2 straight fall line segments. Approximate Length : 360 feet Mountain Laurel- Purple Ash connector 1. The segment is composed of 2 straight fall line sections (photo 1) 2. The tread is narrow and slightly cupped in places. 3. The current alignment has good separation from all property boundaries proposed re-route The current alignment does not meet current trail standards because it is running along fall line. With increased use after adoption into the trail system, this will eroded easily and be difficult to maintain. To address this, a new alignment is proposed to the north, with greater cross slope and greater sinuosity which will lead to a better drained and more durable tread surface. This alignment has the additional benefit of maximizing distance from houses on both the the south and north side of the Open Space. Photos : Fall line segment in photo 1 1. Re-route segment to the north per the map (photo 2). 2. Build re-route to new trail standards ; 24 inch tread, 3-5 deg outslope, etc. 3. Use turf from re-route to reclaim current tread Current alignment Photo 3 : Re-route alignment (green dashed), tying existing drainage crossing and segment 5 re-route (looking north) 4. Place temporary buck and rail on either end to discourage continued use of existing alignment until vegetation recovers. 5.On east end, bring trail across drainage at existing crossing for Mountain Laurel - Purple Ash trail to tie to re-route of segment 5. (photo 3) Estimated Time and Resources to Implement 36 man-hours, Trail Club volunteer time Ranger Staff to deliver and install buck and rail Photo 1 : Straight, fall line sement, looking east Photo 2 : Re-route alignment (green dashed), looking west

8 Segment 5 Details Map and Descriptions : Photos : From Mountain Laurel - Purple Ash crusher fine trail on the west to Stone Bridge on the east. Drainage (green line) Property Boundaries (dashed magenta) User Hazard falling into drainage Approximate Length : 605 feet Mountain Laurel- Purple Ash connector crossing proposed re-route Willow section for boardwalk Stone bridge crossing 1. The segment mostly runs right along the south property boundaries (photos 1, 4 and 6) 2. It is pinched in 2 places between the property boundaries and drainage with unsafe user conditions, where users could fall into the drainage (photo1) 3. There is a marshy / willow covered section that runs all the way across the open space, from south property line to north property line (photo 5) 4. The restored stone bridge is at the east end (photo 2) 5) There is an old concrete foundation on the east end of the willow area (photo 3) This is the most difficult section to bring into the system with multiple challenges. The tread needs to be moved off the property lines. Because the drainage pinches the south property lines, this means the alignment needs to be moved north of the drainage axis. To facilitate this, there are two existing drainage crossings which will be used: the Mountain Laurel-Purple Ash crossing (see photo 3 in segment 4) and the old stone bridge (photo 2). drainage pinch point drainage pinch point (photo 1) Old concrete foundation (photo 3) Property Boundaries (dashed magenta) Photo 1 : Current trail pinched between drainage and fence, looking west The middle section of the proposed alignment runs through an area on dense vegetation that is seasonally wet. Because the vegetation runs across the entire width, we believe the best solution is to find a relatively high point in the middle. By being in the middle, maximum property boundary seperation is preserved. Because this is seasonly wet, a raised boardwalk will be needed through this section (approximately 125 ft in length, minimum). This is a recommended solution in the water quality section of the Comprehensive OS Management Plan update. This section should be monitored in the spring to determine if there are additional wet sections that will need more boardwalk. Staff and VCLs will continue to discuss and determine the exact amount of boardwalk needed. Photo 2 : Stone Bridge crossing, east end Finally, the alignment for the re-route has been placed to not disturb the old concrete foundation but is close enough that if the Historical Society wanted to put up informational signage, like they have at the stone bridge, it could be easily incorporated. They should be consulted prior to final design approval for concurrence. 1. Re-route entire segment to the north per the map. 2. Perform a wetlands survey on segment prior to implementation of alignment and plan. 3. Contact Historical Society to provide guidance on importance and protection of identified structures. 4. Build re-route to new trail standards; 24 inch tread, 3-5 deg outslope, etc. 5. Use turf from re-route to reclaim current tread 6. Place temporary buck and rail on either end to discourage continued use of existing alignment until vegetation is established. 7.On west end, bring trail across drainage at existing crossing for Mountain Laurel - Purple Ash trail to tie to re-route of segment On the east end, bring trail across drainage at restored stone bridge. 9. Build a boardwalk through the willow section (~125 feet minimum) Photo 5 : Middle willow section, looking west Photo 6 : Current trail along fence line, looking west Estimated Time and Resources to Implement 55 man-hours for building non-boardwalk sections, Trail Club volunteer time Ranger Staff to deliver and install buck and rail, deliver supplies for boardwalk 80 man-hours to build boardwalk, Trail Club volunteer time Photo 3 : Old concrete foundation Photo 4 : Current alignment (red dashed) along fence and proposed re-route (green dashed), west end looking west

9 Segment 6 Details Map and Descriptions : From the Stone Bridge on the west to the intersection of the Manzanita segments on the east. Approximate Length : 125 feet Stone bridge Segment 6 Manzanita trails 1. The segment is already mowed for community access to the stone bridge 2. The tread is narrow and slightly cupped. 3. The current alignment does not have issues with proximity to property boundaries. 4. The current alignment does not have issues meeting established trail standards Drainage axis Bridge crossing 1. Keep the current alignment 2. Widen the tread to 24 inches 3. De-berm where tread is cupped 4. Disperse spoils from items 1 and 2 5. Add 1 drainage dip mid-way along segment. 6. Align at bridge approach to facilitate cross-slope drainage Photo : Proposed Extension Estimated Time and Resources to Implement 5 man-hours, Trail Club volunteer time No additional resources Photo 1 : Narrow, slightly cupped trail. Mowed for community stone bridge acces. Looking east.

10 Segment 7 Currently runs from the Stone Bridge - Manzanita intersection and runs to Woodruff St., providing access to the elementary school. An extension is proposed to connect to the concrete trail along the drainage east of Valley Parkway. Approximate Length : 185 feet (school connector ) feet (Valley Pkwy connection) Details Map and Descriptions : Photos : Stone bridge Manzanita trails Marshy thicket Drainage axis Existing concrete trail (red) Valley Pkwy connection Bridge location Option 1 1. The existing segment is already mowed for community access to the stone bridge 2. The current alignment connects the trail to the elementary school (photo 5). 3. The tread is narrow and slightly cupped (photo 4). 4. The current alignment does not have issues with proximity to property boundaries. 5. The current alignment does not have issues meeting established trail standards 6. The proposed Valley Parkway connection will run through open grassland (photo 3) and will cross a drainage on it s east end (photo1). Segment 7 East Extension, option 1 (red) East Extension, option 2 (green) East Extension, option 3 (magenta) Bridge location Option 1 Bridge location Option 2 Right angle crossing to slow bike traffic Drainage axis Photo 1 : Option 1 bridge location, drainage crossing Looking SW from Valley Pkwy. The extension to Valley Parkway and the existing concrete trail (photo 2) was included in the TMP to create another closed loop within the Ken Caryl trail system. 3 options could be used to connect : 1) Option 1 is closest to the woods on the north edge Pluses: Most efficient route. Narrowest drainage crossing. User-Desired edge effect. Minuses : Bike traffic could flush deer onto Valley Parkway 2) Option 2 runs through the middle of the meadow and has several sharp turns to slow bike traffic prior to drainage and Valley Parkway Pluses : Mitigates wildlife flushing concerns. Still makes direct connection to concrete trail. Minuses : Less efficient than option 1 3) Option 3 follows the existing sidewalk. Pluses : No new disturbance. No wildlife flushing Minuses: No sense of continuation of the trail system along the drainage, creating a discontinuity in an otherwise continuous trail from the top of Lost Canyon through the bottom of the Mastodon trail. The VTCs favor option 1, followed by option 2. Photo 2 : Connection to concrete trail at Valley Pkwy, looking east. Photo 3 : Grassland area of east extension, marshy thicket in background, looking west. Photo 4 : Existing trail, looking NW. Slightly cupped and narrow. Photo 5 : Existing trail, looking SE. Access to elementary school, seen in the background. 1. Keep the current alignment 2. Perform a wetlands survey on segment prior to implementation of alignment and plan. 3. Widen the tread to 24 inches 4. De-berm where tread is cupped 5. Disperse spoils from items 1 and Add 1-2 drainage dips, evenly spread out, along longer straight section. 7. Add eastern extension to Valley parkway, per the map, built to community new trail standards. Final option to be determined by OSC and staff after community input 8. Staff to determine if there are any ROW issues with the bridge on east end and procure any needed permits. VTCs will provide Staff with any supporting documents needed in obtaining permits. 9. Add a bridge, similar in design to trail bridges currently installed on Lost Canyon and High Meadow trails, at the east end of the alignement (photo 1 location). Length ft. 10. Add signage on either side of Valley Parkway cautioning trail users about crossing traffic Estimated Time and Resources to Implement 10 man-hours for upgrading existing tread, Trail Club volunteer time 55 man-hours to build eastern extension to Valley Parkway, Trail Club volunteer time 20 man-hours to build and install bridge on eastern end of alignment Open Space Staff to buy materials for bridge.

11 Segment 8 This segment runs from the intersection of the main west branch to the intersection of the Mountain Laurel access, parallel to Manzanita. Details Map and Descriptions : Photos : Approximate Length : 395 feet 1. The segment runs along several property boundaries backing to Mountain Laurel (photos 1 and 2) 2. Existing tread is narrow but general well drained and has reasonable cross slope 3. There is a drainage and diversion to the east of the existing tread (photos 3 and 4). The existing trail in pretty good shape and could be upgraded to meet new trail standards, however it is too close to several property boundaries (photos 1 and 2). As such, it needs to be moved east. There is a drainage diversion structure that sits about mid way between Mountain Laurel and Manzanita which is ideal for the new alignment. If placed on the west side of this feature, it provides a good cross-slope for drainage and provides viewscape protection for property owners on both sides of the Open Space. This alignment does require a drainage crossing which may be seasonally wet. This crossing may require a board walk for the wet season. This decision can be made after observing the conditions and deciding if it is necessary. Property Boundaries (magenta dashed) Existing alignment Location of drainage crossing Possibly requiring boardwalk Drainage diversion top (yellow dashed) Drainage diversion axis (yellow dashed) Property Boundaries (magenta dashed) Drainage axis New proposed alignment Photo 1 : Current trail along property boundary, looking north 1. Fully abandon the current alignment 2. Perform a wetlands survey on segment prior to implementation of alignment and plan. 3. Create new tread, per the map alignment, 24 inches wide, according to community new trail standards. 4. If needed, on cross slope section of drainage diversion, build up tread with new material instead of cutting into drainage feature. Staff to investigate if this building up is needed or not. 5. Use turf from re-route to reclaim current tread 6. Place temporary buck and rail on either end to discourage continued use of existing alignment until revegetated. 7. Assess need for boardwalk across drainage during wet season. Build and install if deemed necessary. New alignment Potential boardwalk location Estimated Time and Resources to Implement 50 man-hours to build re-route and reclaim current trail, Trail Club volunteer time Open Space Staff to bring and install buck and rail 20 man-hours to build and install board walk if needed, Trail Club volunteer time Photo 2 : Current trail along another property boundary, looking south Photo 3 : New alignment along drainage diversion, looking south Photo 4 : New alignment crossing drainage, location of possible boardwalk annotated, looking south Open Space staff to buy materials for boardwalk if needed

12 Segment 9 Details Map and Descriptions : Photos : Segment 9 Short connector trail from Mountain Laurel to main Mountain Laurel-Manzanita Open Space. Approximate Length : 195 feet 1. The segment in pinned in by property boundaries on both sides (photo 1) 2. The tread is narrow and slightly cupped in places (photo 1) 3. There is a small tree on the west end that the trail goes under, with branches impeding users (photo 2). short tree re-route Property Boundaries (magenta dashed) There is little that can be modified on the current alignment, due to property boundaries on either side. In photo 2, two braids are seen, associated with users trying to avoid tree branches. The solution is to have a short re-route to the south side of the tree, where the branches are taller. Photo 1 : Narrow, slightly cupped trail. Looking west. 1. Keep the current alignment, except at the tree and have a short re-route around the tree on the south side. 2. Widen the tread to 24 inches 3. De-berm where tread is cupped 4. Disperse spoils to the east in the main Open Space corridor, or possibly for reclamation on south end segment 10 (see segment 10 discussion). Estimated Time and Resources to Implement 8 man-hours, Trail Club volunteer time No additional resources Photo 2 : Lone tree impeding users, causing braid to form Re-route dashed in green; Looking west.

13 Segment 10 Details Map and Descriptions : This segment runs from the Mountain Laurel connector, which comes in from the west, to the Manzanita connector, which comes in from the east. Segment 10 Approximate Length : 285 feet 1. The segment has reasonable cross-slope along most of its length (photo 3) 2. Most of the current tread is in good shape. 3. Except for the south end, current grade is less than 10% 4. On the south end, there is a short, steep (>10% grade), fall line section. This section is cupped and lightly eroded (photo 2). 5. On the north end, there is a conifer with a broken branch blocking the trail (photo 4) 6. There is a slight drainage low to the west of the trail, in the center of the Open Space between the property boundaries. Photos : Steep section to armor or abandon 3 way connector Property Boundaries (magenta dashed) Drainage low trees as viewscape buffer The bulk of this segment is pretty good, as is. On the north end, the trail does get close to property lines. The alternative would be to move the alignment to the center of the Open Space. However, there is a slight drainage low which could be seasonally wet, which will not be a good location for the trail. In this same area, the property owners have a good viewscape buffer provided by trees. Given these 2 observations, the current alignment is acceptable. On the south end, there is a short fall line section of trail, where segments 8, 9 and 10 come together. Given the re-route of segment 8, this section will be hard to close, due to user efficiency issues. As such, our primary recommendation is to armor the tread surface in the same fashion as segment 2, so that it is viable for both foot and bike traffic. Our alternative recommendation would be to abandon the fall line segment, using the south triangle on the map. This will require buck and rail initially, and possibly planting some trees or shrubs to maintain a longer term closure. Photo 1 : Overview of Segment 10, looking northeast Photo 2 : Steep fall line section on SW end of trail, looking east Photo 3 : Good quality trail in center of segment Drainage low to the left of alignment Estimated Time and Resources to Implement 1. Keep the current alignment, except at the south end. Add a 3-way connector with good cross slope to link segments 8, 9 and 10, per the map 2. Widen the tread to 24 inches as need 3. De-berm where tread is cupped 4. Armor steep section connecting segments 9 and 10, per recommendations of segment 2 5. Remove broken tree limb on north end. 15 man-hours for tread re-habilitation, Trail Club volunteer time 10 man-hours to build 3 way connector, Trail Club volunteer time 20 man-hours for armoring section, Trail Club volunteer time Staff assistance to procure and deliver hardening materials ~ 100 sq. ft of rock or masonry pavers for hardening (2 ft wide x 50 ft long) Photo 4 : Fallen branch over primary trail at east end of alignment, new trail braid forming around west side of tree. Looking NE.

14 Segment 11 This segment runs from the Manzanita connector, which comes in from the east, to the connection with Mountain Laurel on the north end. Approximate Length : 500 feet Details Map and Descriptions : Segment 11 re-route alignment Property Boundaries (magenta dashed) Photos : Moving crossing east directly across from sidewalk ramp across Mtn. Laurel 1. The segment has several fall lines sections with erosion and deposition (photos 3 and 4) 3. The current grade is less than 10%, except the last ft at the Mountain Laurel connection (photo 2). 4. There is a nice gateway feature in the middle of the segment through red rock outcroppings (photos 1 and 3) 5. The trail has good property boundary separation, except near the Manzanita connection. These properties do have good viewscape seperation via trees on their fence lines. The most signifiant problem with this segment are the fall line erosional segments. To make the trail more durable / sustainable, the trail needs to be re-routed per the map, which will create cross slope and shorter segments lengths, which will drain the trail better. The red rock gap / gateway feature will be preserved as this is a key feature for a good user experience. Along the fence line, the west portion will be left as is. If the alignment were moved further north towards Mountain Laurel, there is a slight drainage low that the tread would be in, leading to seasonally muddy conditions. This section to be left along the fence line has good viewscape protection via the trees planted along the fence (photo 4). At Mountain Laurel, the short steep section will be kept (photo 2). This embankment is continuous along the road and difficult to avoid. If a longer tread section were put in, the trail would feel inefficient to foot traffic and short cutting and re-establishment of this alignment is likely. Drainage low trees as viewscape buffer Photo 1 : View of red rock gap from Mountain Laurel. Current trail and re-route (green dashed) annotated. Looking southwest. Current trail 1. Re-route middle section of the trail, per the map, to create better cross-slope, shorter segments and better drainage. Build to new trail standards. 2. Widen the tread to 24 inches as need 3. De-berm where tread is cupped but not re-routed. 4. Use spoils from re-route to reclaim abandoned section of trail 5. Add 2 drainage dips on straight section east of Manzanita connection. 6. Move crossing east to be across from Mtn Laurel sidewalk ramp. Also creates cross slope approaching street. Photo 2 : Connection at Mountain Laurel. Steep section along road embankments. Move connection east to get better cross slope and drainage. Looking northeast. Estimated Time and Resources to Implement 50 man-hours, Trail Club volunteer time No additional resources Photo 3 : Eroded, fall line section between Mountain Laurel connection and red rock gap. Looking southwest. Photo 4 : Fall line section along fence line. Erosion not extensive. Note trees along fence line. Looking northeast from Manzanita connection. Re-route in green dashed line.

15 Segment 12 Details Map and Descriptions : Lower Manor House trail Connection to North Hogback and Pasture trails (east side of road) Photos : Segment 12 This segment runs from Mountain Laurel to the connection (north side of road) to the Lower Manor house connector trail at North Ranch Rd. The current alignment is composed of 2 fall line segments. One segment runs along Manor House Road (photo 3) and one runs from Manor House Rd. to North Ranch Rd. (photo 4) Approximate Length : 480 feet re-route alignment 1. The current alignment is composed of 2 fall line segments (see description above) 3. The current grade exceeds 10% locally 4. There are no property boundaries on this segment 5. There are several abandoned braids on the north segment due to erosion. Segment 11 N. Hogback trail Pasture Trail Photo 1 : View of re-route from Lower Manor House connection. Looking southwest. Segment 11 This segment illustrates trail user s desire to have connected trails. This social trail creates closed loops to the Manor House trail, North Hogback trail and Pasture trails from the Manzanita social trails. As such, this is an important segment to bring into the system as part of this project. The two ends of these segments have a similar elevation. As such, they can be connected via a trail that roughly contours the hill. This will provide good cross slope along the entire length of the segment and avoid the erosional / sustainability issues of the current alignment. The west end can be tied into an existing ramp at the corner of Mountain Laurel and Manor House Rd. Lower Manor House trail N Ranch Rd. 1. Abandon the entire length of the current alignment and re-route, per the map, to create good cross-slope along the entire segment length. Photo 2 : View of re-route approaching Mountain Laurel. Looking west. 2. Build new alignment. 24 inches wide, per community new trail standards 3. Use spoils from re-route to reclaim the abandoned trail 4. Add signage on both sides of Mountain Laurel alerting users to crossing traffic. Photo 4 : Current fall line alignment approaching Lower Manor House trail and North Ranch Rd. Looking east. Estimated Time and Resources to Implement 50 man-hours, Trail Club volunteer time No additional resources Photo 3 : Current fall line alignment along Manor House Rd. Looking south.

16 Summary : Project Resources and Metrics NOTE : The estimated work time are volunteer hours donated by the Trail Club. Other physical resource costs would be budgeted in the Open Space budget. There would be some staff time associated with procurement and delivery of materials.

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project

More information

Daniels Park Master Plan

Daniels Park Master Plan Daniels Park Master Plan Prepared for: Douglas County & The City and County of Denver October, 2007 EXHIBIT A Contents Daniels Park Overview 2 Project History & Goals 2-3 Regional Context Map 4 Park Zone

More information

4.500 Preston Road Overlay District

4.500 Preston Road Overlay District Section 4.500 Preston Road Overlay District 2004 Zoning Ordinance 4.500 Preston Road Overlay District (ZC 98-29; Ordinance No. 98-9-12) 4.501 Purpose To provide appropriate design standards for the use

More information

Description of Preferred Alternative

Description of Preferred Alternative Chapter 2 Description of Preferred Alternative 2.1 Introduction This chapter of the programmatic Sammamish Town Center Sub-area Plan Final EIS provides a more detailed description of the Preferred Alternative

More information

E. Natural areas include habitats such as wetlands, tidal marshes, waterways, natural drainage-ways, woodlands and grassland meadows.

E. Natural areas include habitats such as wetlands, tidal marshes, waterways, natural drainage-ways, woodlands and grassland meadows. Adopted November 1999 I. Purpose A. The purpose of these guidelines is to assist in the design and layout of open space, as provided on developed lots within the District. The intent of these guidelines

More information

F. Driveways. Driveways which provide access to off-street parking or loading from public streets shall comply with the following:

F. Driveways. Driveways which provide access to off-street parking or loading from public streets shall comply with the following: Section 20.945.040 General Design Standards for Surface Parking Areas. A. Review Authority. Parking lot design and drainage shall be subject to review and approval of the City Transportation Manager. B.

More information

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN OPPORTUNITIES AT OXBOW EXISTING WETLANDS Site is undeveloped and we can design a park that works well from the start. SAND BEACH Potential to eliminate invasive species. DEBRIS (CONCRETE, OLD CARS) VEGETATION

More information

Draft Master Plan for Franklin Park

Draft Master Plan for Franklin Park Draft Master Plan for Franklin Park Metro Parks Tacoma with SiteWorkshop November 2009 I. overview & background Process & History Master Plan Process The Master Plan is based on a community involvement

More information

Glenborough at Easton Land Use Master Plan

Glenborough at Easton Land Use Master Plan Public Facilities 102 7.0 PUBLIC FACILITIES 7.1 OVERVIEW This chapter describes the public facilities that will provide high-quality services in the Glenborough at Easton community, to include three schools,

More information

SECTION 5: REACH RECOMMENDATIONS/MAPS

SECTION 5: REACH RECOMMENDATIONS/MAPS SECTION 5: REACH RECOMMENDATIONS/MAPS This section describes areas of concern and provides specific recommendations for each project reach. Locations of stormwater drains were from GIS coverage supplied

More information

Chapter 5: Natural Resources and Environment

Chapter 5: Natural Resources and Environment NATURAL RESOURCES AND ENVIRONMENT 5-1 5 Chapter 5: Natural Resources and Environment BACKGROUND AND INTENT Urban expansion represents the greatest risk for the future degradation of existing natural areas,

More information

Errol Heights Park and Community Garden Frequently Asked Questions March 22, 2018

Errol Heights Park and Community Garden Frequently Asked Questions March 22, 2018 Errol Heights Park and Community Garden Frequently Asked Questions March 22, 2018 Question 1: What improvements are planned for Errol Heights Park? How will the community be engaged in the process to shape

More information

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report Page 1 of 18 ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville Environmental Screening Report July 2011 Page 2 of 18 Table of Contents 1.0 INTRODUCTION

More information

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan Town of Portola Valley General Plan Amended December 10, 1997 Table of Contents Introduction... 1 Planning Area... 1 Objectives... 2 Principles... 2 Standards... 4 Description... 4 Community Commercial...

More information

Welcome to the. Open House

Welcome to the. Open House Welcome to the 5th Street to Kinsman Road Open House November 14 5:30 7:00 p.m. Please sign in Project Overview In December 2016, City Council adopted SW 5th Street as the preferred alignment to connect

More information

MILL POND OVERLOOK. A project of the Town of Oyster Bay. Prepared by Cameron Engineering & Associates, LLP

MILL POND OVERLOOK. A project of the Town of Oyster Bay. Prepared by Cameron Engineering & Associates, LLP MILL POND OVERLOOK A project of the Town of Oyster Bay Prepared by Cameron Engineering & Associates, LLP Funded in part through an EPF grant from the NYS Department of State Project Goals & Advisory Committee

More information

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009 SOUTHWEST CORRIDOR EXTENSION Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009 AGENDA I. Welcome/Introductions II. Project Review and Status III. Environmental

More information

LEMON CREEK AREA PLAN. Steering Committee Meeting April 27, 2017

LEMON CREEK AREA PLAN. Steering Committee Meeting April 27, 2017 LEMON CREEK AREA PLAN Steering Committee Meeting April 27, 2017 Agenda Roll Call (6:00pm) Approval of Minutes April 20, 2017 (5 minutes) Review and Approve the Natural Resources & Recreation Chapter, Goals,

More information

Ramsey Center area - potential BMP sites

Ramsey Center area - potential BMP sites Ramsey Center area - potential BMP sites Lilly Branch Carlton St. 1 2 Joe Frank Harris Commons 3 4 8 5 East Campus Rd. 11 6 12 7 9 East Campus Deck 10 20 16 17 Ramsey Center 13 14 18 19 15 River Road Road

More information

Hidden Pointe Landscape Master Plan. June, archi terra

Hidden Pointe Landscape Master Plan. June, archi terra Hidden Pointe Landscape Master Plan June, 2006 t h e archi terra g r o u p 1 Table of Contents Background Purpose and Goals of the Master Plan Master Plan Process Existing Conditions Entrance Hidden Pointe

More information

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas.

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas. Chapter 19.06. Landscaping and Fencing. Sections: 19.06.01. Purpose. 19.06.02. Required Landscaping Improvements. 19.06.03. General Provisions. 19.06.04. Landscaping Plan. 19.06.05. Completion of Landscape

More information

Bridge Type Assessment and Evaluation

Bridge Type Assessment and Evaluation 16M-01410-01 (3216026) Glen Road Pedestrian Bridge EA Study Bridge Type Assessment and Evaluation Factor Group/Criteria Alternative 1: Steel girder with two inclined steel legs Alternative 2: Steel girder

More information

VEHICULAR AND PEDESTRIAN CIRCULATION

VEHICULAR AND PEDESTRIAN CIRCULATION This perspective sketch communicates the intended character and quality of a proposed streetscape design. Locate benches near a major intersection where people tend to gather. Seating and lighting provide

More information

FY Capital Improvement Program Arroyo Projects

FY Capital Improvement Program Arroyo Projects FY 219-223 Capital Improvement Program FY 218 FY 219 FY 22 FY 221 FY 222 FY 223 1 2 3 4 5 6 7 8 9 1 Hahamongna - Implement Master Plan - Oak Grove Area Improvements (7756) Hahamongna - Implement Master

More information

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION FOR AVALON INN (APN 069-241-27 & -04) 1201 & 1211 NORTH MAIN STREET FORT BRAGG, CA MENDOCINO COUNTY prepared for:

More information

The scope of the plan will focus on the Prospect Heights Slough and Hillcrest Lake as one entity.

The scope of the plan will focus on the Prospect Heights Slough and Hillcrest Lake as one entity. Plan for Prospect Heights Natural Resources Commission Plan for Improved Public Access and Enjoyment of the Prospect Heights Slough and Hillcrest Lake July 23, 2018 The City Council has requested the Natural

More information

City of Phoenix Street Transportation Department East Sonoran Parkway Alignment (ESPA) Committee Committee Recommendation April 2006

City of Phoenix Street Transportation Department East Sonoran Parkway Alignment (ESPA) Committee Committee Recommendation April 2006 SONORAN PARKWAY BACKGROUND City of Phoenix Street Transportation Department Important east-west alignment for congested northeast Phoenix Alignment on Street Classification map since 1987 Originally shown

More information

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures 4.0 EROSION & SEDIMENT CONTROL MEASURES After performing the analysis summarized above, Burns & McDonnell

More information

Red Fox Commercial Outline Plan

Red Fox Commercial Outline Plan Red Fox Commercial Outline Plan City of Cold Lake, Alberta Prepared by Durrance Projects Ltd and Ross W. Sharp & Associates Ltd October 2014 Rupert 1 Table of Contents 1. PURPOSE...3 1.1. Location...4

More information

FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT

FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT FIELD INSPECTION REPORT Date September 19, 2018 Project Northern Natural Gas Company (Northern) Cedar Station Upgrade Project Dakota County, Minnesota Authority: Section 7(c) Personnel FERC Staff: Company

More information

Glenn Highway MP DSR. Landscape Narrative

Glenn Highway MP DSR. Landscape Narrative Glenn Highway MP 34-42 DSR Landscape Narrative Project Landscape Goals The Glenn Highway MP 34-42 Project extends through a variety of landscape types typical to the Matanuska-Susitna Valley. In general,

More information

Transportation. Strategies for Action

Transportation. Strategies for Action Transportation A major priority for the Overlake Neighborhood is to develop a multimodal transportation system. To achieve this system, a balance has to be found among travel, circulation and access needs;

More information

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Potential Green Infrastructure Strategies May 6, 2015 Workshop Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National

More information

FY Capital Improvement Program Arroyo Projects - Lower Arroyo Summary

FY Capital Improvement Program Arroyo Projects - Lower Arroyo Summary LOWER ARROYO FY 214-218 Capital Improvement Program Description FY 213 FY 214 FY 215 FY 216 FY 217 FY 218 1 Bird Sanctuary Improvements (7749) 35, 225, 125, 2 Lower Arroyo - Implement Master Plan - Signage

More information

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SITE PLAN REVIEW APPLICATION AND CHECKLIST SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description

More information

Rocky Areas Project Guidance HABITAT

Rocky Areas Project Guidance HABITAT Rocky Areas Project Guidance HABITAT Introduction Rocky habitats are surface areas dominated by exposed rock, such as mountain peaks, inland cliffs, buttes and rocky outcrops. In many cases, rocky areas

More information

COLLIER BOULEVARD (CR 951) CORRIDOR

COLLIER BOULEVARD (CR 951) CORRIDOR Project(s) Goals Improve Traffic Circulation, Capacity & Safety Focus on Safety During Design & Construction Address Public Concerns Design an Aesthetically Pleasing Project Limit Environmental Impacts

More information

B - Coalfield River Corridor Landscape Character Type

B - Coalfield River Corridor Landscape Character Type B - Coalfield River Corridor Landscape Character Type Landscape Character Type - Coalfield River Corridor The Coalfield River Corridors Landscape Character Type is located in the two converging valleys

More information

RZC Public View Corridors and Gateways

RZC Public View Corridors and Gateways RZC 21.42 Public View Corridors and Gateways 21.42.010 Purpose 21.42.020 Scope and Authority 21.42.030 Administration 21.42.040 Gateways Design 21.42.050 Unidentified Public Views 21.42.060 Identification

More information

Fall 2017 Construction Update

Fall 2017 Construction Update Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,

More information

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 25-5 Problem: Stormwater collected from the neighborhood upstream is released at 9 Muirfield Lane and flows west toward

More information

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES LOS ANGELES MISSION COLLEGE MASTER PLAN DESIGN & DEVELOPMENT PRINCIPLES 34 Quality Learning Along the Arroyo PROGRAM SUMMARY BY PROJECT The following are program summaries for each of the projects planned

More information

APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY

APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY A. Purpose: 1. Regulatory Requirement and Use Mitigation: The purpose of this appendix is to provide a regulatory context (standards)

More information

Conservation Plan. I. Property Information. II. Objectives. Natural Resource Objectives. Sustainability in Practice (SIP) Certified

Conservation Plan. I. Property Information. II. Objectives. Natural Resource Objectives. Sustainability in Practice (SIP) Certified Conservation Plan Sustainability in Practice (SIP) Certified I. Property Information Vineyard Name and Establishment Date: Location: Map (attach showing blocks and acres): II. Objectives Natural Resource

More information

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 July 27, 2009 TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Plan Area Location & Context... 1 1.2 Ownership

More information

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

PROJECT BACKGROUND. Preliminary Design Scope and Tasks PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of

More information

DRAFT MAP AMENDMENT FLU 04-4

DRAFT MAP AMENDMENT FLU 04-4 DRAFT MAP AMENDMENT FLU 04-4 SW 24 TH AVENUE ROADWAY CORRIDOR The University of Florida participates with the Metropolitan Transportation Planning Organization (MTPO) in its responsibilities for the continuing,

More information

Verde Valley Landscape Character Type

Verde Valley Landscape Character Type Existing Condition Landscape Character The existing landscape character describes the existing set of valued aesthetic attributes for the current landscape. The landscape character descriptions include

More information

Building Bocage Hedgerows in 25/28mm By Binhan Lin

Building Bocage Hedgerows in 25/28mm By Binhan Lin Building Bocage Hedgerows in 25/28mm By Binhan Lin Introduction Bocage Hedgerows gained infamy in WW2 during the Normandy Invasion as being difficult obstacles to traverse. No WW2 Normandy scenario is

More information

DESIGN CRITERIA PACKAGE

DESIGN CRITERIA PACKAGE RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA

More information

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270. Seneca Meadows Seneca Meadows has an industrial park in its southern end and a mixed-use employment area planned for the north end. The district benefits from extensive I-270 visibility, stream valley

More information

ROAD AND CAR PARK DESIGN GUIDELINES

ROAD AND CAR PARK DESIGN GUIDELINES 3.2 ROAD AND CAR PARK DESIGN GUIDELINES PIHA AREA DESIGN GUIDELINES AUCKLAND REGIONAL COUNCIL 37 Existing Road and Car Park Photos: North Piha carpark Anawhata carpark Winstone Track carpark off Piha Road

More information

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS Caldwell County Pathways along with our co-partners City of Lenoir, Town of Gamewell,

More information

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual. 4.4. Filter Strips Filter Strips are densely vegetated lands that treat sheet flow storm water from adjacent pervious and impervious areas. They function by slowing runoff, trapping sediment and pollutants,

More information

PUBLIC MEETING SEPTEMBER 19, 2012

PUBLIC MEETING SEPTEMBER 19, 2012 PUBLIC MEETING SEPTEMBER 19, 2012 M-NCPPC Project Manager Marian Elsasser Project Engineer Kim Paniati PROJECT TEAM Consultants Greenman-Pedersen, Inc. (GPI) Project Manager Liz Marcy Environmental Specialist

More information

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 July 7, 2015 RFP NO. 16-02 POPES CREEK RAIL TRAIL DESIGN ADDENDUM NUMBER ONE TO: All

More information

Rezoning Transportation Analysis Petition Number: General Location Identifier:

Rezoning Transportation Analysis Petition Number: General Location Identifier: From: Kelsie Anderson, PE Kelsie.Anderson@charlottenc.gov 704-432-5492 Staff Reviewer: Kory Hedrick, PE, PMP Khedrick@charlottenc.gov 704-432-6511 CDOT s review of this rezoning petition is intended to

More information

2011 ASLA Design Awards. Coyote Gulch Honor Award and Land Stewardship Designation Valerian LLC. Environmental Restoration and Reclamation

2011 ASLA Design Awards. Coyote Gulch Honor Award and Land Stewardship Designation Valerian LLC. Environmental Restoration and Reclamation 2011 ASLA Design Awards Honor Award and Land Stewardship Designation Valerian LLC Environmental Restoration and Reclamation Project Name: Category : Project Location: 5 2011 Environmental Restoration and

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

KY 55 Bypass & KY 61 Small Area Plan

KY 55 Bypass & KY 61 Small Area Plan CHAPTER TEN EXECUTIVE SUMMARY The construction of a new road has the power to improve or damage the quality of life for a community. With proper planning and development, a street or road can compliment

More information

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018 Rezoning Petition 2018-028 Pre-Hearing Staff Analysis May 21, 2018 REQUEST Current Zoning: MX-1 LLWPA (mixed use district, Lower Lake Wylie Protected Area), R-3 LLWPA (single family residential, Lower

More information

Rights-of-Way Preservation Guidelines

Rights-of-Way Preservation Guidelines Rights-of-Way Preservation Guidelines Summary of Policy The purpose of the Rights-of-Way Preservation Guidelines is to help staff make decisions about preserving rights-ofway for future transportation

More information

Right-of-Way Acquisitions and Relocations Technical Memorandum

Right-of-Way Acquisitions and Relocations Technical Memorandum Right-of-Way Acquisitions and Relocations Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional

More information

Access Management: An Overview

Access Management: An Overview Figures 1-5 Below Evolution of development along a highway. In the early stages, land along the road is used for farming with little traffic generated. As time passes, the highway corridor becomes a de

More information

Chagrin River Watershed Partners, Inc. Local Regulations. Amy H. Brennan (440)

Chagrin River Watershed Partners, Inc. Local Regulations. Amy H. Brennan (440) Chagrin River Watershed Partners, Inc. Local Regulations Amy H. Brennan (440) 975-3870 www.crwp.org abrennan@crwp.org July 9, 2013 Applicable Zoning and Building Codes Erosion and Sediment Control Grading

More information

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5 VISION STATEMENT 3 UTILIZATION OF THE GUIDELINES 3 IMPLEMENTATION 3 PROCEDURES FOR DESIGN REVIEW 3 LAND USE AND ZONING 4 LAND USE 4 ELEMENTS:... 4 ZONING 4 ELEMENTS:... 4 BUILDING SCALE AND SETBACKS 5

More information

Rezoning Petition Final Staff Analysis June 18, 2018

Rezoning Petition Final Staff Analysis June 18, 2018 Rezoning Petition 2018-028 Final Staff Analysis June 18, 2018 REQUEST Current Zoning: MX-1 LLWPA (mixed use district, Lower Lake Wylie Protected Area), R-3 LLWPA (single family residential, Lower Lake

More information

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM PUBLIC RIGHT-OF-WAY This section provides design guidelines for improvements in the public right-of-way. The public right-of-way refers to streets, sidewalks, non-vehicular thoroughfares, parks and greenways

More information

Chapter IV: Development Pattern

Chapter IV: Development Pattern Chapter IV: Development Pattern Introduction The 2002 Prince George s County Approved General Plan designates three growth policy tiers Developed, Developing, and Rural as well as three center designations

More information

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent COMMUNITY DESIGN Intent An attractive, well-designed County will attract quality development, instill civic pride, improve the visual character of the community, and create a strong, positive image for

More information

BISCUIT RUN PARK MASTER PLAN

BISCUIT RUN PARK MASTER PLAN BOARD OF SUPERVISORS November 14, 2018 BISCUIT RUN PARK MASTER PLAN COUNTY OF ALBEMARLE ANHOLD ASSOCIATES Contents Project Introduction Property Background County Park Planning Process Existing Site &

More information

Project Consulting Team:

Project Consulting Team: THE DOWNTOWN CHERRYVILLE LAND USE + STREETSCAPE MASTER PLAN WAS FUNDED THROUGH THE GENEROUS DONATIONS OF THE FOLLOWING: The Community Foundation of Gaston County ElectriCities of North Carolina The Cherryville

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

MUNICIPALITY OF ANCHORAGE

MUNICIPALITY OF ANCHORAGE MUNICIPALITY OF ANCHORAGE ANCHORAGE PARKS & RECREATION Memorandum PRC 08-38 DATE: June 4, 2008 TO: FROM: SUBJECT: Parks & Recreation Commission Monique Anderson, Parks Superintendent PRC 08-38 Creekside

More information

4.0 Concept Plan Implementation

4.0 Concept Plan Implementation 4.0 Concept Plan Implementation The following section defines the recommended strategy for the implementation of the Terwillegar Park Concept Plan including park management guidelines, capital costs, development

More information

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways Welcome to Pubic Information Centre #1 Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways Welcome to Open House # 1 Tonight, we invite you to.

More information

Project Purpose. Project Need

Project Purpose. Project Need Project Purpose The purpose of the project is to implement a bridge improvement solution that corrects the existing safety problem at the Strasburg Pike Bridge. The project will provide a structurally

More information

PROJECT SHOWING MINUTES

PROJECT SHOWING MINUTES PROJECT SHOWING MINUTES North Lynn Street Esplanade Improvements Project No. 0029-000-859, C501, B605 UPC No. 109813 November 1, 2017 10:00 a.m. 1911 North Ft. Myer Drive, LL-10, Arlington, VA Overview

More information

URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION

URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION Stephen Crawford, P.E., CFM Romin Khavari, P.E., CFM NCTCOG Public Works Roundup MAY 23, 2018 Today s Agenda Urbanized Stream Erosion Solving

More information

MEMORANDUM. Jim Tomberlin, Mountain Valley Properties

MEMORANDUM. Jim Tomberlin, Mountain Valley Properties MEMORANDUM TO: CC: Jim Tomberlin, Mountain Valley Properties GR Fielding, Pitkin County Engineer Brian Pettit, Pitkin County Public Works Director Dan Cokley, SGM FROM: Lee Barger, SGM DATE: June 16, 2016

More information

Creating Complete Roadway Corridors:

Creating Complete Roadway Corridors: Creating Complete Roadway Corridors: The AASHTO Guide to Transportation Landscape Architecture and Environmental Design NCHRP Project 15-33 Status Report AASHTO Standing Committee on Design Technical Committee

More information

SHEFFIELD PARK Paulding County, GA DRI #588

SHEFFIELD PARK Paulding County, GA DRI #588 SHEFFIELD PARK Paulding County, GA DRI #588 Supplemental Information for RDC s DRI (Form 2) Review August 16, 2004 Prepared for: Mr. David Howerin Coosa Valley RDC 1 Jackson Hill Drive Rome, GA 30161 P.O.

More information

Reconstruction Project. Wayzata Task Force Meeting September 3, 2009

Reconstruction Project. Wayzata Task Force Meeting September 3, 2009 CSAH 101 Reconstruction Project Wayzata Task Force Meeting September 3, 2009 Agenda 700 7:00 Re-Introductions ti 7:05 2008 Activity Recap / 2009 Activities-to-date 7:10 Discussion of Layout Revisions (per

More information

WELCOME TO OPEN HOUSE TWO November 28, 2018

WELCOME TO OPEN HOUSE TWO November 28, 2018 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting

More information

Zoning Ordinance Article 3

Zoning Ordinance Article 3 Article 3 Natural Resources Protection Section 301 Natural Resources Protection 301.1. Purpose - The following natural resources protection standards are established to protect the public health, safety

More information

2017 Summer Projects

2017 Summer Projects 2017 Summer Projects Mission: The Anchorage Park Foundation builds healthy parks and healthy people by mobilizing public support and financial resources for Anchorage parks, trails and recreation opportunities.

More information

BEST PRACTICES FOR PROJECT NOMINATIONS TA Set-Aside Program

BEST PRACTICES FOR PROJECT NOMINATIONS TA Set-Aside Program BEST PRACTICES FOR PROJECT NOMINATIONS 2017 TA Set-Aside Program Focus of this presentation Photos Public Support Maps & Exhibits Proposed Budget Design Details Project Evaluation & Selection Criteria

More information

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement (blank page) WestConnex New M5 5-42 (blank page) WestConnex New M5 5-44 5.5 Tunnels 5.5.1 Main alignment tunnels The main alignment tunnels would be about nine kilometres long, with the western tunnel

More information

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 The following items are required for the preliminary plat. Numbers correspond with those on the example preliminary plat. RENO COUNTY SUBDIVISION REQUIREMENTS

More information

2. Analysis. DRAFT Gerald Richards & Pleasantview Park Master Plan

2. Analysis. DRAFT Gerald Richards & Pleasantview Park Master Plan DRAFT Gerald Richards & Pleasantview Park Master Plan 19 Historic Features According to the National Register of Historic Places and the National Historic Landmarks Program, there is nothing of national

More information

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET A RROYO P ROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEARS 214-218 HAHAMONGNA Priority Description 1 Hahamongna Watershed Park - Implement Master Plan 211,6 211,6 (77565) 2 Hahamongna -

More information

CITY PLANNING COMMISSION AGENDA ITEM: C STAFF: ROBERT TEGLER FILE NO: CPC PUD QUASI-JUDICIAL

CITY PLANNING COMMISSION AGENDA ITEM: C STAFF: ROBERT TEGLER FILE NO: CPC PUD QUASI-JUDICIAL CPC AGENDA June 8, 2006 Page 37 CITY PLANNING COMMISSION AGENDA ITEM: C STAFF: ROBERT TEGLER FILE NO: CPC PUD 05-294 - QUASI-JUDICIAL PROJECT: APPLICANT: OWNER: PARKWOOD AT WOLF RANCH NASS DESIGN ASSOCIATES

More information

Downtown Denver Morrison. Located 30 minutes from downtown Denver behind the hogback

Downtown Denver Morrison. Located 30 minutes from downtown Denver behind the hogback Downtown Denver Morrison Located 30 minutes from downtown Denver behind the hogback Founded in 1874 as a passageway gold mines to the west. Morrison is the gateway to the Bear Creek Canyon. Surrounded

More information

C ity of Grande Prairie Development Services Department

C ity of Grande Prairie Development Services Department C ity of Grande Prairie Development Services Department FAIRWAY DEVELOPMENT OUTLINE PLAN OP 08 09 Approved April 6, 2009 Prepared by: Focus Corporation Table of Contents 1.0. Introduction 2 3 1.1. Plan

More information

Pennsy Greenway Trail

Pennsy Greenway Trail Town of Schererville Pennsy Greenway Trail DES. #s: 0401062, 1173595 & 1382661 Construction of Pennsy Greenway Trail beginning at Wilhelm Street and continuing northwest along the former Penn Central railroad

More information

Official Plan Amendment Setbacks from Railway Operations

Official Plan Amendment Setbacks from Railway Operations Official Plan Amendment Setbacks from Railway Operations August 12, 2015 Send your comments to: Krista Libman, Planner City of Ottawa Planning and Growth Management Tel: 613-580-2424 ext. 27893 E-mail:

More information

5.0 Storm Water Landscape Guidance Introduction

5.0 Storm Water Landscape Guidance Introduction 5.0 Storm Water Landscape Guidance Introduction Landscaping is a critical element to improve both the function and appearance of storm water management practices. Integrated storm water landscapes can

More information

Section 11 Grading and Drainage Standards

Section 11 Grading and Drainage Standards Section 11 Grading and Drainage Standards 11.1 INTRODUCTION The proper grading, conveyance, storage and release of storm water is critical to maintain the integrity of the Property. Drainage facilities,

More information

Kittson Parkway / Watershed Park Parking Lot

Kittson Parkway / Watershed Park Parking Lot Kittson Parkway / Watershed Park Parking Lot Date Constructed: Summer 2005 Site Location / Description: Kittson Parkway, North Delta, British Columbia. Permeable parking lot adjacent to Watershed Park;

More information

PROJECT SITE The Proposed Project includes the Allen and Pike Street malls between Delancey and South Streets (see Figure 2C-1).

PROJECT SITE The Proposed Project includes the Allen and Pike Street malls between Delancey and South Streets (see Figure 2C-1). Chapter 2, Section C: A. INTRODUCTION This chapter considers the potential of the proposed Reconstruction of the Allen and Pike Street Malls project to affect the urban design characteristics and visual

More information