Station Area Plan Introduction & Draft Alternatives Review

Size: px
Start display at page:

Download "Station Area Plan Introduction & Draft Alternatives Review"

Transcription

1 Station Area Plan Introduction & Draft Alternatives Review City Council Meeting - February 22, 2016

2 Project Background: California High-Speed Rail San Jose to San Fernando Valley Segment CHSRA will select preferred alignment on completion of the EIR in late 2017 or early Business Plan assumes that HSR will be in operation by 2026 Electrified Caltrain between San Francisco and San Jose (and potentially Gilroy) by

3 Project Background: Visioning process High-Speed Train Visioning Project from 2011 to 2012 Evaluation two locations for a Gilroy HSR station and several options for the configuration of the alignment Identify the best possible station location and alignment City Council and community identified Downtown as the preferred station location and favored modified at-grade vertical alignment 4

4 Project Background: Downtown Gilroy Station Area Plan Funded by grant from CHSRA to study and plan for HSR Downtown Purpose to identify opportunities and issues created by future HSR station and tracks in Downtown Gilroy and mitigate impacts and maximize opportunities 5

5 Amendment of Downtown Specific Plan Most effects of HSR will occur Downtown Project will amend land use and transportation portions of Downtown Specific Plan and other plans, as needed 6

6 Alternative Land Use and Circulation Plans Overview Alternative Plans: Illustrate three different approaches to address opportunities and impacts of high-speed rail in Downtown Basis for Alternative Plans: Opportunities and Constraints report Input from Technical Advisory Committee and Citizen Advisory Committee Community input via stakeholder interviews and community meeting 2

7 Request and Recommendation Request: Review of Draft Alternative Land Use Scenarios to identify aspects that would not be favorably considered under any circumstances. Recommendation: If any aspects of any of the Scenarios would not be favorably considered, direct staff to remove those aspects from the draft alternative plans. Planning Commission Recommendation: Analyze Draft Alternatives, as presented. 3

8 Components of Alternative Land Use and Circulation Plans Land Use Elements Gateway treatment locations Fire Station locations Arts Center locations Parks/Plazas Increased building heights Transportation Elements HSR alignment (vertical modified at-grade v. aerial) HSR platform location Potential HSR long-term parking locations Potential Downtown parking locations Street closures or extensions Depressed streets Enhanced bike connections 4

9 Potential Changes Building heights could increase to 5 or 6 stories throughout the area and increase to 10 to 12 stories east of HSR and south of Old Gilroy St. Increases to the amount of residential, retail, office and hotel development, mostly south of 7 th St. / Old Gilroy St. Expansion of auto mall Public or mixed use development on west side of Swanston Ln. Alternative locations for Arts Center 5

10 Potential Changes Long-term HSR parking facilities east of HSR and south of Old Gilroy St. Possible closure of Railroad St. and some east-west street connections New underpasses and depression of cross streets where east-west vehicle access maintained Easterly extension of 1 st St. to Murray Ave. Extension of Chestnut St. over Miller Slough Aerial alignment of HSR ft. 6

11 Alternatives Buildout Projection SCENARIO 1. TRANSIT FOCUS SCENARIO 2. DOWNTOWN FOCUS SCENARIO 3. EMPLOYMENT FOCUS Phase 1 (by 2025) Housing: 500 units Commercial: 100,000 SF Class A office: 100,000 SF Hotel: 100 rooms Industrial: 50,000 SF Housing: 800 units Commercial:165,000 SF Class A office: 100,000 SF Hotel: 100 rooms Housing: 600 units Commercial: 200,000 SF Class A office: 100,000 SF Hotel: 100 rooms Phase 2 (by 2040) Housing: 1,900 units Commercial: 400,000 SF Class A office: 650,000 SF Hotel: 400 rooms Industrial: 50,000 SF Housing: 2,400 units Commercial: 490,000 SF Class A office: 200,000 SF Hotel: 300 rooms Housing: 1,600 units Commercial: 600,000 SF Class A office: 1.0 million SF Hotel: 1,400 rooms [1] Phase II includes Phase I development. Commercial development includes both retail and small offices, such as law firm offices. [2] Buildout projections are based on the market assessment prepared by BAE and the projections in the 2005 Downtown Specific Plan. 7

12 Scenario 1: Transit Focus High-intensity dev. focused within walking distance of the HSR station. Least effect on the remaining Downtown area. Modified at-grade HSR alignment would close one east-west vehicle access and may eliminate Railroad St. Depressed streets may affect access to adjacent properties. HSR parking structures at three locations near highway interchanges. 8

13 Scenario 2: Downtown Focus Mixed use residential dev. spread out along Monterey St. and around the HSR station. Retail dev. (supporting DT) extending along east-west streets on both sides of Monterey St. Aerial alignment of HSR allows all existing east-west street connections to remain. Union Pacific Railroad (UPRR) remains at the current location at grade. HSR parking structures at two locations near highway interchanges. 9

14 Scenario 3: Employment Focus Office dev. and multifamily housing within walking distance of the HSR station. Enhanced commercial corridor along Monterey, extending south of 10 th St. Area south of 10 th St. reserved for future R&D and office dev., a hotel/conference center, and HSR parking. Modified at-grade HSR alignment would keep all east-west vehicle access, requiring new underpasses and depression of cross streets. 10

15 Next Steps March to May, 2016: Alternatives analysis June 2016: CAC meeting and Community meeting 11

16 Questions or Comments?

17 Backup slides

18 HSR Vertical Alignment Options Aerial Alignment refers to the high-speed rail tracks supported on columns elevated approximately 30 to 35 feet above existing grade. Vertical Modified At-Grade Alignment: refers to the high-speed rail tracks on an earthen berm elevated approximately 20 feet above the existing grade. The existing Union Pacific rail tracks would similarly be elevated and realigned in some areas parallel to the high-speed rail tracks.

19 Alternative Land Use and Circulation Plans Overview Transit Focus Downtown Focus Employment Focus

20 Land Use Comparison Transit Focus Downtown Focus Employment Focus

21 Transportation Comparison Transit Focus Downtown Focus Employment Focus

22 2005 DTSP Buildout Projection DISTRICT COMMERCIAL BUILDOUT (S.F.) RESIDENTIAL DWELLING UNITS Historic 72, Expansion 281, Cannery 180, Cannery Project 45, Transitional 141, Civic/residential only 7, Gateway 265, TOTAL 994,495 1,576 BAE Buildout Projection Phase I (2025) Phase II (2040) Housing (du) Commercial (bldg. s.f.) 102, ,000 Office (bldg. s.f.) 82, ,000 Hotel (rooms) Industrial (bldg. s.f.) N/A Housing (du) 235-1,763 Commercial (bldg. s.f.) 383, ,000 Office (bldg. s.f.) 186, ,000 Hotel (rooms) 290 1,400 Industrial (bldg. s.f.) N/A

Community Meeting #1: Project Kick Off

Community Meeting #1: Project Kick Off Community Meeting #1: Project Kick Off November 17, 2015 What are 3 things you like about Downtown Gilroy that you want to hold onto in the future? Please write them down and share with us! Tonight s Meeting

More information

Community Meeting #2.1

Community Meeting #2.1 Community Meeting #2.1 Thursday, October 20, 2016, 7:00 p.m. to 9:00 p.m. Eliot Elementary School, 475 Old Gilroy Street, Gilroy, CA 95020 Meeting Summary The City of Gilroy held its third community meeting

More information

Citizen Advisory Committee Meeting #3.2

Citizen Advisory Committee Meeting #3.2 Citizen Advisory Committee Meeting #3.2 August 10, 2016, 7:00 p.m. to 9:00 p.m. Police Department Conference Room, 7301 Hanna Street, Gilroy, CA 95020 Meeting Summary I. Call to Order Members present:

More information

HIGH-SPEED RAIL PROGRAM UPDATE. Gilroy Unified School District & Gilroy City Council September 24, 2018 Gilroy City Council Chambers, Gilroy, CA

HIGH-SPEED RAIL PROGRAM UPDATE. Gilroy Unified School District & Gilroy City Council September 24, 2018 Gilroy City Council Chambers, Gilroy, CA HIGH-SPEED RAIL PROGRAM UPDATE Gilroy Unified School District & Gilroy City Council September 24, 2018 Gilroy City Council Chambers, Gilroy, CA OVERVIEW Introductions High-Speed Rail Project Update Overview

More information

Dumbarton Rail Corridor. Project Scoping Meeting Nov 15, :15 PM City of Newark Nov 16, :15 PM City of Menlo Park

Dumbarton Rail Corridor. Project Scoping Meeting Nov 15, :15 PM City of Newark Nov 16, :15 PM City of Menlo Park Dumbarton Rail Corridor Project Scoping Meeting Nov 15, 2006 7:15 PM City of Newark Nov 16, 2006 7:15 PM City of Menlo Park 1 Presentation Overview I. Introduction History of the Project II. III. Purpose

More information

Chapter 1.0 Introduction

Chapter 1.0 Introduction Chapter 1.0 Introduction 1.1 Background The North Metro commuter rail line is part of the RTD FasTracks regional transit system expansion program to build more than 100 miles of rail transit throughout

More information

Railyard Alternatives and I-280 Boulevard Feasibility Study. MTA Board Meeting May 6, 2014

Railyard Alternatives and I-280 Boulevard Feasibility Study. MTA Board Meeting May 6, 2014 Railyard Alternatives and I-280 Boulevard Feasibility Study MTA Board Meeting May 6, 2014 Planned Infrastructure Major pieces of new infrastructure are planned including: Downtown Rail Extension (DTX)

More information

Bay Meadows Specific Plan Amendment - Phase II Overview. I. Phase II Overview. November 7, 2005 I - 1

Bay Meadows Specific Plan Amendment - Phase II Overview. I. Phase II Overview. November 7, 2005 I - 1 I. Phase II Overview November 7, 2005 I - 1 Explanatory Note This Specific Plan Amendment amends the Bay Meadows Specific Plan adopted by the San Mateo City Council on April 22, 1997. The original Specific

More information

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE Overview I. Draft Plan Process II. Draft Plan Overview a. Market Analysis b. Master Land Use Plan

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW Steering Committee Presentation February 14, 2018 Purpose of General Plan Guide land use and development decisions Coordinate transportation, infrastructure,

More information

3.0 Project Description

3.0 Project Description 3.0 Project Description 3.0 PROJECT DESCRIPTION 3.1 PROJECT LOCATION AND SETTING PROJECT LOCATION The proposed Downtown Lancaster Specific Plan Project (project) is located in the City of Lancaster, California.

More information

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT 2. AGENCY COORDINATION AND PUBLIC INVOLVMENT This chapter discusses the process carried out for conducting agency coordination and public involvement activities. TECHNICAL ADVISORY COMMITTEE A Technical

More information

Planning Charlotte s Future. Transportation & Planning Committee March 14, 2016

Planning Charlotte s Future. Transportation & Planning Committee March 14, 2016 Planning Charlotte s Future Transportation & Planning Committee March 14, 2016 Charlotte s Vision Livable city Vibrant economy Thriving natural environment Diverse population Choices for housing, education,

More information

MAYFIELD WEST SECONDARY PLAN PHASE 2

MAYFIELD WEST SECONDARY PLAN PHASE 2 MAYFIELD WEST SECONDARY PLAN PHASE 2 Public Open House #3 February 25, 2010 Draft Preferred Land Use Scenario TOWN OF CALEDON PLANNING & DEVELOPMENT DEPARTMENT Open House Agenda TOWN OF CALEDON 1. Welcome

More information

The Role of Cities in Planning Transportation Megaprojects

The Role of Cities in Planning Transportation Megaprojects The Role of Cities in Planning Transportation Megaprojects SPUR Oakland, November 28, 2018 + Elizabeth Deakin / UC Berkeley + Eric Eidlin / City of San Jose + Doug Johnson / City of San Francisco The Role

More information

Planning Charlotte s Future. Planning Committee June 21, 2016

Planning Charlotte s Future. Planning Committee June 21, 2016 Planning Charlotte s Future Planning Committee June 21, 2016 Charlotte s Vision Livable city Vibrant economy Thriving natural environment Diverse population Choices for housing, education, employment Safe

More information

Union Station Master Plan Task 3 Update

Union Station Master Plan Task 3 Update Union Station Master Plan Task 3 Update June 18, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 2012 2013 2014 A S O N D J F M A M J J A S O N D J F M A M J J A S O Task 1`

More information

Key Concepts of the General Plan

Key Concepts of the General Plan Key Concepts of the General Plan General Plan Purpose Vision for City s future Standards for City Services Land Use Plan General Plan Purpose San Jose is creating its Blueprint for the Future to become

More information

Isabel Neighborhood Plan: Alternatives

Isabel Neighborhood Plan: Alternatives Isabel Neighborhood Plan: Alternatives Presented by: Lori Parks, Associate Planner February 2, 2015 Agenda 1. Background on BART to Livermore 2. Isabel Neighborhood Plan 3. Alternative Scenarios 4. General

More information

1.0 PROJECT PURPOSE AND NEED

1.0 PROJECT PURPOSE AND NEED 1.0 PROJECT PURPOSE AND NEED The FasTracks Plan includes the extension of the Central Corridor from its current terminus at 30th/Downing to a connection to the East Corridor commuter rail service planned

More information

Introduction and Overview

Introduction and Overview Introduction and Overview Articulate local values and priorities Guide land use and development decisions Coordinate transportation, infrastructure, and City services with expected growth and available

More information

S C O P E O F W O R K A P R I L

S C O P E O F W O R K A P R I L white flint 2 sector plan S C O P E O F W O R K A P R I L 2 0 1 2 MONTGOMERY COUNTY PLANNING DEPARTMENT M-NCPPC MontgomeryPlanning.org 1 white flint 2 sector plan Scope of Work abstract This scope of work

More information

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN Tuesday, February 28, 2012 6pm 9pm 1 st Floor Atrium, City Hall 2 Wellington Street West, Brampton 1 POLICY FRAMEWORK The 2006 Provincial Growth

More information

III. Design Principles

III. Design Principles III. Design Principles The design of Bay Meadows Phase II has been guided by a series of Urban Design Principles. These principles, informed by consultant site analysis, City staff recommendations, and

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016 Item 5, Report No. 26, of the Committee of the Whole (Working Session), which was adopted without amendment by the Council of the City of Vaughan on June 7, 2016. 5 MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

More information

WEST OAKLAND SPECIFIC PLAN & DRAFT ENVIRONMENTAL IMPACT REPORT

WEST OAKLAND SPECIFIC PLAN & DRAFT ENVIRONMENTAL IMPACT REPORT WEST OAKLAND SPECIFIC PLAN & DRAFT ENVIRONMENTAL IMPACT REPORT Landmarks Preservation Advisory Board Public Hearing February 10, 2014 1 Specific Plan Overview Plan Area is generally bounded by I-580 to

More information

Description of Proposed Station Area Planning Project

Description of Proposed Station Area Planning Project DETAILED SCOPE OF SERVICES In partnership with the California High Speed Rail Authority (Authority) the City of Palmdale (City) shall undertake station area planning (the Project) around the planned high

More information

UPDATE ON THE INDEPENDENCE BOULEVARD AREA PLAN. Citizen Advisory Group Meeting March 3, 2011

UPDATE ON THE INDEPENDENCE BOULEVARD AREA PLAN. Citizen Advisory Group Meeting March 3, 2011 UPDATE ON THE INDEPENDENCE BOULEVARD AREA PLAN Citizen Advisory Group Meeting March 3, 2011 Purpose: Why are we here? To provide an update on the Independence Boulevard Area Plan 1. Overview of the ULI

More information

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation Department of Community Development Michael J. Penrose, Acting Director Divisions Building Permits & Inspection Code Enforcement County Engineering Economic Development & Marketing Planning & Environmental

More information

THE PLANNING AREA 2.1 PLANNING AREA LOCATION

THE PLANNING AREA 2.1 PLANNING AREA LOCATION 2. The Planning Area Brisbane Baylands Specific Plan 21 2 THE PLANNING AREA 2.1 PLANNING AREA LOCATION The Baylands is located approximately midway between San Francisco s central business district and

More information

A. WHAT IS A GENERAL PLAN?

A. WHAT IS A GENERAL PLAN? I. Introduction A. WHAT IS A GENERAL PLAN? A general plan is the planning guideline for the future of a city. It contains goals and policies which regulate urban development, the protection of the natural

More information

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan.

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan. Regional Smart Growth Program Economic Development Commission What is Smart Growth? Adopted as part of the Regional Comprehensive Plan (RCP) RCP provides vision for region based on Smart Growth and sustainability

More information

Tonight s Agenda. Summary Presentation Open House. Group Discussion Next Steps: online community wide survey

Tonight s Agenda. Summary Presentation Open House. Group Discussion Next Steps: online community wide survey Community Open House February 22, 2018 Tonight s Agenda Summary Presentation Open House Station 1: Project Overview and Community Input Station 2: Draft Vision and Guiding Principles Station 3: Western,

More information

Chapter 3 Project Description

Chapter 3 Project Description Chapter 3 Project Description 3.1 OVERVIEW This Draft EIR evaluates the potential for impacts to the environment for two separate but linked proposed projects: the San Mateo Rail Corridor Transit-Oriented

More information

Promoting Economic Development Through Upfront SEPA Review: Lessons from South Downtown Tacoma

Promoting Economic Development Through Upfront SEPA Review: Lessons from South Downtown Tacoma Promoting Economic Development Through Upfront SEPA Review: Lessons from South Downtown Tacoma 1 This session will focus on the City of Tacoma s South Downtown Subarea Plan and associated Non-Project SEPA

More information

HISTORIC TOWN CENTER MASTER PLAN CITY COUNCIL PRESENTATION APRIL 3, 2012

HISTORIC TOWN CENTER MASTER PLAN CITY COUNCIL PRESENTATION APRIL 3, 2012 HISTORIC TOWN CENTER MASTER PLAN CITY COUNCIL PRESENTATION APRIL 3, 2012 REQUESTED CITY COUNCIL ACTIONS Certification of the Final Program Environmental Impact Report (PEIR); and, Approval of General Plan

More information

MARINA BAY. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 14, 2010

MARINA BAY. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 14, 2010 MARINA BAY NEIGHBORHOOD G O OO PRESENTATION S O City of Richmond Officer Bradley A. Moody Memorial Underpass April 14, 2010 TEAM INTRODUCTIONS Project Oversight and Approval City of Richmond Richmond Community

More information

LAND USE MODEL UPDATE. Planning and Land Use Advisory Committee Meeting #2 September 4, 2014

LAND USE MODEL UPDATE. Planning and Land Use Advisory Committee Meeting #2 September 4, 2014 1 LAND USE MODEL UPDATE Planning and Land Use Advisory Committee Meeting #2 September 4, 2014 2 Presentation Outline Introduction and Recap Model Process Study Design Place Types Suitability Factors 3

More information

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

PROJECT BACKGROUND. Preliminary Design Scope and Tasks PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of

More information

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension RESOLUTION NO. R2018-32 Refining the route, profile and stations for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 09/13/2018

More information

Natomas Vision Plan and PLNP

Natomas Vision Plan and PLNP Natomas Vision Plan 20030171 and PLNP2014-00172 Department of Community Development Planning and Environmental Review Leighann Moffitt Sub-Agenda 1. Staff Presentation Leighann Moffitt, County Planning

More information

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park PINE CURVE REZONING BACKGROUND Purchased as two parcels in 2001 and 2002 Annexed and Zoned Greater Downtown District Historic Center September 25, 2002 and October 7, 2002 WHAT THE PROJECT IS AND IS NOT

More information

TOWN COUNCIL / PLANNING COMMISSION

TOWN COUNCIL / PLANNING COMMISSION Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011 Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L.

More information

2. Form and Character. 2.1 Introduction. 2.2 The Downtown Addition Plan. 2.1 Introduction

2. Form and Character. 2.1 Introduction. 2.2 The Downtown Addition Plan. 2.1 Introduction 2.1 Introduction 2.1 Introduction This section of the Specific Plan describes and illustrates the desired form, character and uses of the Downtown Addition and explains the underlying design principles.

More information

I-84 Hartford Project Open Planning Studio #12. April 25, 2017

I-84 Hartford Project Open Planning Studio #12. April 25, 2017 I-84 Hartford Project Open Planning Studio #12 April 25, 2017 Meeting Agenda 1. I-84 Hartford Project alternatives update 2. Multimodal station area planning 3. I-84 / I-91 Interchange Study coordination

More information

New Partners for Smart Growth Conference February 5, 2010

New Partners for Smart Growth Conference February 5, 2010 Dan Stroh, Planning Director City of Bellevue Planning and Community Development Bellevue, WA New Partners for Smart Growth Conference February 5, 2010 Summary of Project Long-range plan update for Bel-Red

More information

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, 2013 Our Perspective Broward Fort Lauderdale 1 Broward Metropolitan Planning Organization Fort Lauderdale Fort Lauderdale Skyline

More information

1 INTRODUCTION Purpose Project Background PROJECT CONTEXT Background The Capital City Downtown Plan...

1 INTRODUCTION Purpose Project Background PROJECT CONTEXT Background The Capital City Downtown Plan... Attachment 3 Contents CONTENTS 1 INTRODUCTION... 3 Purpose... 3 Project Background... 3 2 PROJECT CONTEXT... 9 Background... 9 The Capital City Downtown Plan... 9 The LRT Expansion Plan - LRT Downtown

More information

Connecting Key Activity Centers with High Quality Bus Service

Connecting Key Activity Centers with High Quality Bus Service Connecting Key Activity Centers with High Quality Bus Service Lessons Learned from the DC Circulator Transit Development Plan April 15, 2011 1 DC Circulator Transit Development Plan Ten-year plan for development

More information

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Potential Green Infrastructure Strategies May 6, 2015 Workshop Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National

More information

SOUTHEAST AREA SPECIFIC PLAN. Planning Commission Study Session August 18, 2016

SOUTHEAST AREA SPECIFIC PLAN. Planning Commission Study Session August 18, 2016 SOUTHEAST AREA SPECIFIC PLAN Planning Commission Study Session August 18, 2016 Background: How did we get here? Directed by City Council to prepare Specific Plan (2012) Sustainability focused grant from

More information

INDEPENDENCE BOULEVARD AREA PLAN

INDEPENDENCE BOULEVARD AREA PLAN INDEPENDENCE BOULEVARD AREA PLAN Public Meeting October 28, 2008 Tonight s Agenda Introduction 4:00 4:05 Tom Warshauer Presentation 4:05 5:00 Blake Drury Group Exercises 5:00 5:50 All Wrap Up & Next Steps

More information

9IMPLEMENTATION AND PHASING

9IMPLEMENTATION AND PHASING 9IMPLEMENTATION AND PHASING Purpose A key objective of the Railyard Master Plan is the integration of the public and private realm to provide a network of places that connect to and complement Commercial

More information

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose: Page 1 of Report PB-23-18 SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building Report Number: PB-23-18 Wards Affected: 2 File Numbers:

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION To: All Interested Parties Subject: Notice of Preparation of an Environmental Impact Report From: City of Petaluma Address: 11 English Street, Petaluma, CA 94952-2610 Contact: Heather

More information

Creating Complete Roadway Corridors:

Creating Complete Roadway Corridors: Creating Complete Roadway Corridors: The AASHTO Guide to Transportation Landscape Architecture and Environmental Design NCHRP Project 15-33 Status Report AASHTO Standing Committee on Design Technical Committee

More information

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH 112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG060310124909PGH C ontents Introduction 1 Project Overview 1 Public Involvement and Technical Coordination 4 Description

More information

Preliminary Assessment of Transportation Issues Related to Proposed Casino at Gateway South

Preliminary Assessment of Transportation Issues Related to Proposed Casino at Gateway South Preliminary Assessment of Transportation Issues Related to Proposed Casino at Gateway South DRAFT - 9/16/09 This memorandum summarizes the perspective of the City of Baltimore, Department of Transportation

More information

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development Office of the City Manager ACTION CALENDAR January 29, 2013 To: From: Honorable Mayor and Members of the City Council Christine Daniel, City Manager Submitted by: Eric Angstadt, Director, Planning and

More information

Stakeholders Advisory Working Groups (SAWGs) Smart Growth and TOD Land Use (#11) SAWG Meeting

Stakeholders Advisory Working Groups (SAWGs) Smart Growth and TOD Land Use (#11) SAWG Meeting Presentation - Part II Tappan Zee Bridge/I-287 Corridor Project July 21, 2010 Slide 1. David Kooris (Regional Plan Association) welcomed members of the Land Use Stakeholders Advisory Working Groups (SAWGs)

More information

Metro Orange Line Extension Four Years Early and $61 Million Under Budget

Metro Orange Line Extension Four Years Early and $61 Million Under Budget White Paper: Metro Orange Line Extension Four Years Early and $61 Million Under Budget July 2013 Innovation for better mobility Metro Orange Line Extension Iteris, Inc. was the prime consultant leading

More information

MAYFIELD WEST SECONDARY PLAN PHASE 2

MAYFIELD WEST SECONDARY PLAN PHASE 2 MAYFIELD WEST SECONDARY PLAN PHASE 2 Council Information Workshop February 16, 2010 Draft Preferred Land Use Plan TOWN OF CALEDON PLANNING & DEVELOPMENT DEPARTMENT Workshop Agenda TOWN OF CALEDON 1. Welcome

More information

Rock Spring Master Plan Community Meeting #6: Land Use + Transportation Forecasts

Rock Spring Master Plan Community Meeting #6: Land Use + Transportation Forecasts Rock Spring Master Plan Community Meeting #6: Land Use + Transportation Forecasts May 23, 2016 Ι Walter Johnson High School Andrea Gilles, andrea.gilles@montgomeryplanning.org Ι www.montgomeryplanning.org/community/rockspring/

More information

Portage Parkway Environmental Assessment Public Information Centre No. 1

Portage Parkway Environmental Assessment Public Information Centre No. 1 City of Vaughan Portage Parkway Environmental Assessment Public Information Centre No. 1 November 25, 2015 Welcome to the Public Information Centre This first Public Information Centre (PIC) introduces

More information

Northwest Corridor LRT Line to Irving/DFW Public Meeting No. 1 Project Overview

Northwest Corridor LRT Line to Irving/DFW Public Meeting No. 1 Project Overview LRT Line to Irving/DFW Public Meeting No. 1 Project Overview January 21, 2004 Agenda Purpose Corridor Background Environmental Impact Assessment Public Involvement Plan Project Schedule Purpose Project

More information

Union Station Master Plan Task 2 Briefing

Union Station Master Plan Task 2 Briefing Union Station Master Plan Task 2 Briefing Goals and Organization for Tonight s Meeting Presentation Master Plan Schedule and Scope Key Findings Guiding Principles Alternatives Process Draft Alternatives

More information

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JULY 17, 2017

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JULY 17, 2017 TO: FROM: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JULY 17, 2017 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES AND CITY ENGINEER SUBJECT: HIGH SPEED RAIL

More information

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS 4.4 STATION AREA FINDINGS Each station is different, and each one requires a separate set of recommendations based on the vision for the site. This section outlines an initial TOD strategy and recommendations

More information

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1 INTRODUCTION CHAPTER 1 Ms. Guajardo s Class - Central Elementary CH 1 1 1.1 SETTING South Centre City is a linear corridor south of Downtown Escondido paralleling Centre City Parkway and South Escondido

More information

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016 Silver Line CPAM UPDATE Transportation and Land Use Committee October 14, 2016 Purpose Recap Project History and Map Changes Provide Overview of CPAM Components Discuss Transportation Impacts Discuss Fiscal

More information

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James

More information

THE GREEN VISION WORKSHOP Friday, November 6, 2009

THE GREEN VISION WORKSHOP Friday, November 6, 2009 THE GREEN VISION WORKSHOP Friday, November 6, 2009 SUSTAINABLE LONG RANGE PLANNING IN SANTA MONICA Eileen Fogarty Director, Planning and Community Development GREEN BUILDINGS Santa Monica has the most

More information

POLICY ADVISORY COMMITTEE

POLICY ADVISORY COMMITTEE July 26, 2018 POLICY ADVISORY COMMITTEE ENVIRONMENTAL ANALYSIS PHASE Agenda 1. Welcome and introductions. 2. Overview of project activities. 3. Community Advisory Committee update. 4. Public engagement

More information

Gilroy High-Speed Train Station Visioning Project Vision Report March 2012

Gilroy High-Speed Train Station Visioning Project Vision Report March 2012 Gilroy High-Speed Train Station Visioning Project March 2012 FACT SHEET: Transit Capitol Expressway Light Rail Project Project Description The Capitol Expressway Transit Improvement Project will transform

More information

SOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE

SOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE WELCOME! SOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE Monday, November 18, 2013 3:30 to 5:30PM and 7:00 to 9:00PM Tuesday, November 19, 2013 3:30 to 5:30PM and 7:00 to 9:00PM Welcome to the Southwest

More information

New land uses or changes to existing land uses in the Phase 1 area since certification of the FEIR and SEIR-1 are discussed below for each city.

New land uses or changes to existing land uses in the Phase 1 area since certification of the FEIR and SEIR-1 are discussed below for each city. 4.12 LAND USE 4.12.1 INTRODUCTION This section provides relevant updates to information presented in the FEIR and SEIR-1 related to land use and the consistency of Phase 1 with local and regional planning

More information

DRAFT BELLEVUE COMMUNITY PLAN. City Council Study Session February 17, 2015

DRAFT BELLEVUE COMMUNITY PLAN. City Council Study Session February 17, 2015 DRAFT BELLEVUE COMMUNITY PLAN City Council Study Session February 17, 2015 PROJECT LOCATION Bellevue Road UC Merced PROJECT LOCATION CONSIDERATIONS Advisory Committee and public input Merced Vision 2030

More information

Planning for TOD Implementation at a Corridor Scale

Planning for TOD Implementation at a Corridor Scale Planning for TOD Implementation at a Corridor Scale Catherine Cox Blair, Reconnecting America Presentation to DRCOG and the Sustainable Communities Initiative May 14, 2012 What is Reconnecting America?

More information

4/8/2015 Item #10D Page 1

4/8/2015 Item #10D Page 1 MEETING DATE: April 8, 2015 PREPARED BY: Christy Villa, Associate Civil Engineer DEPT. DIRECTOR: Glenn Pruim DEPARTMENT: Public Works CITY MANAGER: Larry Watt SUBJECT: NORTH COAST HIGHWAY 101 STREETSCAPE

More information

Subject: 2014 Regional Transportation Plan Amendment No. 1

Subject: 2014 Regional Transportation Plan Amendment No. 1 Agenda Item: 6 Memorandum To: Board of Directors From: Grant Leonard, Transportation Planner Meeting Date: April 27, 2016 Subject: 2014 Regional Transportation Plan Amendment No. 1 RECOMMENDED ACTIONS

More information

Sub Area 2: Downtown Overland Park

Sub Area 2: Downtown Overland Park Downtown 132 2.12 encompasses over 600 acres and extends between 71st Street and 87 th Street including Downtown Overland Park. The area is home to several individual historic sites and structures, including

More information

New Rail Hubs along High Speed Rail Corridors The Urban Design Challenge

New Rail Hubs along High Speed Rail Corridors The Urban Design Challenge Institute of Urban and Regional Development (IURD) TRANSIT & CITIES CONFERENCE UC Berkeley March 20-21, 2014 Plenary Session 2: Transit and Urban Design New Rail Hubs along High Speed Rail Corridors The

More information

California Environmental Quality Act (CEQA) Environmental Review Process

California Environmental Quality Act (CEQA) Environmental Review Process California Environmental Quality Act (CEQA) Environmental Review Process Los Angeles Union Station Forecourt and Esplanade Improvements constitute a Project Los Angeles County Metropolitan Transportation

More information

1INTRODUCTION. Purpose of the Truckee Railyard Master Plan

1INTRODUCTION. Purpose of the Truckee Railyard Master Plan 1INTRODUCTION Purpose of the Truckee Railyard Master Plan The purpose of the Truckee Railyard Master Plan is to capture and describe the Town s vision for the Railyard Area and to guide its future redevelopment.

More information

CHAPTER 7: Transportation, Mobility and Circulation

CHAPTER 7: Transportation, Mobility and Circulation AGLE AREA COMMUNITY Plan CHAPTER 7 CHAPTER 7: Transportation, Mobility and Circulation Transportation, Mobility and Circulation The purpose of the Transportation, Mobility and Circulation Chapter is to

More information

Transportation Committee

Transportation Committee Transportation Committee Business Item No. 2013-286SW Meeting date: October 14, 2013 For the Metropolitan Council meeting of October 16, 2013 Subject: Southwest Light Rail Transit (Green Line Extension):

More information

N Watt Avenue Corridor Plan. STOREFRONT WORKSHOP May 15-17, 2007

N Watt Avenue Corridor Plan. STOREFRONT WORKSHOP May 15-17, 2007 N Watt Avenue Corridor Plan STOREFRONT WORKSHOP May 15-17, 2007 Workshop Overview May 15 12 & 2 pm General Overview/3D Modeling 4 pm Special Topic: Market Study 6 pm Special Topic: McClellan May 16 12

More information

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting Rosecrans/Marquardt Grade Separation Project Community Open House Meeting October 17, 2017 Rosecrans/Marquardt Presentation Agenda 1. Welcome Remarks & Introductions 2. Community Outreach 3. Project Goals

More information

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017 Street Flooding Mitigation Plan KYOVA Interstate Planning Commission Presented to AMPO National Conference October 18, 2017 Saleem Salameh, Ph.D., P.E., M.ASCE Chet Parsons, AICP CTP Agenda: Background

More information

WELCOME TO OPEN HOUSE TWO November 28, 2018

WELCOME TO OPEN HOUSE TWO November 28, 2018 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting

More information

North Central Texas APA Transit-Oriented Development Seminar. Case Study City of North Richland Hills TOD. February 20, 2009

North Central Texas APA Transit-Oriented Development Seminar. Case Study City of North Richland Hills TOD. February 20, 2009 North Central Texas APA Transit-Oriented Development Seminar Case Study City of North Richland Hills TOD February 20, 2009 1. Background TOD Code Adoption 2. Regulating Plans 3. Street Types 4. Special

More information

2 Project Description

2 Project Description Project Description 2 Project Description The proposed project involves the adoption of the Bay Fair Transit Oriented Development (TOD) Specific Plan ( proposed Specific Plan ). The proposed Specific Plan

More information

DRAFT Civic Center Station Area Plan. Executive Summary

DRAFT Civic Center Station Area Plan. Executive Summary DRAFT Civic Center Station Area Plan Executive Summary This project is funded in part through the Metropolitan Transportation Commission s Station Area Planning Program. The preparation of this report

More information

Dumbarton Transportation Corridor Study

Dumbarton Transportation Corridor Study Dumbarton Transportation Corridor Study SPD&S Committee August 2, 2017 Agenda Item # 4 Two Bridges 2 Complex Corridor 3 Headlines Corridor requires phased improvements Solutions require consensus, other

More information

Globemaster Corridor Specific Plan. Community Workshop

Globemaster Corridor Specific Plan. Community Workshop Globemaster Corridor Specific Plan Community Workshop Tonight s Staff City of Long Beach Linda Tatum Carrie Tai Scott Kinsey Craig Chalfant Dudek Ruta Thomas Shannon Kimball John Kaliski Architects John

More information

PROJECT DESCRIPTION. Providing a mix of housing options supporting a diversity of needs (800-1,600 sf 1-3 bd flats and Townhomes).

PROJECT DESCRIPTION. Providing a mix of housing options supporting a diversity of needs (800-1,600 sf 1-3 bd flats and Townhomes). ROHNERT PARK Planned Development - Preliminary Application Project Site LOCATION MAP Project Site Rohnert Crossings is a acre mixed-use urban village proposed in the center of the city adjacent what will

More information

Public Meeting March 10 th 2011

Public Meeting March 10 th 2011 Public Meeting March 10 th 2011 Agenda 6:00-6:15 6:15-7:00 7:00-8:00 8:00-8:30 8:30-9:00 9:00 Welcome and Introductions Presentation» Project Overview» Recap Existing Conditions / Issues & Opportunities»

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

Building the transportation network we need for the future

Building the transportation network we need for the future Building the transportation network we need for the future WHO IS METROLINX? Metrolinx was created in 2006 by the Province of Ontario with a mandate to create greater connection between the communities

More information