1 WATERMAN ENERGY, ENVIRONMENT & DESIGN LTD 60 ludgate hill / 30 old bailey environmental STATEMENT NON - TECHNICAL SUMMARY REV. 01 january 2011

2 Non-Technical Summary 60 Ludgate Hill / 30 Old Bailey 1. Introduction The City of London Real Property Company Limited (the Applicant ), a subsidiary company of Land Securities Plc, is seeking to obtain full planning permission for the redevelopment of a site (the Site ) located adjacent to Old Bailey Central Criminal Court within the City of London (CoL). The Site comprises approximately 0.65 hectares of previously developed land, and is bound by Ludgate Hill to the south, Old Bailey to the east and Limeburner Lane, Seacoal House and the existing UK Power Networks (UKPN) substation to the north and west. The Site is currently occupied by two buildings known as Hillgate House and 50 Ludgate Hill. These buildings comprise mainly offices with retail uses at ground floor level along Ludgate Hill and Limeburner Lane. An NCP public car park is present within the basement beneath the Site. Site Location Plan Site Boundary 1

3 60 Ludgate Hill / 30 Old Bailey Non-Technical Summary Whilst the Applicant has an existing planning consent for redeveloping the Site ( the Applicant s consented scheme ), this included Seacoal House and the UKPN substation, which is now excluded from the planning application boundary. UKPN have since obtained separate planning consent for the redevelopment of their site (the consented UKPN scheme ), which is now excluded from the Applicant s Site. This, along with a change in market conditions, has resulted in the Applicant seeking a new planning permission for a revised proposal (the Development ). Like the Applicant s consented scheme, the Development is office-led and comprises the construction of two nine-storey buildings on the Site. The Development includes the demolition of the existing buildings on the Site, together with the construction of two new nine-storey office buildings. The existing basement would be retained as part of the Development, which would largely provide office space, although a range of retail uses (cafés, restaurants and shops) would be provided at ground floor level, with the basement used for servicing, parking and plant storage. An area of publically accessible space would be provided between the two buildings fronting Old Bailey and a new pedestrian route would be created east/west through the Site. An Environmental Impact Assessment (EIA) has been undertaken to assess the environmental effects of the Development. The EIA is reported in an Environmental Statement (ES) which has been prepared to accompany the planning application. The ES describes the likely significant environmental effects of the Development, together with a range of measures required to prevent, reduce or offset any potential adverse environmental effects. This document provides a summary of the ES in non-technical language. 2. Environmental Impact Assessment Methodology An EIA aims to ensure that the potential significant environmental effects of a new development (which can be beneficial and adverse) are given due consideration in the deciding whether to grant planning consent. The EIA of the Development was undertaken in accordance with legal requirements and best practice guidelines, and used established methods and criteria. This involved Site surveys, data reviews, consultation with relevant authorities, computer modelling and specialist assessments. The first stage of the EIA process involved undertaking a scoping study. This study identified the potentially significant environmental issues associated with the Development and, therefore the focus of the ES. As a result of the EIA scoping study, it was determined that the following environmental topic areas should be addressed as part of the EIA and detailed in this ES: waste management; socio-economics; archaeology; transport and access; noise and vibration; air quality; ground conditions and contamination; wind; daylight, sunlight, overshadowing and solar glare; townscape and visual effects; and cumulative effects. Each environmental assessment topic is reported in the ES as a technical chapter. Each technical chapter describes how the assessment was undertaken, the current conditions on and adjacent to the Site, and the potential effects of the Development. They also describe a range of measures that would be incorporated to avoid, reduce, or offset any identified adverse effects, and/or enhance potential beneficial effects. Such measures are referred to as mitigation measures. The resulting effects (known as likely residual effects ) following the implementation of mitigation measures are then described. UKPN has confirmed that they are to implement the consented UKPN scheme adjacent to the western part of the Site in parallel with the Development, and therefore relevant aspects of the EIA were based on the assumption that the consented UKPN scheme would be completed at approximately the same time as the Development. 3. Existing and Future Land Uses and Activities The Site is currently occupied by two buildings dating to the 1950s and 1960s. These comprise: Hillgate House: a three-storey office building and a 13-storey office tower in the north of the Site (1 to 26 Old Bailey); and 50 Ludgate Hill: a U -Shaped nine-storey office building, with ground floor retail comprising 50 to 62 Ludgate Hill in the south and 1 to 9 Limeburner Lane in the south-west of the Site. 2

4 Non-Technical Summary 60 Ludgate Hill / 30 Old Bailey Existing Ground Floor Plan Above ground, the Site predominantly comprises hard-standing, including a central service yard. There is a small area of open space on the Site, but this is not for public use, and soft landscaping is limited to a few planters. As such, the Site is currently uninviting and presents a barrier to pedestrian movement. Beneath the Site, there is a large basement that is currently used as a NCP car park providing car parking for approximately 136 vehicles. Land uses surrounding the Site are varied and include: office buildings; an existing (vacant) office building (Seacoal House) with UKPN electrical substation beneath; small scale retail units along Ludgate Hill, and Limeburner Street; Central Criminal Court (Old Bailey) to the east of the Site on Old Bailey; and transport-related uses including a busy road network, the City Thameslink Station to the southwest of the Site and a number of London Underground Limited (LUL) stations. Existing view on the Site looking south towards Existing view from Old Bailey towards the Site looking 50 Ludgate Hill at 50 Ludgate Hill in the foreground and Hillgate House behind 3

5 60 Ludgate Hill / 30 Old Bailey Non-Technical Summary The Site is not located within a Conservation Area. However, there are three Conservation Areas within the immediate vicinity of the Site: Ludgate Hill Conservation Area immediately to the south-east of the Site; Newgate Street Conservation Area immediately to the north-east and Fleet Street Conservation Area to the west of the Site. There are also several listed buildings close to the Site, including the Central Criminal Court (Grade II* listed), Stationers Hall (Grade I listed) and St Paul s Cathedral (Grade I listed). In terms of future land uses, the consented UKPN scheme adjacent to the Site has been taken fully taken into account in the EIA process. It will comprise the demolition of the existing Seacoal House office building above basement level and the construction of a new two-storey building in its place. The existing basement and associated plant will be retained. The new building will contain only electrical plant and limited welfare facilities for UKPN personnel. Access to the consented UKPN scheme will be provided by new vehicular and personnel doors on the Limeburner Lane façade of the building. 4. Alternatives and Design Evolution In line with the EIA Regulations, the ES provides a description of the main alternatives considered by the Applicant. These included the do-nothing scenario (that is, leaving the Site in its current state), alternative sites, alternative uses and a series of alternative designs. Following an appraisal of the Site, it was concluded that existing buildings are in need of modernising. Without redevelopment, there would be a continued deterioration in the condition of the offices which would struggle to meet the requirements of modern-day tenants. In addition, without redevelopment, the setting of the surrounding listed buildings and Conservation Areas would not reach their full potential. Consequently, to ensure the efficient use of the Site, comprehensive redevelopment is proposed. Owing to the Site s location within a prime area for business and commerce, it was agreed that a comprehensive office-led redevelopment would be the most suitable option for the Site. From the start of the design process, due consideration has been given to a number of Site constraints, the most influential of which included: the presence of the consented UKPN scheme adjacent to the Site; the presence of height restrictions imposed in respect of maintaining local views of St Paul s Cathedral; the viewing corridor from Primrose Hill to St Paul s Cathedral; the surrounding townscape (particularly listed buildings and Conservation Areas); the surrounding transport infrastructure; and surrounding properties (particularly the Central Criminal Court at Old Bailey). Following numerous alternative design iterations, the Development is considered to offer the most advantageous design solution. In particular it: maximises the efficiency of the Site, taking into account the consented UKPN scheme; respects the height restrictions imposed by the Primrose Hill viewing corridor and St Paul s Heights policy; improves the visual appearance of the Site, and the setting of nearby listed buildings and Conservation Areas; provides improved pedestrian access through the Site, particularly in relation to City Thameslink Station; and improves the amount and quality of publically accessible space on the Site. 4

6 Non-Technical Summary 60 Ludgate Hill / 30 Old Bailey 5. The Proposed Development The Development comprises demolition of all on-site buildings and the construction of two new buildings known as Building A (in the north) and Building B (in the south) in their place. The Development would provide 55,661square metres Gross External Area (GEA) of office floorspace and 2,791 square metres GEA of retail floorspace. The proposed layout of Building A and Building B closely follows the Site boundary and surrounding streets Proposed Ground Floor Plan Proposed Development 5

7 60 Ludgate Hill / 30 Old Bailey Non-Technical Summary Building A would be nine-storeys above the ground floor, with plant and machinery located at roof level. The height of Building A has been defined by the Primrose Hill viewing corridor height restrictions and would be metres above sea level. Office space would be provided within Building A from ground floor to ninth floor level and a small amount of retail would be provided within the ground floor. The main access to Building A would be in the north-east of the Site at the junction of Old Bailey and Limeburner Lane, with a secondary access in the south of the building from the new public amenity area. Building B would similar to Building A, i.e. a maximum of nine-storeys above the ground floor, with plant and machinery located at roof level and a maximum height of metres above sea level, in order to respect the St Paul s Grid Height and Primrose Hill viewing corridor restrictions. However, the southern element of Building B along Ludgate Hill would be four-storeys (with a roof terrace at fifth floor level) to respect the St Paul s Grid Height. Office space would be provided within Building B from first floor to ninth floor level, with a mix of retail uses (including shops, cafés and restaurants) at ground floor level. Offices within Building B would be accessed to the south of the Site at the junction of Ludgate Hill and Limeburner Lane, with individual accesses provided to retail units from street level. The external appearance to Building A and Building B would comprise a mix of glass and masonry, which has been carefully selected to complement the surrounding townscape character and maximise energy efficiency within the buildings. Both new buildings on the Site would be constructed above the existing double level basement, which would be strengthened with new walls within the existing structure. The basement would house plant, waste and recycling storage, servicing, parking and shower facilities. Parking spaces provided within the basement would comprise eight car spaces (including two accessible spaces), 74 motorcycle spaces and 290 pedal cycle spaces. A new pedestrian route would also be created on the Site between Building A and Building B in an east/west direction through the Site, connecting Limeburner Lane with Old Bailey. The pedestrian route would open up to a new public amenity space in the eastern part of the Site on Old Bailey. In addition, a number of terraces would be provided within the Development for office workers, located on the ninth floor of Building A and the fifth, seventh and eighth floors of Building B. Landscaping at the Site would include the planting of mature trees at street level and provision of roof gardens and green roofs on the new buildings. The Development incorporates the following sustainable features: waste storage facilities; cycling facilities; green roofs; rainwater and greywater harvesting; photovoltaic (solar) panels to contribute to renewable energy supply; louvres in the building façade to provide shade from the sun; use of glass to optimise natural daylight within offices; and incorporation of recyclable material within the construction of the buildings. 6. Development Programme and Construction It is anticipated that the demolition and construction works would take approximately three years and three months to complete, including internal stripping out of existing buildings, service diversions, enabling works, demolition of Site buildings, Site preparation, piling and foundation construction and construction of buildings. As previously outlined, the consented UKPN scheme would be constructed at the same time, although it is scheduled to commence approximately two months prior to the Development. In order to control and manage the potential environmental effects of demolition and construction works, a Site-specific Environmental Management Plan (EMP) would be developed and implemented throughout the duration of the works. This would specify a range of measures to manage the environmental effects that could arise during the works; for example, controls in relation to dust, noise and vibration. The EMP would be prepared in line with relevant legislative and best practice 6

8 Non-Technical Summary 60 Ludgate Hill / 30 Old Bailey guidelines, and contractors would be required to implement the EMP and ensure monitoring is undertaken where it has been specified. EMPs are an established method of managing environmental effects from demolition and construction works. In addition to the EMP, the appointed construction Contractor would be required to sign up to CoL s Considerate Contructors Scheme and adhere to the CoL s Code of Practice for Demolition and Construction Sites. 7. Waste Management An assessment of the effects with respect to the nature and volume of demolition, construction and operational waste arisings from the Development, and the requirements for waste treatment, has been undertaken. The generation of waste from the Development was estimated and recommendations for appropriate management are set out in the context of regional and local waste policies, best practice guidance and existing disposal infrastructure. During demolition and construction, the Applicant is committed to recycling 90 percent of demolition waste off-site, with an additional 5 percent to be reused on-site. This commitment would be included in Contractor appointment documents and would be achieved through the implementation of a Site Waste Management Plan (SWMP). The SWMP would also ensure that where waste cannot be reused, it would be disposed of in accordance with appropriate legislation and as close as possible to the Site. The completed and operational Development would generate a range of waste types including packaging and food waste from retail and food units, and paper, cardboard, drinks cans/bottles and food waste from offices. Sufficient storage space would be provided for both general and recyclable waste within buildings and within the basement of the Development, in accordance with best practice guidance. In addition, information on sustainable waste management would be provided to building occupants in order to promote the re-use and recycling of waste. Overall, it is anticipated that approximately 60 percent of operational waste could be recycled 8. Socio-economics A socio-economic assessment was undertaken to assess the likely significant effects of the Development on the local and regional economy, using a wide range of information sources. These sources included a detailed review of planning policies, guidance and standards, population Census data and professional experience of similar scale redevelopment schemes. The assessment identifies that the proposed demolition and construction programme for the Development would generate approximately 130 full time construction jobs, both on-site and within the construction supply chain. In addition, once the Development is completed and operational it is estimated that approximately 1,640 additional full time jobs would be created by the proposed office and retail uses, over and above those currently provided on the Site. These jobs would include a wide range of skills and would provide opportunities for both the local and regional workforce. With the introduction of additional employees at the Site, additional spending within the local economy would be expected. This is estimated at an increased spend of 2.1 million per year over current levels. The social effects of redefining publically accessible amenity areas on the Site were also considered and it is anticipated that this element of the Development would improve perceptions of safety on the Site and lead to long term beneficial effects for the local area. 9. Archaeology An assessment of the effects of the Development on archaeological deposits present beneath the Site has been undertaken. This included a site walkover, a review of various historical information sources and consultation with the CoL. As with the rest of the CoL, which forms the historic centre of London, the Site lies within an area of archaeological potential. However, the historical development of the Site, in particular the construction of the basement, is likely to have removed or severely damaged any archaeological remains. Nevertheless, there are a few areas around the periphery of the Site that may contain archaeological remains of interest, although the potential is considered to be low to moderate. 7

9 60 Ludgate Hill / 30 Old Bailey Non-Technical Summary The effects of the Development on any surviving archaeology would be limited to during the demolition and construction works, in particular from excavations and piling works. However, an Archaeological Evaluation would be undertaken prior to construction to further confirm and define the presence and nature of any archaeological remains beneath the Site. This would be undertaken in close consultation with CoL and would ensure that any archaeological finds are appropriately recorded. 10. Transport A detailed study of the effects of the Development on local highways, public transport, pedestrians and cyclists was undertaken and is reported within both the ES and accompanying Transport Assessment (TA). It is estimated that demolition and construction related traffic would result in between a 2 percent and 7percent increase in local traffic flows during peak morning and afternoon periods. This traffic would, however, travel to and from the Site on pre-agreed routes on the local highway network and, where practicable, outside of peak hours. On this basis, likely construction traffic effects on the local highway network are considered to be insignificant. An assessment of the amount of traffic likely to be generated from the Development concluded that there would be no significant effects on the local highway network. This is owing to the removal of the NCP car park, minimal parking (eight spaces) provided by the Development and the proximity of public transport to the Site. In addition, the provision of 290 secure cycle spaces in the basement and the implementation of a Travel Plan would encourage occupants of the Development to travel to and from the Site by means other than by car. With regards to the loss of the existing NCP car park, there are over 400 alternative parking spaces available within 500m of the Site. Therefore, the loss of car parking from the Site would not result in significant effects. An assessment of the additional use of public transport resulting from the Development concluded that all modes of public transport would have adequate capacity to accommodate the increase in passenger demand without significantly compromising comfort and safety. The Development incorporates a public amenity space and pedestrian route, which would increase permeability to, from and through the Site. In particular, access to the City Thameslink Station would be improved and the pedestrian environment would be designed to facilitate access for the mobilityimpaired. 11. Noise and Vibration The noise and vibration effects of the Development were established using published guidelines and a comprehensive baseline monitoring survey of the Site. Demolition and construction activities would inevitably give rise to some noise and vibration effects on receptors closest to the Site. However, during the demolition and construction works a number of steps would be taken to minimise the amount of noise and vibration arising from the Site. This would include careful selection of modern and quiet plant and machinery, and working to specified noise and vibration action levels and working hours, taking account of CoL s Quiet Hours policy. Noise and vibration levels would be verified by monitoring throughout the works to ensure no significant effects arise. All such mitigation would form part of the Site-specific EMP and would lead to only temporary minor effects during the demolition and construction works. Less traffic would be generated from the Development owing to the removal of the NCP car park. However, the changes in traffic as a result of the Development would not have a significant effect on traffic-related noise levels. New modern building plant within the Development would be concealed within the basement or positioned at roof level, thereby providing suitable internal noise conditions within the proposed buildings and in respect of surrounding properties. 8

10 Non-Technical Summary 60 Ludgate Hill / 30 Old Bailey 12. Air Quality The entire administrative area of CoL has been declared an Air Quality Management Area (AQMA) because of existing and predicted future levels of pollutants, mainly arising from road traffic. Accordingly, an air quality assessment was undertaken to determine the effects of the Development on local air quality. During demolition and construction works, best practice measures would be implemented to minimise dust arising from the Site. These measures would form part of the Site-specific EMP and would include damping down surfaces, erecting hoarding around the Site, covering all construction materials and regularly cleaning frequently used areas. However, even with the above measures in place, it is difficult to completely eliminate the generation of dust. Consequently, some minor and temporary effects from dust on nearby receptors could occur. As described above in the discussion of transportation, the demolition and construction traffic is not anticipated to significantly add to local traffic flows. As a result, the effects of demolition and construction traffic on local air quality would be insignificant. Traffic generation from the Development would be minimal, and consequently, the changes in air quality surrounding the Site as a result of the Development would not be significant. All building plant would be designed to accord with best practice guidelines and regulations. Consequently, there would be no significant air quality effects arising from building plant emissions on the Site. 13. Ground Conditions and Contamination A ground conditions and contamination assessment was undertaken to establish the likely contamination risks posed to a number of receptors including construction workers, future occupants of the Development, underlying soil and groundwater. The assessment used a range of information sources including historical maps, geological maps and information provided by the CoL. The Site and its surrounds have been in industrial and commercial use since the nineteenth century. Accordingly, there is the potential for some isolated contamination beneath the Site. The demolition and construction works would be subject to a range of health and safety controls required by law. These would prevent construction workers coming into direct contact with any potential contamination in the soil. Such controls would form part of the Site-specific EMP, which would also include protective and preventative measures to ensure that contamination risks to underlying soils and groundwater would be minimised. Available information also indicates that the Site was bombed during the Second World War, Consequently, a range of mitigation measures including safety and awareness briefings to workers, the presence of an Explosive Ordnance Disposal engineer during the works and appropriate testing of all piling locations would be undertaken to minimise risks from unexploded ordnance. The excavation works would be likely to generate approximately 12,500 cubic metres of excavated material. Opportunities for the re-use of this material would be explored, although it is anticipated that some of this material would require disposal off site at an appropriately licensed waste facility. All disposal of excavated material would be undertaken in accordance with legislative requirements. On completion of the Development, the risk posed by contamination to future occupants, soils and groundwater would not be significant. This is largely owing to the predominant covering of the Site with hardstanding that would act as a physical barrier between potential contamination in the soil and future occupants of, and visitors to, the Site. 14. Wind The effects of the Development on wind conditions both on, and surrounding, the Site were assessed in relation to the comfort and safety of pedestrians within and around the Development. The assessment included a desk study and review of a previous wind tunnel test carried out on the Site for the Applicant s consented scheme. Consideration was given to the suitability of conditions on pedestrian routes (surrounding pavements and the new pedestrian route through the Site) at building entrances and within the proposed public amenity space and building terraces. 9

11 60 Ludgate Hill / 30 Old Bailey Non-Technical Summary Existing wind conditions on and surrounding the Site are relatively calm and generally suitable for sitting and standing/entrance use, which is considered suitable for current users of the Site and surrounding area. The prevailing wind direction is south-westerly. Following demolition of the existing buildings, including the adjacent Seacoal House by UKPN, the Site and immediate surrounds may become slightly windier as the Site is opened up, although this change is predicted to be insignificant. As the construction works progress, wind conditions would progress towards those of the completed Development. The assessment of the completed Development, including the consented UKPN scheme, revealed that the predicted wind conditions on the Site and within the surrounding area would be equivalent to, or better than those required for the desired pedestrian activities on the Site. As such, the Development is predicted to have a beneficial effect on local wind conditions. 15. Daylight Sunlight, Overshadowing and Solar Glare An assessment was undertaken to establish the effects of the Development on the amount of daylight, sunlight and solar reflective glare received by properties adjacent to the Site. An analysis of the amount of overshadowing of new public spaces within the Development was also undertaken. The assessment involved the use of a three-dimensional computer model of the Development and its immediate surrounds. Following demolition of the existing buildings, including the adjacent Seacoal House by UKPN, daylight and sunlight levels at the Site and the immediate surrounds are likely to temporarily increase. As the construction works continue, the levels of daylight, sunlight, overshadowing and solar glare received by neighbours of the Site would progress towards those of the completed Development. Following completion of the Development levels of daylight and sunlight are deemed suitable for all surrounding properties which are all commercial in nature. Whilst some existing properties would receive a minor reduction in daylight and sunlight levels resulting from the Development, this is considered acceptable because: commercial properties have a low requirement for natural daylight and sunlight and a high dependence upon artificial lighting; and in the existing situation (without the Development) a high proportion of the surrounding commercial properties already experience low levels of daylight and sunlight. With regard to solar glare, whilst some potential small adverse effects have been identified, instances of solar glare would be limited to short-periods of time in the morning. The Development would not result in significant overshadowing within the proposed public amenity space and building terraces, and the effects would therefore be negligible. 16. Townscape and Visual Assessment An assessment was undertaken to determine the effects of the Development on the existing townscape and a selection of 30 key views around the Site. The assessment was undertaken in consultation with the CoL. A series of accurate computer generated images were produced to inform the assessment. Construction activities can be a source of significant visual intrusion, albeit over a temporary timescale. However, good Site management and housekeeping via the implementation of the Sitespecific EMP would ensure that any adverse effects would be minimised. The greatest effects are anticipated to occur at locations closest to the Site. It was concluded that the completed Development would preserve and enhance the settings of St Paul s Cathedral (Grade I listed), St Martins Church (Grade I listed), and the Ludgate Hill and Newgate Street Conservation Areas. The Development would also add to the group of buildings of significant architectural merit and enrich the fabric of the City. 10

12 Non-Technical Summary 60 Ludgate Hill / 30 Old Bailey View of Proposed Development from the South-west Corner of Ludgate Circus View of Proposed Development from North-east on Old Bailey 17. Cumulative Effects Two types of cumulative effects were assessed in relation to the Development: the interaction of individual effects arising from the Development. For example, noise, dust and visual intrusion during the demolition and construction works; and the combination of the effects arising from other schemes with those arising from the Development. During the demolition and construction stages of the Development, there would be some temporary cumulative effects primarily associated with townscape and visual effects, dust, noise and transport. However, implementing the Site-specific EMP would reduce the significance of these constructionrelated cumulative effects as far as practically possible. The cumulative effects of the Development in conjunction with the construction of a number of other relevant schemes were generally found to be minimal, with the exception of: noise and air quality (dust) cumulative effects which may arise in relation to the consented UKPN scheme, owing to the proximity to the Site; and socio-economics, where the benefits of the completed Development together with other reasonably foreseeable schemes would bring wider benefits for the London economy. If you would like to receive further copies of this Non-Technical Summary or would like to purchase a copy of the Environmental Statement, please contact: Waterman Energy, Environment & Design Versailles Court 3 Paris Garden London SE1 8ND Tel: Fax: Heed@waterman-group.co.uk 11

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

Principal Place ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

Principal Place ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction RT Group Property Investments Limited (the Applicant ) is seeking detailed planning permission for the redevelopment of 1.28 hectares of land off Norton Folgate to the north of Liverpool

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

1. Introduction. Site Boundary

1. Introduction. Site Boundary 1. Introduction Workspace Group Plc (hereafter referred to as the Applicant ) is seeking to obtain full planning permission for the redevelopment of (hereafter referred to as the Site ), situated to the

More information

185 Park Street ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

185 Park Street ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction DV4 Properties Park Street Co. Ltd (hereafter referred to as the Applicant ) is seeking to obtain full planning permission for the redevelopment of 185 Park Street, situated on land bounded

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

Armourers Court, Woolwich

Armourers Court, Woolwich Armourers Court, Woolwich Environmental Statement, Non-Technical Summary December 2013 DESIGN PACKAGE C158 WOOLWICH STATION East End Over Site Development (Armourers Court, Arsenal Way, Woolwich) Environmental

More information

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor

More information

The Haymarket 189 Morrison Street, Edinburgh. Environmental Statement. Volume 1 Non Technical Summary

The Haymarket 189 Morrison Street, Edinburgh. Environmental Statement. Volume 1 Non Technical Summary The Haymarket 189 Morrison Street, Edinburgh Environmental Statement Volume 1 Non Technical Summary 16 August 2010 Tiger Haymarket Limited Partnership Non Technical Summary Contents 1 Introduction 1 2

More information

17A. Wind Microclimate

17A. Wind Microclimate 17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 17A.1.3 17A.1.4 This Chapter, which has been prepared by Waterman and BMT, provides further information with regard to the potential wind microclimate

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY November 2014 Introduction 1.1 St George Central London (the Applicant ) is seeking to obtain planning

More information

NON-TECHNICAL SUMMARY. October 2017 CLARENDON GAS WORKS WOOD GREEN

NON-TECHNICAL SUMMARY. October 2017 CLARENDON GAS WORKS WOOD GREEN NON-TECHNICAL SUMMARY October 2017 CLARENDON GAS WORKS WOOD GREEN CLARENDON GAS WORKS, HARINGEY ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY October 2017 Our Ref: Q70251 Contents 1 INTRODUCTION... 2 2

More information

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2 11.1 OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11.2 POLICIES RELEVANT TO ALL WORKSITES IN ISLINGTON... 3 11.3 FARRINGDON

More information

on behalf of LS Portland House Developer Ltd Portland House, Bressenden Place, London Environmental Statement - Non-Technical Summary February 2013

on behalf of LS Portland House Developer Ltd Portland House, Bressenden Place, London Environmental Statement - Non-Technical Summary February 2013 on behalf of LS Portland House Developer Ltd Portland House, Bressenden Place, London Environmental Statement - Non-Technical Summary February 2013 1. INTRODUCTION LS Portland House Developer Limited (hereafter

More information

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical

More information

Environmental Statement Non-Technical Summary

Environmental Statement Non-Technical Summary Environmental Statement Non-Technical Summary 91-101 Moorgate Over Site Development September 2011 Aviva Life and Pensions UK Ltd 1. Introduction 1.1 The Application Aviva Life and Pensions UK Ltd and

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

SMITHFIELD QUARTER ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY HENDERSON GLOBAL INVESTORS LTD. FEBRUARY Waterman Energy, Environment & Design

SMITHFIELD QUARTER ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY HENDERSON GLOBAL INVESTORS LTD. FEBRUARY Waterman Energy, Environment & Design SMITHFIELD QUARTER ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY HENDERSON GLOBAL INVESTORS LTD. FEBRUARY 2013 Waterman Energy, Environment & Design 1. Introduction Henderson Global Investors Limited

More information

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

I539. Smales 2 Precinct

I539. Smales 2 Precinct I539. Smales 2 Precinct I539.1. Precinct Description The Smales 2 Precinct applies to a 4.8 hectare block of land located on the southern side of Northcote Road and fronting Lake Pupuke, Takapuna. The

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

Meridian Gate. Non Technical Summary. Submitted by Meridian Property Holdings Ltd.

Meridian Gate. Non Technical Summary. Submitted by Meridian Property Holdings Ltd. Meridian Gate Non Technical Summary Submitted by Meridian Property Holdings Ltd. Meridian Gate May 2014 Waterman Energy, Environment & Design Limited Pickfords Wharf, Clink Street, London SE1 9DG, www.watermangroup.com

More information

Marshgate Business Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

Marshgate Business Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction Workspace 14 Limited (hereafter referred to as the Applicant ) has applied for full planning permission for the redevelopment of and 14 Marshgate Lane, situated on land bound by Marshgate

More information

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London Chapter 27 Route Window SE7 Church Manorway Bridge Transport for London CHURCH MANORWAY BRIDGE 27 Route Window SE7 Church Manorway bridge Introduction 27.1 The North Kent Line will be converted to four

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

Non-Technical Summary

Non-Technical Summary Introduction The Brent Cross Cricklewood regeneration scheme is located in northwest London and comprises 151 hectares (ha) of land within the London Borough of Barnet (LBB) (the Site ). In July 2014,

More information

Plumstead Temporary Railway Sidings and Associated Permanent Works

Plumstead Temporary Railway Sidings and Associated Permanent Works Plumstead Temporary Railway Sidings and Associated Permanent Works Environmental Impact Assessment Non-Technical Summary Document Number: February 2013 Plan Design Enable Page 2 of 20 Contents Contents...

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision 5. 5.1. Area Vision 5.1.1. are: A globally significant central London business district which is home to international business headquarters; At the heart of the commercial and cultural life of the capital

More information

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 in association with 1. Introduction Peel Holdings is applying to Nottingham City Council (NCC) for Outline planning

More information

intu Bromley Planning Summary Bringing more to Bromley February 2014

intu Bromley Planning Summary Bringing more to Bromley February 2014 intu Bromley Planning Summary February 2014 Bringing more to Bromley Contents Introduction 1 Description of the Proposals 2 Economic Benefits 4 Planning Policy 6 Cinema and Catering Assessment 7 Design

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

Manchester Town Hall Complex Transformation Programme

Manchester Town Hall Complex Transformation Programme Manchester Town Hall Complex Transformation Programme St Peter s Square Public Realm Scheme 49307969 Environmental Statement NON-TECHNICAL SUMMARY November 2012 Prepared for: Manchester City Council Rev

More information

Peckham Peckham Area Vision Map

Peckham Peckham Area Vision Map Area Vision Map PNAAP13 PNAAP8 Sumner Road Surrey Canal Walk Bird in Bush Park Key: NSP Site Allocations PNAAP Allocations Greenspace Low Line Cycle Network Primary Shopping Areas Square Surrey Canal Walk

More information

Crossharbour District Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

Crossharbour District Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction ASDA Stores Limited and Ashbourne Beech Property Limited (hereafter referred to as the Applicants ) are seeking to obtain planning permission for the redevelopment of the existing supermarket

More information

Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh

Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh Duddingston House Properties and Urbanist Hotels Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh Environmental Statement Non-Technical Summary 3rd September 2015 www.oldroyalhighschool.com

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

AOTEA SUPERMARKET ZONE. Zone Introduction

AOTEA SUPERMARKET ZONE. Zone Introduction C18 AOTEA SUPERMARKET ZONE Zone Introduction C18.1 Objective This zone identifies a specific area in Aotea for a stand alone supermarket. The zone is site specific and has a range of objectives, policies

More information

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433 LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...

More information

GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. 24 December 2010

GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. 24 December 2010 GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY 24 December 2010 Our Ref: DT/JLL0509 Appeal Ref (optional): RPS 1 st Floor West Cottons Centre Cottons Lane London

More information

PLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS

PLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS PLANNING STATEMENT To support planning and listed building consent applications for change of use from Class A1 shop and Class A3 cafe to Class A3 restaurant at: Market House Market Place Kingston upon

More information

South Quay Plaza Tower Hamlets Community Forum; Record of Discussion

South Quay Plaza Tower Hamlets Community Forum; Record of Discussion South Quay Plaza Tower Hamlets Community Forum; 03.02.14 Record of Discussion Attendees: Jerry Bell - Tower Hamlets Council Nasser Farooq - Tower Hamlets Council Emily Harris - Berkeley Homes (South East

More information

17A. Wind Microclimate

17A. Wind Microclimate 17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 This Chapter has been prepared by BMT and provides further information with regard to the potential wind microclimate impacts arising from the

More information

16. Peckham Peckham Area Vision

16. Peckham Peckham Area Vision 16. 16.1. Area Vision 16.1.1. is: A lively town centre providing a range of daytime and night time activities on Rye Lane including a Library, a Leisure Centre and many independent retailers which specialise

More information

Longbridge East : Site Wide and Phase One Development

Longbridge East : Site Wide and Phase One Development Longbridge East : Site Wide and Phase One Development Non-Technical Summary of the August 2011 Introduction St Modwen Developments Ltd intend to submit a new outline planning application for Longbridge

More information

4 RESIDENTIAL ZONE. 4.1 Background

4 RESIDENTIAL ZONE. 4.1 Background 4 RESIDENTIAL ZONE 4.1 Background The residential areas within the City are characterised by mainly lowrise dwellings sited on individual allotments. Past architectural styles, settlement patterns and

More information

London Bridge London Bridge Area Vision Map

London Bridge London Bridge Area Vision Map Area Vision Map Borough Market Southwark Cathedral NSP54 Hay s Galleria Key: NSP Site Allocations Greenspace Low Line Thames Path Cycle Network Primary Shopping Areas Borough High Street Tube Station NSP51

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 11 October 2016 by Mike Hayden BSc DipTP MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 21 November 2016 Appeal

More information

13. London Bridge London Bridge Area Vision

13. London Bridge London Bridge Area Vision 13. 13.1. Area Vision 13.1.1. is: A globally significant central London business district which is home to international business headquarters; Internationally renowned for its prominent riverfront location

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD 1.0 Introduction: The relocation of the City Council stores and depot from Bolton Street creates an exciting opportunity for development

More information

This document provides a summary of the ES findings in non-technical language.

This document provides a summary of the ES findings in non-technical language. Introduction MOTO Hospitality Limited (the Applicant ) is seeking full planning permission to redevelop the Kinross Motorway Service Area (the Site ) located at Turfhills, near Kinross, west of Junction

More information

Moat Lane Regeneration Project Environmental Statement

Moat Lane Regeneration Project Environmental Statement AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental

More information

GREENFORD HALL & ADJOINING LAND

GREENFORD HALL & ADJOINING LAND GREENFORD HALL & ADJOINING LAND CONTENTS 1. Introduction 1. Introduction 2. Urban Context 2.1 The Site and Surroundings 2.2 Urban Context Map 2.3 Access and Movement 3. Planning Context 3.1 Planning History

More information

SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN

SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN DD/MM/YY Proposed C120 SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY Shown on the planning scheme map as DDO12. GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN 1.0 Design objectives DD/MM/YY Proposed

More information

9 Archaeology & Cultural Heritage

9 Archaeology & Cultural Heritage High Clachaig Wind Farm Scoping Report Page 56 9 Archaeology & Cultural Heritage 9.1 Introduction Cultural heritage in this context means the above- and below-ground archaeological resources, built heritage,

More information

Library of Birmingham integrated with The REP

Library of Birmingham integrated with The REP 0123456789 Birmingham City Council Library of Birmingham integrated with The REP Environmental Statement Chapter 9 Shadowing 9 Shadowing Chapter Summary Key features A private amenity garden is located

More information

I615. Westgate Precinct

I615. Westgate Precinct I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents Interim Advice Note 76 / 06 VOLUME 11 SECTION 1: ENVIRONMENTAL ASSESSMENT INTRODUCTION PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT Contents 1. Introduction and Application 2. Aims and Objectives

More information

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015 Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report

More information

Application Recommended for Approval Hapton with Park Ward

Application Recommended for Approval Hapton with Park Ward Application Recommended for Approval Hapton with Park Ward APP/2017/0036 Outline Planning Application Outline application for the construction of a new 3 bedroom dwelling (with all matters reserved for

More information

NATIONAL INSTITUTE FOR MEDICAL RESEARCH REDEVELOPMENT THE RIDGEWAY, MILL HILL. Environmental Statement, Non-Technical Summary Prepared by:

NATIONAL INSTITUTE FOR MEDICAL RESEARCH REDEVELOPMENT THE RIDGEWAY, MILL HILL. Environmental Statement, Non-Technical Summary Prepared by: NATIONAL INSTITUTE FOR MEDICAL RESEARCH REDEVELOPMENT THE RIDGEWAY, MILL HILL Document name: Environmental Statement, Non-Technical Summary Prepared by: Deloitte Real Estate Date submitted: June 2016 National

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 3 October 2012 AUTHOR/S: Planning and New Communities Director S/1723/12/OL CAXTON AND ELSWORTH OUTLINE APPLICATION FOR ERECTION OF RESTAURANT/TAKEAWAY

More information

H7 Open Space zones. (a) provide for the needs of the wider community as well as the needs of the community in which they are located;

H7 Open Space zones. (a) provide for the needs of the wider community as well as the needs of the community in which they are located; H7. Open Space zones H7.1. Background The majority of land zoned as open space is vested in the Council or is owned by the Crown. However some areas zoned open space are privately owned. While the open

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

Ashfields, Normanton. Environmental Statement Non Technical Summary

Ashfields, Normanton. Environmental Statement Non Technical Summary Ashfields, Normanton Taylor Wimpey Environmental Statement Non Technical Summary Spawforths has been accepted as a registrant to the Institute of Environmental Management and Assessment's (IEMA) EIA Quality

More information

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary Environmental Impact Assessment Non Technical Summary Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 December 2013 Page left intentionally blank INTRODUCTION

More information

6. Bermondsey 6.1. Bermondsey Area Vision

6. Bermondsey 6.1. Bermondsey Area Vision 6. 6.1. Area Vision 6.1.1. is: An inner-london neighbourhood characterised by modest worker ho associated with the historic Rotherhithe docks and local manufacturing industries such as biscuits, jam, vinegar

More information

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS SCHEME EVOLUTION STARBUCKS The proposed Starbucks Drive Thru alongside the proposed food store provides an appropriate mix of uses, suitable for this location. The proposed store is bespoke, designed specifically

More information

Camberwell Camberwell Area Vision Map

Camberwell Camberwell Area Vision Map Area Vision Map NSP23 Burgess Park Edmund Street NSP29 NSP30 NSP31 New Road Benhill Road NSP27 NSP33 Green Brunswick Park NSP22 station NSP24 Peckham Road NSP26 St Giles Church Lucas Gardens NSP28 NSP25

More information

NORTH KENSINGTON GATE SOUTH ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. September 2016 Our Ref: Q60157

NORTH KENSINGTON GATE SOUTH ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. September 2016 Our Ref: Q60157 NORTH KENSINGTON GATE SOUTH ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY September 2016 Our Ref: Q60157 Contents 1 INTRODUCTION... 2 2 EIA METHODOLOGY... 5 3 SITE DESCRIPTION AND SETTING... 6 4 ALTERNATIVES...

More information

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary For Engine of the North April 2015 Contents Contents 3 1 Introduction 1 2 The Proposals 5 3 Alternative Options

More information

CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2)

CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2) CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2) Central Chelmsford Development Agency / Genesis 27/08/2014 Central Chelmsford Development Agency: Environmental Statement Quality Management

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities)

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities) SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 12 January 2011 AUTHOR/S: Executive Director (Operational Services) Corporate Manager (Planning and New Communities) Notes: S/1848/10

More information

1 INTRODUCTION 1.1 INTRODUCTION

1 INTRODUCTION 1.1 INTRODUCTION 1 INTRODUCTION 1.1 INTRODUCTION RREEF (UK) Ltd in partnership with Sheffield City Council (SCC) is applying for planning permission for the construction of: a new indoor city centre market hall and indoor

More information

Non-Technical Summary

Non-Technical Summary Non-Technical Summary Consultant: Ramboll Environ July 2016 Section 73 application, 283-329 Edgware Road and 5 Newcastle Place, London W2 Intended for Berkeley Homes (Central London) Ltd Date July 2016

More information

Garden Bridge Planning Application

Garden Bridge Planning Application Planning Application Additional Verified photomontages and assessment September 2014 Contents Page 1 Visual assessment 2 1.1 Introduction 2 1.2 Baseline 2 1.3 Potential effects and good environmental

More information

London Borough of Lambeth. Lambeth Depots. Environmental Impact Assessment Environmental Statement: Non-Technical Summary.

London Borough of Lambeth. Lambeth Depots. Environmental Impact Assessment Environmental Statement: Non-Technical Summary. London Borough of Lambeth Lambeth Depots Environmental Impact Assessment Environmental Statement: Non-Technical Summary April 2009 This Non-Technical Summary (NTS) sets out the findings of an Environmental

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

Non-Technical Summary The former Middlesex Hospital site

Non-Technical Summary The former Middlesex Hospital site Introduction 1. 2-10 Mortimer Street Limited Partnership (hereinafter referred to as the Applicant ) is seeking planning permission for the construction of a residential led, mixed use development (hereinafter

More information

WELCOME TO THE NEW WILTON PARK

WELCOME TO THE NEW WILTON PARK WELCOME TO THE NEW WILTON PARK VISION HISTORY OF WILTON PARK TOWARDS A PLANNING APPLICATION Our objective is to create a truly outstanding environment at Wilton Park. At the heart of our proposals is a

More information

I404 Beachlands 2 Precinct

I404 Beachlands 2 Precinct I404. Beachlands 2 I404.1. Precinct Description The Beachlands 2 precinct covers approximately 6 hectares of land at the corner of Beachlands and Whitford Maraetai Roads. Its purpose is to provide for

More information

DELEGATED DECISION on 1st September 2015

DELEGATED DECISION on 1st September 2015 Application N o : 14/04810/OUT LONDON BOROUGH OF BROMLEY TOWN PLANNING RENEWAL AND RECREATION DEPARTMENT DELEGATED DECISION on 1st September 2015 14/04810/OUT Claire Harris 4 Oaklands Road Bromley BR1

More information

REFERENCE: 16/8568/ENQ Received: 25 October 2016 Accepted: 26 October 2016

REFERENCE: 16/8568/ENQ Received: 25 October 2016 Accepted: 26 October 2016 LOCATION: Allianz Park, Greenlands Lane, London, NW4 1RL REFERENCE: 16/8568/ENQ Received: 25 October 2016 Accepted: 26 October 2016 WARD(S): Mill Hill APPLICANT: Saracens Copthall Ltd. PROPOSAL: Extension

More information

PENRHYN QUARRY BETHESDA GWYNEDD. Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT

PENRHYN QUARRY BETHESDA GWYNEDD. Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT PENRHYN QUARRY BETHESDA GWYNEDD Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT September 2010 PENRHYN QUARRY, BETHESDA, GWYNEDD Proposed development of an Inert Waste Recycling Facility

More information

6 Site Framework Strategies

6 Site Framework Strategies 6 Site Framework Strategies 6.1 Introduction Section 6 identifies a number of specific areas which are considered to be key sites within the Plan area and which may have potential for development / redevelopment.

More information

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth

More information

Chapter 13 Residential Areas: Appendices APPENDIX 1 Residential Areas

Chapter 13 Residential Areas: Appendices APPENDIX 1 Residential Areas Chapter 13 Residential Areas: Appendices Page 1 Chapter 13 Residential Areas: Appendices APPENDIX 1 Residential Areas Design Code for Intensive Housing INTRODUCTION DESIGN ELEMENTS A NEIGHBOURHOOD DESIGN

More information

Aspirations Ltd. art otel, Hoxton London, EC2. ES Volume VII: Non Technical Summary

Aspirations Ltd. art otel, Hoxton London, EC2. ES Volume VII: Non Technical Summary Aspirations Ltd. art otel, Hoxton London, EC2 ES Volume VII: Non Technical Summary October 2009 Non-Technical Summary 1. Introduction Aspirations Limited (hereinafter referred to as the Applicant) is

More information

Memorial Business Park Site. Proposed Future Development. Design guidelines. August

Memorial Business Park Site. Proposed Future Development. Design guidelines. August Memorial Business Park Site Proposed Future Development Design guidelines August 2014 www.designenvironment.co.nz 0064 3 358 3040 Contents 1.0 Background 1.1 Introduction 3 1.2 Objectives 4 2.0 Context

More information

10. East Dulwich East Dulwich Area Vision

10. East Dulwich East Dulwich Area Vision 10. 10.1. Area Vision 10.1.1. is: A predominantly residential area characterised by mostly medium density housing, including many family homes. Many parts of have retained historic character and it includes

More information

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon.

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon. 138 140 44.3m MP 11.5 El Sub Sta EPSOM ROAD 13 Bank 1 to 5 154 Trough 19to21 1 to 5 156 The Waddon (PH) 23 FB Waddon Station 45.0m Posts 29to31 1 to 9 Stafford Court 39 37 Meridian Court 10 43 to 45 1

More information

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1 Environmental Statement Non-Techncial Summary 28.06.2017 Anthology Hale Works xx.xx.xx Document title 1 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description...

More information