1 ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN Village Board Presentation May 8, 2018 Teska Associates Christopher Burke Engineering
2 AGENDA 1. Project Scope & Schedule 2. Steering Committee & Community Outreach a. Streetscape Strategies 3. Streetscape Master Plan a. Roadway Character & Thematic Approach b. Gateway & Wayfinding Signage c. Streetscape Typologies d. Materials & Products e. Priority Projects & Phasing
3 PROJECT SCOPE & SCHEDULE Aug Sept Oct Nov Dec Jan Feb Mar Apr May c PHASE 1 DATA COLLECTION PHASE 2 OUTREACH PHASE 3 PRELIM PLAN p c PHASE 4 FINAL PLAN c p PHASE 5 IMPLEMENTATION PLAN pc vb c p pc vb committee public Plan Commission Village Board
4 STUDY AREA 4
5 STEERING COMMITTEE Jill Martin-Golden, Business Owner, JR Finally Art Studio Mark Golden, Business Owner, JR Finally Art Studio Stephanie McGuire, Business Owner, The Mix Jamie Swanson, Business Owner, S&H Nursery Erica Smith, Business Owner, Rockton Sanctuary Spa 5 Marc Smith, Business Owner, Rockton Sanctuary Spa Megan Gove, Director, Talcott Free Library Nancy Ajrulouvski, Business Owner, Ray s Family Restaurant Kathleen Storm, Business Owner, Rocktek Workspace Scott Fridly, Trustee, Village of Rockton Tricia Diduch, Planning & Development Administrator, Village of Rockton Mayor Adams, Mayor, Village of Rockton
6 2015 VILLAGE OF ROCKTON RESIDENT SURVEY KEY PRIORITIES Safety; Streets & sidewalks; Water & sanitary service. TOP RATED INFRASTRUCTURE IMPROVEMENTS 65% sidewalk patios 62% landscape planters 57% benches & seating 51% wayfinding signage Downtown Rockton gets a lot of use and people feel safe here
7 STREETSCAPE STRATEGIES #1: REINFORCE DOWNTOWN STREETS AS THE HISTORIC AND CULTURAL CENTER OF ROCKTON. Evaluate opportunities to balance existing roadway/on-street parking functions with widened sidewalks and active seating/dining areas. #2: PROMOTE ROCKTON S IMAGE AND FUNCTION THROUGH SIGNAGE Create a comprehensive signage program that addresses gateway, wayfinding, parking and business directory signage #3: REINFORCE FESTIVAL SPACES Accommodate a variety of fest types, including large format events at Settlers Park, and smaller format events on Main and/or Hawick Streets. #4: ENHANCE OFF STREET PARKING AND ALLEYWAY CONNECTIONS Improve off street parking functions and alleyway connectivity through design treatments. #5: IMPROVE CONNECTIVITY BETWEEN DOWNTOWN AND RIVERFRONT Provide interconnected experiences that draw users between Downtown and Riverfront. Experiential elements may include interconnected pathways, crosswalks, sidewalks, seating/ gathering areas, river overlooks, passive open space, active play and interpretive landscaping.
8 COMMUNITY OUTREACH PROJECT WEBSITE 47 followers page views 700+ unique visitors POP UP EVENT: Rockton Holiday Walk, PUBLIC OPEN HOUSE: Village Hall, Key Themes: Provide better connections to the River; Incorporate more trees & plantings; Add more places to sit; Preference for historical style lighting; Provide more interactive elements for kids & teens
9 GATEWAY & WAYFINDING SIGNAGE Gateway Sign Directional Sign Parking Identifier Parking Directional Business Directory Kiosk Bicycle/ Pedestrian Directional Sign Preferred Sign Concept
10 10
11 11
12 12
13 13
14 14
15 15
16 SPLASH PAD CONSIDERATIONS 16
17 17
18 18
19 ON STREET PARKING ASSESSMENT 19
20 if they have difficulty finding parking, that occurs around dinner, evenings, summer/tourist season and December/holiday season. ROCKTON PARKING NEEDS ASSESSMENT SLATS MPO REPORT March 9, 2017 KEY FINDINGS Committee found parking in downtown to be available & proximate. Input received during public meetings suggested parking is not an issue most days but is an issue for events. Online survey respondents reported: they rarely or never have a hard time finding a space (72%); typically look for parking no longer than 5 minutes (71%); find parking within 1-block of their destination (75%); and
21 21 OFF-STREET PARKING OPPORTUNITIES
22 SHOPPING / DINING STREETS CURB & GUTTER Opportunities to redistribute / expand downtown parking Expanded corner bump outs at intersection corners LIGHTING Decorative LED pedestrian light PLANTINGS Planter pits at intersection corners / bump outs Trees in grates at narrow sidewalk sections Parallel parking PAVING Unit pavers at accent corners Concrete sidewalks with regular joint pattern Unit pavers at crosswalks SITE FURNISHINGS Clustered benches, trash receptacles and planter pots at intersection corners Bike racks and repair stations at intersection corners Diagonal parking Diagonal parking
23 ON-STREET PARKING ASSESSMENT C.1 H.1 HAWICK ST EXISTING PARKING PROPOSED CONCEPT PARKING {-5} M.1 MAIN ST {-19} M.2 MAIN ST {+1} M.2 M.1 M.3 MAIN ST {+14} M.2 C.1 CHAPEL ST {0} M.3 H.1 TOTAL {-9}
24 {A} Main Street 15 10
25 {B} Main Street
26 {A} {B} 26
27 STREETSCAPE PHASING H.1 Hawick Street Blackhawk Blvd. to Bridge St. +/- 550 LF C.1 M.1 Main Street Prairie St. to Green St. (Prairie St Intersection Included) M.2 Main Street Center St. to Prairie St. & Prairie Street Main St. to Hawick St. +/- 1,000 LF +/- 650 LF M.2 M.1 M.3 Main Street Cottage St. to Center St. & Hawick Street Center St. to Blackhawk Blvd. +/- 1,700 LF M.2 C.1 Chapel Street Blackhawk Blvd. to Green St. +/- 550 LF M.3 H.1
28 Blackhawk Boulevard IDOT COORDINATION IDOT requires a formal Phase 1 study for any upgrades that involve Blackhawk Rd (IL-75). Typical timeframe: Main Street Phase 1 review 1 year Phase 2 construction docs 1 year Phase 3 Construction 1 year Design team is meeting with IDOT April 10 to discuss intersection upgrades.
29 Streetscape budget costs are provided for Village planning purposes. Costs are derived based on past planning efforts, aerial photography and site reviews. Final design and engineering is required to produce final cost estimates. STREETSCAPE BUDGET COSTS: PROJECT CATEGORIES & ELEMENTS Roadway & Drainage Site mobilization; curb & gutter remove and replace; pavement resurfacing; tree removals; pavement marking; detectable warning plates; alternate utility improvements, signal modifications. Lighting Hardscape & Furnishings Utility Upgrades Plantings Design & Engineering (15%) Maintenance of Traffic / Administration Decorative light poles. Decorative pavers, stone outcropping, outcropping seating, stone lighting pier bases, 6 concrete planter curb, sidewalk, benches, planter pots, litter & recycling. Sewer & water utility improvements Trees, shrubs, perennials/groundcover, soils, mulches. Permit/bid document preparation Construction phase activities
30 STREETSCAPE COSTS SUMMARY C.1 M.2 M.1 M.2 M.3 H.1 H.1 Hawick Street - Blackhawk Blvd. to Bridge St. (approx. 550 LF) M.1 Main Street - Prairie St. to Green St. (Prairie St Intersection Included) (approx. 1,000 LF) M.2 Main Street - Center St. to Prairie St. & Prairie Street - Main St. to Hawick St. (approx. 650 LF) M.3 Main Street - Cottage St. to Center St. & Hawick Street - Center St. to Blackhawk Blvd. (approx. 1,700 LF) C.1 Chapel Street - Blackhawk Blvd. to Green St. (approx. 550 LF) Settlers Park Base Infrastructure TOTAL STREETSCAPE Settlers Park Specialty Amenities Settlers Park Base Infrastructure Improvements Settlers Park Specialty Park Amenities **Not included in total costs $861,800 $2,963,500 $1,518,000 $2,992,500 $499,500 $1,006,500 $9,841,800 $1,485,000 to $2,700,000
31 COMMITTEE PRIORITIES & IMPLEMENTATION CONSIDERATIONS STREETSCAPE DEVELOPMENT AREA PROS CONS M.1 Main Street, between Prairie & Green Streets Highest return on investment for local businesses Committee identified a preference to develop a complete future project limits of M.1, not a portion thereof Highest infrastructural cost, greatest disruption to businesses H.1 Hawick Street Gateway & Wayfinding Signage Lower infrastructural cost, lesser disruption to businesses Lowest infrastructural cost, relatively high return on investment Gateway signs may be developed separately from wayfinding signs May not directly benefit downtown businesses --
32 Grant Opportunities Project Types Funding Source Illinois Transportation Enhancement Program (ITEP) Surface Transportation Program (STP) Congestion Mitigation and Air Quality Improvement (CMAQ) Program BUILD Transportation Grant (Replaces TIGER) Illinois Safe Routes to School (SRTS) Illinois Green Infrastructure Grant Program for Stormwater Management (IGIG) Highway Safety and Improvement Program (HSIP) Alternative modes of transportation, enhancements to transportation systems through preservation of visual and cultural resources Provides flexible funding that may be used by States and localities for projects on any Federal-aid highway, including the NHS, bridge projects on any public road, transit capital projects, and intracity and intercity bus terminals and facilities Supports surface transportation projects and other related efforts that contribute air quality improvements and provide congestion relief Investment in road, rail, transit and port projects Projects that encourage walking, biking to and from school for grades K-8. Sidewalks, traffic signals, pavement stripings, signage, bike lanes, bike racks. Green Infrastructure / Stormwater Management The goal of the program is to achieve a significant reduction in traffic fatalities and serious injuries on all public roads, including highway and rail grade crossings. IDOT USDOT (Federal) Jointly administered by FHWA and the Federal Transit Administration (FTA) USDOT (Federal) National Center for Safe Routes to School IEPA FHWA
33 THANK YOU! Jodi Mariano Teska Associates
34 34
35 STREETSCAPE COSTS M.1 - Main Street - Prairie St. to Green St Roadway $948,000 Lighting $270,000 Hardscape & Furnishings $590,500 Utility Upgrades (sewer) $271,000 Traffic Signal Modifications $120,000 Plantings $102,500 Design and Engineering (15%) $386,500 Maintenance of Traffic / Admin $275,000 TOTAL $2,963,500 M.1
36 STREETSCAPE COSTS M.2 M.2 - Main Street - Center St. to Prairie St. & Prairie Street - Main St. to Hawick St. Roadway $606,000 Lighting $130,000 Hardscape & Furnishings $162,000 Utility Upgrades (sewer, structure adjustments) $204,000 Plantings $45,000 Design and Engineering (15%) $198,000 Maintenance of Traffic / Admin $173,000 TOTAL $1,518,000 M.2
37 STREETSCAPE COSTS M.3 M.3 - Main Street - Cottage St. to Center St. & Hawick Street - Center St. to Blackhawk Blvd. Roadway $778,500 Lighting $270,000 Hardscape & Furnishings $371,500 Utility Upgrades (sewer, water main west of Blackhawk, structure adjustments) $942,500 Plantings $60,000 Design and Engineering (15%) $390,000 Maintenance of Traffic / Admin $180,000 TOTAL $2,992,500 M.3
38 STREETSCAPE COSTS C.1 C.1 - Chapel Street - Blackhawk Blvd. to Green St Roadway $232,500 Lighting $0 Hardscape & Furnishings $26,500 Utility Upgrades (sewer laterals, structure adjustments) $89,500 Plantings $18,000 Design and Engineering $65,000 Maintenance of Traffic / Admin $68,000 TOTAL $499,500
39 STREETSCAPE COSTS H.1 - Hawick Street - Blackhawk Blvd. to Bridge St Roadway $366,500 Lighting $86,500 Hardscape & Furnishings $89,000 Utility Upgrades (sewer) $75,000 Plantings $61,500 Design and Engineering (15%) $112,300 Maintenance of Traffic / Admin $71,000 TOTAL $861,800 H.1
40 PARK COSTS Settlers Park Base Infrastructure Improvements Site Preparations $84,000 Hardscape & Furnishings $212,500 Lighting $432,000 Plantings $104,500 Design and Engineering (15%) $131,500 Maintenance of Traffic / Admin $42,000 TOTAL $1,006,500 Settlers Park Specialty Park Amenities Specialty Amenities Design and Engineering (15%) $1,260,000 to $2,340,000 $165,000 to $300,000 Maintenance of Traffic / Admin $60,000 TOTAL $1,485,000 to $2,700,000 Settlers Park
41 UTILITY POLE UPGRADES Costs to relocate utilities underground H.1 - Hawick Street - Blackhawk Blvd. to Bridge St. (approx. 550 LF) TOTAL: $208,800 M.1 - Main Street - Prairie St. to Green St. (Prairie St Intersection Included) (approx. 1,000 LF) TOTAL: $295,200 M.2 - Main Street - Center St. to Prairie St. & Prairie Street - Main St. to Hawick St. (approx. 650 LF) TOTAL: $146,400 M.3 - Main Street - Cottage St. to Center St. & Hawick Street - Center St. to Blackhawk Blvd. (approx. 1,700 LF) TOTAL: $590,400 C.1 - Chapel Street - Blackhawk Blvd. to Green St. (approx. 550 LF) TOTAL: $244,800 Settlers Park Base Infrastructure Improvements TOTAL: $2,505,510 Utility Pole Upgrades Project Total: $3,991,110
42 COMMUNITY IDENTITY WAYFINDING SIGNAGE WAYFINDING SIGNAGE Gateway Sign (Option A) (2 signs) $100,000 Gateway Sign (Option B) (2 signs) $40,000 Directional Sign 4 Letters (7 signs) $70,000 Directional Sign 3 Letters (2 signs) $16,000 Business Directory Kiosk (4 signs) $60,000 Bicycle/Ped Directional Sign (3 signs) $7,500 Parking Identifier (5 signs) $37,500 Parking Directional (5 signs) $25,000 SUBTOTAL $379,200 Design & Engineering (10%) $ 37,920 TOTAL $417,120
43 M.1 MAIN STREET PRAIRIE ST Rockton Food & Sprirts 6 Landscape Planter Curbs - with Outcropping Stone, Limestone Benches, BLACKHAWK Library Dairyhaus GREEN ST MAIN ST Local Dough Cafe Parallel Parking (both sides) - 17 spaces Village Hall Pedestrian Lighting - with Decorative Planter Pots
44 M.2 MAIN STREET Corner Bump-outs -Decorative Pavers, Benches, Planter Pots, Bike Racks, and 6 Landscape Planter Curbs Greater Rockton Centre MAIN ST Post Office Trees in Expanded Grates Local Dough Cafe PRAIRIE ST Landscape Bump-outs - Modified for Snow Operations HAWICK
45 M.3 MAIN STREET COTTAGE New Parking Area - 7 spaces CENTER ST American Legion PRAIRIE ST BLACKHAWK MAIN ST Greater Rockton Centre Post Office Local Dough Cafe Cottage Riverfront Plaza -Decorative Pavers, Benches, Limestone Boulders Riverfront Pathway 8 w Hawick Riverfront Plaza -Limestone Seatwall, Decorative Pavers, Limestone Boulders New Parking Area - 10 spaces Pedestrian Lighting - with Decorative Planter Pots New Parallel Parking - 28 spaces HAWICK
46 C.1 CHAPEL STREET Village Green Park Village Green Park Entry Plaza & Sidewalk - benches, bike racks, trash receptacles, plantings GREEN ST BLACKHAWK CHAPEL ST Curb & Gutter Landscaped Bump Outs Painted Crosswalks
47 H.1 HAWICK STREET BLACKHAWK The Mix Cafe Landscape Bump-outs - Modified for Snow Operations Rockton Sanctuary Spa 47 HAWICK ST
48 SETTLER S PARK IMPROVEMENTS HAWICK BLACKHAWK Splash Pad Area Playground/ Large Games Concrete Walkway Settler s Park Naturalized Area w/paths and seating areas Athletic Fields/ Ice Skating New Park Shelter - 40 x 60 Existing Basketball Courts Existing Soccer Field Potential Pathway Extension New Riverfront Access Pathway New Park Lighting Potential Pathway Extension Riverfront Overlook - Decorative Pavers, Benches, Limestone Boulders or Decking Overlook New Riverfront Dock
49 49
50 50
51 51
ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering
ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering AGENDA 1. Project Scope & Schedule 2. Steering Committee & Community
More informationElm Street Business District: Streetscape and Signage Plan
Elm Street Business District: Streetscape and Signage Plan VILLAGE OF WINNETKA DOWNTOWN MASTER PLAN TASK FORCE MTG #1 Teska Associates 30 October 2017 AGENDA 1. Introductions and Walking Tour 2. Past Streetscape
More informationElm Street Business District: Streetscape and Signage Plan
Elm Street Business District: Streetscape and Signage Plan VILLAGE OF WINNETKA DOWNTOWN MASTER PLAN VILLAGE COUNCIL MEETING Final Streetscape & Signage Planning Teska Associates 04 June 2018 WHY WE RE
More informationSOUTH UNIVERSITY Street Design Alternatives in Progress
1 Alternatives in Progress 2016.01.20 Meeting Agenda 2 1. Progress & Schedule 2. Utilizing the Street Design Manual 3. Site Characteristics and Input Received 4. Street Geometry What can we accomplish
More informationCity of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design
City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access Welcome Thank you for coming this evening. Agenda PART I - Project Context The Downtown Revitalization Program Our DRI Projects Other
More informationMain Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre
Main Street Reconstruction From Ninth Line to Stouffer Street Town of Whitchurch-Stouffville Public Information Centre November 23, 2016 4:30 to 6:00 pm & 7:00 to 8:00 pm 6240 Main Street, Stouffville
More informationMaplewood Avenue Downtown Complete Street Project
Maplewood Avenue Downtown Complete Street Project Second Public Meeting January 24, 2018 Welcome and Introduction of Project Team City Planning and Public Works Staff City of Portsmouth Juliet Walker Planning
More informationBRADENTON RIVERWALK EXPANSION MASTER PLAN
BRADENTON RIVERWALK EXPANSION MASTER PLAN INTRODUCTION & AGENDA Process Update Community Engagement Summary Center for Active Design (CfAD) Recommendations Context and Existing Conditions Master Plan Alternatives
More informationopen house 3 CITY OF SALEM Downtown Streetscape Plan
open house 3 Streetscape concepts CITY OF SALEM Downtown Streetscape Plan analysis concepts we are here refined concepts & document Feb 13th 1 2 3 apr 18th KICKOFF OPEN HOUSE Streetscape Work Group Walking
More informationPUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM
PUBLIC RIGHT-OF-WAY This section provides design guidelines for improvements in the public right-of-way. The public right-of-way refers to streets, sidewalks, non-vehicular thoroughfares, parks and greenways
More informationBUSINESS DISTRICT DESIGN GUIDELINES
Des Plaines, Illinois Prepared for the City of Des Plaines by: The Lakota Group Laurie Marston, AICP March 2005 Section 5: Streetscape Elements Business District Design Guidelines STREETSCAPE ELEMENTS
More informationVEHICULAR AND PEDESTRIAN CIRCULATION
This perspective sketch communicates the intended character and quality of a proposed streetscape design. Locate benches near a major intersection where people tend to gather. Seating and lighting provide
More informationSOUTH UNIVERSITY Street Design Setting a Direction for Schematic Design
1 SOUTH UNIVERSITY Street Design Setting a Direction for Schematic Design Meeting Agenda 2 1. Project Scope 2. Design Direction 3. Design Details 4. Schedule and Construction Logistics 3 SOUTH UNIVERSITY
More informationBroadway Avenue Streetscape Project City of Albert Lea. Streetscape Design Committee Meeting October 29, 2012
Broadway Avenue Streetscape Project City of Albert Lea Streetscape Design Committee Meeting October 29, 2012 1 Presentation Outline Street Widths, Sidewalk Widths and Bump-Out Configuration Decorative
More informationFifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design
1 Fifth and Detroit Street Design May 2017 Capital Improvements Committee Agenda 2 Review Street Configuration Prior Meeting Review Outreach Synopsis Functional Street Design Refinements Curb Edge, Turning
More informationParapet/Formliner/Fencing
Parapet/Formliner/Fencing Cross Parapet/Formliner/Fencing Street Aesthetic Features Context The I-290 Phase I study is evaluating improvements along 13 miles of the Eisenhower Expressway, from west of
More informationFifth and Detroit Street Design/South University Update Capital Improvement Committee Meeting
1 Fifth and Detroit Street Design/South University Update Capital Improvement Committee Meeting Kick-off Meeting Agenda 2 1. Introductions 2. Update on South University 3. Fifth and Detroit-project scope
More informationTOWN COUNCIL / PLANNING COMMISSION
Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011 Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L.
More informationWest Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons
West Dennis Center: Bass River to Old Main Street West Dennis Business District: Old Main Street to Dennis Commons Dennisport Center: Dennis Commons to Division Street Main Street Project Goals Project
More informationJohnson Street Bridge Public Realm Update
Johnson Street Bridge Public Realm Update August 20, 2015 Background Johnson Street Bridge Replacement Project impacts a diverse range of stakeholders In addition to a new bridge, the project also includes
More informationElgin O Hare Western Access Project Local Advisory Committee. February 10, 2014
Elgin O Hare Western Access Project Local Advisory Committee February 10, 2014 Agenda Project status update Design and construction Funding Aesthetics Project events and outreach Land acquisition Next
More informationChapter 14 Streetscape Improvements
This chapter presents streetscape design concepts for key streets and gateways in the Downtown Specific Plan area. This chapter is organized as follows: 14 Streetscape Improvements 14.1 Streetscape Treatments
More informationSpring 2018 Construction Update
Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the
More informationTURN TO THE RIVER CITY PLAZA LANDSCAPE DESIGN CONCEPT May 25, 2016
Turn to the River is a multi-year project of Art Spaces - Wabash Valley Outdoor Sculpture Collection, Inc. to connect downtown Terre Haute with the Wabash River through public art and design. The four-square
More informationGREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle
GREENING THE BOULEVARD Katherine Spitz Associates Inc. 4212½ Glencoe Avenue Marina Del Rey, CA 90292 310 574 4460 Fax 574 4462 January 2008 Table of Contents Overview Proposed Design Improvements Illustration
More information4.9 Mendocino Avenue Corridor Plan Design Guidelines
4.9 Mendocino Avenue Corridor Plan Design Guidelines The Mendocino Avenue Corridor Plan addresses the area between College Avenue and Steele Lane. Mendocino Avenue is a busy arterial that runs parallel
More informationJewel. Platte. of the. Plattsmouth Main Street Landscape Architecture by HDR
Jewel of the Platte Plattsmouth Main Street Landscape Architecture by HDR Plattsmouth, Nebraska is a historic community of 6,500 residents located along the west bank of the Missouri River, just south
More informationProject Consulting Team:
THE DOWNTOWN CHERRYVILLE LAND USE + STREETSCAPE MASTER PLAN WAS FUNDED THROUGH THE GENEROUS DONATIONS OF THE FOLLOWING: The Community Foundation of Gaston County ElectriCities of North Carolina The Cherryville
More informationCOMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING
COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING Subject: Recommendation Prepared by: PRELIMINARY DESIGN REVIEW OF LOCUST STREET BRIDGE CONSTRUCTION & COURT AVENUE,
More informationCOMPLETE GREEN STREET CHECKLIST
COMPLETE GREEN STREET CHECKLIST This document was developed to dissect the structure of an urban street and explore opportunities to make our streets more complete while also integrating green street strategies.
More informationMAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA
MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION 7:00 P.M. TO 8:30 P.M. NOVEMBER 21 st, 2017 PENETANGUISHENE MEMORIAL COMMUNITY CENTRE BRIAN ORSER HALL (61 Maria Street) 1.
More informationDivision VI Community Mixed Use (CMU) Architectural Guidelines and Standards
Division VI 18.40.800 Community Mixed Use (CMU) Architectural Guidelines and Standards 18.40.810 Guidelines The goals of the Comprehensive Plan include a focus on pedestrian safety, amenities and aesthetics
More informationStreets Vision
streets 86 2.9 Vision : The Most Prevalent and Important Public Spaces Fixed routes of human travel have served as corridors for commerce and places for human interaction from the earliest trails and foot
More informationJuly 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project
OHIO DEPARTMENT OF TRANSPORTATION DISTRICT 6 400 EAST WILLIAM STREET DELAWARE, OHIO 43015 800.372.7714 Columbus City Council City Hall 90 West Broad Street Columbus, OH 43215-9015 RE: I-70/71 Columbus
More informationProperty Owners Association. Annual Meeting Notice July 26, :00pm - 7:00pm Park City Marriott 1895 Sidewinder Drive Park City, Utah
Property Owners Association Annual Meeting Notice July 26, 2016 5:00pm - 7:00pm Park City Marriott 1895 Sidewinder Drive Park City, Utah Annual Meeting Agenda Welcome Approval of Minutes Introduction of
More informationSFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE
SFMTA Municipal Transportation Agency Image: a bus in front of the Palace of the Legion of honor SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN AVENUE @ OCEAN AVENUE Community Meeting May 23, 2012 San Francisco,
More informationPedestrian and Bike Bridge LOGO
6.2.2 Pedestrian and Bike Bridge The proposed pedestrian and bike crossing re-envisions the existing bridge at Pismo Creek on Cypress Street. The bridge is currently underutilized by vehicular through
More informationGYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015
GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado Schematic Design January 2015 1 2 3 4 5 6 7 8 9 DESIGN WORKSHOP Landscape Architecture Land Planning Urban Design Tourism Planning Asheville Aspen Austin
More informationCharles P. Johnson and Associates. Annapolis Landscape Architects
Charles P. Johnson and Associates Annapolis Landscape Architects AGENDA Introduction Project Limits and Scope Site Analysis Opportunities & Constraints Program Goals Image Boards Design Alternatives Pros
More informationBuilding Great Neighbourhoods. Strathcona
Building Great Neighbourhoods Strathcona March 21, 2018 Becky Redford Project Manager, Planning & Design Building Great Neighbourhoods Integrated Infrastructure Services Welcome and Purpose To provide
More informationElm Street Business District: Streetscape and Signage Plan
Winnetka Final Streetscape & Signage Planning DMP Task Force Mtg 4 02/26/18 1 Elm Street Business District: Streetscape and Signage Plan VILLAGE OF WINNETKA DOWNTOWN MASTER PLAN TASK FORCE MTG #4 Final
More informationTHREE-YEAR CAPITAL IMPROVEMENT PLAN FY
THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering
More informationElm Street Business District: Streetscape and Signage Plan
Attachment C Elm Street Business District: Streetscape and Signage Plan VILLAGE OF WINNETKA DOWNTOWN MASTER PLAN TASK FORCE MTG #4 Final Streetscape & Signage Planning Teska Associates 26 February 2018
More informationCommercial Node Plan Devine Street/Jackson Blvd. COLUMBIA, SC
Commercial Node Plan Devine Street/Jackson Blvd. COLUMBIA, SC 9.17.13 AGENDA 1 Introductions 2 Project Update 3 Concepts 4 Recommendations 5 Next Steps Introductions Project Update Process 5-Phase Process
More informationThe Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies
Vision, Objectives & Strategies The is the public framework and guide for future development of the Grand Traverse Commons. The establishes public polices for infrastructure, the preservation of natural
More informationLandscape and Streetscape Design 2.5
Landscape and Streetscape Design 2.5 2.5.1 Goals 2.5.2 Planting 2.5.3 Sidewalks and Pavement 2.5.4 Furnishings 2.5.5 Walls 2.5.6 Lighting 2.5.7 Stormwater 2.5.8 Street Cross Sections 2.5 LANDSCAPE AND
More informationThe open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..
The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. Mixed-use and infill development should maintain or enhance
More informationWayfinding. North Gateway: Integrate a vertical gateway marker on the west side of Ward Street at the south corner of Vernon Street.
3.3.6.2 Wayfinding Existing Conditions Wayfinding signage is important to direct visitors and tourists to different locations in the downtown. A significant part of the wayfinding signage in the downtown
More informationPlease see attached for more detailed project information. Project Schedule Designer Award by SBC Executive Sub-Committee December 21, 2015
Project Title Campus Beautification Projects Volunteer Blvd Ph 1 540/009-08-2015 Institution Description UT Knoxville This project will improve Volunteer Boulevard from West Cumberland Ave. to East Cumberland
More informationConstruction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT)
Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT) 1 Firm Overview 2 We are a well established multi disciplinary firm that has
More informationAGENDA ACTION ITEMS INFORMATION ITEMS
NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION
More informationAVONDALE ESTATES GREENSPACE AD-HOC COMMITTEE
AVONDALE ESTATES GREENSPACE AD-HOC COMMITTEE INVENTORY AND RECOMMENDATIONS REPORT November 7, 2018 Our Mission Statement: To provide assistance and support, through professional expertise in matters of
More informationPublic input has been an important part of the plan development process.
Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the
More informationTable of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.
Table of Contents Introduction 1 Existing Context 1 Figure 1 2 Plan Guidelines 3 Future Urban Form 4 The West-End 4 Main Street 6 The East-End 7 Figure 2 9 Public Improvement Recommendations 7 General
More informationPotential Green Infrastructure Strategies May 6, 2015 Workshop
Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National
More informationPreci nct P l ans Figure 56 Campus Aerial Photo, 2008 CAL STATE EAST BAY, HAYWARD CAMPUS MASTER PLAN
9 Precinct Plans This section contains a detailed discussion of the planning and design concepts for specific areas or precincts of the Cal State East Bay Hayward campus. The Precinct Plans pertain to
More informationWelcome to the. Open House
Welcome to the 5th Street to Kinsman Road Open House November 14 5:30 7:00 p.m. Please sign in Project Overview In December 2016, City Council adopted SW 5th Street as the preferred alignment to connect
More informationDESIGN & GREEN INFRASTRUCTURE UPDATE December 13, 2016
DESIGN & GREEN INFRASTRUCTURE UPDATE December 13, 2016 Welcome & Introduction Michael J. Finn, P.E. City Engineer Summary of Public Outreach to Date Ground the work in established principles December 2015
More informationCommunity Mixed Use Zone Districts (CMU)
18.28.500 Community Mixed Use Zone Districts (CMU) The Community Mixed Use Zone Districts (CMU) are intended to help implement the land use goals and strategies found in the Golden Vision 2030 values,
More informationCRA Five Year Capital Improvement Plan. September 2, 2015
CRA Five Year Capital Improvement Plan September 2, 2015 Downtown CRA Recap Introduction Downtown Capital Improvement Projects: $2.6M available for FY 2016. Includes the recent loan of $2.0M. DOWNTOWN
More informationFROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!
FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW Welcome! Meeting Agenda 6:00 PM Open House 6:30 PM Presentation 7:00 PM Open House / Q&A at the Boards Project Design Team Connecticut Avenue, NW Project
More informationSouth Yonge Street Corridor
South Yonge Street Corridor Streetscape Master Plan Study Draft Final Executive Summary Prepared by: January 2012 In Partnership with: Introduction The Future... Yonge Street is at the forefront of York
More informationCanal Winchester Parks Master Plan. Public Meeting 2 Thursday, February 2 6:30pm
Canal Winchester Parks Master Plan Public Meeting 2 Thursday, February 2 6:30pm Meeting Agenda 1. Project overview 2. Project schedule 3. Public input results Survey Public Meeting #1 Stakeholder Interviews
More informationCHAPTER 8. Mrs. Zimman s Class - Central Elementary
SUSTAINABILITY CHAPTER 8 Mrs. Zimman s Class - Central Elementary 8.1 OVERVIEW Green infrastructure also known as low impact development (LID) and environmental or sustainable site design is an environmentally
More informationThe Auburn Plan Designing the Future of Auburn February 28, 2005
The Auburn Plan Designing the Future of Auburn February 28, 2005 Block-by-Block Bicycle Tour Aerial survey Focus Group Meetings September 7 and 8 Design Workshops October 11, 14, and 21 Revitalization
More informationGOODY CLANCY WITH KITTELSON & ASSOCIATES RHODESIDE & HARWELL FARR ASSOCIATES W-ZHA
1 1. Welcome 5 min. 2. Follow-up from 9/22 / Corridor of Light, ground floor uses 20 min. 3. Small on-site open spaces / Overview of types, identities 15 min. 4. Rosslyn Plaza Park / Rosslyn Plaza PDSP
More informationToday Land & People. Northeast Nampa Gateway District. Employment. Land Use Characteristics. Demographics. Current Zoning
Today Land & People Employment Major employers include Saint Alphonsus, the College of Western Idaho, the Auto Mall, Sorrento Lactalis and Walmart. 3,004 jobs in 2010 (COMPASS-CIM 2040 TAZ data) 4,345
More informationConceptual Design. Main Street Enhancement and Extension Project. Bothell, Washington. June 11, 2009
Conceptual Design Main Street Enhancement and Extension Project Bothell, Washington June 11, 2009 Berger/ABAM Engineers and Cascade Design Collaborative, Inc For Main Street Bothell to succeed it must
More informationVillage of Glenview Appearance Commission
Village of Glenview Appearance Commission STAFF REPORT July 23, 2014 TO: Chairman and Appearance Commissioners CASE #: A2014-059 LOCATION: 727 Harlem Avenue FROM: Community Development Department PROJECT
More informationDesign Guidelines for the Route 30 Corridor Master Plan: Subdivision and Land Development Elements
Design Guidelines for the Route 30 Corridor Master Plan: Subdivision and Land Development Elements East Whiteland Township- Chester County, PA Prepared by: Draft: May 7, 2018 Design Guidelines for the
More informationMASTER PLAN QUEEN ST. WEST BIA
QUEEN ST. WEST BIA MASTER PLAN QUEEN ST. WEST BIA EXECUTIVE COMMITTEE IN ASSOCIATION WITH PMA LANDSCAPE ARCHITECTS LTD. SWEENY STERLING FINLAYSON & CO ARCHITECTS INC. FUGITIVE GLUE MARCH 2013 4.5.4 PLAZA
More information10 Implementation. Implementation. Responsibility for Implementation. Blueprint for Bloomsburg. Town of Bloomsburg Comprehensive Plan 10-1
Implementation 10 Implementation This chapter overviews how to use the comprehensive plan as a land use and programming tool for the Town of Bloomsburg and recommends annual review of the plan by the Town
More informationV. Gateways GATEWAYS / V-1
V. GATEWAYS / V-1 Many of Chesapeake s gateways are located on highways and call for bold and attractive designs that motorists can understand, appreciate, and enjoy. can also take the form of natural
More informationQuality Public Realm & Streetscapes
1 Quality Public Realm & Streetscapes Lambeth Community Association/Business Association 1.1 Install decoration and/or decorative lighting on London Hydro poles along Main Street from Campbell Street to
More informationRoute 1 Corridor Study
Route 1 Corridor Study Westbrook, Connecticut A Vision for the Connecticut Shoreline Public Informational Meeting July 28, 2015 Lower Connecticut River Valley Council of Governments Fitzgerald & Halliday,
More informationLambeth Main Street Streetscape Improvements
Lambeth Main Street Streetscape Improvements Open House October 5th, 2017 Agenda 1. Introduction 2. Project Background 3. Context 4. Project Objectives 5. Design Principles & Approach 6. Streetscape Design
More informationHighway 15 Project - Hutchinson
Highway 15 Project - Hutchinson Agenda What are we going to talk about today? Goals and benefits of the project Details about the proposed work Project schedule and costs Any questions you may have about
More informationD ESIGN REVIEW COMMITTEE
CVDRC STAFF REPORT C REATIVE VILLAGE D ESIGN REVIEW COMMITTEE March 14, 2017 Case Number LDC2017-00035 Applicant AGENDA ITEM 1 CREATIVE VILLAGE STREETSCAPE DESIGN GUIDELINES AMENDMENT Craig Ustler, Manager
More informationCourthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014
Courthouse Square Planning & Urban Design Study Courthouse Square Working Group #13 October 15, 2014 1 Courthouse Square Process Working Group Community Courthouse Square Advisory Groups & Civic Associations
More informationBow to Bluff Public Realm Plan Design Update
Bow to Bluff Public Realm Plan Design Update December 017 Great public spaces encourage people to gather, recreate, explore and discover. Introduction The City of Calgary is planning to improve the corridor
More informationTechnical Advisory Committee
CULVER DOWNTOWN STREETSCAPE PLAN STREETSCAPE IDEAS REPORT 01.08.2008 Project Team Matt Crall, Transportation and Growth Management Quick Response Program Donna McCormack, City of Culver Darrell Newton,
More informationThe Project. In 2013, construction was completed between 100 Street and 102 Street.
The Project Jasper Avenue New Vision (JANV) is a major catalyst project identified in the Capital City Downtown Plan (2010) between 92 Street and 109 Street, including the streets half a block north and
More informationDundas Place Flexible Street Public Information Centre
WELCOME TO THE DUNDAS PLACE DESIGN REVEAL Dundas Place Flexible Street Public Information Centre November 8, 2017 This project is funded by the City of London with support from the Government of Canada
More informationBEMIDJI CITY COUNCIL Work Session Agenda Monday July 9, 2012
BEMIDJI CITY COUNCIL Work Session Agenda Monday July 9, 2012 City Hall Conference Room 5:30 p.m. 1. CALL TO ORDER / ROLL CALL 2. REVIEW PARK PLANS FOR PAUL BUNYAN PARK, LIBRARY PARK AND SOUTH SHORE BAUER
More informationStudy Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project
Olympia, WA: Greening Capitol Way Supporting Communities move towards sustainability is a priority for the federal government. A Greening America s Capitals Project Office of Sustainable Communities U.S.
More information7-PARKS, OPEN SPACE & PUBLIC ART
7-s, Open Space & Public Art 7-PARKS, OPEN SPACE & PUBLIC ART This chapter provides recommendations for the expansion of new parks, plazas and open space that serve the many user groups targeted for downtown.
More informationCITY OF BOCA RATON GOVERNMENTAL CAMPUS Master Plan Progress August 22, 2017
CITY OF BOCA RATON GOVERNMENTAL CAMPUS Master Plan Progress August 22, 2017 This is a rare moment in the City s history which affords us the opportunity to create a civic landmark born of comprehensive
More informationCity of Los Angeles Department of Public Works
City of Los Angeles Department of Public Works Environmental Scoping Meeting for the Proposed Sixth Street Park, Arts, River & Connectivity Improvements (PARC) Project May 3, 2017 1 Agenda Introductions
More information\\ Comprehensive Facilities Master Plan. Design Guidelines
Design Guidelines CU-Boulder What are Design Guidelines? Institution Character Continuity of Fabric Accelerate Design Process, constrained options MIT Descriptive Buildings on the campus reflect many styles,
More informationProject Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006
Project Goal Town of Halifax Revitalization Project RRRC Living Towns Planning Workshp July 12, 2006 Town of Halifax Halifax County *** Revitalization Project Goal*** To create Economic Opportunity and
More informationAlexandria Recreation & Education Program (AREP) April 2014
Alexandria Recreation & Education Program (AREP) April 2014 PROPOSITION (AREP RECREATION MILLAGE) VOTE: May 3, 2014! L14-095 - Rapides Parish, City of Alexandria - 6 mills tax, 20 years, 2014-2033, acquiring,
More informationComplete Streets Master Plan for Downtown New Britain CRCOG Transportation Committee Meeting Monday, December 9, 2013
CRCOG Transportation Committee Meeting Monday, December 9, 2013 Introduction Why the Project was Initiated About Downtown New Britain Master Plan Goals Master Plan Overview Master Plan Study Areas and
More informationOhlone College Measure G Project Scope Revisions
Scope Revisions Current Title Revised Title Current Scope Revised Scope 6101 Relocated Baseball Field Athletic Fields Create new sustainable baseball field with synthetic turf, bleacher seating and batting
More informationSITE FURNISHINGS STANDARDS MANUAL
University Planner's Office Architecture, Engineering & Construction University of Michigan January, 2011 http://www.umaec.umich.edu/ Table of Contents Introduction page 3 Campus Landscape Design Elements
More informationCHAPTER 6 URBAN DESIGN
CHAPTER 6 URBAN DESIGN WINNETKA DOWNTOWN PLAN 51 URBAN DESIGN isn t just about making places attractive. People tend to associate urban design with community beautification and while it does many things
More informationI-70/71 Innerbelt Project
I-70/71 Innerbelt Project Project Progress Meeting and Design Enhancement Update November 9, 2009 Ohio Department of Transportation MS Consultants MSI Design Overview of Presentation 1. Recap Recent Project
More informationCit of Kitchener Ur 6 an Design Manual PARTA. Desi n for _--::
Cit of Kitchener Ur 6 an Design Manual Date PARTA Year ) Desi n for k Nodes Corridors _--:: Section Page 01 of 12 2 INTRODUCTION Purpose & Application Nodes and Corridors have been identified as key intensification
More informationPARKLET PROPOSAL PACKAGE & PROCESS
500.3 I PARKLETS The term parklet refers to a small temporary constructed seating or community gathering area over an on-street parking space or an extension of the sidewalk into the operating State highway
More informationWhitemarsh Comprehensive Plan Update: Housing & Land Use. Public Workshop #3: September 20, 2018
Whitemarsh Comprehensive Plan Update: Housing & Land Use Public Workshop #3: September 20, 2018 Agenda Welcome Process Recap What We ve Heard The Plan Framework Review of Recommended Actions Land Use Housing
More informationThis Review Is Divided Into Two Phases:
Semiahmoo Town Centre Review The purpose of this review: To review the Semiahmoo Town Centre Concept Plan, originally approved in 1993, to ensure that this centre will continue to serve the needs of South
More information