1 June 20, 2011 PUBLIC OPEN HOUSE - COMMENT FORM RESULTS A public open house and workshop session were held on June 20, 2011 at the Charleswood United Church at 4820 Roblin Avenue. Approximately people attended. The open house session was modified to include an extensive question and answer period to accommodate the strong level of participation. The following charts provide a summary of the data received from 284 open house participants. This data will be used to help inform draft plans and policies to be prepared to guide and inform development planning for the Ridgewood Precinct area. A. Participant Information 1
2 2
3 B. Meeting Effectiveness 3
4 C. Commentary Provided 4
5 5
6 COMPILATION OF WORKBOOK COMMENTARY PROVIDED On the evening of June 20, 2011 following the public open house, approximately 50 participants stayed to complete a community planning workbook. Participants worked together in groups of 6-10 people providing their comments and suggestions on a topic by topic basis. The following notes are summarized transcriptions of the input provided. NOTES: - Raw data has been grouped by topic and paraphrased and spell corrected as required; - Illegible comments are not recorded - Notes are opinions only and do not constitute consensus - When more than one participant provided a similar comment, this is noted in parentheses following the comment (e.g. (2x) means the comment was provided on two worksheets) A. TRANSPORTATION AND DRAINAGE Existing Infrastructure Current infrastructure (roads) not able to handle traffic (x6); Condition of roads is poor (x3); This development will exacerbate current problems; Roads are too narrow; specification width does not work for new cars+ speed; extremely unsafe Safety; children; Fix roads - paving; Speeding in residential areas; Maintenance of existing infrastructure: potholes, curbs, blvds, trees, drainage Lack of quality control on re-surfacing roads, Lack of maintenance on roads; Land drainage network needs to be maintained; Overland flooding in-fill housing (need drainage plan); Some want ditches removed, others want to keep for cost; Upgrade old Charleswood simultaneously with storm drainage system for entire neighbourhood; Leave existing Charleswood community with their ditches where they exist; Drainage flowing north impact of new development on existing; huge drainage issues in certain areas 6
7 Excess Traffic, Through-Traffic and Traffic Calming Need traffic calming; (x5) Dead-end through streets at Harte Trail; (x5) More development will cause more traffic (x2); Increased truck traffic on Parkway; increased through-traffic on side streets (x2) No additional through-traffic across Harte Trail; (x2) Minimize through traffic; streets are failing (x2) Need an east-west alternative for roads (x2) Non-residential traffic using residential roads to cut through; IKEA traffic; Lack of use of stop signs; Controlled corridors to route traffic; Public Transportation and Active Transportation Commentary Well serviced bike trails/paths (x6) More buses (connections to Kenaston); (x4) Need active transportation corridors; (x3) Seven-day bus service; (x2) Need Park+Ride (x2) Feeder bus services to rapid bus on Portage; Create more hubs for transit; more comprehensive trail (multi-use) system; Rapid transit east-west, near the RR tracks, with a spot to park cars and safely park bikes ; Light rail; Remove hub+ spoke model; Harte Trail for running and walking, separate path for biking; Don t pave the Harte Trail Separate bike lanes; Need Harte trail extensions; More lighting, more trails and integration of such; Sidewalks; Wider streets; hard top no loose gravel shoulders Lighting for pedestrians; Anything would be an improvement No hope! 7
8 Wilkes WRCP Make 4 lanes on Wilkes (x2); East/West thoroughfare needed between Ridgewood + Wilkes; (x2) How will Wilkes handle the increased traffic? It doesn t handle the current load. Fix Wilkes; Go around vs. through Limit number of crossings to Wilkes; Limit access in and out to Wilkes and William R. Clement Parkway (WRCP); Close off existing residential streets to Wilkes; 4 lanes on Wilkes; underpass+ overpass (not through Harte Trail); Dangerous to get onto/off Wilkes; Upgrade Ridgewood and Wilkes - relocating if necessary; If WRCP is extended, will Eldridge and Ridgewood go through? Parkway extension will devalue property and remove green space Greenspace needed on parkway extension; Make Parkway as narrow as possible; limit heavy truck traffic; WRCP must be completed prior to housing; All traffic north of portage has to come through, timeline for extension of Parkway - needed now; WRCP must be extended (unanimous) Other Questions and Ideas Sound barriers are attractive; Overpass from Grant to Wilkes; Create perimeter access; Additional lanes on Rte 90; 4-way stop signs, lights, etc.; Enhance streets at no extra costs to residents; Cloverleafs instead of stop signs to keep traffic flowing; Put drainage going west with Perimeter along with sewage; Expansion of Shaftesbury to take traffic to IKEA; Need for childcare, activities for people of all ages; French Immersion High School Marj Edey Park; New subdivision on Charleswood greenspace will drive down property values; Construction traffic should travel Wilkes; 8
9 B. LAND USES Parks, Recreation and Natural Areas Keep greenspace, will change friendly atmosphere to remove it (x3). Preserve existing parks (x2) and nature plus 10% of new development; Character of the neighbourhood is mature trees and green space and nature; Harte Trail has to be preserved, maintained and enhanced; Preserve green space alongside Harte Trail Continuous wide green space, green belts and marsh or park; Dog park is important; Flora preservation; Residential Land Uses Type: Location: Other: Single Family (x11), Two Family (x3), Multi-family (x3), Seniors Condos (x2), Nursing Home (x2 some debate), All Types (x2); Multi-family near shopping area (x2); not in the centre area; close to Wilkes, near major bus routes; Housing for young people, university students; apartment development with high density housing; needs to be mixed use- more houses; green space and water should be accessible to all, not just wealthy single-family walkout lots; dispersed throughout the development area flow to the development; Commercial Land Uses Type: Location: Other: Small corner store type; very minimal; none; minimal; no big box; South Wilkes between Charleswood and the perimeter; where possible along the main corridors; convenient for area residents; west of Charleswood Road; 100' off Wilkes; directly on Wilkes south of tracks; village area seems sufficient; (x2); everything needed is close enough (x2); more would close local businesses; local re-fuelling for electric vehicles; will need another service station; 9
10 Other Land Uses Type: Location: Other: Community centres, soccer fields, baseball diamonds, schools(x2); Expansion for french immersion school system; personal care home (x4); 50+ housing; daycare; side by sides; seniors housing -need a variety of options; light commercial; possible future grocery store; community medical clinic; office (x2); commercial; NO industrial; Overlooking natural trees and wildlife; Need to keep lots 60' wide (x2), concern about taking business from Roblin businesses; NEXT STEPS At the close of the public open house, participants were advised of the next steps, which included: Study Team will summarize and review the feedback provided at the public open house and workshop event; Study Team will prepare a list of FAQs to re-iterate responses to questions received at the Public Open House; Study Team will begin preparing draft policies and plans for the area with consideration given to feedback to date; A second series of stakeholder group meetings and public open houses will be held in late fall once draft plans and policies have been prepared; Following the second series of meetings the Study Team will prepare a second draft of plans and policies; A final public meeting will likely be held in Spring 2012; A proposed Precinct Plan will be considered by City of Winnipeg Council and subcommittees; If any landowner decides to proceed to submit required municipal approval applications (subdivisions and rezoning) on his or her respective parcels of land, they may do so at their discretion; such applications will each be subject to a public hearing and approval process. 10
RIDGEWOOD SOUTH PRECINCT PLAN STATUTORY PLAN APPENDIX B. Public Consultation Report
RIDGEWOOD SOUTH PRECINCT PLAN STATUTORY PLAN APPENDIX B Public Consultation Report TABLE OF CONTENTS 1.0 Introduction 5 1.1 Consultation Methodology 1.2 Notification Approach 1.3 Overall Participation
More informationWaverley West B Secondary Planning Process. Open House South Pointe School April 25, 2018
averley est B Secondary Planning Process South Pointe School April 25, 2018 averley est B Secondary planning process open house Please review the boards and provide your feedback. 1 The Role of a Secondary
More informationInform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;
WELCOME The intent of today s Open House is to: Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass; Review highway crossing locations, future access closures
More informationDon Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions
Consultation Summary Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions This report is not intended to provide a verbatim transcript
More informationThe Cambie Corridor 2015 Fall workshop series. What we heard WORKSHOP OUTLINE
The Cambie Corridor 2015 Fall workshop series W 16 AVE Area 5 CAMBIE CORRIDOR Phase 3 What we heard ovember 21, 2015, 9am-noon, 1:30-4:30pm Peretz Centre 89 Participants* WORKSHOP OUTLIE Introductions
More informationLaird in Focus Community Information Session
Laird in Focus Community Information Session Tuesday, December 5, 2017 St. Anslem Catholic School, 182 Bessborough Drive Session 1: 5:30 pm - Presentation and Question and Answer Period 6:15 pm - Breakout
More informationThis Review Is Divided Into Two Phases:
Semiahmoo Town Centre Review The purpose of this review: To review the Semiahmoo Town Centre Concept Plan, originally approved in 1993, to ensure that this centre will continue to serve the needs of South
More informationJune 19th Public Workshop #3 Summary
Norval Secondary Plan Review June 19th Public Workshop #3 Summary SUBMITTED BY: Macaulay Shiomi Howson Ltd June, 2013 Table of Contents 1.0 Introduction 1 1.1 Workshop Outline 1 1.2 Who Came to the Workshop?
More informationClair-Maltby Community visioning
Clair-Maltby Community visioning workshop #1 Summary April 27th, 2017 Table of Contents INTRODUCTIon 1 PURPOSE 1 CONSULTATION STRUCTURE 2 PARTICIPANT FEEDBACK 3 VISIONING EXERCISE 8 ONLINE SURVEY RESULTS
More informationTRANSPORTATION & STREET DESIGN
TRANSPORTATION & STREET DESIGN Review of Goals Connect neighborhoods to Square Enable access to the river Improve pedestrian environment Reorient road network to local use Three Specific Areas of Intervention
More informationCITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK
Page 34 CITY PLANNING COMMISSION AGENDA ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK FILE NOS: CPC ZC 12-00035 QUASI-JUDICIAL CPC NV 12-00036 QUASI-JUDICIAL AR DP 12-00039 QUASI-JUDICIAL PROJECT: APPLICANT: OWNER:
More informationEAST IRVINGTON / TOWN GREEN / GLENVILLE / WATCH HILL / WYLDWOOD / BENEDICT AVENUE MEETING March 11, 2008 Open Group Visioning
, Town Councilman and CPSC Chair EAST IRVINGTON / TOWN GREEN / GLENVILLE / WATCH HILL / WYLDWOOD / BENEDICT AVENUE MEETING March 11, 2008 Open Group Visioning TRANSPORTATION Bee Line going hybrid Reduce
More informationSOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE
WELCOME! SOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE Monday, November 18, 2013 3:30 to 5:30PM and 7:00 to 9:00PM Tuesday, November 19, 2013 3:30 to 5:30PM and 7:00 to 9:00PM Welcome to the Southwest
More informationCommunity Workshop November 19, 2014
Community Workshop November 19, 2014 Agenda Welcome and Introduction What is a General Plan? About the General Plan Update Our General Plan Topics to be included in the Update Update process Opportunities
More informationSchedule B to Report PLS
Page 25 Q1. The land use concept is made up of many different land uses (residential, commercial, parks, schools, environmental areas etc.) A number of land uses are concentrated in the Community Core,
More informationImagining Ward 3 Session #2. April 18, :00 pm 8:30 pm
Imagining Ward 3 Session #2 April 18, 2016 7:00 pm 8:30 pm Project Team City of Mississauga Karen Crouse, Project Leader, Policy Planning Division Frank Marzo, Planner, Policy Planning Division Brook McIlroy
More informationPublic Consultation Summary: Lakeview Place Making Workshop January 30, 2008.
Page 1 of 11 Public Consultation Summary: Lakeview Place Making Workshop January 30, 2008. 1.0 Introduction: On January 30, 2008 the City of Mississauga, in conjunction with the consulting team of Brook
More informationSCORE CARD RESULTS. Power Tool Results. Vision Georgetown Draft Land Use Concept
SCORE CARD RESULTS Power Tool Results Vision Georgetown Draft Land Use Concept Results of Public Consultation Open House Sept. 20, 2017 Positives - What do you like about the Plan? Walkability and Bike
More informationGRANDVIEW HEIGHTS NCP AREA #3 CITIZEN ADVISORY COMMITTEE (CAC) MEETING #6
WELCOME TO THE NCP AREA #3 CITIZEN ADVISORY COMMITTEE (CAC) MEETING #6 For more information visit the city of surrey webpage at: www.surrey.ca/gh3ncp 1 Feb 1, 2018 CAC Meeting NEIGHBOURHOOD CONCEPT PLAN
More informationCreate Policy Options Draft Plan Plan Approval. Public Consultation Events. Phase 2
Background Grandview-Woodland Community Plan In the spring of 2012, the City of Vancouver embarked on a comprehensive community planning program in the Grandview-Woodland neighbourhood. The process has
More informationFANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016
FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 2 June 16, 2016 ACCESSIBILITY Under the Accessibility Standards 2015 for
More informationRights-of-Way Preservation Guidelines
Rights-of-Way Preservation Guidelines Summary of Policy The purpose of the Rights-of-Way Preservation Guidelines is to help staff make decisions about preserving rights-ofway for future transportation
More informationROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018
Page 1 of 19 EXECUTIVE SUMMARY This application proposes redesignating two parcels in the community of Silver Springs from Special Purpose Future Urban Development (S-FUD) District and undesignated road
More informationWHAT WE HEARD REPORT - Summary Bonnie Doon Mall Redevelopment Application (LDA )
WHAT WE HEARD REPORT - Summary Bonnie Doon Mall Redevelopment Application (LDA18-0184) PROJECT ADDRESS: 1 Bonnie Doon Shopping Centre NW, 8420 85 Street NW & 8715 85 Street NW PROJECT DESCRIPTION: Rezoning
More informationMill Woods Town Centre Proposed Rezoning LDA
Mill Woods Town Centre Proposed Rezoning LDA15 0649 The City of Edmonton has received an application for rezoning and an amendment to the Mill Woods Station Area Redevelopment Plan (ARP) for the Mill Woods
More informationEAST VILLAGE STRATEGIC SITE NOVEMBER 2017
EAST VILLAGE STRATEGIC SITE NOVEMBER 2017 East Village will be a sustainable, mixeduse precinct with a focus on innovative employment and education opportunities. Enhanced by green spaces and places for
More informationThe petition proposes the development of five townhomes on a vacant parcel between Charlotte Latin School and Providence Presbyterian Church.
Rezoning Petition 2017-202 Final Staff Analysis June 18, 2018 REQUEST LOCATION Current Zoning: R-3 (single family residential) Proposed Zoning: UR-2(CD) (urban residential, conditional) with five-year
More informationSTRATHEARN HEIGHTS APARTMENTS PARKLAND IMPACT ASSESSMENT
STRATHEARN HEIGHTS APARTMENTS PARKLAND IMPACT ASSESSMENT This document is submitted with the DC2 Application to the City of Edmonton on behalf of Rockwell Investments Ltd. and Nearctic Development Corporation
More informationEast Central Area Plan
East Central Area Plan Steering Committee Meeting March 14 th, 2019 Tears-McFarlane House Community Room East Central Area Plan Steering Committee Meeting March 14, 2019 CHUN Tears-McFarlane House Community
More informationShared Principles and Emerging Plan Directions
Shared Principles and Emerging Plan Directions Introduction Since the Fairfield Neighbourhood planning process launched in June 2016, we have heard from many residents, businesses, groups and other people
More informationNOTES FROM PUBLIC MEETING #3 AUGUST 30, 2017
NOTES FROM PUBLIC MEETING #3 AUGUST 30, 2017 1. MEETING SUMMARY & MAIN POINTS The community meeting consisted of one overview presentation and two small group discussions of preferred approaches to Hale
More informationCity Plan Commission Briefing #2
City Plan Commission Briefing #2 August 2, 2016 Image Source City of Richardson Agenda Project Overview / Progress to Date Property and Business Owner Meeting Series 2 Community Workshop 2 Belt Line Road
More information1.0 Purpose of a Secondary Plan for the Masonville Transit Village
Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village
More informationWelcome to the Oakridge Centre Open House
Welcome to the Oakridge Centre Open House Why is the City hosting this event? This open house is to inform you of a rezoning application submitted to the City of Vancouver to amend the existing CD-1 (Comprehensive
More informationPrecinct Q Location. Figure 1. Landmark
V:\\active\00\drawing\01_predesign\options\Final Report\Revised Figures September 2012\Ridgewood-Report_Fig1-2.dwg, //2012 12:0:20 PM V:\\active\00\drawing\01_predesign\options\Final Report\Revised Figures
More informationEast Area Plan. Steering Committee Meeting May 24, Art Gym Denver
East Area Plan Steering Committee Meeting May 24, 2018 Art Gym Denver East Area Plan Steering Committee Meeting May 24, 2018 ArtGym Denver, 1460 Leyden Street AGENDA 1 6:00-6:05 Approval of April Meeting
More informationBurloak Drive Grade Separation
Burloak Drive Grade Separation Transit Project Assessment Process Public Meeting #1 March 30, 2017 GO Lakeshore West Service Plan Weekday Rush Hour 15-minute, two-way service between Aldershot* and Union
More informationSmart Growth Development Checklist
2004 Smart Growth Development Checklist Smart Growth Development Checklist Corporation of the City of New Westminster Guide and manage growth in a manner which is consistent with the principles of sustainable
More informationPotential Green Infrastructure Strategies May 6, 2015 Workshop
Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National
More informationSUMMARY OF KEY POINTS FROM PUBLIC OPINIONS EXPRESSED DURING THE MUNICIPAL PLAN REVIEW PUBLIC CONSULTATION SESSIONS
SUMMARY OF KEY POINTS FROM PUBLIC OPINIONS EXPRESSED DURING THE MUNICIPAL PLAN REVIEW PUBLIC CONSULTATION SESSIONS Page 1 SUMMARY OF KEY POINTS FROM PUBLIC OPINIONS EXPRESSED DURING THE MUNICIPAL PLAN
More informationTABLE OF CONTENTS. Building Great Neighbourhoods. Working together to make the most out of your neighbourhood.
1 What We Heard Report October 2018 City of Edmonton Building Great Neighbourhoods TABLE OF CONTENTS 1. Introduction PG 2 2. Objectives PG 2 3. Public Engagement and Communications Methods PG 3 4. About
More informationSt. Clair Avenue West Area Transportation Master Plan
1 (Between Keele Street and Old Weston Road) Public Information Centre 1 December 2, 2015 2 Welcome Welcome to the first Public Information Centre for the St. Clair Avenue West Area. The panels will present
More informationFurther input invited as Colchester Growth Strategy nears final phase
IUE 3 / NOVEMBER 2015 Further input invited as Colchester Growth trategy nears final phase trathcona County is seeking public feedback as it enters the final phase of work on a Growth Management trategy
More informationPublic Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill. March 30, 2017
Public Open House Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017 Open House Review of Project Purpose and Process Policy Refresher Highlights of
More informationBURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE JANUARY 25, 2018 PUBLIC MEETING
BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE JANUARY 25, 2018 PUBLIC MEETING 1 PRESENTATION OUTLINE History of the Burton Station SGA Plan Changes since the Plan Adoption City Infrastructure Projects
More informationCity of Charlottesville
City of Charlottesville MEMORANDUM To: Charlottesville Planning Commission From: Ebony Walden, Neighborhood Planner and Missy Creasy, Planning Manager Date: November 15, 2012 Re: Comprehensive Plan Fall
More informationPublic input has been an important part of the plan development process.
Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the
More informationPlanning, Property and Development Department Report. To the Riel Community Committee
Planning, Property and Development Department Report To the Riel Community Committee Date: October 30, 2006 File: SP 5/2006 Subject: Waverley West Northeast Neighbourhood Area Structure Plan Location:
More informationPART 1: PROJECT SUMMARY. The application is Attachment A. The site plan is Attachment B.
Belleterre Subdivision Sketch Plan Town Board 8.7.17 Belleterre Subdivision Sketch Plan PART 1: PROJECT SUMMARY Applicant: Bowman Development Project Size: +/- 20.85 acres Parcel Number: 01115104 and 01115121
More informationPublic may provide comments on the GDP within the next two weeks (December 24)
25/70 General Development Plan (GDP) Public Meeting Wednesday, December 10, 2014 6:00 8:00 P.M. District 1 Police Station Community Room 1311 W 46th Ave, Denver, CO 80211 Council Woman Montero: This particular
More informationWELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm
WELCOME 50 street cp rail grade separation + road widening public information session #1 June 26, 2018 5 pm to 8 pm session purpose To provide residents, businesses, and users of 50 Street with the opportunity
More informationSUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting
Page 1 of Report PB-76-17 SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO TO: FROM: Planning and Development Committee - Public Meeting Planning and Building
More information4-Town Comprehensive Plan DRAFT 7/30/07
4-Town Comprehensive Plan DRAFT 7/30/07 Acknowledgements ning Committee Town of Harrisburg Norman Roof Randy Nicol Town of Martinsburg Terry Thisse Paul Kelly Town of Montague Jan Bagdanowicz Wendy Perry
More informationReport to: Development Services Committee Report Date: April 24, 2017
SUBJECT: Cornell Rouge National Urban Park Gateway - Report on Design Charrette and Next Steps PREPARED BY: Lilli Duoba, MES, MCIP, RPP, Manager, Natural Heritage (ext. 7925) REVIEWED BY: Marg Wouters,
More informationLAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017
Page 1 of 10 EXECUTIVE SUMMARY This Land Use Amendment application seeks to redesignate a full downtown block (currently the YWCA site) from a Direct Control based on the CM-2 District (Land Use Bylaw
More informationAccess Management: An Overview
Figures 1-5 Below Evolution of development along a highway. In the early stages, land along the road is used for farming with little traffic generated. As time passes, the highway corridor becomes a de
More informationCommunity Visioning Workshop Prep
Community Visioning Workshop Prep Visioning Workshop 73 Visioning Workshop: Public Events 1 2 3 4 74 Visioning Workshop: draft Schedule 75 Visioning Workshop: draft Schedule working to schedule stakeholder
More informationApril 21, 2007 CCRP Workshop Summary
April 21, 2007 CCRP Workshop Summary Group 1 1. Reuse around BART with a lot of housing and jobs 2. Greenway around creek 3. Transit and auto connection all through the site from Kirker Pass to Port Chicago
More informationSTREETSCAPE MANUAL ONLINE TRAINING SESSION 1: Background
TRAINING SESSION 1: The Urban Design Streetscape Manual is a reference tool developed to help implement City policy and guide the design, construction and maintenance of streetscape improvements in Toronto.
More informationThe petition proposes to rezone the site to allow all uses permitted in the B-1 (neighborhood business) district.
Rezoning Petition 2018-040 Pre-Hearing Staff Analysis June 18, 2018 REQUEST Current Zoning: R-17MF (multi-family residential) Proposed Zoning: B-1 (neighborhood business) LOCATION Approximately 0.38 acres
More informationJohn M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference
Report to Planning and Environment Committee To: From: Subject: Chair and Members Planning & Environment Committee John M. Fleming Managing Director, Planning and City Planner Old East Village Dundas Street
More informationUTSC SECONDARY PLAN COMMUNITY OPEN HOUSE
WELCOME TO THE UTSC SECONDARY PLAN COMMUNITY OPEN HOUSE 1 Welcome to the first Community Open House for the UTSC Secondary Plan. Hosted by the University of Toronto Scarborough (UTSC), the following panels
More informationCoronation Park Neighbourhood Plan. Open House #2 15 September 2016
Coronation Park Neighbourhood Plan Open House #2 15 September 2016 Outline What is a Neighbourhood Plan? Project Status Update Policy Context Refresher Coronation Park Yesterday & Today What We Heard -
More informationCity of Grande Prairie Development Services Department
City of Grande Prairie Development Services Department ROYAL OAKS NORTH OUTLINE PLAN OP-07-03 NW 35-71-6 W6M May 7, 2007 Royal Oaks North Outline Plan TABLE OF CONTENTS 1.0 INTRODUCTION........ 3 1.1 Purpose
More informationSea Level Rise Workshop #4 May 22, 2018 Venice Local Coastal Program SUMMARY
Sea Level Rise Workshop #4 May 22, 2018 Venice Local Coastal Program SUMMARY CONTENTS WORKSHOP OVERVIEW... 1 WORKSHOP OBJECTIVES... 2 WHERE AND WHEN... 2 OUTREACH AND ATTENDENCE... 2 FORMAT AND ACTIVITIES...
More informationSQUAMISH 2010 AND BEYOND COMMUNITY VISION
Our plan has been imagined and created to be both pragmatic and visionary. At the core of the strategy is a consideration of the highway s role and its impact on the community. First and foremost in creating
More informationCity Council Special Meeting AGENDA ITEM NO. C.
City Council Special Meeting AGENDA ITEM NO. C. DATE: 01/04/2019 TO: Honorable Mayor and City Council Members SUBJECT: Transit Villages Specific Plan project Study Session (Development Services Director
More informationJASPER PLACE. Area Redevelopment Plan
JASPER PLACE Area Redevelopment Plan Executive Summary Jasper Place is an established community where people live, work and play. The Jasper Place Area Redevelopment Plan (ARP) provides a tool to help
More informationTHREE-YEAR CAPITAL IMPROVEMENT PLAN FY
THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering
More informationINTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB
INTRODUCTION This event is being hosted by the promoters of the proposed North Heybridge Garden Suburb who are working with Maldon District Council and other key stakeholders on the preparation of a comprehensive
More informationOPEN HOUSE. Future. Neighborhood. Thursday April 27, :30 8:30 PM Refreshments provided Discovery Center, 4444 Hadley Avenue North
OPEN HOUSE Thursday April 27, 2017 6:30 8:30 PM Refreshments provided Discovery Center, 4444 Hadley Avenue North The City Council has ini ated a planning process to guide future development on 206 acres
More informationStanley Greene District Downsview (80 Carl Hall Road) Zoning By-law Amendment and Draft Plan of Subdivision Applications Request for Direction Report
STAFF REPORT ACTION REQUIRED Stanley Greene District Downsview (80 Carl Hall Road) Zoning By-law Amendment and Draft Plan of Subdivision Applications Request for Direction Report Date: December 16, 2011
More informationLOW DENSITY RESIDENTIAL
LOW DENSITY RESIDENTIAL Corner lots with coach houses to increase diversity, provide unity to the streetscape and increase eyes on the street. Garages and ancillary units accessed via rear lanes. Parking
More informationEngagement Summary Gastown Streets: Local Business Visioning Workshop
Engagement Summary Gastown Streets: Local Business Visioning Workshop Gastown s streets are in need of major repair and rehabilitation and we have a once in a lifetime opportunity to holistically plan
More informationAtlanta BeltLine Subarea 3 Master Plan Update
Atlanta BeltLine Subarea 3 Master Plan Update April 14, 2018 Workshop Meeting 1 22 miles, connecting 45 neighborhoods 22 MILES of transit 46 MILES of streetscapes and complete streets 33 MILES of urban
More informationWelcome to our exhibition
Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes
More information2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016
2035 General Plan Update and Belmont Village Specific Plan Joint Study with the City Council and Planning Commission April 12, 2016 Agenda 1. Welcome and Introductions 2. General Plan Update Status of
More informationBROADWAY-ARBUTUS POLICIES. Adopted by City Council on July 7, NOTE: To be considered in combination with applicable guidelines
50 City of Vancouver Land Use and Development Policies and Guidelines Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 873.7344 fax 873.7060 planning@city.vancouver.bc.ca BROADWAY-ARBUTUS POLICIES
More informationMary Hills Nature Area. Roadway Lighting. The Minneapolis Clinic of Neurology Courage Kenny Rehabilitation Institute
PUBLIC REALM IMPROVEMENTS Mary Hills Nature Area Enhanced Programming Glenview Terrace Valley View Roadway Lighting Enhanced Streetscape Trail Lighting / Roadway Lighting Wayfinding Public Art The Minneapolis
More informationCENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES
WELCOME Thank you for coming to our consultation event to find out more about our emerging proposals for Hayfield Park, a residential development jointly promoted by the Hayfield Consortium: Martin Grant
More informationVillage of Glenview Plan Commission
Village of Glenview Plan Commission STAFF REPORT January 22, 2019 TO: Chairman and Plan Commissioners CASE #: P2018-047 FROM: Community Development Department CASE MANAGER: Tony Repp, Senior Planner SUBJECT:
More informationExecutive Summary. NY 7 / NY 2 Corridor
Executive Summary NY 7 / NY 2 Corridor Transportation and Land Use Study December 2005 Prepared for: Town of Colonie Capital District Transportation Committee Prepared by: Introduction: Land use decisions
More informationAgincourt Mall Planning Framework Review Public Open House #2 Consultation Summary
Agincourt Mall Planning Framework Review Public Open House #2 Consultation Summary This summary provides a high level summary of participant feedback. It is not intended to provide a verbatim transcript
More informationRESEDA - WEST VAN NUYS COMMUNITY PLAN
RESEDA - WEST VAN NUYS COMMUNITY PLAN Executive Summary As part of the initial outreach effort, the Department of City Planning hosted two workshops for the Reseda-West Van Nuys Community Plan Area during
More informationEnvision Concord Public Event Part 3. October 21, :30 AM 12:00 PM Concord-Carlisle High School Cafeteria
Envision Concord Public Event October 21, 2017 9:30 AM 12:00 PM Concord-Carlisle High School Cafeteria Survey Responses + Emerging Priority Areas Summary from Spring Kick-Off Event Envision Concord Survey
More informationOne said, without a clear understanding of what will be annexed, this is an exercise in futility.
Stakeholder Focus Groups: Summary of Meetings Stakeholder Focus Group meetings were held on at the Pinellas County Planning Department conference room. Focus Group meetings will be held during each of
More informationThe following principles guide the development of goals and strategies to protect and promote these amenities:
OPEN SPACE/PARKS/TRAILS/RECREATION GOALS/STRATEGIES Cherry Hills Village is a living environment that offers low density development, open areas, public scenic vistas, public trails and public parks. This
More informationRe: Keeping Special Area D North of Jensen Lane In the Town Of Windsor s Urban Growth Boundary
Attachment 2a April 15, 2016 Town of Windsor Community Development Department Linda Kelly, Town Manager Toni Bertolero, Interim Community Development Director Town Council Members 9291 Old Redwood Highway
More informationLeonard s Beach Secondary Plan (Alcona North) Official Plan Amendment
Leonard s Beach Secondary Plan (Alcona North) Official Plan Amendment Public Meeting Presentation August 14, 2013 Note: This document is for presentation purposes only. Please see Staff Report DSR-135-13
More informationMEETING PURPOSE AND OVERVIEW
MEETING PURPOSE AND OVERVIEW On February 23, 2012, the City of Elk Grove hosted the first of two community workshops related to the Southeast Policy Area. The workshop was held from 6:00 8:30 p.m. in the
More informationSCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference
Scarborough Subway Extension Final Terms of Reference 1 1.0 Introduction and Background 1.1 Introduction Toronto City Council recently confirmed support for an extension of the Bloor-Danforth Subway from
More informationEdward R. Sajecki Commissioner of Planning and Building. Land Use Review- Former Parkway Belt West Lands- Fieldgate Drive and Audubon Boulevard
Corporate Report Clerk s Files Originator s Files CD.04.FOR DATE: November 15, 2011 TO: FROM: SUBJECT: Chair and Members of Planning and Development Committee Meeting Date: December 5, 2011 Edward R. Sajecki
More informationCIP Meeting 3 Summary April 28, 2017 Page 1 of 7
Lambeth Area Community Improvement Plan Launch Community Meeting #3 Summary Tuesday, March 28, 2017 6:30 pm to 8:30 pm Lambeth Community Centre Gymnasium, 7112 Beattie Street 1. Project Summary The City
More informationBuilding Great Neighbourhoods. Strathcona
Building Great Neighbourhoods Strathcona March 21, 2018 Becky Redford Project Manager, Planning & Design Building Great Neighbourhoods Integrated Infrastructure Services Welcome and Purpose To provide
More informationSection4 Design Vision & Implementation Plan
Section4 Design Vision & Implementation Plan W Woodschurch Rd 4.1 Design Focus Areas The Framework Plan is simply the starting point for directing the design and implementation of a wide range of transportation
More informationThe Lincoln Neighborhood Corridor Plan. The LiNC
October 1, 2014 Planning Commission Study Session The Lincoln Neighborhood Corridor Plan The LiNC Purpose of Tonight s Meeting Introduction to The LiNC Review of Existing Conditions and Community Identified
More informationADMINISTRATION RECOMMENDATION(S) 2018 January 25. That Calgary Planning Commission recommend APPROVAL of the proposed Land Use Amendment.
Page 1 of 9 EXECUTIVE SUMMARY This land use amendment proposes to redesignate a parcel from DC Direct Control District to Multi-Residential Contextual Grade-Oriented (M-CG) District to allow for multi-residential
More informationDOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE
DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE Overview I. Draft Plan Process II. Draft Plan Overview a. Market Analysis b. Master Land Use Plan
More informationNorth Fair Oaks Community Plan Summary and Information
North Fair Oaks Community Plan Summary and Information WHAT IS THE NORTH FAIR OAKS COMMUNITY PLAN? The North Fair Oaks Community Plan is part of the San Mateo County General Plan, and establishes policies
More informationWELCOME CPT CORRIDOR AREA PROJECT BACKGROUND BROOKSIDE BLVD. The objectives of the CPT Functional Design Study included:
1 WELCOME Welcome to the Public Information Session for the Functional Design Study of the Chief Peguis Trail Extension West from Main Street to Brookside Boulevard PROJECT BACKGROUND The objectives of
More information