DuPage Mayors and Managers Conference June 21, 2013 TRANSPORTATION PROGRAM (STP) WORKSHOP
|
|
- Kelly O’Neal’
- 5 years ago
- Views:
Transcription
1 DuPage Mayors and Managers Conference June 21, 2013 TRANSPORTATION PROGRAM (STP) WORKSHOP Lombard Village Hall Marilin Solomon, P.E. Field Engineer West Division (Central & North Central Cook County, DuPage County, and Kane County) IDOT, Bureau of Local Roads and Streets (BLRS) 1
2 Phase I Coordination Field Engineers process ALL Phase I for projects within their area for all fund sources, Local, State and/or Federal. NORTH: Alex Househ, P.E. Lake, McHenry, North Shore and Northwest Cook SOUTH: Kevin Stallworth, P.E. Will, South and Southwest Cook EAST: Zubair Haider, P.E. City of Chicago, Cook County Highway Department, Cook County Forest Preserve WEST: Marilin Solomon, P.E. DuPage, Kane, Central and North Central Cook 2
3 Field Engineer s Responsibilities Federal projects (Phase I) Locally-Let Federal projects (Phase I and II) All MFT-funded projects State-funded projects for which local agency is the lead 3
4 Federal Phase 1 Kick-off Meeting Planning Liaison should schedule and attend (or at least concur with) meeting If Fed funds in Phase 1, Engr Agreement must be executed The following documents are suggested: Location Map (show FA routes, functional class, etc.) Plan Sheet(s) with aerial (recommended) Existing and Proposed Typical Sections Initial Project Coordination form (BLR22410) 4
5 Phase I Categories: LAFO (Local Agency Functional Overlay) CE1 Projects (Group I) NOT Requiring a PDR Requiring a PDR (Project Development Report) CE 2 Projects (Group II) Environmental Assessments (EA) 5
6 6 Local Agency Functional Overlay (LAFO) BLRS Manual Chapter 46, section 46-3 At least 1 block in Urban, or 1 mile in Rural. HMA Overlay up to 3.75 inches. Mill to any depth, HMA replacement to thickness of mill plus 2 inches 10% patching. 20% base repair. Small % curb & gutter improvements. No ROW acquisition or geometric improvements Submittals: BLR Form BLR with location map and typical sections Bridge Clearances by IDOT Bridge Unit (if resurfacing over a bridge): Detour Approval by IDOT (if applicable) Design Approval is granted by District 1 (not Central Office)
7 7 CE 1 Projects NOT requiring PDR BLRS Manual, Chapter 19, section No potential for Unusual Circumstances : No ROW acquisition (or minimal ROW acquisition) No geometric changes (or minimal geometric changes) No major environmental impacts Examples: resurfacing, sidewalks, signals, signing, lighting, landscaping, etc. Intersection Improvement Projects (if no major environmental impacts, no additional through lanes) Submittals: Form BLR with location map and typical sections: Plans/ Profiles required for new sidewalk Environmental and Special Waste clearances attached (if applicable) Approvals from various IDOT bureaus attached (if State route) IDS (if applicable) Design Approval is granted by District 1 (not Central Office)
8 CE 1 Projects requiring PDR BLRS Manual, Chapter 19, section Generally requires more documentation than CE1 without PDR No potential for Unusual Circumstances : No ROW acquisition (or minimal ROW acquisition) No geometric changes (or minimal geometric changes) No major environmental impacts Examples: roadway resurfacing with minimal widening, bike/pedestrian paths with minimal ROW/environmental impacts Submittals: Preparation of Project Development Report (PDR), BLR Design Approval is granted by District 1 (not Central Office) 8
9 CE 2 Projects BLRS Manual, Chapter 19, section Potential for Unusual Circumstances Significant environmental impacts and/or controversy Significant impacts on historic areas, historic structures Significant issues regarding Section 4(f) or Section 106 (Parks & Public Lands) Substantial changes in access, access control, or traffic patterns Examples Bridge Removal and Replacement Adding through lane(s) Shifting alignment FHWA/IDOT Coordination Meeting (for approval of CE determination) Submittals: Preparation of Project Development Report (PDR), BLR Take note of the following: Use 2040 Projected Traffic Accidents for the last five (5) years with crash diagrams (new) Any Noise Analysis prior to August 2011 must be updated (new) Design Approval is granted by Central Office
10 Environmental Assessment (EA) Referenced in BLRS Manual, Chapter 19, section Generally, larger scope than most CE2 projects Examples: New interchange New roadway on new alignment (including bypasses) Project with substantial environmental controversy Actions in which the significance of the environmental impact is not clearly established FHWA/IDOT Coordination Meetings EA is required to determine the appropriate environmental document required. Numerous Design Submittal Documents 10
11 Phase I Engineering Environmental Survey Request (ESR) 11
12 Screening Cultural Resources: 12 Any right-of-way or easements required? Are the limits of the proposed project located within or adjacent to (share a common point or side) the boundaries of a historic district or building? Are 50 years and older houses within the project limits? Is the bridge on the historic bridge list? Is it a 50 years and older bridge? Note: Photographs for 50 years and older houses are required if working within or adjacent to historic district If the answer is No to these questions, no cultural resources survey request needed. If you Don t Know, please contact Field Engineer. Screening Biological & Wetland Resources: Any right-of-way or easements required? Any tree removal? Project screening for ESR Any in-stream work (bridge or culvert replacement/rehab) within the project limits? Any work that will potentially affect a recognized Illinois Natural Inventory (INAI) site or dedicated Nature Preserve? Any wetland within the project area (see NWI map and/or field observation)? If the answer is No to these questions, no biological or wetland resources survey request needed. If you Don t Know, please contact Field Engineer.
13 ESR Submittal for Special Waste Required if the following is involved: Digging / linear excavation within State ROW ROW acquired in the name of the State ESR submitted online at Submit HARD COPIES of the following documents to Local Roads Field Engineer: Location Map (2 copies) Aerial Exhibit (2 copies) CD including the location map and aerial in pdf format, plus Shape Files. (1 copy) PESA Results or In-house signoff must be granted before Phase 1 Design Approval. Preliminary Environmental Site Assessment (PESA) Required when excavated material is removed from State ROW May take 6-8 months In-house Special Waste Sign-Off Possibly granted if all excavated material stays within State ROW Usually granted within two weeks of initial ESR submittal. 13
14 Cultural Resources Clearance does not expire. Biological Resources Clearance expires two (2) years after initial clearance date Wetland delineations expire five (5) years after the delineators are initiated. If the project letting date is scheduled beyond the five (5) year timeframe The Preliminary Environmental Site Assessment (PESA) is valid for six (6) months. After the initial six (6) months, the PESA requires validation, which is performed in-district by the Special Waste Coordinator. The PESA can be validated every six (6) months for up to three (3) years. After three (3) years the PESA shall be redone to update existing geologic conditions. The Preliminary Site Assessment (PSI) is valid for five (5) years. 14 Environment Clearance Expiration Timeframe
15 Wetland Impact Evaluation (WIE) Required for all projects that are surveyed for wetlands and determined to have wetlands within the study area Entirely electronic submittal (should be submitted after ESR) WIE submitted online at Wetland Report is submitted electronically to IDOT s ftp site ftp://ftp.dot.il.gov 15
16 16 Bridges
17 BRIDGE PROJECT REQUIREMENTS (Bridge Condition Report) BLRS Manual, Chapter 22, section Bridge Rehabilitation requires Complete BCR including: Administrative, geographical information Results of visual inspection Verification of reuse of existing bridge elements Color photos and justification for the rehabilitation Total Bridge Replacement requires Abbreviated BCR: Short description along with photo(s) Submit 3 copies of the BCR to Local Roads Field Engineer. Field Engineer will coordinate with Bridge Office for approval 17
18 BRIDGE PROJECT REQUIREMENTS (cont d) (Preliminary Bridge Design and Hydraulic Report) BLRS Manual, Chapter 10, section PBDHR submittal should include: Form BLR (PBDHR) Type, Size and Location (TS&L) Drawing Scour Critical Evaluation Coding Report Form Scour Analysis Foundation Information Roadway Plan & Profile BLR (Asbestos Determination Certification) Submit 4 copies of the PBDHR to Local Roads Field Engineer District 1 Local Roads will provide review, comment and approval of the hydraulics Field Engineer will coordinate with Bridge Office for approval of preliminary bridge design 18
19 OTHER REQUIREMENTS FOR STRUCTURES Retaining Wall (7 (new) or greater from ground level) must be reviewed and approved by Bridge Office Need Structural Engineer (S.E.) stamp & signature, as well as consultant s P.E. stamp & signature for all structures (in Phase II) of Plans, Specifications & Estimates (PS&E) 19
20 Field Engineer Contact Information Alex Househ: Asst. Field Engineer: Kaamil Tayyab Marilin Solomon: Asst. Field Engineer: Suleyman Tulgar Kevin Stallworth: Asst. Field Engineer: Michelle Davis-Byrd Zubair Haider: Asst. Field Engineer: Ben Hartman Address: Illinois Department of Transportation Bureau of Local Roads and Streets 201 West Center Court Schaumburg, IL Fax: (847)
21 Thank You! QUESTIONS?? 21
SECTION 4(f) DE MINIMIS DOCUMENTATION
SECTION 4(f) DE MINIMIS DOCUMENTATION Illinois Route 60/83 IL 176 to the intersection of IL 60 (Townline Road) Lake County P-91-084-07 Mundelein Park and Recreation District Project Limit SECTION 4(f)
More informationThe Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass
The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn
More informationLongmeadow Parkway Fox River Bridge Corridor. August 6, 2015
Longmeadow Parkway Fox River Bridge Corridor August 6, 2015 Longmeadow Parkway Bridge Corridor 5.6 miles from Huntley Road to IL 62 Unique municipal/county/state/federal partnership Links Randall Road
More informationThe Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the
The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the first Public Meeting for the proposed interchange improvement
More informationPROJECT BACKGROUND. Preliminary Design Scope and Tasks
PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of
More informationSAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY
KICK-OFF PRESENTATION SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PROJECT IDENTIFICATION NUMBER (PID): #001036A May 13, 2015 1 2 PROJECT LOCATION PROJECT HISTORY
More informationAlternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:
Race Road/Jessup Village Planning Study (H550601) Project Newsletter Spring 2015 Project Description The Study Team, consisting of staff from Anne Arundel County (Department of Public Works and Department
More informationFinal Design Activity Descriptions July, 2017
Final Design Activity Descriptions July, 2017 Check the Capital Project Delivery website to ensure this is the current version. Table of Contents Final Design Final Design Initiated (4000)... 7 Initiate
More informationWELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A
WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project
More informationITS Concept Development Activity Descriptions
ITS Concept Development Activity Descriptions October 2015 Procedures are subject to change without notice. Check the NJDOT website to ensure this is the current version. Table of Contents Concept Development
More informationSTATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION
STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION Suite 900 - James K. Polk Building 505 Deaderick Street Nashville, Tennessee 37243-0334 MEMORANDUM TO: FROM: Files Joe W. Matlock,
More informationRFP REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH. DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway
RFP 61-18 REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway Sealed Requests for Proposals, plainly marked RFP 61-18 Design Engineering Services
More informationTOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST
TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST Applications: 5 copies of application - Applicant will reproduce the copies at his/her costs. The Township Clerk
More informationPLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017
& PUD-0000102-2017 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 NAME SUBDIVISION NAME Dauphin Creek Estates Subdivision Dauphin Creek Estates Subdivision LOCATION CITY COUNCIL
More informationFall 2017 Construction Update
Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,
More informationPublic Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.
Public Hearing Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, 2019 open house at 4 p.m., formal presentation at 5 p.m. Welcome to the Public Hearing for the Harborview Road (CR 776)
More informationNorth Carolina Department of Transportation Project Development and Environmental Analysis Branch
North Carolina Department of Transportation Project Development and Environmental Analysis Branch Citizens Informational Workshop I-85, from I-485 to NC 73 Mecklenburg and Cabarrus Counties October 30,
More informationAGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:
AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: March 7, 2016 AGENDA ITEM: Consideration of approval of a resolution approving Engineering Services Amendment No. 1 with
More informationKankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016
Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment May 5, 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service
More informationSH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017
Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year
More informationARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)
ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25) Preliminary Design Report February 2015 Prepared For: City of Inver Grove Heights Dakota County Prepared By: Kimley-Horn and Associates,
More informationBucks Bar Road Bridge Project Public Informational Meeting Wednesday, January 6, 2010
PRESENTED BY: Bucks Bar Road Bridge Project Public Informational Meeting Wednesday, January 6, 2010 Matthew Smeltzer, P.E. Deputy Director of Engineering, DOT Supervisor Ray Nutting El Dorado County, District
More informationSection 4(f) De minimis Impact Documentation
1. Project Description Section 4(f) De minimis Impact Documentation Wadsworth Road at Kilbourne Road Section No. 13-00999-47-ES Lake County Forest Preserve District Lake County, Illinois a. Project Number:
More informationOverall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.
Overall Map Summit Chicago Bloomington-Normal Lincoln New Station Planned New Station Planned Dwight Pontiac Joliet Pedestrian overpass and second platform planned Higher speed service began in this section
More informationElgin O Hare Western Access Project Local Advisory Committee. February 10, 2014
Elgin O Hare Western Access Project Local Advisory Committee February 10, 2014 Agenda Project status update Design and construction Funding Aesthetics Project events and outreach Land acquisition Next
More informationPREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY
PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY SEPTEMBER 2016 Introduction The Platteview Road Corridor Study was led by the Metropolitan Area Planning Agency (MAPA) with assistance from
More informationIOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014
IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014 INTRODUCTION The City of Cedar Falls and the Iowa Department of Transportation are conducting a Public Informational
More informationDESIGN CRITERIA PACKAGE
RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA
More informationProject Overview. Get Involved. Public Information Meeting. Contact Information
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationChecklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:
Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number
More informationOVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS
OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS Caldwell County Pathways along with our co-partners City of Lenoir, Town of Gamewell,
More informationProject Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationAppendix I. Checklists
Appendix I Checklists Town of Greenwich Drainage Manual Department of Public Works - Engineering Division Town Hall - 101 Field Point Road, Greenwich, CT 06836-2540 Phone 203-622-7767 - Fax 203-622-7747
More informationHunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL
Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL Agenda Design Concept Report Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Questions Design Concept Report
More information7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES
7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES The following list of social, economic, and environmental issues have been identified based on a preliminary inventory of resources in the project area, an
More informationPROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.
PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. 67 HEARING LOCATION: ERICKSEN COMMUNITY CENTER 1401 11 TH AVENUE NORTH
More informationChesterfield County Project Update
Chesterfield County Project Update SOUTHEAST HIGH SPEED RAIL TIER II ENVIRONMENTAL IMPACT STATEMENT RICHMOND, VA, TO RALEIGH, NC CHESTERFIELD COUNTY, VA OFFICIALS BRIEFING February 2013 Federal Railroad
More informationPennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP.
(10/27/14) PennDOT Section 106 Field Assessments and Finding Combined Early tification/finding? Yes Concurrence required or requested: Yes MPMS: 51507 ER# (if consultation with PHMC required) ): County:
More informationPLANNED UNIT DEVELOPMENT APPLICATION
PLANNED UNIT DEVELOPMENT APPLICATION CITY OF THE DALLES Community Development Department 313 Court Street The Dalles, OR 97058 (541) 296-5481, ext. 1125 Fax (541) 298-5490 www.ci.the-dalles.or.us Date
More informationHarlem Avenue Corridor Plan: Corridor Planning Across Municipal Boundaries
Harlem Avenue Corridor Plan: Corridor Planning Across Municipal Boundaries Heather Tabbert, Manager, Local Planning and Programs Division Regional Transportation Authority (RTA) Jen McNeil Dhadwal, Principal
More information13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road
13. corner of 159 th Street and Quivira Road 1. APPLICANT: HNTB Corporation is the applicant for this request. 2. REQUESTED ACTION: The applicant is requesting approval of a preliminary plat for a 383-lot
More informationFY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Schooleys Mountain Bridge Rehabilitation Project ID Numbers: N1707 / 173470 Schooleys Mountain Road Bridge was built in 1920 and widened in 1937. The project is a replacement of the bridge structure and
More informationCAG Meeting #4 Summary
General Information, Overview, Purpose, and Goals The fourth Community Advisory Group (CAG) meeting for the Sugar Grove Parkway (IL 47) Interchange at the Reagan Memorial Tollway (I-88) Improvement Study
More informationPlat Requirements CHECKLIST FOR SITE PLAN REVIEW
This checklist is to be used as a guide for complying with the Town of Hollis Site Plan Regulations. It is to be used for each individual site plan review application submitted. Applicants are encouraged
More informationTHREE-YEAR CAPITAL IMPROVEMENT PLAN FY
THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering
More informationCongestion Management Safety Plan. Michael Corbett State Program Administrator September 2017
Congestion Management Safety Plan Michael Corbett State Program Administrator September 2017 Agenda Topic 1 What is the Congestion Management Safety Plan (CMSP)? 2 Relevance to Congestion Investments 3
More informationEngineering Department R.H. Thomson Freeway Records,
Engineering Department R.H. Thomson Freeway Records, 1958-1977 Overview of the Collection Creator Seattle (Wash.). Engineering Dept. Title Engineering Department R.H. Thomson Freeway Records Dates 1958-1977
More informationDESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED
DESIGN PUBLIC HEARING MAY 10, 2018 AT GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED Reconstruction of Granby Road/West State Street (Route
More informationPARKLET PROPOSAL PACKAGE & PROCESS
500.3 I PARKLETS The term parklet refers to a small temporary constructed seating or community gathering area over an on-street parking space or an extension of the sidewalk into the operating State highway
More informationCapital Projects in and near Odenton Town Center
Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately
More informationANTONIO R. VILLARAIGOSA MAYOR. Transmitted herewith, is the City Engineer's report dated September 28, 2006 for Council review and approval of:
BOARD OF PUBLIC WORKS MEMBERS CYNTHIA M. RUIZ PRESIDENT VALERIE LYNNE SHAW COMMISSIONER YOLANDA FUENTES COMMISSIONER DAVID SICKLER COMMISSIONER - c.tv OF LOS ANGELt:S CALIFORNIA DEPARTMENT OF PUBLIC WORKS
More informationServices Department F May 28, 2007
Report To: Development Services Committee Item: Date of Report: From: DS-07-144 May 23, 2007 Commissioner, Development File: Date of Meeting: Services Department F-7000-0013 May 28, 2007 Subject: Gibb
More informationNORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary
Executive Summary Background As congestion continues to affect mobility in the region, the Ozarks Transportation Organization (OTO) is particularly concerned with traffic movement. The North-South Corridor
More informationPUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204
DISTRICT TWO PUBLIC HEARING I 10 (SR 8) from I 295 to I 95 Project Development & Environment Study Duval County, Florida Financial Project Number 213326 2 22 01 Efficient Transportation Decision Making
More informationSITE PLAN REVIEW APPLICATION AND CHECKLIST
SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description
More informationMeeting Purpose: Date and Time: Location: Attendance: Handouts:
Meeting Purpose: Date and Time: Location: Attendance: Handouts: PA Turnpike / I-95 Interchange Project Design Advisory Committee (DAC)/Public Officials Meeting #8 April 12, 2012 at 1:30 p.m. Project Office,
More informationAgenda. Introductions and Overview Study Purpose Study Approach Key Analysis Components Study Context Development Activity ( )
October 5, 2017 Agenda Introductions and Overview Study Purpose Study Approach Key Analysis Components Study Context Development Activity (2005-2017) Existing Conditions Alternatives Public Engagement
More informationSEWRPC. Joint Meeting of the Advisory Committees on Regional Land Use Planning and Regional Transportation Planning APRIL 26, 2018
SEWRPC Joint Meeting of the Advisory Committees on Regional Land Use Planning and Regional Transportation Planning APRIL 26, 2018 WISCONSIN DEPARTMENT OF TRANSPORTATION BRETT WALLACE, FOXCONN PROJECT DIRECTOR
More informationBEST PRACTICES FOR PROJECT NOMINATIONS TA Set-Aside Program
BEST PRACTICES FOR PROJECT NOMINATIONS 2017 TA Set-Aside Program Focus of this presentation Photos Public Support Maps & Exhibits Proposed Budget Design Details Project Evaluation & Selection Criteria
More informationCitizen Information Meeting
Prince William County Government Citizen Information Meeting Vint Hill Road Extension May 11, 2016 Benefits: Route 28 Corridor Improvement Program Estimated significant cost savings versus bidding these
More informationUS 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007
US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007 Sponsored by: The Ohio Department of Transportation and The City of Defiance Project
More informationParapet/Formliner/Fencing
Parapet/Formliner/Fencing Cross Parapet/Formliner/Fencing Street Aesthetic Features Context The I-290 Phase I study is evaluating improvements along 13 miles of the Eisenhower Expressway, from west of
More informationCapital Projects impacting Odenton Town Center
Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000
More informationGlenborough at Easton Land Use Master Plan
Implementation 114 9.0 IMPLEMENTATION 9.1 OVERVIEW This chapter summarizes the administrative procedures necessary to implement the proposed land use plan, infrastructure improvements, development standards,
More information7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET
7th Avenue Creek Master Plan Development Project MARKET City of St. Charles, IL IAFSM CONFERENCE March 14, 2018 7 TH AVENUE CREEK PROJECT AREA 2 2008 RAIN EVENT 3 RESIDENTIAL STRUCTURE FLOODING COMMERCIAL
More informationSR 15 SECTION 088 CSVT SOUTHERN SECTION PUBLIC MEETING JUNE 16, 2015
PUBLIC MEETING JUNE 16, 2015 AGENDA PROJECT HISTORY NORTHERN SECTION UPDATE SOUTHERN SECTION OVERVIEW INTERCHANGES PROJECT SCHEDULE UPCOMING ACTIVITIES OPEN DISCUSSION & GROUP QUESTIONS ONE-ON-ONE QUESTIONS
More information3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects. B. After construction and prior to recording Notice of Completion:
3.0 SURVEY 3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects A. Prior to construction: 1. Public survey records are to be researched for the location of all possible survey
More informationLetter of Notification For East Lima Station Expansion Project
Letter of Notification For East Lima Station Expansion Project PUCO Case No. 18-0906-EL-BLN Submitted to: The Ohio Power Siting Board Pursuant to Ohio Administrative Code Section 4906-6-05 Submitted by:
More informationPublic Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B
Public Meeting US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B Mark Leiferman Chief Road Design Engineer April 28, 2014 Why
More informationI. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...
PROJECT COMMITMENTS SUMMARY... S-1 1. Type of Action... S-1 2. Description of Action... S-1 3. Summary of Purpose and Need... S-1 4. Alternatives Considered... S-2 5. NCDOT Alternatives Carried Forward...
More informationWELCOME TO OPEN HOUSE TWO November 28, 2018
Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting
More informationDesign Review Application *Please call prior to submittal meeting to determine applicable fees*
CITY OF EAGLE 660 E. Civic Lane, Eagle, ID 83616 Phone#: (208) 939-0227 Fax: (208) 938-3854 Design Review Application *Please call prior to submittal meeting to determine applicable fees* FILE NO.: CROSS
More informationSecrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018
Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018 Background and Process Monroe Expressway will be open by the end of 2018 Union County and Indian Trail identified a need to revisit
More informationAppendix E Preliminary Location Hydraulic Study
Appendix E Prepared for: State of Alaska Department of Transportation and Public Facilities Prepared by: HDR Alaska, Inc. 2525 C Street, Suite 305 Anchorage, Alaska 99503 February 2014 This page intentionally
More informationUS-69 McAlester. Anthony Echelle, P.E. ODOT Division II Engineer
US-69 McAlester US-69 from the US-270 junction south approximately 2 miles to Fourteenth Street, including the Village Road (Kinkead Road) interchange and adjacent frontage roads. Anthony Echelle, P.E.
More informationCITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS
CITY OF CYPRESS 5275 Orange Avenue Cypress, California 90630 (714) 229-6720 DESIGN REVIEW COMMITTEE PERMIT PROCESS 1. Discuss project with Planning staff to determine zoning regulations, any unusual characteristics
More information14 October 10, 2012 Public Hearing APPLICANT: MPB, INC
14 October 10, 2012 Public Hearing APPLICANT: MPB, INC PROPERTY OWNER: MUNDEN & ASSOCIATES, LP STAFF PLANNER: Karen Prochilo REQUEST: Conditional Change of Zoning (AG-1 & AG-2 to Conditional O-2) ADDRESS
More informationLevel 1 Downstream Analysis
Level 1 Downstream Analysis Newcastle Way Apartments Newcastle, Washington King County April 14, 2014 Revised July 10, 2014 Prepared by: Dean A. Furr, P.E. Reviewed by: Donald Scarberry, P.E. Coffman Engineering,
More informationProcedures IV. V. Rural Road Design Option
i IV. Procedures A. All applicants required to prepare a Conservation Design Subdivision shall provide the Planning Board with a conceptual conventional subdivision design as well as a proposed layout
More information2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects
2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects Preservation / Structural Improvement Projects in 2018 Ravine
More informationWe d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.
We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation. We will provide you information on the overall project and
More informationBypass #16 - Bend Parkway (new alignment for US 97) (MP )
Bypass #16 - Bend Parkway (new alignment for US 97) (MP 134.76-141.83) Description: The Parkway is on new alignment for US 97 through Bend. US 97 is a Statewide Highway on the National Highway System that
More informationVillage of Plainfield Strategic Plan 2021 Action Item Update May 24, 2017
Village of Plainfield Strategic Plan 2021 Action Item Update May 24, 2017 Transportation, Traffic, & Infrastructure Action Items Action Item: Continue to foster regular project design and implementation
More informationHISTORIC BRIDGE FOR SALE COLUMBIA BRIDGE IN JACKSON PARK, CHICAGO, ILLINOIS
HISTORIC BRIDGE FOR SALE COLUMBIA BRIDGE IN JACKSON PARK, CHICAGO, ILLINOIS In Accordance With Illinois Law, The City of Chicago presents this information package as part of an effort to offer this historic
More informationConstructing PCCP Under High Traffic Volume
Constructing PCCP Under High Traffic Volume THE LANE CONSTRUCTION CORPORATION Jim Seybert Casey Hurley PE, PLS November 18, 2016 Agenda Lane Experience Challenges Access Design Elements Staging of Construction
More informationThe following two (2) checklists verify what information is being provided and required.
PLAN REVIEW CHECKLIST ROADWAY DEVELOPMENTS FOR ANY MINOR OR MAJOR REVIEW Instructions: Failure to complete the checklist, or provide the information listed therein, will result in the application being
More informationSUBMITTAL REQUIREMENTS
WHEN PROCESS TYPE III IS USED References to Process Type III applications are found in several places in the Milton Municipal Code (MMC), indicating that the development, activity, or use, is permitted
More informationD1 September 11, 2013 Public Hearing APPLICANT:
D1 September 11, 2013 Public Hearing APPLICANT: BEACH MUNICIPAL FEDERAL CREDIT UNION PROPERTY OWNER: SISTERS II, LLC STAFF PLANNER: Karen Prochilo REQUEST: Conditional Change of Zoning (AG-2 Agriculture
More information6:00 8:00 PM I-95 FROM EXIT 57 TO EXIT 60 PROJECT
PUBLIC INFORMATIONAL MEETING TUESDAY, APRIL 27, 2010 AT NEWBURYPORT CITY HALL, AUDITORIUM 60 PLEASANT STREET NEWBURYPORT, MASSACHUSETTS 6:00 8:00 PM FOR THE PROPOSED WHITTIER BRIDGE / I-95 IMPROVEMENTS
More informationSTAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001
STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP 2014-0030 FEBRUARY 26, 2015 CPA - 1 OWNER/APPLICANT: AGENT: REQUEST: HANS HEIM PO BOX 238 APTOS, CA 94001 JAMES HAY PO BOX 762 MENDOCINO, CA 95460
More informationAPPENDIX I PUBLIC MEETING AT PROJECT INCEPTION
APPENDIX I PUBLIC MEETING AT PROJECT INCEPTION OKLAHOMA DEPARTMENT OF TRANSPORTATION STATE HIGHWAY 10 ENVIRONMENTAL ASSESSMENT (MIAMI, OKLAHOMA) OPEN HOUSE SEPTEMBER 7, 2006 PROJECT OVERVIEW The Oklahoma
More informationBostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London
Bostwick Road Municipal Class Environmental Assessment Public Information Centre #2 June 14, 2017 Welcome! Welcome to the 2 nd Public Information Centre for the. Representatives from the and the consulting
More informationPLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)
Central Permit Center 555 Santa Clara Street Vallejo CA 94590 Business License Building Fire Prevention Planning Public Works 707.648.4310 707.648.4374 707.648.4565 707.648.4326 707.651.7151 PLANNED DEVELOPMENT
More informationFrom local initiatives to some of the largest and most complex projects, KOA leads the field in:
Krech Ojard & Associates offers a highly capable multidisciplined team that provides the professional services needed to deliver successful transportation facility improvements. Our team provides multidisciplinary
More informationAppendix E Memorandum of Agreement between FHWA and the SHPO
Appendix E between FHWA and the SHPO MEMORANDUM OF AGREEMENT BETWEEN THE FEDERAL HIGHWAY ADMINISTRATION AND THE FLORIDA STATE HISTORIC PRESERVATION OFFICER PURSUANT TO 36 CFR PART 800 REGARDING THE WEKIVA
More informationDepartment of Community Development Engineering Office NJDOT Municipal Aid Program - Cottrell Road Pedestrian Safety
Department of Community Development Engineering Office Nicole S. Shapiro, PE, PP, CME Director of Community Development & Township Engineer Parminder Sumal, PE, PP, CME Assistant Engineer MEMO TO: Mayor
More informationDRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina
DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina 1.0 INTRODUCTION Section 4(f) of the Department of Transportation Act of 1966, 49 U.S.C. 303, requires that prior to
More informationSpring 2018 Construction Update
Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the
More informationCobb County Design Guidelines Mableton Parkway & Veterans Memorial Highway Community Design Workshop January 12, 2017
Community Design Workshop January 12, 2017 Agenda Opening Remarks / Introductions Scope of Work Existing Conditions Key Issues / Opportunities VPS Summary Draft Vision & Goal Statement Implementation Concepts
More informationChapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES
CHAPTER 1 GENERAL DESIGN GUIDELINES 1.0 INTRODUCTION This Publication has been developed to provide current, uniform procedures and guidelines for the application and design of safe, convenient, efficient
More information