Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

Size: px
Start display at page:

Download "Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates)."

Transcription

1 Pelican Bay Community Improvement Plan Traffic,JI Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). D1 -A: Provide consistent signing, marking and use of RPM's for roadways throughout the community. no Proposed Improvement: Install reflective pavement markings (RPM's) in the center line skip striping of Gulf Park Drive and replace the missing RPM's in Pelican Bay Boulevard (estimated 235 RPM's). Opinion of Probable Cost: $ 800 Alternative solution: This is a roadway maintenance item. Phasing: This work should be done at one time. Sequencing: This work requires maintenance from time to time to replace RPM's that break away from the pavement. We suggest that the center line skip striping be done at the same time that the entire community is reviewed for missing blue fire hydrant RPM's. Whenever pavement resurfacing occurs new pavement striping, markings and RPM's are to be included in the work. D1 -B: Install yellow RPM's on the asphalt at the base of the curbing of all the median bull noses throughout the community for better visual identification of turning movements and lane demarcation at night (estimated 2,178 RPM's). C rt3 ov (T) Proposed Improvement: Install yellow RPM's only on the asphalt at the base of curb lines at all median nosings do not paint curb line or asphalt yellow. Opinion of Probable Cost: $ 7,300 Alternative solution: This is a roadway maintenance item. Phasing: This work should be done at one time. Sequencing: This work requires maintenance from time to time to replace RPM's that break away from the pavement. We suggest that this work be done with the center line skip striping and while the entire community is reviewed for missing blue fire hydrant RPM's. Whenever pavement resurfacing occurs new pavement striping, markings and RPM's are to be included in the work. D1 -C: Relocate to the north and re-construct the deceleration lane and realigned curb cut to access the North Tram Station parking lot from north bound Pelican Bay Boulevard traffic. Proposed Improvement: Replace the original curb line in Pelican Bay Boulevard with a new curb line and drive access that is in alignment with the new parking lot drive way access, keeps the crosswalk in its current location and provides for landscape removal for improved sight line distance (reference Crosswalk Sheet #1 1). Opinion of Probable Cost: $ 164,500 05/18/2010

2 Alternative solutions: n n rt5 ae ro Close the current vehicular median turn lane and return it to landscape while maintaining the existing crosswalk location. Opinion of Probable Cost: $ 182,000 Maintain the current vehicular median turn lane but remove landscape for better lines of sight. Opinion of Probable Cost: $ 5,700 a) E cu 2> 0 E ro>' ro a_ Phasing: This is a one time project and based on the Owners chosen solution should be done all at once. Sequencing: These projects may also be done within other specific area improvement projects for mid-block crosswalks and the North Tram Station improvements including street lighting and landscape improvements in the median. D1 -D: Install consistently finished, signed and marked existing and proposed crosswalks in the community (9 intersections; reference Intersection Crosswalk Layout plans; refer to D1 -E for mid-block crosswalks). Proposed Improvement: Install monolithic concrete base and 12" header curb each side of cross walk to receive mud set clay brick crosswalks in a herringbone field pattern and a soldier course border between header curbs and valley gutters including all associated signing and ADA compatible connections. Opinion of Probable Cost: $ 817,000 Alternative solutions: Same as proposed improvement but with color concrete pavers in lieu of clay brick. Opinion of Probable Cost: $ 742,500 Install thermoplastic paint in a high visibility piano key striping pattern for all existing and proposed crosswalk locations in the community. Opinion of Probable Cost: $ 289,500 Phasing: These projects can be phased however we suggest that little phasing or time passes between beginning and completing the work. We suggest that a reasonable phasing would be to improve the crosswalks south of Gulf Park Drive in one year and improve the balance of the crosswalks north of Gulf Park Drive in the next year. Sequencing: These projects may also be done within other specific area improvement projects or should be considered to be part of the pathway, signage and ADA ramping improvements. D1 -E: Install mid-block crosswalks in Pelican Bay Boulevard at Community Amenity Destination points (5 locations; reference Mid-block Crosswalk Location plan). 05/18/2010

3 Proposed Improvement: Install mud set clay brick crosswalks on a monolithic base with 12" header bands to match D1-D above and include a 32" split face cobble stone band edge inside the header band at both sides of the cross walk as an upgrade to these five crosswalk locations including all associated signing and ADA compatible connections. Opinion of Probable Cost: $ 263,000 Alternative solutions: Same as proposed improvement, but do not include the cobble stone band edge with the clay brick pavers. Opinion of Probable Cost: $ 220,000 Same as proposed improvement, but install precast colored concrete pavers in lieu of clay brick as noted above. Opinion of Probable Cost: 247,500 Same as alternative solution #2, but do not include the cobble stone band edge with the colored concrete pavers. Opinion of Probable Cost: $ 204,500 Install only Thermoplastic paint in a high visibility piano key striping pattern. Opinion of Probable Cost: $ 115,300 a) E 2> 0 E >1 CD co av Phasing: These projects can be phased however we suggest that little phasing or time passes between beginning and completing the work. We suggest that a reasonable phasing would be to improve the mid-block crosswalks that may be done in part of area wide improvements such as the North Tram Station or the St. Raphael beach access lighting project. Sequencing: These projects may also be done within other specific area improvement projects or should be considered to be part of the pathway, signage and ADA ramping improvements. D1 -F: Install fields of clay brick pavement in the major community intersection areas. Patterns should be artful and aesthetically pleasing, serve as announcement of entry and primary intersections within the community and assist on the ground-plane by expressing the expected turning movements around adjacent street medians (reference Intersection Treatment Alternatives this section) Proposed Improvement: Install sand set clay brick pavers in the field areas between the crosswalks in the street intersections of Pelican Bay Boulevard and Ridgewood Drive, Pelican Bay Boulevard and Oakmont Parkway/Extension and Pelican Bay Boulevard and Gulf Park Drive. Opinion of Probable Cost: $ 536,000 Alternative solutions: 1. Install sand set colored concrete pavers in lieu of clay brick pavers in conjunction with colored concrete paver crosswalks in the intersection field areas noted above. Opinion of Probable Cost: $ 496,500 05/18/2010

4 Install stamped concrete pavement and exposed aggregate colored concrete in the intersection field areas with clay brick paver crosswalks. Opinion of Probable Cost: $ 549,500 co a_ C E." C a) E a) 2> E to ca C... TC) a. Phasing: This work can be phased by whole intersection field areas. Sequencing: This work should be considered to be complete with the crosswalk improvements in these intersections. D1 -G: Install fields of clay brick pavement across the three roadway entries into Pelican Bay from US 41 at Pelican Bay Boulevard north and south as well as Gulf Park Drive (reference pages 19, 20 and 21 under the Project Improvement Plan section C). Proposed Improvement: Install 12" header curb between the valley gutters each side of the pavement area to receive sand set clay brick pavement in a herringbone field pattern and a soldier course border between header curbs and valley gutters for a length of up to 150 feet. Opinion of Probable Cost: $ 463,000 Alternative solutions: 1. Same as proposed improvement but with colored concrete pavers in lieu of clay brick pavers. Opinion of Probable Cost: $ 429,000 Phasing: These projects can be phased by individual location however we suggest that consideration of the installation of an intersection field area noted in Dl-F above would also include the installation of the corresponding US-41 entry drive area improvement in D1-G too. Sequencing: These projects may also be done within other Community entry specific area improvement projects for landscape, lighting and signage. D1 -H: Install fields of clay brick pavement across the roadway entries in to the single family neighborhoods where intersection improvements noted in Dl-F above are not suggested (2 locations, Gulf Park Drive and Ridgewood Drive/ Gulf Park Drive and Green Tree Drive). Proposed Improvement: Install 12" header curb between the valley gutters each side of the pavement area to receive sand set clay brick pavement in a herringbone field pattern and a soldier course border between header curbs and valley gutters for a length of up to 50 feet behind any cross walk improvement. Opinion of Probable Cost: $ 52,600 Alternative solutions: 1. Same as proposed improvement but with colored concrete pavers in lieu of clay brick pavers. Opinion of Probable Cost: $ 48,900

5 Phasing: These projects can be phased by individual location however we suggest that consideration of the installation of an intersection field area noted in Dl-F above would also include the installation of the corresponding US-41 entry drive area improvement in D1-G too. Sequencing: These projects may also be done within other residential area entry specific area improvement projects for landscape, lighting and signage. Future maintenance and improvement guidelines: The addition of a four foot bike lane in accordance with FDOT policy as delivered through its Plans and Preparation Manual and through the Collier County MPO Policies and Resolutions within the existing asphalt cross section of Pelican Bay Boulevard and Gulf Park Drive is recommended to be implemented at the next resurfacing of these roadways. This remarking and restriping is to occur at the time of the next resurfacing of each street and provide for two ten foot automobile travel lanes and one four foot bicycle lane in each direction unless otherwise deemed unjustified through the variance process. Although not a County law, Collier County highly recommends incorporation of bike lanes where feasible in new construction or resurfacing of roadways. Transportation engineering design will be required to provide the documentation necessary for this improvement. Maintain un-obstructive landscape and elevated median grades in favor of pedestrian and driver sight lines at the edges of the rights of way and within the medians of the community. Continue to work with the Collier County Transportation Division on multi-modal and pathway master plans at the exterior edges of the Pelican Bay Community so as to budget and plan for Community Landscape, Perimeter Wall and connective pathway improvements in the future. Continue to work with the Collier County Sherriff Department in street and community policing and reporting of community incidents. Continue to work with the Collier County Transportation Department within the Neighborhood Traffic Management Plans for additional traffic calming techniques beyond the addition of the bike lane noted above. 05/18/2010

6 ,VilsonMiller - March 29, 2010 Location Striping Only Concrete Pavers Clay Brick Paving Iltern Type Option 1 Option 2 Option Pelican Bay Ridgewood Drive 3 Direction $19,276 $69,591 $77,755 01a - Add paver field (1) $158,116 (1) $189, Pelican Bay Myra J. Daniels Blvd. 2 Direction $15,019 $41,360 $45, Pelican Bay Crayton Road 2 Direction $15,036 $47,118 $52, Pelican Bay Glenview Place Mid-Block $19,213 $35,666 $38,283 04a - Add cobble bands (2) $5,960 (2) $5, Pelican Bay The Commons Mid-Block $19,309 $33,101 $35,479 05a - Add cobble bands (2) $6,110 (2) $6, Pelican Bay Gulf Park Drive 4 Direction $92,506 $158,011 $169,257 06a - Add paver field (1) $154,396 (1) $184, Gulf Park Ridgewood Drive 2 Direction $16,859 $47,688 $52, Gulf Park Green Tree Drive 2 Direction $19,149 $49,964 $55, Pelican Bay Sandpiper Parking Mid-Block $23,983 $36,291 $38,658 09a - Add cobble bands (2) $4,800 (2) $4, Pelican Bay Beachwalk Pathway Mid-Block $23,220 $36,417 $38,779 10a - Add cobble bands (2) $5,100 (2) $5, Pelican Bay North Tram Station Mid-Block $3,591 $17,042 $19,450 iia - Add cobble bands (2) $11,213 (2) $11, Pelican Bay North Pointe Drive 2 Direction $14,863 $48,161 $53, Pelican Bay Hammock Oak Drive 2 Direction $15,057 $46,613 $51, Pelican Bay Oakmont Parkway 3 Direction $16,535 $67,072 $75,284 (Subtotal: 115% Contingency:!Design / Permit Fee Estimate: (Grand Total: $313,616 $734,095 $804,002 $47,042 I $110,114 I $43,279 $101,305 $120,600-1 $110,952 I $403,937 I $945,514 I I $1,035,555( * Price Sources: Historic Project File Cost Data, RSMeans Site Work and Landscape Data 2010, FDOT Statewide Item Average Unit Cost "" Prices are a comparison of finishes only and do not include design or permitting fees. Additional cost beyond crosswalk improvements to include field area between crosswalks in special pavement. Additional cost to include 3.0' wide split-face cobble paver either side of mid-block crosswalks. (3) Additional Item 11 costs to improve median: Close Median +/- $126, Re-Align Median +/- $125,130.00

7 01 - Pelican Bay Ridgewood Drive Option 1 - Striping Only $19,276 Iltern Demolition - Clearing and Grubbing Demolition - Curb Demolition - Sidewalk Demolition - Thermoplastic Striping (Remove) Sitework - Concrete - ADA Compliant Ramp Assembly Sitework - Concrete - Sidewalk (5.0') Sitework - Concrete - Type 'A' Curb Sitework - Regulatory Signage - Decorative Post Mount Sitework - Roadway - Retro-reflective pavement markers Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width Landscape - Shrubs, Grasses, Groundcovers, Mulch Landscape - Irrigation Iltern Demolition - Asphalt to 4" Thick (Includes limerock base to 8") Demolition - Clearing and Grubbing Demolition - Curb Demolition - Sidewalk Sitework - Concrete - ADA Compliant Ramp Assembly Sitework - Concrete - Brick Pavers Sitework - Concrete - Sidewalk (5.0') Sitework - Concrete - Slab (Up to 8" thick reinforced) Sitework - Concrete - Type 'A' Curb Sitework - Regulatory Signage - Decorative Post Mount Sitework - Roadway - 8" Limerock Base Sitework - Roadway - Retro-reflective pavement markers Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width Landscape - Irrigation Landscape - Shrubs, Grasses, Groundcovers, Mulch Quantity Unit Unit Cost Subtotall 250 SF $0.49 $ LF $6.00 $ SY $12.00 $ LF $2.08 $ EA $ $2, SY $32.00 $ LF $10.50 $ EA $1, $11, EA $3.34 $ LF $2.01 $1, LF $4.06 $ SF $5.50 $1, SF $0.80 $ Option 2 - Concrete Pavers $69, SY $8.00 $2, SF $0.49 $ LF $6.00 $ SY $12.00 $ EA $ $2, ,177 SF $5.50 $11, SY $32.00 $ ,729 SF $12.80 $34, LF $10.50 $ EA $1, $11, SY $6.50 $1, EA $3.34 $ LF $2.01 $1, LF $4.06 $ SF $0.80 $ SF $5.50 $1, Option 3 - Clay Brick Paving $77,755 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 304 SY $8.00 $2, Demolition - Clearing and Grubbing 250 SF $0.49 $ Demolition - Curb 10 LF $6.00 $60.00 Demolition - Sidewalk 2 SY $12.00 $24.00 Sitework - Concrete - ADA Compliant Ramp Assembly 4 EA $ $2, Sitework - Clay - Brick Pavers 2,177 SF $9.25 $20, Sitework - Concrete - Sidewalk (5.0') 28 SY $32.00 $ Sitework - Concrete - Slab (Up to 8" thick reinforced) 2,729 SF $12.80 $34, Sitework - Concrete - Type 'A' Curb 10 LF $10.50 $ Sitework - Roadway - 8" Limerock Base 304 SY $6.50 $1, Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 860 LF $2.01 $1, Landscape - Irrigation 230 SF $0.80 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 230 SF $5.50 $1,265.00

8 02 - Pelican Bay Myra J. Daniels Blvd. Option 1 - Striping Only $15,019 Demolition - Thermoplastic Striping (Remove) 196 LF $2.08 $ Sitework - Concrete - ADA Compliant Ramp Assembly 4 EA $ $2, Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 430 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 0 LF $4.06 $0.00 Option 2 - Concrete Pavers $41,360 Iltern Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 304 SY $8.00 $2, Sitework - Concrete - ADA Compliant Ramp Assembly 4 EA $ $2, Sitework - Concrete - Brick Pavers 1,070 SF $5.50 $5, Sitework - Concrete - Slab (Up to 8" thick reinforced) 1,383 SF $12.80 $17, Sitework - Roadway - 8" Limerock Base 154 SY $6.50 $1, Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 295 LF $2.01 $ Option 3 - Clay Brick Paving $45,373 Iltern Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 304 SY $8.00 $2, Sitework - Concrete - ADA Compliant Ramp Assembly 4 EA $ $2, Sitework - Clay - Brick Pavers 1,070 SF $9.25 $9, Sitework - Concrete - Slab (Up to 8" thick reinforced) 1,383 SF $12.80 $17, Sitework - Roadway - 8" Limerock Base 154 SY $6.50 $1, Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 295 LF $2.01 $592.95

9 03 - Pelican Bay Crayton Road Option 1 - Striping Only $1 5,036 Demolition - Thermoplastic Striping (Remove) 280 LF $2.08 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 550 LF $2.01 $1, Option 2 - Concrete Pavers $47,118 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 197 SY $8.00 $1, Sitework - Concrete - Brick Pavers 1,387 SF $5.50 $7, Sitework - Concrete - Slab (Up to 8" thick reinforced) 1,765 SF $12.80 $22, Sitework - Roadway - 8" Limerock Base 197 SY $6.50 $1, Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 345 LF $2.01 $ Option 3 - Clay Brick Paving $52,320 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 197 SY $8.00 $1, Sitework - Clay - Brick Pavers 1,387 SF $9.25 $12, Sitework - Concrete - Slab (Up to 8" thick reinforced) 1,765 SF $12.80 $22, Sitework - Roadway - 8" Limerock Base 197 SY $6.50 $1, Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 345 LF $2.01 $693.45

10 04 - Pelican Bay Glenview Place Option 1 - Striping Only $19,213 Iltern Demolition - Clearing and Grubbing 685 SF $0.49 $ Demolition - Curb 36 LF $6.00 $ Demolition - Thermoplastic Striping (Remove) 20 LF $2.08 $41.60 Sitework - Concrete - Sidewalk (5.0') 27 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 40 LF $10.50 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 260 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 62 LF $4.06 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 550 SF $5.50 $3, Landscape - Irrigation 550 SF $0.80 $ Landscape - Topsoil (6" Depth) 11 CY $40.00 $ Option 2 - Concrete Pavers $35,666 Iltern Demolition - Clearing and Grubbing 685 SF $0.49 $ Demolition - Curb 36 LF $6.00 $ Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 100 SY $8.00 $ Sitework - Concrete - Brick Pavers 698 SF $5.50 $3, Sitework - Concrete - Slab (Up to 8" thick reinforced) 895 SF $12.80 $11, Sitework - Concrete - Sidewalk (5.0') 27 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 40 LF $10.50 $ Sitework - Roadway - 8" Limerock Base 100 SY $6.50 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 135 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 62 LF $4.06 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 550 SF $5.50 $3, Landscape - Irrigation 550 SF $0.80 $ Landscape - Topsoil (6" Depth) 11 CY $40.00 $ Option 3 - Clay Brick Paving $38,283 Iltern Demolition - Clearing and Grubbing 685 SF $0.49 $ Demolition - Curb 36 LF $6.00 $ Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 100 SY $8.00 $ Sitework - Clay - Brick Pavers 698 SF $9.25 $6, Sitework - Concrete - Slab (Up to 8" thick reinforced) 895 SF $12.80 $11, Sitework - Concrete - Sidewalk (5.0') 27 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 40 LF $10.50 $ Sitework - Roadway - 8" Limerock Base 100 SY $6.50 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 135 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 62 LF $4.06 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 550 SF $5.50 $3, Landscape - Irrigation 550 SF $0.80 $ Landscape - Topsoil (6" Depth) 11 CY $40.00 $440.00

11 05 - Pelican Bay The Commons Option 1 - Striping Only $19,309 Quantity Unit Unit Cost Subtotall Demolition - Clearing and Grubbing 685 SF $0.49 $ Demolition - Curb 36 LF $6.00 $ Demolition - Thermoplastic Striping (Remove) 20 LF $2.08 $41.60 Sitework - Concrete - Sidewalk (5.0') 30 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 40 LF $10.50 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 260 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 62 LF $4.06 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 550 SF $5.50 $3, Landscape - Irrigation 550 SF $0.80 $ Landscape - Topsoil (6" Depth) 11 CY $40.00 $ Option 2 - Concrete Pavers $33,101 Demolition - Clearing and Grubbing 685 SF $0.49 $ Demolition - Curb 36 LF $6.00 $ Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 90 SY $8.00 $ Sitework - Concrete - ADA Compliant Ramp Assembly 0 EA $ $0.00 Sitework - Concrete - Brick Pavers 634 SF $5.50 $3, Sitework - Concrete - Slab (Up to 8" thick reinforced) 811 SF $12.80 $10, Sitework - Concrete - Sidewalk (5.0') 30 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 40 LF $10.50 $ Sitework - Roadway - 8" Limerock Base 90 SY $6.50 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 136 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 62 LF $4.06 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 550 SF $5.50 $3, Landscape - Irrigation 550 SF $0.80 $ Landscape - Topsoil (6" Depth) 11 CY $40.00 $ Option 3 - Clay Brick Paving $35,479 Demolition - Clearing and Grubbing 685 SF $0.49 Demolition - Curb 36 LF $6.00 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 90 SY $8.00 Sitework - Concrete - ADA Compliant Ramp Assembly 0 EA $ Sitework - Clay - Brick Pavers 634 SF $9.25 Sitework - Concrete - Slab (Up to 8" thick reinforced) 811 SF $12.80 Sitework - Concrete - Sidewalk (5.0') 30 SY $32.00 Sitework - Concrete - Type 'A' Curb 40 LF $10.50 Sitework - Regulatory Signage - Decorative Post Mount 10 EA $1, Sitework - Roadway - 8" Limerock Base 90 SY $6.50 Sitework - Roadway - Retro-reflective pavement markers 20 EA $3.34 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 136 LF $2.01 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 62 LF $4.06 Landscape - Shrubs, Grasses, Groundcovers, Mulch 550 SF $5.50 Landscape - Irrigation 550 SF $0.80 Landscape - Topsoil (6" Depth) 11 CY $40.00 $ $ $ $0.00 $5, $10, $ $ $11, $ $66.80 $ $ $3, $ $440.00

12 06 - Pelican Bay Gulf Park Drive Option 1 - Striping Only $92,506!Item Demolition - Clearing and Grubbing 13,620 SF $0.49 $6, Demolition - Curb 160 LF $6.00 $ Demolition - Sidewalk 30 SY $12.00 $ Sitework - Concrete - ADA Compliant Ramp Assembly 4 EA $ $2, Sitework - Concrete - Sidewalk (5.0') 8 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 140 LF $10.50 $1, Sitework - Roadway - 8" Limerock Base 84 SY $6.50 $ Sitework - Roadway - Asphalt (2") 1 TN $ $ Sitework - Roadway - Retro-reflective pavement markers 60 EA $3.34 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 940 LF $2.01 $1, Landscape - Trees 15 EA $ $4, Landscape - Shrubs, Grasses, Groundcovers, Mulch 9,780 SF $5.50 $53, Landscape - Sod 3,840 SF $0.35 $1, Landscape - Topsoil (6" Depth) 181 CY $40.00 $7, Landscape - Irrigation 13,620 SF $0.80 $10, Option 2 - Concrete Pavers $158,011 Iltern Quantity Unit Unit Cost Subtotall Demolition - Asphalt 319 SY $8.00 $2, Demolition - Clearing and Grubbing 13,620 SF $0.49 $6, Demolition - Curb 160 LF $6.00 $ Demolition - Sidewalk 30 SY $12.00 $ Sitework - Concrete - ADA Compliant Ramp Assembly 4 EA $ $2, Sitework - Concrete - Brick Pavers 2,999 SF $5.50 $16, Sitework - Concrete - Ribbon Curb 560 LF $15.00 $8, Sitework - Concrete - Sidewalk (5.0') 8 SY $32.00 $ Sitework - Concrete - Slab (Up to 8" thick reinforced) 2,871 SF $12.80 $36, Sitework - Concrete - Type 'A' Curb 140 LF $10.50 $1, Sitework - Roadway - 8" Limerock Base 403 SY $6.50 $2, Sitework - Roadway - Asphalt 1 TN $ $ Sitework - Roadway - Retro-reflective pavement markers 60 EA $3.34 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 560 LF $2.01 $1, Landscape - Trees 15 EA $ $4, Landscape - Shrubs, Grasses, Groundcovers, Mulch 9,780 SF $5.50 $53, Landscape - Sod 3,840 SF $0.35 $1, Landscape - Topsoil (6" Depth) 181 CY $40.00 $7, Landscape - Irrigation 13,620 SF $0.80 $10, Option 3 - Clay Brick Paving $169,257 Demolition - Asphalt 319 SY $8.00 $2, Demolition - Clearing and Grubbing 13,620 SF $0.49 $6, Demolition - Curb 160 LF $6.00 $ Demolition - Sidewalk 30 SY $12.00 $ Sitework - Concrete - ADA Compliant Ramp Assembly 4 EA $ $2, Sitework - Clay - Brick Pavers 2,999 SF $9.25 $27, Sitework - Concrete - Ribbon Curb 560 LF $15.00 $8, Sitework - Concrete - Sidewalk (5.0') 8 SY $32.00 $ Sitework - Concrete - Slab (Up to 8" thick reinforced) 2,871 SF $12.80 $36, Sitework - Concrete - Type 'A' Curb 140 LF $10.50 $1, Sitework - Roadway - 8" Limerock Base 403 SY $6.50 $2, Sitework - Roadway - Asphalt 1 TN $ $ Sitework - Roadway - Retro-reflective pavement markers 60 EA $3.34 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 560 LF $2.01 $1, Landscape - Trees 15 EA $ $4, Landscape - Shrubs, Grasses, Groundcovers, Mulch 9,780 SF $5.50 $53, Landscape - Sod 3,840 SF $0.35 $1, Landscape - Topsoil (6" Depth) 181 CY $40.00 $7, Landscape - Irrigation 13,620 SF $0.80 $10,896.00

13 07 - Gulf Park Ridgewood Drive Option 1 - Striping Only $16,859 Demolition - Clearing and Grubbing 225 SF $0.49 $ Demolition - Curb 35 LF $6.00 $ Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 10 SY $8.00 $80.00 Sitework - Concrete - Sidewalk (5.0') 4 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 26 LF $10.50 $ Sitework - Roadway - Asphalt 1 TN $ $ Sitework - Roadway - 8" Limerock Base 20 SY $6.50 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 540 LF $2.01 $1, Landscape - Shrubs, Grasses, Groundcovers, Mulch 180 SF $5.50 $ Landscape - Irrigation 180 SF $0.80 $ Landscape - Topsoil (6" Depth) 4 CY $40.00 $ Option 2 - Concrete Pavers $47,688 Quantity Unit Unit Cost Subtotal Demolition - Clearing and Grubbing 225 SF $0.49 $ Demolition - Curb 35 LF $6.00 $ Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 10 SY $8.00 $80.00 Sitework - Concrete - Brick Pavers 1,396 SF $5.50 $7, Sitework - Concrete - Slab (Up to 8" thick reinforced) 1,772 SF $12.80 $22, Sitework - Concrete - Sidewalk (5.0') 4 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 26 LF $10.50 $ Sitework - Roadway - Asphalt 1 TN $ $ Sitework - Roadway - 8" Limerock Base 208 SY $6.50 $1, Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 166 LF $2.01 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 180 SF $5.50 $ Landscape - Irrigation 180 SF $0.80 $ Landscape - Topsoil (6" Depth) 4 CY $40.00 $ Option 3 - Clay Brick Paving $52,923 Demolition - Clearing and Grubbing 225 SF $0.49 $ Demolition - Curb 35 LF $6.00 $ Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 10 SY $8.00 $80.00 Sitework - Clay - Brick Pavers 1,396 SF $9.25 $12, Sitework - Concrete - Slab (Up to 8" thick reinforced) 1,772 SF $12.80 $22, Sitework - Concrete - Sidewalk (5.0') 4 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 26 LF $10.50 $ Sitework - Roadway - Asphalt 1 TN $ $ Sitework - Roadway - 8" Limerock Base 208 SY $6.50 $1, Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 166 LF $2.01 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 180 SF $5.50 $ Landscape - Irrigation 180 SF $0.80 $ Landscape - Topsoil (6" Depth) 4 CY $40.00 $160.00

14 08 - Gulf Park Green Tree Drive Option 1 - Striping Only $19,149 Iltern Quantity Unit Unit Cost Subtotal Demolition - Clearing and Grubbing 380 SF $0.49 $ Demolition - Curb 55 LF $6.00 $ Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 163 SY $8.00 $1, Sitework - Concrete - Sidewalk (5.0') 12 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 35 LF $10.50 $ Sitework - Roadway - Asphalt 1 TN $ $ Sitework - Roadway - 8" Limerock Base 18 SY $6.50 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 550 LF $2.01 $1, Landscape - Shrubs, Grasses, Groundcovers, Mulch 255 SF $5.50 $1, Landscape - Irrigation 255 SF $0.80 $ Landscape - Topsoil (6" Depth) 5 CY $40.00 $ Option 2 - Concrete Pavers $49,964 Demolition - Clearing and Grubbing 380 SF $0.49 $ Demolition - Curb 55 LF $6.00 $ Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 150 SY $8.00 $1, Sitework - Concrete - Brick Pavers 1,385 SF $5.50 $7, Sitework - Concrete - Slab (Up to 8" thick reinforced) 1,755 SF $12.80 $22, Sitework - Concrete - Sidewalk (5.0') 12 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 35 LF $10.50 $ Sitework - Roadway - Asphalt 1 TN $ $ Sitework - Roadway - 8" Limerock Base 213 SY $6.50 $1, Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 336 LF $2.01 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 255 SF $5.50 $1, Landscape - Irrigation 255 SF $0.80 $ Landscape - Topsoil (6" Depth) 5 CY $40.00 $ Option 3 - Clay Brick Paving $55,157 Iltern Demolition - Clearing and Grubbing 380 SF $0.49 $ Demolition - Curb 55 LF $6.00 $ Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 150 SY $8.00 $1, Sitework - Clay - Brick Pavers 1,385 SF $9.25 $12, Sitework - Concrete - Slab (Up to 8" thick reinforced) 1,755 SF $12.80 $22, Sitework - Concrete - Sidewalk (5.0') 12 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 35 LF $10.50 $ Sitework - Roadway - Asphalt 1 TN $ $ Sitework - Roadway - 8" Limerock Base 213 SY $6.50 $1, Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 336 LF $2.01 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 255 SF $5.50 $1, Landscape - Irrigation 255 SF $0.80 $ Landscape - Topsoil (6" Depth) 5 CY $40.00 $200.00

15 09 - Pelican Bay Sandpiper Parking Option 1 - Striping Only $23,983!Item Quantity Unit Unit Cost Subtotall Demolition - Clearing and Grubbing 1,075 SF $0.49 $ Demolition - Curb 50 LF $6.00 $ Sitework - Concrete - Sidewalk (5.0') 14 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 72 LF $10.50 $ Sitework - Roadway - Asphalt 3 TN $ $ Sitework - Roadway - 8" Limerock Base 305 SY $6.50 $1, Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 260 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 48 LF $4.06 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 850 SF $5.50 $4, Landscape - Irrigation 850 SF $0.80 $ Landscape - Topsoil (6" Depth) 16 CY $40.00 $ Option 2 - Concrete Pavers $36,291 Demolition - Clearing and Grubbing 1,075 SF $0.49 $ Demolition - Curb 50 LF $6.00 $ Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 90 SY $8.00 $ Sitework - Concrete - Brick Pavers 631 SF $5.50 $3, Sitework - Concrete - Slab (Up to 8" thick reinforced) 806 SF $12.80 $10, Sitework - Concrete - Sidewalk (5.0') 14 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 72 LF $10.50 $ Sitework - Roadway - 8" Limerock Base 90 SY $6.50 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 48 LF $4.06 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 850 SF $5.50 $4, Landscape - Irrigation 850 SF $0.80 $ Landscape - Topsoil (6" Depth) 16 CY $40.00 $ Option 3 - Clay Brick Paving $38,658 Demolition - Clearing and Grubbing 1,075 SF $0.49 $ Demolition - Curb 50 LF $6.00 $ Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 90 SY $8.00 $ Sitework - Clay - Brick Pavers 631 SF $9.25 $5, Sitework - Concrete - Slab (Up to 8" thick reinforced) 806 SF $12.80 $10, Sitework - Concrete - Sidewalk (5.0') 14 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 72 LF $10.50 $ Sitework - Roadway - 8" Limerock Base 90 SY $6.50 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 48 LF $4.06 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 850 SF $5.50 $4, Landscape - Irrigation 850 SF $0.80 $ Landscape - Topsoil (6" Depth) 16 CY $40.00 $640.00

16 10 - Pelican Bay Beachwalk Pathway Option 1 - Striping Only $23,220 Demolition - Clearing and Grubbing 1,433 SF $0.49 $ Demolition - Curb 30 LF $6.00 $ Sitework - Concrete - Sidewalk (5.0') 30 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 70 LF $10.50 $ Sitework - Roadway - Asphalt 3 TN $ $ Sitework - Roadway - 8" Limerock Base 38 SY $6.50 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 260 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 50 LF $4.06 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 910 SF $5.50 $5, Landscape - Irrigation 910 SF $0.80 $ Landscape - Topsoil (6" Depth) 17 CY $40.00 $ Option 2 - Concrete Pavers $36,417 Demolition - Clearing and Grubbing 1,433 SF $0.49 $ Demolition - Curb 30 LF $6.00 $ Sitework - Concrete - Brick Pavers 630 SF $5.50 $3, Sitework - Concrete - Slab (Up to 8" thick reinforced) 797 SF $12.80 $10, Sitework - Concrete - Sidewalk (5.0') 30 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 70 LF $10.50 $ Sitework - Roadway - 8" Limerock Base 89 SY $6.50 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 50 LF $4.06 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 910 SF $5.50 $5, Landscape - Irrigation 910 SF $0.80 $ Landscape - Topsoil (6" Depth) 17 CY $40.00 $ Option 3 - Clay Brick Paving $38,779 Demolition - Clearing and Grubbing 1,433 SF $0.49 $ Demolition - Curb 30 LF $6.00 $ Sitework - Clay - Brick Pavers 630 SF $9.25 $5, Sitework - Concrete - Slab (Up to 8" thick reinforced) 797 SF $12.80 $10, Sitework - Concrete - Sidewalk (5.0') 30 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 70 LF $10.50 $ Sitework - Roadway - 8" Limerock Base 89 SY $6.50 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 50 LF $4.06 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 910 SF $5.50 $5, Landscape - Irrigation 910 SF $0.80 $ Landscape - Topsoil (6" Depth) 17 CY $40.00 $680.00

17 11 - Pelican Bay North Tram Station with No Median Adjustments Option 1 - Striping On y $3,591 Demolition - Signage 1 LS $1, Demolition - Thermoplastic Striping (Remove) 592 LF $2.08 Sitework - Concrete - ADA Compliant Ramp Assembly 0 EA $ Sitework - Regulatory Signage - Decorative Post Mount 0 EA $1, Sitework - Roadway - Retro-reflective pavement markers 0 EA $3.34 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 480 LF $2.01 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 48 LF $4.06 Option 2 - Concrete Pavers $17,042 Quantity Unit Unit Cost Subtotall $1, $1, $0.00 $0.00 $0.00 $ $ Quantity Unit Unit Cost Subtotall Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 90 SY $8.00 $ Demolition - Signage 1 LS $1, $1, Sitework - Concrete - ADA Compliant Ramp Assembly 0 EA $ $0.00 Sitework - Concrete - Brick Pavers 642 SF $5.50 $3, Sitework - Concrete - Slab (Up to 8" thick reinforced) 819 SF $12.80 $10, Sitework - Regulatory Signage - Decorative Post Mount 0 EA $1, $0.00 Sitework - Roadway - 8" Limerock Base 91 SY $6.50 $ Sitework - Roadway - Retro-reflective pavement markers 0 EA $3.34 $0.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 48 LF $4.06 $ Option 3 - Clay Brick Paving $19,450 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 90 SY $8.00 $ Demolition - Signage 1 LS $1, $1, Sitework - Concrete - ADA Compliant Ramp Assembly 0 EA $ $0.00 Sitework - Clay - Brick Pavers 642 SF $9.25 $5, Sitework - Concrete - Slab (Up to 8" thick reinforced) 819 SF $12.80 $10, Sitework - Regulatory Signage - Decorative Post Mount 0 EA $1, $0.00 Sitework - Roadway - 8" Limerock Base 91 SY $6.50 $ Sitework - Roadway - Retro-reflective pavement markers 0 EA $3.34 $0.00 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 48 LF $4.06 $194.88

18 11 a - Pelican Bay North Tram Station with Filled, Continuous Landscape Median Option 1 - Striping Only $139,239 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 630 SY $8.00 $5, Demolition - Clearing and Grubbing 7,820 SF $0.49 $3, Demolition - Tree Removal (Includes stump) 3 EA $ $1, Demolition - Palm Removal (Includes stump) 20 EA $ $4, Demolition - Curb 870 LF $6.00 $5, Demolition - Sidewalk 10 SY $12.00 $ Demolition - Signage 1 LS $1, $1, Demolition - Thermoplastic Striping (Remove) 160 LF $2.08 $ Sitework - Concrete - Sidewalk (5.0') 10 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 1,035 LF $10.50 $10, Sitework - Roadway - 8" Limerock Base 82 SY $6.50 $ Sitework - Roadway - Asphalt 7 TN $ $1, Sitework - Roadway - Retro-reflective pavement markers 40 EA $3.34 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 260 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 72 LF $4.06 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 12,950 SF $5.50 $71, Landscape - Irrigation 12,950 SF $0.80 $10, Landscape - Topsoil (6" Depth) 240 CY $40.00 $9, Option 2 - Concrete Pavers $152,297 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 690 SY $8.00 $5, Demolition - Clearing and Grubbing 7,820 SF $0.49 $3, Demolition - Tree Removal (Includes stump) 3 EA $ $1, Demolition - Palm Removal (Includes stump) 20 EA $ $4, Demolition - Curb 870 LF $6.00 $5, Demolition - Sidewalk 10 SY $12.00 $ Demolition - Signage 1 LS $1, $1, Sitework - Concrete - Brick Pavers 620 SF $5.50 $3, Sitework - Concrete - Sidewalk (5.0') 10 SY $32.00 $ Sitework - Concrete - Slab (Up to 8" thick reinforced) 790 SF $12.80 $10, Sitework - Concrete - Type 'A' Curb 1,035 LF $10.50 $10, Sitework - Roadway - 8" Limerock Base 142 SY $6.50 $ Sitework - Roadway - Asphalt 3 TN $ $ Sitework - Roadway - Retro-reflective pavement markers 40 EA $3.34 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 72 LF $4.06 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 12,950 SF $5.50 $71, Landscape - Irrigation 12,950 SF $0.80 $10, Landscape - Topsoil (6" Depth) 240 CY $40.00 $9, Option 3 - Clay Brick Paving $154,622 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 690 SY $8.00 Demolition - Clearing and Grubbing 7,820 SF $0.49 Demolition - Tree Removal (Includes stump) 3 EA $ Demolition - Palm Removal (Includes stump) 20 EA $ Demolition - Curb 870 LF $6.00 Demolition - Sidewalk 10 SY $12.00 Demolition - Signage 1 LS $1, Sitework - Concrete - ADA Compliant Ramp Assembly 2 EA $ Sitework - Clay - Brick Pavers 620 SF $9.25 Sitework - Concrete - Sidewalk (5.0') 10 SY $32.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 790 SF $12.80 Sitework - Concrete - Type 'A' Curb 1,035 LF $10.50 Sitework - Regulatory Signage - Decorative Post Mount 10 EA $1, Sitework - Roadway - 8" Limerock Base 142 SY $6.50 Sitework - Roadway - Asphalt 3 TN $ Sitework - Roadway - Retro-reflective pavement markers 40 EA $3.34 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 72 LF $4.06 Landscape - Shrubs, Grasses, Groundcovers, Mulch 12,950 SF $5.50 Landscape - Irrigation 12,950 SF $0.80 Landscape - Topsoil (6" Depth) 240 CY $40.00 $5, $3, $1, $4, $5, $ $1, $1, $5, $ $10, $10, $11, $ $ $ $ $ $71, $10, $9,600.00

19 11 a - Pelican Bay North Tram Station with Filled, Continuous Landscape Median WilsonMiller - March 26, 2010 Option 3 - Clay Brick Paving $154,622 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 690 SY $8.00 $5, Demolition - Clearing and Grubbing 7,820 SF $0.49 $3, Demolition - Tree Removal (Includes stump) 3 EA $ $1, Demolition - Palm Removal (Includes stump) 20 EA $ $4, Demolition - Curb 870 LF $6.00 $5, Demolition - Sidewalk 10 SY $12.00 $ Demolition - Signage 1 LS $1, $1, Sitework - Clay - Brick Pavers 620 SF $9.25 $5, Sitework - Concrete - Sidewalk (5.0') 10 SY $32.00 $ Sitework - Concrete - Slab (Up to 8" thick reinforced) 790 SF $12.80 $10, Sitework - Concrete - Type 'A' Curb 1,035 LF $10.50 $10, Sitework - Roadway - 8" Limerock Base 142 SY $6.50 $ Sitework - Roadway - Asphalt 3 TN $ $ Sitework - Roadway - Retro-reflective pavement markers 40 EA $3.34 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 72 LF $4.06 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 12,950 SF $5.50 $71, Landscape - Irrigation 12,950 SF $0.80 $10, Landscape - Topsoil (6" Depth) 240 CY $40.00 $9, (TOTAL: I $154,622 I 115% CONTINGENCY: I $23,193( Design / Permit Fee Estimates $22,000 Engineering / Survey/ Geotechnical Landscape Architecture Permitting!GRAND TOTAL: Quantity Unit Unit Cost LS $11, LS $3, LS $7, Subtotal' $11, $3, $7, I $199,815 I

20 llb - Pelican Bay North Tram Station with New Turn Lane Relocated Option 1 - Striping Only $123,670 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 630 SY $8.00 $5, Demolition - Clearing and Grubbing 7,820 SF $0.49 $3, Demolition - Tree Removal (Includes stump) 3 EA $ $1, Demolition - Palm Removal (Includes stump) 20 EA $ $4, Demolition - Curb 870 LF $6.00 $5, Demolition - Sidewalk 10 SY $12.00 $ Demolition - Signage 1 LS $1, $1, Demolition - Thermoplastic Striping (Remove) 160 LF $2.08 $ Sitework - Concrete - Sidewalk (5.0') 10 SY $32.00 $ Sitework - Concrete - Type 'A' Curb 964 LF $10.50 $10, Sitework - Roadway - 8" Limerock Base 416 SY $6.50 $2, Sitework - Roadway - Asphalt 34 TN $ $6, Sitework - Roadway - Retro-reflective pavement markers 40 EA $3.34 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 260 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 72 LF $4.06 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 9,770 SF $5.50 $53, Landscape - Irrigation 9,770 SF $0.80 $7, Landscape - Topsoil (6" Depth) 181 CY $40.00 $7, Option 2 - Concrete Pavers $137,494 Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 690 SY $8.00 $5, Demolition - Clearing and Grubbing 7,820 SF $0.49 $3, Demolition - Tree Removal (Includes stump) 3 EA $ $1, Demolition - Palm Removal (Includes stump) 20 EA $ $4, Demolition - Curb 870 LF $6.00 $5, Demolition - Sidewalk 10 SY $12.00 $ Demolition - Signage 1 LS $1, $1, Sitework - Concrete - Brick Pavers 620 SF $5.50 $3, Sitework - Concrete - Sidewalk (5.0') 10 SY $32.00 $ Sitework - Concrete - Slab (Up to 8" thick reinforced) 790 SF $12.80 $10, Sitework - Concrete - Type 'A' Curb 964 LF $10.50 $10, Sitework - Roadway - 8" Limerock Base 440 SY $6.50 $2, Sitework - Roadway - Asphalt 35 TN $ $7, Sitework - Roadway - Retro-reflective pavement markers 40 EA $3.34 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 72 LF $4.06 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 9,770 SF $5.50 $53, Landscape - Irrigation 9,770 SF $0.80 $7, Landscape - Topsoil (6" Depth) 181 CY $40.00 $7, Option 3 - Clay Brick Paving $139,819 Quantity Unit Unit Cost Subtotal! Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 690 SY $8.00 Demolition - Clearing and Grubbing 7,820 SF $0.49 Demolition - Tree Removal (Includes stump) 3 EA $ Demolition - Palm Removal (Includes stump) 20 EA $ Demolition - Curb 870 LF $6.00 Demolition - Sidewalk 10 SY $12.00 Demolition - Signage 1 LS $1, Sitework - Concrete - ADA Compliant Ramp Assembly 2 EA $ Sitework - Clay - Brick Pavers 620 SF $9.25 Sitework - Concrete - Sidewalk (5.0') 10 SY $32.00 Sitework - Concrete - Slab (Up to 8" thick reinforced) 790 SF $12.80 Sitework - Concrete - Type 'A' Curb 964 LF $10.50 Sitework - Regulatory Signage - Decorative Post Mount 10 EA $1, Sitework - Roadway - 8" Limerock Base 440 SY $6.50 Sitework - Roadway - Asphalt 35 TN $ Sitework - Roadway - Retro-reflective pavement markers 40 EA $3.34 Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 72 LF $4.06 Landscape - Shrubs, Grasses, Groundcovers, Mulch 9,770 SF $5.50 Landscape - Irrigation 9,770 SF $0.80 Landscape - Topsoil (6" Depth) 181 CY $40.00 $5, $3, $1, $4, $5, $ $1, $1, $5, $ $10, $10, $11, $2, $7, $ $ $ $53, $7, $7,240.00

21 llb - Pelican Bay North Tram Station with New Turn Lane Relocated WilsonMiller - March 26, 2010 Option 3 - Clay Brick Paving $139,819 (TOTAL: Demolition - Asphalt to 4" Thick (Includes limerock base to 8") 690 SY $8.00 $5, Demolition - Clearing and Grubbing 7,820 SF $0.49 $3, Demolition - Tree Removal (Includes stump) 3 EA $ $1, Demolition - Palm Removal (Includes stump) 20 EA $ $4, Demolition - Curb 870 LF $6.00 $5, Demolition - Sidewalk 10 SY $12.00 $ Demolition - Signage 1 LS $1, $1, Sitework - Clay - Brick Pavers 620 SF $9.25 $5, Sitework - Concrete - Sidewalk (5.0') 10 SY $32.00 $ Sitework - Concrete - Slab (Up to 8" thick reinforced) 790 SF $12.80 $10, Sitework - Concrete - Type 'A' Curb 964 LF $10.50 $10, Sitework - Roadway - 8" Limerock Base 440 SY $6.50 $2, Sitework - Roadway - Asphalt 35 TN $ $7, Sitework - Roadway - Retro-reflective pavement markers 40 EA $3.34 $ Sitework - Thermoplastic Striping, STD, White, Solid - 12" Width 160 LF $2.01 $ Sitework - Thermoplastic Striping, STD, White, Solid - 24" Width 72 LF $4.06 $ Landscape - Shrubs, Grasses, Groundcovers, Mulch 9,770 SF $5.50 $53, Landscape - Irrigation 9,770 SF $0.80 $7, Landscape - Topsoil (6" Depth) 181 CY $40.00 $7, % CONTINGENCY: I I $139,819 I $20,973( Design / Permit Fee Estimates $22,000 Item Engineering / Survey/ Geotechnical Landscape Architecture Permitting (GRAND TOTAL: Quantity Unit Unit Cost LS $11, LS $3, LS $7, Subtotal' $11, $3, $7, I $182,792 I

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in May 2010 construction rates)

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in May 2010 construction rates) Pelican Bay Community Improvement Plan Lighting Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in May 2010 construction rates) D3-A: Replace the existing HID ballast and

More information

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015 GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado Schematic Design January 2015 1 2 3 4 5 6 7 8 9 DESIGN WORKSHOP Landscape Architecture Land Planning Urban Design Tourism Planning Asheville Aspen Austin

More information

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts Sectional View of Concepts PAVEMENT FEATURES PAVEMENTS INTERSECTION INTERSECTION TREATMENTS LANDSCAPE BUFFER LANDSCAPE DESIGN GPCID CD D: GWINNETT P LACE DRIVE & MALL B COMPLETE STREET DESIGN ELEMENTS

More information

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle GREENING THE BOULEVARD Katherine Spitz Associates Inc. 4212½ Glencoe Avenue Marina Del Rey, CA 90292 310 574 4460 Fax 574 4462 January 2008 Table of Contents Overview Proposed Design Improvements Illustration

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES 01050-1 Construction Surveying 1 LS 01500-1 Temporary Fences & Barricades 1,500 LF 02600-1 Shoring, Cofferdam, Temp. Sheeting, & Dewatering 1 LS 01565-1 Storm Drainage & Erosion Sediment Control 1 LS 01565-2

More information

JOB CREATION PROJECTS

JOB CREATION PROJECTS SPRINGDALE INFRASTRUCTURE DEVELOPMENT PLAN JOB CREATION PROJECTS The following pages provide a narrative description, preliminary street alignment and a preliminary construction cost estimate for each

More information

FDOT D4 Complete Streets

FDOT D4 Complete Streets FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,

More information

MEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item

MEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item MEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item TO: THRU: FROM: RE: Mayor Leon Skip Beeler and Members of the City Commission Chuck Billias, City Manager Anthony

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: September 2, 2015 # 9 SUBJECT: ELECTION DISTRICT: Identification of Funds for the Traffic Signal at the Intersection of Northstar Boulevard

More information

Conceptual Design. Main Street Enhancement and Extension Project. Bothell, Washington. June 11, 2009

Conceptual Design. Main Street Enhancement and Extension Project. Bothell, Washington. June 11, 2009 Conceptual Design Main Street Enhancement and Extension Project Bothell, Washington June 11, 2009 Berger/ABAM Engineers and Cascade Design Collaborative, Inc For Main Street Bothell to succeed it must

More information

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. Mixed-use and infill development should maintain or enhance

More information

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area City/CCSD 28E Agreement February 14, 2017 Page 1 28E Agreement Between the City of Cedar Rapids, Iowa (City) and College Community School District (CCSD) Regarding the construction of a roundabout at the

More information

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013 Office of Capital Planning and Development; 130 Oak Creek Building; Corvallis, Oregon 97331-2001 CPC STAFF REPORT: SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN

More information

GUIDELINES FOR PERMEABLE SIDEWALK-LANDSCAPING PERMIT

GUIDELINES FOR PERMEABLE SIDEWALK-LANDSCAPING PERMIT GUIDELINES FOR PERMEABLE SIDEWALK-LANDSCAPING PERMIT Green spaces are vital to San Francisco s quality of life as they provide a range of environmental benefits and bring beauty to our neighborhoods and

More information

ORDINANCE NO

ORDINANCE NO ORDINANCE NO. 2014-032 Amending Ordinance 2012-059 granting encroachment to the University of South Carolina for use of the right of way area of the 1500 block of Greene Street and 800 block of Pickens

More information

VEHICULAR AND PEDESTRIAN CIRCULATION

VEHICULAR AND PEDESTRIAN CIRCULATION This perspective sketch communicates the intended character and quality of a proposed streetscape design. Locate benches near a major intersection where people tend to gather. Seating and lighting provide

More information

University Park Subdivision Street Assessment Report

University Park Subdivision Street Assessment Report University Park Subdivision Street Assessment Report Prepared for: University Park Subdivision TABLE OF CONTENTS Introduction... 3 Existing Conditions Analysis... 4 Street Improvements... 5 Existing:...

More information

russell+mills studios

russell+mills studios S C H E M A T I C D E S I G N B O O K L E T O C T O B E R 2 2, 2 0 0 8 114 east oak st, fort col TABLE OF CONTENTS...ii SITE CONTEXT...1 BACKGROUND...2 PARK PROGRAM...3 SLOPE ANALYSIS...4 SPATIAL ANALYSIS...5

More information

Butchers Hill. Greening Feasibility FINAL REPORT MAY 2009 N PORT ST N WOLFE ST S MADEIRA ST. Submitted To: Submitted By:

Butchers Hill. Greening Feasibility FINAL REPORT MAY 2009 N PORT ST N WOLFE ST S MADEIRA ST. Submitted To: Submitted By: S WOLFE ST N CASTLE ST N WASHINGTON ST S WASHINGTON ST S CHAPEL ST S DURHAM ST S DUNCAN ST N MADEIRA ST N MONTFORD AVE Butchers Hill Greening Feasibility N DUNCAN ST MULLIKIN ST N PORT ST N WOLFE ST E

More information

Construction Engineering & Inspection

Construction Engineering & Inspection Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over

More information

Design Guidelines and Standards for Sight Triangles. Sight Triangle MANUAL

Design Guidelines and Standards for Sight Triangles. Sight Triangle MANUAL Design Guidelines and Standards for Sight Triangles Sight Triangle MANUAL Table of Contents 1.0 Introduction..............................................7 1.1 Key Terms..............................

More information

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design 1 Fifth and Detroit Street Design May 2017 Capital Improvements Committee Agenda 2 Review Street Configuration Prior Meeting Review Outreach Synopsis Functional Street Design Refinements Curb Edge, Turning

More information

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre Main Street Reconstruction From Ninth Line to Stouffer Street Town of Whitchurch-Stouffville Public Information Centre November 23, 2016 4:30 to 6:00 pm & 7:00 to 8:00 pm 6240 Main Street, Stouffville

More information

3 Focusing the Vision Following the second workshop, the Project

3 Focusing the Vision Following the second workshop, the Project 3 Focusing the Vision Following the second workshop, the Project Team undertook the task of refining the Vision developed during the workshops. The final plan addresses participant desires while incorporating

More information

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

Garfield Elementary School Feasibility Study for New Library Building Project Number A C Larry Teixeira Selma Unified School District 3036 Thompson Avenue Selma, CA 93662 Subject: Feasibility Study for New Library Building Project Number A 12-8581.00 C Dear Mr. Teixeira: At your request, we

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 27, 2007 DATE: January 12, 2007 SUBJECT: U-3101-04-2 Use Permit Review for drive-through facilities; premises known as 5222 Lee Highway

More information

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project What is the Main Street Project? The Main Street Project is a roadway project that addresses pavement, infrastructure and safety issues

More information

PROJECTS UNDER CONSTRUCTION

PROJECTS UNDER CONSTRUCTION Project Name Project Status Project Funding Project Manager PJ 2144 Clayton Rd-Treat Blvd Intersection Improvements Widen the Clayton Road/Treat Blvd intersection and upgrade the traffic signal. Construction

More information

Fall 2017 Construction Update

Fall 2017 Construction Update Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,

More information

PARKLET PROPOSAL PACKAGE & PROCESS

PARKLET PROPOSAL PACKAGE & PROCESS 500.3 I PARKLETS The term parklet refers to a small temporary constructed seating or community gathering area over an on-street parking space or an extension of the sidewalk into the operating State highway

More information

COMPLETE GREEN STREET CHECKLIST

COMPLETE GREEN STREET CHECKLIST COMPLETE GREEN STREET CHECKLIST This document was developed to dissect the structure of an urban street and explore opportunities to make our streets more complete while also integrating green street strategies.

More information

CHAPTER 8. Mrs. Zimman s Class - Central Elementary

CHAPTER 8. Mrs. Zimman s Class - Central Elementary SUSTAINABILITY CHAPTER 8 Mrs. Zimman s Class - Central Elementary 8.1 OVERVIEW Green infrastructure also known as low impact development (LID) and environmental or sustainable site design is an environmentally

More information

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B

More information

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details CITY OF LATHROP Department of Public Works DESIGN & CONSTRUCTION Standard Details January 2014 General G-1A Signature Blocks G-1B Signature Blocks G-2 Drafting Standards G-3 Drafting Standards G-4 Drafting

More information

3.13. Development Guidelines

3.13. Development Guidelines 3.3 Landscaping Elements Landscaping should be used to frame and soften structures, define site functions, enhance the quality of the environment, and screen undesirable views. Safety, environmental impacts,

More information

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change* 12/6/2017 3012115-03 Northwood Dr NE, Glass to s/o Brookland $980,000.00 J. 4/16/2018 12/13/2017 3012121-02 O Ave NW, 16th to Ellis $4,065,000.00 Tippe; Lee J. 3/19/2018 Collins Rd NE from E of Northland

More information

DESIGN CRITERIA PACKAGE

DESIGN CRITERIA PACKAGE RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA

More information

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015 AGENCY: 2016 REVISIONS COMMENT FORM Section Title Number Chapter 1 Introduction Comment 1.1 CDOT Mission Statement 1.2 Purpose of Rules and Regulations for Construction in the Public Way 1.3 Chicago Department

More information

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE CITY STREETS AS PART OF STATE HIGHWAYS GUIDELINES REACHED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION

More information

Corridor Identity. Section 9. Introduction. Corridor Guiding Principles

Corridor Identity. Section 9. Introduction. Corridor Guiding Principles Corridor Identity An attractive and healthy community is a critical element of a quality place, and the design of quality places is a balance between environmental, economic, and social considerations.

More information

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015 CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY Adopted by the Carver County Board of Commissioners March 3, 2015 Policy Statement Goals It is the goal of Carver County Public Works to provide

More information

ATTACHMENT A. SILVERDALE DESIGN STANDARDS Amendments to the Waaga Way Town Center Chapter

ATTACHMENT A. SILVERDALE DESIGN STANDARDS Amendments to the Waaga Way Town Center Chapter ATTACHMENT A SILVERDALE DESIGN STANDARDS Amendments to the Waaga Way Town Center Chapter Chapter 10. Waaga Way Town Center 10.1 Physical Identity Elements & Opportunities The Waaga Way Town Center includes

More information

23 EA , , , , , , , LF , , ,596.

23 EA , , , , , , , LF , , ,596. Mast Arm Traffic Signals at Central Ave. 5th, 6th, 8th & 31st St. Engineering & Capital Improvements Department, City of St. Petersburg, FL Project No.: 11027-112 Bid date: January 10, 2012 Item Description

More information

3.0 master plan concept

3.0 master plan concept 3.0 master plan concept 3.1 introduction The purpose of the Huron Church Road Master Plan Concept is to provide an overview of the Master Plan design process, identify preliminary streetscape installations

More information

AGENDA ACTION ITEMS INFORMATION ITEMS

AGENDA ACTION ITEMS INFORMATION ITEMS NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION

More information

Pine Avenue Improvement Project

Pine Avenue Improvement Project Seaside Way to ocean Boulevard ocean Boulevard to 7 th Street 7 th Street to anaheim Street L O ng BeACh DeveLOpment ServiC e S Building a Better long Beach Pine Avenue Improvement Project Seaside Way

More information

Roads Plan

Roads Plan Roads Plan 2019-2023 Background Road conditions have been a problem for Painesville City over the past decade. Between 2009 and 2013, the city was only able to dedicate $1.9 million in total road repairs

More information

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 The following items are required for the preliminary plat. Numbers correspond with those on the example preliminary plat. RENO COUNTY SUBDIVISION REQUIREMENTS

More information

Maury County Projects

Maury County Projects Maury Projects Main Street (SR-6/US-31N) and Donald F. Ephlin Parkway Signage & Landscaping TIP # 2016-212-224 Streetscaping Columbia Maury Length 0.00 Regional Plan ID Consistent Air Quality Status Exempt

More information

Cottage Grove Road Reconstruction. City of Madison Engineering

Cottage Grove Road Reconstruction. City of Madison Engineering Public Informational Meeting Cottage Grove Road Reconstruction October 8, 2015 Presentation Outline Introduction Project Purpose & Need Proposed Design Overview Environmental Concerns Pedestrian Needs

More information

Municipality of Anchorage, Alaska Parks & Recreation Department

Municipality of Anchorage, Alaska Parks & Recreation Department Municipality of Anchorage, Alaska Parks & Recreation Department 632 W. 6 th Avenue, Suite 630 P.O. Box 196650 Anchorage, AK 99519 Tel 907-343-4355 URL www.muni.org/departments/parks MEMORANDUM Date: October

More information

Millar Park. Master Plan. Prepared for CITY OF UNIVERSITY CITY Department of Public Works & Parks 6801 Delmar Avenue University City, Missouri 63130

Millar Park. Master Plan. Prepared for CITY OF UNIVERSITY CITY Department of Public Works & Parks 6801 Delmar Avenue University City, Missouri 63130 Millar Park Master Plan Prepared for CITY OF UNIVERSITY CITY Department of Public Works & Parks 6801 Delmar Avenue University City, Missouri 63130 Prepared by PLANNING DESIGN STUDIO 727 North First Street

More information

Lilburn, Georgia A Pedestrian Master Plan Report

Lilburn, Georgia A Pedestrian Master Plan Report Lilburn, Georgia A Prepared for the City of Lilburn by August 15, 2003 Landscape Architecture Historic Preservation Planning Environmental Assessment Lilburn, Georgia Table of Contents 1.0 Introduction...1

More information

Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT)

Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT) Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT) 1 Firm Overview 2 We are a well established multi disciplinary firm that has

More information

Spreadsheet Report Page 1. WREDP Infrastructure Wickenburg, AZ SD Estimate Rev

Spreadsheet Report Page 1. WREDP Infrastructure Wickenburg, AZ SD Estimate Rev Spreadsheet Report Page 1 Phase I Wickenburg, AZ SD Estimate Rev 0 9-29-11 Project name Estimator Labor rate table Equipment rate table Job size Duration Wickenburg AZ Hal White Denver Denver 121 ac 9

More information

Chapter 14 Streetscape Improvements

Chapter 14 Streetscape Improvements This chapter presents streetscape design concepts for key streets and gateways in the Downtown Specific Plan area. This chapter is organized as follows: 14 Streetscape Improvements 14.1 Streetscape Treatments

More information

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering AGENDA 1. Project Scope & Schedule 2. Steering Committee & Community

More information

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs The following form is to be filled out by the Project Consultant(s) and submitted to the City of Kitchener, Planning Division for

More information

This page left intentionally blank.

This page left intentionally blank. July 2012 This page left intentionally blank. Table of Contents Appendix A : Project Development Checklist Appendix B: At-Grade Rail Crossings Appendix C: Maintenance and Operations Examples Appendix D:

More information

City of Aurora Planning Department DESIGN STANDARDS FOR MOTOR VEHICLE FUEL DISPENSING STATION. August 3, 1998

City of Aurora Planning Department DESIGN STANDARDS FOR MOTOR VEHICLE FUEL DISPENSING STATION. August 3, 1998 City of Aurora Planning Department DESIGN STANDARDS FOR MOTOR VEHICLE FUEL DISPENSING STATION August 3, 1998 1. GENERAL PURPOSE AND APPLICABILITY The following design standards for motor vehicle fuel dispensing

More information

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016 KASPER City of Georgetown, Texas PUD Planned Unit Development December 30, 2015 Revised January 27, 2016 Applicant: Sentinel Land Company, LLC 4910 Campus Drive Newport Beach, CA Prepared by: SEC Planning

More information

Carson Street Streetscape Improvements. Request for Proposals

Carson Street Streetscape Improvements. Request for Proposals Carson Street Streetscape Improvements Request for Proposals Complete Design Services for a Landscape/Streetscape Plan for Carson Street (Pioneer Boulevard to Norwalk Boulevard) Submittal Deadline: October

More information

PROJECT SITE The Proposed Project includes the Allen and Pike Street malls between Delancey and South Streets (see Figure 2C-1).

PROJECT SITE The Proposed Project includes the Allen and Pike Street malls between Delancey and South Streets (see Figure 2C-1). Chapter 2, Section C: A. INTRODUCTION This chapter considers the potential of the proposed Reconstruction of the Allen and Pike Street Malls project to affect the urban design characteristics and visual

More information

DRAFT. CITY OF ESCONDIDO 11th Avenue Park WORKSHOP SUMMARY December 17, 2008

DRAFT. CITY OF ESCONDIDO 11th Avenue Park WORKSHOP SUMMARY December 17, 2008 DRAFT RJM DESIGN GROUP, INC. CITY OF ESCONDIDO 11th Avenue Park WORKSHOP SUMMARY December 17, 2008 INTRODUCTION This report summarizes the results of the planning process that was conducted as a part of

More information

Mary Hills Nature Area. Roadway Lighting. The Minneapolis Clinic of Neurology Courage Kenny Rehabilitation Institute

Mary Hills Nature Area. Roadway Lighting. The Minneapolis Clinic of Neurology Courage Kenny Rehabilitation Institute PUBLIC REALM IMPROVEMENTS Mary Hills Nature Area Enhanced Programming Glenview Terrace Valley View Roadway Lighting Enhanced Streetscape Trail Lighting / Roadway Lighting Wayfinding Public Art The Minneapolis

More information

BEMIDJI CITY COUNCIL Work Session Agenda Monday July 9, 2012

BEMIDJI CITY COUNCIL Work Session Agenda Monday July 9, 2012 BEMIDJI CITY COUNCIL Work Session Agenda Monday July 9, 2012 City Hall Conference Room 5:30 p.m. 1. CALL TO ORDER / ROLL CALL 2. REVIEW PARK PLANS FOR PAUL BUNYAN PARK, LIBRARY PARK AND SOUTH SHORE BAUER

More information

TAC/CAC, TPO Project Update February 2016

TAC/CAC, TPO Project Update February 2016 A1A MULTIMODAL CORRIDOR PLANNING AND ENGINEERING ANALYSIS Florida Department of Transportation TAC/CAC, TPO Update February 2016 PRESENTATION FOOTERT Meeting Agenda What We Plan To Discuss Background New

More information

Technical Bullet Series on Clay Brick Pavers

Technical Bullet Series on Clay Brick Pavers 2701 Shorefair Drive, Winston-Salem, NC 27105 pinehallbrick.com 1-800-334-8689 Technical Bullet Series on Clay Brick Pavers #4 Designing For Heavy Vehicular Traffic Abstract This Tech Bullet focuses on

More information

Design Guidelines for Residential Subdivisions

Design Guidelines for Residential Subdivisions Design Guidelines for Residential Subdivisions Development Services 972-466-3225 cityofcarrollton.com This page intentionally left blank. Table of Contents Purpose... 1 Design Objectives... 1 Design Guidelines

More information

Corridor Investment Projects (FY FY2012)

Corridor Investment Projects (FY FY2012) City of Long Beach, California Department of Development Services Corridor Investment Projects (FY1980 - FY2012) Building A Better Long Beach North Long Beach Corridor Investments Bixby Knolls on Long

More information

Property Owners Association. Annual Meeting Notice July 26, :00pm - 7:00pm Park City Marriott 1895 Sidewinder Drive Park City, Utah

Property Owners Association. Annual Meeting Notice July 26, :00pm - 7:00pm Park City Marriott 1895 Sidewinder Drive Park City, Utah Property Owners Association Annual Meeting Notice July 26, 2016 5:00pm - 7:00pm Park City Marriott 1895 Sidewinder Drive Park City, Utah Annual Meeting Agenda Welcome Approval of Minutes Introduction of

More information

BEST PRACTICES FOR PROJECT NOMINATIONS TA Set-Aside Program

BEST PRACTICES FOR PROJECT NOMINATIONS TA Set-Aside Program BEST PRACTICES FOR PROJECT NOMINATIONS 2017 TA Set-Aside Program Focus of this presentation Photos Public Support Maps & Exhibits Proposed Budget Design Details Project Evaluation & Selection Criteria

More information

County of El Dorado Standard Plans

County of El Dorado Standard Plans County of El Dorado Standard Plans Table of Contents Section 1 General Standards GS-01 General Legend and Abbreviations Section 2 Roads and Streets RS-01 RS-02 RS-03 RS-04 RS-05 RS-06 RS-07 RS-08 RS-20

More information

Transportation Alternatives Program (TAP) Experience

Transportation Alternatives Program (TAP) Experience 1 Transportation Alternatives Program (TAP) Experience McCormick Taylor is a full-service engineering firm providing creative design, planning, and environmental solutions to the challenges of everyday

More information

FREEWAY/TOURIST DISTRICT

FREEWAY/TOURIST DISTRICT FREEWAY/TOURIST DISTRICT DESIGN STANDARDS FOR THE CITY OF MOUNTLAKE TERRACE March, 2014 MOUNTLAKE TERRACE FREEWAY/TOURIST DESIGN STANDARDS March, 2014 1 TABLE OF CONTENTS Introduction...1 Design Site Design

More information

Hidden Pointe Landscape Master Plan. June, archi terra

Hidden Pointe Landscape Master Plan. June, archi terra Hidden Pointe Landscape Master Plan June, 2006 t h e archi terra g r o u p 1 Table of Contents Background Purpose and Goals of the Master Plan Master Plan Process Existing Conditions Entrance Hidden Pointe

More information

Chapter 6. Green Streets

Chapter 6. Green Streets Chapter 6. Green Streets Description Green streets are designed in a holistic manner that minimizes impervious surfaces, emphasizes landscaped elements, includes measures for enhancing water quality, while

More information

Index to Projects by Project Name

Index to Projects by Project Name Index to Projects by Project Name Project # PROJECT NAME PAGE 2134 2119 PR-1109 Clayton Road (Market Street to Oakland Avenue) Sidewalk Repair 911 System Replacement and Dispatch Room Remodel ADA Barrier

More information

North Hutchinson Island 7.55 Acres Vacant Land Approved for 30 Townhome Units

North Hutchinson Island 7.55 Acres Vacant Land Approved for 30 Townhome Units OFFERING MEMORANDUM Contact: Yates & Company Realty, LLC 255 Alhambra Circle Suite 325, Coral Gables, FL 33134 Phone: 305-446-0406 Cell: 786-258-6500 Email: brendayates@bellsouth.net Website: www.yatesandcompany.net

More information

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street Memorandum DATE November 10, 2011 CITY OF DALLAS TO Trinity River Corridor Project Committee Members: Vonciel Jones Hill (Chair) Linda Koop (Vice Chair), Monica Alonzo, Scott Griggs, Angela Hunt, and Delia

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Schooleys Mountain Bridge Rehabilitation Project ID Numbers: N1707 / 173470 Schooleys Mountain Road Bridge was built in 1920 and widened in 1937. The project is a replacement of the bridge structure and

More information

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 SR 62 Traffic and Pedestrian Improvements from Apache Trail to Palm Avenue (PLHD) The project includes construction of curbs, gutters,

More information

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT DATE: April 29, 2013 STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT 1100 Patricia Boulevard, Prince George, B.C., V2L 3V9 TO: FROM: SUBJECT: MAYOR AND COUNCIL JESSE DILL, PLANNER Development Variance

More information

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014 IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014 INTRODUCTION The City of Cedar Falls and the Iowa Department of Transportation are conducting a Public Informational

More information

Public input has been an important part of the plan development process.

Public input has been an important part of the plan development process. Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the

More information

Design Considerations

Design Considerations Essential to the development of a successful Master Plan for the Park Complex is input from the community that the park will serve. The community outreach component of the planning process included numerous

More information

GROUND LEVEL ENLARGEMENT / STREETSCAPE AT PIER AVENUE STRAND & PIER HOTEL HERMOSA BEACH HARDSCAPE MATERIAL KEY MAP PIER AVENUE

GROUND LEVEL ENLARGEMENT / STREETSCAPE AT PIER AVENUE STRAND & PIER HOTEL HERMOSA BEACH HARDSCAPE MATERIAL KEY MAP PIER AVENUE COMPOSITE LANDSCAPE LOT B ( MAX SPACES) WILSHIRE BLVD, SUITE 0 BEVERLY HILLS, CA 0 TH STREET WILSHIRE BLVD, SUITE 0 BEVERLY HILLS, CA 0 BRYANT STREET, SUITE 00 SAN FRANCISCO, CA 0 S. FIGUEROA ST. TH FLOOR

More information

NEWPORT NEWS/WILLIAMSBURG INTERNATIONAL AIRPORT DESIGN AND SUSTAINABILTY GUIDELINES

NEWPORT NEWS/WILLIAMSBURG INTERNATIONAL AIRPORT DESIGN AND SUSTAINABILTY GUIDELINES NEWPORT NEWS/WILLIAMSBURG INTERNATIONAL AIRPORT DESIGN AND SUSTAINABILTY GUIDELINES VERSION 1.6 August 2011 PREPARED BY: 900 Bland Boulevard Suite G Newport News, Virginia 23602 DESIGN AND SUSTAINABILITY

More information

Shell Beach Road Streetscape Frequently asked Questions

Shell Beach Road Streetscape Frequently asked Questions Shell Beach Road Streetscape Frequently asked Questions General What is the Shell Beach Road Streetscape Improvements Project? The overall goal of the Shell Beach Road Streetscape Improvement project is

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

STANDARD DETAILS QUICK REFERENCE

STANDARD DETAILS QUICK REFERENCE STANDARD DETAILS QUICK REFERENCE Note: DWGs need to be saved locally before opening file. Requires AutoCad, DWG TrueView, or Autodesk Design Review (the later two are available for free from http://usa.autodesk.com/)

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 12-10-15 Leisure World Clubhouse II Addition Fitness Center, Limited Site Plan Amendment

More information

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE SFMTA Municipal Transportation Agency Image: a bus in front of the Palace of the Legion of honor SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN AVENUE @ OCEAN AVENUE Community Meeting May 23, 2012 San Francisco,

More information

Below the trestle lie artifacts of past industry along the Cobbossee Stream. South end of the trestle, at the proposed trailhead area.

Below the trestle lie artifacts of past industry along the Cobbossee Stream. South end of the trestle, at the proposed trailhead area. The existing railroad trestle, when refitted as a pedestrian walkway, could be an important, eye-catching, scenic component to the Cobbossee Stream Trail. South end of the trestle, at the proposed trailhead

More information

Grafton Street < N September 2, 2015

Grafton Street < N September 2, 2015 Grafton Street < N September 2, 2015 Project Background, Site Inventory + Analysis Brunswick Street Duke Street Scotia Bank Centre Carmichael Street Argyle Street City Hall Grand Parade Barrington Street

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Landscape Architecture Program NUMBER: SPECIFIC SUBJECT: Integration of Landscape

More information

CHURCH STREET MAIN STREET CHURCH STREET

CHURCH STREET MAIN STREET CHURCH STREET CHURCH STREET NOTES:. See Civil Sheets for Roadway, Crosswalks, Utilities, Lighting, and Maintenance of Traffic. 2. Refer to this sheet for brick and concrete unit paver laying patterns. See detail sheets

More information

February 17, Sara Ullman Planner I. Sincerley,

February 17, Sara Ullman Planner I. Sincerley, February 17, 2016 Sara Ullman Planner I City of Aurora Planning Department Re: Mrachek Middle School Replacement (#1116704)/Response Initial Submission Review Dear Ms. Ullman, Thank you for your assistance

More information

CRA Five Year Capital Improvement Plan. September 2, 2015

CRA Five Year Capital Improvement Plan. September 2, 2015 CRA Five Year Capital Improvement Plan September 2, 2015 Downtown CRA Recap Introduction Downtown Capital Improvement Projects: $2.6M available for FY 2016. Includes the recent loan of $2.0M. DOWNTOWN

More information

STREETSCAPE IMPROVEMENTS - RECOMMENDATIONS

STREETSCAPE IMPROVEMENTS - RECOMMENDATIONS STREETSCAPE IMPROVEMENTS - RECOMMENDATIONS Figure 4.3.1- A map of all of the recommended streetscape improvements. The key component of downtown s public realm, apart from its public spaces, is its street

More information