2 SECTION EARTHWORK PART 1 GENERAL 1.1 SECTION INCLUDES A. Grading and Excavation B. Trenching C. Bedding D. Backfill and Compaction (New and Native) E. Aggregate Material F. Geotextile Fabric PART 2 PRODUCTS 2.1 SOIL STERILANT Herbicide shall be Garlon 4 or engineer approved equal. If any case, all herbicides used on this project shall be applied by a licensed applicator for the type of herbicides being applied. 2.2 AGGREGATE MATERIALS AND PIPE BEDDING Crushed surfacing (WSDOT (3)) Access Road Access paths around cells Course Aggregate (WSDOT (2)) Cell Fill 4 inch stream bed cobbles Pea Gravel (WSDOT (4)C) Cell Fill AASHTO Grading #8 Round Rock (WSDOT9-03.1(4)C) Cell Fill 1 to 2 inch round rock Sand Bedding WSDOT (2)B Class 2) Cell Bedding Pipe Bedding Quarry Spalls (WSDOT ) Construction Entrance (as required for maintenance) Cell perimeter 2.3 GEOTEXTILE FABRIC A. All new access roads and access paths around cells shall be lined with a geotextile fabric under crushed rock surfacing. Access roads geotextile: Geotex 200 ST by Proper Geotextile Systems or approved equal. B. All new perimeter of cell access paths shall be lined with a geomembrane under a crushed rock surfacing. Access path geomembrane: Geotex 651 by proper geotextile systems or approved equal. 2.4 GEOMEMBRANE LINER A. All new treatment cells/ponds shall be lined with a single continuous 60 mil thick HDPE or 40 mil thick PVC liner in accordance with Department of Ecology standards. Section Page 1 Specification PG F
3 B. Liners shall extend beyond cell edge, under gravel access path/road, a minimum of 5-0 on all sides. PART 3 EXECUTION 3.1 CONSTRUCTION DETAILS Upon completion of all clearing and grubbing operations and after all excavation and reconsolidation of in-situ materials is complete to the satisfaction of the engineer, road/path surfacing shall be applied at the locations shown on the drawings and further specified in these specifications. Soil sterilant shall be applied prior to installing surfacing. The contractor shall submit the name of the aggregate materials suppliers. Provide materials from the same source throughout the project. Change of source requires engineer approval. Aggregate materials which the contractor intends to store on-site shall separate differing materials with dividers or stockpile apart to prevent mixing. 3.2 EXCAVATION AND GRADING All materials to be removed and replaced shall be native materials. All materials shall be compacted in lifts as stated therein. Prior to performing any grading operations, the contractor shall: A. Verify site conditions, survey bench marks and elevations for the work are as indicated. B. Locate, identify, and protect utilities from damage. C. Fill areas to required grades or blend into existing grades as directed with approved backfill materials. Correct areas over-excavated as directed by the engineer or his designated representative with approved backfill material. 3.3 TRENCHING All trenches shall be sufficiently true to line and grade to permit accurate alignment of pipe and trench shall be as nearly rectangular in section with reasonable sheeting and bracing as the ground requires and shall clear the side of the pipe sufficiently to permit proper tamping of the pipe bedding. If the trench bottom is deemed unsuitable by the engineer for supporting the pipe, the unsuitable material shall be removed and disposed of and sand shall be placed for pipe bedding as directed by the engineer. The contractor shall keep the dust from his operations under control at all times to prevent nuisances. Boulders or rocks shall be entirely removed or cut to full trench width and 12-inches below grade. Where pipe is to be laid on fill, all top soil and debris shall be removed from the existing ground and the fill made of suitable material thoroughly compacted to pipe grade by methods approved by the engineer. The contractor shall provide adequate cross drainage and prevent flooding of the trench. Section Page 2 Specification PG F
4
5
Milpitas College Extension Milpitas Dry Landscape
SAN JOSÉ / EVERGREEN COMMUNITY COLLEGE DISTRICT Milpitas College Extension Milpitas Dry Landscape PROJECT MANUAL VOLUME II TABLE OF CONTENTS DIVISION 02 through 30 Not Used DIVISION 31 - EARTHWORK Document
More information3" TO 4" OF TOPSOIL 2:1 MIRAFI HP 565 GEO FABRIC OR EQUIVALENT 9' SPILLWAY EL=7147 2:1 SPILLWAY SECTION N.T.S. TOP OF POND EL=7149' RIP-RAP D 50 8" WRAPPED IN FILTER FABRIC 45 MIL HDPE POND LINER OR EQUIVALENT
More informationDepartment of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16
GENERAL NOTES: SYMBOL LEGEND 1. All work shall comply with the constriction specifications, drawings, project-specific quality assurance plan and other contract requirements. 2. All notes on the drawings
More informationI N D U S T R I A L Y A R D S
I N D U S T R I A L Y A R D S GEOTEXTILES INDUSTRIAL YARDS 1.0 Features of INDUSTRIAL PG 2 YARDS 2.0 How Typar geotextiles PG 2 work 4.0 Installation guide PG 7 5.0 Overlap and joining PG 8 6.0 Setting
More informationHILCORP ALASKA, LLC HAPPY VALLEY MIDDLE NATURAL GAS EXPLORATION PROJECT DEEP CREEK UNIT BOUNDARY PROPOSED ACCESS ROAD T02S T03S R14W
, LLC STERLING HWY. M.P. 142.8 28 33 TIM AVE. DEEP CREEK UNIT BOUNDARY 27 26 25 TIM AVE. CULVERT REPLACEMENT PROPOSED ACCESS ROAD 34 35 36 T2S T3S 31 NINILCHIK, ALASKA 5 4 3 2 BEGIN ROAD CONSTRUCTION 1
More informationVALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION
MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION Adopted November 28, 2005 TABLE OF CONTENTS DEFINITION OF TERMS...II I. DESIGN CRITERIA... 1 A. GENERAL DESIGN CRITERIA... 1 B. ROADWAY CLASSIFICATION...
More informationTHE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS
Chapter 11 Slope Stabiliza bilization and Stability of Cuts and Fills THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS are 1) to create space for the road template and driving surface; 2) to balance material
More informationCONSTRUCTION SPECIFICATION FOR RIP RAP, ROCK PROTECTION AND GRAVEL SHEETING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 511 FEBRUARY 1990 CONSTRUCTION SPECIFICATION FOR RIP RAP, ROCK PROTECTION AND GRAVEL SHEETING 511.01 SCOPE 511.02 REFERENCES 511.03 DEFINITIONS 511.04
More informationINSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS
INSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS Prepared by TenCate Geosynthetics North America 365 South Holland Drive Pendergrass, GA 30567 Tel: (706) 693-2226 Fax:
More informationE R O S I O N C O N T R O L
E R O S I O N C O N T R O L GEOTEXTILES T O U G H O V E R T I M E EROSION CONTROL 1.0 Features of PERMANENT PG 2 EROSION CONTROL 2.0 How Typar geotextiles PG 2 work 4.0 Installation guide PG 6 5.0 Overlap
More informationCONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 355 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS TABLE OF CONTENTS 355.01 SCOPE 355.02 REFERENCES
More informationBioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake
Bioretention Matt Scharver Northeast Ohio Regional Sewer District Stormwater Management Training for MS4 Municipal Employees Training Session Agenda Pre-Training Survey Presentation & Site Visit Post-Training
More informationPondless Waterfall Vault
Pondless Waterfall Vault Installation Instructions & Owner s Manual Step-by-Step Installation Instructions for the Pondless Waterfall Vault Congratulations on the purchase of the AquascapePRO Pondless
More informationCLAHS #11 RACR APPENDIX G. SCS Photographic Log, Photographs
CLAHS #11 RACR APPENDIX G SCS Photographic Log, Photographs PHOTO LOG A (1-50) NUMBER DESCRIPTION 1 West Central Footing Excavation Building Q. 2 60-Mil HDPE Membrane Installation Building Q. 3 60-Mil
More informationGEOMEMBRANE FIELD INSTALLATION
GEOMEMBRANE FIELD INSTALLATION CONTENTS Introduction Quality Control and Quality Assurance Types of lining systems Basic Lining Design Executive Lining Design Basic Lining Design Specification Executive
More informationAquaBlox Water Matrix
quablox Water Matrix Installation Instructions & Owner s Manual Step-by-step installation Instructions for the following quablox Water Matrix pplications: { Pondless Waterfalls { RainXchange Rainwater
More informationThe following general requirements will be met for all planter box installations:
Greenville County Technical Specification for: WQ-25 PLANTER BOX 1.0 Planter Box 1.1 Description Planter boxes are designed to capture and temporarily store stormwater runoff. Planter Boxes are intended
More informationHILCORP ALASKA, LLC KALOTSA PAD
, LLC ACCESS ROAD, PAD & FLOWLINE FLOWLINE END SEC 7 T1S R13W SM NINILCHIK, ALASKA FLOWLINE & ACCESS ROAD START PROPOSED 200' x 300' DRILL PAD M.P. 130 STERLING HWY ACCESS ROAD END INDEX S 0 1000 VICINITY
More informationAdd Value DECORATIVE PONDS NATURAL PONDS REFLECTION PONDS KOI PONDS WATER GARDENS STREAMS WATERFALLS PONDLESS WATER FEATURES
Add Value DECORATIVE PONDS NATURAL PONDS REFLECTION PONDS KOI PONDS WATER GARDENS STREAMS WATERFALLS PONDLESS WATER FEATURES IMAGINE YOUR HOME S POTENTIAL Today, more and more homeowners are looking at
More informationfield note Culvert foundation improvement design concepts The challenge of low-cost culvert foundations
field note Culvert improvement design concepts Mark Partington, R.P.F., M.Sc., EP 1 Papa Masseck Thiam, Ing. Jr., M.Sc. 2 Introduction Canada s northern forested landscapes feature numerous wetlands, such
More informationShelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN
Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN 2.1 Requirements The City of Shelbyville, KY will require an Erosion Prevention and Sediment Control (EPSC) Plan for most types of development construction.
More informationConstruction Progress Report
Report Date: 4/8/2017 Subject: Construction Week 2 70% Complete Project: Sunset Pond EWP Stream Reclamation, Fourmile Creek, Boulder County, CO Report By: TJ Burr, Civil Engineer/Stream Restoration Specialist,
More informationDESIGN GUIDE.
DESIGN GUIDE www.helixlifesupport.com How to Use the Helix Design Guide The Helix Life Support Design Guide was created to help homeowners and contractors understand the different pond construction techniques
More informationFeet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary
0 25 50 00 Feet Parcel Boundary, Approximate 202 LIDAR 2 FT CONTOURS, VCGI BING AERIAL NRCS SOIL MAPPING MMI FIELD DATA Culvert Pipe Swale 0 Scale: "=40' SOURCE(S): NRCS Soil Area Boundary Overland st
More information6.1 Bioretention Areas
SAN MATEO COUNTYWIDE WATER POLLUTION PREVENTION PROGRAM 6.1 Bioretention Areas Figure 6-1. Bioretention Area. Source: City of Brisbane Bioretention areas 1, or rain gardens, are concave landscaped areas
More informationFinal Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information
Bridgewater State University Virtual Commons - Bridgewater State University Phase II Final Report Taunton River Watershed Project 2011 Final Report: Appendix C. LID Parking Lot Design and Teaching Tool
More informationSilva Cell 2 Installation Guidelines
Silva Cell 2 Installation Guidelines Silva Cell 2 components Deck 1X post 3X post 2X post Base 1 Base (bottom piece) 2 Posts 1X 2X 3X (1x + 2X) 3 1X assembled 16.7 (424 mm) 4 2X assembled 30.9 (784 mm)
More informationWQ-07 INFILTRATION TRENCH
Greenville County Technical Specification for: WQ-07 INFILTRATION TRENCH 1.0 Infiltration Trench 1.1 Description Infiltration Trenches are excavations filled with stone to create an underground reservoir
More informationSECTION AMENDED TOPSOIL
SECTION 02486 AMENDED TOPSOIL PART 1 - GENERAL 1.01 SUMMARY A. Work described in this section includes requirements for soil amendments, soil preparation, preparation and finish grading of turf restoration
More informationROADWAY SECTION PRINCIPAL ARTERIAL 2-01
ROADWAY SECTION PRINCIPAL ARTERIAL 2-01 ROADWAY SECTION MINOR ARTERIAL COMMERCIAL/MIXED USE 2-02 ROADWAY SECTION MINOR ARTERIAL REDISENTIAL 2-03 ROADWAY SECTION COLLECTOR COMMERCIAL MIXED USE 2-04 ROADWAY
More informationEngineering Report: Appendix F Volume 3 Landfill Liner Construction Specifications COWLITZ COUNTY HEADQUARTERS LANDFILL PROJECT COWLITZ COUNTY, WASHIN
Engineering Report: Appendix F Volume 3 Landfill Liner Construction Specifications COWLITZ COUNTY HEADQUARTERS LANDFILL PROJECT COWLITZ COUNTY, WASHINGTON TECHNICAL SPECIFICATIONS GENERIC CELL CONSTRUCTION
More information511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511
511 - - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511 511.1 GENERAL 511.1.1 Rip Rap 511.1.2 Rock Protection Excavation for placing Rip Rap, Rock Protection and Gravel
More informationTable 4.7.1: Swales Potential Application and Storm Water Regulation
4.7. Swales A swale is a vegetated open channel, planted with a combination of grasses and other herbaceous plants, shrubs, or trees. A traditional swale reduces peak flow at the discharge point by increasing
More informationAcronyms. TRI TRI Environmental, Inc. Table of Contents. iii
Table of Contents Acronyms AEG American Environmental Group, Ltd. AMEC American Environmental & Infrastructure, Inc. CAT I Category I CES ARCADIS Construction and Environmental Services Group CQA Construction
More informationA. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.
The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language
More informationSTORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough
STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough DATE Application is hereby made to Manheim Borough for the issuance of a Storm Water Management Plan approval pursuant to the Manheim Borough Storm
More informationSection Specification for Geotextile Used in Permanent Erosion Control Application
Project Name: Project Number: 1 GENERAL Section 02370 Specification for Geotextile Used in Permanent Erosion Control Application 1.1 SECTION INCLUDES A. Geotextile to prevent soil loss resulting in excessive
More informationMethods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline
Agricultural Impact Minimization Plan Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline operation. PennEast
More informationA. Contractor shall provide product data for each type of product indicated.
31 13 00 SELECTIVE TREE AND SHRUB REMOVAL AND TRIMMING SECTION 1 GENERAL 1.1 SUMMARY A. This section includes general protection and pruning of existing trees and plants that are affected by execution
More informationPublic Works Department 104 W. Magnolia Street, Suite 109 Bellingham, WA (360)
Public Works Department 104 W. Magnolia Street, Suite 109 Bellingham, WA 98225 (360) 778-7900 STORMWATER PERMIT SUBMITTAL REQUIREMENTS Most development within the City of Bellingham that involves disruption
More informationMethods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline
Agricultural Impact Minimization Plan Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline operation. PennEast
More informationSECTION 02230BP AGGREGATE BASE
SECTION 02230BP AGGREGATE BASE This page is intentionally left blank. Fluor-B&W Portsmouth, LLC (FBP) SITE PREPARATION INFRASTRUCTURE PHASE 1 SPECIFICATION COVER SHEET Client: U.S. Department of Energy
More informationHIGH PERFORMANCE COAL COMBUSTION RESIDUAL (CCR) SOLUTIONS
HIGH PERFORMANCE COAL COMBUSTION RESIDUAL (CCR) SOLUTIONS COAL COMBUSTION RESIDUAL (CCR) COMPLEXITY Committed to reliably generating and transmitting energy in an environmentally responsible manner, electric
More informationSPECIAL SPECIFICATION 3687 Impermeable Liner
1993 Specifications CSJ s 0569-01-043 & 0945-04-025 SPECIAL SPECIFICATION 3687 Impermeable Liner 1. Description. This Item shall govern for the furnishing and installation of the impermeable liner (geomembrane)
More informationPLAN SUBMITTER'S CHECKLIST
Page 1 of 8 PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and reference the plan sheets/pages where the information may be found, where appropriate, or write
More informationCapillary Action Subsurface Irrigation
Sandy Soil Layer-Green Pavement Irrigation and Drainage Grass Grid Green Pavement Grass Grid Growing Medium Geotextile Capillary Action Subsurface Irrigation Graded Gravel Geotextile WCID-Water Conservation,
More informationTree Pits Construction Guide
Tree Pits Construction Guide What are tree pits? Tree pits collect stormwater runoff from small carpark areas or roads. Runoff filters through the tree roots and surrounding soil mix, trapping sediment
More informationSECTION SOIL PREPARATION
SECTION 329113 SOIL PREPARATION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Components of planting mediums. 2. Testing and certification of components. 3. Mixing of planting mediums. 4. Transporting
More informationSKAPS GEOTEXTILE SUBSURFACE DRAINAGE
SKAPS INDUSTRIES 335 Athena Drive, Athens, GA 30601 Ph: (706)-354-3700 Fax: (706)-354-3737 Email: contact@skaps.com DROP-IN SPECIFICATIONS SKAPS GEOTEXTILE SUBSURFACE DRAINAGE The following drop-in specification
More informationGEOTEXTILE DESIGN DESIGN GUIDELINES APPENDIX H. FM /AFPAM , Vol 1. Geotextile Design H-1 UNPAVED-AGGREGATE DESIGN
FM 5-430-00-1/AFPAM 32-801, Vol 1 APPENDIX H GEOTEXTILE DESIGN DESIGN GUIDELINES The widespread acceptance of geotextiles for use in engineering designs has led to a proliferation of geotextile manufacturers
More informationAlternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)
4.5-s EROSION CONTROL BLANKET SYSTEM Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP) DESCRIPTION Erosion control blanket systems are woven or
More informationGREEN INFRASTRUCTURE DESIGNS RAIN GARDEN
GREEN INFRASTRUCTURE DESIGNS RAIN GARDEN JULY 2015 RAIN GARDEN SCALABLE TOOL AND DESIGN TEMPLATE This tool and associated design files are one section of a larger toolkit: Green Infrastructure Designs:
More informationIII.DRAINAGE. This section describes the use of geotextiles in underdrains for two different field conditions:
III.DRAINAGE This section describes the use of geotextiles in underdrains for two different field conditions: Protected (or light duty installations) and, Unprotected (for heavy duty installations). Both
More informationGEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE
GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of Civil Engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module - 2
More informationSECTION LANDSCAPE
1 SECTION 02900 LANDSCAPE PART 1 GENERAL 1.1 Summary A. This section contains requirements relating to lawns, trees, shrubs, flowering plants and ground covers including site preparation, material installation
More informationSTORM TACOMA 02. Potential permitting requirements STANDARD DETAILS FOR RAIN GARDEN CONSTRUCTION. How to use this document
R R G R P 02 STORM TACOMA 02 STANDARD DETAILS FOR RAIN GARDEN CONSTRUCTION Updated October 23, 2013 How to use this document Your rain garden will need to be designed and constructed in accordance with
More informationTERREWALKS Installation Manual
TERREWALKS Installation Manual Overview 2 1 2 3 4 5 6 7 8 9 10 1) Break out existing concrete (use jackhammers near trees) and clean out loose soil 2) Conduct tree root inspection (if applicable) 3) If
More informationTHE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE.
THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.2 THE COMPLETE 2011 EDITION MAY BE FOUND AT: HTTP://WWW.SEATTLE.GOV/UTIL/ENGINEERING/STANDARD_PLANS_&_SPECS/INDEX.ASP
More informationDIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING
DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING 40.01 SCOPE: The contractor shall furnish all labor, materials, equipment, and supplies; and shall perform all work necessary for the installation of
More informationSMALL PAVER PROJECT. Home Gardeners School March 19, Presented by Robert W. Bellek Owner
SMALL PAVER PROJECT Home Gardeners School March 19, 2016 Presented by Robert W. Bellek Owner LET S GET STARTED You re going to need some important tools in order to accomplish your patio with less headaches
More informationRUBBERSIDEWALKS Installation Manual
RUBBERSIDEWALKS Installation Manual Overview 2 1 2 3 4 5 6 7 8 9 10 11 12 1) Break out existing concrete (use jackhammers near trees) and clean out loose soil 2) Conduct tree root inspection (if applicable)
More informationCost Estimating for Landfill Design
Cost Estimating for Landfill Design Presentation at ASTSWMO Portland, Oregon Meeting August 14, 2007 Robert Maxey, P.E. EPA Office of Solid Waste Corrective Action Programs Branch maxey.bob@epa.gov Landfill
More informationPaving - 8 easy steps for DIY and professional landscapers
Pavers Victoria Paving - 8 easy steps for DIY and professional landscapers 18 Before you begin... These general instructions will allow an average home handyperson to design, plan and construct a path,
More information2.1.4 Roof Downspout Rain Gardens
2008 SWMM, 2010 Revision City of Tacoma 2.1.4 Roof Downspout Rain Gardens Purpose and Definition Bioretention areas are shallow stormwater retention facilities designed to mimic forested systems by controlling
More informationBREWSTER SR173 PROPOSED: OKANOGAN RIVER PADDLERS CAMPGROUND WATERBODY: OKANOGAN RIVER NEAR: BREWSTER COUNTY: OKANOGAN STATE: WASHINGTON
OKANOGAN RIVER PROJECT LOCATION SR53 COLUMBIA RIVER SR73 METHOW RIVER PATEROS SR7 SR7 BRIDGEPORT VICINITY MAP NEAR: VICINITY 2 GEBBERS FARMS INC APN 302570024 STATE HWY 7 DOUGLAS CO. PUD NO. APN 302570037
More informationENVIRONMENTAL ENGINEERING LAND SURVEYING
ENVIRONMENTAL ENGINEERING LAND SURVEYING Closure Plan Scrubber Solids Pond No. 3 Sherburne County Generating Plant Introduction This plan describes the closure requirements for Scrubber Solids Pond No.
More informationAnalyzing the Bioretention Construction Sequence
Analyzing the Bioretention Construction Sequence Avoiding future problems through careful installation procedures, construction inspection and first year maintenance 20 Steps to Better Bioretention Step
More informationUrban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT
NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.
More informationLandscape Rebate: Rainwater Harvesting Rain Garden Installer Guidelines
City of Santa Monica Office of Sustainability and the Environment 1717 4th Street, Suite 100 Santa Monica, CA 90401 Landscape Rebate: Rainwater Harvesting Rain Garden Installer Guidelines TO QUALIFY FOR
More informationNOTICE OF INTENT. Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff, VA 23022
NOTICE OF INTENT TO CLOSE INACTIVE CCR SURFACE IMPOUNDMENTS NOTICE OF INTENT Bremo Power Station Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff, VA 23022 Submitted By: Golder Associates
More informationSITE TOPSOIL & FINISH GRADING
CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02911-1 PART 1 GENERAL 1.1 Related Work.1 Section 02311 Site Grading.2 Section 02315 Excavating, Trenching, & Backfilling.3 Section 02906 Planting of Trees,
More informationSECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 329000 PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 01 Specification Sections, apply
More informationSECTION 605 PLANTING
SECTION 605 PLANTING I. GENERAL 1.1. DESCRIPTION OF WORK The Contractor shall furnish all labor, supervision, material (except as herein provided), tools, equipment, supplies, and services; and, shall
More information1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Impermeable Liner
1993 Specifications CSJ 0128-01-085 SPECIAL SPECIFICATION ITEM 5327 Impermeable Liner 1. Description. This Item shall govern for the furnishing and installation of the impermeable liner (geomembrane) shown
More information6.2 Flow-Through Planter
SAN MATEO COUNTYWIDE WATER POLLUTION PREVENTION PROGRAM 6.2 Flow-Through Planter Figure 6-8: At-grade flow-through planter. Source: City of Emeryville Best uses Treating roof runoff Next to buildings Dense
More informationLatest developments and best practice in landfill lining and capping. Rob Marshall Environment Agency
Latest developments and best practice in landfill lining and capping Rob Marshall Environment Agency test developments.. test developments.. h In reality not that much has changed recently landfill engineering!
More informationSmall Town Sustainable Stormwater Solutions
Small Town Sustainable Stormwater Solutions Kathryn Hamilton, RLA, ASLA Westmoreland Conservation District PA/DE ASLA Annual Meeting April 8-9, 8 2011 Urban, Industrial, Residential, Agricultural Flooding,
More informationPlease make the following changes in your copy of the bid proposal for the captioned project:
Charles A. Kilpatrick, P.E. Commissioner September 8, 2014 DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000 Order No.: F50 Route: 0501 Project: (NFO) 0501-005-640,C501,B648
More informationAppendix G. Detailed Design
Appendix G Detailed Design G1: Construction details Construction detail drawings usually include important details and specifications for required project design elements. This section provides information
More informationPROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION
PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION NO CONSTRUCTION OR EXCAVATION IS TO OCCUR ON LOTS THAT REQUIRE TREE PRESERVATION UNTIL PROPER APPROVALS HAVE BEEN GIVEN BY A CITY ARBORIST 1. When trees
More informationCONSTRUCTION DRAWINGS MODULE 6 LINER SYSTEM MONTEREY PENINSULA LANDFILL
CONSTRUCTION S R SYSTEM VICINITY MAP B- GEOTECHINCAL BORING LOCATION G- MONITORING WELL LOCATION GP-6A LANDFILL GAS PROBE LOCATION POINT LOCATION MAP DESCRIPTION SHEET EISTING CONDITIONS ECAVATION GRADES
More informationSILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.
STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. ATTACH FABRIC TO POSTS WITH MINIMUM 3 ZIP TIES (50 LB. TENSILE) PER POST IN TOP 8" OF FABRIC. MONOFILAMENT GEOTEXTILE FABRIC PER MNDOT TABLE
More informationSWANA/A&WMA s. Third Annual Landfill Operator s Training Geosynthetics in Landfills. February 13, 2013
SWANA/A&WMA s Third Annual Landfill Operator s Training Geosynthetics in Landfills February 13, 2013 Geosynthetics Products Applications Current Lining Requirements Tips 2 Geosynthetics polymeric products
More informationGeneral Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration
Model Construction SWPPP Planning & Development Services 1800 Continental Place Mount Vernon WA 98273 voice 360-416-1320 inspections 360-416-1330 www.skagitcounty.net/stormwaterpermitting Permit #: General
More informationA. Project Identification: Lions Club Sensory Garden Water Feature. 1. Project Location: 1301 Pennsylvania Ave., Lansing, MI 48912
SECTION 011000 - SUMMARY PART 1 - GENERAL Ingham County would like to add a waterfall feature to the Sensory Garden located within Potter Park Zoo. The intent of the attraction is to be able to stimulate
More informationInstallation Manual May 9/14 No revision
815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Manual May 9/14 No revision Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles
More informationLET S GET IT DONE STORMWATER MANAGEMENT
LET S GET IT DONE STORMWATER MANAGEMENT STORMWATER MANAGEMENT R-Tank stormwater systems provide underground storage of stormwater. After a rain event fills the R-Tank, stormwater can flow into the drainage
More informationand Water Features and Water Features
Liners for for Lakes, Lakes, Ponds Ponds and Water Features and Water Features Before 2 After The GT Difference The GT Difference Because all liners AREN T the same! At Geosynthetic Technology Limited
More information5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS
5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically
More informationSection Seeding
Section 02936 Seeding PART 1 - GENERAL 1.01 SECTION INCLUDES A. Fertilizing. B. Seeding. C. Hydroseeding. D. Mulching. E. Maintenance. F. Sodding. 1.02 RELATED WORK A. Documents affecting work of this
More informationChesapeake Energy Center. Submitted To: Chesapeake Energy Center 2701 Vepco Street Chesapeake, VA 23323
NOTICE OF INTENT TO CLOSE INACTIVE CCR SURFACE IMPOUNDMENT NOTICE OF INTENT Chesapeake Energy Center Submitted To: Chesapeake Energy Center 2701 Vepco Street Chesapeake, VA 23323 Submitted By: Golder Associates
More informationSubsurface Infiltration Bed
Subsurface Infiltration Bed The Subsurface Infiltration Bed BMP consists of a storage bed underlying either a vegetated or hardscaped surface for the purpose of temporary storage and infiltration of stormwater
More informationA. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.
The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language
More informationLow Flow Rates Low Filtration Sandy Soils Medium Flow Rates Medium Filtration Clayey Soils [1] High Flow Rates High Filtration Polluted Soils
Filter Ponds DE-WATERING SEDIMENT CONTROL TECHNIQUE Low Flow Rates Low Filtration Sandy Soils Medium Flow Rates Medium Filtration Clayey Soils [1] High Flow Rates High Filtration Polluted Soils [1] Capture
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-02 66 00 (February 2010) ----------------------------- Preparing Activity: USACE Superseding UFGS-02 66 00 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More informationPozidrain. A guide to the selection and specification of Pozidrain drainage geocomposite
Pozidrain A guide to the selection and specification of Pozidrain drainage geocomposite Pozidrain Pozidrain is the original wide width drainage and gas venting layer and offers a sustainable, environmentally
More informationUBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6
Page 1 of 6 1.0 GENERAL 1.1 Scope.1 This guideline addresses the materials, and equipment necessary for the supply, placement, and amendment of the growing medium. 1.2 Related Work:.1 Section 32 93 00
More informationTest Pit Observation Report. Albertville Business Park 67th Street to 70th Street NE Albertville, Minnesota. Prepared for.
Test Pit Observation Report Albertville Business Park 67th Street to 70th Street NE Albertville, Minnesota Prepared for Fehn Companies Professional Certification: I hereby certify that this plan, specification,
More informationABBREVIATIONS. Dwg LID of 1. Abbreviations
ABBREVIATIONS DIA DIAMETER EL ELEVATION FT2 SQUARE FOOT GAL/MIN GALLONS PER MINUTE H HORIZONTAL HDPE HIGH DENSITY POLYETHYLENE HMAC HOT MIX ASPHALT CONCRETE IE INVERT ELEVATION MAX MAXIMUM NO. NUMBER ODEQ
More informationStormwater protection
70 70 Visqueen High Performance Urban Drainage Geomembrane 70 Visqueen GX Geomembrane UDG 73 Hanson Aquaflow SC Membrane Stormwater protection A fully integrated stormwater management system provides relief
More information