2010 Tentative Enhancement Program Allocations (FY11)

Size: px
Start display at page:

Download "2010 Tentative Enhancement Program Allocations (FY11)"

Transcription

1 Bristol Buchanan County Buchanan County project cost $1,190,332 Bull Creek Trail - construction of a pedestrian/bicycle trail along abandoned request amount $240,323 railroad right of way. allocation $240, Grayson County Grayson County project cost $1,697,476 Construction of a pedestrian/bicycle trail that will link the historic Grayson request amount $489,981 County courthouse in the Town of Independence with the historic Peach allocation $489, City of Bristol City of Bristol project cost $450,396 Installation of new streetlights in downtown Bristol, VA. request amount $60,317 allocation $60, Town of Wytheville Town of Wytheville project cost $284,641 Construction of walking trails, landscaping, signage and lighting at the Great request amount $77,381 Lakes to Florida Transportation Museum. allocation $77, Town of Appalachia Town of Appalachia project cost $2,500,098 Construction of a trail along abandoned Norfolk Southern right of way between request amount $318,036 the Towns of Big Stone Gap and Appalachia; and the restoration of a caboose allocation $318,000 for use as a trailhead information/visitor center Town of Cedar Bluff Town of Cedar Bluff project cost $2,775,823 Construction of the Indian Creek section of the Cedar Bluff Historic Walkway. request amount $332,232 allocation $332, Town of Chilhowie Town of Chilhowie project cost $1,808,370 Construction of a walking trail from the Bonham Tourism Center to the request amount $296,800 Chilhowie Town Park. allocation $296, Town of Gate City Town of Gate City project cost $541,881 Construction of pedestrian improvements along East Jackson Street. request amount $312,333 allocation $312,000 May 19, 2010 Page 1 of 11

2 10033 Town of Grundy Town of Grundy project cost $455,367 Construction of new sidewalks, lighting improvements, and landscaping in request amount $364,294 downtown Grundy. allocation $364, Town of Rural Retreat Town of Rural Retreat project cost $2,444,076 Construction of sidewalks in downtown Rural Retreat. request amount $200,000 allocation $200,000

3 Salem Giles County Giles County project cost $611,786 Construction of pedestrian and streetscape improvements along both sides of request amount $52,429 Mountain Lake Avenue between North Main Street and Tazewell Street; and allocation $52,000 along the western side of Tazewell Street between Mountain Lake Avenue and Wenonah Avenue Montgomery County Montgomery County project cost $1,963,060 Construction of a 2 mile extension to the Huckleberry Trail. request amount $212,500 allocation $212, City of Roanoke City of Roanoke project cost $2,374,222 Rehabilitation of the Virginian Railway Passenger Station for use as a request amount $499,766 transportation museum and comfort station for Mill Mountain Greenway. allocation $250, City of Salem City of Salem project cost $6,702,355 Roanoke River Greenway - construction of the City of Salem section of a 31 request amount $491,850 mile bicycle/pedestrian trail through the Roanoke Valley. allocation $251, Town of Christiansburg Town of Christiansburg project cost $3,141,318 Construction of streetscaping improvements in downtown Christiansburg. request amount $250,000 allocation $250, Town of Floyd Town of Floyd project cost $1,247,650 Construction of pedestrian facilities in the Town of Floyd. request amount $176,120 allocation $176, Town of Pearisburg Town of Pearisburg project cost $1,667,254 Construction of the final phase for the Pearisburg Downtown Streetscaping. request amount $56,803 allocation $56, Town of Rich Creek Town of Rich Creek project cost $1,831,019 Construction of pedestrian facilities and landscaping along transportation request amount $200,000 corridors in downtown Rich Creek. allocation $200,000 May 19, 2010 Page 3 of 11

4 Lynchburg Nelson County Nelson County project cost $2,833,196 Blue Ridge Railway Trail - renovation of the Piney River Depot for use as a request amount $335,631 transportation museum and restoration of the weigh station as a trail amenity. allocation $335, Pittsylvania County Pittsylvania County project cost $1,517,688 Rehabilitation of the Chatham Depot for use as the Pittsylvania County request amount $203,150 Historical Center. allocation $203, City of Danville City of Danville project cost $4,316,848 Construction of an extension to the Riverwalk Trail and renovation of the request amount $535,000 former rail passenger waiting area. allocation $268, Town of Altavista Town of Altavista project cost $4,654,121 Construction of streetscaping improvements in the Central Business District of request amount $821,898 Altavista. allocation $411,000 May 19, 2010 Page 4 of 11

5 Richmond Chesterfield County Chesterfield County project cost $615,000 Construction of the Virginia State University segment of the Appomattox request amount $175,000 Riverside trail. allocation $175, Hanover County Hanover County project cost $955,376 Construction of sidewalks and landscaping at the Montpelier Center and request amount $447,172 Sycamore Tavern. allocation $225, City of Richmond City of Richmond project cost $1,476,000 Construction of crosswalks, curb ramps, and pedestrian signals at the request amount $165,600 Belvidere/Cary Street intersection. allocation $165, Town of La Crosse Town of La Crosse project cost $1,362,822 Rehabilitation of the La Crosse Hotel for use as a Trailhead Facility, Visitor request amount $275,837 Information Center and Transportation Museum. allocation $275, Town of Lawrenceville Town of Lawrenceville project cost $200,633 Reconstruction of sidewalks that will link the Tobacco Heritage Trail to the request amount $150,475 downtown business area. allocation $150, Town of South Hill Town of South Hill project cost $2,089,053 Construction of streetscaping improvements in downtown South Hill. request amount $233,840 allocation $233, Town of Victoria Town of Victoria project cost $2,018,335 Construction of streetscaping improvements in the Town's Central Business request amount $407,690 allocation $204,000 May 19, 2010 Page 5 of 11

6 Hampton Roads Southampton County Southampton County project cost $525,000 Development of the 1831 Southampton Insurrection Tour through fabrication request amount $420,000 of exhibits, installation of interpretive signs, construction of turnouts, and allocation $300,484 production of a brochure and map City of Emporia City of Emporia project cost $2,097,306 Construction of streetscaping improvements along South Main Street. request amount $971,596 allocation $486, City of Newport News City of Newport News project cost $2,672,961 Restoration of the Lee Hall Depot. request amount $100,000 allocation $100, City of Chesapeake City of Chesapeake project cost $6,276,266 Construction of the Great Bridge Battlefield and Waterways Visitor Center, request amount $608,129 Park and Trail. allocation $325, Town of Cape Charles Town of Cape Charles project cost $7,330,206 Construction of a pedestrian/bicycle pathway that links the harbor, beach, request amount $364,000 historic district, commercial district, and museum. allocation $331,000 May 19, 2010 Page 6 of 11

7 Fredericksburg Mathews County Mathews County project cost $2,200,000 Stabilization and restoration of the historic New Point Comfort Lighthouse request amount $424,660 allocation $424, Mathews County Mathews Main Street, Inc. project cost $4,356,545 Construction of sidewalks, parking, landscaping, and signage within Mathews request amount $177,017 Courthouse area. allocation $177, Spotsylvania County Spotsylvania County project cost $2,074,000 Construction of sidewalks in the Courthouse area - Phases II and III. request amount $791,450 allocation $500, Stafford County Stafford County project cost $5,004,830 Construction of sidewalk, street lights, landscaping, and interpretive signage request amount $998,665 along Route 1 - Phase III. allocation $500,000 May 19, 2010 Page 7 of 11

8 Culpeper Albemarle County Lewis & Clark Exploratory Center of Va., Inc project cost $1,300,000 Construction of the Lewis and Clark Exploratory Center of Virginia including request amount $200,000 visitor center, trail connections and ferry crossing. allocation $200, Albemarle County Albemarle County project cost $3,351,762 Construction of bike lanes, sidewalks, crosswalks, streetlights, and request amount $250,000 undergrounding of utilities in historic Crozet. allocation $250, Fauquier County Marshall Business & Residents Assoc. project cost $5,552,424 Construction of sidewalks, landscaping, lighting and undergrounding of utilities request amount $865,055 along Main Street in the Town of Marshall. allocation $600, University of Virginia University of Virginia project cost $590,143 Development of a "Ubikes" bicycle share program on the grounds of the request amount $35,333 University of Virginia. allocation $35, Town of Gordonsville Town of Gordonsville project cost $1,366,592 Construction of sidewalks, crosswalks, street lighting and landscaping in the request amount $457,083 Town's Historic District. allocation $245, Town of Louisa Town of Louisa project cost $2,000,000 Construction of final streetscape and sidewalk improvements in the Town of request amount $121,888 allocation $121, Town of Remington Remington Community Partnership project cost $202,686 Relocation and restoration of the Freight Depot for use as a railroad museum. request amount $108,084 allocation $108,000 May 19, 2010 Page 8 of 11

9 Staunton Alleghany County Alleghany County project cost $2,951,055 Jackson River Scenic Trail - construction of multi-use trail along the former request amount $600,000 Chesapeake and Ohio right of way from the City of Covington to Hot Springs. allocation $300, Augusta County Augusta County project cost $808,475 Construction of sidewalks along Augusta Farms Road (Route 649) within the request amount $262,940 Stuarts Draft School's Complex and residential development. allocation $136, Rockbridge County Lexington & Rockbridge Area Tourism project cost $650,000 Design, installation, and maintenance of customized directional signage request amount $250,000 throughout Rockbridge County. allocation $125, Warren County Warren County project cost $409,422 Construction of a shared-use trail along old road bed establishing a connection request amount $206,530 between several community facilities. allocation $206, City of Lexington City of Lexington project cost $456,000 Underground overhead utilities around the newly constructed Rockbridge request amount $234,800 County/City of Lexington Courthouse. allocation $234, City of Waynesboro City of Waynesboro project cost $1,545,883 Construction of improved sidewalks, street lights, and landscaping along request amount $486,706 Waynesboro's Main Street. allocation $486, City of Winchester City of Winchester project cost $7,110,000 Green Circle Trail - construction of a multi-use trail within the City of request amount $800,000 Winchester - Phase II. allocation $400, Town of New Market Town of New Market project cost $2,110,000 Construction of sidewalks, historic style streetlighting, and landscaping in the request amount $388,784 historic downtown area. allocation $388,000 May 19, 2010 Page 9 of 11

10 Northern Virginia Fairfax County Fairfax County Park Authority project cost $1,045,300 Construction of a multi-modal trail in the Pohick Stream Valley to connect request amount $440,000 existing trails, community and retail centers, and commuter train stations. allocation $220, Fairfax County Mason Neck Citizens project cost $2,909,722 Construction of Phase II of the Mason Neck Trail. request amount $2,944 allocation $2, Loudoun County Waterford Foundation Inc. project cost $89,609 Installation of landscaping along the Virginia Scenic Byways at the Old School request amount $71,687 allocation $71, Loudoun County Waterford Foundation, Inc. project cost $2,218,441 Construction of an interpretive pull-off and walkway on the Phillip's Farm request amount $540,553 allocation $540, Town of Clifton Town of Clifton project cost $298,515 Construction of a trail to access the park and landscaping. request amount $106,620 allocation $106, Town of Herndon Town of Herndon project cost $2,722,091 Construction of crosswalks, landscaping, and streetlights along the south side of request amount $290,000 Elden Street from west of the Commerce Center to the Monroe Street/Elden allocation $290,000 Street intersection Town of Purcellville Town of Purcellville project cost $2,379,800 Construction of streetscaping improvements along 21st and 23rd Streets. request amount $400,000 allocation $400,000 May 19, 2010 Page 10 of 11

11 Statewide Statewide Civil War Preservation Trust project cost $9,729,870 Acquisition of battlefields and construction of access trails in Dinwiddie County. request amount $1,000,000 allocation $1,000, Statewide Civil War Preservation Trust project cost $6,352,525 Acquisition of various battlefield properties in the Piedmont area of Virginia request amount $500,000 allocation $500, Statewide Virginia Tourism Authority project cost $1,875,000 Development of multi-media applications that will promote Virginia's Scenic request amount $1,500,000 Roads and Historic Trail Programs. allocation $1,500, Statewide VA Dept of Historic Resources project cost $1,979,631 Continuation of the Historic Highway Marker Program. request amount $358,572 allocation $180,000 Total Allocations $18,568,332 May 19, 2010 Page 11 of 11

2013 Final Transportation Alternatives Allocations (FY14)

2013 Final Transportation Alternatives Allocations (FY14) Bristol 13007 Town of Marion Town of Marion Enhancement of Main Street in downtown Marion, including the replacement of sidewalks and new lighting from Sheffy Street to College Street. $998,988 $240,000

More information

2006 Final Enhancement Allocations (FY07)

2006 Final Enhancement Allocations (FY07) Bristol 06056 Buchanan County Buchanan County cost $1,094,800 Construction of a Biking/Hiking Trail on the old N&S railroad bed. amount requested $875,840 award $300,000 06015 Grayson County Grayson County

More information

VRS-Participating Employers

VRS-Participating Employers VRS-Participating Employers More than 800 employers participate in the Virginia Retirement System (VRS) on behalf of their employees. Employers include state agencies, public colleges and universities,

More information

CY2015 Actual LAP Construction Advertisements

CY2015 Actual LAP Construction Advertisements UPC District Admin By Description Locality Project No. Rec. CN Est. CN Start Date Act Ad Date Tar Adv Date 81130 Bristol Locally DANIEL BOONE WILDERNESS TRAILScott County SLEN084101 $3,332,622 6/21/2015

More information

FOR SALE 280.5± ACRES SUSSEX COUNTY, VA Price: $430,000

FOR SALE 280.5± ACRES SUSSEX COUNTY, VA Price: $430,000 LATITUDE & LONGITUDE 37.5556, -79.2318 Winchester Front Royal 15 Leesburg 495 Washington 66 Chantilly Arlington Falls Church Fairfax Alexandria Springfield Manassas Warrenton 301 13 113 Dale City Waldorf

More information

Urban Development Areas Frederick County

Urban Development Areas Frederick County 18 Urban Development Areas Frederick County UDA Needs Profile: All UDAs Frederick County, Virginia's northernmost county has two UDA s, surrounded by the City of Winchester and located adjacent to the

More information

Urban Development Areas Bedford County

Urban Development Areas Bedford County 5 Urban Development Areas Bedford County UDA Needs Profile: All UDAs Bedford County has designated two UDAs: areas just outside the Bedford City Limits (generally to the south and east of the city) and

More information

Virginia Department of Transportation Expenditures by City/County by Type For Period Ending June 30, 2016 Report 1 of 3

Virginia Department of Transportation Expenditures by City/County by Type For Period Ending June 30, 2016 Report 1 of 3 Virginia Department of Transportation Expenditures by City/County by Type For Period Ending June 30, 2016 Report 1 of 3 City/County Description Federal Expenditures/ Special (Toll & Bond) State Expenditures

More information

AWARD ARTERIAL. Bid Amount: Less Than 5 Million. Report created on : 1/12/19 Letting Date: 12/19/2018. Estimated Construction Cost.

AWARD ARTERIAL. Bid Amount: Less Than 5 Million. Report created on : 1/12/19 Letting Date: 12/19/2018. Estimated Construction Cost. ARTERIAL A46 09889 LOCATION: DISTRICTWIDE THE TRUESDELL CORPORATION 9999-96-437,N50 TEMPE HSIP-96-(08) AZ Construction 7 $55,55.00 $788,739.07 BRISTOL DISTRICT HIGH FRICTION SURFACE TREATMENT PAVING Recommended

More information

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements:

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements: Eligibility Requirements To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements: 1) Relate to surface transportation and 2) Be one of the 12 designated

More information

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006 Project Goal Town of Halifax Revitalization Project RRRC Living Towns Planning Workshp July 12, 2006 Town of Halifax Halifax County *** Revitalization Project Goal*** To create Economic Opportunity and

More information

Virginia Department of Transportation Expenditures by City/County by Type For Period Ending March 31, 2017 Report 1 of 3

Virginia Department of Transportation Expenditures by City/County by Type For Period Ending March 31, 2017 Report 1 of 3 Virginia Department of Transportation Expenditures by City/County by Type For Period Ending March 31, 2017 Report 1 of 3 City/County Description Expenditures/ Collections Special (Toll & Bond) State Expenditures

More information

FY19 AND FY20 REVENUE SHARING APPLICATIONS SUBMITTED PRELIMINARY REVIEW - JANUARY 2018

FY19 AND FY20 REVENUE SHARING APPLICATIONS SUBMITTED PRELIMINARY REVIEW - JANUARY 2018 District Locality Road Name / Description FUNDING PRIORITY 1 APPLICATIONS - PRELIMIMARY REVIEW - JANUARY 2018 2019 Bristol Wytheville Town East Main Street $125,000 1 2019 Culpeper Fauquier County Salem

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Landscape Architecture Program NUMBER: SPECIFIC SUBJECT: Integration of Landscape

More information

Center in the Square Science Museum of Western Virginia History Museum of Western Virginia Taubman Museum of Art

Center in the Square Science Museum of Western Virginia History Museum of Western Virginia Taubman Museum of Art Center in the Square Center in the Square serves as a catalyst for downtown revitalization and economic development, as well as excellence in education through uniting the arts, science, and education.

More information

CHAPTER 2 THE GEORGE WASHINGTON REGION TODAY

CHAPTER 2 THE GEORGE WASHINGTON REGION TODAY CHAPTER 2 THE GEORGE WASHINGTON REGION TODAY 2.1 THE REGION DEFINED The George Washington Region represents 1,429 square miles in four counties. Political jurisdictions in the area include King George,

More information

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2. Table of Contents Introduction 1 Existing Context 1 Figure 1 2 Plan Guidelines 3 Future Urban Form 4 The West-End 4 Main Street 6 The East-End 7 Figure 2 9 Public Improvement Recommendations 7 General

More information

Our Legacy Projects DOWNTOWN JACKSONVILLE MASTER PLAN

Our Legacy Projects DOWNTOWN JACKSONVILLE MASTER PLAN DOWNTOWN JACKSONVILLE MASTER PLAN A major component of our master plan is the creation of a strong and accessible open space and recreation system. The four most vital links in that system are our legacy

More information

The Long Road from Planning to Breaking Ground:

The Long Road from Planning to Breaking Ground: The Long Road from Planning to Breaking Ground: A Collaboration Between Roanoke County and VDOT Megan G. Cronise, AICP VDOT Coordinating Transportation and Land Use Planning Forum May 10, 2018 Where is

More information

HISTORIC RESOURCES VIII. HISTORIC RESOURCES THE 2035 COMPREHENSIVE PLAN 98

HISTORIC RESOURCES VIII. HISTORIC RESOURCES THE 2035 COMPREHENSIVE PLAN 98 VIII. HISTORIC RESOURCES THE 2035 COMPREHENSIVE PLAN 98 HISTORIC RESOURCES CURRENT CONDITIONS Frederick County has shifted in recent years from an agrarian community to one that has seen strong residential

More information

Rappahannock- Rapidan Regional Commission

Rappahannock- Rapidan Regional Commission Rappahannock- Rapidan Regional Commission Last Updated July 2008 RAPPAHANNOCK-RAPIDAN REGIONAL TRANSPORTATION PLAN The Virginia Department of Transportation (VDOT) and the Rappahannock-Rapidan are partnering

More information

Landscape Architecture Urban Design Planning

Landscape Architecture Urban Design Planning Landscape Architecture Urban Design Planning L/KLA is an award-winning design and planning firm with the ability to clearly convey ideas to clients, citizens, and team members. The firm s success results

More information

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Potential Green Infrastructure Strategies May 6, 2015 Workshop Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National

More information

Trail Feasibility and Planning Project for Northern Dutchess County, New York

Trail Feasibility and Planning Project for Northern Dutchess County, New York for Northern Dutchess County, New York Funded in Part by Grants from the Hudson River Valley Greenway, Land Trust Alliance Conservation Partnership Program and the Thomas Thompson Trust 1 STEERING COMMITTEE

More information

Pennsy Greenway Trail

Pennsy Greenway Trail Town of Schererville Pennsy Greenway Trail DES. #s: 0401062, 1173595 & 1382661 Construction of Pennsy Greenway Trail beginning at Wilhelm Street and continuing northwest along the former Penn Central railroad

More information

Small Area Plan. South Gateway

Small Area Plan. South Gateway Small Area Plan Adopted May 12, 2008 South Gateway Purpose. The South Gateway Small Area Plan defines the City s expectations for the future of the southern entrance to the City at Interstate 85 and Highway

More information

TRANSPORTATION. Part 1: Background. Section 1: Introduction. P a g e 70

TRANSPORTATION. Part 1: Background. Section 1: Introduction. P a g e 70 P a g e 70 Part 1: Background Section 1: Introduction TRANSPORTATION Round Hill is served by secondary state roads which are maintained by the Virginia Department of Transportation (VDOT). The Route 7

More information

Project Overview. Get Involved. Public Information Meeting. Contact Information

Project Overview. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION June 15, 2015 Revised: August 1, 2016 I. VISION Brookhill is a proposed community based upon the principles of Albemarle County

More information

Route 66 Business Corridor

Route 66 Business Corridor Route 66 Business Corridor DOWNTOWN BUSINESS AND CULTURAL DISTRICT SPECIFIC PLAN Draft April 2016 Acknowledgments Text Acknowledgments here etc... LIST NAME List List List Table of Contents 1. Introduction...

More information

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons West Dennis Center: Bass River to Old Main Street West Dennis Business District: Old Main Street to Dennis Commons Dennisport Center: Dennis Commons to Division Street Main Street Project Goals Project

More information

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County Exhibit A SH 161 RTC Work Program of New Projects Collin County 0918-24-969 N/A 0918-24-970 N/A 0918-24-973 N/A 2351-01-020 N/A 2679-03-010 N/A On Exchange Parkway from US 75 to Allen Heights On Country

More information

CHAPTER 7: Transportation, Mobility and Circulation

CHAPTER 7: Transportation, Mobility and Circulation AGLE AREA COMMUNITY Plan CHAPTER 7 CHAPTER 7: Transportation, Mobility and Circulation Transportation, Mobility and Circulation The purpose of the Transportation, Mobility and Circulation Chapter is to

More information

Chapter 5: Recreation

Chapter 5: Recreation Chapter 5: Recreation Introduction and Setting Recreational opportunities within Nevada County are varied, ranging from public parks with intensively used active recreational facilities, to vast tracts

More information

Planning Districts INTRODUCTION

Planning Districts INTRODUCTION INTRODUCTION To facilitate detailed examination of development prospects for all areas of the community, Delano has been divided into 14 planning districts. The location of these planning districts is

More information

Welcome to the 2018 FRPA Conference!

Welcome to the 2018 FRPA Conference! Welcome to the 2018 FRPA Conference! Learning Objectives Describe the benefits of regional multipurpose trails Recall Florida s Priority Regional Trails and recognize their general locations across the

More information

Lower South Street/Louisa Street Charrette Final Presentation. September 22, 2009

Lower South Street/Louisa Street Charrette Final Presentation. September 22, 2009 Lower South Street/Louisa Street Charrette Final Presentation September 22, 2009 Recap Mayor and Council called for a Charrette to engage the public on creating a vision for the Lower South Street area.

More information

Abingdon Urban Path System

Abingdon Urban Path System Abingdon Urban Path System Transportation Enhancement Program Application (FY 2012-2013) Submitted by: Town of Abingdon,Virginia P. O. Box 789 133 West Main Street Abingdon, VA, 24212 November 1, 2011

More information

TOWN COUNCIL / PLANNING COMMISSION

TOWN COUNCIL / PLANNING COMMISSION Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011 Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L.

More information

HOT SPRINGS COMPREHENSIVE PLAN OUTLINE

HOT SPRINGS COMPREHENSIVE PLAN OUTLINE HOT SPRINGS COMPREHENSIVE PLAN OUTLINE 7/28/2015 Draft outline - Hot Springs Comprehensive Plan Draft outline of topics to be discussed at public hearings and in planning sessions. Order and topics and

More information

2040 Long Range Transportation Plan

2040 Long Range Transportation Plan 2040 Long Range Transportation Plan Adopted: April 15, 2013 APPENDIX D HIGHWAY NEEDS PLAN PROJECTS FREDERICKSBURG Existing and Committed Projects Fall Hill Avenue/Mary Washington Blvd. (Fredericksburg)

More information

Crozet Implementation Projects

Crozet Implementation Projects Implementation Projects COMMUNITY LIFE Advisory Council Included in Relations/CDD / Relations Continue community-county dialogue and community involvement in master plan implementation Periodic meetings

More information

Northeast Everglades Natural Area

Northeast Everglades Natural Area Northern Palm Beach County Natural Areas Master Plan Northeast Everglades Natural Area August 3, 2006 GLATTING JACKSON KERCHER ANGLIN LOPEZ RINEHART, INC. Community Planning 1 Public Land Partners Agenda

More information

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: Welcome Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: - Review Environmental Assessment - Share Preferred Alternative -Receive Public Comments 2003 EA Preferred Alternative

More information

TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. SR-37 No Projects US-19E Under Development in Carter County

TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. SR-37 No Projects US-19E Under Development in Carter County CARTER COUNTY SR-37 No Projects US-19E Under Development in Carter County PIN: 125256.00 AT LM 8.7 (ROCKFALL MITIGATION) Length - 0.0 (Mitigation - Rockfall) CARTER COUNTY SR-91EXT PIN: 043975.01 FROM

More information

Turkey Creek Corridor

Turkey Creek Corridor A NATURAL SANCTUARY Creek Corridor Creek Corridor.1 Kimberly BLOUNT ST CLAIR rro w sr Ro 79 oa 75 d A ad Pinson High School Jackson Creek Nature Preserve H B. D Pinson Dug Hollow Rd d o fo rl oo p er Rd

More information

Urban Analysis. Downtown Zanesville like any city, has been physically modified through time as it

Urban Analysis. Downtown Zanesville like any city, has been physically modified through time as it Urban Analysis As a part of the consulting team s reconnaissance effort, an urban analysis was performed. Before the future of a place can be envisioned, one must understand the physical characteristics

More information

Delaware Transportation Enhancements/Transportation Alternatives Program

Delaware Transportation Enhancements/Transportation Alternatives Program PROJECT SPEND JULY 1, 2013 TO JUNE 30, 2014 Delaware Transportation Enhancements/Transportation Alternatives Program PROJECT NAME FEDERAL STATE OTHER TOTAL DESCRIPTION Pomeroy Trail will connect the James

More information

ADOPTED AT NOVEMBER 15, 2012 PACC MEETING

ADOPTED AT NOVEMBER 15, 2012 PACC MEETING ADOPTED AT NOVEMBER 15, 2012 PACC MEETING STAFF MEMORANDUM TO PACC-TECH TO: PACC-Tech FROM: Elaine K. Echols, AICP, Missy Creasy, AICP, and Julia Monteith, AICP TOPIC: Review of Area B Recommendations

More information

Finish Roanoke River Greenway from Green Hill Park to the Blue Ridge Parkway Regional Surface Transportation Program Application

Finish Roanoke River Greenway from Green Hill Park to the Blue Ridge Parkway Regional Surface Transportation Program Application Finish Roanoke River Greenway from Green Hill Park to the Blue Ridge Parkway Regional Surface Transportation Program Application 1. Project Sponsors: City of Roanoke, City of Salem, Roanoke County, Town

More information

BISCUIT RUN PARK MASTER PLAN

BISCUIT RUN PARK MASTER PLAN BOARD OF SUPERVISORS November 14, 2018 BISCUIT RUN PARK MASTER PLAN COUNTY OF ALBEMARLE ANHOLD ASSOCIATES Contents Project Introduction Property Background County Park Planning Process Existing Site &

More information

Panama City Beach Community Redevelopment Agency Condo Con Property Owner Conference & Expo November 14, 2014

Panama City Beach Community Redevelopment Agency Condo Con Property Owner Conference & Expo November 14, 2014 Panama City Beach Community Redevelopment Agency Condo Con Property Owner Conference & Expo November 14, 2014 Front Beach Road CRA On November 30, 2000, the City created the Panama City Beach Community

More information

VILLAGE & TOWN OF BERGEN: COMPREHENSIVE PLAN

VILLAGE & TOWN OF BERGEN: COMPREHENSIVE PLAN VILLAGE & TOWN OF BERGEN: COMPREHENSIVE PLAN CPC Public Hearing April 21, 2016 History 1996 Comprehensive Plan Comprehensive Plan Update Committee Consultant (LaBella Associates): December 2014 Residents

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

TRANSPORTATION PROJECTS

TRANSPORTATION PROJECTS TRANSPORTATION PROJECTS 40 BUFFALO S LWRP PROPOSED PROJECTS T1. Niagara Street/Great Lakes Seaway Trail Streetscape Project City of Buffalo Department of Public Works Niagara Street from Niagara Square

More information

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies Draft Stillwater 2030 Comprehensive Plan- Goals and Policies Instructions- Review each goal and policy and discuss with group any changes, deletions for additions to the list using your groups pen. Keep

More information

Downtown Dubuque...it s a great time.

Downtown Dubuque...it s a great time. Downtown Dubuque...it s a great time. Your timing could not be better to invest in Downtown. With hundreds of millions in public and private investment occurring on the City s downtown waterfront, millions

More information

STUART MASTER PLAN. The Town on its Western Waterfront. Treasure Coast Regional Planning Council/City of Stuart TCRPC/Tom Spain

STUART MASTER PLAN. The Town on its Western Waterfront. Treasure Coast Regional Planning Council/City of Stuart TCRPC/Tom Spain STUART MASTER PLAN C i t y O f S t u a r t F l o r i d a 1998 TCRPC/Tom Spain The Town on its Western Waterfront Treasure Coast Regional Planning Council/City of Stuart STUART MASTER PLAN A WATERFRONT

More information

DRAFT Civic Center Station Area Plan. Executive Summary

DRAFT Civic Center Station Area Plan. Executive Summary DRAFT Civic Center Station Area Plan Executive Summary This project is funded in part through the Metropolitan Transportation Commission s Station Area Planning Program. The preparation of this report

More information

The Capital Design Advisory Committee St. Mary s College of Maryland & Historic St. Mary s City

The Capital Design Advisory Committee St. Mary s College of Maryland & Historic St. Mary s City The Capital Design Advisory Committee St. Mary s College of Maryland & Historic St. Mary s City Welcome April 21, 2010 Capital Design Advisory Presentation: Relocating Margaret Brent Hall Traffic Calming

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Burlington County Computerized Signal Control, IV D9911 D9911 This ITS project will be a traffic responsive signal system, consisting of 24 intersections--9 on CR 607, 4 on

More information

Mendota Heights 2040 Comprehensive Plan Draft Vers

Mendota Heights 2040 Comprehensive Plan Draft Vers 4 Parks and Trails The City of Mendota Heights boasts a variety of recreational and open space opportunities. Few cities can claim access to regional trails, riverside and lakeside parks, scenic bluffs

More information

BID RESULTS OCTOBER 24, 2007

BID RESULTS OCTOBER 24, 2007 INTERSTATE A20 83068 (NF0)PM04-026-248, N501 IM-PM04(223) VARIOUS LOCATIONS DINWIDDIE CO. ASPHALT PAVING & GUARDRAIL UPGRADE B. P. SHORT & SON PAVING CO., INC. PETERSBURG, VA 1 $1,262,410.02 N9J CM408A09431

More information

Riverwalk Dreams compiled by Thomas P. Healy November 16, 2017

Riverwalk Dreams compiled by Thomas P. Healy November 16, 2017 Riverwalk Dreams compiled by Thomas P. Healy November 16, 2017 1986 Ripple Village Plan: A neighborhood plan developed by the City of Indianapolis Department of Metropolitan Development s Division of Planning

More information

Carlsbad Village Redevelopment Concept Summary of Features

Carlsbad Village Redevelopment Concept Summary of Features Carlsbad Village Redevelopment Concept Summary of Features Calthorpe Associates November 5, 2003 The Redevelopment Concept illustrates a vision for the future of Carlsbad Village. The overall vision of

More information

V. Gateways GATEWAYS / V-1

V. Gateways GATEWAYS / V-1 V. GATEWAYS / V-1 Many of Chesapeake s gateways are located on highways and call for bold and attractive designs that motorists can understand, appreciate, and enjoy. can also take the form of natural

More information

West Kendall Corridor June 11, 2014

West Kendall Corridor June 11, 2014 June 11, 2014 Miami-Dade County Department of Regulatory and Economic Resources Development Services Division ā 1 Presentation Outline Review Study Area Review of Citizens Plans and Presentations Planning

More information

COBBOSSEE CORRIDOR MASTER PLAN. For larger image, see end of Section I.

COBBOSSEE CORRIDOR MASTER PLAN. For larger image, see end of Section I. COBBOSSEE CORRIDOR MASTER PLAN For larger image, see end of Section I. 11 REDEVELOPMENT PARCELS For larger image, see end of Section I. 12 COBBOSSEE CORRIDOR S RICH HISTORY ACOBBOSSEE CORRIDOR HISTORICAL

More information

Hopkins. Development Guidelines May Overview. Sponsored by: Blake Road Corridor Collaborative City of Hopkins

Hopkins. Development Guidelines May Overview. Sponsored by: Blake Road Corridor Collaborative City of Hopkins Hopkins Blake Road LRT Station Area Development Guidelines May 2015 Sponsored by: Blake Road Corridor Collaborative City of Hopkins Overview Hopkins is a dynamic community of over 17,000 residents located

More information

DESIGN PUBLIC HEARING. Phase II

DESIGN PUBLIC HEARING. Phase II CITY OF SYRACUSE DEPARTMENT OF ENGINEERING STEPHANIE A. MINER, Mayor MARY E. ROBISON, City Engineer DESIGN PUBLIC HEARING Phase II City of Syracuse Onondaga County Tuesday, July 26, 2016 at 7:00 P.M. Southwest

More information

CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS

CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS N Project Location -Town Square -Villages at Ocean SE 1st St, between E Woolbright Rd and SE 2nd Ave Project Location -Boynton One -Publix

More information

Chapter 14 Streetscape Improvements

Chapter 14 Streetscape Improvements This chapter presents streetscape design concepts for key streets and gateways in the Downtown Specific Plan area. This chapter is organized as follows: 14 Streetscape Improvements 14.1 Streetscape Treatments

More information

Gloucester County s Comprehensive Plan. The Community Connection

Gloucester County s Comprehensive Plan. The Community Connection Gloucester County s Comprehensive Plan The Community Connection Current Comp Plan Adopted in 1991 with a 20 year planning horizon Updated in 1995 with Part V- Implementation Recommendations and Appendix

More information

AUTO CIRCULATION & PARKING

AUTO CIRCULATION & PARKING CHAPTER 5 Chapter 5 Auto Circulation & Parking AUTO CIRCULATION & PARKING Parking use and automobile circulation have been topics of many discussions on street corners as well as at public workshops and

More information

CHAPTER IV Transportation

CHAPTER IV Transportation CHAPTER IV Transportation An effective and efficient transportation system is one of the most critical elements a city or county must have if it is to prosper and provide its residents with the necessary

More information

The GATEWAYS Sub Area Master Plan. City of Walker

The GATEWAYS Sub Area Master Plan. City of Walker The GATEWAYS Sub Area Master Plan City of Walker Introduction: The Walker City Commission and Planning Commission decided in 2011 to create a sub-area master plan for the Remembrance Road and Wilson Avenue

More information

Great Rivers Greenway CLEAN GREEN CONNEC TED T RAILS

Great Rivers Greenway CLEAN GREEN CONNEC TED T RAILS Great Rivers CLEAN GREEN CONNEC TED T RAILS Great Rivers (GRG) was established in 2000 to create a clean, green, connected St. Louis region. Today, many new and exciting projects demonstrate the social,

More information

Welcome to the. Open House

Welcome to the. Open House Welcome to the 5th Street to Kinsman Road Open House November 14 5:30 7:00 p.m. Please sign in Project Overview In December 2016, City Council adopted SW 5th Street as the preferred alignment to connect

More information

Byway Beginnings: What s Your Story and How It Can Create Tourism. Sharon Liggett University of Georgia Archway Partnership

Byway Beginnings: What s Your Story and How It Can Create Tourism. Sharon Liggett University of Georgia Archway Partnership Byway Beginnings: What s Your Story and How It Can Create Tourism Sharon Liggett University of Georgia Archway Partnership Summer Trips VA - Blue Ridge Parkway AL - Natchez Trace FL - Florida State Parks,

More information

Civic Greenway Natural Features Map. Astoria Riverfront Vision Plan The City of Astoria, Oregon December 2009

Civic Greenway Natural Features Map. Astoria Riverfront Vision Plan The City of Astoria, Oregon December 2009 67 Civic Greenway Natural Features Map 68 Land Use and Urban Design It is expected that large amounts of overwater development will not occur in the Civic Greenway area due to the amount of public control

More information

MOUNT ROSE AND WASHOE VALLEY SCENIC BYWAY CORRIDOR MANAGEMENT PLANS

MOUNT ROSE AND WASHOE VALLEY SCENIC BYWAY CORRIDOR MANAGEMENT PLANS MOUNT ROSE AND WASHOE VALLEY SCENIC BYWAY CORRIDOR MANAGEMENT PLANS PARK COMMISSION JANUARY 5, 2016 PREPARED BY Aspen Asheville Austin Chicago Denver Dubai Houston Lake Tahoe Los Angeles CORRIDOR MANAGEMENT

More information

5. Father Hennepin Blufs Park and Hennepin Island Father Hennepin Bluffs Park Supporting Initiatives (see Figure 36): 7-22

5. Father Hennepin Blufs Park and Hennepin Island Father Hennepin Bluffs Park Supporting Initiatives (see Figure 36): 7-22 5. Father Hennepin Blufs Park and Hennepin Island As described in existing conditions portion of Chapter 2, Father Hennepin Blufs Park lies on the upland portion of the park and Hennepin Island spans the

More information

1. Lenox Dale Community Character Strengths and Opportunities Identified by Residents: Strong neighborhood identity and sense of community.

1. Lenox Dale Community Character Strengths and Opportunities Identified by Residents: Strong neighborhood identity and sense of community. LENOX DALE ISSUES AND OPPORTUNITIES -- EIGHT CATEGORIES: Concerns and opportunities identified by Lenox residents and in previous Community Surveys, along with thought-starter suggestions on possible Town

More information

Highway & Bridge Capabilities

Highway & Bridge Capabilities Highway & Bridge Capabilities Part of a diversified family of solutions www.jmt.com An Employee Owned Company I-95/I-295/I-495 Interchange, Woodrow Wilson Memorial Bridge, Prince George s County, MD Our

More information

Welcome! Get On Board!

Welcome! Get On Board! Get On Board! Welcome! Thank you for a ending! This public informa on mee ng is being held to provide an update and an opportunity to comment on DC2RVA s: Purpose and Need Statement Alterna ves Development

More information

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Carteret Industrial Road 98547 This project will address the upgrade of Carteret Industrial Road. The federal Transportation Equity Act for the 21st Century (TEA-21) provided funding for this project under

More information

Creation of Confluence Park and Input from Vermont River Conservancy

Creation of Confluence Park and Input from Vermont River Conservancy CITY COUNCIL Agenda Item #18-236 Date: August 22, 2018 Consent Discussion X SUBJECT: Creation of Confluence Park and Input from Vermont River Conservancy SUBMITTING DEPARTMENT: Mayor RECOMMENDED ACTION:

More information

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects 30 130 Collingswood/Pennsauken ( B) 155C Vicinity of Cooper River Bridge at Park Drive to 200 feet north of PATCO Railroad Bridge This project may provide for the construction of a proposed new bridge

More information

Downtown Lead Revitalization Project Final Recommendations. Three Proposed Options for the Revitalization of Downtown Lead

Downtown Lead Revitalization Project Final Recommendations. Three Proposed Options for the Revitalization of Downtown Lead Downtown Lead Revitalization Project Final Recommendations Three Proposed Options for the Revitalization of Downtown Lead November 1, 2011 Three Proposed Options for the Revitalization of Downtown Lead

More information

I-70 Corridor Enhancement Plan

I-70 Corridor Enhancement Plan i - Table of Contents Table of Contents Chapter I Overview Chapter II Bridge and Roadway Improvements Chapter III Landscape Enhancements Chapter IV Riparian Corridors Chapter V Showcase Missouri Plan Chapter

More information

Sustainable Development Call for Projects Western Infrastructure Project Submissions

Sustainable Development Call for Projects Western Infrastructure Project Submissions 2009-2010 Sustainable Development Call for Projects Western Infrastructure Project Submissions January 20, 2010 2009-2010 SDCFP Summary of Infrastructure Funding Infrastructure Projects Number of Projects

More information

STUDY AREA. Tonight s Agenda. Project Tasks Completed. Next Steps. Town of Oyster Bay Eastern Waterfront Community Vision & Revitalization Plan

STUDY AREA. Tonight s Agenda. Project Tasks Completed. Next Steps. Town of Oyster Bay Eastern Waterfront Community Vision & Revitalization Plan Town of Oyster Bay Eastern Waterfront Community Vision & Revitalization Plan Public Meeting January 27, 2009 Opening Remarks Presentation Tonight s Agenda Introduction Study Area Overview Public Participation

More information

Turkey Creek Streamway Corridor

Turkey Creek Streamway Corridor Turkey Creek Streamway Corridor Turkey Creek Corridor Overview History Watershed Corridor Inventory Coalition Corridor Plan Stages of Development Benefits Funding Turkey Creek History Kansas and Missouri

More information

Overview Report. Proposed Development

Overview Report. Proposed Development Overview Report Proposed Development the construction of a 1km cycle/pedestrian trail including a new footbridge, new car park and entrance road at Drumshanbo Lock and a new pedestrian/cycle road crossing,

More information

SECTION TWO: Urban Design Concepts

SECTION TWO: Urban Design Concepts SECTION TWO: Urban Design Concepts The Gardnerville Plan for Prosperity shapes economic opportunities presented by regional growth. The Urban Design Concepts provide policies and concepts for land use,

More information

The Auburn Plan Designing the Future of Auburn February 28, 2005

The Auburn Plan Designing the Future of Auburn February 28, 2005 The Auburn Plan Designing the Future of Auburn February 28, 2005 Block-by-Block Bicycle Tour Aerial survey Focus Group Meetings September 7 and 8 Design Workshops October 11, 14, and 21 Revitalization

More information

The University District envisions, in its neighborhood

The University District envisions, in its neighborhood Envisioning the University District Link Light Rail in Seattle s neighborhoods CIY OF SEALE CONCEP-LEVEL SAION AREA PLANNING RECOMMENDAION RESOLUION # 30165 EXHIBI L Vision 08.2000 he University District

More information

Village of Fair Haven Goals & Objectives

Village of Fair Haven Goals & Objectives Village of Fair Haven Goals & Objectives 1 Natural Environmental Quality & Aesthetics Embrace policies and programs that preserve and enhance the Village s natural resources, environment, water quality,

More information

LAND USE PLAN 7. Housing

LAND USE PLAN 7. Housing 21 LAND USE PLAN While the land uses that have historically dominated the Corridor itself have been industrial/commercial, the Master Plan proposes a shift to mixed-use redevelopment, complimented by a

More information

The Lower SaLuda Greenway

The Lower SaLuda Greenway The Lower SaLuda Greenway InITIaTIve a FLourIShInG Greenway. a hub For economic GrowTh. a ConneCTIon BeTween CoMMunITIeS. In April 2017 the Michael J. Mungo Foundation and Lexington County commissioned

More information