1 Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design

2 Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over a 20-year span, Genesis has earned an exceptional level of respect and trust from clients and the community through our construction engineering & inspection services. It s a result of our focus on maintaining collaborative relationships, implementing a partner approach, and being proactive in offering smart, innovative solutions to every project challenge. Our dedicated, professional team offers extensive knowledge in: Construction Engineering & Inspection (CEI) Utility Coordination Intelligent Transportation System (ITS) Contractor Quality Control (CQC) Scheduling Claims Analysis & Dispute Resolution 2

3 Construction Engineering & Inspection (CEI) T A B L E O F C O N T E N T S Gateway Expressway Pensacola Bay Bridge Gandy Boulevard I-10 Davis to Scenic Hwy US 19 (SR 55) SR 85 (Eglin Parkway)... 9 SR US 98 Intersection...10 Scenic Beach Drive Restoration US 331 (SR 83) I-275 Reconstruction SR 30 (US 98) SR I-4 (SR 400) Tampa Train Depot Historic Restoration

4 Gateway Expressway Earthwork Drainage Bridges Guardrail Retaining Wall Traffic Control Utility Coordination Signalization ITS Public Involvement Environmental Permitting Gateway Expressway from SR 690 at US 19 and SR 686 Extension at DR 611 to West of I-275 & I-275 from south of Gandy Boulevard to North of 4th Street North Design-Build Pinellas County 12 miles 4 years ETC $544 million SR 690 will be an elevated 4-lane expressway connection from US 19 to west of I-275. SR 686A will be an elevated 4-lane elevated expressway from the Bayside Bridge to just west of I-275 that will merge with SR 690 via flyover structures. SR 686 (Roosevelt Blvd.) will be reconstructed from the Bayside Bridge to SR 688 (Ulmerton Rd.) as a 2-lane road with access to the St. Pete-Clearwater International Airport. CR 296 (118th Ave.) will be reconstructed from US 19 to 31 st Ct. North. I-275 will be reconstructed from South of Gandy Blvd. to North of 4 th St. North. 4

5 Pensacola Bay Bridge Bridge Construction Multi-use Path Maintenance of Traffic Signalization & Lighting Retaining Walls Earthwork Construction Utility Relocation Environmental Compliance SR 30 (US 98) Pensacola Bay Bridge Replacement Escambia and Santa Rosa Counties 4.2 miles 5 years $398.5 million Construction of two new Category 2 bridges across Pensacola Bay to replace the old bridge built in Built on 30 and 36 square prestressed concrete pile foundations, each bridge will have three 12 travel lanes, two 10 shoulders and a 10 multi-use path. Aesthetic features include acrylic coatings, LED lighting, decorative concrete walls and scenic overlooks. This is the largest project to date in FDOT District 3 and the largest Infrastructure project in Northwest Florida. 5

6 Gandy Boulevard Elevated Roadway Interchanges Frontage Roads Overpasses Pedestrian Features Bicycle Lanes Median Changes Signalization Lighting ITS Landscaping Gandy Boulevard from I-275 to east of 4th Street N. Design-Build Pinellas County 2.7 miles 3 years $83 million The new features and improvements for this project include a six-lane roadway from I-275 to Dr. Martin Luther King Jr. Street N.; a fourlane roadway between Dr. Martin Luther King Jr. Street N. to east 4th Street N.; overpasses at 4th Street N., Roosevelt Boulevard, Dr. Martin Luther King Jr. Street N., and 94th Avenue; and a frontage road system parallel to the main roadway. 6

7 I-10 Davis to Scenic Hwy Bridge Construction Sidewalks & Bike Lanes Highway Ramps MSE Walls Stormwater Retention Ponds Signalization & Lighting Sound Barrier Wall Asphalt Pavement Milling & Resurfacing Earthwork Construction SR 8 (I-10) from SR 291 to SR 10A (US 90) Escambia County 4 miles 3 years $46.1 million New features and improvements for this project include widening I-10 from four to six travel lanes; widening Scenic Hwy between Whisper Way and Northpointe Pkwy; replacing the Scenic Hwy overpass with a new bridge, including decorative lighting, sidewalks, turn lanes, and bike lanes; reconstructing I-10 ramps at Scenic Hwy; constructing drainage improvements, including five stormwater retention ponds; installing new signalization and highway lighting; constructing sound barrier walls; asphalt pavement milling and resurfacing; and earthwork construction. 7

8 US 19 (SR 55) Scheduling Utility Coordination Bridges MSE Walls Storm Sewer Construction Signing & Pavement Markings Lighting Signalization ITS Utility Coordination US 19 (SR 55): North of Whitney Road to North of SR 60 Pinellas County 2.5 miles 5 years $110 million This project included structures (bridges and retaining walls), storm sewer construction, signing and pavement markings, lighting, signalization, intelligent transportation systems (ITS), and numerous utility relocations. The utility improvements included more than one mile of 48 water main. 8

9 SR 85 Okaloosa County Asphalt Milling Resurfacing Drainage Reconstruction Awards: Sidewalks Lighting Signalization Signing Pavement Markings Landscaping Phased Construction Temporary Sheet Piles SR 85 (Eglin Parkway) from SR 30 (US 98) to north of Richbourg Avenue Okaloosa County 4 miles 2 years $7 million Developed a cost savings initiative for phased drainage reconstruction under a seven-lane roadway project. This resulted in a cost savings of $314k and a 13 day reduction of contract time ACAF District 3 Excellence in Paving Award for Resurfacing - Urban 9

10 SR US 98 Intersection Concrete Pavement Asphalt Milling Resurfacing Road Widening Drainage Improvements Sidewalks Lighting Signalization Signing Pavement Markings Landscaping SR US 98 Intersection Polk County 1.5 miles 2 years $9.54 million Reconstructed and widened the SR 60 intersection with US 98, and converted the intersection from asphalt pavement to concrete pavement. Operational improvements at the intersection included triple left turns for eastbound SR 60 and southbound US 98, dual right turns for westbound SR 60, and dual left turns and a single right turn for northbound Broadway Avenue. Awards: 2014 FTBA Florida s Best in Construction Award for Maintenance of Traffic 10

11 Scenic Beach Drive Restoration Pavement Removal & Reconstruction Sand Recovery J Earle Bowden Parkway and FT. Pickens Road Emergency Operations Escambia County 2.6 miles 3 months $608,000 This was an emergency response to Hurricane Isaac, administered by the FDOT District Three within the Gulf Islands National Seashore Park limits. Work included pavement removal, shoulder pavement construction, and over 21,000 cubic yards of sand removal and placement in order to reopen the roadway to public traffic. 11

12 US 331 (SR 83) Walton County Storm Sewer Stormwater Retention Ponds Awards: Turn Lanes Bicycle Lanes Sidewalks Signalization US 331 (SR 83) from US 98 to the Choctawhatchee Bay Bridge Walton County 1.6 miles 2.5 years $11.4 million The existing two-lane rural roadway was replaced by a four-lane, divided, urban road with storm sewer, stormwater retention ponds, bike lanes, and sidewalks. Reconstruction of the SR 83/US 98 intersection included new turn lanes and mast arm signals FTBA Florida s Best in Construction Award Urban 12

13 I-275 Reconstruction Bridges MSE Walls Utility Coordination Awards: Asphalt Pavement Concrete Pavement Lighting Signalization ITS Pavement Markings Architectural Features I-275 from Himes Avenue to Hillsborough River Hillsborough County 1.8 miles 3 years $105 million This reconstruction project for FDOT included 10 bridges, 17 Mechanically Stabilized Earth (MSE) walls, major drainage improvements, asphalt and concrete pavement, highway lighting, signalization, intelligent transportation systems (ITS), pavement markings, and extensive architectural features FTBA Florida s Best in Construction Award Interstate 13

14 SR 30 Okaloosa/Walton County Asphalt Milling Concrete Paving Road Widening Awards: Bicycle Lanes Signalization Signage Pavement Markings SR 30 (US 98) from West of Airport Road to CR 30A Okaloosa/Walton County 1.8 miles 1 year $14.2 million This project included the milling and paving of an urban and rural multi-lane highway in Okaloosa and Walton Counties, along with road widening for construction of bicycle keyhole lanes, LED traffic signal upgrades, sign installation, and striping NAPA Quality in Construction Award for Excellence in Asphalt Pavements 2009 ACAF Excellence in Paving Award for Urban Statewide Resurfacing 14

15 SR 54 Pasco County Major Earthwork Demucking Box Culvert Storm Drainage Systems Storm Pond Construction Wetland Mitigation Sites Limerock Base Asphalt Paving Lighting Signing Pavement Markings SR 54 Awards: Pasco County 2.7 miles 2 years $40 million SR 54 involved the multi-lane reconstruction of a two-lane undivided highway to a six-lane divided rural highway. Services included major earthwork, demucking, box culvert, storm drainage systems, storm pond construction, floodplain compensation/wetland mitigation sites, earthwork preload site, limerock base, asphalt paving, highway lighting, signing, and pavement markings FTBA Florida s Best in Construction Award Utility Coordination/Damage Prevention 15

16 I-4 (SR 400) Ybor City Fiber Optic Communications ITS Bridges MSE Walls Architectural Inspection Scheduling Utility Coordination Asphalt Pavement Concrete Pavement Signalization I-4 (SR 400) Hillsborough County 2.6 miles 4 years $151 million This multi-lane reconstruction project for FDOT included 18 bridges, 29 mechanically stabilized earth (MSE) walls, asphalt and concrete pavement, utility and drainage work, lighting, signalization, an intelligent transportation system (ITS) installation, and numerous architectural features. In addition, many aesthetic elements, including a multitiered fountain located between 21 st and 22 nd Street, were incorporated into this project to highlight the historic appeal of Ybor City. 16

17 Tampa Union Station Historic Restoration Parking Lot Improvements Drainage Base Asphalt Landscaping Architectural Restoration Tampa Union Station Hillsborough County N/A 1 year $2.62 million Provided inspection, contract administration, and architectural restoration of this historic train station which included parking lot improvements, coordination with City of Tampa for local funding, and coordination with Historical Preservation Society entities/representatives. 17

18 STATEWIDE Tony Harvey President (m) ST. PETERSBURG Marty Sanchez, P.E. Vice President 9543 International Court N. St. Petersburg, FL (m) TAMPA Christy Peeples Associate Vice President 1000 N. Ashley Drive, Suite 900 Tampa, FL (m) CENTRAL FLORIDA Bradley (Brad) Post, P.E. Executive Vice President (m) MIRAMAR BEACH Douglas Pritchard Associate Vice President US Highway 98 Suite 250 Miramar Beach, FL (m) PENSACOLA William (Bill) Klepac, P.E. Vice President 9322 N. Palafox Street Pensacola, FL (m)

Creative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals

Creative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals ABOUT US Creative Engineering Group Inc, (Creative) is a Construction Engineering and Inspection (CEI) firm established in 2006 by two Principals Rick Estripeaut & Sri Mavanur. In the last decade Creative

More information

Transportation Design

Transportation Design Transportation Design Serving communities across Florida for 30 Years Engineering Planning Landscape Architecture Urban Design CEI Transportation Corridor Analysis Roadway Design Intelligent Transportation

More information

A Connected Region for Our Future. Tampa Bay Regional Planning Council

A Connected Region for Our Future. Tampa Bay Regional Planning Council A Connected Region for Our Future Tampa Bay Regional Planning Council TBARTA Vision A world class transportation network for the Tampa Bay region that will connect people and places, move goods and services,

More information

2017 Asphalt Contractors Association of Florida Pavement Awards

2017 Asphalt Contractors Association of Florida Pavement Awards 2017 Asphalt Contractors Association of Florida Pavement Awards Special Projects Any project of a special or unique nature requiring specialized equipment, techniques, materials, time restrictions, or

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018 I-4 Beyond the Ultimate Florida Transportation Builders Association February 9, 2018 FDOT: Improving Mobility & Safety in Central Florida FDOT is Designing and building a better I-4 through Central Florida

More information

PROPOSED IMPROVEMENTS

PROPOSED IMPROVEMENTS IV. PROPOSED IMPROVEMENTS The proposed improvements for each alternative carried forward are discussed below. A. FUNCTIONAL CLASSIFICATION AND ROADWAY CROSS-SECTIONS The classifications of the roadways

More information

SR 483 Clyde Morris Boulevard FDOT District 5

SR 483 Clyde Morris Boulevard FDOT District 5 This project occurs on a 3.0 mile section of SR 483 (Clyde Morris Blvd.) south of Beville Road (SR 400) to north of International Speedway Boulevard (SR 600). Ghyabi is providing project management and

More information

SOLICITATION J P1 Construction Engineering Services for Wiles Road Riverside Drive to Rock Island Road

SOLICITATION J P1 Construction Engineering Services for Wiles Road Riverside Drive to Rock Island Road SOLICITATION J2112395P1 Construction Engineering Services for Wiles Road Riverside Drive to Rock Island Road Qualifications and Experience of Key Personnel Dan Tintner, P.E., Project Manager/Senior Project

More information

Spring 2018 Construction Update

Spring 2018 Construction Update Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the

More information

2040 Long Range Transportation Plan

2040 Long Range Transportation Plan 2040 Long Range Transportation Plan Adopted: April 15, 2013 APPENDIX D HIGHWAY NEEDS PLAN PROJECTS FREDERICKSBURG Existing and Committed Projects Fall Hill Avenue/Mary Washington Blvd. (Fredericksburg)

More information

Landscape Architecture

Landscape Architecture Landscape Architecture The profession dedicated to aesthetically improving environments within our community while minimizing the impact on natural processes. Engineering Planning Landscape Architecture

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Camden County Civic Center Access Study, Pennsauken 03340 This project will address operational and access improvements on Routes 30, 73 and 90 related to the Crossroads redevelopment project around the

More information

Moving The Metro. A special construction update for the metro Omaha area.

Moving The Metro. A special construction update for the metro Omaha area. Moving The Metro A special construction update for the metro Omaha area. ebraska Department of Roads Spring/Summer 2017 I-80 / I-480 / US-75 Interchange The improvements on this project consist of bridge

More information

COLLIER BOULEVARD (CR 951) CORRIDOR

COLLIER BOULEVARD (CR 951) CORRIDOR Project(s) Goals Improve Traffic Circulation, Capacity & Safety Focus on Safety During Design & Construction Address Public Concerns Design an Aesthetically Pleasing Project Limit Environmental Impacts

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) ADA Central, Contract 1 DBNUM: 15417 / UPC: 154170 This contract will bring projects into compliance with current ADA design requirements that could not be completed within original design or construction

More information

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES ROAD CONSTRUCTION 36 June 2014 ROADS&BRIDGES Young is full of life Recent expansion completes continuous, multilane arterial By Donald Hammack, P.E. Contributing Author The Florida Department of Transportation

More information

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204 DISTRICT TWO PUBLIC HEARING I 10 (SR 8) from I 295 to I 95 Project Development & Environment Study Duval County, Florida Financial Project Number 213326 2 22 01 Efficient Transportation Decision Making

More information

FDOT D4 Complete Streets

FDOT D4 Complete Streets FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Garden State Parkway, Interchange 67, at Bay Avenue, CR 554 NS0210 NS0210 This project will provide new and modified movements to the Garden State Parkway, Interchange 67 at Bay Avenue (CR 554). Currently,

More information

Fall 2017 Construction Update

Fall 2017 Construction Update Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,

More information

Capital Projects in and near Odenton Town Center

Capital Projects in and near Odenton Town Center Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately

More information

23 EA , , , , , , , LF , , ,596.

23 EA , , , , , , , LF , , ,596. Mast Arm Traffic Signals at Central Ave. 5th, 6th, 8th & 31st St. Engineering & Capital Improvements Department, City of St. Petersburg, FL Project No.: 11027-112 Bid date: January 10, 2012 Item Description

More information

AGENDA ACTION ITEMS INFORMATION ITEMS

AGENDA ACTION ITEMS INFORMATION ITEMS NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION

More information

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Burlington County Computerized Signal Control, IV D9911 D9911 This ITS project will be a traffic responsive signal system, consisting of 24 intersections--9 on CR 607, 4 on

More information

Reconnecting New Haven: Downtown Crossing

Reconnecting New Haven: Downtown Crossing Reconnecting New Haven: Downtown Crossing Phase 2 Update Introduction to Phase 3 November 16, 2017 City of New Haven, Connecticut Toni N. Harp, Mayor Reconnecting New Haven Introduction Project Overview

More information

Welcome. South Seminole Heights Civic Association, Inc. Tampa Interstate Study Supplemental Environmental Impact Statement.

Welcome. South Seminole Heights Civic Association, Inc. Tampa Interstate Study Supplemental Environmental Impact Statement. Welcome South Seminole Heights Civic Association, Inc. October 17, 2018 Tampa Interstate Study Supplemental Environmental Impact Statement 1 Stephen Benson Opening FDOT District Seven 2 3 Our solutions

More information

Capital Projects impacting Odenton Town Center

Capital Projects impacting Odenton Town Center Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000

More information

DESIGN CRITERIA PACKAGE

DESIGN CRITERIA PACKAGE RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA

More information

Cottage Grove Road Reconstruction. City of Madison Engineering

Cottage Grove Road Reconstruction. City of Madison Engineering Public Informational Meeting Cottage Grove Road Reconstruction October 8, 2015 Presentation Outline Introduction Project Purpose & Need Proposed Design Overview Environmental Concerns Pedestrian Needs

More information

Sumter County Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 SR 35 in Sumter County

Sumter County Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 SR 35 in Sumter County Sumter County Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 SR 35 in Sumter County August 15, 2014 1408 N. Westshore Boulevard Suite 600 Tampa,

More information

Preliminary Sea Level Rise Case Study: Navarre Beach, FL

Preliminary Sea Level Rise Case Study: Navarre Beach, FL Preliminary Sea Level Rise Case Study: Navarre Beach, FL This publication was funded in part, through a grant agreement from the Florida Department of Environmental Protection, Florida Coastal Management

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: October 18, 2018 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction and Traffic Highlights

More information

FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,

More information

Focus Group First Meeting Belfountain Community Centre Tuesday June 29, :00 p.m. to 9:00 p.m.

Focus Group First Meeting Belfountain Community Centre Tuesday June 29, :00 p.m. to 9:00 p.m. Focus Group First Meeting Belfountain Community Centre 7:00 p.m. to 9:00 p.m. Mississauga Road/Old Main Street and Bush Street, from Olde Base Line Road to Winston Churchill Boulevard Environmental Assessment

More information

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY KICK-OFF PRESENTATION SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PROJECT IDENTIFICATION NUMBER (PID): #001036A May 13, 2015 1 2 PROJECT LOCATION PROJECT HISTORY

More information

I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010

I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010 I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010 I-75/I-475 Interchange Upgrade Project David R. Dysard, AICP District Two Deputy Director Theresa Pollick Public Information

More information

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights ANCHORAGE PARKS & RECREATION Nichols Park Design and improve neighborhood park 2008 Challenge Grant applicant. 2008 $500K State Grant for Neighborhood Parks. Tikishla Park Lighting, paved parking, hockey

More information

4.1 Build Alternative 1 Construction Phasing

4.1 Build Alternative 1 Construction Phasing SECTION 4 Implementation Plan This section discusses potential segmentation of the build alternatives into multiple projects for implementation of improvements to the NSH from Rabbit Creek Road to 36th

More information

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date HILLSBOROUGH COUNTY Greenways and Trails Plan Update Executive Summary Date PURPOSE AND PROJECT OVERVIEW The Hillsborough County Greenways Master Plan (1995) and the City of Tampa s Greenways and Trails

More information

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). Pelican Bay Community Improvement Plan Traffic,JI Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). D1 -A: Provide consistent signing, marking

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects 69th Street Bridge 02311 02311 A grade separation at 69th Street would eliminate the current at-grade crossing which causes frequent automobile delays due to long freight trains moving through this area.

More information

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL Agenda Design Concept Report Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Questions Design Concept Report

More information

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering

More information

TRANSPORTATION COMMITTEE

TRANSPORTATION COMMITTEE TRANSPORTATION COMMITTEE CITY OF OTTAWA Ministry of Transportation Detailed Design Assignment G.W.P.# 4058-01-00 Highway 417 (Ottawa Queensway) Widening & Rehabilitation from Maitland Avenue to Island

More information

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015 Rt. 29 Solutions Project Delivery Advisory Panel December 3, 2015 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Nov

More information

Welcome. Tina Fischer. East Tampa Area Community Working Group September 25, Collaborative Labs, St. Petersburg College

Welcome. Tina Fischer. East Tampa Area Community Working Group September 25, Collaborative Labs, St. Petersburg College Welcome East Tampa Area Community Working Group September 25, 2018 Tina Fischer Collaborative Labs, St. Petersburg College Tonight s Agenda Open House Area (6:00 - ongoing) Information about related studies,

More information

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status I-95 Girard Avenue Interchange Project Status Construction is underway for Phase 1 and 2. Phase 3 construction will begin early 2014. Overall Project Area and Schedule GR0: Completed GR0: Completed in

More information

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: Welcome Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: - Review Environmental Assessment - Share Preferred Alternative -Receive Public Comments 2003 EA Preferred Alternative

More information

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016 Rt. 29 Solutions Project Delivery Advisory Panel January 7, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Dec

More information

Roads Plan

Roads Plan Roads Plan 2019-2023 Background Road conditions have been a problem for Painesville City over the past decade. Between 2009 and 2013, the city was only able to dedicate $1.9 million in total road repairs

More information

CTH C RESURFACING Douglas County, Wisconsin

CTH C RESURFACING Douglas County, Wisconsin Krech Ojard s Civil Group provides full range design and construction management services for municipal transportation and utility projects, as well as a variety of private developments. With a staff possessing

More information

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK Open House 10.12.16 RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK MEETING AGENDA Great Rivers Greenway and Project Partners River des Peres Greenway Overview Project

More information

HERNANDEZ & SWIFT ASSOCIATES, INC. Engineering & Environmental Services Balihai Court Gulf Breeze, Florida (850)

HERNANDEZ & SWIFT ASSOCIATES, INC. Engineering & Environmental Services Balihai Court Gulf Breeze, Florida (850) HERNANDEZ & SWIFT ASSOCIATES, INC. Engineering & Environmental Services 1630 Balihai Court Gulf Breeze, Florida 32563 (850) 934-1530 July 3, 2008 Escambia County Office of Purchasing, Room 230 213 Palafox

More information

This page left intentionally blank.

This page left intentionally blank. July 2012 This page left intentionally blank. Table of Contents Appendix A : Project Development Checklist Appendix B: At-Grade Rail Crossings Appendix C: Maintenance and Operations Examples Appendix D:

More information

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future

More information

Fairfax County Parkway (Route 286) Widening Project

Fairfax County Parkway (Route 286) Widening Project Fairfax County Parkway (Route 286) Widening Project Route 29 (Lee Highway) to Route 123 (Ox Road) State Project No. 0286-029-259, P101; UPC 107937 Fairfax Station HOA Meeting January 30, 2018 7:00 to 9:00

More information

2014 PSPE Philadelphia Chapter Outstanding Engineering Achievement Award Nomination

2014 PSPE Philadelphia Chapter Outstanding Engineering Achievement Award Nomination 2014 PSPE Philadelphia Chapter Outstanding Engineering Achievement Award Nomination Route 29 Roadway Improvement Project SR 0029, Section AL2 Charlestown Township, Chester County, PA Nomination Form Route

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Route 1&9, County Road 99380 99380 Improvements are planned at the Route 1&9, County Road intersection to address operational and safety issues in the vicinity of Manhattan Avenue and County Road. COUNTY:

More information

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 28, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 28, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 28, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,

More information

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project PennDOT Public Meeting S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project Mt Lebanon Township, Allegheny County Mt Lebanon Township Municipal Building November 6, 2014 1 Project

More information

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

North Carolina Department of Transportation Project Development and Environmental Analysis Branch North Carolina Department of Transportation Project Development and Environmental Analysis Branch Citizens Informational Workshop I-85, from I-485 to NC 73 Mecklenburg and Cabarrus Counties October 30,

More information

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1] nhancements [1] STATUS OF PROJECT: The project has recently moved from the Preliminary Design Phase to the Final Design Phase following the most recent Public Involvement Meeting held on January 9, 2019

More information

City of Jersey City. Department of Administration Division of Engineering Traffic and Transportation

City of Jersey City. Department of Administration Division of Engineering Traffic and Transportation Division of Engineering Traffic and Transportation : Duncan Avenue Road Program Bergen Avenue Road Program PSE&G Gas System Modernization Program NJDOT Municipal Aid FY2015 Road Program Ogden Dog Park

More information

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). III. ALTERNATIVES A. CONSTRUCTION METHOD ALTERNATIVES NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). One of the

More information

From local initiatives to some of the largest and most complex projects, KOA leads the field in:

From local initiatives to some of the largest and most complex projects, KOA leads the field in: Krech Ojard & Associates offers a highly capable multidisciplined team that provides the professional services needed to deliver successful transportation facility improvements. Our team provides multidisciplinary

More information

METRO Gold Line BRT CMC Meeting

METRO Gold Line BRT CMC Meeting METRO Gold Line BRT CMC Meeting April 26, 2018 Today s Topics Welcome and Introductions Project Overview CMC Roles and Responsibilities Current Project Baseline: Scope and Cost Estimate Overview Municipal

More information

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Carteret Industrial Road 98547 This project will address the upgrade of Carteret Industrial Road. The federal Transportation Equity Act for the 21st Century (TEA-21) provided funding for this project under

More information

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017 Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year

More information

Ybor City, located northeast of

Ybor City, located northeast of COMPLETE STREETS One final puff Last leg of work in historic Fla. town with cigar roots set to begin By Michael Bernos Contributing Author Ybor City, located northeast of Tampa s downtown, is one of only

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: October 19, 2017 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction and Traffic Highlights

More information

I-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280

I-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280 I-25 / Rio Bravo Interchange TONIGHT S MEETING SCHEDULE OPEN HOUSE 6:00 PM TO 6:30 PM PRESENTATION BEGINS AT 6:30 PM Q & A FOLLOWING PRESENTATION CN A300280 / PNA300280 I-25 / Rio Bravo Interchange THIRD

More information

Wiles Road from University Drive to Riverside Drive

Wiles Road from University Drive to Riverside Drive Wiles Road from University Drive to Riverside Drive Presented to: Broward County WSP Parsons Brinckerhoff is now Presented by: WSP USA Inc. Our Team.. Introduction / Project Team Cecilia Villoria, PE Project

More information

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project

More information

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation. We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation. We will provide you information on the overall project and

More information

Design Services for Wiles Road Broward County Project #104026

Design Services for Wiles Road Broward County Project #104026 Design Services for Wiles Road Broward County Project #104026 ORGANIZATIONAL CHART THE CGA TEAM Firm Services Key Staff CBE Calvin, Giordano & Associates, Inc. HBC Engineering Company Florida Engineering

More information

CHAPTER House Bill No. 385

CHAPTER House Bill No. 385 CHAPTER 2005-292 House Bill No. 385 An act relating to state facility designations; designating Ramon Puig Way, Shawn O Dare Way, Marge Pearlson Way, and Jorge L. Cabrera Way in Miami-Dade County; designating

More information

Citizen Information Meeting

Citizen Information Meeting Prince William County Government Citizen Information Meeting Vint Hill Road Extension May 11, 2016 Benefits: Route 28 Corridor Improvement Program Estimated significant cost savings versus bidding these

More information

Location. Served. Category. Units Start Year. Previous Appropriations

Location. Served. Category. Units Start Year. Previous Appropriations 20142018 CAPITAL IMPROVEMENT PLAN ($ Thouss) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: TC Jester: Washington to I 10 N100002 Paving Drainage Project Description Project provides for the design

More information

Interstate Traffic Interruptions Weekend of Oct 9, 2015-Oct 12, 2015

Interstate Traffic Interruptions Weekend of Oct 9, 2015-Oct 12, 2015 Interstate Traffic Interruptions Weekend of Oct 9, 2015-Oct 12, 2015 District 1 10/9/15 10/12/15 D Gwinnett/Hall I-985 NB MP 0 (I-85) 9pm 5am 1 right lane of 2 458462 to MP 20 (SR 60) ROLLING CLOSURE 10/9/15

More information

Route 7 Reconstruction and Widening, Wilton. State Project Nos & 124. Wolf Pit Road to just north of Olmstead Hill Road

Route 7 Reconstruction and Widening, Wilton. State Project Nos & 124. Wolf Pit Road to just north of Olmstead Hill Road Route 7 Reconstruction and Widening, Wilton State Project Nos. 161-118 & 124 Wolf Pit Road to just north of Olmstead Hill Road Tonight s Agenda Introduction Bill Brennan, Wilton First Selectman Construction

More information

Henderson County Project Prioritization Discussion

Henderson County Project Prioritization Discussion French Broad River MPO Henderson County Project Prioritization Discussion A discussion on projects considered for MPO Local Input Points in the tier for P 5.0 French Broad River MPO 8-8-2018 INTRODUCTION

More information

Borderland Expressway Coalition Status Report Camino Real RMA Board Meeting. El Paso, TX April 11, 2018

Borderland Expressway Coalition Status Report Camino Real RMA Board Meeting. El Paso, TX April 11, 2018 Borderland Expressway Coalition Status Report Camino Real RMA Board Meeting El Paso, TX April 11, 2018 Coalition Key Stakeholders Texas Department of Transportation New Mexico Department of Transportation

More information

FDOT/FTBA Construction Conference Work Plan

FDOT/FTBA Construction Conference Work Plan FDOT/FTBA Construction Conference 19 2019 2023 Work Plan Ben Dreiling, P.E., Director of Construction Central Florida Expressway Authority January 18, 2019 Major Projects Map FY 2019-2023 Work Plan 2 FY

More information

Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge

Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge MEPA Meeting, EEA#14702 Wednesday, March 2, 2011 6:30 PM Dr. Martin Luther King, Jr. School 100 Putnam Avenue, Cambridge, MA Rendering by:

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Transportation Authorities Project Descriptions

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Transportation Authorities Project Descriptions Bridge Rehabilitation Burlington County Bridge Commission Burlington-Bristol Bridge This project includes the replacement of the existing span decks, repairs to the existing walkway, railing and ladder

More information

Pine Island Road Corridor Master Plan

Pine Island Road Corridor Master Plan RECOMMENDED DEVELOPMENT PLAN Figure 9: Del Prado Village District Conceptual Framework The Conceptual Framework (Figure 8) for development of the Pine Island Corridor is to encourage mixed-use development

More information

TRANSPORTATION & STREET DESIGN

TRANSPORTATION & STREET DESIGN TRANSPORTATION & STREET DESIGN Review of Goals Connect neighborhoods to Square Enable access to the river Improve pedestrian environment Reorient road network to local use Three Specific Areas of Intervention

More information

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases. I-95 Avenue Interchange Project Status Construction is underway for Phase 3. Overall Project Area and Schedule Phase 0: Completed 2010 Section GR0: Completed in Fallin 2010 Phase 2: Completed Section GR2:

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Schooleys Mountain Bridge Rehabilitation Project ID Numbers: N1707 / 173470 Schooleys Mountain Road Bridge was built in 1920 and widened in 1937. The project is a replacement of the bridge structure and

More information

STREET IMPROVEMENT AND MAINTENANCE PROGRAMS

STREET IMPROVEMENT AND MAINTENANCE PROGRAMS 2018-2019 STREET IMPROVEMENT AND MAINTENANCE PROGRAMS Engineering Department Pamela S. Cooksey, City Engineer Public Works Department Jonathan Gano, Public Works Director April 2018 Attached for your information

More information

Index to Projects by Project Name

Index to Projects by Project Name Index to Projects by Project Name Project # PROJECT NAME PAGE 2134 2119 PR-1109 Clayton Road (Market Street to Oakland Avenue) Sidewalk Repair 911 System Replacement and Dispatch Room Remodel ADA Barrier

More information

Route 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347

Route 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347 The GREENING of Route 347 The Greening of Route 347 The Greening of Route 347: History 3 The Greening of Route 347 4 The Greening of Route 347 5 The Greening of Route 347 Smith Haven Mall 6 The Greening

More information

PROJECTS UNDER CONSTRUCTION

PROJECTS UNDER CONSTRUCTION Project Name Project Status Project Funding Project Manager PJ 2144 Clayton Rd-Treat Blvd Intersection Improvements Widen the Clayton Road/Treat Blvd intersection and upgrade the traffic signal. Construction

More information

Index to Projects by Project Name

Index to Projects by Project Name Index to Projects by Project Name 2062 1701 & 1711 Concord Avenue Purchase and Demolition of Structures 85 1279 1024 UF-802 UF-803 Affordable Housing 77 Annual CIP/TIP Management Program 105 Arnold Industrial

More information

TRANSPORTATION ELEMENT

TRANSPORTATION ELEMENT TRANSPORTATION ELEMENT GOAL I: To create and maintain a safe, efficient and aesthetic transportation system that encourages multi-modal transportation and promotes the mobility strategies of the Ocala

More information

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects 30 130 Collingswood/Pennsauken ( B) 155C Vicinity of Cooper River Bridge at Park Drive to 200 feet north of PATCO Railroad Bridge This project may provide for the construction of a proposed new bridge

More information

ROAD PAVING VARIOUS LOCATIONS LANE KM

ROAD PAVING VARIOUS LOCATIONS LANE KM ROAD PAVING VARIOUS LOCATIONS 9.317 LANE KM $1,465,200 General: $1,465,200 BASED ON CONDITION ASSESSMENTS OF THE ENTIRE ROAD NETWORK; USING ASSET MANAGEMENT PRINCIPLES, ROADS THAT ARE SUITABLE FOR REPAVING

More information

CAPA ASPHALT & AIRPORT PAVEMENT MARCH 27, 2019

CAPA ASPHALT & AIRPORT PAVEMENT MARCH 27, 2019 CAPA ASPHALT & AIRPORT PAVEMENT MARCH 27, 2019 PRESENTERS William Epp, PE, SE Colorado Division Manager Senior Vice President Brett Holt, PE Project Manager WHO WE ARE A nationally recognized transportation

More information

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m. Public Hearing Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, 2019 open house at 4 p.m., formal presentation at 5 p.m. Welcome to the Public Hearing for the Harborview Road (CR 776)

More information