CRYSTAL CITY BLOCK PLAN # CCBP- G 1 DRAFT
|
|
- Hope Allen
- 5 years ago
- Views:
Transcription
1 CRYSTAL CITY BLOCK PLAN # CCBP- G 1 DRAFT BLOCK G (Metro Market Square block) Long Range Planning Committee Meeting January 29,
2 1. Introduction 2
3 1. LRPC Meeting Purpose Review of proposed Crystal City Block Plan G Collectively work towards: A) Determining whether there are major outstanding issues with the proposed Block Plan that should be addressed B) Developing at least one Crystal City Block Plan Scenario Map including the envisioned uses and level of development associated with each site across the block C) Developing guiding principles for the open space 3
4 1. Tonight s Agenda 1. Introductory Remarks - Chair 2. Background - Staff a. Overview of Block Plan Review Process b. Preliminary Review Schedule 3. Sector Plan Guidance for the Block - Staff 4. Overview of Metro Entrance Project - Staff 5. Applicant Presentation on Proposed Block Plan Elements, Scenarios and Justification - Applicant 6. Preliminary Staff Assessment of Proposed Crystal City Block Plan - Staff a. Sector Plan Deviation b. Issues for Discussion at LRPC #2/Open House 7. LRPC Discussion - Chair 8. Public Comment - Chair 9. Concluding Remarks - Chair 4
5 2. Background a. Overview of Block Plan Review Process 5
6 2. CCBP Background Crystal City Sector Plan calls for block-level planning analysis - Specifically references Phased-Development Site Plans (PDSPs) In developing C-O Crystal City zoning, major obstacles with using PDSPs to implement Sector Plan were identified - Fragmented parcel ownership - Inability to condition property of others - Uncertainty regarding consent Crystal City Block Plan (CCBP) process was developed to address these issues CCBPs help to ensure that: - Crystal City develops consistent with Sector Plan vision - Proposed new buildings do not preclude future planned improvements - Systems and infrastructure continue to function during redevelopment - Focus is maintained on timing of community improvements 6
7 2. CCBP Overview What is a CCBP? - A general, guiding long-range plan for a single block in Crystal City, east of Route 1, depicting existing and proposed general building locations, land use mix, tower coverage, public open space and facilities, transportation and other infrastructure, etc.. When is a CCBP needed? Rezoning to C-O Crystal City. How is it finalized? - Adopted by County Board as supplemental guidance to Crystal City Sector Plan. Does not create new entitlements. 2 CCCBPs adopted to date. What will the LRPC review encompass? - LRPC review will focus on the Crystal City Block Plan Document. Base maps, analyses, and supporting information Culminates in proposed Block Plan scenario map(s) showing how the block could ultimately develop in the future and how it and the final site plan would achieve Sector Plan goals for the block. * Submission also includes Block Development Document, (with civil, technical, legal drawings), primarily reviewed by staff 7
8 2. CCBP Community Services/Amenities Review of the CCBP also informed by Crystal City Community Services and Amenities Inventory Provides continual awareness on progress made towards meeting community-oriented service and amenity goals from a Crystal City perspective, as opposed to a block level perspective Inventory provides additional context for Planning Commission and community review of CCBPs and Final Site Plans; helps identify opportunities for achieving certain needs on a block 8
9 2. CCBP Review Process LRPC Block Plan is reviewed by the LRPC for consistency with the Sector Plan. SPRC SPRC typically reviews the Final Site Plan after the Bock Plan review. The Block Plan and any proposed refinements are used as a guide for reviewing the final site plan. PC Following SPRC process, the Site Plan and Block Plan are presented to the full Planning Commission at a public hearing. CB County Board then holds a public hearing to consider: 1) adoption of the Block Plan and 2) approval of the Final Site Plan, and any associated rezonings. Adopted Block Plan would serve as the most current plan for the block, until the next site plan on the block necessitates an updated Block Plan. 9
10 2. Background b. Preliminary Review Schedule 10
11 2. Preliminary Schedule Initial Staff Observations of CCBP Note: Dates subject to change. 11
12 3. Sector Plan Guidance for the Block 12
13 3. Sector Plan Guidance for the Block 13
14 3. Sector Plan Guidance for the Block Existing Conditions Future Metro Market Square th St. Water Park 14
15 3. Sector Plan Guidance for the Block Existing Conditions Future Metro Market Square
16 3. Sector Plan Guidance for the Block Existing Conditions 1770 Future Metro Market Square 16
17 3. Sector Plan Guidance for the Block 17
18 3. Sector Plan Guidance for the Block BULK PLANE ANGLE DIAGRAM Figure
19 3. Sector Plan Guidance for the Block 19
20 3. Sector Plan Guidance for the Block Tower Coverage is defined as the sum of the largest single floor of all buildings on the block, above the fifth floor, divided by the site s net buildable area. 20
21 3. Sector Plan Guidance for the Block 21
22 3. Sector Plan Guidance for the Block Water Park 1770 Center Park View Looking East 22
23 3. Sector Plan Guidance for the Block 23
24 3. Sector Plan Guidance for the Block 3D MODEL BIRD S EYE PERSPECTIVE VIEW (FROM SOUTHWEST) 1770 View Looking North 24
25 3. Sector Plan Guidance for the Block 25
26 3. Sector Plan Guidance for the Block View Looking East 1770 View Looking West 3D MODEL BIRD S EYE PERSPECTIVE VIEW (FROM SOUTHWEST)
27 3. Sector Plan Guidance for the Block 3D MODEL BIRD S EYE PERSPECTIVE VIEW (FROM SOUTHWEST) Target size of Metro Market Square is 43,900 square feet. The space will provide for and celebrate a new entrance to the Metro Station at the east end of the plaza and will be a primary center of retail activity. The ground plane of Metro Market Square will be finished primarily in hard surfaces which will allow for market uses, temporary pushcart retail, public gatherings, outdoor entertainment, and a variety of related uses. Metro Market Square could also create an opportunity for crafting a permanent market building arcade along the length of the plaza which could be used for a local farmer s market, arts and crafts festivals, and/or carnivals. The head house on the east end of the market arcade could be the new entry to the Metro Station. A major connection across 18th Street to the Center Park should be emphasized in the plaza design. Small water features, benches, cafe seating, larger interactive sculptures, chess tables, bosques of trees, and similar features should be incorporated into the overall design. Pervious paving, artistic wind turbines, and/or solar panels on the roof of the market building could all be incorporated into the design. 27
28 3. Sector Plan Guidance for the Block 110 between build-to lines 3D MODEL BIRD S EYE PERSPECTIVE VIEW (FROM SOUTHWEST) 19 wide sidewalk on park edge Assumes full build out with parking/loading moving to Clark-Bell View Looking East 28
29 3. Sector Plan Guidance for the Block 100 between build-to lines 3D MODEL BIRD S EYE PERSPECTIVE VIEW (FROM SOUTHWEST) 17.5 wide sidewalk on west side of Crystal Dr. Assumes full redevelopment
30 3. Sector Plan Guidance for the Block SUMMARY Street Network re-alignment of Clark-Bell and introduction of alleys Tower Coverage 75% for block excluding public open space Land Use Mix Residential, Commercial, Hotel or Mixed-Use: Minimum 40% Residential or Hotel on the northern portion, with the southern portions being designated as Residential, Commercial, Hotel or Mixed-Use: Minimum 70% Office Retail Frontage and Underground on southwest corner of Clark-Bell, south edge facing park, and entire block frontage on Crystal Drive. Base Density 3.8 FAR for commercial and 4.8 FAR for residential Architectural Features Coordinated frontage on south edge facing park, and architectural features on Block G-1 at existing CC Metro plaza, and on Block G-2 where 1770 Crystal Dr. exists today. Surface Transitway Transit stops on Clark-Bell near existing CC Metro plaza, and on Crystal Dr. near new Metro entrance and Water Park. Service and Loading preferred locations along Clark-Bell Parking- between 1 space/ 750 square feet and 1 space/1,000 square feet (office), or spaces/ dwelling unit (residential) 30
31 3. Area Wide Sector Plan Guidance Appendix 3 County Board Guidance for the Implementation and Elaboration of the Crystal City Sector Plan Additional Area-Wide Goals to Consider: Housing 800 additional committed or market rate affordable units above projected 1,200 units in/near Crystal City Public Space 14 to 15 total acres of publicly-available open space east of Route 1 Connectivity Additional cross-streets and pedestrian passageways east of Route 1 Energy Design and construction with a preference for easy conversion to district energy systems 31
32 4. Overview of Metro Entrance Project 32
33 4. East Metro Entrance Second full entrance at east end of Metro station Elevators, stairs, fare gates, fare machines, kiosk 3D MODEL BIRD S EYE PERSPECTIVE VIEW (FROM SOUTHWEST) Improves pedestrian access; provides additional ADA elevator access Improves access from Crystal Dr. and connections to VRE Station and Transitway station (Metroway stop) To be built on northwest corner of Crystal Dr. and 18 th St. S. Feasibility and alternatives study completed Spring 2014 Concept design phase in final stage coordinated with WMATA and JBG Smith Included in County s adopted FY17-FY26 Capital Improvement Plan; also in County s adopted Transit Development Plan 33
34 4. East Metro Entrance Planned Location for Crystal City Metro Station East Entrance 3D MODEL BIRD S EYE PERSPECTIVE VIEW (FROM SOUTHWEST)
35 5. Applicant Presentation of Proposed Block Plan Elements, Scenarios, and Justification 35
36 6. Preliminary Staff Assessment of Proposed Crystal City Block Plan 36
37 6. Existing Conditions Land Use Mix Initial Staff Observations of CCBP Land Use % % 87% 37
38 6. Proposed Block Plan Scenario 1 Initial Staff Observations of CCBP Interim - Land Use Mix Land Use % % 51% 38
39 6. Proposed Block Plan Scenario 1 Interim - Density & Tower Coverage Initial Staff Observations of CCBP Residential FARs are below 4.8 FAR Commercial FARs are below 3.8 FAR Tower Coverage is below 75% 39
40 6. Proposed Block Plan Scenario 2 Final Sector Plan- Land Use Mix Initial Staff Observations of CCBP Land Use % % 81% 40
41 6. Proposed Block Plan Scenario 2 Initial Staff Observations of CCBP Final Sector Plan- Density & Tower Coverage Commercial FARs are above 3.8 FAR in 4 buildings highlighted in table & plan Tower Coverage is below 75% 41
42 6. Building Placement Deviations Sector Plan Applicant Proposal Initial Staff Observations of CCBP th St. South and east facades of 1770 Crystal Dr. building do not meet build-to lines in CCSP Corner building encroaches on open space & build-to line for park space 42
43 6. Building Placement/Street Deviations Sector Plan Applicant Proposal Initial Staff Observations of CCBP A SECTION A 18 th St. B SECTION B Proposed build-to lines not achieved on 18 th St. & Crystal Dr. Sidewalk widths are not achieved on 18 th St. & Crystal Dr. Corner building encroaches on final sidewalk dimensions per CCSP 43
44 6. Bulk Plane Angle Deviations Initial Staff Observations of CCBP Bulk/plane angles could be modified by County Board when finding that site maintains adequate sunlight to public open spaces 18 th St. Plan calls for no more than 55 % in shadow between 11am and 3pm on equinoxes Proposal is at 59% in the fall 44
45 6. Street Network Deviations Initial Staff Observations of CCBP Access to the apartment building (Dweck) provided from 15 th St. is a private drive - not an alley 18 th St. 45
46 6. Service and Loading Deviations Initial Staff Observations of CCBP Sector Plan Applicant Proposal 18 th St. 18 th St. Existing Entrance to Remain New Entrance Vehicular access on 18 th St., Crystal Dr. & 15 th St. 46
47 6. Retail Frontage Deviations Initial Staff Observations of CCBP Sector Plan Applicant Proposal 18 th St. Corner Building Retail frontage not fully implemented Corner building with inward facing retail 47
48 6. Open Space Deviations Sector Plan Renderings Applicant Proposal- Concept Landscape Plan Considerations: Initial Staff Observations of CCBP Market Square Theme 2. Size & Configuration 3. Design Character 4. Topography 5. Circulation/ Access 6. Retail Activation/ Corner Building th St Crystal Dr. 48
49 6. Open Space Deviations Sector Plan Concept Narrative for Metro Market Square p.83 Target size of 43,900 square feet. Applicants proposal creates fragmented design 3D MODEL BIRD S EYE PERSPECTIVE VIEW (FROM SOUTHWEST) with three distinct spaces, as opposed to a contiguous 43,900sf. 17 ft. grade change between upper & lower levels creates a visual & physical disconnect. The space will provide for and celebrate a new entrance to the Metro Station at the east end of the plaza and will be a primary center of retail activity. This can be achieved with proposed plan. The ground plane of Metro Market Square will be finished primarily in hard surfaces which will allow for market uses, temporary pushcart retail, public gatherings, outdoor entertainment, and a variety of related uses. An appropriate balance of paving & landscape needs to be evaluated further. Metro Market Square could also create an opportunity for crafting a permanent market building arcade along the length of the plaza which could be used for a local farmer s market, arts and crafts festivals, and/or carnivals. Discussion topic. 49
50 6. Open Space Deviations Sector Plan Concept Narrative for Metro Market Square p.83 The head house on the east end of the market arcade could be 3D MODEL BIRD S EYE PERSPECTIVE VIEW (FROM SOUTHWEST) the new entry to the Metro Station. Current design includes new Metro elevators housed in proposed corner building. Without corner building, concept of head house is unknown. Metro elevator may simply rise to sidewalk level at corner. A major connection across 18th Street to the Center Park should be emphasized in the plaza design. Not provided. Small water features, benches, cafe seating, larger interactive sculptures, chess tables, bosques of trees, and similar features should be incorporated into the overall design. Discussion topic. Pervious paving, artistic wind turbines, and/or solar panels on the roof of the market building could all be incorporated into the design. Discussion topic. 50
51 Applicant Proposal 6. Open Space Deviations Initial Staff Observations of CCBP Corner Building Pros: Anchors the corner, houses new Metro, and retail. Could be a focal point if well designed on all sides. Retail could help activate public space. Building helps connect two open spaces together while maintaining vehicular access from 18 th St.. Could be retrofitted in the future for public market uses. Building, elevator and wall could help address topography challenges. Cons: Changes configuration & character of open space. Creates less desirable condition on 18 th St. sidewalk & west façade with sloping landscape. Ancillary uses from corner building could encroach on public space. 51
52 6. Open Space Deviations Applicant Proposal Overall Park Design Comments: Initial Staff Observations of CCBP Sloped landscape & steps could limit flexible use of park for markets, events, etc.. 2. Promenade needs to remain clear for fire lane; opportunity to provide space between trees for pop-up market tents, seating, etc. 3. Retail on corner building should also be on upper terrace with activity. 4. Change in topography 17 ft. step between spaces could provide a better transition and connection to new Metro entrance & Crystal Dr.. 5. Lower Metro plaza could be mostly paved space with grove of trees, movable public seating, water feature, public art, etc th St. sidewalk experience & façade treatment is a concern. 7. Wall design will need to be further evaluated. 52
53 CCSP Map/ Item 6. Summary of Sector Plan Deviations Scenario 1 - Interim Condition CCSP Page Deviation (Y/N) Description Building Heights 95 N Heights are below maximums 250 & 200. Bulk Plane Angle 97 Y Can be modified by County Board. Build-to Lines 47 Y Corner building in park space building not consistent on south and east sides. Street Network 51 Y Only private access from 15 th St. provided- no alleys proposed. Tower Coverage 99 N Coverage is below 75%. Land Use Mix 103 Y Commercial office below minimum 70% on south block. Base Density 93 N Commercial & Residential FARs below 3.8 & 4.8 Architectural Features 119 TBD Final site plan review will determine if met. Surface Transit 57 N Transit stops are consistent. Service/Loading 111 Y Maintaining existing access- not relocating to Clark-Bell. Public Open Space 79,83 Y Corner building & overall character, configuration not met. Retail Frontage/Underground 107 Y Corner building with inward facing retail Street Sections 63,66 Y Street ROW & sidewalk dimensions not met on 18 th St. or Crystal Dr. Parking 72,73 TBD Final site plan will determine calculations. 53
54 6. Issues for LRPC #2/Open House Community Services and Amenities Inventory Framing Issues for Open Space will help to develop Guiding Principles for the Open Space during LRPC #2 and the Open House General Configuration Corner Building Market Theme Topography Access and Circulation Paving v. Landscaping Other Framing Issues Identified During LRPC #1 54
55 7. LRPC Discussion 55
56 7. Issues for LRPC #1 Sector Plan Deviations Table on slide 53 Questions for Staff or Applicant to Address at LRPC #2 Identification of Framing Issues for Open Space Discussion at LRPC #2/Open House 56
57 8. Public Comment 57
58 9. Conclusion 58
CRYSTAL CITY BLOCK PLAN # CCBP- G 1
CRYSTAL CITY BLOCK PLAN # CCBP- G 1 BLOCK G (Metro Market Square block) Long Range Planning Committee Meeting #3 April 2, 2018 1 1. Tonight s Agenda 1. Introductory Remarks (Jane Siegel) 2. Follow-up from
More informationCRYSTAL CITY BLOCK PLAN #CCBP-JK-1
CRYSTAL CITY BLOCK PLAN #CCBP-JK-1 Blocks J-K Adopted September 15, 2012 A R L I N G T O N V I R G I N I A Jefferson Davis Highway/U.S. 1 N Blocks J-K and Vicinity (existing conditions) Note: Block boundary
More informationTO: FROM: SUBJECT: Background
TO: FROM: SUBJECT: Long Range Planning Committee and Zoning Committee of the Planning Commission Kellie Brown and Margaret Rhodes, Planning Division, CPHD DATE: June 8, 2017 Courthouse Square Implementation
More informationCourthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014
Courthouse Square Planning & Urban Design Study Courthouse Square Working Group #13 October 15, 2014 1 Courthouse Square Process Working Group Community Courthouse Square Advisory Groups & Civic Associations
More informationPentagon Centre (SP#297) Phase I Site Plan Amendments SPRC #3
Pentagon Centre (SP#297) Phase I Site Plan Amendments SPRC #3 CPHD April 23, 2015 Meeting Agenda Overview of approved Phase I Site Plan Review of relevant design guidelines Presentation of current proposal
More informationARLINGTON COUNTY PLANNING COMMISSION SITE PLAN REVIEW COMMITTEE SITE PLAN CHAIR GUIDE
ARLINGTON COUNTY PLANNING COMMISSION SITE PLAN REVIEW COMMITTEE SITE PLAN CHAIR GUIDE Excerpts from the SPRC Operating Guide, 1/31/04 Revised March 17,2010 1. Site Plan Chair Responsibilities 1 1, The
More informationSP #94, AREP Rosslyn City Center
SP #94, AREP Rosslyn City Center 1700 & 1810 N. Moore Street Department of Community Planning, Housing, and Development County Board July 15, 2017 1 19 th Street N. Wilson Boulevard Location Rosslyn City
More informationSite Planning. 1.0 Site Context. 2.0 Pedestrian Circulation Systems. Pag e 2-23
The following photographs from throughout the country illustrate key urban design principles. Photographs are provided to illustrate the overall urban design concepts described in Chapter 1 of the Downtown
More informationCITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT
CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT Agenda Item: 2 March 9, 2011 Project: Description: Applicant: DSR11-004 The applicant is requesting approval to replace the existing exterior wood framed
More informationPolicies and Code Intent Sections Related to Town Center
Policies and Code Intent Sections Related to Town Center The Town Center Vision is scattered throughout the Comprehensive Plan, development code and the 1994 Town Center Plan. What follows are sections
More informationR STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist
R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist Applicant s Name: Project Address: Phone: Email: Applicant shall fill out the design guidelines checklist for
More informationSITE PLAN REVIEW COMMITTEE MEETING AGENDA Crystal Drive, 11 th Floor Arlington, VA 22202
Page 1 SITE PLAN REVIEW COMMITTEE MEETING AGENDA DATE: Thursday, October 26, 2017 TIME: 7:00 9:00 p.m. PLACE: 2011 Crystal Drive, 11 th Floor Arlington, VA 22202 SPRC STAFF COORDINATOR: Matt Ladd, 703-228-3525
More informationDRAFT. October Wheaton. Design Guidelines
October 2011 DRAFT Wheaton Design Guidelines 2 Draft - Design Guidelines - Wheaton Sector Plan Contents 04 Section 1: Introduction 06 Section 2: Context 08 Section 3: Design Guidelines 09 Goal 1: Create
More informationSeneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.
Seneca Meadows Seneca Meadows has an industrial park in its southern end and a mixed-use employment area planned for the north end. The district benefits from extensive I-270 visibility, stream valley
More informationTown Center. Block 5 Existing multifamily residential units are expected to remain.
Area Guidelines Germantown s districts should be developed as distinct communities with unique features that are supported through the guidelines. The guidelines not only help distinguish these districts
More informationELMVALE ACRES SHOPPING CENTRE MASTER PLAN
ELMVALE ACRES SHOPPING CENTRE MASTER PLAN Contents 1.0 INTRODUCTION... 2 2.0 LOCATION... 2 3.0 EXISTING CONTEXT... 2 4.0 VISION & GUIDING PRINCIPLES... 2 5.0 LAND USE AND BUILT FORM... 4 5.1 St. Laurent
More informationProsperity Hucks Area Plan. Transportation and Planning Committee May 11, 2015
Prosperity Hucks Area Plan Transportation and Planning Committee May 11, 2015 Presentation Outline 1. Background and Location 2. Community Dialog Process 3. Activity Center Recommendations 4. Wedge Recommendations
More informationYonge Eglinton Centre Urban Design Guidelines
Yonge Eglinton Centre Urban Design Guidelines City Planning Urban Design January 2009 YONGE EGLINTON CENTRE INTRODUCTION.................................................... 1 GENERAL SITE PLAN OBJECTIVES......................................
More informationThis Review Is Divided Into Two Phases:
Semiahmoo Town Centre Review The purpose of this review: To review the Semiahmoo Town Centre Concept Plan, originally approved in 1993, to ensure that this centre will continue to serve the needs of South
More informationAdoption of the Rosslyn Sector Plan Site Plan Review Committee (SPRC) Meeting October 26, 2015
Adoption of the Rosslyn Sector Plan Site Plan Review Committee (SPRC) Meeting October 26, 2015 Rosslyn Sector Plan Introduction Adopted by the County Board in July 2015 Reflects the new long range planning
More informationLINCOLN COUNTY COMMONS - REVISED MASTER PLAN. Lincoln County Public Meetings June 26-27, 2018, 6pm
LINCOLN COUNTY COMMONS - REVISED MASTER PLAN Lincoln County Public Meetings June 26-27, 2018, 6pm PROJECT OVERVIEW Lincoln County is preparing a Refined Master Plan for facilities at the Lincoln County
More informationChapter 1.0 Introduction
Chapter 1.0 Introduction 1.1 Background The North Metro commuter rail line is part of the RTD FasTracks regional transit system expansion program to build more than 100 miles of rail transit throughout
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 21, 2012 DATE: July 12, 2012 SUBJECT: SP #416 SITE PLAN AMENDMENT to modify condition #6 to eliminate requirement to provide a pedestrian
More informationCRYSTAL CITY BLOCK PLAN #
CRYSTAL CITY BLOCK PLAN # DRAFT February 13, 2012 /U.S. 1 N and Vicinity (existing conditions) Note: Block boundary for illustrative purposes only. FEBRUARY 13, 2012 1 CRYSTAL CITY BLOCK PLAN # BLOCKS
More information3.0 URBAN DESIGN. December 6, OVERVIEW
Urban Design 3.0 URBAN DESIGN December 6, 2007 3.1 OVERVIEW The highly urban character of Easton Place is defined by the overall design of the community. The following sections provide an overview of the
More informationReview of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions. Special Working Group Meeting March 4, 2015
Review of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions Special Working Group Meeting March 4, 2015 The slides that follow identify where the draft Comprehensive Plan has
More informationTown Center (part of the Comprehensive Plan)
Town Center (part of the Comprehensive Plan) Mercer Island Town Center Looking North (2014) In 1994, a year-long process culminated in a set of design guidelines and code requirements for the Town Center
More informationArchitectural Review Board Report
Architectural Review Board Report To: From: CC: Subject: Architectural Review Board Architectural Review Board Meeting: May 21, 2018 Agenda Item: 8-A Grace Page, Senior Planner Stephanie Reich, AIA, LEED
More information3.1 community vision. 3.3 required plan elements
Chapter 3 Community Form 3.1 community vision 3.2 Parks & landscaping concepts 3.3 required plan elements D R A F T 20 Community Form Chapter 3 3.0 Community form 3.1 community vision The Specific Plan
More informationGATEWAY AREA STRUCTURE PLAN
CHESTERMERE GATEWAY AREA STRUCTURE PLAN COMMUNITY OPEN HOUSE SEPTEMBER 22 nd, 2015 PLAN AREA ± 512 hectares (± 1,265 acres) GATEWAY LOCATION UNDEVELOPED LANDS PRESENT AGRICULTURAL USE REGIONAL LAND USE
More informationCourthouse Square Implementation Comment/Response Matrix
Courthouse Square Implementation /Response Matrix 1 Are open space symbols binding? GLUP No, open space symbols are not binding, as the GLUP is a policy instrument illustrating the County s future vision
More informationNORTH LAKE SPECIFIC PLAN AREA
NORTH LAKE SPECIFIC PLAN AREA June 21, 2018 WELCOME Workshop Agenda Introduction Provide information about the program and introduce the team Background Information Share information about the North Lake
More informationREQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional)
Rezoning Petition 2016-117 Zoning Committee Recommendation January 4, 2017 REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional) LOCATION
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of October 23, 2004 DATE: October 6, 2004 SUBJECT: SP #106-3 Site Plan Amendment for changes to façade, plaza deck, landscaping, number of units,
More informationWheaton CBD & Vicinity Sector Plan D E S I G N G U I D E L I N E S
Wheaton CBD & Vicinity Sector Plan D E S I G N G U I D E L I N E S 1 a b s t r a c t This document contains the design guidelines the property owners, community members, and planners should use to implement
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 16, 2018
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of June 16, 2018 DATE: June 7, 2018 SUBJECT: Z-2604-18-1 Rezoning from R-6 and R-5 Single Family Residential Districts to S-3A Special District
More informationPOLICY AMENDMENT AND LAND USE AMENDMENT TUXEDO PARK (WARD 9) CENTRE STREET N AND 26 AVENUE NE BYLAWS 36P2017 AND 234D2017
Page 1 of 11 EXECUTIVE SUMMARY This application proposes to redesignate a single parcel of land in the Community of Tuxedo Park from Commercial Corridor 2 (C-COR2 f1h10) District to Mixed Use Active Frontage
More informationCourthouse Square Planning & Urban Design Study. Clarendon / Courthouse Civic Association October 21, 2014
Courthouse Square Planning & Urban Design Study Clarendon / Courthouse Civic Association October 21, 2014 1 Courthouse Square Process Working Group Community Courthouse Square Advisory Groups & Civic Associations
More informationPROJECT DESCRIPTION. Providing a mix of housing options supporting a diversity of needs (800-1,600 sf 1-3 bd flats and Townhomes).
ROHNERT PARK Planned Development - Preliminary Application Project Site LOCATION MAP Project Site Rohnert Crossings is a acre mixed-use urban village proposed in the center of the city adjacent what will
More information4.9 Mendocino Avenue Corridor Plan Design Guidelines
4.9 Mendocino Avenue Corridor Plan Design Guidelines The Mendocino Avenue Corridor Plan addresses the area between College Avenue and Steele Lane. Mendocino Avenue is a busy arterial that runs parallel
More informationCourthouse Square Planning & Urban Design Study Working Group Meeting #11 September 2, 2014
Courthouse Square Planning & Urban Design Study Working Group Meeting #11 September 2, 2014 1 Study Area Courthouse Square DRAFT Design Concepts A B C 3 Public Feedback July 23 Workshop & Online Survey
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting October 15, 2005 DATE: September 28, 2005 SUBJECT: Request to Advertise the adoption of the 2005 Clarendon Sector Plan C. M. RECOMMENDATION:
More informationSITE PLAN REVIEW COMMITTEE MEETING AGENDA. Courthouse Plaza 2100 Clarendon Boulevard Cherry and Dogwood Rooms (C&D) Arlington, VA 22201
Page 1 SITE PLAN REVIEW COMMITTEE MEETING AGENDA DATE: Monday, May 15, 2017 TIME: 8:00 10:00 p.m. PLACE: Courthouse Plaza 2100 Clarendon Boulevard Cherry and Dogwood Rooms (C&D) Arlington, VA 22201 SPRC
More informationBloor St. W. Rezoning - Preliminary Report
STAFF REPORT ACTION REQUIRED 1638-1644 Bloor St. W. Rezoning - Preliminary Report Date: April 1, 2008 To: From: Wards: Reference Number: Toronto and East York Community Council Acting Director, Community
More informationSITE PLAN REVIEW COMMITTEE MEETING AGENDA Clarendon Boulevard Conference Room 311 Arlington, VA 22201
SITE PLAN REVIEW COMMITTEE MEETING AGENDA DATE: Thursday, July 13, 2017 TIME: 7:00 8:30 p.m. PLACE: 2100 Clarendon Boulevard Conference Room 311 Arlington, VA 22201 SPRC STAFF COORDINATOR: TBD Item 1.
More informationADMINISTRATION RECOMMENDATION(S) 2018 January 25. That Calgary Planning Commission recommend APPROVAL of the proposed Land Use Amendment.
Page 1 of 9 EXECUTIVE SUMMARY This land use amendment proposes to redesignate a parcel from DC Direct Control District to Multi-Residential Contextual Grade-Oriented (M-CG) District to allow for multi-residential
More informationDESIGN REVIEW COMMITTEE AGENDA ITEM
DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: AUGUST 2, 2017 TO: THRU: FROM: SUBJECT: Chair Imboden and Members of the Design Review Committee Anna Pehoushek, Assistant Community Development Director
More information1.0 Purpose of a Secondary Plan for the Masonville Transit Village
Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village
More information12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH
12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH STAFF PLANNER: Faith Christie REQUEST: Conditional Change of Zoning (from PD-H1 Planned
More informationWelcome. Walk Around. Talk to Us. Write Down Your Comments
Welcome This is an information meeting introducing the applications for proposed redevelopment of the Yorkdale Shopping Centre site at 3401 Dufferin Street and 1 Yorkdale Road over the next 20+ years,
More informationNew-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario
URBAN DESIGN BRIEF New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario TABLE OF CONTENTS: 1.0 Executive Summary 2.0 Creating Vibrant and Sustainable Urban Places: Excerpts from
More informationWorkshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership
Workshop 3 City of Burlington Waterfront Hotel Planning Study September 14, 2017 The Planning Partnership The Waterfront Hotel Planning Study 01 The Brant & Lakeshore Planning Study will establish a Strategic
More informationTOWN COUNCIL / PLANNING COMMISSION
Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011 Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L.
More informationEstablish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area.
This Plan s urban design goals are to create an urban scale, walkable community with connections to transit, parks, and services and with amenities and facilities for residents and employees. The 1992
More informationNorth Downtown Specific Plan MEMORANDUM
North Downtown Specific Plan MEMORANDUM MEETING DATE: November 13, 2017 TO: Members of the North Downtown Specific Plan Advisory Committee FROM: Jeanine Cavalli, Senior Planner SUBJECT: Materials for the
More informationSLIDE TITLE TRANSIT-ORIENTED DEVELOPMENT PLAN RED-PURPLE BYPASS STUDY AREA PUBLIC MEETING #2 RED AND PURPLE MODERNIZATION. RPM TOD Plan Update
SLIDE TITLE TRANSIT-ORIENTED DEVELOPMENT PLAN RED-PURPLE BYPASS STUDY AREA PUBLIC MEETING #2 RED AND PURPLE MODERNIZATION 1 SLIDE TITLE AGENDA Project Introduction TOD s and Development Trends Real Estate
More informationDENVER DESIGN DISTRICT GDP
DENVER DESIGN DISTRICT GDP Urban Design Standards and Guidelines November 17, 2008 Amended February 3, 2016 City and County of Denver CF Property Management, Inc. C/O Denver Design District - Starboard
More informationSITE PLAN REVIEW COMMITTEE MEETING SUMMARY
DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee 2100 Clarendon Boulevard, Suite 700, Arlington, VA 22201 TEL 703-228-3525 FAX 703-228-3543 www.arlingtonva.us
More informationpublic review draft Key objectives for this chapter are:
5 - parks & open space Providing a rich collection of outdoor places for informal gathering and recreation, as well as planned promotional activities and community events, is a key concept for Midtown.
More informationCharles P. Johnson and Associates. Annapolis Landscape Architects
Charles P. Johnson and Associates Annapolis Landscape Architects AGENDA Introduction Project Limits and Scope Site Analysis Opportunities & Constraints Program Goals Image Boards Design Alternatives Pros
More informationSlot Home Task Force Meeting #5 Phase 2 June 8, 2017
Slot Home Task Force Meeting #5 Phase 2 June 8, 2017 MEETING OBJECTIVES Review Staff Recommended Strategy for Mixed Use and Main Street districts Confirm the Strategy for the Mixed Use and Main Street
More informationMaster Environmental Servicing Plan & Secondary Plan
1 East Side Lands Stage 2 Master Environmental Servicing Plan & Secondary Plan Public Consultation Centre #4 March 20, 2018 Welcome! Today s Agenda Please sign in at the registration table. 6:00 pm 6:30
More informationRezoning Transportation Analysis Petition Number: General Location Identifier:
From: Kelsie Anderson, PE Kelsie.Anderson@charlottenc.gov 704-432-5492 Staff Reviewer: Kory Hedrick, PE, PMP Khedrick@charlottenc.gov 704-432-6511 CDOT s review of this rezoning petition is intended to
More informationForest Hills Improvement Initiative A Partnership for Building a Better Community. Use & Design Guidelines September 23, 2008
Forest Hills Improvement Initiative A Partnership for Building a Better Community City of Boston Thomas M. Menino, Mayor Emerging Community Vision p. 2 Site Use & Design Guidelines p. 3 to 21 Arborway
More informationFLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist
FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist Applicant s Name: Project Address: Phone: Email: Applicant shall fill out the design guidelines checklist for all guidelines applicable
More informationS C O P E O F W O R K A P R I L
white flint 2 sector plan S C O P E O F W O R K A P R I L 2 0 1 2 MONTGOMERY COUNTY PLANNING DEPARTMENT M-NCPPC MontgomeryPlanning.org 1 white flint 2 sector plan Scope of Work abstract This scope of work
More informationappendix and street interface guidelines
appendix five: building and street interface guidelines appendix 5 building and street interface guidelines BOULEVARDS Boulevards are generally characterized by higher levels of traffic movement at higher
More information599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report Date: March 7, 2017 To: From: Wards: Reference Number: Scarborough Community
More informationPlanning Board Briefing
Planning Board Briefing Why Now? The Sector Plan Implementation Chapter States: Before Stage 1 begins, the following must occur: Approval of the Sectional Map Amendment. Approval of the Greater Lyttonsville
More informationThe Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN
The Village SPECIFIC PLAN Chapter 3 3.1 INTRODUCTION 3.1.1 Purpose This Chapter describes the development regulations applicable to the Mixed-Use and Transit Center Planning Areas. These form-based regulations
More informationJordan Harrison, Planner III, San Francisco Recreation and Park Department
Date December 8, 2015 To: Through: From: Subject: Recreation and Park Commission Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Capital & Planning Division Jordan Harrison, Planner III,
More informationBuildings may be set back to create small plazas provided that these setbacks do not substantially disrupt the street wall s continuity.
6-22 Community Design Street Walls and Street-front Setbacks The siting of buildings will play a critical role in establishing the character and sense of place for the District. Siting buildings at the
More informationDESIGN SERVICES FOR BALLSTON- MU METRO STATION AREA IMPROVEMENTS 90% PLAN PRESENTATION: DECEMBER 2015
DESIGN SERVICES FOR BALLSTON- MU METRO STATION AREA IMPROVEMENTS 90% PLAN PRESENTATION: DECEMBER 2015 PRESENTATION OUTLINE The purpose of this presentation is: 1. Update on the status of the plans for
More informationBallston Station Multimodal Study. Stakeholder Meeting October 5, 2010
Ballston Station Multimodal Study Stakeholder Meeting October 5, 2010 Agenda Welcome and Introductions Update on Short Term Improvements Update on the Multimodal Study Recap of Goals and Key Issues Working
More informationUptown Rideau Street Secondary Plan [Amendment #166, January 12, 2016]
[Amendment #166, January 12, 2016] The policies of this Secondary Plan are in effect, save and except for the property at 560 Rideau Street, for which there remains a site specific appeal to this Secondary
More informationFuture Proposed Development
Future Proposed Development on and around Link light rail s Capitol Hill Station Meeting September 24, 2012 Tonight s Agenda 6:00 pm Open House 6:30 pm Introductions Richard Conlin, City of Seattle Councilmember/Sound
More informationAPPENDICES DESIGNING PUBLIC SPACES - ENERGIZED PUBLIC SPACES DESIGN GUIDELINES WORKING DRAFT DECEMBER 2018 A1
APPENDICES DESIGNING PUBLIC SPACES - ENERGIZED PUBLIC SPACES DESIGN GUIDELINES WORKING DRAFT DECEMBER 2018 A1 App.1 Case Studies by Park Types The upcoming (in-progress) online library will house several
More informationBuilding Great Neighbourhoods. Strathcona
Building Great Neighbourhoods Strathcona March 21, 2018 Becky Redford Project Manager, Planning & Design Building Great Neighbourhoods Integrated Infrastructure Services Welcome and Purpose To provide
More informationAMITY STATION Revised Concept Plan Review West Rosemary Street Chapel Hill, NC September 27, 2016
AMITY STATION Revised Concept Plan Review West Rosemary Street Chapel Hill, NC September 27, 2016 DEVELOPER'S PROGRAM Introduction This is a request for review of a Revised Concept Plan by Chapel Hill
More informationRESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE
RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE DEVELOPMENT TEAM DONEGAL SOUTH Maple Grove, Minnesota March 27, 2017 Applicant/Developer/Builder:
More informationSubject: 30 Otis Street, Evaluation of Shadow on Proposed 11th and Natoma Park
Date: September 5, 2018 To: Recreation and Park Commission Capital Committee Through: Philip A. Ginsburg, General Manager Toks Ajike, Director, Capital & Planning Division From: Brian Stokle, Planner,
More informationROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018
Page 1 of 19 EXECUTIVE SUMMARY This application proposes redesignating two parcels in the community of Silver Springs from Special Purpose Future Urban Development (S-FUD) District and undesignated road
More informationSUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO)
TO: FROM: Honorable Mayor and City Council Planning & Community Development Department SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 260-400 E. COLORADO BOULEVARD (PASEO COLORADO) RECOMMENDATION:
More informationRIVERSIDE, Newton MA June 9, 2011
June 9, 2011 TONIGHT S AGENDA: 1.Project Update (5 min.) 2.Master Plan Update (10 min.) 3.Environmental Update (5 min.) 4.Traffic Plan Update (25 min.) Questions PROJECT STATUS UPDATE Responding / Clarifying
More informationA. INTRODUCTION B. PROJECT LOCATION
Chapter 1: Project Description A. INTRODUCTION The Lower Manhattan Development Corporation (LMDC), a subsidiary of the New York State Urban Development Corporation, doing business as the Empire State Development
More informationBehnke Ranch Property, Pasco County: Master Plan Development Approach
February 24, 2014 , Pasco County: Master Plan Development Approach Location & Program The (Legacy PUD) is located in southwest Pasco County along State Road 54 approximately 1.5 miles west of the Suncoast
More informationMONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. 6 Date: 7.22.13 Bethesda Purple Line Station Minor Master Plan Amendment, Scope of Work Elza
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 23, 2019 DATE: April 12, 2019 SUBJECT: SP #413 SITE PLAN AMENDMENT to permit a fixed bar in a private outdoor café space with associated
More informationSub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting
Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee Ninth Meeting Date: 5 October 2005 Time: 3:30pm Venue: Conference Room 15/F, North Point Government Offices, 333 Java Road, North
More informationScope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan
Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity
More informationDRAFT. 10% Common Open Space
% OF CHARLOTTE IS CATEGORIZED AS A. LAND USES : Placeholder map displaying location of Place Type GOALS: Accommodate XX% of future growth. Provide a concentration of primarily commercial and civic activity
More informationPublic may provide comments on the GDP within the next two weeks (December 24)
25/70 General Development Plan (GDP) Public Meeting Wednesday, December 10, 2014 6:00 8:00 P.M. District 1 Police Station Community Room 1311 W 46th Ave, Denver, CO 80211 Council Woman Montero: This particular
More informationPLANNING BOARD REPORT PORTLAND, MAINE
PLANNING BOARD REPORT PORTLAND, MAINE Zero Canal Plaza Development 0 Canal Plaza 2016-162 Cow Plaza 1, LLC Submitted to: Portland Planning Board Date: August 4, 2016 Public Hearing Date: August 9, 2016
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of October 21, 2017 DATE: October 2, 2017 SUBJECTS: Request to authorize advertisement of public hearings by the Planning Commission and County
More informationORDINANCE AN ORDINANCE TO ADD A NEW SECTION 4.N. IN THE ZONING CODE FOR THE TOWN OF MIDDLETOWN, RELATING TO MIXED-USE DEVELOPMENT
Introduced: November 5, 2018 Approved: ORDINANCE 18-11-01 AN ORDINANCE TO ADD A NEW SECTION 4.N. IN THE ZONING CODE FOR THE TOWN OF MIDDLETOWN, RELATING TO MIXED-USE DEVELOPMENT BE IT ENACTED BY THE MAYOR
More informationEXPANDED ENVIRONMENTAL ASSESSMENT FORM PART III Bear Mountain Triangle Rezoning
EXPANDED ENVIRONMENTAL ASSESSMENT FORM PART III Bear Mountain Triangle Rezoning Town of Yorktown, NY Introduction The Environmental Assessment Form (EAF) examines the environmental implications of the
More informationNEC of Central Avenue and Indian School Road
NEC of Central Avenue and Indian School Road For this location, there are two applicable plans that provide guidance on development. The two plans include the Indian School Specific Plan (1991) and the
More information(DC1) Direct Development Control Provision DC1 Area 4
. General Purpose (DC) Direct Development Control Provision DC Area 4 The purpose of this Provision is to provide for an area of commercial office employment and residential development in support of the
More informationClairtrell Area Context Plan
Clairtrell Area Context Plan March 2005 Urban Development Services City Planning Contents 1. Introduction... 4 2. Development Structure... 6 2.1 Streets... 7 2.1.1 Sheppard Avenue and Bayview Avenue...
More information40 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor
40 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor A presentation by the Arlington County Department of Community Planning,
More information