CITY OF TIGARD EXPECTED SERVICE AREA

Size: px
Start display at page:

Download "CITY OF TIGARD EXPECTED SERVICE AREA"

Transcription

1 CITY OF TIGARD EXPECTED SERVICE AREA City overview / Background Incorporated in 1961, the has experienced rapid growth over the years. This growth can be attributed to many factors, primarily the close proximity to Portland and easy access to major transportation facilities such as Hwy 99W, Hwy 217, and I-5. At incorporation, the city had a population of 1,084 residents. Almost fifty years later, Tigard has grown to become Oregon s 11 th largest city with 47,150 residents in Along with population growth, Tigard s land area has increased to 7,570 acres and the economy grown to 37,861 jobs. The present employment to population ratio is approximately 0.8 jobs per resident. Approximately 61% of land within Tigard is comprehensively planned to accommodate residential uses, ranging from low-density single-family homes to high-density multi-family dwellings. Commercially designated uses compromise approximately 10% of the City s land use area, and Industrial uses around 9%. Almost 9% of the City is planned for mixed-use, which allows for various combinations of commercial, industrial, and residential uses. The remainder of the City is planned for open space and institutional uses, at 8% and 3% respectively. The 2008 Buildable Lands Inventory (BLI) included only 7% of the total land area of Tigard. The majority of land included was residential, primarily low and medium density. Approximately 87% of residential lots were less than one acre in size, and over half of all residential lots were less than 10,000 square feet in size. No Community Commercial or Neighborhood Commercial was identified. While new development is not limited to properties included in the BLI, the low percentage of BLI properties and their small size point to the likelihood of increased pressure to redevelop properties, to increase density, and to look to mixed use areas to absorb more residential development. Such pressure would be reinforced by Tigard s unique position as the only Washington County city landlocked by urbanized land uses, including the unincorporated residential development in the vicinity of Bull Mountain, which prevents the annexation of undeveloped rural lands. As a result, the extension of municipal services to growth areas 63 and 64, though probable, is not a certainty. The s current aspirations are to provide functional, multi-modal transportation connections between Tigard and the Metro Region, as well as local and sub-regional centers and corridors including the Washington Square Regional Center, the Downtown Tigard Town Center, the Tigard Triangle, and the Hwy 99W corridor. These connections are critical to integrate the urban functions found in these areas to create a synergy of urban density land uses that move Tigard towards a complete community. Concurrent with that, the City is committed to the protection and maintenance of the single family pattern of its existing neighborhoods. Such aspirations are reflected in the 2040 Metro Growth Concept and Tigard s ongoing long range planning and redevelopment activities. Urban Reserves Findings 1

2 Tigard aspires to absorb another 17,504 additional dwelling units and 31,845 additional jobs within the existing city limits. Assuming 2.48 persons per household, approximately 43,410 additional residents will reside in such housing. The distribution of the new dwelling units is as follows: 3,476 dwelling units (Tigard Buildable Lands Analysis, January 2008) 2,500 dwelling units (Tigard Downtown 2058 Redevelopment Aspiration) 3,008 dwelling units (Tigard Triangle Aspiration: 470 acres x 16% 1 x 40 units/acre) 5,000 dwelling units (99W Corridor Aspiration: 200 acres x 50% 2 x 50 units/acre) 3,520 dwelling units (Washington Square Aspiration: 550 acres x 16% 2 x 40 units/acre) 17,504 total additional dwelling units Similarly, the City aspires to increase employment density in its employment areas and maintain a balanced jobs housing ratio of 1.7 jobs per household, with a minimum of 1 job per household added. This outcome can best be achieved when new urban land is annexed as part of a community that already possesses a healthy jobs/household balance, such as Tigard. Furthermore, Tigard is making land use and policy decision to increase employment density on existing employment lands, though precise numbers are hard to predict due to economic uncertainties. As such, Tigard would respond to provide appropriate new employment lands for economic development if conditions warrant. Urban Reserve Candidate Area The candidate urban reserve area that Tigard is proposing is approximately 888 acres in size, and located in Southeast Washington County, westerly of Tigard and north of the Tualatin River National Wildlife Refuge. The current planning designations for these lands are Exclusive Farm Use on the southerly portions of the candidate area, and Agriculture and Forest Use along Scholls Ferry Road to the north. The candidate area is noncontiguous to the, with the unincorporated urbanized areas of Bull Mountain forming a barrier between Tigard City Limits and this growth area, preventing near term annexation by the City. Annexation of several unincorporated properties or County right of way will be necessary to enable the extension of city services to this area. In the long term, Tigard expects the annexation of its full urban services area and the proposed candidate lands for the following reasons: The probable annexation of the unincorporated but urbanized Bull Mountain area by the City of Tigard, lands which are contiguous to the candidate area and presently within the Urban Growth Boundary and the Tigard Urban Planning Area, due to the City s ability to provide the full range of urban services to this community over the long term. 1 5 year trend ( ) shows 16% of new development not captured by Tigard Buildable Lands Inventory 2 Assumes 50% redevelopment of property with High Capacity Transit development along 99W Urban Reserves Findings 2

3 The County and its cities have committed through the recently completed urbanization forum process to not undertake any further unincorporated development. Tigard is the closest City with the capacity to provide these services. The City recognizes that new population and job growth cannot be accommodated by infill and redevelopment alone, and new lands will be needed to be added to the Urban Growth Boundary. Tigard is the logical provider of services to the candidate area. The location of existing and significant north-south and east-west transportation facilities alongside the candidate area, and its reasonable proximity to high capacity transit along the Hwy 99W corridor, reduces the burden of transportation costs necessary for Tigard and other supporting service districts to develop and service this area, and future residents to travel to and from Tigard and the broader region. The anticipated expansion of Beaverton and King City along the Northern and Southern edges of the candidate area will provide the opportunity for the three cities to cooperate in providing key services such as water service and transportation. Approximately 248 acres of Tigard s expected service area has been included in Washington County s West Bull Mountain Concept Planning Area, otherwise known as the Rural Element (WBM-R). Despite its current location outside of the Urban Growth Boundary, Washington County included this area as part of the ongoing concept planning process for Areas 63 and 64 based on the existing road layout and advantages of master planning both 63 and 64 as one contiguous and interconnected community. This portion of the candidate area is bordered by SW Roy Rogers Road to the west, SW Beef Bend Road to the south, Area 63 and 64 to the North, and SW 150 th to the east (Figure 1). Small farms and rural residential parcels are the predominant land use. The remainder is approximately 640 acres in size and bounded by Scholls Ferry Road (Oregon Route 210) to the North, Vandermost Road to the West, the Tualatin River National Wildlife Refuge to the South, Area 64 to the northwest, and West Bull Mountain Planning Area to the Southeast (across Roy Rogers Road). Land uses are comprised primarily of small farms, a vineyard, nurseries, and forested lands. Topography of the site is varied with an elevation change of approximately 120 feet from highest to lowest point. Areas of relatively flat and moderately sloped agricultural and forest land are separated by steep slopes and unnamed stream corridors that drain into the Tualatin River to the South and East. Regional access to these lands occurs through three major roads contiguous or bisecting the area: SW Scholl s Ferry Road, SW Beef Bend Road, and Roy Rogers Road, all of which are classified as arterials in Washington County s 2020 Transportation Plan. Other points of access include SW Bull Mountain Road, a collector street; and SW Vandermost Road, a local street, as classified in the Washington County 2020 Transportation Plan. Public Transit does not service the area at this time. Pre-Qualified Concept Plan Figures 1 and 2 show those areas proposed for an Urban Reserve designation by the. As discussed above, Washington County has already initiated concept planning for approximately 248 acres of Tigard s expected service area which is marked as the West Bull Mountain Planning Area Rural Element on Figure 1. Urban Reserves Findings 3

4 At this time, Tigard has not concept planned the remaining 640 acres west of Roy Rogers Road as such an action would be premature and potentially misleading to landowners and other stakeholders. Furthermore, given the geographic and legal constraints that presently prevent Tigard from annexing these lands in the near future, and the City s inward looking aspirations for the near future, it is likely that significant time will elapse before this noncontiguous area is considered for inclusion in the UGB. Geographical constraints will not change, but other facts such as environmental regulations, community preferences, demographics, and market demand are subject to considerable adjustment over time. As a result any concept planning should wait until that time to ensure accuracy and prevent undue market influence on landowner expectations. Future concept planning for the area will be consistent with the following assumptions: Tigard will be the primary service provider for urban services including water, parks, and police services. Washington County Clean Water Services and Tualatin Valley Fire & Rescue will continue to service the area, in coordination and/or partnership with the. Future land use designations will support the comprehensive development of Area 63, 64, and the 888 acres of candidate lands into a complete community consistent with the 2040 Growth Concept or successor Metro policies. Such land uses would likely include housing and transportation choices, employment areas, commercial and civic services, access to nature and recreational facilities, and a sense of place and community. Residential land uses are anticipated to be the dominant land use, and built at an average density of 10 to 12 units an acre. Such densities will include a mixture of housing types, densities, and levels of affordability consistent with market demand, sub-regional need, and the Metropolitan Housing Rule. Given the existing topography, natural resource constraints, and need for commercial and civic services, the City anticipates that up to 5,000 residential units can be achieved across the 888 acres of candidate lands. Existing topography limits the development of this area into large scale industrial or employment centers. As a result commercial land uses will likely consist of neighborhood commercial centers and modest amounts of employment land along SW Scholls Ferry Road and/or Roy Rogers Road. Low Impact Design strategies and the location of parks and open space will be used to protect slopes, streams, wetlands, and other natural features on the property, and to avoid conflicts with adjacent non-urban land uses and natural features. Urban Reserve Factor Findings The urban reserve factors identified in OAR were considered by the in selecting the potential candidate urban reserve areas. This section addresses each factor and presents findings of fact for the non-concept planned areas westerly of SW Roy Rogers Road. Please refer to Pre-qualified Concept Plan 11 for findings related to the 248 acres presently being concept planned as part of the West Bull Mountain - Rural Element. (1) Urban Reserve Factors: When identifying and selecting land for designation as urban reserves under this division, Metro shall base its decision on consideration of whether land proposed for designation as urban reserves, alone or in conjunction with the land inside the UGB: Urban Reserves Findings 4

5 a. Can be developed at urban densities in a way that makes efficient use of existing and future public and private infrastructure developments; As discussed above, the candidate area is adjacent to the existing Urban Growth Boundary and within 1/4 mile of existing unincorporated urban development that Tigard expects to annex and service when appropriate and necessary. Areas of relatively flat and moderately sloped agricultural and forest land suitable for development are directly adjacent to existing roads in the area, with steeper slopes and natural resource corridors bisecting the site in a manner that does not constrain site access or the location of parks and open space in those areas. Given the topography of the site, resource constraints, and need for commercial and civil land uses to compliment housing, the City anticipates approximately half the lands will be available for residential development at average densities of units an acre. Adjacent lands are also expected to experience urban growth as Tigard, Beaverton, and King City grow to the west along Bull Mountain Road, Scholls Ferry Road, and Beef Bend Road. All three of these roads are identified as arterials in the Washington County 2020 Transportation Plan, with Scholls Ferry Road also identified as a Major Arterial in the 2035 Regional Transportation Plan. The expected service area is also within reasonable proximity to a high capacity transit corridor planned for Hwy 99W. As a result, future investments on any of these roads will have system wide benefits for both the local and broader region. At present the candidate area does not have an identified provider of potable water. The anticipated provider is the Tigard Water Service Area (TWSA) from the east, which presently serves approximately two-thirds of the, and all of Durham, King City, and unincorporated Bull Mountain. The is the water provider for the TWSA, and recently entered into a water partnership agreement with Lake Oswego to jointly upgrade and expand the existing system while securing long-term water rights from the Clackamas River. In addition, Tigard also has an agreement for access to future finished water from Wilsonville s Willamette River treatment plant should even more water be needed. Alternatively, the City of Beaverton may be willing and able to provide water from the north should concept planning reveal that to be a superior solution. Sanitary and storm sewer services will most likely be provided through Clean Water Services (CWS), which presently services approximately 500,000 customers throughout the Tualatin River Watershed. Additional infrastructure necessary to service the area, such as transmission lines or treatment plants, will be located and constructed by CWS in coordination with the Cities of Tigard, Beaverton, and King City. b. Includes sufficient development capacity to support a healthy economy; The candidate area is expected to develop with predominantly residential and civic uses in a manner that will support Tigard s aspirations of to be a complete community with a jobs-to-housing balance of 1.7 jobs for every household. The location of housing in the candidate area will also support Urban Reserves Findings 5

6 regional and sub-regional industrial and employment centers in Hillsboro and Beaverton to the North, and Tualatin to the southeast. Commercial services and employment areas are anticipated along Scholls Ferry Road, Roy Rogers Road, and Beef Bend Road in order to make use of existing and future roads and high capacity transit corridors. c. Can be efficiently and cost-effectively served with public school and other urban-level public facilities and services by appropriate and financially capable service providers; The candidate area is currently served by three school districts: Beaverton, Tigard-Tualatin, and Hillsboro. The Tigard-Tualatin School District owns an 18.6 acre parcel in Area 63, but has yet to undertake a needs assessment to determine how to develop the site. Provision of public education to future residents will be provided by one or more of these districts, subject to a needs and capacity analysis at the time of concept planning. Parks are expected to be provided and managed by Parks Division. A division of the Public Works Department, the Parks Division presently manages over 300 acres of parks, greenways, and natural areas. Fire protection and emergency medical services would be provided by Tualatin Valley Fire & Rescue which presently serves nine cities and portions of three counties. As development reaches particular thresholds, the location of an additional fire station would be located and constructed in coordination with the Cities of Tigard, Beaverton, King City, and Washington County. This new station is planned for somewhere near the intersection of Roy Rogers and Beef Bend Road. Additional utilities such as electricity, gas, and communication services will be provided by the private sector. d. Can be designed to be walkable and served with a well-connected system of streets, bikeways, recreation trails and public transit by appropriate service providers; The interior of the candidate urban reserve area has minimal road infrastructure and any future development will require the development of an entirely new local circulation network. Improvements to this area will be designed as part of a complete circulation plan that connects the various land uses in the interior with the arterial roads along the edges. Transportation improvements are expected to include upgrades to existing roads, construction of new roads with bike lanes and sidewalks, and accommodation of public transit in coordination with Tri-Met. Natural resource corridors that cross the property, and the adjacency of the Tualatin River National Wildlife Refuge, may provide preferred locations for recreational trails that tie into a regional network. Urban Reserves Findings 6

7 e. Can be designed to preserve and enhance natural ecological systems; Natural resources on the property are principally associated with unnamed streams that drain the property towards the south and west, and the proximity of the Tualatin River and the Tualatin River National Wildlife Refuge to the south. Future concept planning will inventory existing areas and functions deemed appropriate for preservation and enhancement as part of development. Such strategies could include the location of park and open space areas along natural resource corridors, low impact development techniques, buffer areas, and minimizing or avoiding road crossings in natural resource corridors. f. Includes sufficient land suitable for a range of housing types; As previously discussed under criterion a, it is reasonable to expect that up to half of the candidate area will be available for residential land uses at units an acre, with the remainder going towards open space and buffer areas, parks, employment areas, and sundry civic uses as determined at the time of concept planning. Precise configurations and densities are subject to future resource inventories and concept planning, but it is anticipated that higher density housing types, including mixed use typologies, will be located closer to SW Scholls Ferry and SW Roy Rogers Road. g. Can be developed in a way that preserves important natural landscape features included in urban reserves; and The location of resources corridors on the candidate area is such that development can be clustered between these natural landscape features, with major access points located along existing roads that will minimize the need for additional intrusions across resource corridors. Clean Water Service regulations, Goal 5 regulatory programs, parkland aspirations, and Low Impact Design strategies during concept planning will allow for protection and integration of important natural landscape features into the urbanized candidate area. h. Can be designed to avoid or minimize adverse effects on farm and forest practices and on important natural landscape features on nearby resource land, including land designated as rural reserves. Development within the candidate area can be designed to avoid impacts to agriculture lands to the west, and the Tualatin River National Wildlife Refuge to the south, through the use of land use buffers. SW Vandermost Road to the west serves as both a logical boundary for the candidate area, but also a hard buffer between urbanized land uses and agricultural lands to the west. Limiting Impacts on the wildlife refuge to the south can occur through site planning strategies such as the placement of parks and open space along the southern boundary of the candidate area. Specific strategies will be developed during future concept planning as further resource inventories are taken during future concept planning. Urban Reserves Findings 7

8 Summary In summary, the candidate urban reserve lands being proposed are consistent with both local growth aspirations and the necessary criteria to place land in an urban reserves status. These lands are well served by existing or proximate infrastructure and urban services, and would enable the logical and efficient extension of services from Tigard into an area with sufficient capacity to accommodate approximately 5,000 housing units, new employment areas, and civic functions and services. Urban Reserves Findings 8

REVISED FINDINGS FOR CLACKAMAS COUNTY URBAN AND RURAL RESERVES APRIL 21, 2011

REVISED FINDINGS FOR CLACKAMAS COUNTY URBAN AND RURAL RESERVES APRIL 21, 2011 REVISED FINDINGS FOR CLACKAMAS COUNTY URBAN AND RURAL RESERVES APRIL 21, 2011 Revised Findings for Clackamas County Urban and Rural Reserves April 21, 2011 Page 1 I. REASONS FOR URBAN AND RURAL RESERVES

More information

Woodburn Comprehensive Plan Growth Management Goals and Policies

Woodburn Comprehensive Plan Growth Management Goals and Policies Goal Woodburn Comprehensive Plan Growth Management Goals and Policies G-1. The City's goal is to manage growth in a balanced, orderly and efficient manner, consistent with the City s coordinated population

More information

COLVER ROAD INDUSTRIAL CONCEPT PLAN

COLVER ROAD INDUSTRIAL CONCEPT PLAN COLVER ROAD INDUSTRIAL CONCEPT PLAN A CONCEPTUAL LAND USE AND TRANSPORTATION PLAN FOR TA-4 AN URBAN RESERVE AREA OF THE CITY TALENT City of Talent Adopted by City Council Resolution No., June, 2015 PART

More information

Westbound: A One-day Exploration of Growth

Westbound: A One-day Exploration of Growth Westbound: A One-day Exploration of Growth Frog Pond Area 2018 UGB Expansion Proposal June 13, 2018 Growing Out: UGB Asks Four cities submitted proposals to expand greater Portland s urban footprint by

More information

West Bull Mountain Concept Plan REPORT OCTOBER (http://www.co.washington.or.us/westbullmt)

West Bull Mountain Concept Plan REPORT OCTOBER (http://www.co.washington.or.us/westbullmt) West Bull Mountain Concept Plan REPORT (http://www.co.washington.or.us/westbullmt) i OCTOBER 2010 This page intentionally left blank West Bull Mountain Concept Plan i West Bull Mountain Concept Plan Prepared

More information

Rural Land Use Designations Kittitas County December 6, 2007 Draft

Rural Land Use Designations Kittitas County December 6, 2007 Draft KITTITAS COUNTY COMMUNITY DEVELOPMENT SERVICES 411 N. Ruby St., Suite 2, Ellensburg, WA 98926 CDS@CO.KITTITAS.WA.US Office (509) 962-7506 Fax (509) 962-7682 Rural Land Use Designations Kittitas County

More information

Clackamas County Responses to Questions from Stafford Hamlet Stafford Hamlet Community Meeting March 13, 2017, 7-8 p.m., Stafford Elementary School

Clackamas County Responses to Questions from Stafford Hamlet Stafford Hamlet Community Meeting March 13, 2017, 7-8 p.m., Stafford Elementary School Clackamas County Responses to Questions from Stafford Hamlet Stafford Hamlet Community Meeting March 13, 2017, 7-8 p.m., Stafford Elementary School 1. In 2009 the PAC, Planning Commission, and the BCC

More information

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement CHAPTER 7: VISION AND ACTION STATEMENTS This chapter presents the vision, policy and action statements that transform the comprehensive planning study, an analysis of Noble s past, future trends and community

More information

Ten Mile Creek Planning Area

Ten Mile Creek Planning Area PLANNING AREA POLICIES TEN MILE CREEK Ten Mile Creek Planning Area Location and Context The Ten Mile Creek Planning Area ( Ten Mile Creek area ) is located south of the current Boise AOCI, generally south

More information

This chapter describes the purpose of the Plan, introduces how the Plan is organized and provides contextual background for the Plan.

This chapter describes the purpose of the Plan, introduces how the Plan is organized and provides contextual background for the Plan. Chapter 1: INTRODUCTION Purpose of a Comprehensive Plan The 2040 Comprehensive Plan establishes Medina s vision as a community and sets goals and objectives which guide future decisions and policies. The

More information

A Growing Community Rural Settlement Areas

A Growing Community Rural Settlement Areas Town of Huntsville Official Plan Review - POLICY BACKGROUND PAPER A Growing Community Rural Settlement Areas BACKGROUND: In addition to the fully municipally-serviced Urban Settlement Area and the Hidden

More information

Chapter 2: Vision, Goals and Strategies

Chapter 2: Vision, Goals and Strategies Chapter 2: Vision, Goals and Lake Elmo Today & Tomorrow Comprehensive Plan 2040 2 VISION, GOALS & STRATEGIES - DRAFT 4-6-2018 INTRODUCTION Comprehensive Plan Purpose Perhapse the most important objective

More information

Regional Context Statement

Regional Context Statement Regional Context Statement REGIONAL CONTEXT STATEMENT 3. REGIONAL CONTEXT STATEMENT In 1995, the Provincial Government passed into law the Growth Strategies Act. The purpose of this provincial initiative

More information

Tāhuhu whakaruruhau ā-taone The sheltering ridge pole

Tāhuhu whakaruruhau ā-taone The sheltering ridge pole B2. Tāhuhu whakaruruhau ā-taone - Urban growth and form B2.1. Issues Tāhuhu whakaruruhau ā-taone The sheltering ridge pole Auckland s growing population increases demand for housing, employment, business,

More information

PSRC REVIEW REPORT & CERTIFICATION RECOMMENDATION

PSRC REVIEW REPORT & CERTIFICATION RECOMMENDATION PSRC REVIEW REPORT & CERTIFICATION RECOMMENDATION KITSAP COUNTY COUNTYWIDE PLANNING POLICIES July 2, 2012 BACKGROUND A major emphasis of the Washington State Growth Management Act (GMA) is the need to

More information

Chapter 10 IMPLEMENTATION RECOMMENDATIONS

Chapter 10 IMPLEMENTATION RECOMMENDATIONS Chapter 10 IMPLEMENTATION RECOMMENDATIONS The recommended land use plan presented in the previous chapter provides a design for the attainment of the urban and rural development and open space preservation

More information

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018 Page 1 of 19 EXECUTIVE SUMMARY This application proposes redesignating two parcels in the community of Silver Springs from Special Purpose Future Urban Development (S-FUD) District and undesignated road

More information

Outline Plan in Belvedere (Ward 9) at Street SE, LOC (OP)

Outline Plan in Belvedere (Ward 9) at Street SE, LOC (OP) 2018 October 04 Page 1 of 12 EXECUTIVE SUMMARY This outline plan application was submitted by B&A Planning Group on 2016 July 15, on behalf of Tristar Communities Inc. for 50.14 hectares (123.89 acres)

More information

CHAPTER 4 FUTURE LAND USE AND URBAN SERVICES DISTRICTS

CHAPTER 4 FUTURE LAND USE AND URBAN SERVICES DISTRICTS CHAPTER 4 FUTURE LAND USE AND URBAN SERVICES DISTRICTS Introduction This chapter discusses how Benzie County should grow and change in the future. A community can grow and change in many different ways.

More information

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION June 15, 2015 Revised: August 1, 2016 I. VISION Brookhill is a proposed community based upon the principles of Albemarle County

More information

City of Grande Prairie Development Services Department

City of Grande Prairie Development Services Department City of Grande Prairie Development Services Department ROYAL OAKS NORTH OUTLINE PLAN OP-07-03 NW 35-71-6 W6M May 7, 2007 Royal Oaks North Outline Plan TABLE OF CONTENTS 1.0 INTRODUCTION........ 3 1.1 Purpose

More information

Goal 14 Urbanization

Goal 14 Urbanization Urbanization The residents of Benton County value the rural character that still exists in much of the County, the distinction that has been maintained between settlement areas and resource lands and open

More information

General Location Annex, Rezone & Preliminary Plat Lansdowne Addition, Unit Three

General Location Annex, Rezone & Preliminary Plat Lansdowne Addition, Unit Three NEWFOUNDLAND I-5 Agricultural District Subject Site SUNDANCE ANDERSON Single Family Residential CHRISTY PUD Agricultural District Highway Business General Location Annex, Rezone & Preliminary Plat Lansdowne

More information

LAND USE ELEMENT. Purpose. General Goals & Policies

LAND USE ELEMENT. Purpose. General Goals & Policies LAND USE ELEMENT Purpose This Land Use Element contains the goals and policies necessary to support the City s responsibility for managing land resources and guiding development through implementing regulations,

More information

LAND USE OVERVIEW WHAT YOU WILL FIND IN THIS CHAPTER

LAND USE OVERVIEW WHAT YOU WILL FIND IN THIS CHAPTER LAND USE WHAT YOU WILL FIND IN THIS CHAPTER Information about the City s expected population and employment growth. Description and capacity of existing and future land use designations. Policies that

More information

Clackamas County Comprehensive Plan. Chapter 4: LAND USE

Clackamas County Comprehensive Plan. Chapter 4: LAND USE Chapter 4: LAND USE When the pioneers settled Clackamas County, the land resource appeared infinite. They cleared forest, carved towns from the wilderness, and used waterways as the arterials of commerce.

More information

Description of Preferred Alternative

Description of Preferred Alternative Chapter 2 Description of Preferred Alternative 2.1 Introduction This chapter of the programmatic Sammamish Town Center Sub-area Plan Final EIS provides a more detailed description of the Preferred Alternative

More information

4-Town Comprehensive Plan DRAFT 7/30/07

4-Town Comprehensive Plan DRAFT 7/30/07 4-Town Comprehensive Plan DRAFT 7/30/07 Acknowledgements ning Committee Town of Harrisburg Norman Roof Randy Nicol Town of Martinsburg Terry Thisse Paul Kelly Town of Montague Jan Bagdanowicz Wendy Perry

More information

CITY OF PUYALLUP. Background. Development Services

CITY OF PUYALLUP. Background. Development Services CITY OF PUYALLUP Development Services 333 South Meridian Puyallup WA 98371 To: City Council From: Katie Baker, AICP, Planning Division Re: South Hill Neighborhood Plan Adoption Date: (Meeting date: February

More information

BUILDER LOTS FOR SALE

BUILDER LOTS FOR SALE BUILDER LOTS FOR SALE NORTHERN CULPEPER - 135 ACRES RESIDENTIAL DEVELOPMENT 1256 Old Bridge Road, Amissville, VA 20106 SALE PRICE: $995,000 LOT SIZE: 135+ Acres APN #: Tax Map 2 Parcel 23 ZONING: R-1 ACCESS:

More information

Developer s Program. The Station at East 54

Developer s Program. The Station at East 54 Developer s Program The Station at East 54 Existing Conditions The Station at East 54 is proposed for a 1.12 acre site at the northeast corner of Hamilton Road and Prestwick Road, tucked between the East

More information

PRELIMINARY REPORT. HIGHWAY 18 CORRIDOR NEIGHBORHOOD PLAN VILLAGE OF DOUSMAN November, 2014

PRELIMINARY REPORT. HIGHWAY 18 CORRIDOR NEIGHBORHOOD PLAN VILLAGE OF DOUSMAN November, 2014 PRELIMINARY REPORT HIGHWAY 18 CORRIDOR NEIGHBORHOOD PLAN VILLAGE OF DOUSMAN November, 2014 This preliminary report presents the initial recommendations for land use within the Highway 18 corridor along

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

At first Work Session on October 22, At second Work Session on November 19, At third Work Session on December 3, 2015

At first Work Session on October 22, At second Work Session on November 19, At third Work Session on December 3, 2015 At first Work Session on October 22, 2015 Staff Reviewed Infrastructure: Transportation Capacity School Capacity Willett Branch Proposed Staging Language At second Work Session on November 19, 2015 Land

More information

Location. Need GOAL 14 URBAN GROWTH BOUNDARY. Urban Planning in Oregon 7/8/2015

Location. Need GOAL 14 URBAN GROWTH BOUNDARY. Urban Planning in Oregon 7/8/2015 Urban Planning in Oregon June 24, 2015 Redmond, Oregon Gordon Howard, DLCD Urban Planning Specialist GOAL 14 URBAN GROWTH BOUNDARY To provide for an orderly and efficient transition from rural to urban

More information

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies Draft Stillwater 2030 Comprehensive Plan- Goals and Policies Instructions- Review each goal and policy and discuss with group any changes, deletions for additions to the list using your groups pen. Keep

More information

Policy & Procedure Effective Date: Parks Department Page of

Policy & Procedure Effective Date: Parks Department Page of City of Arvada Policy & Procedure Effective Date: Parks Department Page of TITLE: City of Arvada Prairie Dog Habitat Plan APPROVAL: PURPOSE: To establish a plan for the preservation of black-tailed prairie

More information

CHAPTER 7: Transportation, Mobility and Circulation

CHAPTER 7: Transportation, Mobility and Circulation AGLE AREA COMMUNITY Plan CHAPTER 7 CHAPTER 7: Transportation, Mobility and Circulation Transportation, Mobility and Circulation The purpose of the Transportation, Mobility and Circulation Chapter is to

More information

Urban Development Areas Frederick County

Urban Development Areas Frederick County 18 Urban Development Areas Frederick County UDA Needs Profile: All UDAs Frederick County, Virginia's northernmost county has two UDA s, surrounded by the City of Winchester and located adjacent to the

More information

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations.

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations. This section of the Draft EIR addresses the existing land uses on and adjacent to the project site and discusses the potential impacts of the proposed project on existing land uses. Key issues addressed

More information

Growing Community Urban Settlement Area and Hidden Valley Settlement Area

Growing Community Urban Settlement Area and Hidden Valley Settlement Area Town of Huntsville Official Plan Review - POLICY BACKGROUND PAPER Growing Community Urban Settlement Area and Hidden Valley Settlement Area BACKGROUND: Through the Provincial Policy Statement (PPS), the

More information

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

Applicant Name Phone / Fax / Address City State Zip Code  . Property Owner Phone / Fax / Address City State Zip Code Master Development Plan Application Community Development Department City of Redmond 411 SW 9 th Street Redmond, Oregon 97756 541-923-7721 541-548-0706 FAX Master Development Plan Fee $38,862.52 File Number

More information

AREASTRUCTURE PLAN AMENDMENT COCHRANE NORTH

AREASTRUCTURE PLAN AMENDMENT COCHRANE NORTH AREASTRUCTURE PLAN AMENDMENT COCHRANE NORTH In order to implement the vision outlined in the Conceptual Scheme, the following three amendments to the Cochrane North ASP are proposed: 1. Allow commercial

More information

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES In This Chapter Goals & Strategies 182 Project List 183 Future Land Use 186 11 IMPLEMENTATION STRATEGIES NORTH AUGUSTA, SC 2017 COMPREHENSIVE PLAN 179 Individual commitment to a group effort that is what

More information

Plan Modification to Chapter B2 of the Auckland Unitary Plan(AUP) Operative in part (15 November 2016)

Plan Modification to Chapter B2 of the Auckland Unitary Plan(AUP) Operative in part (15 November 2016) UNITARY PLAN UPDATE REQUEST MEMORANDUM TO FROM Phill Reid Linley Wilkinson DATE 25 September 2018 SUBJECT Plan Modification to Chapter B2 of the Auckland Unitary Plan(AUP) Operative in part (15 November

More information

Chapter IV: Development Pattern

Chapter IV: Development Pattern Chapter IV: Development Pattern Introduction The 2002 Prince George s County Approved General Plan designates three growth policy tiers Developed, Developing, and Rural as well as three center designations

More information

City of Redmond. Urban Holding Area Master Planning Requirements and Approval Process

City of Redmond. Urban Holding Area Master Planning Requirements and Approval Process City of Redmond Urban Holding Area Master Planning Requirements and Approval Process June 21, 2006 City of Redmond: Urban Holding Area Master Planning Requirements and Approval Process Table of Contents

More information

OP Council Resolution June 16, Planning and Development Services

OP Council Resolution June 16, Planning and Development Services OP-08-01 Council Resolution June 16, 2008 Planning and Development Services Kingsgate Landing Outline Plan Table of Contents 1.0 Introduction 1 1.1 Purpose of Plan 1 1.2 Plan Area Location 1 1.3 Ownership

More information

Staff Report and Recommendation

Staff Report and Recommendation Community Planning and Development Planning Services 201 W. Colfax Ave., Dept. 205 Denver, CO 80202 p: 720.865.2915 f: 720.865.3052 www.denvergov.org/cpd TO: City Council Neighborhoods and Planning Committee

More information

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018 Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018 Background and Process Monroe Expressway will be open by the end of 2018 Union County and Indian Trail identified a need to revisit

More information

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS Name of Project: Poulsbo Meadows; A Planned Residential Development (PRD)/Plat Applicants Name: PBH Group LLC/Byron Harris PO Box 1010 Silverdale, WA 98038 Description

More information

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c.

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c. Leduc Business Park North Leduc Industrial Area Structure Plan C it y of Led u c Prepared for Farm Air Properties Inc. January, 2007 Table of Contents Page Number 1.0 Purpose of Plan and Definition of

More information

INTRODUCTION PLANNING HISTORY

INTRODUCTION PLANNING HISTORY INTRODUCTION The Upper Rock Creek Master Plan Area lies in the east central part of Montgomery County. The Master Plan Area is adjacent to the City of Rockville to the south, the Olney Planning Area to

More information

POLICY 41, URBAN GROWTH BOUNDARY EXPANSIONS:

POLICY 41, URBAN GROWTH BOUNDARY EXPANSIONS: POLICY 41, URBAN GROWTH BOUNDARY EXPANSIONS: It is the policy of Washington County to ensure an efficient and effective transition of rural land to urban development when an Urban Growth Boundary (UGB)

More information

9 th Street Sub Area Plan

9 th Street Sub Area Plan 9 th Street Sub Area Plan In the 1990 s, when the Township prepared the last Master Plan, the 9 th Street corridor was studied as part of a larger 9 th Street Focus Area that included the West Main Street

More information

Northern Territory Compact Urban Growth Policy

Northern Territory Compact Urban Growth Policy Northern Territory Compact Urban Growth Policy A Reference Policy Document to clause 2.7 (Reference to Policy) of the NT Planning Scheme May 2015 Table of Contents 1 Policy Setting... 3 1.1 Context for

More information

2040 LUP is a part of the Comprehensive Plan and carries the same legal authority. Economic Challenges

2040 LUP is a part of the Comprehensive Plan and carries the same legal authority. Economic Challenges 1.1. Guiding Anchorage s Growth Where will new residents settle over the next two decades? Where will people work, shop, and play? Will there be enough room to grow? How will Anchorage look? Will growth

More information

PUBLIC OPEN HOUSE SEPTEMBER 8 TH, 2010 CITY OF LETHBRIDGE DEVELOPMENT SERVICES

PUBLIC OPEN HOUSE SEPTEMBER 8 TH, 2010 CITY OF LETHBRIDGE DEVELOPMENT SERVICES PUBLIC OPEN HOUSE SEPTEMBER 8 TH, 2010 CITY OF LETHBRIDGE DEVELOPMENT SERVICES INTRODUCTION Why is the City creating the West Lethbridge Employment Centre Area Structure Plan? West Lethbridge Urbanization

More information

SHEFFIELD PARK Paulding County, GA DRI #588

SHEFFIELD PARK Paulding County, GA DRI #588 SHEFFIELD PARK Paulding County, GA DRI #588 Supplemental Information for RDC s DRI (Form 2) Review August 16, 2004 Prepared for: Mr. David Howerin Coosa Valley RDC 1 Jackson Hill Drive Rome, GA 30161 P.O.

More information

E. RURAL COMMERCIAL/INDUSTRIAL PARK MODEL

E. RURAL COMMERCIAL/INDUSTRIAL PARK MODEL E. RURAL COMMERCIAL/INDUSTRIAL PARK MODEL 1. PURPOSE The purpose of the Rural Commerce/Industrial Park Model is to provide parameters within which a grouping of business buildings with parking, loading

More information

DEVELOPMENT FRAMEWORK POST 2030 LAND USE PLAN INTRODUCTION

DEVELOPMENT FRAMEWORK POST 2030 LAND USE PLAN INTRODUCTION INTRODUCTION Oak Grove s Comprehensive Plan identifies a future Metropolitan Urban Service Area (MUSA). The Metropolitan Council does not anticipate extending utilities to this area prior to 2030. The

More information

WASHINGTON COUNTY OREGON

WASHINGTON COUNTY OREGON WASHINGTON COUNTY OREGON LONG RANGE PLANNING DIVISION North Bethany Subarea Stream Corridors: Existing Regulations In Oregon, there is a distinct difference between the land use rules that apply in rural

More information

TOWN OF SPRINGFIELD, NEW HAMPSHIRE

TOWN OF SPRINGFIELD, NEW HAMPSHIRE TOWN OF SPRINGFIELD, NEW HAMPSHIRE NATURAL RESOURCES INVENTORY EXECUTIVE SUMMARY March 2008 Prepared by: Watershed to Wildlife, Inc. Natural Resource Consultants 42 Mill Street, Suite 3 Littleton, NH 03561

More information

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails Appendix A: Park Classifications The intent of parks and recreation classifications is to aid in making acquisition and design decisions for park sites, facilities and the organization of recreation space

More information

Improve Neighborhood Design and Reduce Non Point Source Water Pollution

Improve Neighborhood Design and Reduce Non Point Source Water Pollution HOW TO Planning Guide Improve Neighborhood Design and Reduce Non Point Source Water Pollution This document was funded by a grant from the New Hampshire Coastal Program with funding from the National Oceanic

More information

D-O LRT Zoning Discussion. Chapel Hill Boards & Commissions October 16, 2017

D-O LRT Zoning Discussion. Chapel Hill Boards & Commissions October 16, 2017 D-O LRT Zoning Discussion Chapel Hill Boards & Commissions October 16, 2017 Update on Overall D-O LRT Station Area Initiative Objectives Design and educate on principles of Good Transit-Oriented Development

More information

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 July 27, 2009 TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Plan Area Location & Context... 1 1.2 Ownership

More information

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC 2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from

More information

FUTURE LAND USE PLAN 7

FUTURE LAND USE PLAN 7 FUTURE LAND USE PLAN 7 The recommendations of each of the preceding chapters can be combined to present an overall Future Land Use Plan for Wilton. The Future Land Use Plan, presented on the following

More information

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan Town of Portola Valley General Plan Amended December 10, 1997 Table of Contents Introduction... 1 Planning Area... 1 Objectives... 2 Principles... 2 Standards... 4 Description... 4 Community Commercial...

More information

CITY OF COLWICH COMPREHENSIVE PLAN LAND USE LAND USE 1

CITY OF COLWICH COMPREHENSIVE PLAN LAND USE LAND USE 1 LAND USE LAND USE 1 WHAT YOU WILL FIND IN THIS CHAPTER: Discussion of today s conditions and tomorrow s projections Discussion of challenges and opportunities Discussion of the environmental quality goals,

More information

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY JACKSON HIGHWAY & GRANT LINE EAST S A C R A M E N T O C O U N T Y P L A N N I N G D E P A R T M E N T SUMMARY AND WORKBOOK November 19, 2008 History of the Visioning Study Sacramento County has two growth

More information

Erik Rundell, Project Manager

Erik Rundell, Project Manager Erik Rundell, Project Manager M.U.R.P., Portland State University Certificate, Commercial Real Estate, University of Washington Graduate Certificate, GIS, University of Wisconsin-Madison B.A. Geography,

More information

Exhibit A Comprehensive Plan Amendments

Exhibit A Comprehensive Plan Amendments Exhibit A Comprehensive Plan Amendments May 2010 Draft Chapter One - Introduction Chapter One INTRODUCTION NOTE: For brevity and ease in viewing the proposed changes, portions of chapter one that are not

More information

A citizen s guide to the. Comprehensive Plan. City of Lakeville, Minnesota 1

A citizen s guide to the. Comprehensive Plan. City of Lakeville, Minnesota 1 A citizen s guide to the Comprehensive Plan 2008 City of Lakeville, Minnesota 1 Introduction The City of Lakeville completed an update of its Comprehensive Plan in 2008. A comprehensive plan is a tool

More information

Silverdale Regional Center

Silverdale Regional Center Silverdale Regional Center Vision for Silverdale Regional Center The Silverdale Regional Center Plan (Plan) will guide the evolution of the Silverdale Regional Center from a collection of strip malls and

More information

Appendix A. Planning Processes. Introduction

Appendix A. Planning Processes. Introduction 1 Planning Processes Introduction This appendix outlines a number of planning processes which are used in the Auckland Region to support the effective management of development in the region s rural and

More information

HAZARD MITIGATION GOALS AND OBJECTIVES

HAZARD MITIGATION GOALS AND OBJECTIVES SEWRPC Community Assistance Planning Report No. 282, 2nd Edition CITY OF MILWAUKEE ALL HAZARDS MITIGATION PLAN UPDATE Chapter IV HAZARD MITIGATION GOALS AND OBJECTIVES [NOTE: Throughout this plan update

More information

REASONS FOR DESIGNATION OF URBAN AND RURAL RESERVES IN CLACKAMAS COUNTY

REASONS FOR DESIGNATION OF URBAN AND RURAL RESERVES IN CLACKAMAS COUNTY REASONS FOR DESIGNATION OF URBAN AND RURAL RESERVES IN CLACKAMAS COUNTY The Metro Council adopts these findings for the purpose of responding to the decision of the Oregon Court of Appeals in Barkers Five

More information

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT MAY 8, 2014 The Planning and Development Department hereby forwards to the Planning

More information

WEST BULL MOUNTAIN COMMUNITY PLAN Initial Examination of Standards for Parks, Trails, Public Spaces and Open Space

WEST BULL MOUNTAIN COMMUNITY PLAN Initial Examination of Standards for Parks, Trails, Public Spaces and Open Space WEST BULL MOUNTAIN COMMUNITY PLAN Initial Examination of Standards for Parks, Trails, Public Spaces and Open Space WEST BULL MOUNTAIN COMMUNITY PLAN Initial Examination of Standards for Parks, Trails,

More information

Section 9 NEIGHBORHOOD DESIGN

Section 9 NEIGHBORHOOD DESIGN Section 9 NEIGHBORHOOD DESIGN City of Lancaster Comprehensive Plan D u n k i n, S e f k o & A s s o c i a t e s, I n c. NEIGHBORHOOD DESIGN INTRODUCTION There are many ways in which a neighborhood can

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING

4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING 4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING 4.7.1 INTRODUCTION The following analysis discusses the consistency of the Proposed Project with the corresponding land use and zoning designations

More information

6 Growth Management Challenges and Opportunities

6 Growth Management Challenges and Opportunities 6 Growth Management Challenges and Opportunities The Town has established a goal of attaining a 50% participation rate with respect to employment opportunities versus residential population. The Town s

More information

C. Westerly Creek Village & The Montview Corridor

C. Westerly Creek Village & The Montview Corridor C. Westerly Creek Village & The VISION Community Vision When the goals of the city are achieved Westerly Creek Village, a distinctive community defined by Montview Boulevard and Westerly Creek, is a strong

More information

open public hearing and allow public comment request to continue LPA public hearing to January 16, 2014 at 10:30 am

open public hearing and allow public comment request to continue LPA public hearing to January 16, 2014 at 10:30 am TODAY S AGENDA Work Session LPA Transmittal Public Hearing open public hearing and allow public comment request to continue LPA public hearing to January 16, 2014 at 10:30 am staff will issue a recommendation

More information

WATERFORD Plan of Preservation, Conservation and Development Supplement Part 1 - Policy Element

WATERFORD Plan of Preservation, Conservation and Development Supplement Part 1 - Policy Element WATERFORD 2012 Plan of Preservation, Conservation and Development 2015 Supplement Part 1 - Policy Element Effective June 11, 2015 2015 Plan Update GOAL To respond to the evolving land use needs and continually

More information

Rapid City Planning Commission Comprehensive Plan Amendment Project Report

Rapid City Planning Commission Comprehensive Plan Amendment Project Report Rapid City Planning Commission Comprehensive Plan Amendment Project Report June 7, 2018 Applicant Request(s) Item #3 Case # 18CA001 Comprehensive Plan Amendment to change the future land use from Mixed-

More information

Town of Oakville Streetscape Strategy

Town of Oakville Streetscape Strategy Town of Oakville Streetscape Strategy Endorsed by PDC on February 10, 2014 (PD-011-14) Town of Oakville Streetscape Strategy [endorsed by PDC February 10, 2014] 0 Town of Oakville Streetscape Strategy

More information

Preliminary Plan Framework: Vision and Goals

Preliminary Plan Framework: Vision and Goals Preliminary Plan Framework: Vision and Goals Draft: May 2015 Introduction Since the Town of Milliken s comprehensive plan was last updated in 2010, the community was heavily impacted by the 2013 flood,

More information

This page intentionally blank.

This page intentionally blank. This page intentionally blank. Parks, Recreation, and Open Space Chapter Relationship to Vision Vision Parks, Recreation and Open Space Chapter Concepts County Government. County government that is accountable

More information

Background Summary Report

Background Summary Report Background Summary Report May 2014 Submitted by Macaulay Shiomi Howson Ltd. In association with AMEC MMM Group Brook McIlroy Inc. Hemson Consulting Ltd. Table of Contents 1. Introduction... 1 2. Why is

More information

THE 355/270 CORRIDOR:

THE 355/270 CORRIDOR: THE 355/270 CORRIDOR: Strategic Ideas for Sustaining a Livable Work Place Project Summary ACCESS LIFE DESIGN HEALTH WORK Montgomery County Planning Department The Maryland-National Capital Park and Planning

More information

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals.

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals. CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES Introduction The Greensburg Comprehensive Plan is intended as a working community document. A combination of long and short-term goals, this document is intended

More information

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project 1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA 1.1.1 Project Description The Trunk Highway (TH) 14 West Corridor is a two-lane roadway approximately 22 miles in length. Located in Nicollet County, the corridor

More information

COUNTY-WIDE PLANNING POLICIES

COUNTY-WIDE PLANNING POLICIES Thurston County COUNTY-WIDE PLANNING POLICIES November 10, 2015 These policies were adopted by the Board of County Commissioners on September 8, 1992. They were ratified earlier by each of the seven cities

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION 3.0 PROJECT DESCRIPTION 3.1 BACKGROUND Under California law (Government Code Section 65300 et seq.), every city and county is required to have a general plan. The general plan is to be comprehensive and

More information

DRAFT Amsterdam/Churchill Community Plan (4/17/08) Adopted By the Gallatin County Commission

DRAFT Amsterdam/Churchill Community Plan (4/17/08) Adopted By the Gallatin County Commission DRAFT Amsterdam/Churchill Community Plan (4/17/08) Adopted By the Gallatin County Commission Table of Contents Acknowledgements Chapter 1: Introduction A Brief History What s Next Authority Organization

More information

Access Management: An Overview

Access Management: An Overview Figures 1-5 Below Evolution of development along a highway. In the early stages, land along the road is used for farming with little traffic generated. As time passes, the highway corridor becomes a de

More information

COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE

COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE Attachment 1 COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE Priorities and Key Initiatives Committee May 2013 Page E-1 How we grow Goal 2: To ensure sustainable development

More information