1 The City has been awarded a $2.34 million Ohio Department of Transportation (ODOT), Small Cities Grant for the complete reconstruction of Madison Street AWARD WINNING PROJECT Best of Lake Erie Award Lake Erie Living Magazine Location Port Clinton, Ohio Population 5,957 (2015 Census) Downtown Planning, Community Visioning, Transportation, Grant Administration Project Funding $2.34 million ODOT Small Cities Grant $300,000 CDBG Grant PORT CLINTON DOWNTOWN REVITALIZATION PLAN Project Team Lauren O. Falcone, Project Manager Paul Z. Tecpanecatl, AICP, Project Planner Julie L. Thomas, P.E., Project Engineer City of Port Clinton/Main Street Port Clinton Downtown Revitalization Plan The City of Port Clinton commissioned a Downtown Revitalization Plan to provide a road map that can be used by all the City s Downtown Revitalization partners and stakeholders, particularly Main Street Port Clinton (MSPC). Over the course of a year, PDG worked with the City, MSPC and members of the Downtown Revitalization Steering Committee to organize multiple public workshops and analyze feedback to ensure the Plan was responsive to local needs and reflected local vision for the Downtown. The workshops were well-attended (30-40 people) and community members actively participated in each of the topics. Discussions and workshops were conducted in line with the National Trust s Main Street Approach, and the resulting recommendations were based on these discussions and organized according to Main Street s Four Points (Organization, Design, Economic Restructuring and Promotions). Downtown Port Clinton is a wonderful place that is simply in need of a physical and mental revitalization lift. Improved buildings and infrastructure will give it that self-esteem boost it needs to show off its more... Project Relevance Ohio Main Street Community Community Visioning/Workshops and Surveys Administration of Numerous Grant Applications for Streetscape and Building Renovations Mr. Gabe Below Councilman City of Port Clinton pcdirector@portclinton-oh.gov

2 Port Clinton Downtown Revitalization Plan wonderful lake front location for residents and tourists alike. Both the public and private sectors have proven themselves interested, able, and willing to make improvements, so there seems to be little doubt that they will continue to achieve success. The key to this however, is remembering to undertake activities in each of the Four Points (i.e., selecting projects and following up on recommendations from Organizational Development, Physical Design, Market Analysis and Promotions Chapters) simultaneously. The Main Street methodology absolutely works; it has been proven over nearly thirty years in more than 1,800 communities nationwide. The Plan is meant to be used as a tool by local revitalization partners to methodically, incrementally and comprehensively revitalize the entire Downtown, leveraging local human and financial resources to achieve a better physical, economic, and social atmosphere. The City, with assistance from MSPC, is now charged to implement the many grand ideas represented in this document. The City and MSPC are well on their way, with multiple grant applications submitted in 2014 to implement the Madison Street concept from the Design section of this Plan, as well as a Building Renovation grant program. In fact, the City recently found it was successful with a $2.34 million Ohio Department of Transportation (ODOT), Small Cities Grant for the complete reconstruction of Madison Street (1,100 feet) to include new wider sidewalks, new roadway, and new drainage structures including storm sewer, sanitary sewer and waterlines. The City also received a $300,000 grant for Community Development Block Grant (CDBG) Downtown Revitalization funds for new street trees, brick intersections and a private property building improvements program for code and façade improvements. The CDBG DT grant application boasted an investment in the Downtown of $4.4 million over a two-year period.

3 An Ohio Main Street Community Location Amherst, Ohio Community Planning, Project Funding Assistance Professional Services: PDG Project Manager Lauren O. Falcone, AICP AMHERST DOWNTOWN PLAN PDG assisted Amherst City and Chamber representatives with the preparation of a Downtown Plan that was used to apply for various funding sources such as CDBG-DT and TEP. The plan included identifying the key parameters of the downtown; a market study that involved both consumer and business surveys; parking and traffic analysis; utility and infrastructure concerns in the area; potential pedestrian connectors; a streetscaping plan; design standards and the establishment of a design review board; and identifying a potential CDBG project for submittal of a CDBG-DT application, the CDBG-DT was submitted and approved and PDG is assisting the City with all aspects of the project. PDG was subsequently engaged to provide design and construction administration for reconstruction of Park Avenue and South Main Street including water and sanitary infrastructure, storm water, and decorative lighting and pavement. Ms. Judy Recknagel City of Amherst 480 Park Avenue Amherst, Ohio

4 Location Van Wert, Ohio Planning Grantwriting Transportation Engineering Cost Project Cost $ 1.1 Million Project Funding ODOT TEP $625,490 Size 10,846 population (2010 census) Professional Services: 2008; 2013 (Update) Construction: PDG Project Team Lauren O. Falcone, AICP, Project Planner MAIN STREET DOWNTOWN VISION PDG assisted the City of Van Wert to help define its vision for future upgrades to its Downtown area. Our staff reviewed various improvements identified by various City committees, which included new sidewalks, curbs, decorative brick and street lighting, signage, benches, landscaping and gateway features at the entrance to the Downtown. PDG provided illustrations of the proposed improvements with a rendering and computer imaging software. Cost estimates of the various improvements were also provided, with items estimated individually to help the City prioritize future improvements according to its budget. PDG also coordinated funding applications for the streetscape improvements and secured $625,490 in Transportation Enhancement Program funds through the Ohio Department of Transportation. The Main Street Downtown Streetscape improvements included decorative sidewalks with brick pavers, landscaping, ADA improvements, road resurfacing, new traffic signal installation and the installation of decorative lighting. The work took place on Main Street between Jefferson and Market Streets. In addition, overhead power lines were placed in conduit underground. more... Project Relevance Downtown Plan Downtown Improvements Identifies Project and Program Financing Options Jay Fleming Safety Service Director City of Van Wert jfleming@vanwert.org

5 Main Street Downtown Vision The City was awarded a planning grant by ODSA in 2011 to define continued/future phase improvements in the public infrastructure, historic preservation, and business opportunites. PDG assisted the City with an intensive 13 month comprehensive study of the historic central business district in Van Wert. Early in the process an all-day strategic planning session was conducted with Main Street Van Wert, Inc. (MSVW). Short and long term goals were established for downtown revitalization efforts and skills and traits necessary to accomplish the goas were identified. A wide variety of stakeholders were interviewed, including city elected officials and staff, business, property owners, and other local professionals. Highly inclusvie public workshops were organized around design, economic restructuring and promotions. PDG partnered with the EDGE Group for the Downtown Plan Update and jointly facilitated the workshops, interacting with participants about challenges, as well as, potential solutions, to further improve the Downtown area. The resulting Plan integrates strategies to simultaneously address the physical, economic, and soical environments. MSVW has adopted the Plan as their roadmap and volunteer committees will incorporate efforts into current and future work plans.

6 Gregory Location Vermilion, Ohio Downtown Planning Grant Writing/Administration Cost PDG Fee $27,500 Size City 2011 PDG Project Team Lauren O. Falcone, Project Manager EDGE Group, Landscape Architect VERMILION DOWNTOWN REVITALIZATION PLAN PDG and the EDGE Group collaborated to produce the 2011 Revitalization Plan Update for Historic Downtown Vermilion. The planning process was designed to engage a broad cross-section of stakeholders, and included in depth conversations with city officials, governmental and non-profit organizations, residents, business and property owners. The Revitalization Plan celebrates the community s shared vision, and makes recommendations to improve public access to Lake Erie and the Vermilion River. The improvements would create a regional waterfront destination by reinvesting in public waterfront access, create pedestrian and vehicular linkages between the waterfront and downtown core, and redevelop key sites which add to the year-round vitality of the downtown core. In addition to physical improvements, the Plan identifies funding sources to assist the City in their implementation efforts. The City has already implemented several of the recommendations, including proceeding with planning for a new pocket park in the Downtown and securing FY11 CDBG-DT Tier II Grant funding to assist private property owners with improvements to their historic commercial properties. PDG has assisted the City with administration of two previous CDBG-DT Tier II grants. Eileen Bulan Mayor, City of Vermilion 5511 Liberty Ave. Vermilion, Ohio (voice) (fax

7 Location Sylvania, Ohio Planning Grantwriting Size 18,965 (2010 census) PDG Project Team Randy Mielnik, AICP, LEED AP, Project Manager Danielle Steinhauser, CMSM Beth Barton, Graphic Designer SYLVANIA DOWNTOWN PLAN Downtown Sylvania has long been recognized as offering an outstanding downtown environment within northwest Ohio. To help maintain its quality urban environment, the City selected Poggemeyer Design Group, Inc. to assist with the development of its first Downtown Plan. The process began in late 2011 and was completed in the summer of A Steering Committee of select stakeholders was formed and work elements focused on both urban design and market research to help uncover business development opportunities. The planning process followed the Main Street Approach recommended by the National Trust for Historic Preservation and the overarching planning themes included the need for. Planning Themes 1. A greater sense of place in Downtown Sylvania, 2. More emphasis on physical design 3. Forming and sustaining partnerships 4. A more market-wise focus on development opportunities more... Project Relevance Existing data collection and analysis Comprehensive market study to determine types of retail and other feasible activities in the downtown district Facilitated community input sessions Assisted with the update of Design Review Guidelines Promotional Plan for special and retail events, heritage tourism and branding William Sanford ED/Administrative Services City of Sylvania

8 Sylvania Downtown Plan Some key issues included the need for unique planning polices north and south of Maplewood, along Main Street. South of Maplewood, downtown Sylvania offer compact urban forms and traditional downtown spaces. North of Maplewood there is a collection of converted residences, a historical center, office uses and auto-oriented commercial spaces that all combine to form a unique place with a clear emphasis on arts and cultural features Urban design issues that surfaced prominently during the planning process included the need for more walkability and human-scale building form. This included encouraging outdoor dining and defined pedestrian spaces in the right-of-way and on private land. Market research conducted as part of this project revealed a number of opportunities to fill voids in the local business mix. Specific business types missing in downtown Sylvania were identified to the level of actual square feet of space necessary to help satisfy calculated market demand. An optimal retail mix was also explored.

ASHTABULA COUNTY COASTAL MANAGEMENT PLAN

ASHTABULA COUNTY COASTAL MANAGEMENT PLAN Location Ashtabula County, Ohio Planning Grantwriting ODNR, Office of Coastal Management, $25,000 Local Match $25,000 Size 21 miles of coastal area Professional Services 2012 Project Team Randy Mielnik,

More information

10 Implementation. Implementation. Responsibility for Implementation. Blueprint for Bloomsburg. Town of Bloomsburg Comprehensive Plan 10-1

10 Implementation. Implementation. Responsibility for Implementation. Blueprint for Bloomsburg. Town of Bloomsburg Comprehensive Plan 10-1 Implementation 10 Implementation This chapter overviews how to use the comprehensive plan as a land use and programming tool for the Town of Bloomsburg and recommends annual review of the plan by the Town

More information

North Fair Oaks Community Plan Summary and Information

North Fair Oaks Community Plan Summary and Information North Fair Oaks Community Plan Summary and Information WHAT IS THE NORTH FAIR OAKS COMMUNITY PLAN? The North Fair Oaks Community Plan is part of the San Mateo County General Plan, and establishes policies

More information

Downtown Streetscape Manual & Built Form Standards

Downtown Streetscape Manual & Built Form Standards City of Guelph Downtown Streetscape Manual & Built Form Standards July 2014 Prepared by Brook McIlroy Inc. in association with Unterman McPhail Associates and McCormick Rankin Inc. City of Guelph Downtown

More information

HURON WATERFRONT DEVELOPMENT AND AMPHITHEATER

HURON WATERFRONT DEVELOPMENT AND AMPHITHEATER AWARD WINNING PROJECT Location Huron, Ohio Architectural, Engineering, Site, Landscaping, Planning, Survey, Grant Administration, Construction Administration Cost $285,000 Amphitheater $300,000 Marina

More information

4- PA - LD - LIVELY DOWNTOWN. LD - Background

4- PA - LD - LIVELY DOWNTOWN. LD - Background 4- PA - LD - LIVELY DOWNTOWN LD - Background The downtown has been the service centre for the community since the city s inception and the area continues to supply people with their personal services,

More information

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Potential Green Infrastructure Strategies May 6, 2015 Workshop Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National

More information

TEMPLE MEDICAL & EDUCATION DISTRICT

TEMPLE MEDICAL & EDUCATION DISTRICT City of Temple, Texas TEMPLE MEDICAL & EDUCATION DISTRICT 1 Description. The City of Temple joined in partnership with key public and private entities to jointly promote education and medical activities

More information

Sherri Ferguson. President/CEO Portland Chamber of Commerce. Tennessee Certified Economic Developer Capstone Project

Sherri Ferguson. President/CEO Portland Chamber of Commerce. Tennessee Certified Economic Developer Capstone Project Sherri Ferguson President/CEO Portland Chamber of Commerce Tennessee Certified Economic Developer Capstone Project Strategic Plan Development for the North Gateway of Portland, Tennessee The New Gateway

More information

Dyersville Downtown Plan. Open House October 24, 2017

Dyersville Downtown Plan. Open House October 24, 2017 Dyersville Downtown Plan Open House October 24, 2017 What is a Comprehensive Plan? - Vision - Guidance for decisions - Basis for regulations What is a Downtown Plan? - Understand priorities - Identify

More information

38 Queen s University Campus Master Plan Part 1

38 Queen s University Campus Master Plan Part 1 38 Queen s University Campus Master Plan Part 1 46 The Campus at the City Scale Chapter 4 The Campus at the City Scale 39 Queen s is an urban University centrally located in Kingston. Decisions made by

More information

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006 Project Goal Town of Halifax Revitalization Project RRRC Living Towns Planning Workshp July 12, 2006 Town of Halifax Halifax County *** Revitalization Project Goal*** To create Economic Opportunity and

More information

Welcome to the Oakridge Centre Open House

Welcome to the Oakridge Centre Open House Welcome to the Oakridge Centre Open House Why is the City hosting this event? This open house is to inform you of a rezoning application submitted to the City of Vancouver to amend the existing CD-1 (Comprehensive

More information

ARISE: The Rock Renaissance Area Redevelopment & Implementation Strategy

ARISE: The Rock Renaissance Area Redevelopment & Implementation Strategy 2014 Professional Awards 1 ARISE: The Rock Renaissance Area Redevelopment & Implementation Strategy Janesville, WI Completed December 2014 Analysis & Planning Purpose of Project 2 The purpose of the Rock

More information

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose: Page 1 of Report PB-23-18 SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building Report Number: PB-23-18 Wards Affected: 2 File Numbers:

More information

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN Public Meeting October 2016 1 Plan Summary and Discussion Public Meeting May 4 2017 City of Brockton Bill Carpenter, Mayor Department of Planning

More information

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1 Illustration of Eastlake Farmer s Cooperative Grain Elevator Chapter 5: implementation 5-1 chapter 5: implementation Introduction The Eastlake Subarea Plan includes a wide range of recommendations intended

More information

Streets for People, Place-Making and Prosperity. #TOcompletestreets

Streets for People, Place-Making and Prosperity.  #TOcompletestreets COMPLETE STREETS FOR TORONTO Streets for People, Place-Making and Prosperity COMPLETE STREETS: A NEW APPROACH A Complete Streets design approach considers the needs of all users people who walk, bicycle,

More information

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004 City of Farmington Amendment to the 1998 Master Plan Adopted October 11, 2004 Introduction Planning Background 1 Scope and Components of the Plan Amendment 2 Concept Introduction 3 Plan Concepts 3 Conceptual

More information

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY MAIN STREET ECONOMIC DEVELOPMENT STRATEGY A PATHWAY TO A BETTER POUGHKEEPSIE DRAFT Working Paper #2: Planning Strategies Submitted December 1 st, 2015 to the City of Poughkeepsie LAND USE LAW CENTER PACE

More information

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan.

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan. Regional Smart Growth Program Economic Development Commission What is Smart Growth? Adopted as part of the Regional Comprehensive Plan (RCP) RCP provides vision for region based on Smart Growth and sustainability

More information

2030 Comprehensive Plan VISION STATEMENT

2030 Comprehensive Plan VISION STATEMENT RESOURCE DOCUMENT for Steering Committee Meeting #2 July 12, 2017 2030 Comprehensive Plan VISION STATEMENT Steering Committee from 2008 Established the Lauderdale s Vision as: Creating a livable, lovable

More information

Public input has been an important part of the plan development process.

Public input has been an important part of the plan development process. Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the

More information

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1 EXHIBIT A Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1 1 As amended by Resolution No. 2008-02-001(TR1R) of the Tax Increment Reinvestment Zone No.1, and approved to

More information

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project OHIO DEPARTMENT OF TRANSPORTATION DISTRICT 6 400 EAST WILLIAM STREET DELAWARE, OHIO 43015 800.372.7714 Columbus City Council City Hall 90 West Broad Street Columbus, OH 43215-9015 RE: I-70/71 Columbus

More information

APPENDIX 4 NEWBURY TOWNSHIP TOWN CENTER MASTER PLAN

APPENDIX 4 NEWBURY TOWNSHIP TOWN CENTER MASTER PLAN APPENDIX 4 NEWBURY TOWNSHIP TOWN CENTER MASTER PLAN Prepared by the Urban Design Center of Northeast Ohio September, 2008 Newbury Township Land Use Plan A4-1 INDEX Page No. 1 Newbury Township Town Center

More information

Creating a Main Street Strategy A Roadmap to a Community s Future

Creating a Main Street Strategy A Roadmap to a Community s Future Creating a Main Street Strategy A Roadmap to a Community s Future Creating a Main Street Strategy A Roadmap to a Community s Future 9:00 am Session 1: Creating a Main Street Strategy A Roadmap to a Community

More information

Request for Proposal

Request for Proposal Request for Proposal 10 th Street Corridor Master Plan Department of Planning and Zoning 500 Quartermaster Court Suite 200 Jeffersonville, IN 47130 April 18, 2017 For further information contact: Chad

More information

THE CIVIC DISTRICT DEVELOPMENT OPPORTUNITIES

THE CIVIC DISTRICT DEVELOPMENT OPPORTUNITIES 1 THE CIVIC DISTRICT DEVELOPMENT OPPORTUNITIES The Civic District is the physical and emotional heart of the downtown. It is also a major gateway into the central core, establishing the image and identity

More information

hermitage town center

hermitage town center hermitage town center A Community Vision prepared by Strada for The City of Hermitage and The Mercer County Regional Planning Commission January 2007 table of contents introduction 3 design principles

More information

UNIVERSITY OF KENTUCKY 2012 Campus Plan Update. Ross Tarrant Architects

UNIVERSITY OF KENTUCKY 2012 Campus Plan Update. Ross Tarrant Architects UNIVERSITY OF KENTUCKY 2012 Campus Plan Update AGENDA TEAM 1 2 3 4 5 ENGAGEMENT PUBLIC INPUT PROCESS GOALS AND OBJECTIVES PLANNING PROCESS AND SCHEDULE TOPICS AND DISCUSSION Team SASAKI UNIVERSITY OF PENNSYLVANIA

More information

Town Center (part of the Comprehensive Plan)

Town Center (part of the Comprehensive Plan) Town Center (part of the Comprehensive Plan) Mercer Island Town Center Looking North (2014) In 1994, a year-long process culminated in a set of design guidelines and code requirements for the Town Center

More information

EXISTING COMPREHENSIVE PLAN

EXISTING COMPREHENSIVE PLAN EXISTING COMPREHENSIVE PLAN Town Center Land Use Element: V. LAND USE POLICIES Town Center Mercer Island's business district vision as described in "Your Mercer Island Citizen-Designed Downtown" was an

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

Downtown Whitby Action Plan

Downtown Whitby Action Plan Downtown Whitby Action Plan Final Report October 2016 Table of Contents Introduction 1 Public Consultation 2 Walkability 3 Downtown Whitby Walkability Map 4 Vision 5 Goal & Objectives 6 Objective 1 7 Objective

More information

The Auburn Plan Designing the Future of Auburn February 28, 2005

The Auburn Plan Designing the Future of Auburn February 28, 2005 The Auburn Plan Designing the Future of Auburn February 28, 2005 Block-by-Block Bicycle Tour Aerial survey Focus Group Meetings September 7 and 8 Design Workshops October 11, 14, and 21 Revitalization

More information

The Private Role in a Public-Private Partnership. Ask Me Anything Conference May 30, 2018

The Private Role in a Public-Private Partnership. Ask Me Anything Conference May 30, 2018 The Private Role in a Public-Private Partnership Ask Me Anything Conference May 30, 2018 1 Thoughts to Share Today Schmit+Associates Essential Elements of a P3 Community Vision Market Demand Economic Viability

More information

Planning Districts INTRODUCTION

Planning Districts INTRODUCTION INTRODUCTION To facilitate detailed examination of development prospects for all areas of the community, Delano has been divided into 14 planning districts. The location of these planning districts is

More information

About Momentum Midland

About Momentum Midland About Momentum Midland Achieving a community s full potential in terms of economic development and quality of life is critically important to its long term sustainability. Core to achieving this is a vibrant

More information

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project Olympia, WA: Greening Capitol Way Supporting Communities move towards sustainability is a priority for the federal government. A Greening America s Capitals Project Office of Sustainable Communities U.S.

More information

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies Vision Statement Queen Creek s interconnected network of parks, trails, open spaces and recreation opportunities provide safe and diverse activities and programs that sustain its unique, small town, equestrian

More information

Anatomy of A Vibrant Downtown. Anatomy of a Vibrant Downtown

Anatomy of A Vibrant Downtown. Anatomy of a Vibrant Downtown Anatomy of A Vibrant Downtown The goal of MAIN ST. REVITALIZATION PLANNING is to provide a framework that will help transform your downtown into a VIBRANT DOWNTOWN a place where people love to LIVE, WORK,

More information

Highway 15 Project - Hutchinson

Highway 15 Project - Hutchinson Highway 15 Project - Hutchinson Agenda What are we going to talk about today? Goals and benefits of the project Details about the proposed work Project schedule and costs Any questions you may have about

More information

The University District envisions, in its neighborhood

The University District envisions, in its neighborhood Envisioning the University District Link Light Rail in Seattle s neighborhoods CIY OF SEALE CONCEP-LEVEL SAION AREA PLANNING RECOMMENDAION RESOLUION # 30165 EXHIBI L Vision 08.2000 he University District

More information

The Community and Transportation Linkage Planning Program

The Community and Transportation Linkage Planning Program The Community and Transportation Linkage Planning Program Sandy Misiewicz, AICP Capital District Transportation Committee Senior Transportation Planner II CSS National Dialog 2 October 1, 2013 Capital

More information

Public Forum. Kelley s Corner: The Corner that Connects Us. The Cecil Group. March 7, Acton 2020 Town of Acton.

Public Forum. Kelley s Corner: The Corner that Connects Us. The Cecil Group. March 7, Acton 2020 Town of Acton. Public Forum Acton 2020 Town of Acton March 7, 2013 AGENDA Purpose of Forum Kelley s Corner Project Examples of the Planning Processes Next Steps Dialogue: Questions and Answers PURPOSE Acton 2020 April

More information

Summary of Action Strategies

Summary of Action Strategies Strategic Action Plan 6 Summary of Action Strategies Action Strategy Categories: 1. Organization and Management 2. Implementation 3. Marketing and Promotion This chapter summarizes all of the action strategies

More information

DOWNTOWN DEVELOPMENT. Dimension IV 211 N. BROADWAY, SUITE 204 GREEN BAY, WI WAUGOO, OSHKOSH, WI 54901

DOWNTOWN DEVELOPMENT. Dimension IV 211 N. BROADWAY, SUITE 204 GREEN BAY, WI WAUGOO, OSHKOSH, WI 54901 211 N. BROADWAY, SUITE 204 GREEN BAY, WI 54303 19 WAUGOO, OSHKOSH, WI 54901 (920) 431-3444 TOLL FREE: (866) 431-3444 DOWNTOWN DEVELOPMENT DIMENSION IV.COM Architecture. Sustainability. Planning. Economic

More information

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity

More information

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING Subject: Recommendation Prepared by: PRELIMINARY DESIGN REVIEW OF LOCUST STREET BRIDGE CONSTRUCTION & COURT AVENUE,

More information

City of Long Beach. creating vibrant and exciting places

City of Long Beach. creating vibrant and exciting places City of Long Beach creating vibrant and exciting places Land Use Element Urban Design Element Overview of the two draft General Plan elements Discuss areas of change Economic goals of the plans Case study

More information

Highway 12 Sibley Avenue Reconstruction. Project Overview and Progress To Date Litchfield City Council April 17, 2017

Highway 12 Sibley Avenue Reconstruction. Project Overview and Progress To Date Litchfield City Council April 17, 2017 Highway 12 Sibley Avenue Reconstruction Project Overview and Progress To Date Litchfield City Council April 17, 2017 Agenda Item Topic 1) Project Purpose and Need 2) Key Recommendations from Study 3) Preliminary

More information

PLAN ELEMENTS WORKSHOP. April 5, 2016

PLAN ELEMENTS WORKSHOP. April 5, 2016 PLAN ELEMENTS WORKSHOP April 5, 2016 needs more housing. But there is no one-size fits-all solution. Every neighborhood has its own character. In some places, density is not only appropriate it is badly

More information

Designation Process: Step One

Designation Process: Step One WATERFRONTS FLORIDA P A R T N E R S H I P P R O G R A M Community Statement of Interest Designation Process: Step One The Waterfronts Florida Partnership Program is a program of the Department of Economic

More information

Cumberland Region Tomorrow is a private, non-profit, citizen based regional organization working with Greater Nashville Regional Council

Cumberland Region Tomorrow is a private, non-profit, citizen based regional organization working with Greater Nashville Regional Council Cumberland Region Tomorrow is a private, non-profit, citizen based regional organization working with Greater Nashville Regional Council and others in the public and private sectors, dedicated to planning

More information

Keyport. Vision for Keyport

Keyport. Vision for Keyport Keyport Vision for Keyport Keyport is a rural, historic waterfront village bounded and limited in size by its natural borders of water and the Naval Undersea Warfare Center. The community consists primarily

More information

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James

More information

CHAPTER 7: Transportation, Mobility and Circulation

CHAPTER 7: Transportation, Mobility and Circulation AGLE AREA COMMUNITY Plan CHAPTER 7 CHAPTER 7: Transportation, Mobility and Circulation Transportation, Mobility and Circulation The purpose of the Transportation, Mobility and Circulation Chapter is to

More information

FUNDING CORRIDOR REVITALIZATION

FUNDING CORRIDOR REVITALIZATION FUNDING CORRIDOR REVITALIZATION Integrated corridor planning for the 21 st Century America Planning Association Annual Conference Atlanta, GA April 27, 2014 Mariia Zimmerman, MZ Strategies, LLC mariia@mzstrategies.com

More information

Plan-It Greenville (2009) Comprehensive Plan 5-Year Update

Plan-It Greenville (2009) Comprehensive Plan 5-Year Update Plan-It Greenville (2009) Comprehensive Plan 5-Year Update What is the comprehensive plan: Collecting communitywide data Projecting future population growth Setting communitywide goals Framing policies

More information

Welcome & Introductions

Welcome & Introductions Creating a Pedestrian Friendly Street American Public Works Association: 2009 Congress Session 4791 September 16, 2009 Welcome & Introductions Doug Roberts, P.E. Transportation Design Section Manager City

More information

City Center Specific Plan Amendments And Background Report City of Richmond. PLANNING COMMISION FINAL DRAFT January, 2001

City Center Specific Plan Amendments And Background Report City of Richmond. PLANNING COMMISION FINAL DRAFT January, 2001 City Center Specific Plan Amendments And Background Report City of Richmond PLANNING COMMISION FINAL DRAFT January, 2001 TABLE OF CONTENTS Page LIST OF TABLES... LIST OF FIGURES... INDEX... OVERVIEW...

More information

Downtown Dubuque...it s a great time.

Downtown Dubuque...it s a great time. Downtown Dubuque...it s a great time. Your timing could not be better to invest in Downtown. With hundreds of millions in public and private investment occurring on the City s downtown waterfront, millions

More information

This Review Is Divided Into Two Phases:

This Review Is Divided Into Two Phases: Semiahmoo Town Centre Review The purpose of this review: To review the Semiahmoo Town Centre Concept Plan, originally approved in 1993, to ensure that this centre will continue to serve the needs of South

More information

Town of Peru Comprehensive Plan Executive Summary

Town of Peru Comprehensive Plan Executive Summary Town of Peru Comprehensive Plan Executive Communities that plan grow by choice, not by chance. A plan makes growth thoughtful, understandable, and predictable. A plan shows that a community is managing

More information

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference Report to Planning and Environment Committee To: From: Subject: Chair and Members Planning & Environment Committee John M. Fleming Managing Director, Planning and City Planner Old East Village Dundas Street

More information

Corridors. Re-vitalize our Corridors and Gateways

Corridors. Re-vitalize our Corridors and Gateways Corridors Re-vitalize our Corridors and Gateways Artist s rendering from the 287 Strategic Plan, 2015 Corridors are the major throughways of Loveland but they also provide important commercial, community

More information

Downtown Cleveland Alliance/Tremont

Downtown Cleveland Alliance/Tremont Cleveland Innerbelt Urban Design Stakeholder Workshops Downtown Cleveland Alliance/Tremont May 4, 2007 2007 Activities: What We re Going To Be Doing. March 8, 2007 Initiate Urban Design Aesthetic Study

More information

8implementation. strategies

8implementation. strategies PROGRAM STRATEGIES 8implementation strategies T he implementation actions of this chapter are designed to support and carry out the land use, economic development, transportation, urban design, and program

More information

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas 111111 PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction The ION rapid transit system will link Waterloo, Kitchener and Cambridge through a central transit corridor (CTC). There are a number

More information

Hockessin Community Redevelopment Plan

Hockessin Community Redevelopment Plan Hockessin Community Redevelopment Plan 3.1 Introduction The Community Redevelopment Plan for the Village of Hockessin is the result of the people s vision for a distinct village center that serves as the

More information

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development Office of the City Manager ACTION CALENDAR January 29, 2013 To: From: Honorable Mayor and Members of the City Council Christine Daniel, City Manager Submitted by: Eric Angstadt, Director, Planning and

More information

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access Welcome Thank you for coming this evening. Agenda PART I - Project Context The Downtown Revitalization Program Our DRI Projects Other

More information

Implementation Status Jan 2013

Implementation Status Jan 2013 Implementation Status Jan 2013 Key Red Strikethrough: Green Text: Black Text: Completed Project has been initiated or is underway No action Circulation & Linkages Goal A: To establish safe and efficient

More information

City of Bristol Route 6 Corridor Implementation Program

City of Bristol Route 6 Corridor Implementation Program City of Bristol Route 6 Corridor Implementation Program FITZGERALD & HALLIDAY, INC. Innovative Planning, Better Communities June 2017 Route 6 Corridor Plan IMPLEMENTATION PROGRAM The following Implementation

More information

Community and Economic Development

Community and Economic Development Exhibit Incorporated in 1909 Community and Economic Development Presentation To: From: For Village Board Meeting of: July 10, 2017 Subject: Review of Project and Program for North Lake Street Facades Financial

More information

South of Eastern Strategic Direction Status Update

South of Eastern Strategic Direction Status Update STAFF REPORT ACTION REQUIRED South of Eastern Strategic Direction Status Update Date: July 10, 2014 To: From: Planning and Growth Management Committee Chief Planner and Executive Director, City Planning

More information

STUDY AREA. Tonight s Agenda. Project Tasks Completed. Next Steps. Town of Oyster Bay Eastern Waterfront Community Vision & Revitalization Plan

STUDY AREA. Tonight s Agenda. Project Tasks Completed. Next Steps. Town of Oyster Bay Eastern Waterfront Community Vision & Revitalization Plan Town of Oyster Bay Eastern Waterfront Community Vision & Revitalization Plan Public Meeting January 27, 2009 Opening Remarks Presentation Tonight s Agenda Introduction Study Area Overview Public Participation

More information

Prince William Street Project (Grant Avenue to Wellington Road)

Prince William Street Project (Grant Avenue to Wellington Road) Prince William Street Project (Grant Avenue to Wellington Road) 1 Goals Improve pedestrian and bike traffic safety Improve street drainage with curb & gutter Upsize water mains Enhance overall street appearance

More information

Main Street Streetscape Plan. Downtown Redevelopment Plan Phase One

Main Street Streetscape Plan. Downtown Redevelopment Plan Phase One 2012 Main Street Streetscape Plan Downtown Redevelopment Plan Phase One Message from Council Council Left to right: Dwight Ganske, Judy Bennett, Darren Badry, Mayor Ken Lemke, Robert Twerdoclib, Pat Hansard,

More information

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved. COMMITTEE OF THE WHOLE AUGUST 18, 2003 THORNHILL CENTRE STREET STUDY PLANNING FILE: 15.92 Recommendation The Commissioner of Planning recommends: THAT the attached Terms of Reference for the Thornhill

More information

North Topeka Arts District Master Planning Phase 2: Community Visioning. April 6, 2016

North Topeka Arts District Master Planning Phase 2: Community Visioning. April 6, 2016 North Topeka Arts District Master Planning Phase 2: Community Visioning April 6, 2016 Welcome Back! Agenda Workshop Goals/Approach (6:30pm - 6:35pm) Planning Goals/Process (6:35pm - 6:45pm) District Development/Design/Management

More information

6 Strategic Vision and Vision Matrix

6 Strategic Vision and Vision Matrix PUBLIC HANDOUT: FEBRUARY 11, 2013 TOWN COUNCIL MEETING STRATEGIC VISION PLAN: VISIONING INTO ACTION 6 Strategic Vision and Vision Matrix 6.1 Strategic Vision The Strategic Vision builds on the vision of

More information

Lehigh Acres Land Development Regulations Community Planning Project

Lehigh Acres Land Development Regulations Community Planning Project Lehigh Acres Land Development Regulations Planning Effort Summary In July, 2010 Commissioner Frank Mann invited the Lehigh Acres community to start discussing how to achieve their recently adopted community

More information

PUBLIC NOTICE. All meetings will be held at Hinesville City Hall located at 115 East ML King Jr. Drive, Hinesville, GA beginning at 5:30 PM.

PUBLIC NOTICE. All meetings will be held at Hinesville City Hall located at 115 East ML King Jr. Drive, Hinesville, GA beginning at 5:30 PM. 100 Main Street Suite 7520 Hinesville, Georgia 31313 Phone: 912-408-2030 H.E. Sonny Timmerman Executive Director April 2, 2013 PUBLIC NOTICE On March 7, 2013, Mayor and Council took action to initiate

More information

Laberge Group. Town of Coeymans. Draft Comprehensive Plan. Overview of Planning Process

Laberge Group. Town of Coeymans. Draft Comprehensive Plan. Overview of Planning Process Draft : Presentation of Goals & Strategies Laberge Group Benjamin H. Syden, A.I.C.P., E.D.P Director in Charge Nicole Allen, A.I.C.P. Senior Planner Anjali Malhotra Planner Presentation Outline Introductions

More information

SOUTH FLORIDA TOD GRANT UPDATE

SOUTH FLORIDA TOD GRANT UPDATE Palm Beach Transportation Planning Agency October 2018 SOUTH FLORIDA TOD GRANT UPDATE Presented by Treasure Coast Regional Planning Council in partnership with SFRTA & SFRPC What is Transit Oriented Development

More information

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

1.0 Purpose of a Secondary Plan for the Masonville Transit Village Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village

More information

Rio/29 Small Area Plan. Design Plan & Implementation Framework Open House - January 25, 2018

Rio/29 Small Area Plan. Design Plan & Implementation Framework Open House - January 25, 2018 Rio/29 Small Area Plan Design Plan & Implementation Framework Open House - January 25, 2018 MEETING PURPOSE PRESENTATION 1. Orient to the updated design plans 2. Introduce implementing options 3. Explain

More information

WAC #7 3/14/14. Coachella General Plan Update

WAC #7 3/14/14. Coachella General Plan Update WAC #7 3/14/14 Coachella General Plan Update Agenda 2 Introductions Public Draft General Plan Overview and Discussion of Next Steps Implementation and Evaluation Health Element Process Evaluation (discussion)

More information

Comprehensive Plan ADOPTED APRIL 2014

Comprehensive Plan ADOPTED APRIL 2014 Comprehensive Plan ADOPTED APRIL 2014 8 8. Outstanding Recreational & Cultural Opportunities We are proud of our community s parks and recreation system. Our community will ensure that the legacy of our

More information

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018 Public Open House Overview of the Downtown Plan Official Plan Amendment April 23, 2018 1 A 25-Year Plan for Downtown To ensure growth contributes positively to Toronto s Downtown as a great place to live,

More information

Helping the Homeowner: A Program for Residential Rehab

Helping the Homeowner: A Program for Residential Rehab Helping the Homeowner: A Program for Residential Rehab A Webinar Sponsored by Heritage Ohio July 18 th, 2012 The Cleveland Restoration Society uses the powerful tool of historic preservation to revitalize

More information

FDOT D4 Complete Streets

FDOT D4 Complete Streets FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,

More information

THEMES, VISION, + PRINCIPLES

THEMES, VISION, + PRINCIPLES CHAPTER 2: THEMES, VISION, + PRINCIPLES This page intentionally left blank. 20 VISION DRAFT AUGUST 2018 2 2 THEMES, VISION, + GUIDING PRINCIPLES The Key Themes, Vision, and Guiding Principles presented

More information

The Project. In 2013, construction was completed between 100 Street and 102 Street.

The Project. In 2013, construction was completed between 100 Street and 102 Street. The Project Jasper Avenue New Vision (JANV) is a major catalyst project identified in the Capital City Downtown Plan (2010) between 92 Street and 109 Street, including the streets half a block north and

More information

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File # 0 'O DI Lan-171-14 1 - THE CORPORATION OF THE TOWN OF COBOURG..,. STAFF REPORT TO: FROM: Mayor and Members of Council Dean A. Hustwick, Director of Recreation and Culture DATE OF MEETING: Committee of

More information

Preliminary Plan Framework: Vision and Goals

Preliminary Plan Framework: Vision and Goals Preliminary Plan Framework: Vision and Goals Draft: May 2015 Introduction Since the Town of Milliken s comprehensive plan was last updated in 2010, the community was heavily impacted by the 2013 flood,

More information

Introducing the Main Street Strategic Toolbox

Introducing the Main Street Strategic Toolbox Ulster County Main Streets: A Regional Approach Ulster County Planning Department, 244 Fair Street, Kingston NY 12401 Why do we take a regional approach to Main Streets? There are many different approaches

More information

6-GATEWAYS, WAYFINDING & PUBLIC SIGNS

6-GATEWAYS, WAYFINDING & PUBLIC SIGNS 6-GATEWAYS, Wayfinding & ublic Signs 6-GATEWAYS, WAYFINDING & UBLIC SIGNS Downtown Georgetown has a strong base of local users as well as seasonal tourists and visitors. Many first-time visitors, and those

More information