WWT Steart Marshes: a coastal wetland that works for people and wildlife
|
|
- Irene Greer
- 6 years ago
- Views:
Transcription
1
2 Background Environment Agency required to compensate for loss of internationally important intertidal habitat from process of coastal squeeze (3000ha in next 100 years) Severn Estuary: 200km flood defence embankment: protects 84,000 properties through FCRM Strategies Steart peninsula identified as a potential area at 500ha it s one of the largest wetland habitat creation scheme in the UK a successful long-term partnership with Wildfowl & Wetlands Trust a site that demonstrates best practice in public engagement; is an exemplar of landscape wetland design; and provides benefit people and wildlife
3 From design on paper to working wetland 2009: initial designs; extensive early stakeholder consultation begins 2010: preferred option presented to stakeholders 2011: trail embankment built; EPS mitigation & archaeological work begins 2012: planning approved by Sedgemoor District Council; construction starts 2013: construction new flood banks completed; hand-over to WWT 2014: opened as WWT Steart Marshes; paths finished; breach completed 21.7 million pounds: 320ha intertidal, 80ha freshwater & 50ha brackish habitat
4 Inter-tidal habitat a change in landscape from improved pasture/cultivated land to saltmarsh accretion will allow for the natural development of dynamic intertidal habitats benefit to specialised plants, migratory waterfowl and fish some areas will inundate infrequently and resemble permanent pasture a working landscape underpinned by an extensive grazing system over 300ha of saltmarsh providing a living, natural flood defence Will trap an estimated 650 tonnes of carbon each year
5 Functional freshwater wetlands improved storage capacity within local IDB rhyne network ability to store flood water within higher catchment enhanced wetland landscape rich in biodiversity 130ha mosaic of wildlife-rich fresh & brackish water wetlands integral part of a wider local landscape: Bridgwater Bay and Pawlett Hams a refuge for species such as great crested newt, water vole and otter an enhanced visitor experience of functional wetlands
6 People and Wildlife continue to maintain strong links with local residents and Parish communities provide safe access to nature through appropriate levels of interpretation over 10km of new multi-use paths including regional & national coastal trails seek ways to measure net economic benefit WWT staff presence: site manager, wardens and engagement officers create opportunities for volunteering, skills learning, training and research develop wardened activities and self guided trails to focal observation points
7 Constraints and design
8 Constraints and design
9 Constraints and design WWT Steart Marshes a wetland working for people and wildlife
10 Constraints and design
11 Vision, changes and management
12 Construction Excavation volume: 489,442 m 3 over 1M tonnes material Length of creek: 2,900m 4.2Mm 3 of water at HAT
13 Computer aided design
14 Breach completion
15 Breach completion
16 Breach completion
17 Breach completion
18 Breach completion WWT Steart Marshes a wetland working for people and wildlife
19 Reserve enhancements stoning and creation of islands and scrapes provision of reserve infrastructure extensive predator and stock fencing traditional livestock management burying of power supply cables to Steart
20 Survey, monitoring, review and adaptation
21 Learning, engagement, training and volunteering active participation through volunteering provision of skill training practical work parties increased public interface enhancing learning with colleges and schools working directly with local community
22 Summary Compensate for the loss of saltmarsh elsewhere in the Severn Estuary in order to maintain defences that protect 84,000 properties worth 5 billion Improved flood protection for Steart village and local infrastructure Be managed in association with local people (volunteers & farmers) Provide better access for walkers, horse-riders, cyclists and wheelchair users Create opportunities for learning and skills development Produce upto 1 million worth of goods and services every year The creation of Steart Marshes has turned hundreds of hectares of the Steart Peninsula in Somerset into vibrant living wetlands
23 Vision We need to be brave and bold if we are going to deal with the impacts of climate change. WWT Steart Marshes proves you can protect homes and businesses by using wetland technology that works with nature, not against it. WWT Chief Executive Martin Spray CBE
Saltmarsh Conference. 8 October in the Suffolk Coast & Heaths Area of Outstanding Natural Beauty
Saltmarsh Conference 8 October 2015 in the Suffolk Coast & Heaths Area of Outstanding Natural Beauty Conference organised by Haidee Stephens, Suffolk Estuaries Officer Suffolk Coast & Heaths AONB t: 01394
More informationThe Moors at Arne Project, Managing Coastal Change
General Questions What are we doing? The Environment Agency, RSPB and Natural England are working together to adapt approximately 150ha of The Moors at Arne into a diverse wetland habitat. With the sea
More informationGreat Fen Action Plan
Page1 Taking forward the vision of the Great Fen Masterplan This document shows what will be happening in the Great Fen over the period 2011-2016. The Great Fen Masterplan sets out the vision of the Great
More informationMedmerry Managed Realignment Environmental Statement Non-Technical Summary. Final. Reference number/code IMSO Environment Agency Title
Medmerry Managed Realignment Environmental Statement Non-Technical Summary Final Reference number/code IMSO001023 Environment Agency Title We are The Environment Agency. It's our job to look after your
More informationLetcombe Brook Project Officer
Letcombe Brook Project Officer Job Description Responsible to: Responsible for: Purpose of post: Key Committees: Chairman and Trustees of Letcombe Brook Project. Project volunteers and any relevant personnel
More informationAT THE HEART OF LAND & WATER MANAGEMENT ON TWEED. tweedforum.org
AT THE HEART OF LAND & WATER MANAGEMENT ON TWEED Why do we exist? The Tweed is one of the region s greatest assets. It provides a focal point for our natural, built and cultural heritage and a multitude
More informationCandlestick Point SRA Yosemite Slough Restoration Project. Presented by
Candlestick Point SRA Yosemite Slough Restoration Project Presented by Yosemite Slough Restoration Project The Center of a Revitalized Waterfront in Southeastern San Francisco The Yosemite Slough Restoration
More informationSHORELINE, FLOOD AND COASTAL DEFENCE MANAGEMENT PLANS
These plans may provide opportunities as well as concern for recreational boating. They are currently being revised and consulted on. This document explains how we can engage in the process. Shoreline,
More informationApril 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept
TO: FROM: SUBJECT: April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept RECOMMENDATION A. THAT the Vancouver
More informationPolicy Unit 5A05 Ella Nore Lane to Fishbourne
orth olent horeline Management lan olicy Unit 5A5 lla ore Lane to Fishbourne ummary description of olicy Unit This frontage is within Chichester Harbour AOB and largely agricultural land, grades, 2 and
More informationWLI North America webinar 30 th July 2014 Masterplanning for wetland centres. Marie Banks Principal Consultant
WLI North America webinar 30 th July 2014 Masterplanning for wetland centres Marie Banks Principal Consultant WWT & WWT Consulting brief background Our masterplanning approach Lessons learned and top tips
More informationBrockholes Wetland and Woodland Nature Reserve, Preston Lancashire
Newlands Brockholes Wetland and Woodland Nature Reserve, Preston Lancashire Nature s Gateway to Lancashire NEWLANDS Brockholes: site profile Brockholes Wetland and Woodland Nature Reserve project area
More informationMaking the case for Sustainable Transport Project Potential
Making the case for Sustainable Transport Project Potential The Structural Investment Fund (SIF) Strategy for Greater Lincolnshire identifies the barriers to growth identified by having poor transport
More informationNON-TECHNICAL SUMMARY
Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland
More informationA 50-YEAR VISION FOR WETLANDS. England s Wetland Landscape: securing a future for nature, people and the historic environment
A 50-YEAR VISION FOR WETLANDS England s Wetland Landscape: securing a future for nature, people and the historic environment LIFEBLOOD OF THE NATURAL WORLD Freshwater wetlands are among the most important
More informationA 50-YEAR VISION FOR WETLANDS. England s Wetland Landscape: securing a future for nature, people and the historic environment
A 50-YEAR VISION FOR WETLANDS England s Wetland Landscape: securing a future for nature, people and the historic environment LIFEBLOOD OF THE NATURAL WORLD Freshwater wetlands are among the most important
More informationorld Heritage Site W
World Heritage Site Stonehenge Historic England Avebury Henge and Stone Circle Historic England The Great Wall of China The Pyramids of Giza, Egypt Stonehenge Mike Goddard Stonehenge and Avebury WHS Vision
More informationStreams and Ponds. A few facts A vital resource. Changing environment. Globally rare. Flood plains. Watery wildlife. Water power
Streams and Ponds With a varied landscape and temperate climate, Dorset has a good network of rivers, streams and ditches, all set within a wider floodplain landscape. Ponds, lakes, fens and marsh give
More informationFLOOD CELL 6 & 7 SNAPE TO LANGHAM BRIDGE BENEFIT COST RATIO (BCR) 10.6 Appendix 12
FLOOD CELL 6 & 7 SNAPE TO LANGHAM BRIDGE BENEFIT COST RATIO (BCR) 10.6 Appendix 12 FEATURES The area in the flood plain is defined as all land below 5m contour which conforms to the EA s definition of
More informationManaging the coast North Norfolk Shoreline Management Plan 2 Non-technical summary of final plan Old Hunstanton to Kelling Hard
Managing the coast Non-technical summary of final plan Old Hunstanton to Kelling Hard Contents What is a Shoreline Management Plan? 1 How we developed the plan 2 The partnership 2 Finding the right balance
More informationLocation: The Wildlife Trust for Bedfordshire, Cambridgeshire and Northamptonshire, Lings House, Billing Lings, Northampton NN3 8BE
Role Description Role Title: Volunteer Conservation Officer Location: The Wildlife Trust for Bedfordshire, Cambridgeshire and Northamptonshire, Lings House, Billing Lings, Northampton NN3 8BE Accountable
More informationThe Biodiversity Services SLA Between RBC and the Nottinghamshire Wildlife Trust (NWT)
The Biodiversity Services SLA Between RBC and the Nottinghamshire Wildlife Trust (NWT) Janice Bradley Head of Conservation Nottinghamshire Wildlife Trust Rushcliffe BC Service Level Agreement RBC and NWT
More informationDesign Guidelines for the Enhancement and Creation of Estuarine Habitats in the Middle Reaches of the Lower Columbia River
Design Guidelines for the Enhancement and Creation of Estuarine Habitats in the Middle Reaches of the Lower Columbia River Astoria, May 16, 2012 1 Outline I. Nature of Project/Background II. Approach to
More informationBioengineered designs
Bioengineered designs In bioengineered designs, plants are essential for the long-term integrity of the water s edge. Certain hard elements may be included, such as driven wooden piles, but their functions
More informationRestoring Water Ecosystems in NYC Parks
Restoring Water Ecosystems in NYC Parks Hooked on our Waters Con October 19, 2013 - CUNY Graduate Center Marit Larson NYC Parks Landscape and ecosystem focus Watershed Streams Freshwater wetlands Tidal
More informationPolicy DM19: Development and Nature Conservation
Avonmouth Wetland Habitat Project October 2010 and December 2011 (the Cresswell study). Policy Links Bristol Local Plan Core Strategy Lead Policy BCS4: Avonmouth and Bristol Port BCS9: Green Infrastructure
More informationElderberry Walk. Developer HAB Housing
Case studies Elderberry Walk Developer HAB Housing Development of 161 new homes on the former Dunmail Primary School site, focused around a central green street, with retained trees, new multifunctional
More informationBigger Better and. Giving nature a home in the Trent Valley: Newark to South Clifton Concept Plan
Bigger Better and Giving nature a home in the Trent Valley: Newark to South Clifton Concept Plan Our 2050 vision Objectives The Trent and Tame River Valleys will once again be one of the great British
More informationBaylands Segment P. 206 The Baylands and Climate Change: What We Can Do COYOTE CREEK
Baylands Segment P BAYLANDS coyote 2009 creek area COYOTE Southern CREEK end of San Francisco Bay AREA between Alviso Slough and Albrae Slough Southern end of San Francisco Bay Baylands between Alviso
More informationSandwich Town Tidal Defences Environmental Statement Non Technical Summary
Sandwich Town Tidal Defences Environmental Statement Non Technical Summary Environment Agency Introduction The Environment Agency is proposing to construct a scheme to reduce the risk of tidal flooding
More informationINTEGRATING PROTECTED AREAS INTO THE WIDER LANDSCAPE, SEASCAPE AND RELATED SECTORS. An Overview
INTEGRATING PROTECTED AREAS INTO THE WIDER LANDSCAPE, SEASCAPE AND RELATED SECTORS An Overview USING AN EXAMPLE FROM NORTHEAST US Relationship of IPAWLS guide to other planning and assessment processes
More informationLAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP
LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date
More informationUNIVERSITY TOWN NEIGHBOURHOODS 5.2 ECO-CORRIDOR MELBOURNE CAMPUS MASTER PLAN 2014
5.2 ECO-CORRIDOR 37 ECO-CORRIDOR EXISTING CONDITIONS & VISION NEIGHBOURHOOD VISION Investment in the Eco-corridor Neighbourhood will signify the University s commitment to supporting local ecology and
More information8.0 Design and Form of Development 43/
42/ 8.0 Design and Form of Development 43/ Rothwells Farm, Golborne/ Development Statement Figure 7. Site Constraints Key 44/ Site Boundary 360 Bus Route/Stops Existing Trees Underground Water Pipe Sensitive
More informationChalk, Cherries and Chairs Central Chilterns Landscape Partnership Scheme LANDSCAPE PARTNERSHIP DEVELOPMENT OFFICER JOB INFORMATION PACK
Chalk, Cherries and Chairs Central Chilterns Landscape Partnership Scheme LANDSCAPE PARTNERSHIP DEVELOPMENT OFFICER JOB INFORMATION PACK How to apply Please complete our application form, together with
More informationWind Energy - Stepping Offshore to Building an Industry
Wind Energy - Stepping Offshore to Building an Industry Event: Presentation to P.O.W.E.R.E.D. Project Conference Venue: Università Politecnica delle Marche, Ancona Date: 29 th May 2013 An Introduction
More informationWingerworth, Chesterfield. February Surveyor: James Porter
Report Wingerworth, Chesterfield February 2014 Surveyor: James Porter (Natural England Licence Number: CLS00241 Contents Contents Notice to readers 1.0 Introduction Background Information Site Description
More informationNeighbourhood Planning Local Green Spaces
Neighbourhood Planning Local Green Spaces Introduction... 2 1. Why green space is important... 4 2. Neighbourhood plans and green space... 6 3. Evidence... 8 Statutory designations... 9 Green space audit...
More informationThe Fifth Continent Landscape Partnership Scheme
the world, according to the best geographers, is divided into Europe, Asia, Africa, America and Romney Marsh Rev. Richard Barham, The Ingoldsby Legends The Fifth Continent Landscape Partnership Scheme
More informationNew Brighton Park Shoreline Habitat Restoration Project
Vancouver Board of Parks and Recreation and Port Metro Vancouver New Brighton Park Shoreline Habitat Restoration Project Conceptual Design Public Consultation August 26 September 9, 2015 Discussion Paper
More informationPriority Delivery Areas for Landscape Scale Conservation in the South West ( )
Priority Delivery Areas for Landscape Scale Conservation in the South West (2011-15) Together, this set of Biodiversity Delivery Areas (BDAs) represents an ambitious vision to establish a network of strategic
More informationWildlife and Planning Guidance: Neighbourhood Plans
Wildlife and Planning Guidance: Neighbourhood Plans This Leaflet is one of a series of 4 Wildlife and Planning Guidance Leaflets and is intended to provide useful information to assist you to campaign
More informationNJ Department of Environmental Protection
NJ Department of Environmental Protection COASTAL AND LAND USE PLANNING New Jersey Coastal Management Program Covers NJ coastal waters to limit of tidal influence including 239 municipalities in 19 counties,
More informationThe Napa River Flood Protection Project
The Napa River Flood Protection Project Creating Flood Protection and Restoring Geomorphic and Biological Processes Jeremy Sarrow, Napa County Flood Control & Water Conservation District June 2, 2014.
More informationHeadlands to Headspace
Headlands to Headspace Cultural & Community Heritage Louise Martin: Cultural Heritage Officer Michelle Cooper: Community Heritage & Training Officer Headlands to Headspace 5 year Heritage Lottery Landscape
More informationDesign considerations
Design considerations There are many different considerations, so good forward planning will help you immensely. Most importantly: Softer solutions should be used where possible Look to the surrounding
More informationRempstone Extension - East Leake 2014
Overall Restoration of East Leake Quarry Sand Martin Face Southern Agricultural Corridor Wetland Ponds/Conservation Corridor following Sheepwash Brook Reinstated Bridleway/Footpaths Southern Agricultural
More informationScotland s 2020 Biodiversity Challenge: Loch Lomond & The Trossachs National Park Authority Delivery Agreement
Scotland s 2020 Biodiversity Challenge: Loch Lomond & The Trossachs National Park Authority Delivery Agreement Scotland s National Parks Both of Scotland s National Park Authorities contribute to the Scottish
More informationBiodiversity Standard
14 Sustainability Service + This is a controlled document whilst viewed at https://universityofleeds.myeqms.com/login/login.aspx. Once downloaded or printed it becomes an uncontrolled copy. Please check
More information10.0 Open Space and Public Realm
10.0 Open Space and Public Realm 10.0 Open Space and Public Realm The Public Open Space System is comprised of: outdoor spaces available for public use that are either publicly owned (e.g., parks and
More informationWelcome to our exhibition
Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes
More informationPlanning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore
Habitat Restoration and Green Infrastructure Planning for Staten Island s North Shore Community Board 1 March 1, 2018 NYC Parks Forestry, Horticulture, and Natural Resources Funded by the NYS Department
More informationWater Vole (Arvicola terrestris)
Water Vole (Arvicola terrestris) The Water Vole was formerly common along the banks of rivers, streams, ditches, dykes, lakes and ponds throughout mainland Britain. Its decline is thought to be largely
More informationTerra Nova Rural Park Plan
Terra Nova Rural Park Plan Part 1 Getting to know the land The Surrounding Area North Side Airport, River, Trail East Side - Residential West Side- Sturgeon Banks, West Dyke Trail South Side:Terra Nova
More informationE16: MAINTENANCE OF LANDSCAPED AREAS
HIGH SPEED TWO INFORMATION PAPER E16: MAINTENANCE OF LANDSCAPED AREAS This paper outlines the proposed approach to the maintenance of landscaped areas created for HS2 Phase One. It will be of particular
More informationAlbion Hills Conservation Area Master Plan. Public Information Session
Albion Hills Conservation Area Master Plan Public Information Session 1 03.25.2014 Meeting Agenda 1. Project Introduction Property History Current Use Master Plan Process 2. Draft Vision Goals and Objectives
More informationSevern Estuary Shoreline Management Plan What does it mean for planning in North Somerset?
Severn Estuary Shoreline Management Plan What does it mean for planning in North Somerset? Coastal planning The National Planning Policy Framework sets out the Government s planning policies for England.
More informationRegional Restoration Planning:
Regional Restoration Planning: A Case Study in Collaborative Restoration Science and Planning Campbell Ingram, Executive Officer NCER August 28, 2018 Co-Equal Responsibilities Act as a primary state agency
More informationCoastal Planning in Texas. Tony Williams Senior Director of Planning Coastal Resources Division Texas General Land Office
Coastal Planning in Texas Tony Williams Senior Director of Planning Coastal Resources Division Texas General Land Office e The Texas General Land Office (GLO) and the Texas Coast Since 1836: Manager of
More informationTHE HIDDEN VALUE OF OUR GREEN SPACES
THE HIDDEN VALUE OF OUR GREEN SPACES J A N U A R Y 2 0 1 7 GREEN SPACES... UNDERSTANDING THEIR VALUE The Land Trust is dedicated to providing free public open space for the benefit of communities. Our
More informationIntroduction. Integrating Ecological Restoration of Estuarine Shorelines with Urban Community Revitalization Efforts. Ed Morgereth Biohabitats, Inc.
Introduction Integrating Ecological Restoration of Estuarine Shorelines with Urban Community Revitalization Efforts Ed Morgereth Biohabitats, Inc. 5 th National Conference & Expo on Coastal and Estuarine
More informationSt. Asaph Flood Risk Management Scheme Case Study KS2/3
St. Asaph Flood Risk Management Scheme Case Study KS2/3 St. Asaph Awarded city status 2012, St Asaph is a small city in North Wales, situated in the Vale of Clwyd between Denbigh and the coastal resort
More informationA Delta Renewed: A Guide to Science Based Ecological Restoration in the Delta
A Delta Renewed: A Guide to Science Based Ecological Restoration in the Delta J. Letitia Grenier, San Francisco Estuary Institute, letitia@sfei.org Julie Beagle, San Francisco Estuary Institute, julieb@sfei.org
More informationTandridge Local Plan Assessing the Ecological Suitability of 183 sites considered for development Tandridge District Council, Surrey
Tandridge Local Plan Assessing the Ecological Suitability of 183 sites considered for development Tandridge District Council, Surrey PLANNING I DESIGN I ENVIRONMENT 1.0 INTRODUCTION TEP conducted Site
More informationPark Development Framework Area Proposals. Context to Area 2 Ruckholt Road to Coppermill Lane
Park Development Framework Area Proposals Context to Area 2 Ruckholt Road to Coppermill Lane The defining feature of this area is the broad expanse of marshlands. These provide the context for a diverse
More informationPontchartrain Coastal Lines of Defense Program Figure 1 Figure 2 Figure 1
Pontchartrain Coastal Lines of Defense Program Coastal Sustainability Program February 2006 The Pontchartrain Coastal Lines of Defense Program consists of ten priority project areas within the Pontchartrain
More informationSPG 1. * the northern and western sections which are open fields used for pasture and grazing;
SPG 1 1.0 INTRODUCTION This development brief is based on the allocation of the Priors Hall site for employment and countryside recreational purposes in the Corby Borough Local Plan. The brief is intended
More informationWelcome to our exhibition
Welcome to our exhibition housing development A46 Wildmoor Alcester Road Canal Quarter A422 Town Centre housing development Warwickshire-based IM Properties, one of the UK s largest privately owned property
More informationMaking Space for Nature A Leicester Case Study. Dr Helen O Brien Leicester City Council
Making Space for Nature A Leicester Case Study Dr Helen O Brien Leicester City Council Helen.Obrien@Leicester.gov.uk Definitions Biodiversity (biological diversity) The variety of plant and animal life
More informationNortheast Florida Estuary Restoration Initiative: A District Perspective. Ron Brockmeyer, SJRWMD And a cast of thousands!!
Northeast Florida Estuary Restoration Initiative: A District Perspective Ron Brockmeyer, SJRWMD And a cast of thousands!! Success and Local Partners Impoundment Reconnection / Restoration (Merritt Island
More informationThe Gwennap Parish Vision Statement
QUICK GUIDE What is a Neighbourhood Development Plan? Ultimately it is a document used by developers or anyone wishing to submit a planning application that describes the vision, strategy, plans, regeneration,
More informationCreating ponds for water voles
Creating ponds for water voles A 50-YEAR PROJECT TO CREATE A NETWORK OF CLEAN WATER PONDS FOR FRESHWATER WILDLIFE 1. Introduction Water voles have suffered a catastrophic decline in Britain over the last
More informationSunshine Coast Council Coastal Management Overview. January 2016 edition
Sunshine Coast Council Coastal Management Overview January 2016 edition Mayor Mark Jamieson Mayor s foreword Our impressive beaches are fundamental to our Sunshine Coast lifestyle, economy and coastal
More informationCRIPPEN REGIONAL PARK
CRIPPEN REGIONAL PARK DAVIES ORCHARD CONCEPT OPTIONS Jeffrey Fitzpatrick Sylvia Pendl DIVISION MANAGER, REGIONAL PARKS, WEST AREA PARK PLANNER, REGIONAL PARKS, WEST AREA Bowen Island Municipality, September
More informationAREA-WIDE PEDESTRIAN AND BICYCLE CIRCULATION
OUSD LANEY CHILD CARE CENTER ART BUILDING LANEY COLLEGE BALL FIELDS PCCD OFFICES PERALTA PARK AQUATIC CENTER & ESTUARY PARK EDOFF MEMORIAL BANDSTAND SNOW PARK COURT HOUSE OAKLAND MUSEUM OAK ST AREA-WIDE
More informationThis design proposal was funded by the Aggregates Levy Sustainability Fund with financial assistance from Arts Council England.
This design proposal was funded by the Aggregates Levy Sustainability Fund with financial assistance from Arts Council England. 1 COTSWOLD WATER PARK SOCIETY Cotswold House, Manor Farm, Down Ampney, Cirencester
More informationM4 Corridor around Newport Environmental Statement Volume 3: Appendices
Environmental Statement Volume 3: Appendices Environmental Statement Volume 3: Appendices At Issue March 2016 CVJV/AAR 3 rd Floor Longross Court, 47 Newport Road, Cardiff CF24 0AD Volume 3: Contents 1
More informationPort of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018
Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3. September 18, 2018 Agenda Welcome Introductions Rules of the Ad-Hoc Presentation Background Vulnerability Assessment Results Non-Agenda
More informationDesign, implementation and cost elements of Green Infrastructure projects
ENV.F.1/ETU/2010/0052r Design, implementation and cost elements of Green Infrastructure projects Presenters: McKenna Davis and Matt Rayment Report authors: Sandra Naumann, McKenna Davis, Timo Kaphengst
More informationWise use of floodplains - a demonstration of techniques to evaluate and plan floodplain restoration LIFE99 ENV/UK/000203
Wise use of floodplains - a demonstration of techniques to evaluate and plan floodplain restoration LIFE99 ENV/UK/000203 Project description Environmental issues Beneficiaries Administrative data Read
More informationThe Hadean-Creation studio.
Residential Designing Spring 2016 The Hadean-Creation studio. We provide sustainable and ethical responses to the client s brief by adding value and empowering a sense of pride and ownership. Hadean-Creation
More informationAUGUST/ Year Wetland Vision for England Update
AUGUST/09 50 Year Wetland Vision for England Update Inside... Funding new wetland schemes to realise the Vision New studies to inform wetland restoration projects Next steps for Wetland Vision workshops
More informationInfrastructure for London. Perspective
Infrastructure for London Perspective Contents Investing in Infrastructure 3 Project Services 5 Transport 7 Airports 7 Waterways 9 Rail 11 Roads 13 Cycle Routes 15 Water 17 Green Infrastructure 19 Contact
More information4. Aims and objectives to deliver the Avalon Marshes Landscape Partnership
4. Aims and objectives to deliver the Avalon Marshes Landscape Partnership The Aims and Objectives of the Avalon Marshes Landscape Partnership reflect the issues and requirements of our landscape. They
More informationNorth Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration
North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration Rocky Powell Clear Creeks Consulting, LLC Keith D. Tate, P.E. BayLand Consultants & Designers, Inc.
More informationClearwater Photography UK
1 Tackling Pollution in London s Rivers November 2017 Clearwater Photography UK 2 Within the Greater London Authority boundary there are 39 rivers, of which, so far, only one has been classified as achieving
More informationPRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION
PRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION Project Background November 19, 2007 Executive Summary The Grand Canal is an important tidal waterway in the Venice community of Los Angeles, California,
More informationSlough International Freight Exchange Proposals, Colnbrook+
Welcome Welcome to this exhibition, which is being held in connection with our proposals for a new freight exchange facility on land to the north of the A4. Please take this opportunity to look at the
More informationHighways England Environment Fund. Graeme Hull Tyne Tees Catchment Coordinator
Highways England Environment Fund Graeme Hull Tyne Tees Catchment Coordinator 2 3 Strategic Road Network HE Road Investment Strategy 2015/16 to 2019/20 Part 1: Strategic Vision Part 2: Investment Plan
More informationPotential sources of guidance for EIA opinions and consents for Glastir Woodland Creation schemes
EIA guidance Potential sources of guidance for EIA s and consents for Glastir Woodland Creation schemes Every Glastir Woodland Creation plan requires an Environment Impact Assessment (EIA) to assess whether
More informationPark Board Strategic Framework. (Mission, Vision, Directions, Goals and Objectives) June 27, 2012
Park Board Strategic Framework (Mission, Vision, Directions, Goals and Objectives) June 27, 2012 Planning Process Overview Phase 1: Renewed Strategic Framework Phase 2: Objectives Phase 3: Prioritization
More informationSankey Valley Corridor Enhancement Project Green Infrastructure data Biodiversity and ground nesting bird habitat
Sankey Valley Corridor Enhancement Project Green Infrastructure data Biodiversity and ground nesting bird habitat Introduction Sankey Valley is a key environmental and economic corridor; it runs through
More informationYadkin River Greenway Feasibility Study Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run
Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run Project Background The Yadkin River Greenway Feasibility Study is a joint project with the Village of Clemmons, the Town of Bermuda
More informationPoolbeg West SDZ Draft Planning Scheme
Poolbeg West SDZ Draft Planning Scheme Introduction/vision Housing Community Economy/Employment Movement/transport Infrastructure green infrastructure /open space Land-use and phasing Public Realm Urban
More informationAshbridges Bay Erosion and Sediment Control Project
Ashbridges Bay Erosion and Sediment Control Project Project Brief Overview Toronto and Region Conservation Authority, in partnership with the City of Toronto, intends to carry out remedial erosion control
More informationPublic Consultation. Land at Monks Farm, North Grove. Welcome
Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open
More informationThe Place Solar Farm
The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1
More informationSubject: Sea Level Rise Constraints and Opportunities for India Basin
Memorandum To: Monica Melkesian, Build Inc Cc: From: Leslie Lazarotti lazarotti@wra-cacom Ext 1300 Subject: Sea Level Rise Constraints and Opportunities for Date: July 8, 2015 The impetus for this study
More informationRECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES
RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL R-1: DEVELOP A RECREATION, OPEN SPACE AND GREENWAYS SYSTEM AS AN INTEGRAL COMPONENT OF AN OVERALL, COUNTY-WIDE ECONOMIC
More informationPeninsular Florida Landscape Conservation Cooperative. Marine and Estuarine Priority Resources and Conservation Targets
Peninsular Florida Landscape Conservation Cooperative Marine and Estuarine Priority Resources and Conservation Targets Why are we here today? Workshop Goals: Develop a list of potential conservation targets
More information