South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017

Size: px
Start display at page:

Download "South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017"

Transcription

1 South Macclesfield Development Area Environmental Statement March 2017

2 Contents 1.0 Introduction Background Environmental Assessment Site Description The Proposals Background and Need Description of the Development Alternative Development Scenarios Consultation Environmental Impacts Ecology Landscape and Visual Impacts Cultural Heritage Transport and Access Noise and Vibration Air Quality Hydrology, Drainage and Flood Risk Ground Conditions Lighting Summary Conclusions What happens next? Engine of the North

3 1.0 Introduction 1.1 Background This document summarises the Environmental Statement (ES) which accompanies the planning application submitted by Engine of the North and T&G Ltd (hereafter termed the Clients) The planning application is for a comprehensive residential development comprising the following; Demolition of existing structures and redevelopment of site including up to 950 homes; a one form entry primary school (use class D1), retail development (use class A1) of up to 4000sqm; employment floorspace comprising offices (use class B1a) of up to 500sqm and warehousing (use class B8) up to 10,000 sqm or relocation of existing demolition / reclamation yard operational facilities (suis generis); associated landscaping, roads and related works - outline application, all matters reserved except site accesses from Congleton Road, Moss Lane and Moss Lane/Star Lane This document is a summary of the Environmental Impact Assessment (EIA) process in non-technical language. The main Environmental Statement (ES) (Volume 1) and the supporting Appendices (Volume 2) contain detailed information on the project and each of the environmental topics considered. 1.2 Environmental Assessment EIA is a formal process by which the likely environmental effects of a project are assessed, and where there is potential for a significant negative effect that cannot be avoided, works are identified to lessen the effect (mitigation). The ES reports on the findings of the EIA and sets out those areas where likely significant environmental effects have been identified and the mitigation proposed to lessen predicted effects. It forms an important part of the planning application decision making process Under the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 the Proposed Development is considered to be large enough to require an Environmental Impact Assessment On this basis, a formal Scoping Report was submitted to Cheshire East Council in July In conjunction with the scoping process consultation has been undertaken specifically with regards to ecology, ground conditions, landscape and noise The scoping report stated that the following topics should be included within the assessment: Ecology; Landscape and Visual Impact; Archaeology; Traffic and Transport; Noise and Vibration; Air Quality; Hydrology and Drainage; Ground Conditions; and The EIA project team has been led by EIA co-ordinators from WYG, with input from other specialists. 1.3 Site Description The Proposed Development Site covers an area of approximately ha including the London Road Junction or ha without The site covers are area dominated by a mixture of grassland, hedgerows, woodland and scrub land There are some existing uses on site such as small business off Turf Lane, Cheshire Demolition which operates a salvage yard based on 2

4 Moss Lane and playing fields with an associated changing room in the western corner of the site The area is bordered to the east by the A536 (Congleton Road), a housing and commercial area including the Moss Lane Estate to the north, Moss Rose Stadium (Macclesfield Town Football Club) to the north east and a railway to the west The Site is boarded to the south by Danes Moss an area of scrub and grassland which forms part of the larger landfill site, which in part is still operational to the south and east of the site. Further south Danes Moss is designated as a Site of Special Scientific Interest (SSSI). 3

5 2.0 The Proposals 2.1 Background and Need This site has long been considered suitable for development. The site is allocated in the existing development plan (Macclesfield Borough Local Plan adopted 8th January 2004) for employment and retail use. The site has been considered appropriate for development for over 20 years The site is a priority for Cheshire East Council (CEC) and is an emerging allocation in the Council s final amended version of the new Local Plan. This Plan has evolved through three rounds of examination hearing sessions (2014, 2015 and 2016) and the modified version is currently open to consultation until the 20 th March CEC hope to adopt the Plan in July Within this replacement Local Plan the site is identified within policy CS8 for 1,050 new homes, replacement playing fields, green infrastructure, pavilion and changing rooms, a Public House and restaurant, a drive through restaurant, a health club/gym, an superstore, 5 hectares of employment land, a new primary school, and potential relocation for Macclesfield Town Football Club. A key principle of the development is the delivery of a link road from Congleton Road to London Road Over the years, a number of development proposals have been put forward and the western part of the site CEC previously resolved to grant outline planning consent for a mixed use development This application is for the whole site to ensure a comprehensive approach to development. 2.2 Description of the Development The proposal comprises a mixed use community development and key components include: Up to 950 new homes; Shops; School; Local squares and play areas; and Community open space, woodland footpaths and parks Figure 3 details the illustrative masterplan The schedule of development is provided in Table 1 below. Table 1 Schedule of Development Development Type Indicative Area (ha) Residential Retail Use 2.45 Commercial Use 2.92 Primary School 1.2 Potential Parking Area 0.26 Sports Area 5.6 Equipped Play Areas 0.63 Structural Landscape including ecology Infrastructure

6 Development Type Indicative Area (ha) Off-site Highway works 0.4 Total Residential Uses The residential housing will sit within a network of green corridors, spaces and movement routes. They have been located to align with existing tree and hedgerows where practical. Building Heights A range of building heights are proposed across the Site. The building heights fall into three general categories: which include; Up to 2 storey; Up to 2.5 storey; and Up to 3 storey. Open space The Site includes a provision of approximately 7.46ha of formal open space and 10.42ha of informal outdoor space, consisting of a well connected network of open space. Including the retention of the existing sports fields, a Neighbourhood Equipped Area for Play (NEAP), a Multi Use Games Area (MUGA) and a number of other strategically placed Local Equipped Area for Play (LEAPs). Highways Three vehicular access points are proposed into site. They are: Western Access from Congleton Road Northern Access from Moss Lane (near Ash Grove) Eastern Access from Moss Lane/Star Lane Water Existing streams and ditches will be retained where practical into the proposed surface water drainage system, supplemented by a series of swales and detention ponds, to maintain run off rates to existing levels. Landscape and Ecology One of the key principles of the landscape design is the retention, protection and enhancement of existing assets, such as hedgerows A green southern boundary is proposed to provide a transitional edge to the development. This is linked back into the site through two green corridors. Existing vegetation will be retained and enhanced along the length of all boundaries of the Site and along the central spine of the site Woodland will be retained almost in full and enhanced along the southern boundary of the Site to maintain suitable foraging and commuting habitat for willow tit and nocturnal wildlife such as badgers and bats The western hedgerow extending from north to south will be retained therefore, maintaining the connectivity of the Site to off-site habitats where bat roost sites may be located and to key commuting areas for the local bat population The main badger setts on site will be retained, while at least three badger tunnels will be installed along the link road. Lighting All proposed external lighting will be designed to relevant standards and guidance. 5

7 2.3 Alternative Development Scenarios Whilst the Development Site is identified by the clients as being the preferred location to accommodate development of this nature, during preparation of the proposal, a series of development scenarios have evolved for the Site that seek to accommodate both the aspirations of the client, Cheshire East Council, consultees and the general public Over a number of years, a series of baseline studies have been undertaken at the Site, the results of which are referenced in the various chapters of the ES. The results of these surveys have been used to refine the iterative masterplan into a position where it could be reviewed and consulted upon A few of the changes to the design include: A single application covering the whole site. This allows the delivery of the strategic east-west link route easing movement of cars, cyclists and pedestrians between Congleton Road and Moss Lane/London Road. The original application included a large area of retail, however due to a lack of demand some of this has been replaced by additional areas of proposed residential. Inclusion of a primary school on the site, in addition to commercial and retail uses. 6

8 Figure 1 Site Location Plan Engine of the North 7 March 2017

9 Figure 2 Red Line Boundary 8

10 Figure 3 Illustrative Masterplan 9

11 3.0 Consultation The client and their consultants have undertaken extensive discussions with consultees and the local community with the findings having an influence over the evolution of the design and the scope of the EIA. Previous Consultation In 2014, a planning application was submitted for the development of the western side of the site. Public consultation was carried out as part of that planning application, which was subsequently granted permission This development has looked to address the issues raised during previous public engagement. The main amendments to the proposals include: A significant reduction in retail space proposed; Relocate and improve the junction with Congleton Road with the introduction of a roundabout junction; and The scheme has also evolved to include a primary school, new employment space and a link road between Congleton Road and London Road. Stakeholder Engagement As part of the consultation for this proposed development round 590 stakeholders were identified, including: Leadership of CEC including Leader of the Council, Councillor Rachel Bailey; Ward councillors for Macclesfield South and Sutton; Adjacent ward councillors for Gawsworth and Macclesfield Central; Macclesfield Town Council ; Sutton Parish Council ; Gawsworth Parish Council; David Rutley MP ; Local schools and colleges; Local sports clubs ; and Neighbouring businesses and residents A presentation was given to Cheshire East Council members on Monday 10 th October A stakeholder preview event was held on Friday 14 th October at St Barnabas Church, Lyme Avenue, Macclesfield between 1pm and 2pm A public exhibition was held on Friday 14 th October 2016 at the same venue as the stakeholder preview. The exhibition was a drop-in event and people were able to attend any time between 2pm and 7pm This event was well attended, with around 120 people attending throughout the day Members of the development team were on hand to discuss the proposals with the local community Feedback questionnaires were available for people to provide comments on the proposals. This included questions on: The type of homes required; What sports and recreation facilities are needed locally; Which of the options for the Moss Lane/London Road area was preferable; and Further comments and whether they thought the development is a good idea generally. 10

12 Design Development The design has evolved following the results of the protected species surveys and consultations with the design team A key evolution of the design has been to retain as much of the natural habitats within the Site as possible and to promote opportunities for habitat enhancement The layout of the new road has been moved to the north of the woodland along the southern boundary. Therefore the woodlands to the south of the Site will be retained and not fragmented The Client and their consultant team have been keen throughout to ensure that the views of all interested parties have been taken into account in the design development of the scheme, where environmental and other constraints have been identified these have been built into the design to ensure that the solution presented in this planning application demonstrates an appropriate scheme that takes into account stakeholder views. 11

13 4.0 Environmental Impacts 4.1 Ecology The Proposed Development site consists predominantly of grassland some of which is species rich, marshy and species poor. There is also amenity grassland in use as football pitches, deciduous woodland (lowland mixed deciduous and wet woodland) Some of the habitats recorded within the Proposed Development site have been valued as being a quality that makes them important within the County of Cheshire The Proposed Development site is considered suitable to support a range of notable and protected animal species including invertebrates, amphibians, reptiles, birds and mammals and also lies within 500m of Danes Moss which is a Site of Special Scientific Interest (SSSI) Specific surveys have identified the presence of common lizard and badgers; locally common and widespread birds were noted to be present on site including the notable species barn owl and records were made of calls from the rare willow tit to the south of the site The site is also used bat species to forage and commute and bat activity on site was more likely to occur along woodland edges and areas where there were tree and scrub lines The Proposed Development will retain important woodland habitats, black poplar, tree lines and a hedgerow and ditch networks will be retained and enhanced. Invasive plant species will also be treated on site. However, extensive losses of grasslands and marshy grassland cannot be mitigated against and so some negative impacts may remain for habitats A number of activities were assessed that could result in adverse impacts on ecology, including habitat loss, disturbance, fragmentation (of habitats) or injury or death to protected species In order to prevent any significant impacts, a Construction Environmental Management Plan will be produced which will promote good environmental practice whilst working on site, in particular this will reference good practice with regards the SSSI. Lighting plans for the scheme will be designed to minimise light spill to retain a dark environment around the woodland edge, tree lines and adjacent landfill site An Ecological Management and Maintenance Plan will also be developed for the site, which will include mitigation strategies for the protection of reptiles (and amphibians), and badgers; provide locations for bat boxes and bird boxes and provide recommendations for long term habitat enhancement and management Assessment of the potential effects of the development both during construction and operation on the habitats has concluded that, with appropriate mitigation measures in place that many effects can be avoided. However extensive habitat losses cannot be mitigated against and in some cases significant negative impacts will occur as a result of the Proposed Development. 4.2 Landscape and Visual Impacts Introduction A Landscape and Visual Impact Assessment was undertaken to consider the effects of the proposed development upon landscape elements, landscape character, and visual amenity A landscape strategy has been submitted in support of the application which includes detail on the planting to potentially be retained as part of the development and areas highlighted for proposed additional planting. Despite the implementation of this strategy a number of significant impacts remain This assessment determined a potential effect on the character area of Danes Moss, both during construction and operation. The overall character of this area will change and this effect is considered to be significant in EIA terms. 12

14 4.2.4 The visual assessment has considered the impact of the development from a number of receptors, including public footpaths, roads and residential dwellings This assessment identified major adverse effects at the viewpoints located immediately on the Site boundary where residential properties are located and afford clear views over the development Site. 4.3 Cultural Heritage The construction of the development will cause the loss of parts of Important Hedgerows under the Hedgerow Regulations. To mitigate against this a scheme of additional planting and management has been proposed. Nevertheless despite this mitigation there is still considered to be an adverse effect During construction there is also potential to impact previously unrecorded archaeological remains, therefore to prevent this a programme of archaeological works will be undertaken before construction commences if required by CEC. 4.4 Transport and Access An assessment of the transport impacts of the Proposed Development has been undertaken The proposed design includes pedestrian crossing facilities and cycle ways. These will greatly reduce the barrier effect of the proposed roads, and will allow access to both sides by people walking and cycling in this area Additional off-site highway junction improvements are proposed on London Road. This consists of signalisation of this junction. A pedestrian crossing will also be provided on London Road, north of the junction with Moss Lane It is considered that through the implementation of best practice construction methods the impacts of construction traffic and transport will be negligible. These steps will be included within a Construction Environmental Management Plan that will detail preferred routes for construction vehicles, therefore minimising traffic on Moss Lane Once the Proposed Development is operational the majority of traffic impacts will be reduced to non significant levels through the implementation of a travel plan and junction improvements. Nevertheless two significant impacts remain with respect to severance and pedestrian amenity This impact on severance and pedestrian amenity is on Moss Lane between eastern site access and London Road. This is mitigated in part by the provision of pedestrian crossing points at the new traffic controlled signals providing safer route for pedestrians. In addition pedestrian demand to cross Moss Lane is low as the eastern side of the carriageway is mostly occupied by the grounds of Macclesfield Town F.C. 4.5 Noise and Vibration The noise chapter considers the impact of the development on the noise at and within the vicinity of the proposed development; it includes an assessment of noise from construction and the operational phase including road traffic Through the implementation of best practice measures implemented as part of a CEMP, noise levels during the construction phase are considered to be non significant The assessment identifies a number of potentially adverse impacts as a result of operational road traffic noise. A number of measures are therefore proposed to be considered during detailed design including the provision of alternative means of ventilation for some proposed dwellings along the boundaries of the Site and residential boundaries. Additionally, screening by proposed building facades and / or barriers in the form of acoustic fences / earth bunds will need to be considered if any such spaces are proposed along Congleton Road, the proposed link road and the West Coast Mainline. 13

15 4.5.4 Taking account these additional mitigation measures there remains a significant adverse effect at receptor T14 on Wayside Turf Lane. 4.6 Air Quality The air quality chapter of the environmental statement assesses the potential impacts of the Proposed Development during its construction and operational phases The impacts have been considered for the relevant sensitive residential and ecological receptors (Danes Moss SSSI) and the nearby Air Quality Management Areas (AQMAs) The impacts during the construction phase include fugitive dust emissions from site activities, such as earthworks, construction and trackout. These can be controlled through the implementation of best practice techniques The impacts during the operational phase take into account of exhaust emissions from additional road traffic generated by the proposed development and cumulative developments within the area. These have been assessed using the detailed dispersion modelling (ADMS-Roads) and using the latest tools and guidance provided by Defra. The model predictions are then compared with the EU and national air quality standards to determine any exceedences. From this it is determined that the operational phase will not have any significant impacts on air quality. 4.7 Hydrology, Drainage and Flood Risk The site is drained by series of unnamed watercourses and ditches flowing into a single watercourse to the north east corner where it becomes a culverted system running under Star Lane. This then flows under the Macclesfield football stadium before finally discharging into the River Bolin The site is shown to lie within Flood Risk Zone 1 (i.e. land assessed as having a less than 0.1% annual probability of river or sea flooding) A flood risk and drainage impact assessment has been undertaken to consider the effects of the proposed development specifically those associated with the construction phase and the effect on foul and surface water infrastructure Any potential effects from construction will alleviated by good practice construction measures. These will be outlined in a Construction Drainage Design Plan that will address all activities that have the potential to result in surface water quality pollution, including contingency planning for extreme or accidental scenarios The long term effects from the built development will be mitigated by controlling surface water controls and improvements to the foul drainage network. A proposed Surface Water Drainage Strategy will maximise the appropriate use of Sustainable Drainage Systems (SuDS) taking into account the site s conditions Following the implementation of these measures the proposed development is anticipated to have no significant impact on hydrology, drainage or flood risk. 4.8 Ground Conditions The majority of the site is open previously undeveloped land which is crossed by several un-named water courses and ditches. Dense vegetation and deciduous woodland is found along old field boundary lines. There is industrial activity on in the form of a waste storage and treatment facility (Cheshire Demolition Ltd) and a vehicle scrap yard (Henshaws Ltd). Both these operations are situated on Turf Lane which runs toward the sites eastern boundary The site is underlain with organic rich Peat deposits which have been identified as a source of ground gas therefore a number of remedial measures have been proposed within the new building development During construction there is the potential for effects on construction workers from contaminated land and pollution of soils and groundwater. These impacts can be mitigated through the adoption of good site management practices. 14

16 4.8.4 Once operational there is predicted to be negligible impacts on ground conditions. 4.9 Lighting Given the outline nature of the application there is no detailed lighting strategy supporting the application. Therefore an indicative lighting model has been produced and the lighting assessment has been based upon the best practice lighting measures The assessment has concluded that any new lighting associated with the development, including any lighting associated with the new road and the sports pitches would not exceed the recommended levels and is therefore unlikely to affect either existing residential properties adjacent to the site or the Danes Moss SSSI to the south. 15

17 5.0 Summary 5.1 Conclusions The ES has considered how the environment and the local community would be affected by the development A range of potential environmental effects have been predicted to occur as a result of the development, both positive and negative. However, mitigation and compensation measures have been identified to appropriately reduce, minimise or offset any potential negative environmental effects However, there remain a small number of significant adverse effects that are still considered to be significant following additional mitigation and compensation. These effects are listed below: Ecology - loss of improved and marshy grasslands. 5.2 What happens next? Prior to making a decision on the planning application, CEC will seek advice from statutory and non-statutory consultees as part of the determination process for the submitted planning application CEC will make the full Environmental Statement available for examination by members of the public at the Council s offices. Ecology - impact on badgers through disturbance and loss of habitat. LVIA - Impact on the Character Area of Danes Moss. LVIA - Impacts on the visual effects from existing residential properties on Moss Lane, Congleton Road and Flying Fields Drive. Cultural Heritage Loss of part of an Important Hedgerow. Traffic severance and pedestrian amenity on Moss Lane. Noise operational traffic noise at properties on Turf Lane, Moss Lane and Congleton Road 16

18 Printed copies of the Non-technical Summary and ES (including figures and appendices) may be obtained from: Executive Park, Avalon Way, Anstey, Leicester, Leicestershire, LE7 7GR Tel: The Non-technical Summary is available free of charge, and a limited number of hard copies of the Environmental Statement are available for 350* per copy (plus p&p). Alternatively, these documents are available as adobe acrobat files on CD from the same address at 25 (plus p&p) per copy. Copies of the ES may also be viewed on Cheshire East Council s online services ( * Includes 17

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016 Thornton Road, Pickering Environmental Statement Non-Technical Summary January 2016 EIA Quality This Environmental Statement, and the Environmental Impact Assessment (EIA) carried out to identify the significant

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

Burgess Hill, Land South of Freeks Farm Phase 1 of Burgess Hill Northern Arc East Environmental Statement Non-Technical Summary September 2016

Burgess Hill, Land South of Freeks Farm Phase 1 of Burgess Hill Northern Arc East Environmental Statement Non-Technical Summary September 2016 Burgess Hill, Land South of Freeks Farm Phase 1 of Burgess Hill Northern Arc East Environmental Statement September 2016 Contents 1.0 Introduction... 1 1.1 Background... 1 1.2 Environmental Assessment...

More information

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary For Engine of the North April 2015 Contents Contents 3 1 Introduction 1 2 The Proposals 5 3 Alternative Options

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

WELCOME SMDA

WELCOME SMDA WELCOME Indicative image of similar scheme Welcome to today s public consultation event regarding the emerging proposals for the South Macclesfield Development Area (SMDA) as part of the final amended

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

WELCOME. Land North of STEVENAGE.   We would like to thank you for attending our public exhibition today. WELCOME We would like to thank you for attending our public exhibition today. The purpose of this event is to share our proposals and hear your thoughts on our ideas. Members of the project team are on

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

LAND NORTH OF NETHERHOUSE COPSE, FLEET

LAND NORTH OF NETHERHOUSE COPSE, FLEET REPORT N O 70020067 LAND NORTH OF NETHERHOUSE COPSE, FLEET ENVIRONMENTAL STATEMENT VOLUME 3:NON-TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT PUBLIC JUNE 2016 LAND NORTH OF NETHERHOUSE COPSE, FLEET

More information

Causeway Farm, Petersfield Environmental Statement Non-Technical Summary October 2015

Causeway Farm, Petersfield Environmental Statement Non-Technical Summary October 2015 Causeway Farm, Petersfield Environmental Statement October 2015 2 Contents 1.0 Introduction... 1 1.1 Background... 1 1.2 Environmental Assessment... 1 1.3 Site Description... 3 2.0 The Proposals... 6 2.1

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

Land East of Horndean, Hampshire. Environmental Statement Non-Technical Summary October 2014

Land East of Horndean, Hampshire. Environmental Statement Non-Technical Summary October 2014 Land East of Horndean, Hampshire Environmental Statement October 2014 Contents 1.0 Introduction... 1 1.1 Background... 1 1.2 Environmental Assessment... 1 1.3 Site Description... 3 2.0 The Proposals...

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 1 st February 2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: Full Planning application Amended

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

Land at Rampton Road. Cottenham

Land at Rampton Road. Cottenham Land at Rampton Road Cottenham Introduction TEP is preparing an outline planning application for 54 dwellings on 6.9 hectares of land adjacent to Rampton Road, Cottenham on behalf of the owners Cambridgeshire

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001

More information

Non-technical summary

Non-technical summary Non-technical summary Introduction NTS.1 is applying for outline planning permission for a residential development of up to 80 dwellings on land at Hambrook, on the northern fringe of Bristol. NTS.2 An

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

Frequently Asked Questions

Frequently Asked Questions 1. Where is Aylesbury Woodlands? Frequently Asked Questions Aylesbury Woodlands lies to the east of Aylesbury. It is bounded to the south by the A41. To the north is the Aylesbury Arm of the Grand Union

More information

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

Public Consultation 23 January Peel Hall, Warrington Board 1. A message from Satnam... Site history...

Public Consultation 23 January Peel Hall, Warrington Board 1. A message from Satnam... Site history... Board 1 A message from Satnam... Thank you for attending today s public consultation about proposals to develop a new residential neighbourhood at. The display boards show why the development is needed

More information

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to

More information

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site Welcome Welcome to this event to discuss the development of land adjacent to Braggs Farm Lane. is currently in the preliminary stages of designing proposals to sensitively develop this site with high-quality

More information

3.1 The hybrid planning application proposes the following description of development:

3.1 The hybrid planning application proposes the following description of development: CHAPTER 3: PROPOSED DEVELOPMENT 3.1 The hybrid planning application proposes the following description of development: Hybrid (part-outline/part-full) planning application for a single composite development

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

Reserved Matters application for a site that straddles the boundary between CBC and BBC

Reserved Matters application for a site that straddles the boundary between CBC and BBC BBC APPLICATION 15/02682/MAR NUMBER CBC APPLICATION CB/15/04294/RM NUMBER LOCATION Wixams Land at former storage depot, Bedford Road, Wilstead Bedfordshire PROPOSAL Reserved Matters Application for Strategic

More information

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Impact Assessment Environmental Statement Volume 3 KILNWOOD VALE ENVIRONMENTAL STATEMENT NON-TECHNICAL

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This exhibition gives you the chance to view and comment on our proposals for a new residential development of 165 high-quality homes, along with

More information

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd.

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. VALLEY PARK, DIDCOT Non-Technical Summary December 2014 On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. CONTENTS 1 Introduction... 2 2 The Proposed Development...

More information

PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM

PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM PUBLIC CONSULTATION YOUR VIEW MATTERS TO US LOCATION PLAN Thank you for taking the time to read this information leaflet regarding a proposed residential

More information

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand.

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand. WELCOME Welcome to this public consultation event for our proposed development on land to the south of Twelve Leys in Wingrave. Thank you for taking the time to come along today. Homes is preparing a planning

More information

Longbridge East : Site Wide and Phase One Development

Longbridge East : Site Wide and Phase One Development Longbridge East : Site Wide and Phase One Development Non-Technical Summary of the August 2011 Introduction St Modwen Developments Ltd intend to submit a new outline planning application for Longbridge

More information

Haydock Point. Welcome

Haydock Point. Welcome Welcome Peel Logistics Property, alongside Peel Land and Property, is preparing a planning application for Haydock Point, a high-quality logistics park east of Haydock. The purpose of this exhibition is

More information

Application Guide. Should you have any questions on the Outline Application please contact:

Application Guide. Should you have any questions on the Outline Application please contact: Application Guide Application Guide This guide describes the structure of the Outline Application, explains the different documents that have been submitted with it and identifies what will happen next.

More information

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor

More information

Welcome to our public exhibition

Welcome to our public exhibition About Our Scheme Welcome to our public exhibition This exhibition gives you the chance to view and comment upon our emerging proposals for a new residential development of 68 new homes on the site of the

More information

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW

More information

LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY

LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY May 2016 CONTENTS CONTENTS... i 1 Introduction... 1 2 The Proposed Development... 3 3 Need and Alternatives

More information

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015 Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report

More information

A38 Derby Junctions. Preliminary Environmental Information Report: Non-Technical Summary

A38 Derby Junctions. Preliminary Environmental Information Report: Non-Technical Summary Preliminary Environmental Information Report: Preliminary Environmental Information Report Report No: P01 S4 September 2018 Table of contents Introduction... 1 The proposed scheme... 2 Scheme details...

More information

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham 1.0 INTRODUCTION Welcome to this exhibition of our proposals for the regeneration of the Brantham Industrial Area located off Factory Lane in Brantham. This presentation will give you an opportunity to

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager Perth and Kinross Council Development Management Committee 8 June 2016 5(3)(i) 16/259 Pre-Application Report by Development Quality Manager Residential development at St Martins Road, Land 120 metres West

More information

Taylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011

Taylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011 Taylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011 Introduction An application for outline planning permission has been submitted

More information

WELCOME. North East Haverhill. The Planning Process

WELCOME. North East Haverhill. The Planning Process WELCOME North East The site to the North East of, known as Great Wilsey Park, is identified by St Edmundsbury Borough Council in its Core Strategy as capable of delivering a Sustainable Urban Extension.

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY NON TECHNICAL SUMMARY INTRODUCTION NTS.1 CEMEX UK Properties Limited is applying for planning permission to South Cambridgeshire District Council (SCDC) for the redevelopment of the former CEMEX cement

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Hybrid outline/detailed planning application comprising an outline planning application for 196 residential dwellings, landscaping, open space, estate roads and infrastructure, plus 4 permanent gypsy and

More information

CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2)

CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2) CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2) Central Chelmsford Development Agency / Genesis 27/08/2014 Central Chelmsford Development Agency: Environmental Statement Quality Management

More information

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES WELCOME Thank you for coming to our consultation event to find out more about our emerging proposals for Hayfield Park, a residential development jointly promoted by the Hayfield Consortium: Martin Grant

More information

i.6 Under this Key Area of Change the Daresbury Strategic Site will deliver:

i.6 Under this Key Area of Change the Daresbury Strategic Site will deliver: I.0 NON-TECHNICAL SUMMARY Introduction i.1 Redrow Homes NW Ltd is applying to Halton Borough Council for planning permission for the development of up to 300 high quality residential dwellings, including

More information

Ʊ ± ªº Œª ºª ø ª ª ± ª

Ʊ ± ªº Œª ºª ø ª ª ± ª Ʊ ± ªº Œª ºª ø ª ª ± ª ø º Õ± ± ± Œ±øºÙ Õ ß Æª ø檺 ±Æ ƪ ø檺 æß Æ± Ʊ ª ø ø fl ª ª ± ê ø Õ øæß ª ª æªæ Ó ÔÌ Non-Technical Summary Introduction A planning application has been submitted to the Vale

More information

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433 LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...

More information

Moat Lane Regeneration Project Environmental Statement

Moat Lane Regeneration Project Environmental Statement AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental

More information

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary Environmental Impact Assessment Non Technical Summary Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 December 2013 Page left intentionally blank INTRODUCTION

More information

WELCOME TO THE NEW WILTON PARK

WELCOME TO THE NEW WILTON PARK WELCOME TO THE NEW WILTON PARK VISION HISTORY OF WILTON PARK TOWARDS A PLANNING APPLICATION Our objective is to create a truly outstanding environment at Wilton Park. At the heart of our proposals is a

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition housing development A46 Wildmoor Alcester Road Canal Quarter A422 Town Centre housing development Warwickshire-based IM Properties, one of the UK s largest privately owned property

More information

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD Land at Environmental Statement: Non-Technical Summary Introduction Brook Street Properties is applying to Cornwall Council for outline planning permission

More information

HS2 Environment. Protecting the environment

HS2 Environment. Protecting the environment HS2 Environment Protecting the environment Approach to mitigation EIA Regulations require an ES to include a description of the measures envisaged in order to avoid, reduce and, if possible, remedy significant

More information

Application Recommended for Approval Hapton with Park Ward

Application Recommended for Approval Hapton with Park Ward Application Recommended for Approval Hapton with Park Ward APP/2017/0036 Outline Planning Application Outline application for the construction of a new 3 bedroom dwelling (with all matters reserved for

More information

HARDWICK GREEN, King s Lynn. Welcome to our Exhibition. What are your views? Introduction to the site and proposals. About us

HARDWICK GREEN, King s Lynn. Welcome to our Exhibition. What are your views? Introduction to the site and proposals. About us HARDWICK GREE, King s Lynn Welcome to our Exhibition Welcome to our exhibition, which is being held to provide you with the opportunity to understand and comment upon our proposals for new residential

More information

Non-Technical Summary

Non-Technical Summary Introduction The Brent Cross Cricklewood regeneration scheme is located in northwest London and comprises 151 hectares (ha) of land within the London Borough of Barnet (LBB) (the Site ). In July 2014,

More information

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY December 2016 Environmental Statement: Non-Technical Summary Stubbocks Walk, North Hertfordshire J S Bloor

More information

INTRODUCTION. Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. THE CONSULTANT TEAM WHERE IS THE SITE?

INTRODUCTION. Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. THE CONSULTANT TEAM WHERE IS THE SITE? 1 INTRODUCTION Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. This is the third round of information events that we have undertaken on the project, following

More information

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DECEMBER 2014 CRANBROOK EXPANSION AREAS ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY Submitted in support of Outline Planning

More information

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth

More information

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford. Welcome Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of. We are at the early stages of designing our proposals and have a number

More information

Buckinghamshire Aylesbury Woodlands Advantage Ltd Aerial View from West

Buckinghamshire Aylesbury Woodlands Advantage Ltd Aerial View from West The proposed Aylesbury Woodlands site is located to the east of Aylesbury and is being promoted by Buckinghamshire Advantage, which is the infrastructure delivery arm of Buckinghamshire Thames Valley Local

More information

Manywells, Cullingworth

Manywells, Cullingworth Introduction You may recall that planning permission was granted in 2010 for the redevelopment of Manywells Industrial Estate to provide a mix of employment and residential uses. Since that time, the country

More information

LAND EAST OF SUDBURY ROAD, HALSTEAD PUBLIC CONSULTATION. Proposed Residential Development

LAND EAST OF SUDBURY ROAD, HALSTEAD PUBLIC CONSULTATION. Proposed Residential Development LAND EAST OF SUDBURY ROAD, HALSTEAD PUBLIC CONSULTATION Proposed Residential Development YOUR VIEW MATTERS TO US PROPOSED RESIDENTIAL DEVELOPMENT AREA Thank you for taking the time to read this information

More information

Land to the North of Main Road, Wybunbury

Land to the North of Main Road, Wybunbury Land to the North of Main Road, Wybunbury Environmental Statement Non-Technical Summary November 2014 Land to the North of Main Road, Wybunbury Environmental Statement Non-Technical Summary Prepared on

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

LAND NORTH OF STAFFORD

LAND NORTH OF STAFFORD REPORT N O 62000589-ESVOL3 LAND NORTH OF STAFFORD ENVIRONMENTAL STATEMENT VOLUME 3: NON-TECHNICAL SUMMARY JULY 2016 LAND NORTH OF STAFFORD ENVIRONMENTAL STATEMENT VOLUME 3: NON-TECHNICAL SUMMARY Akzo Nobel

More information

The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary

The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary 1 The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary 1. Introduction This report summarises the results of an assessment that has been undertaken to determine how a proposed

More information

NORTH WEST SECTOR HORLEY, SURREY

NORTH WEST SECTOR HORLEY, SURREY Welcome to our Exhibition We are delighted to present our plans for the first phase of the North-West Sector Horley development. We are holding this exhibition to give you the chance to view and comment

More information

The journey so far. The new masterplan for Dargavel Village

The journey so far. The new masterplan for Dargavel Village The journey so far Our vision for Dargavel Village began over ten years ago when the original masterplan for transforming the former Royal Ordnance Factory site into a thriving community was established.

More information

Development of Land at Thorp Arch Estate, Wetherby. Environmental Statement Non-Technical Summary July 2013

Development of Land at Thorp Arch Estate, Wetherby. Environmental Statement Non-Technical Summary July 2013 Development of Land at Thorp Arch Estate, Environmental Statement July 2013 Contents 1. Introduction... 3 1.1 Background... 3 1.2 Environmental Assessment... 3 1.3 Site Description... 4 2. The Proposals...

More information

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1 Environmental Statement Non-Techncial Summary 28.06.2017 Anthology Hale Works xx.xx.xx Document title 1 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description...

More information

M4 Corridor around Newport Environmental Statement Volume 3: Appendices

M4 Corridor around Newport Environmental Statement Volume 3: Appendices Environmental Statement Volume 3: Appendices Environmental Statement Volume 3: Appendices At Issue March 2016 CVJV/AAR 3 rd Floor Longross Court, 47 Newport Road, Cardiff CF24 0AD Volume 3: Contents 1

More information

Hampton Park North Littlehampton West Sussex

Hampton Park North Littlehampton West Sussex North Littlehampton West Sussex SUMMARY Summary An opportunity to create a new community in West Sussex on the northern outskirts of Littlehampton with outstanding views across open countryside towards

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB INTRODUCTION This event is being hosted by the promoters of the proposed North Heybridge Garden Suburb who are working with Maldon District Council and other key stakeholders on the preparation of a comprehensive

More information

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 in association with 1. Introduction Peel Holdings is applying to Nottingham City Council (NCC) for Outline planning

More information

17A. Wind Microclimate

17A. Wind Microclimate 17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 17A.1.3 17A.1.4 This Chapter, which has been prepared by Waterman and BMT, provides further information with regard to the potential wind microclimate

More information