MEMORANDUM OF BOG TURTLE HABITAT INVESTIGATION

Size: px
Start display at page:

Download "MEMORANDUM OF BOG TURTLE HABITAT INVESTIGATION"

Transcription

1 MEMORANDUM OF BOG TURTLE HABITAT INVESTIGATION Fax: To: From: CC: U.S. Fish and Wildlife Service, Pennsylvania Fish and Boat Commission Jennifer A Ottenberg Miller, P.W.S., A.W.B. Narayana Velaga, Todd Rousenberger, Eric Almquist, project file Date: August 22, 2007 Subject: SR 4001 (New Galena Road) Section 62M Bridge Replacement over an Unnamed tributary to North Branch Neshaminy Creek (SIR #25574, MPMS #50650) Rummel, Klepper & Kahl, LLP (RK&K) conducted a Bog Turtle habitat screening investigation for the proposed bridge replacement and road resurfacing in New Britain Township, Bucks County, PA. The bridge is located on New Galena Road (SR 4001), where New Galena Road crosses an unnamed tributary to North Branch Neshaminy Creek. The study area for the project encompasses approximately 0.25 miles along New Galena Road, extending northeast and southwest from the existing bridge structure (Figure 1). The project consists of the removal and replacement of the existing bridge, realignment, widening and reconstruction of 900 linear feet of roadway approaches, and construction of a new box culvert. SUMMARY The proposed project area is approximately 1.7 acres and will directly affect Unnamed Tributary to North Branch Neshaminy Creek, and may indirectly affect an adjacent palustrine forested/palustrine emergent (PFO/PEM) wetland located northeast of the creek. During a Phase I Bog Turtle Habitat Survey, this wetland was determined to be unsuitable bog turtle habitat due to the absence of the critical criteria necessary to provide suitable wintering sites and nesting habitat. BACKGROUND & EXISTING CONDITIONS A Phase I bog turtle habitat survey was conducted based upon the results of a Pennsylvania Natural Diversity Inventory (PNDI) review. The PNDI database indicates the proposed project has three potential impacts under the following agencies jurisdiction: US Fish and Wildlife Service (USFWS), Pennsylvania Department of Conservation and Natural Resources (DCNR), and Pennsylvania Fish and Boat Commission (PFBC). On April 27, 2007, letters were submitted to the agencies requesting additional information on the three potential impacts. A DCNR response letter was received June 27, 2007 indicating No Project Impact Anticipated. The PFBC response letter was also received June 25, 2007 and indicated the project is located within the known range of the bog turtle and any wetland located within 300 feet of the project limits of disturbance, that maybe directly or indirectly impacted, is subject to a Phase I bog turtle investigation. The USFWS response was received June 1, 2007 and confirmed the same findings as the PFBC. A copy of the PNDI Project Review Receipt is attached and all agency correspondence is included in the Wetland Investigation and Delineation Report-Appendix D.

2 Prior to field investigations, the Bucks County Soil Survey and the Bucks County Hydric Soils List were reviewed to identify hydric soils within the study area. The USGS 7.5 minute Quadrangle map (Doylestown Quad), US Fish and Wildlife Service (USFWS) National Wetland Inventory (NWI) Map, Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM), and aerial photography were reviewed to identify the location, extent, and types of wetlands found within the study area. Topography: The topographic relief of the study area ranges from 300 to 320 feet above sea level based on National Geodetic Vertical Datum (NGVD) (Figure 2). Flat areas or gently sloping hills and characterize the topography in the study area. The study area is located within the Piedmont Physiographic Province (Wetland Investigation and Delineation Report-Figure 2). Soils: The Bucks County Soil Survey indicates that the study area is located within the Abbottstown- Doylestown-Reaville soil association. The Abbottstown-Doylestown-Reaville association is described as nearly level and gently sloping, moderately deep and deep, poorly drained to moderately well drained soils on uplands. The Bucks County Soil Survey indicates that three (3) soil units are present within the study area. The Hydric Soils List for Bucks County lists the following soil units as hydric: Bowmansville silt loam and Rowland silt loam. The remaining soils unit within the study area is non-hydric. Soils in the study area are listed in Table 1.0 (below) and shown as Figure 3 in the Wetland Investigation and Delineation Report. Soil Map Unit Table 1.0: Soil Units within the Study Area Soil Description Hydric Soils List Bo Bowmansville silt loam Yes DoB Doylestown silt loam, 3-8% slopes No Ro Rowland silt loam Yes Wetlands and Waters of the United States: The National Wetland Inventory (NWI) does not indicate the presence of any wetlands within the study area boundaries (Wetland Investigation and Delineation Report-Figure 4). Floodplains: A portion of the study area is located within the 100-year floodplain, according to the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Mapping (FIRM, panel numbers 42017C0286F and 42017CO287F) (Figure 5). The floodplain area is located along an unnamed tributary to the North Branch Neshaminy Creek. The floodplain is a Zone A floodplain, which FEMA defines as No base flood elevations determined. METHODOLOGY A Phase I Bog Turtle Habitat investigation was conducted on July 20, 2007 by Jennifer A. Ottenberg Miller and Michael Schening, non-qualified bog turtle surveyors. Ms. Miller has experience conducting Phase I habitat surveys and assisting qualified surveyors with Phase II surveys. Mr. Schenning has experience conducting Phase I habitat surveys. Their resumes are attached. The Phase I survey was conducted in accordance with the guidelines established by USFWS and PFBC. The wetland identified southeast of the project limits was investigated for soils, hydrology and vegetation critical to suitable bog turtle habitat. Criteria used in the determination include the presence of muddy/mucky soils (i.e. can be probe >3 deep with a 1 diameter blunt end pole), New Galena Road Bridge Replacement 9/4/2007 Phase I Bog Turtle Habitat Assessment

3 springs, seeps or shallow rivulets and emergent vegetation consisting of grasses and sedges and possibly having a scrub-shrub community present. RESULTS On July 20, 2007, RKK environmental scientists conducted a wetland delineation and Phase I bog turtle habitat assessment for the New Galena Road Bridge Replacement project. Two potentially jurisdictional features were identified including an intermittent stream and a PFO/PEM wetland (Area WB). A detailed project plan with wetland boundaries is attached. Area WB a PFO/PEM wetland is an oxbow of less than ½ acre, which extends from Unnamed Tributary to North Branch Neshaminy Creek southeast above the left downstream bank of the creek. The hydrologic connection between the stream and oxbow has been disturbed by the presence of large debris piles. No seeps or springhouses were observed to indicate year-round soil saturation/inundation. Flashy storm flows and rain events are likely the main source of hydrology for this wetland. A small area of seasonally saturated soils and evidence of flooding were observed in the southeastern most edge of the wetland. These saturated soils are non-vegetated with dense canopy cover and are firm when probed (1-2 deep). The USFWS Bog Turtle Habitat Evaluation-Field Form, form is attached. It was determined Area WB is not suitable bog turtle habitat. This area lacks the appropriate hydrologic regime to develop and support >3 of mucky soils, hummocks of emergent vegetation and shrubby vegetation and areas of open canopy required for suitable bog turtle habitat. Temporary indirect wetland impacts may occur during the bridge replacement and roadway resurfacing but no bog turtle or critical habitat impacts are anticipated. Photos with a key sheet are attached. New Galena Road Bridge Replacement 9/4/2007 Phase I Bog Turtle Habitat Assessment

4 SITE LOCATION Figure 1 Vicinity Map New Galena Road (S.R. 4001) PENNDOT Bridge Replacement New Britain Township, Bucks County Pennsylvania

5 SITE LOCATION Figure 2 USGS Quad Map New Galena Road (S.R. 4001) PENNDOT Bridge Replacement New Britain Township, Bucks County Pennsylvania

6 SITE LOCATION Figure 3 Soil Survey Map New Galena Road (S.R. 4001) PENNDOT Bridge Replacement New Britain Township, Bucks County Pennsylvania

7 Figure 4 NWI Map New Galena Road (S.R. 4001) PENNDOT Bridge Replacement New Britain Township, Bucks County Pennsylvania

8 Figure 5 FEMA New Galena Road (S.R. 4001) PENNDOT Bridge Replacement New Britain Township, Bucks County Pennsylvania

9 SITE LOCATION Figure 6 Aerial Photograph New Galena Road (S.R. 4001) PENNDOT Bridge Replacement New Britain Township, Bucks County Pennsylvania

10

11

12 Photo 1: Area WB in 2005, northeastern end of the wetland. Photo 2: Area WB in 2007, debris pile in the northeastern end of the wetland. New Galena Road Bridge Replacement 8/22/2007 Bog Turtle Investigation

13 Photo 3: Area WB in 2007, northwestern portion of the wetland. Photo 4: Area WB in 2007, northeastern portion of the wetland. New Galena Road Bridge Replacement 8/22/2007 Bog Turtle Investigation

14 Photo 5: Looking at Unnamed tributary to North Branch Neshaminy Creek east New Galena Road. New Galena Road Bridge Replacement 8/22/2007 Bog Turtle Investigation

15

16

March 31, PENNDOT District Geerdes Road King of Prussia, PA Attn: Mr. Lawrence J. Link, P.E. Dear Mr. Link:

March 31, PENNDOT District Geerdes Road King of Prussia, PA Attn: Mr. Lawrence J. Link, P.E. Dear Mr. Link: March 31, 2002 PENNDOT District 6-0 7000 Geerdes Road King of Prussia, PA 17406 Attn: Mr. Lawrence J. Link, P.E. Re: S.R. 4005 and 4007, Sections 15P & 15B Germantown Avenue Reconstruction Project Letter

More information

PennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP.

PennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP. (10/27/14) PennDOT Section 106 Field Assessments and Finding Combined Early tification/finding? Yes Concurrence required or requested: Yes MPMS: 51507 ER# (if consultation with PHMC required) ): County:

More information

Existing Conditions and Environmental Consequences Floodplains

Existing Conditions and Environmental Consequences Floodplains 3.9 Environmental Consequences 3.8 3.8.1 WHAT ARE FLOODPLAINS? are low-lying areas adjacent to rivers, streams, and other waterbodies that are susceptible to inundation (flooding) during rain events. These

More information

2. Analysis. DRAFT Gerald Richards & Pleasantview Park Master Plan

2. Analysis. DRAFT Gerald Richards & Pleasantview Park Master Plan DRAFT Gerald Richards & Pleasantview Park Master Plan 19 Historic Features According to the National Register of Historic Places and the National Historic Landmarks Program, there is nothing of national

More information

Application for Certificate of Environmental Compatibility and Public Need

Application for Certificate of Environmental Compatibility and Public Need Application for Certificate of Environmental Compatibility and Public Need Central Hudson Gas & Electric A and C Lines Towns of Pleasant Valley, LaGrange, Wappinger, and East Fishkill Dutchess County,

More information

CHECKLIST FOR PHASE II DRAINAGE REPORT

CHECKLIST FOR PHASE II DRAINAGE REPORT I. COVER SHEET CHECKLIST FOR PHASE II DRAINAGE REPORT A. Name of Project B. Address C. Owner D. Developer E. Engineer F. Submittal date and revision dates as applicable II. GENERAL LOCATION AND DESCRIPTION

More information

Part 5. Environmental Protection Overlay District Regulations

Part 5. Environmental Protection Overlay District Regulations Part 5 Environmental Protection Overlay District Regulations Section 501. Statement of Intent. As established through the goals, objectives and policies of the Amity Township Comprehensive Plan, it is

More information

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST Applications: 5 copies of application - Applicant will reproduce the copies at his/her costs. The Township Clerk

More information

Stormwater Pollution Prevention Plan Oneonta Heights Oneonta, NY TABLE OF CONTENTS PAGE

Stormwater Pollution Prevention Plan Oneonta Heights Oneonta, NY TABLE OF CONTENTS PAGE Oneonta Heights Oneonta, NY TABLE OF CONTENTS PAGE I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 3 A. Topography/ Drainage... 3 B. Soils... 3 C. Wetlands... 3 D. Floodplain... 3 E. NYSDEC Environmental

More information

Information for File # MMJ; Methodist Hospital Flood Storage Mitigation and Wetland Enhancement Project

Information for File # MMJ; Methodist Hospital Flood Storage Mitigation and Wetland Enhancement Project Information for File # 2016-01223-MMJ; Methodist Hospital Flood Storage Mitigation and Wetland Enhancement Project Applicant: Park Nicollet, Attn: Robert Riesselman Corps Contact: Melissa Jenny Address:

More information

SITE SUMMARY REPORT Arlington Dump NONCD Yadkin County

SITE SUMMARY REPORT Arlington Dump NONCD Yadkin County SITE SUMMARY REPORT Arlington Dump NONCD 0000644 Yadkin County Hurricane Recovery Act of 2005 State of North Carolina State Contract N06009S Schnabel Project No. 06210002.15 July 31, 2009 Prepared for:

More information

Poisoned Park? How Exide s Lead Contamination Risks Frisco s Grand Park

Poisoned Park? How Exide s Lead Contamination Risks Frisco s Grand Park Frisco City Hall has big plans to transform Stewart Creek into a Grand Park with lots of water features for kids to play in. Poisoned Park? How Exide s Lead Contamination Risks Frisco s Grand Park But

More information

Section 3 Non-Structural BMPs

Section 3 Non-Structural BMPs 3.1 Stream Buffers A stream buffer or stream setback is a designated area around a stream, lake, or wetland left in a natural, densely vegetated state so as to protect the receiving water quality and provide

More information

WASHINGTON COUNTY OREGON

WASHINGTON COUNTY OREGON WASHINGTON COUNTY OREGON LONG RANGE PLANNING DIVISION North Bethany Subarea Stream Corridors: Existing Regulations In Oregon, there is a distinct difference between the land use rules that apply in rural

More information

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION FOR AVALON INN (APN 069-241-27 & -04) 1201 & 1211 NORTH MAIN STREET FORT BRAGG, CA MENDOCINO COUNTY prepared for:

More information

Section 1 TABLE OF CONTENTS

Section 1 TABLE OF CONTENTS Section 1 TABLE OF CONTENTS... [M]ineral fertilizer is essential to feed around half of the world s population, and will be fundamental to ensure global food security through the 21 st century. 2013 U.N.

More information

Draft Rhode Island Stormwater Design and Installation Standards Manual

Draft Rhode Island Stormwater Design and Installation Standards Manual Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately

More information

North Bellingham and Urban Growth Boundary Wetland, Stream, Habitat Conservation Area and Buffer Assessment TECHNICAL MEMORANDUM

North Bellingham and Urban Growth Boundary Wetland, Stream, Habitat Conservation Area and Buffer Assessment TECHNICAL MEMORANDUM Northwest Ecological Services, LLC North Bellingham and Urban Growth Boundary Wetland, Stream, Habitat Conservation Area and Buffer Assessment TECHNICAL MEMORANDUM Prepared For: City of Bellingham Planning

More information

Letter of Notification For East Lima Station Expansion Project

Letter of Notification For East Lima Station Expansion Project Letter of Notification For East Lima Station Expansion Project PUCO Case No. 18-0906-EL-BLN Submitted to: The Ohio Power Siting Board Pursuant to Ohio Administrative Code Section 4906-6-05 Submitted by:

More information

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report Page 1 of 18 ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville Environmental Screening Report July 2011 Page 2 of 18 Table of Contents 1.0 INTRODUCTION

More information

Geology & Soils. Appendix B. Geology & Soils

Geology & Soils. Appendix B. Geology & Soils Appendix B Geology & Soils Geology & Soils A nation that destroys its soils destroys itself. Forests are the lungs of our land, purifying the air and giving fresh strength to our people. Franklin Delano

More information

Bristol Marsh Heritage Conservancy

Bristol Marsh Heritage Conservancy Bristol Marsh Heritage Conservancy The Pennsylvania Environmental Council (PEC) protects and restores the natural and built environments through innovation, collaboration, education and advocacy. PEC believes

More information

Floodplain Technical Memorandum

Floodplain Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK MAY 19, 2014 Prepared By: Timothy M. Lavocat, P.E., CFM

More information

Richton Park Western Development Corridor Green Infrastructure Development Plan August 18, 2017

Richton Park Western Development Corridor Green Infrastructure Development Plan August 18, 2017 Richton Park Western Development Corridor Green Infrastructure Development Plan August 18, 2017 Conservation Design Forum Geosyntec Consultants 403 W. St. Charles Road 1420 Kensington Road, Suite 103 Lombard,

More information

17.18 SENSITIVE AREAS

17.18 SENSITIVE AREAS 17.18 SENSITIVE AREAS 17.18.010 Purpose...1 17.18.020 Definitions...1 17.18.030 Review Process...1 17.18.040 Sensitive Areas Analysis...2 17.18.050 Standards and Development Plan...3 17.18.060 Geotechnical

More information

City of Waco Stormwater Management Regulations

City of Waco Stormwater Management Regulations 1.0 Applicability: City of Waco Stormwater Management Regulations These regulations apply to all development within the limits of the City of Waco as well as to any subdivisions within the extra territorial

More information

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity. US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

Biodiversity Conservation

Biodiversity Conservation Biodiversity Conservation and Site Plan Review Biodiversity conservation principles Threats to biodiversity Location of development Reviewing site plans Lunch Reviewing site plans (continued) LEED and

More information

1. Project Description

1. Project Description To: By: Checked By: Jimmy Vilce, E.I. (FOT istrict 1 Project Manager) Jennifer Nunn, P.E. (The Balmoral Group) Lori Stanfill, P.E. (The Balmoral Group) Memorandum ate: July 10, 2018 Subject: In May of

More information

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS DRAINAGE REPORT STATEMENT ENGINEER'S STATEMENT: The attached drainage plan and report were prepared under my direction and supervision and are correct

More information

POST CONSTRUCTION STORMWATER MANAGEMENT FOR "WHITE OAK SEWER INTERCEPTOR"

POST CONSTRUCTION STORMWATER MANAGEMENT FOR WHITE OAK SEWER INTERCEPTOR POST CONSTRUCTION STORMWATER MANAGEMENT PLAN FOR "WHITE OAK SEWER INTERCEPTOR" Located in Newberry Township, York County March 21, 2008 Prepared by: Mellott Engineering, Inc. 7500 Devonshire Heights Road

More information

New Development Stormwater Guidelines

New Development Stormwater Guidelines New Development Stormwater Guidelines CITY OF MOUNTLAKE TERRACE Table of Contents Introduction... 2 Ecology s Minimum Requirements for stormwater management... 2 Description of the 9 Minimum Requirements...

More information

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION Suite 900 - James K. Polk Building 505 Deaderick Street Nashville, Tennessee 37243-0334 MEMORANDUM TO: FROM: Files Joe W. Matlock,

More information

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number: Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number

More information

Caledon Villas Corp. c/o Mr. John Spina 55 Blue Willow Drive Woodbridge, ON L4L 9E8 May 14, Floodplain Characteristics, Old Church Road

Caledon Villas Corp. c/o Mr. John Spina 55 Blue Willow Drive Woodbridge, ON L4L 9E8 May 14, Floodplain Characteristics, Old Church Road Caledon Villas Corp. c/o Mr. John Spina 55 Blue Willow Drive Woodbridge, ON L4L 9E8 May 14, 2013 Re: Floodplain Characteristics, Old Church Road This letter serves to confirm that I, Linda Sober, have

More information

I. INTRODUCTION. identify long-term capital improvements and rehabilitation measures for the existing drainage system;

I. INTRODUCTION. identify long-term capital improvements and rehabilitation measures for the existing drainage system; I. INTRODUCTION The Town of Windsor, Colorado is presently experiencing rapid growth and development within the boundaries of several of its major drainage basins. As growth continues within these basins,

More information

Rule D Wetland and Creek Buffers

Rule D Wetland and Creek Buffers Rule D Wetland and Creek Buffers 1 Policy It is the policy of the Board of Managers to ensure the preservation of the natural resources, recreational, habitat, water treatment and water storage functions

More information

Town of Vershire Road Erosion Inventory Report

Town of Vershire Road Erosion Inventory Report Town of Vershire Road Erosion Inventory Report Taylor Valley Road. Photo taken by TRORC staff. Prepared by: 128 King Farm Road Woodstock, VT 05091 Inventory and report funded by the Vermont Agency of Transportation

More information

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division Stormwater Regulations & Considerations Morse Study Area Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division Stormwater Regulations Development Considerations Floodplain

More information

Drexel, Barrell & Co.

Drexel, Barrell & Co. Drexel, Barrell & Co. December 21, 2018 Engineers/Surveyors Boulder Colorado Springs Greeley 3 South 7 th Street Colorado Springs, Colorado 80905-1501 719 260-0887 719 260-8352 Fax El Paso County Planning

More information

Weston s Wetlands, Stormwater, & Open Space

Weston s Wetlands, Stormwater, & Open Space Weston s Wetlands, Stormwater, & Open Space Weston s Wetlands, Stormwater, & Open Space Conservation Commission Role and Responsibilities Laws that protect wetlands What residents can do to protect wetlands

More information

Technical Memorandum 5

Technical Memorandum 5 Technical Memorandum 5 Environmental Resources August 2015 PREPARED BY AECOM Table of Contents Introduction... 3 Natural Features... 6 Watersheds... 6 Rivers, Lakes, Creeks... 6 Wetlands... 8 Floodplains...

More information

STREAM BUFFER PROTECTION AND MANAGEMENT

STREAM BUFFER PROTECTION AND MANAGEMENT ORDINANCE NO. 753 AN ORDINANCE AMENDING THE CODE OF ORDINANCES OF THE CITY OF PLEASANT HILL, IOWA 1998, BY ESTABLISHIING CHAPTER 104, STREAM BUFFER PROTECTION AND MANAGEMENT Be it enacted by the City of

More information

Riparian Buffer on the Bushkill Creek. Policies

Riparian Buffer on the Bushkill Creek. Policies Riparian Buffer on the Bushkill Creek Riparian buffers provide numerous benefits to landowners and the community by protecting groundwater recharge areas, providing flood control, providing stormwater

More information

Chapter 3 Site Planning and Low Impact Development

Chapter 3 Site Planning and Low Impact Development CHAPTER 3 Site Planning and Low Impact Development Chapter 3 Site Planning and Low Impact Development 3.0 Introduction The City of Charleston requires that major residential, large commercial (>1 acre),

More information

TRCA Field Staking Protocol December 2016

TRCA Field Staking Protocol December 2016 Page 1 of 6 TRCA Field Staking Protocol December 2016 This Protocol describes TRCA staff s current practice for field staking the physical top of bank, the physical toe of slope, and the limit of existing

More information

Drexel, Barrell & Co.

Drexel, Barrell & Co. Drexel, Barrell & Co. June 18, 2018 Engineers/Surveyors Boulder Colorado Springs Greeley 3 South 7 th Street Colorado Springs, Colorado 80905-1501 719 260-0887 719 260-8352 Fax El Paso County Planning

More information

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SITE PLAN REVIEW APPLICATION AND CHECKLIST SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description

More information

Erosion & Sediment Control Plan Application Form & Checklist

Erosion & Sediment Control Plan Application Form & Checklist Erosion & Sediment Control Plan Application Form & Checklist GENERAL INFORMATION Application Date: Project Address: Tax Map / Parcel Number(s): PROPERTY OWNER / DEVELOPER Firm Name: Contact Person: Title:

More information

STREAM BUFFERS

STREAM BUFFERS 88-415 STREAM BUFFERS 88-415-01 PURPOSE In the Kansas City region and throughout the nation, vegetated stream buffers have been clearly shown to protect stream stability and related infrastructure, improve

More information

Project Description WOO/LUC-SR /0.00. Waterville Bridge Replacement

Project Description WOO/LUC-SR /0.00. Waterville Bridge Replacement Ohio Department of Transportation District 2 317 East Poe Rd. Bowling Green, Ohio 43402 (419) 353-8131 John R. Kasich, Governor Jerry Wray, Director Todd Audet, P.E., District Deputy Director Project Description

More information

When planning stormwater management facilities, the following principles shall be applied where possible.

When planning stormwater management facilities, the following principles shall be applied where possible. 2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between

More information

CATEGORICAL EXCLUSION DETERMINATION I 435/I 35/K 10 INTERCHANGE (JOHNSON COUNTY GATEWAY)

CATEGORICAL EXCLUSION DETERMINATION I 435/I 35/K 10 INTERCHANGE (JOHNSON COUNTY GATEWAY) December 11, 2012 CATEGORICAL EXCLUSION DETERMINATION I 435/I 35/K 10 INTERCHANGE (JOHNSON COUNTY GATEWAY) Project Number: Kansas Department of Transportation (KDOT) Project No. 435-46 KA-1002-03 Route:

More information

Procedures IV. V. Rural Road Design Option

Procedures IV. V. Rural Road Design Option i IV. Procedures A. All applicants required to prepare a Conservation Design Subdivision shall provide the Planning Board with a conceptual conventional subdivision design as well as a proposed layout

More information

Information for File # MHK

Information for File # MHK Information for File #2014-03555-MHK Applicant: Corps Contact: Wimmer Communities Marie Kopka Address: 250 N. Sunnyslope Road, Suite 296 Brookfield, Wisconsin 53005 E-Mail: Marie.H.Kopka@usace.army.mil

More information

The Napa River Flood Protection Project

The Napa River Flood Protection Project The Napa River Flood Protection Project Creating Flood Protection and Restoring Geomorphic and Biological Processes Jeremy Sarrow, Napa County Flood Control & Water Conservation District June 2, 2014.

More information

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST St. Mary s Soil Conservation District 26737 Radio Station Way, Suite B Leonardtown, MD 20650 Phone: 301-475-8402 ext. 3 Fax: 301-475-8391 www.stmarysscd.com St. Mary s County Government Department of Public

More information

III. PROJECT DESCRIPTION

III. PROJECT DESCRIPTION III. PROJECT DESCRIPTION A. PROJECT LOCATION Regional Setting The project site is located in the southeast quadrant of the City of Chico in Butte County, California and is comprised of four parcels totaling

More information

Request for an Exception to the Napa County Road and Street Standards

Request for an Exception to the Napa County Road and Street Standards F Request for an Exception to the Napa County Road and Street Standards Shed Creek Winery Use Permit P16-327 and Use Permit Exception to the Conservation Regulations P17-178 Planning Commission Hearing

More information

Stormwater Management Plan Narrative Quality Fleet Services, Inc. SITE RE-DEVELOPMENT 548 New Ludlow Road South Hadley, MA The project proposed by Quality Fleet Services, Inc. consists of the site improvements

More information

13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road

13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road 13. corner of 159 th Street and Quivira Road 1. APPLICANT: HNTB Corporation is the applicant for this request. 2. REQUESTED ACTION: The applicant is requesting approval of a preliminary plat for a 383-lot

More information

Florida Forever Conservation Needs Assessment Overview Maps

Florida Forever Conservation Needs Assessment Overview Maps Florida Forever Conservation Needs Assessment Overview Maps Prepared by Florida Natural Areas Inventory, The maps in this document are derived from the Florida Forever Conservation Needs Assessment, an

More information

City of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014

City of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014 City of Elmhurst City of Elmhurst Comprehensive Flood Plan City Council Meeting September 15, 2014 City of Elmhurst Presentation Overview Study Background Study Methodology Analysis of Three Additional

More information

Thornbury Township Delaware County Comprehensive Plan

Thornbury Township Delaware County   Comprehensive Plan CHAPTER 3 EXISTING CONDITIONS This chapter addresses the natural features within the Township which have influenced its character and played a role in its development pattern. Features such as topography

More information

Appendix I. Checklists

Appendix I. Checklists Appendix I Checklists Town of Greenwich Drainage Manual Department of Public Works - Engineering Division Town Hall - 101 Field Point Road, Greenwich, CT 06836-2540 Phone 203-622-7767 - Fax 203-622-7747

More information

APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES

APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES TABLE C-1: Resource Actions and Priorities GOAL NRM-4 Objective 4.1: Restore Natural floodplain functions. Objective 4.2: Define and

More information

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST City of Seminole 9199 113 th Street N. Seminole, FL 33772 Ph: (727) 392-1966 Fx: (727) 319-6583 SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST Note: This checklist is designed to aid designers in the review

More information

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION

More information

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST Planning Department Date Stamp Design Review Formal Application Change of Use (No Site Improvements)* All information provided and submitted

More information

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report October 7, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report and

More information

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP) Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP) Presented to Pennsylvania Agency Coordination Meeting May 27, 2015 Doug Smith & Ryan Gordon 1 Southwestern

More information

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity. City of Charlottesville, Virginia Erosion and Sediment Control Plan Review Checklist 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182; Fax 434-970-3359 Project: Developer/Designer:

More information

Chapter 2 Traffic and Safety Assessment

Chapter 2 Traffic and Safety Assessment Paoli Road Improvement Feasibility Study and Public Participation Project Chapter 2 Traffic and Safety Assessment 2.1 Today s Transportation Setting 2 2.2 Transportation Data & Operations 5 2.3 Traffic

More information

INTER-AGENCY COORDINATION MEETING

INTER-AGENCY COORDINATION MEETING Virginia Department of Transportation INTER-AGENCY COORDINATION MEETING Joint Permit Application DEQ COE VMRC I. VDOT PROJECT INFORMATION PERMIT #: PRE-APP#: Route: VDOT Project Number: City/County: Contract

More information

Appendix E Preliminary Location Hydraulic Study

Appendix E Preliminary Location Hydraulic Study Appendix E Prepared for: State of Alaska Department of Transportation and Public Facilities Prepared by: HDR Alaska, Inc. 2525 C Street, Suite 305 Anchorage, Alaska 99503 February 2014 This page intentionally

More information

Northern Branch Corridor DEIS December 2011

Northern Branch Corridor DEIS December 2011 16 Floodplains 161 Chapter Overview 1611 Introduction The flowing chapter identifies floodplains found within the Northern Branch Corridor in accordance with Executive Order 11988, Floodplain Management

More information

AN ARCHAEOLOGICAL SURVEY FOR THE RICHARDS, TEXAS FARM-TO-MARKET ROAD 149 FIBER OPTIC CABLE PROJECT IN MONTGOMERY COUNTY, TEXAS

AN ARCHAEOLOGICAL SURVEY FOR THE RICHARDS, TEXAS FARM-TO-MARKET ROAD 149 FIBER OPTIC CABLE PROJECT IN MONTGOMERY COUNTY, TEXAS AN ARCHAEOLOGICAL SURVEY FOR THE RICHARDS, TEXAS FARM-TO-MARKET ROAD 149 FIBER OPTIC CABLE PROJECT IN MONTGOMERY COUNTY, TEXAS Antiquities Permit 6097 By William E. Moore Brazos Valley Research Associates

More information

Preparing a Wetland Delineation Report

Preparing a Wetland Delineation Report Preparing a Wetland Delineation Report Why is the report important? In addition to documenting the wetland determination/delineation, the report often provides the basis for further regulatory permitting/compliance.

More information

Leduc Industrial Outline Plan SE W4

Leduc Industrial Outline Plan SE W4 Leduc Industrial Outline Plan SE 1-50-25-W4 Within the North Leduc Industrial ASP Prepared for: Leduc Energy Park Ltd. Prepared by: Stantec Consulting Ltd. File No. 1161 104655 V5 Table of Contents 1.0

More information

Natural Areas Certification Program Guidelines

Natural Areas Certification Program Guidelines Natural Areas Certification Program Guidelines Purpose of the Program The City of Fort Collins Natural Areas Department encourages site management practices that focus on protecting, restoring, and enhancing

More information

Pennsylvania Stormwater Best Management Practices Manual. Chapter 4. Integrating Site Design and Stormwater Management

Pennsylvania Stormwater Best Management Practices Manual. Chapter 4. Integrating Site Design and Stormwater Management Pennsylvania Stormwater Best Management Practices Manual Chapter 4 Integrating Site Design and Stormwater Management 363-0300-002 / December 30, 2006 Chapter 4 Integrating Site Design and Stormwater Management

More information

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative Introduction Mitchell Ranch South is a proposed single family (detached) residential development on

More information

Station Street/Haig Road Extension Environmental Assessment (EA)Study. Welcome

Station Street/Haig Road Extension Environmental Assessment (EA)Study. Welcome Station Street/Haig Road Extension Environmental Assessment (EA)Study Welcome Welcome to this Public Information Centre (PIC) meeting. Please record your attendance and obtain a comment sheet at the registration

More information

Town of Corinth Road Erosion Inventory Report

Town of Corinth Road Erosion Inventory Report Town of Corinth Road Erosion Inventory Report Grist Mill Road. Photo taken by TRORC staff. Prepared by: 128 King Farm Road Woodstock, VT 05091 Inventory and report funded by the Vermont Agency of Transportation

More information

Non-Metallic Mining Reclamation Checklist

Non-Metallic Mining Reclamation Checklist Eau Claire County DEPARTMENT OF PLANNING AND DEVELOPMENT Eau Claire County Courthouse, Rm. 1510 721 Oxford Avenue Eau Claire, Wisconsin 54703-5481 (715) 839-4741 f Housing & Community Development 839-6240

More information

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 July 7, 2015 RFP NO. 16-02 POPES CREEK RAIL TRAIL DESIGN ADDENDUM NUMBER ONE TO: All

More information

Florence County Small Commercial Land Disturbance Permit Application

Florence County Small Commercial Land Disturbance Permit Application Florence County Small Commercial Land Disturbance Permit Application Florence County Engineering Division 518 South Irby Street Florence, S.C. 29501 Phone (843) 676-8600 Fax (843) 676-8667 Tax Map Number:

More information

NYC Envirothon 2017 Soil Science Review. Richard K Shaw USDA-NRCS

NYC Envirothon 2017 Soil Science Review. Richard K Shaw USDA-NRCS NYC Envirothon 2017 Soil Science Review Richard K Shaw USDA-NRCS Introduction Who Are We? U.S. Department of Agriculture (1862) Natural Resources Conservation Service (1935) What Do We Do? Provide leadership

More information

Information for File # ARC

Information for File # ARC Information for File # 2016-02630-ARC Applicant Corps Contact Will Bomier-Carlton County Transportation Department Andrew R Chambers Address 600 South Lake Avenue, Suite 211, Duluth, MN 55802 E-Mail Andrew.R.Chambers@usace.army.mil

More information

RCS: Prepared for: DEPARTMENT OF THE AIR FORCE Eglin Air Force Base. Okaloosa County, Florida. July Prepared by:

RCS: Prepared for: DEPARTMENT OF THE AIR FORCE Eglin Air Force Base. Okaloosa County, Florida. July Prepared by: FINAL SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT FOR THE MID-BAY BRIDGE CONNECTOR PHASES 2 AND 3 RCS: 07-523 Prepared for: DEPARTMENT OF THE AIR FORCE Eglin Air Force Base Okaloosa County, Florida July 2010

More information

DRAFT MAP AMENDMENT FLU 04-4

DRAFT MAP AMENDMENT FLU 04-4 DRAFT MAP AMENDMENT FLU 04-4 SW 24 TH AVENUE ROADWAY CORRIDOR The University of Florida participates with the Metropolitan Transportation Planning Organization (MTPO) in its responsibilities for the continuing,

More information

Rockwell Collins Green Communities Grant Application

Rockwell Collins Green Communities Grant Application Rockwell Collins Green Communities Grant Application Contact Information Legal Name of Organization Applying for Funding: Indian Creek Nature Center (should be the same as on IRS determination letter and

More information

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT Veterans Way (previously Powerline Road) and Klondike Park Road Wasaga Beach Welcome Please sign in Take a comment

More information

Farmers Investment Co. (FICO) Continental Farms

Farmers Investment Co. (FICO) Continental Farms Farmers Investment Co. (FICO) Continental Farms Planning & Zoning Commission Study Session (River Master Plan) January 25, 2012 FICO Property 7,000 acres total area 6,000 acres in Town of Sahuarita 1,000

More information

EPOD Environmental Protection Overlay Districts.

EPOD Environmental Protection Overlay Districts. Chapter Environmental Protection Overlay Districts 200-21.Chapter 201 EPOD Environmental Protection Overlay Districts. A. Purpose and intent. The purpose of the EPOD established in this article is to provide

More information

Washington County, Maryland Division of Public Works Policy Manual

Washington County, Maryland Division of Public Works Policy Manual Washington County, Maryland Division of Public Works Policy Manual Subject: Downstream Drainage Easement Category: Land Development Engineering Number: 7-4.1 Date: June 1, 2009 (effective) PURPOSE: The

More information

Appendix 17A Scenic Quality Rating Forms

Appendix 17A Scenic Quality Rating Forms 1 2 Appendix 17A Scenic Quality Rating Forms UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT SCENIC QUALITY RATING SUMMARY Date: March 7, 2018 Landscape Character Unit: N/A Key Observation

More information

Information for File # JTF

Information for File # JTF Information for File # 2013-04665-JTF Applicant Corps Contact Enbridge Energy, Limited Partnership Josh Fitzpatrick Address 1554 Highway 2, Suite 2, Two Harbors, MN 55616 E-Mail joshua.t.fitzpatrick@usace.army.mil

More information

Huntington Stormwater Utility

Huntington Stormwater Utility Huntington Stormwater Utility Stormwater Management & Sediment and Erosion Control Requirements for Construction Sites Authorized by Huntington City Code Articles: 971, 970, 930, 935, 955, Revised April

More information