1 THE SEINE- SCHELDT PROJECT Design & Build Harelbeke ir. Ellen Maes, project engineer SMART Rivers 2011, 15th of September 2011

2 OVERVIEW Waterwegen en Zeekanaal NV Seine-Scheldt an inland navigation project on a European scale with respect for the natural river Lys Design & Build in Harelbeke Aims Procedure

3 OVERVIEW Waterwegen en Zeekanaal NV Seine-Scheldt an inland navigation project on a European scale with respect for the natural river Lys Design & Build in Harelbeke Aims Procedure

4 WATERWEGEN EN ZEEKANAAL NV Flandres Wallonia

5 WATERWEGEN EN ZEEKANAAL NV

6 WATERWEGEN EN ZEEKANAAL NV Transport of goods over water Water management & Safety against flooding Multifunctionality of waterways

7 OVERVIEW Waterwegen en Zeekanaal NV Seine-Scheldt an inland navigation project on a European scale with respect for the natural river Lys Design & Build in Harelbeke Aims Procedure

8 Scheldt bassin Seine bassin?

9 EUROPEAN DECISIONS ( ) Trans-European Network for Transport (TEN-T) Realisation of missing links 30 priority projects, including Seine-Scheldt France (VNF): new canal Seine Nord Europe Flandres (W&Z): navigability improvements ECMT class Vb (185m x 11.4m x 3.5m)

10 SEINE- SCHELDT France

11

12 EUROPEAN FUNDING Multi-annual work program International cooperation Seine-Scheldt Intergovernmental Commission (IGC) European Economic Interest Grouping (EEIG) 10% financial aid granted (= 460 mio EUR) Canal Seine Nord Europe (France) Border Lys (France, Walloon and Flemish region) Lys (45km) + canals (26km) in Ghent region (W&Z) Scheldt + canal Condé-Pommeroeul (Wallonia)

13 SEINE- SCHELDT Improving navigability Design principles 1-way class Vb 2-way smaller vessels

14 SEINE- SCHELDT Water profile in the Lys river Water depth of 4.5m (now: Lys 3.5m) Maintaining the width at water level => Dredging necessary

15 SEINE- SCHELDT Improving navigability Minimal lock dimensions 230m x 12.5m x 4.70m

16 SEINE- SCHELDT Bridges (8) Free height of 7.00m (over 35m width) Necessary for large parts or 3 layers of containers

17 SEINE- SCHELDT Embankments Mooring places ( m long) 1-way traffic with communication through RIS/AIS Waiting zone for large vessels to cross each other Ecological embankments Quay walls

18 OVERVIEW Waterwegen en Zeekanaal NV Seine-Scheldt an inland navigation project on a European scale with respect for the natural river Lys Design & Build in Harelbeke Aims Procedure

19 SEINE- SCHELDT River restoration Ecology Landscape Recreation

20 SEINE- SCHELDT Definition of River Restoration All measures to restore or reinforce the structure and processes which contribute to the dynamic balance in the river ecosystem River ecosystem = river bed + meanders + embankments Dynamic balance: a river is in constant evolution Erosion vs. sedimentation Flooding vs. droughts

21 HISTORY OF THE LYS Extensive calibration

22 SEINE- SCHELDT River restoration (1) Reinforcing the dynamics in the ecosystem

23 SEINE- SCHELDT River restoration (2) Fish migratory routes around locks

24 SEINE- SCHELDT River restoration (3) Recreational routes with respect for heritage Landscaping

25 OVERVIEW Waterwegen en Zeekanaal NV Seine-Scheldt an inland navigation project on a European scale with respect for the natural river Lys Design & Build in Harelbeke Aims Procedure

26 SEINE- SCHELDT Harelbeke

27 SEINE- SCHELDT IN HARELBEKE (1/3) Deepening of the Lys New lock New weir Restoration of migratory routes for fish Heightening of Kuurnebrug upstream (*) New Hoge Brug downstream New waiting and mooring places Construction of (ecological) embankments Hoge brug (*) not part of D&B Kuurnebrug

28 SEINE- SCHELDT IN HARELBEKE (2/3) Dredging + protection against erosion Straightening of waterway downstream Hoge Brug New urban quay New industrial quay Geldof Realisation of intake at Banmolens Renovation of hydraulic turbine Banmolens (*) Continuous service road on left bank (+ bridge over intake) Road works on right bank Site Geldof (*) not part of D&B Banmolens

29 SEINE- SCHELDT IN HARELBEKE (3/3) Spatial planning (without realisation): Passage of the Lys at the new lock & weir Insertion of Marina (Kuurne) Impact assessment on new urban quarter on left bank Overall spatial valorisation of the surroundings (o.o. Bloemmolens) Urban development Bloemmolens

30 HARELBEKE: MAIN PROJECT ZONE

31 EXISTING INFRASTRUCTURE (1/3) Banmolens Industrial heritage Reconversion project Lofts Hydraulic turbine Intake needed! Spatial cohesion Fish migration?

32 EXISTING INFRASTRUCTURE (2/3) Bloemmolens Industrial site until summer 09 Acquisition by W&Z to safeguard space for future lock and weir Possibility to transform into lofts?

33 EXISTING INFRASTRUCTURE (3/3) Lock and weir

34 NAVIGATIONAL DEMANDS Traffic prognosis versus lock capacity (1/2) Traffic prognosis Seine-Scheldt (million tonnes) traffic in the past 4 growth industrial production +1.37% container and waste traffic + new quay walls 2 0 project induced traffic change of route

35 NAVIGATIONAL DEMANDS Traffic prognosis versus lock capacity (2/2)

36 NAVIGATIONAL DEMANDS Lock geometry based on class Vb

37 NAVIGATIONAL DEMANDS Mooring structures Bollards in lock walls Floating construction Continuity of navigation during construction

38 WATER MANAGEMENT Normal water management: Upstream 10.18m TAW Downstream 8.00m TAW Hydrological data T (year) Q (m³/s) H_up (m TAW) H_dwn (m TAW) MHW

39 Variant A CONCEPTUAL PLANS

40 Variant C CONCEPTUAL PLANS

41 CONCEPTUAL PLANS Variant A Variant C Acquisitions needed Minimal to none Bloemmolens By-pass weir Not necessary (temporarely) necess. Techn. feasability To be investigated OK Continuity navigation During construction OK Navigability Optimal axis line Broken axis line Bloemmolens Lofts in the future? Demolition needed Variant A: best solution, but achievable? Variant C is achievable, but not as good

42 FISH MIGRATORY ROUTE By-pass new lock and weir Restoration of river dynamics on meander Integration of Banmolens / Bloemmolens?

43 BRIDGES Heightening Kuurnebrug (*) Rebuilding Hoge Brug (*) not part of D&B

44 KUURNEBRUG Palmbout: Opportunity to improve road situation

45 HOGE BRUG

46 SPATIAL VISION (1/3)

47 SPATIAL VISION (2/3) Masterplan Palmbout

48 SPATIAL VISION (3/3) Masterplan Palmbout

49 PROJECT ZONE DOWNSTREAM Straightening the curve Urban quay widening Industrial quay Geldof

50 STRAIGHTENING THE CURVE Max m Min. 35m Ca. 8m

51 INDUSTRIAL QUAY GELDOF Continuity of Geldofs activities Straightening the curve implies building a new quay wall downstream Acquisition planned nearby

52 EXPLOITATION & MAINTENANCE REQUIREMENTS Life Cycle Management keep the Whole Life Cycle Cost to a minimum Avoid calamities Renewable energy sources Accessibility of the (construction) site

53 CONCLUSION OF PRELIMINARY STUDY The construction of a new lock and weir at Harelbeke is one of the main challenges for the international Seine-Scheldt project There are many conflicting goals that need to be reconciled An integrated project, by means of a Design & Build procedure is launched, based on two variants

54 OVERVIEW Waterwegen en Zeekanaal NV Seine-Scheldt an inland navigation project on a European scale with respect for the natural river Lys Design & Build in Harelbeke Aims Procedure

55 DESIGN & BUILD PROCEDURE Phase 1: 7 candidates 31/05/ /10/2011 Conceptual plans to be provided Phase 2: 3 candidates 20/01/ /06/2012 Detailled design to be provided Phase 3: 3 candidates 01/10/ /10/2012 Price to be offered for approved tender from phase 2

56 D&B AND DURABILITY (1/2) Lack of M(aintenance) in procedure How to obtain durability? Reduce maintenance costs Reduce exploitation costs Use sustainable forms of energy Minimize downtime of the structure Maximize comfort for navigation Avoid calamities Take the necessary safety measures

57 D&B AND DURABILITY (2/2) Criteria for ranking tenders Points Total cost 40 Technical quality 20 Nautic and hydraulic quality 15 Life span, exploitation and maintenance cost 10 Spatial quality 5 Nuisance control 5 Planning 5 TOTAL 100

58 CONCLUSION Complexity of the project Close deadline (2016) D&B procedure Lack of maintenance part in procedure Attention to durability Life Cycle Management

59 Any questions? More information: Thank you for your attention!

River Kleine Nete : Creating ecological flooding zones at recreation areas

River Kleine Nete : Creating ecological flooding zones at recreation areas Stoffel Moeskops Lange Kievitstraat 111-113 bus 64 B-2018 ANTWERPEN T +32 3 205 81 25 s.moeskops@vmm.be River Kleine Nete : Creating ecological flooding zones at recreation areas \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\

More information

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary TABLE OF CONTENTS Page Executive Summary 1.0 INTRODUCTION...1-1 1.1 Purpose of the Undertaking...1-1 1.2 Study Area Description...1-1 1.3 Description of the Undertaking...1-1 1.4 Rationale for the Undertaking...1-2

More information

ENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development

ENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development ENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development TEN-T Project Management Workshop 2010 George Kremlis DG ENV B4, European Commission 13 January 2010 Environmental

More information

Coastal safety- case studies in Flanders

Coastal safety- case studies in Flanders Coastal safety- case studies in Flanders Duinkerke, June 12th 2018 ir. Daphné Thoon MDK-Coastal Division Content 1. Introduction 2. Coastal Safety Masterplan - status 3. Management of the sandy coast 4.

More information

Policy for management and protection of the coast

Policy for management and protection of the coast Policy for management and protection of the coast Policy for management and protection of the coast Mona Ohlsson Samhällsbyggnadsförvaltningen Ystads kommun, 2008 3 THE MUNICIPALITY GUIDELINES REGARDING

More information

The Napa River Flood Protection Project

The Napa River Flood Protection Project The Napa River Flood Protection Project Creating Flood Protection and Restoring Geomorphic and Biological Processes Jeremy Sarrow, Napa County Flood Control & Water Conservation District June 2, 2014.

More information

Figure 1. Proposed Strategic Habitat Conservation Areas for Florida

Figure 1. Proposed Strategic Habitat Conservation Areas for Florida Figure 1. Proposed Strategic Habitat Conservation Areas for Florida Critical Lands and Waters Identification Project (CLIP) Cooperative Effort Century Commission for Sustainable Florida Florida Natural

More information

Lake and Stream Restoration Project

Lake and Stream Restoration Project Pre-project Fact Sheet May 2012 Toledo Botanical Garden (TBG) is a 60 acre public garden visited by more than 120,000 people annually. It is located in Toledo, Ohio in the Ottawa River watershed within

More information

The New INTERREG Programme: Opportunities for

The New INTERREG Programme: Opportunities for The New INTERREG Programme: Opportunities for 2014-2020 Dave Willis mountainsportphoto.com Caroline Salthouse North West Coastal Forum Secretariat Presentation Introduction to INTERREG The new funding

More information

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT PUBLIC INFORMATION CENTRE Vaughan Metropolitan Centre (VMC) Black Creek Renewal Wednesday, May 10, 2017 6:00 p.m. to 8:00 p.m. Add photo Project Management, Environmental Assessment, Stormwater Management

More information

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK St. John s River & Its Tributaries Issue Summary: The St. Johns River is an important

More information

WRC in Mechelen (Belgium)

WRC in Mechelen (Belgium) Water Resilient Cities WRC in Mechelen (Belgium) General overview Location Location Partners in the Mechelen project City of Mechelen Historically important city of art, railroad, 80 000 inhabitants Former

More information

Marinas, Mooring and Boating Facilities 23

Marinas, Mooring and Boating Facilities 23 195 Marinas, Moorings and Waterfronts 23.1 The valleys of the River Severn, River Avon, River Teme and their tributaries significantly define the natural character of South Worcestershire, whilst the canal

More information

The role of Universities: Civic Design and planning futures

The role of Universities: Civic Design and planning futures What did planning ever do for us? A celebration of Civic Design and Planning The role of Universities: Civic Design and planning futures 24 th May 2013 Sue Kidd Head of Civic Design Dept of Geography and

More information

DUBLIN DOCKLANDS MASTER PLAN AND RELATIONSHIP WITH OTHER PLANS

DUBLIN DOCKLANDS MASTER PLAN AND RELATIONSHIP WITH OTHER PLANS .1 National Policy and Programmes.1.1 Sustainable Development A Strategy for Ireland, 1997.1.2 National Climate Change Strategy, 2007-2012.1. National Development Plan 2007-201.1.4 National Spatial Strategy,

More information

Natural Resource Adaptation Action Area Addressing Sea Level Rise in Estuarine Ecosystems TO: TOWN OF YANKEETOWN MAY

Natural Resource Adaptation Action Area Addressing Sea Level Rise in Estuarine Ecosystems TO: TOWN OF YANKEETOWN MAY Natural Resource Adaptation Action Area Addressing Sea Level Rise in Estuarine Ecosystems TO: TOWN OF YANKEETOWN MAY 6 2013 University of Florida Conservation Clinic Vivek Babbar, Student Associate, J.D.

More information

Public Meeting #3 May 9, 2009 MVVA Team

Public Meeting #3 May 9, 2009 MVVA Team Public Meeting #3 May 9, 2009 MVVA Team Welcome to the third Public Meeting for the Lower Don Lands Municipal Class Environmental Assessment (EA) Infrastructure Master Plan and Keating Channel Precinct

More information

Purpose of Open House #3

Purpose of Open House #3 Public Meeting #3 May 9, 2009 MVVA Team Purpose of Open House #3 The main purpose of this Open House is to present and seek input on the: Evaluation of transportation and infrastructure design alternatives

More information

Design Strategies + Planning Tools for Integrated Stormwater Management

Design Strategies + Planning Tools for Integrated Stormwater Management ELKE KRUSE Design Strategies + Planning Tools for Integrated Stormwater Management Department Sustainable Urban and Infrastructure Planning How can we use the transformation process of our drainage system

More information

Arlington, Virginia is a worldclass

Arlington, Virginia is a worldclass EXECUTIVE S U M M A RY Arlington maintains a rich variety of stable neighborhoods, quality schools and enlightened land use policies, and received the Environmental Protection Agency s highest award for

More information

2002/ Modernisation Road N 4

2002/ Modernisation Road N 4 2002/000-606.02 - Modernisation Road N 4 1. Basic Information 1.1. CRIS Number 2002/000-606.02 1.2. Title: Modernisation of the national road No 4 1.3 Sector : Cross Border Co-operation / Infrastructure

More information

Step by step, the construction of a coherent overall restoration on the Seine estuary the role of GIP Seine-Aval

Step by step, the construction of a coherent overall restoration on the Seine estuary the role of GIP Seine-Aval Step by step, the construction of a coherent overall restoration on the Seine estuary the role of GIP Seine-Aval Stéphanie Moussard GIP Seine-Aval Seine estuary - France I-Introduction to the Seine estuary

More information

Cooperative Research in Water Management

Cooperative Research in Water Management Proceedings of the 8 th International Conference on Applied Informatics Eger, Hungary, January 27 30, 2010. Vol. 1. pp. 273 281. Cooperative Research in Water Management Margit Horosz-Gulyás, Katalin Katonáné

More information

IMMERSED TUNNEL An innovation to cross a water-body. Presented by: Sumit Kar & Vishnu Saini On 20 February 2015 Page 1

IMMERSED TUNNEL An innovation to cross a water-body. Presented by: Sumit Kar & Vishnu Saini On 20 February 2015 Page 1 IMMERSED TUNNEL An innovation to cross a water-body Presented by: Sumit Kar & Vishnu Saini On 20 February 2015 Page 1 RoyalHaskoningDHV 100 Offices 35 Countries 8,000 Employees Independent, international

More information

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN APPENDIX G - Stormwater Study Findings & Stormwater Solutions LSU: MP Narrative July 2017 3.5 Open Space Existing Conditions The

More information

Application of GIS and Remote Sensing for Identifying Flood Risk in Ho Chi Minh City, Vietnam

Application of GIS and Remote Sensing for Identifying Flood Risk in Ho Chi Minh City, Vietnam Application of GIS and Remote Sensing for Identifying Flood Risk in Ho Chi Minh City, Vietnam Vo Le Phu and Luu Dinh Hiep Faculty of Environment Ho Chi Minh City University of Technology volephu@hcmut.edu.vn

More information

Cost 24.1m Benefit Cost Ratio: Potential Measures. A2 - Verdant Place Steps and Crèche. A5 - Star Rovers to Athlunkard Boat Club

Cost 24.1m Benefit Cost Ratio: Potential Measures. A2 - Verdant Place Steps and Crèche. A5 - Star Rovers to Athlunkard Boat Club Introduction Limerick City and County Council has appointed the Arup JBA team to assess, develop and design a sustainable flood relief scheme for King s Island. This is our third public consultation event.

More information

URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION

URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION Stephen Crawford, P.E., CFM Romin Khavari, P.E., CFM NCTCOG Public Works Roundup MAY 23, 2018 Today s Agenda Urbanized Stream Erosion Solving

More information

Rotterdam Climate Proof

Rotterdam Climate Proof Rotterdam Climate Proof Connecting water with opportunities Towards Rotterdam Resilient Delta City Jorg Pieneman Programme manager Water www.rotterdamclimateinitiative.nl Rotterdam ROTTERDAM REGION THE

More information

Shoreline Master Program Town of La Conner, Washington

Shoreline Master Program Town of La Conner, Washington Shoreline Master Program Town of La Conner, Washington Department of Ecology approval effective Adopted September 24, 2013 by Town of La Conner Ordinance No.1106 Amended May 13, 2014 by Town of La Conner

More information

APPENDIX K WINDSOR OFFICIAL PLAN

APPENDIX K WINDSOR OFFICIAL PLAN CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX K WINDSOR OFFICIAL PLAN Avalon Consulting Professionals of Ontario,

More information

The Planning Partnership Baird + Associates TCI Management Consultants Ltd. Plan B Natural Heritage Wills Consulting Engineers Poulos & Chung Limited

The Planning Partnership Baird + Associates TCI Management Consultants Ltd. Plan B Natural Heritage Wills Consulting Engineers Poulos & Chung Limited Little Lake Master Plan The Planning Partnership Baird + Associates TCI Management Consultants Ltd. Plan B Natural Heritage Wills Consulting Engineers Poulos & Chung Limited May 26, 2009 Purpose of Study

More information

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File # 0 'O DI Lan-171-14 1 - THE CORPORATION OF THE TOWN OF COBOURG..,. STAFF REPORT TO: FROM: Mayor and Members of Council Dean A. Hustwick, Director of Recreation and Culture DATE OF MEETING: Committee of

More information

Highway Alignment and Route Location Survey

Highway Alignment and Route Location Survey CHAPTER 2 Highway Route Surveys and Location Introduction To determine the geometric features of road design, the following surveys must be conducted after the necessity of the road is decided. Type of

More information

Arkansas River Corridor

Arkansas River Corridor Planning for Access Welcome to the Access Project. This project is a recreational planning effort in response to an interest by regional communities along the Arkansas River corridor. The project plan

More information

Integrated urban policies and land management The URBACT Experience Didier Vancutsem

Integrated urban policies and land management The URBACT Experience Didier Vancutsem Integrated urban policies and land management The URBACT Experience Didier Vancutsem Didier Vancutsem URBACT Expert Prof Urban Planner ISOCARP Contents Integrated urban policies and land management: a

More information

Dr.- Ing. Andreas Hendricks Land consolidation and land development more than reorganizing land property

Dr.- Ing. Andreas Hendricks Land consolidation and land development more than reorganizing land property Dr.- Ing. Andreas Hendricks Land consolidation and land development more than reorganizing land property Tartu, May 2015 Structure Structural data Objectives Procedures Main stages and features Costs and

More information

Presentation to Parks and Open Space Advisory. Committee September 22, 2016

Presentation to Parks and Open Space Advisory. Committee September 22, 2016 Flood Planning & Preliminary Design Services for South St. Vrain Creek Restoration at Hall Ranch Presentation to Parks and Open Space Advisory Prepared for: Boulder County, Colorado Committee September

More information

Ashbridges Bay Erosion and Sediment Control Project

Ashbridges Bay Erosion and Sediment Control Project Ashbridges Bay Erosion and Sediment Control Project Project Brief Overview Toronto and Region Conservation Authority, in partnership with the City of Toronto, intends to carry out remedial erosion control

More information

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015 RFP 2018-02 DRAINAGE OUTFALL DESIGN AND PERMITTING Mandatory Meeting for Proposers August 15, 2015 IMPORTANT DATES August 15 th, 2:00pm August 17 th, 5:00pm August 22 nd, 5:00pm September 5 th, 2:00pm

More information

EUROPEAN REGIONAL DEVELOPMENT FUND INTERREG EUROPE. Draft Cooperation Programme Tako Popma, 5 february INTERREG EUROPE PROGRAMME

EUROPEAN REGIONAL DEVELOPMENT FUND INTERREG EUROPE. Draft Cooperation Programme Tako Popma, 5 february INTERREG EUROPE PROGRAMME EUROPEAN REGIONAL DEVELOPMENT FUND INTERREG EUROPE Draft Cooperation Programme 2014 2020 Tako Popma, 5 february 2014 1 INTERREG EUROPE PROGRAMME CONTENTS Regulatory and policy context Programme Strategy

More information

The purpose of tonight s PIC is to:

The purpose of tonight s PIC is to: The purpose of tonight s PIC is to: Provide an overview of the work completed to date and a summary of the Class EA process being followed; Provide a summary of public input received so far, including

More information

Edgeley Pond + Park Public Meeting

Edgeley Pond + Park Public Meeting Edgeley Pond + Park Public Meeting February 21, 2017 Purpose of the meeting This Public Meeting is an opportunity for you to review the project background, process and provide input. City of Vaughan staff

More information

Alpine Green Infrastructure Joining forces for nature, people and the economy

Alpine Green Infrastructure Joining forces for nature, people and the economy Alpine Green Infrastructure Joining forces for nature, people and the economy Joint declaration of Alpine States and Regions Munich, October 2, 2017 The project is co-financed by the European Regional

More information

Taché Promenade Tuesday, October 17, 2017

Taché Promenade Tuesday, October 17, 2017 Welcome to the Public Information Session for the City of Winnipeg s Taché Promenade Tuesday, October 17, 2017 We want to hear from you. Please participate today by: Viewing the recommended design and

More information

On the way to HARMONY. Ewa Kaczmarczyk

On the way to HARMONY. Ewa Kaczmarczyk On the way to HARMONY Ewa Kaczmarczyk 1 The structure of Poland The transport network Road s influence on a landscape Recent political changes in Poland What was done in previous years The SWOT analyses

More information

Post Construction BMPs

Post Construction BMPs Post Construction BMPs Why are Post Construction BMPs important? With increased development brings the increase of impervious cover Parking lots, rooftops, driveways Storm water runoff volume increases

More information

Niagara National Heritage Area

Niagara National Heritage Area Niagara National Heritage Area What is a National Heritage Area? It is a regional place where natural, cultural, historic and recreational resources combine to form a nationally distinctive landscape and

More information

Sunshine Coast Council Coastal Management Overview. January 2016 edition

Sunshine Coast Council Coastal Management Overview. January 2016 edition Sunshine Coast Council Coastal Management Overview January 2016 edition Mayor Mark Jamieson Mayor s foreword Our impressive beaches are fundamental to our Sunshine Coast lifestyle, economy and coastal

More information

Pietro Elisei URBASOFIA. Gabriel Pascariu UNIVERSITY ION MINCU (Faculty of Urbanism)

Pietro Elisei URBASOFIA. Gabriel Pascariu UNIVERSITY ION MINCU (Faculty of Urbanism) The Danube Strategy and the Romanian Cities, the Danube as catalyzer of regional and urban development in Romania: ongoing strategies, policies and promising projects. Pietro Elisei URBASOFIA pietro.elisei@urbasofia.eu

More information

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP) Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP) Presented to Pennsylvania Agency Coordination Meeting May 27, 2015 Doug Smith & Ryan Gordon 1 Southwestern

More information

Smart City Governance URBIS Solutions. David Ludlow, Assoc. Professor European Smart Cities University of the West of England, Bristol

Smart City Governance URBIS Solutions. David Ludlow, Assoc. Professor European Smart Cities University of the West of England, Bristol Smart City Governance URBIS Solutions David Ludlow, Assoc. Professor European Smart Cities University of the West of England, Bristol Integrated smart city model Smart Mobility Services focused on decreasing

More information

Passerelles Paris, France

Passerelles Paris, France Passerelles Paris, France The River Seine and its banks create a territory of projects at the crossroads of heritage, and environmental and economic issues. Its development and its appropriation by Parisians,

More information

Flood map for the existing situation

Flood map for the existing situation Flood map for the existing situation Flood map after completion construction of the Raciborz reservoir and the WFS modernization WFS tasks: Task no. 1. Enhancement of the Flood Canal Task no. 4. Enhancement

More information

Appendix E Preliminary Location Hydraulic Study

Appendix E Preliminary Location Hydraulic Study Appendix E Prepared for: State of Alaska Department of Transportation and Public Facilities Prepared by: HDR Alaska, Inc. 2525 C Street, Suite 305 Anchorage, Alaska 99503 February 2014 This page intentionally

More information

Adaptation and Resilience at the City of Fort Lauderdale

Adaptation and Resilience at the City of Fort Lauderdale Adaptation and Resilience at the City of Fort Lauderdale Carlos Acosta, P.E. Assistant City Engineer City of Fort Lauderdale Overview Climate challenges and limitations Sea Level Rise Projections King

More information

Vitoria-Gasteiz and lessons learned for Brazil.

Vitoria-Gasteiz and lessons learned for Brazil. II International Seminar on Nature-Based Solutions (NBS) Brazil Europe: promoting urban nature for more resilient cities Vitoria-Gasteiz and lessons learned for Brazil. Iñigo Bilbao. Architect 1. An overview

More information

Canal & River Trust response to the Consultation on the Working Draft Environmental Impact Assessment Report

Canal & River Trust response to the Consultation on the Working Draft Environmental Impact Assessment Report High Speed Two Phase 2a: West Midlands to Crewe Response to Working Draft Environmental Impact Assessment Report Please find below the response of the Canal & River Trust. The Trust is the guardian of

More information

FP7 SMART CITY PROJECT «TRANSFORM»

FP7 SMART CITY PROJECT «TRANSFORM» FP7 SMART CITY PROJECT «TRANSFORM» Results for replication Roberta Casapietra Brussels, 16th September 2015 EIP Integrated Planning IRE Spa IRE SpA is a public equivalent body located in Genoa (IT) founded

More information

CEN-CENELEC response to the European Commission consultation on H2020 Societal Challenge 5 priorities for

CEN-CENELEC response to the European Commission consultation on H2020 Societal Challenge 5 priorities for CEN European Committee for Standardization CENELEC European Committee for Electrotechnical Standardization CEN-CENELEC response to the European Commission consultation on H2020 Societal Challenge 5 priorities

More information

Costal highway E39 Vision, inspiration and challenges

Costal highway E39 Vision, inspiration and challenges Costal highway E39 Vision, inspiration and challenges Bijan Adl Zarrabi zarrabi@chalmers.se E39 Kristiansand -Trondheim ca 1100 km Beautiful but demanding Project E39 includes 8 bridges/tunnels Gold coast

More information

Cities and Desire #4. FEDORA

Cities and Desire #4. FEDORA Cities and Desire #4. FEDORA In the center of Fedora, that gray stone metropolis, stands a metal building with a crystal globe in every room. Looking into each globe, you see a blue city, the model of

More information

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore Habitat Restoration and Green Infrastructure Planning for Staten Island s North Shore Community Board 1 March 1, 2018 NYC Parks Forestry, Horticulture, and Natural Resources Funded by the NYS Department

More information

Big Thompson River Restoration Master Plan. Stakeholder Kick off Meeting and Workshop April 12, 2014

Big Thompson River Restoration Master Plan. Stakeholder Kick off Meeting and Workshop April 12, 2014 Big Thompson River Restoration Master Plan Stakeholder Kick off Meeting and Workshop April 12, 2014 AGENDA 1:30 to 2:10 Information 2:10 to 2:35 Questions 245t 2:45 to 4:00 400 Worksession in Cafeteria

More information

Town of Vershire Road Erosion Inventory Report

Town of Vershire Road Erosion Inventory Report Town of Vershire Road Erosion Inventory Report Taylor Valley Road. Photo taken by TRORC staff. Prepared by: 128 King Farm Road Woodstock, VT 05091 Inventory and report funded by the Vermont Agency of Transportation

More information

Wisconsin NRCS Direct Volume Method Bank Recession Rate Categorizations

Wisconsin NRCS Direct Volume Method Bank Recession Rate Categorizations 2 Executive Summary The City of Ramsey contracted the Anoka Conservation District to complete an inventory of riverbank condition along the entire 5.8 miles of City that border the Mississippi River. The

More information

Public Information Centre No. 1 King-Vaughan Road Bridge Replacement Municipal Class Environmental Assessment City of Vaughan

Public Information Centre No. 1 King-Vaughan Road Bridge Replacement Municipal Class Environmental Assessment City of Vaughan Public Information Centre No. 1 King-Vaughan Road Bridge Replacement Municipal Class Environmental Assessment City of Vaughan Date: April 7, 2016 Location: Al Palladini Community Centre, Meeting Room #1

More information

Development of green infrastructure in EU regions Nature-based solutions delivering multiple benefits

Development of green infrastructure in EU regions Nature-based solutions delivering multiple benefits Development of green infrastructure in EU regions Nature-based solutions delivering multiple benefits A Policy Brief from the Policy Learning Platform on Environment Introduction What is green infrastructure?

More information

PUBLIC SPACE/AMENITY PROJECTS

PUBLIC SPACE/AMENITY PROJECTS BUFFALO S LWRP 49 A1. Black Rock Canal Park Improvements Erie County Parks Black Rock Canal Park, Ontario and Niagara Street intersection PROJECT DESCRIPTION: Erie County s Black Rock Canal Park is 4.25

More information

Low Carbon City Planning Vincent Cheng, PhD LEED AP

Low Carbon City Planning Vincent Cheng, PhD LEED AP Low Carbon City Planning Vincent Cheng, PhD LEED AP 2009 Green Building and Energy Efficiency International Conference Shanghai, China China s growth target - Quadrupling per capita GDP by 2020. 1 billion

More information

Reconnecting rivers in urban areas; challenges and considerations

Reconnecting rivers in urban areas; challenges and considerations River Forth Fisheries Trust Reconnecting rivers in urban areas; challenges and considerations RAFTS-ASFB conference 2016 Currently five morphology project sites in the Forth District with three informing

More information

COMPANY PROFILE. Sellhorn Middle East Engineering

COMPANY PROFILE. Sellhorn Middle East Engineering COMPANY PROFILE Sellhorn Middle East Engineering Page 1/7 Our Business Activities Sellhorn Middle East s.a.r.l. [Sellhorn ME] is a consultancy practice for civil and structural engineering works. We are

More information

Green Infrastructure. IENE 2012 International Conference

Green Infrastructure. IENE 2012 International Conference Green Infrastructure IENE 2012 International Conference Marco Fritz, DG Environment Potsdam, 22/10/2012 Content 1) Green Infrastructure why does it matter? 2) Added value 3) Policy development framework

More information

Green Infrastructure Case Study Template

Green Infrastructure Case Study Template Green Infrastructure Case Study Template The aim of the exercise is to provide information on how the elements of the Green Infrastructure Strategy are implemented at national level and to provide case

More information

B - Coalfield River Corridor Landscape Character Type

B - Coalfield River Corridor Landscape Character Type B - Coalfield River Corridor Landscape Character Type Landscape Character Type - Coalfield River Corridor The Coalfield River Corridors Landscape Character Type is located in the two converging valleys

More information

Northern Branch Corridor DEIS December 2011

Northern Branch Corridor DEIS December 2011 16 Floodplains 161 Chapter Overview 1611 Introduction The flowing chapter identifies floodplains found within the Northern Branch Corridor in accordance with Executive Order 11988, Floodplain Management

More information

The London 2012 Olympic Park and Green Network Legacy

The London 2012 Olympic Park and Green Network Legacy 2012 Central Scotland Green Network Forum How Green Networks make our Towns and Cities Livable The London 2012 Olympic Park and Green Network Legacy Neil Mattinson Senior Partner LDA Design The Story Begins.

More information

Interreg Atlantic Area Programme

Interreg Atlantic Area Programme Interreg Atlantic Area Programme 2014-2020 Strategic Planning Areas What is INTERREG? INTERREG is a series of European Territorial Cooperation programmes that aim to stimulate cross border and inter-regional

More information

What is green Infrastructure (GI)?

What is green Infrastructure (GI)? GreenNet Workshop green Infrastructure, Goričko Nature Park (Slovenia), 11.09.2013 What is green Infrastructure (GI)? Mike Cattell Leidorf DEGES Frankenwaldtourismus Hofrichter Melanie Kreutz PP02, BUND-Project

More information

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No. September 15, 2016 Brett Eidem Cost Share Grant Administrator Minnehaha Creek Watershed District 15320 Minnetonka Boulevard Minnetonka, MN 55345 RE: Storm Water Quality and Shoreline Restoration Improvements

More information

Chicago Maritime Crafts and Small Vessel Museum

Chicago Maritime Crafts and Small Vessel Museum Chicago Maritime Crafts and Small Vessel Museum Illinois School of Architecture University of Illinois at Urbana-Champaign Studio Description Architecture, planning and landscape architecture are studied

More information

{Best Practices. Summary of Tools, Strategies and Best Practices from 11 Michigan Case Study Communities

{Best Practices. Summary of Tools, Strategies and Best Practices from 11 Michigan Case Study Communities Case Studies Michigan Coastal Community Working Waterfronts { Summary of Tools, Strategies and from 11 Michigan Case Study Communities Table of Contents Zoning...2 Community and Stakeholder Collaboration

More information

SECTION 5: REACH RECOMMENDATIONS/MAPS

SECTION 5: REACH RECOMMENDATIONS/MAPS SECTION 5: REACH RECOMMENDATIONS/MAPS This section describes areas of concern and provides specific recommendations for each project reach. Locations of stormwater drains were from GIS coverage supplied

More information

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015 Guiding Landowners in Stream Restoration The Science, Practice & Art of Restoring Native Ecosystems 2015 January 24, 2015 Guiding Landowners in Stream Restoration January 24, 2015 Agenda 1Watershed Planning

More information

Why the workshop, why the cases?

Why the workshop, why the cases? Green Infrastructure in Central and Eastern Europe Cases from the Czech Republic, Poland and Romania Kristijan Civic, ECNC and Agnes Zolyomi, Zolyomi, CEEweb Workshop on redesigning the landscape, connecting

More information

PRELIMINARY PUBLIC NOTICE 1-161

PRELIMINARY PUBLIC NOTICE 1-161 Commander (dpb) First Coast Guard District 1 South Street Battery Park Building New York, NY 10004-1466 March 9, 2018 PRELIMINARY PUBLIC NOTICE 1-161 The United States Coast Guard is soliciting public

More information

Commissioners Road West Realignment Environmental Assessment

Commissioners Road West Realignment Environmental Assessment City of London Commissioners Road West Realignment Environmental Assessment Public Information Centre No. 1 March 30, 2017 Welcome to the Public Information Centre This first Public Information Centre

More information

Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples.

Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples. Gordon River Project Location Naples Beach Golf Club East Naples Naples Naples Bay Evergreen Golf and Country Club and Gordon River Greenway Connector Bridge Gordon River Greenway CONNECTOR BRIDGE AND

More information

Bucks Bar Road Bridge Project Public Informational Meeting Wednesday, January 6, 2010

Bucks Bar Road Bridge Project Public Informational Meeting Wednesday, January 6, 2010 PRESENTED BY: Bucks Bar Road Bridge Project Public Informational Meeting Wednesday, January 6, 2010 Matthew Smeltzer, P.E. Deputy Director of Engineering, DOT Supervisor Ray Nutting El Dorado County, District

More information

Interreg. 18 May 2018

Interreg. 18 May 2018 Interreg 18 May 2018 Overview Interreg VA (Cross border ) 2 Seas Programme France/Channel England Programme Interreg VB (Transnational) North West Europe Programme North Sea Programme Interreg VC (Interregional)

More information

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project

More information

CHRISTELER Stéphane URBAN GROWTH WITHOUT SPRAWL: FOUR EXAMPLES IN THE GENEVESE REGION

CHRISTELER Stéphane URBAN GROWTH WITHOUT SPRAWL: FOUR EXAMPLES IN THE GENEVESE REGION CHRISTELER Stéphane URBAN GROWTH WITHOUT SPRAWL: FOUR EXAMPLES IN THE GENEVESE REGION INDEX 1) Issues of urban densification 2) Perceptions of the urban densification 3) The consequences of urban densification

More information

Design of Movable Bridges - selected examples

Design of Movable Bridges - selected examples Design of Movable Bridges - selected examples Adriaan Kok Designer, Project Manager ipv Delft Delft, The Netherlands adriaankok@ipvdelft.nl Niels Degenkamp Designer, Project Manager ipv Delft Delft, The

More information

GREEN NETWORK APPLICATIONS IN ESTONIA

GREEN NETWORK APPLICATIONS IN ESTONIA GREEN NETWORK APPLICATIONS IN ESTONIA Kalev Sepp, Tuuli Veersalu, Martk Külvik Estonian University of Life Sciences 1 WHY? BACKGROUND - POLITICAL By adopting the Pan-European Biological and Landscape Diversity

More information

Working Groups on Sediments

Working Groups on Sediments Working Groups on Sediments Ecological Problems in PA: sharing experiences (I. Liska) - illustrate the negative impacts on your habitats, species, infrastructure - present your graph, photo etc. which

More information

GENERAL LAND USE PLAN ELEMENT

GENERAL LAND USE PLAN ELEMENT CITY OF Prepared by City of Medford Planning Department 200 South Ivy Street Medford, Oregon 97501 plnmed@ci.medford.or.us James E. Huber, AICP, Planning Director COMPREHENSIVE PLANNING SECTION John Adam,

More information

THE EMERALD NETWORK. A tool for the protection of European natural habitats

THE EMERALD NETWORK. A tool for the protection of European natural habitats THE EMERALD NETWORK A tool for the protection of European natural habitats Why protect natural habitats? The pace of biodiversity decline is accelerating in Europe and worldwide. It is estimated that the

More information

Southern Gateway Project and Public Green

Southern Gateway Project and Public Green Southern Gateway Project and Public Green Transportation and Trinity River Project Committee May 23, 2016 Purpose of Presentation Provide the history and an overview of the Southern Gateway Project (SGP)

More information

Fingal Development Plan & Green Infrastructure. Nicholas O Kane Senior Executive Planner Fingal County Council

Fingal Development Plan & Green Infrastructure. Nicholas O Kane Senior Executive Planner Fingal County Council Fingal Development Plan 2011-2017 & Green Infrastructure Nicholas O Kane Senior Executive Planner Fingal County Council 2011 Fingal Development Plan Must be in compliance with National Spatial Strategy

More information

Pipeline Trail Master Plan Preliminary Concept Design. O Connor Mokrycke Consultants May 14, 2015 meeting

Pipeline Trail Master Plan Preliminary Concept Design. O Connor Mokrycke Consultants May 14, 2015 meeting Pipeline Trail Master Plan Preliminary Concept Design O Connor Mokrycke Consultants May 14, 2015 meeting 1 Purpose of the Meeting: - Share information regarding traffic studies - Present ideas arising

More information