1 Pipeline Trail Master Plan Preliminary Concept Design O Connor Mokrycke Consultants May 14, 2015 meeting 1

2 Purpose of the Meeting: - Share information regarding traffic studies - Present ideas arising from community requests / wish lists to date Study Area: 2

3 Vision (Hamilton Pipeline Trail): - Environmental Stewardship - Recreational Activities - Connections - Length of the pipeline - Safe 3

4 Community Comment Themes: Walkability Greening Corridor Recreation Art Connections Infrastructure Wayfinding Educational 4

5 Connections: CONNECTION BELOW QEW LEASIDE PARK GLOW PARK BRAMPTON ST. GLOBE PARK BRAMPTON ST. PARK CONNECTION TO RED HILL VALLEY, PRIORITY 231, AND PEDESTRIAN BRIDGE TO WATERFRONT OVER QEW FAIRFIELD PARK MAHONY PARK CONNECTION TO GAGE PARK DELTA PARK AM CUNNINGHAM PARKETTE CONNECTION TO KENILWORTH AVE. ANDREW WARBURTON MEMORIAL PARK MONTGOMERY PARK PARKDALE PARK ROXBOROUGH PARK HILLCREST PARK RED HILL BOWL MULTI-USE TRAIL CONNECTION PRIORITY 390 OTTAWA ST. TO ESCARPMENT RAIL TRAIL 5

6 Parks as Opportunities: - What can be done at Parks on the route - Woodlot on the NE end? Other Opportunities: - Nearby streets: - Britannia - Brampton Long and Short Term Solutions / Phasing 6

7 Safe Crossings for Pedestrians and Cyclists CIMA 7

8 Typical Uncontrolled Street Crossing Wc-15 Wc-32t Wc-28 Rb-70 Ra-1 Stop Sign & Stop Bar Curb Extension or Optical Speed Table (photo below): Ra-1 Stop Sign & Stop Bar Wc-28 Rb-70 Realign Trail Path (90 with street) Curb Extension or Optical Speed Table Wc-15 Wc-32t Wc-15 Wc-32t Wc-28 Rb-70 Ra-1 8

9 9 Investigation Required: modifications to existing onstreet parking

10 Approximate Loss of On-Street Parking / Design Details Location Parking Reduction Required Realignment Notes London Street N None None Relocate illumination pole (west side) Edgemont Street N 4 west side 3 east side Major Requires encroachment onto private property Park Row N 3 east side Minor Graham Avenue N 4 west side Minor Houghton Avenue N 3 west side 2 east side Moderate Wexford Avenue N 2 west side 2 east side Moderate Tragina Avenue N None None May require use of parking area of #93 to realign path May require use of parking area of #105 and/ or #88(?) to realign path Weir Street N None Minor Fairfield Avenue 3-4 east side Minor Close off south path on west side Paling Avenue 2 west side 1 east side Minor Close off south path on west side These locations require only partial parking reduction due to parking being restricted only during certain periods of the year and/or month NOTE: LOSS OF 30 PARKING SPACES. CITY WILL NEED TO DISCUSS WITH RESIDENTS. 10

11 Roxborough Ave & Huxley Ave to Crosthwaite Ave Mixed Crossride Optical Speed Table Signed Bicycle Route Sharrows Intersection Pedestrian Signal Crosswalk IPS Crosswalk Conflicts with community desire for crossing. Short and long term approach. 11

12 Strathearne Ave to Barton St - Short Term + No reduction in parking availability expected # 295 Optical Speed Table Mixed Crossride Signed Bicycle Route Multi-use trail/path + Provide wayfinding signage for pedestrians Existing Traffic Signal Mixed Crossride Conflicts with community desire for crossing. Short and long term approach. Source: 12

13 Brampton St Short Term Optical Speed Table Multi-use trail/path Bicycle Lanes Existing Traffic Signal To Mahony Ave 13

14 Woodward Ave Short Term Optical Speed Table Signed Bicycle Route Existing Bicycle Lanes Pedestrian Crossover Type B + Woodward Avenue speed limit: 60 km/h + PXO Type B located away from the curve to provide adequate visibility + New counts required to confirm volumes and warrant in accordance with OTM Book 15 + Current access through Leaside Park or from Glow Avenue 14

15 Barton St to Parkdale Ave Long Term Multi-use trail/path Signed Bicycle Route Optical Speed Table Existing Railway Crossing + Trail runs approximately 500 metres through industrial property + Pedestrians and cyclists required to cross Parkdale Ave N along with a existing railway crossing to continue along the trail + Recommended installation of a optical speed table for pedestrians and cyclists to cross roadway to the north and south of railway crossing 15

16 Parkdale Ave to Brampton St Long Term + Trail runs approximately 550 metres through industrial property + Large property acquisition by the City required to extend trail + Consider installation of a IPS along the Brampton St crossing (pending new count and pedestrian delay study) + Road crossings likely to need optical speed tables 16

17 Woodward Ave Long Term Pedestrian Crossover Type B Existing Bicycle Lane Multi-use trail/path + Trail runs approximately 340 metres + Approximately 130 metres run through industrial property which requires City acquisition + Installation of PXO B along Woodward Ave for pedestrians to cross and continue along existing sidewalks + Woodward Ave contains existing bike lanes in both northbound and southbound directions for cyclists using the trail + Road crossings would likely need optical speed tables 17

18 Wayfinding: Vertical Elements Consistent with other municipal signage 18

19 Wayfinding: Vertical Elements - Important for areas like Andy Warburton & Mahony Parks - Other places where the trail needs to be diverted Unique to Pipeline Trail / Mapping Artistic or thematic 19

20 Wayfinding: Ground Elements Natural elements Pavement markings or specialty pavements 20

21 Plant Materials: Cues in plant materials (seasonal) Ribbon of colour identifying the trail 21

22 Plant Materials: Horticultural / manicured vs. naturalized These naturalized gardens require maintenance Urquhart Butterfly Garden Victoria Park Butterfly Garden 22

23 Plant Materials: Large Scale Naturalization vs. Small Gardens Naturalized / native species Low maintenance - 6 km of trail - Brampton Street 23

24 Low Impact Development: Principles: - Reduce runoff speed, volume, and improve water quality - Ecosystem based approach - An integration of neighbourhood open space, vegetation, and natural hydrogeological function - Permeable pavements and accessibility - Natural materials - Rain gardens - Bioswales - Some segments have catch basins Rain gardens 24

25 25 Aesthetics: Walls of the Outdoor Rooms (Existing Conditions)

26 Aesthetics: Walls of the Outdoor Rooms Ownership & Maintenance Issues 26

27 Lighting - Two concepts: A) solar powered B) A/C powered system - Luminaire style - Most solar luminaires have a contemporary appearance - Most heritage style luminaires have a higher percentage of light trespass, few solar options - Engineers are preparing sample layouts for the first two trail segments: London Street to Park Row, as a prototype - Criteria: pedestrian safety and security; light trespass; durability - With costing 27

28 Seating: Benches as Public Art, such as on James Street N Themed Metal Bench Customized: white oak leaves Wood / Casual Seating Natural Stone: Oasis Garden, McMaster University 28

29 29 Aesthetics: Thematic Connections to Neighbourhood or the Trail

30 Balanced Healthy Community: - Play along the way: stand alone, small pieces might be considered - Community gardens - Rest stops - Personal safety / sight lines - Fitness stations 30

31 Trail Entrance at London Street (Existing Conditions) Potential Encroachment 31

32 PROPOSED IMPROVEMENTS CREATE A SEPARATE PEDESTRIAN ENTRANCE MOW STRIP DECORATIVE PRIVACY FENCING EXISTING CONDITIONS (DASHED RED LINE) Parking Recommendations REMOVED DISEASED TREE SOD PIPELINE TRAIL SIGNAGE SOD POTENTIAL ENCROACHMENT EXISTING TREES NATURALIZED AREA SHARED VEHICULAR & PEDESTRIAN & TRAIL ENTRANCE (EXISTING) PLANTING AREA Identified as planting area by community 32

33 Existing Conditions: - Improvements to accessibility - Re-route trails to avoid catch basins - Control vehicles with boulders vs. curbing 33

34 PROPOSED IMPROVEMENTS PLANTING & WAYFINDING ELEMENT EXISTING SEAT ROCK MOW STRIP EXISTING CONDITIONS (RED LINE) EXISTING TREES SOD SOD LOW PLANT MATERIAL (LESS THAN 600mm HIGH) (sight lines) PEDESTRIAN PATHWAY WITH ALLEY CROSSING PROPOSED TREES NATURALIZED AREA 34

35 PROPOSED IMPROVEMENTS MOW STRIP NATURALIZED AREA EXISTING TREES PIPELINE SOD PEDESTRIAN ACCESS PROPOSED TREES SHARED PEDESTRIAN & VEHICULAR ACCESS VEHICULAR ACCESS 35

36 Existing Conditions: - Approaching A.M. Cunningham Parkette 36

37 PROPOSED IMPROVEMENTS PROPOSED RING SWING Swing Space is limited A regular swing set does not fit This swing can accommodate more than one child Can accommodate children who cannot sit up NATURALIZED AREA OR SHRUB PLANTING SOD SOD TRAIL SECTION WITH PLAY EQUIPMENT EXISTING TREES PROPOSED TREES Trees on south side / children s health and well-being / shade 37

38 38 Existing Conditions:

39 PROPOSED IMPROVEMENTS: Pedestrian Node HEDGE PLANTING EXISTING TREES EXISTING CONDITIONS BIKE RACKS/ BARRIER PIPELINE SOD PROPOSED TREES PARKETTE/ REST AREA TRAIL AT TIM HORTON S 39 - Desired crossing conflicts with traffic engineering requirements - Requires further investigation

40 40 Thank you

41 Next steps: Your comments We will incorporate lighting schematics Further discussion/refinement of traffic engineering studies Refine public art locations 41

COMPLETE GREEN STREET CHECKLIST

COMPLETE GREEN STREET CHECKLIST COMPLETE GREEN STREET CHECKLIST This document was developed to dissect the structure of an urban street and explore opportunities to make our streets more complete while also integrating green street strategies.

More information

Commissioners Road West Realignment Environmental Assessment

Commissioners Road West Realignment Environmental Assessment City of London Commissioners Road West Realignment Environmental Assessment Public Information Centre No. 1 March 30, 2017 Welcome to the Public Information Centre This first Public Information Centre

More information

East Bayshore Road Neighbourhood

East Bayshore Road Neighbourhood East Bayshore Road Neighbourhood Northridge Property Management Urban Design Brief 3195 East Bayshore Road City of Owen Sound January 2016 East Bayshore Road Neighbourhood Northridge Property Management

More information

RZC Public View Corridors and Gateways

RZC Public View Corridors and Gateways RZC 21.42 Public View Corridors and Gateways 21.42.010 Purpose 21.42.020 Scope and Authority 21.42.030 Administration 21.42.040 Gateways Design 21.42.050 Unidentified Public Views 21.42.060 Identification

More information

VEHICULAR AND PEDESTRIAN CIRCULATION

VEHICULAR AND PEDESTRIAN CIRCULATION This perspective sketch communicates the intended character and quality of a proposed streetscape design. Locate benches near a major intersection where people tend to gather. Seating and lighting provide

More information

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London Bostwick Road Municipal Class Environmental Assessment Public Information Centre #2 June 14, 2017 Welcome! Welcome to the 2 nd Public Information Centre for the. Representatives from the and the consulting

More information

Hamilton Road Corridor Streetscape Master Plan. Open House October 4 th, 2017

Hamilton Road Corridor Streetscape Master Plan. Open House October 4 th, 2017 Hamilton Road Corridor Streetscape Master Plan Open House October 4 th, 2017 Agenda 1. Introductions Agenda Overview 2. Project Background 3. Existing Conditions 4. Strengths, Weaknesses, Opportunities

More information

City of Burlington Downtown Street Design & Construction Standards

City of Burlington Downtown Street Design & Construction Standards City of Burlington Downtown Street Design & Construction Standards Adopted April 16, 2018 b City of Burlington Downtown Street Design Standards CITY OF BURLINGTON, VT The Great Streets Initiative is a

More information

Kittson Parkway / Watershed Park Parking Lot

Kittson Parkway / Watershed Park Parking Lot Kittson Parkway / Watershed Park Parking Lot Date Constructed: Summer 2005 Site Location / Description: Kittson Parkway, North Delta, British Columbia. Permeable parking lot adjacent to Watershed Park;

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

AESTHETIC APPEARANCE. Design Guidelines for Grade-Separated Pedestrian, Cyclist and Equestrian Structures

AESTHETIC APPEARANCE. Design Guidelines for Grade-Separated Pedestrian, Cyclist and Equestrian Structures III. AESTHETIC APPEARANCE The aesthetic qualities of a grade-separated structure are as important as the specific design criteria. For example, a structure may be constructed to the exact criteria set

More information

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1 1 Adelaide Street / Canadian Pacific Railway (CPR) Why Are We Here? 2 The purpose of Public Information Centre (PIC) #1 is to: Introduce the study Provide the study background and context Identify the

More information

Cit of Kitchener Ur 6 an Design Manual PARTA. Desi n for _--::

Cit of Kitchener Ur 6 an Design Manual PARTA. Desi n for _--:: Cit of Kitchener Ur 6 an Design Manual Date PARTA Year ) Desi n for k Nodes Corridors _--:: Section Page 01 of 12 2 INTRODUCTION Purpose & Application Nodes and Corridors have been identified as key intensification

More information

Lower Merion Commercial Districts Issues and Characteristics Handbook November 2013

Lower Merion Commercial Districts Issues and Characteristics Handbook November 2013 Lower Merion Commercial Districts Issues and Characteristics Handbook November 2013 DRAFT TOWNSHIP-WIDE VISION: To maintain and enhance commercial areas to complement the surrounding high-quality residential

More information

Reconstruction Project. Wayzata Task Force Meeting September 3, 2009

Reconstruction Project. Wayzata Task Force Meeting September 3, 2009 CSAH 101 Reconstruction Project Wayzata Task Force Meeting September 3, 2009 Agenda 700 7:00 Re-Introductions ti 7:05 2008 Activity Recap / 2009 Activities-to-date 7:10 Discussion of Layout Revisions (per

More information

Design Guidelines and Standards for Sight Triangles. Sight Triangle MANUAL

Design Guidelines and Standards for Sight Triangles. Sight Triangle MANUAL Design Guidelines and Standards for Sight Triangles Sight Triangle MANUAL Table of Contents 1.0 Introduction..............................................7 1.1 Key Terms..............................

More information

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons West Dennis Center: Bass River to Old Main Street West Dennis Business District: Old Main Street to Dennis Commons Dennisport Center: Dennis Commons to Division Street Main Street Project Goals Project

More information

Johnson Street Bridge Public Realm Update

Johnson Street Bridge Public Realm Update Johnson Street Bridge Public Realm Update August 20, 2015 Background Johnson Street Bridge Replacement Project impacts a diverse range of stakeholders In addition to a new bridge, the project also includes

More information

CHAPTER 8. Mrs. Zimman s Class - Central Elementary

CHAPTER 8. Mrs. Zimman s Class - Central Elementary SUSTAINABILITY CHAPTER 8 Mrs. Zimman s Class - Central Elementary 8.1 OVERVIEW Green infrastructure also known as low impact development (LID) and environmental or sustainable site design is an environmentally

More information

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. Mixed-use and infill development should maintain or enhance

More information

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Potential Green Infrastructure Strategies May 6, 2015 Workshop Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National

More information

Landscape and Streetscape Design 2.5

Landscape and Streetscape Design 2.5 Landscape and Streetscape Design 2.5 2.5.1 Goals 2.5.2 Planting 2.5.3 Sidewalks and Pavement 2.5.4 Furnishings 2.5.5 Walls 2.5.6 Lighting 2.5.7 Stormwater 2.5.8 Street Cross Sections 2.5 LANDSCAPE AND

More information

Bethlehem Pike Streetscape Master Plan

Bethlehem Pike Streetscape Master Plan Bethlehem Pike Streetscape Master Plan Prepared for Springfield Township October 2008 By Michael Baker Jr., Inc. Carter Van Dyke Associates Table of Contents 1. Introduction 3 2. General Corridor Wide

More information

Corridor Enhancements

Corridor Enhancements Corridor Enhancements Safety is MoDOT s first priority in widening and rebuilding I-70 across the state of Missouri. MoDOT also understands that the interstate - and its interchanges and overpasses - are

More information

Gas Stations ottawa.ca

Gas Stations ottawa.ca Urban Design Guidelines for Gas Stations ottawa.ca Ce document est disponible en français sur ottawa.ca. This document is available in French on ottawa.ca. Approved by City Council May 24, 2006 City of

More information

GUIDELINES WESTON LOCATION: URBAN DESIGN GUIDELINES

GUIDELINES WESTON LOCATION: URBAN DESIGN GUIDELINES Development in the Weston area will be consistent with the following urban design guidelines. The guidelines correspond to Site and Area Specific Policies 45, 46, 47, 48, 49, 51, 52 and 232 in Chapter

More information

3.0 master plan concept

3.0 master plan concept 3.0 master plan concept 3.1 introduction The purpose of the Huron Church Road Master Plan Concept is to provide an overview of the Master Plan design process, identify preliminary streetscape installations

More information

Project Consulting Team:

Project Consulting Team: THE DOWNTOWN CHERRYVILLE LAND USE + STREETSCAPE MASTER PLAN WAS FUNDED THROUGH THE GENEROUS DONATIONS OF THE FOLLOWING: The Community Foundation of Gaston County ElectriCities of North Carolina The Cherryville

More information

WELCOME and introduction

WELCOME and introduction 1 WELCOME and introduction Mobility Hub Locations within Burlington STUDY OVERVIEW STUDY OBJECTIVES The City of Burlington is developing four Area Specific Plans, one for each of Burlington s Mobility

More information

Purpose of Open House #3

Purpose of Open House #3 Public Meeting #3 May 9, 2009 MVVA Team Purpose of Open House #3 The main purpose of this Open House is to present and seek input on the: Evaluation of transportation and infrastructure design alternatives

More information

Public Meeting #3 May 9, 2009 MVVA Team

Public Meeting #3 May 9, 2009 MVVA Team Public Meeting #3 May 9, 2009 MVVA Team Welcome to the third Public Meeting for the Lower Don Lands Municipal Class Environmental Assessment (EA) Infrastructure Master Plan and Keating Channel Precinct

More information

ROME WATERFRONT VILLAGE PROJECT NARRATIVE January 25, 2018

ROME WATERFRONT VILLAGE PROJECT NARRATIVE January 25, 2018 January 25, 2018 The Rome Waterfront Village project is intended to foster the revitalization of the area between South James Street and Erie Boulevard north of the Erie Canal as well as improve public

More information

Recreational Pathway Crossing of Richmond Street Municipal Class Environmental Assessment. Public Information Centre #2 April 22, 2015

Recreational Pathway Crossing of Richmond Street Municipal Class Environmental Assessment. Public Information Centre #2 April 22, 2015 Recreational Pathway Crossing of Richmond Street Municipal Class Environmental Assessment Public Information Centre #2 April 22, 2015 1. Study Process PHASE 1 PHASE 2 PHASE 3 PHASE 1 : Problem/Opportunity

More information

Toronto Complete Streets Guidelines

Toronto Complete Streets Guidelines Toronto Complete Streets Guidelines 108 110 7.1 Green Infrastructure Design Principles 112 7.2 Context-Sensitive Green Streets 114 7.3 Key Green Street Elements Green infrastructure refers to natural and

More information

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN LEGAL PROPERTY DESCRIPTION SEE NOTES SHEET FOR LEGAL PROPERTY DESCRIPTIONS THE CITY OF PLEASANT RIDGE GAINSBORO PARK IMPROVEMENT PROJECT CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN 4444 Second Avenue

More information

Wayfinding. North Gateway: Integrate a vertical gateway marker on the west side of Ward Street at the south corner of Vernon Street.

Wayfinding. North Gateway: Integrate a vertical gateway marker on the west side of Ward Street at the south corner of Vernon Street. 3.3.6.2 Wayfinding Existing Conditions Wayfinding signage is important to direct visitors and tourists to different locations in the downtown. A significant part of the wayfinding signage in the downtown

More information

Heritage Road Improvements from Steeles Avenue to Rivermont Road

Heritage Road Improvements from Steeles Avenue to Rivermont Road The Corporation of the City of Brampton Heritage Road Improvements from Steeles Avenue to Rivermont Road Class Environmental Assessment Study (Schedule C) September 19, 2013 The Corporation of the City

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES 01050-1 Construction Surveying 1 LS 01500-1 Temporary Fences & Barricades 1,500 LF 02600-1 Shoring, Cofferdam, Temp. Sheeting, & Dewatering 1 LS 01565-1 Storm Drainage & Erosion Sediment Control 1 LS 01565-2

More information

PROPOSED REDEVELOPMENT OF THE GLEN ABBEY GOLF CLUB. STREETSCAPE DESIGN STUDY (excerpt from the Urban Design Brief) TOWN OF OAKVILLE.

PROPOSED REDEVELOPMENT OF THE GLEN ABBEY GOLF CLUB. STREETSCAPE DESIGN STUDY (excerpt from the Urban Design Brief) TOWN OF OAKVILLE. PROPOSED REDEVELOPMENT OF THE GLEN ABBEY GOLF CLUB STREETSCAPE DESIGN STUDY (excerpt from the Urban Design Brief) TOWN OF OAKVILLE OCTOBER, 2016 for 2.4.2 STREETS Streets are the single largest component

More information

Today We re Talking About:

Today We re Talking About: Today We re Talking About: 4 Street S.E. to Highfield 160 AVENUE N Station (Above Grade and 144 AVENUE N At Grade Stations) NORTH POINTE 4 Street S.E. in the Beltline TUSCANY 96 AVENUE N BEDDINGTON SADDLETOWNE

More information

appendix and street interface guidelines

appendix and street interface guidelines appendix five: building and street interface guidelines appendix 5 building and street interface guidelines BOULEVARDS Boulevards are generally characterized by higher levels of traffic movement at higher

More information

Westwood Shopping Center Sketch Plan, Plan # February 23, 2017 Item # 9

Westwood Shopping Center Sketch Plan, Plan # February 23, 2017 Item # 9 Westwood Shopping Center Sketch Plan, Plan # 320170010 February 23, 2017 Item # 9 Westwood II Site 64,111 s.f. Manor Care site: vacant two story building HOC-Westwood Towers, 15 story tower To be considered

More information

Century Park to Ellerslie Road Preliminary Engineering

Century Park to Ellerslie Road Preliminary Engineering Century Park to Ellerslie Road Preliminary Engineering South LRT Extension Stakeholder Information Panel Brochure March 2010 www.edmonton.ca/lrtprojects LRT Station (left) and Transit Centre Architectural

More information

2.5 Roads. Loading and service areas adjacent to Highway 401 should be screened through architectural walls and/or landscape buffer planting.

2.5 Roads. Loading and service areas adjacent to Highway 401 should be screened through architectural walls and/or landscape buffer planting. N HIGHWAY OFF RAMP 2.5 Roads A legible road network with a clear hierarchy will help create a connected community, both within and surrounding the Milton Heights. The following section outlines the proposed

More information

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre Main Street Reconstruction From Ninth Line to Stouffer Street Town of Whitchurch-Stouffville Public Information Centre November 23, 2016 4:30 to 6:00 pm & 7:00 to 8:00 pm 6240 Main Street, Stouffville

More information

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project

More information

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015 St. Laurent Transit Improvements Innes / Industrial to Smyth Public Information Session December 2, 2015 Agenda Introduction Project Background Preliminary Design Widening for transit lanes Roadway resurfacing

More information

Portage Parkway Environmental Assessment Public Information Centre No. 1

Portage Parkway Environmental Assessment Public Information Centre No. 1 City of Vaughan Portage Parkway Environmental Assessment Public Information Centre No. 1 November 25, 2015 Welcome to the Public Information Centre This first Public Information Centre (PIC) introduces

More information

Toronto Complete Streets Guidelines

Toronto Complete Streets Guidelines c. DTAH 58 60 3.1 70 3.2 Performance Measurement 71 3.3 Exceptions Chapter 3 describes the five general steps in the street design process. Not all projects follow these steps, as the number of steps and

More information

Lansing s Moores River Drive Regional Network Trail project extended the Lansing River Trail system to Waverly Road, and also included bike lane

Lansing s Moores River Drive Regional Network Trail project extended the Lansing River Trail system to Waverly Road, and also included bike lane Lansing s Moores River Drive Regional Network Trail project extended the Lansing River Trail system to Waverly Road, and also included bike lane striping on W. Mount Hope Avenue. The boulevard on Moores

More information

Conceptual Design. Main Street Enhancement and Extension Project. Bothell, Washington. June 11, 2009

Conceptual Design. Main Street Enhancement and Extension Project. Bothell, Washington. June 11, 2009 Conceptual Design Main Street Enhancement and Extension Project Bothell, Washington June 11, 2009 Berger/ABAM Engineers and Cascade Design Collaborative, Inc For Main Street Bothell to succeed it must

More information

THE CORPORATION OF THE CITY OF VAUGHAN MAJOR MACKENZIE STREETSCAPE STUDY

THE CORPORATION OF THE CITY OF VAUGHAN MAJOR MACKENZIE STREETSCAPE STUDY THE CORPORATION OF THE CITY OF VAUGHAN MAJOR MACKENZIE STREETSCAPE STUDY STANTEC CONSULTING LTD. 300-675 Cochrane Drive, West Tower Markham, ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889 April 2010

More information

Lambeth Main Street Streetscape Improvements

Lambeth Main Street Streetscape Improvements Lambeth Main Street Streetscape Improvements Open House October 5th, 2017 Agenda 1. Introduction 2. Project Background 3. Context 4. Project Objectives 5. Design Principles & Approach 6. Streetscape Design

More information

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017 PIKE PINE RENAISSANCE: ACT ONE October 19, 2017 WATERFRONT SEATTLE PROGRAM PROJECT INTRODUCTION Pike and Pine streets, between First and Melrose avenues Pedestrian and streetscape improvements Budget:

More information

Update. What is the Osborne Bridge Rehabilitation project all about and how is it being planned? Neighbourhood Advisory Committee (NAC)

Update. What is the Osborne Bridge Rehabilitation project all about and how is it being planned? Neighbourhood Advisory Committee (NAC) Update JANUARY 2010 Neighbourhood Advisory Committee (NAC) ARTS AND CULTURE Gas Station Theatre BUSINESS Osborne Village BIZ Downtown BIZ COMMERCIAL PROPERTY OWNER Great-West Life COMMUNITY ORGANIZATIONS

More information

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies Vision, Objectives & Strategies The is the public framework and guide for future development of the Grand Traverse Commons. The establishes public polices for infrastructure, the preservation of natural

More information

A. INTRODUCTION B. PREFERRED ALTERNATIVE

A. INTRODUCTION B. PREFERRED ALTERNATIVE Chapter 2: Project Alternatives A. INTRODUCTION This chapter presents the Preferred Alternative (also referred to throughout this Environmental Assessment [EA] as the Wyandanch Intermodal Transit Facility

More information

PLANNING RATIONALE FOR THE PROPOSED RIVERSIDE SOUTH ELEMENTARY SCHOOL 715 BRIAN GOOD AVENUE, OTTAWA, ON

PLANNING RATIONALE FOR THE PROPOSED RIVERSIDE SOUTH ELEMENTARY SCHOOL 715 BRIAN GOOD AVENUE, OTTAWA, ON PLANNING RATIONALE FOR THE PROPOSED RIVERSIDE SOUTH ELEMENTARY SCHOOL 715 BRIAN GOOD AVENUE, OTTAWA, ON Conseil des écoles publiques de l'est de l'ontario (CEPEO) French Public School Board TABLE OF CONTENTS

More information

Preferred Riverwalk Alternative Components August 17, 2017:

Preferred Riverwalk Alternative Components August 17, 2017: Preferred Riverwalk Alternative Components August 17, 2017: 1. Entrance and Future Pump Station Location: Entrance location to line up with main parking entrance to Captain Parkers and allows future Pump

More information

CHAPTER 5 Public Realm Improvements

CHAPTER 5 Public Realm Improvements 5.1 OVERVIEW This chapter focuses on the public realm, that is, spaces within and directly adjacent to public rights-of-way (ROWs), including streets, Oso Creek, the rail corridor, and the freeway edge.

More information

Victoria Bridge Municipal Class EA Civic Works Committee

Victoria Bridge Municipal Class EA Civic Works Committee Municipal Class EA John Pucchio, P. Eng., Project Manager June 19 2018 Introduction Existing Conditions Municipal Class EA Proposed Bridge Proposed Road Reconstruction Proposed Improvements Construction

More information

Mary Hills Nature Area. Roadway Lighting. The Minneapolis Clinic of Neurology Courage Kenny Rehabilitation Institute

Mary Hills Nature Area. Roadway Lighting. The Minneapolis Clinic of Neurology Courage Kenny Rehabilitation Institute PUBLIC REALM IMPROVEMENTS Mary Hills Nature Area Enhanced Programming Glenview Terrace Valley View Roadway Lighting Enhanced Streetscape Trail Lighting / Roadway Lighting Wayfinding Public Art The Minneapolis

More information

Public input has been an important part of the plan development process.

Public input has been an important part of the plan development process. Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the

More information

Whitemarsh Comprehensive Plan Update: Housing & Land Use. Public Workshop #3: September 20, 2018

Whitemarsh Comprehensive Plan Update: Housing & Land Use. Public Workshop #3: September 20, 2018 Whitemarsh Comprehensive Plan Update: Housing & Land Use Public Workshop #3: September 20, 2018 Agenda Welcome Process Recap What We ve Heard The Plan Framework Review of Recommended Actions Land Use Housing

More information

Tel: (705) Fax: (705)

Tel: (705) Fax: (705) 521 and 525 Essa Road City of Barrie Tel: (705) 812-3281 Fax: (705) 812-3438 Email: INFO@IPSCONSULTINGINC.com 1 5 0 D U N L O P S T R E E T E A S T, S U I T E 2 0 1, B A R R I E O N T A R I O L 4 M 1 B

More information

Community Design Guidelines. Port Wallace DRAFT

Community Design Guidelines. Port Wallace DRAFT Community Design Guidelines Port Wallace DRAFT Energy 1 2 3 Nature Movement Connections Built Form DRAFT Layout Energy 1 Nature Community Design Guidelines GREAT COMMUNITIES PROTECT, CELEBRATE, AND CONSERVE

More information

Elgin O Hare Western Access Project Local Advisory Committee. February 10, 2014

Elgin O Hare Western Access Project Local Advisory Committee. February 10, 2014 Elgin O Hare Western Access Project Local Advisory Committee February 10, 2014 Agenda Project status update Design and construction Funding Aesthetics Project events and outreach Land acquisition Next

More information

Commissioners Road West Realignment Environmental Assessment

Commissioners Road West Realignment Environmental Assessment City of London Commissioners Road West Realignment Environmental Assessment Public Information Centre No. 2 November 29, 2017 Welcome to the Public Information Centre This 2 nd Public Information Centre

More information

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary New York Avenue Streetscape and Trail Project Public Meeting #1 Summary I. King Jordan Student Academic Center (SAC) Gallaudet University, Washington, DC February 23, 2017 Table of Contents 1.0 Introduction...

More information

Bel-Air Lexus Automobile Service Station

Bel-Air Lexus Automobile Service Station Bel-Air Lexus Automobile Service Station Design Brief 443-447 McArthur Avenue Ottawa April 30, 2015 14-1299-MCA Site Details Application: Site Plan Control Legal Description and Municipal Addresses: 443

More information

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment Urban Design Brief Proposed Official Plan & Zoning By-Law Amendment 3244, 3263 and 3274 Wonderland Road South Southside Group December 23, 2015 TABLE OF CONTENTS Page No. INTRODUCTION... 1 SECTION 1 LAND

More information

Commercial Development Permit Area

Commercial Development Permit Area City of Kamloops KAMPLAN Commercial Development Permit Area PURPOSE The purpose of this Development Permit Area (DPA) is to establish objectives and provide guidelines for the form and character of commercial

More information

Ref. Proposed Change Advantages/Disadvantages Other Implications Status/Recommendation Adelaide Street West, Toronto, M5H 1T1

Ref. Proposed Change Advantages/Disadvantages Other Implications Status/Recommendation Adelaide Street West, Toronto, M5H 1T1 memo To Cc From David Mack Date 01 March 2011 Updated 18 March 2011 Project Hamilton Rapid Transit B-Line Project 22249801 Subject Post Consultation Alignment Changes This note sets out a number of possible

More information

Maplewood Avenue Downtown Complete Street Project

Maplewood Avenue Downtown Complete Street Project Maplewood Avenue Downtown Complete Street Project Second Public Meeting January 24, 2018 Welcome and Introduction of Project Team City Planning and Public Works Staff City of Portsmouth Juliet Walker Planning

More information

Key Moves in the Plan

Key Moves in the Plan Key Moves in the Plan 2 Add housing that fits the neighbourhood s character Make it easier to leave the car behind Oak Bay Avenue Village plan to be completed in future planning process Future active transportation

More information

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN ELMVALE ACRES SHOPPING CENTRE MASTER PLAN Contents 1.0 INTRODUCTION... 2 2.0 LOCATION... 2 3.0 EXISTING CONTEXT... 2 4.0 VISION & GUIDING PRINCIPLES... 2 5.0 LAND USE AND BUILT FORM... 4 5.1 St. Laurent

More information

(DC1) Direct Development Control Provision DC1 Area 4

(DC1) Direct Development Control Provision DC1 Area 4 . General Purpose (DC) Direct Development Control Provision DC Area 4 The purpose of this Provision is to provide for an area of commercial office employment and residential development in support of the

More information

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016 FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 2 June 16, 2016 ACCESSIBILITY Under the Accessibility Standards 2015 for

More information

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B

More information

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA 1 1 Purpose of Public Information Centre #2 To provide interested and/or potentially affected stakeholders with an opportunity to participate in the planning and decision-making process for this Municipal

More information

BEST PRACTICES: PARKING MANAGEMENT & DESIGN

BEST PRACTICES: PARKING MANAGEMENT & DESIGN BEST PRACTICES: PARKING MANAGEMENT & DESIGN Planning for Parking December 2015 The provision of parking is an essential part of planning and site design. However, parking is often associated with negative

More information

lot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site

lot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site Commercial General Commercial Objectives Create developments compatible with adjacent land uses in scale, function and character Define a consistent and attractive street edge with quality landscaping,

More information

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways Welcome to Pubic Information Centre #1 Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways Welcome to Open House # 1 Tonight, we invite you to.

More information

11.5 Kipling Avenue Corridor Secondary Plan

11.5 Kipling Avenue Corridor Secondary Plan 11.5 Kipling Avenue Corridor Secondary Plan ADOPTED BY VAUGHAN CITY COUNCIL NOT YET APPROVED BY THE ONTARIO MUNICIPAL BOARD 11.5.1 Development Principles and Objectives The following principles support

More information

South Yonge Street Corridor

South Yonge Street Corridor South Yonge Street Corridor Streetscape Master Plan Study Draft Final Report Phase 3: Streetscape Master Plan and Pre-Subway Plan May 2011 Prepared by: In Partnership with: South Yonge Street Corridor

More information

Design Considerations

Design Considerations Essential to the development of a successful Master Plan for the Park Complex is input from the community that the park will serve. The community outreach component of the planning process included numerous

More information

St. Clair Avenue West Area Transportation Master Plan

St. Clair Avenue West Area Transportation Master Plan 1 (Between Keele Street and Old Weston Road) Public Information Centre 1 December 2, 2015 2 Welcome Welcome to the first Public Information Centre for the St. Clair Avenue West Area. The panels will present

More information

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING Subject: Recommendation Prepared by: PRELIMINARY DESIGN REVIEW OF LOCUST STREET BRIDGE CONSTRUCTION & COURT AVENUE,

More information

Parapet/Formliner/Fencing

Parapet/Formliner/Fencing Parapet/Formliner/Fencing Cross Parapet/Formliner/Fencing Street Aesthetic Features Context The I-290 Phase I study is evaluating improvements along 13 miles of the Eisenhower Expressway, from west of

More information

FDOT D4 Complete Streets

FDOT D4 Complete Streets FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,

More information

The West Vaughan Employment Area Secondary Plan Policies

The West Vaughan Employment Area Secondary Plan Policies Part 2: The West Vaughan Employment Area Secondary Plan Policies 2.1 General Policies It is the policy of Council: 2.1.1. That the West Vaughan Employment Area (the WVEA), identified on Schedule 1, will

More information

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY PUBLIC INFORMATION MEETING #2 October 12, 2016 LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY AGENDA 5:00 to 5:30pm: Open House 5:30 to 6:15pm: Presentation 6:15 to 7:00pm: Individual paced workshop with

More information

Preliminary Sketch Plan for Fort Hunter Park

Preliminary Sketch Plan for Fort Hunter Park Preliminary Sketch Plan for Fort Hunter Park Public Presentation November 19, 2009 Dauphin County Parks and Recreation 100 Fort Hunter Road Harrisburg, PA 17110 (717) 599-5188 www.dauphinc.org THOMAS COMITTA

More information

The Project. In 2013, construction was completed between 100 Street and 102 Street.

The Project. In 2013, construction was completed between 100 Street and 102 Street. The Project Jasper Avenue New Vision (JANV) is a major catalyst project identified in the Capital City Downtown Plan (2010) between 92 Street and 109 Street, including the streets half a block north and

More information

3.13. Development Guidelines

3.13. Development Guidelines 3.3 Landscaping Elements Landscaping should be used to frame and soften structures, define site functions, enhance the quality of the environment, and screen undesirable views. Safety, environmental impacts,

More information

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases. I-95 Avenue Interchange Project Status Construction is underway for Phase 3. Overall Project Area and Schedule Phase 0: Completed 2010 Section GR0: Completed in Fallin 2010 Phase 2: Completed Section GR2:

More information

Glenn Highway MP DSR. Landscape Narrative

Glenn Highway MP DSR. Landscape Narrative Glenn Highway MP 34-42 DSR Landscape Narrative Project Landscape Goals The Glenn Highway MP 34-42 Project extends through a variety of landscape types typical to the Matanuska-Susitna Valley. In general,

More information

AGENDA ACTION ITEMS INFORMATION ITEMS

AGENDA ACTION ITEMS INFORMATION ITEMS NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION

More information

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access Welcome Thank you for coming this evening. Agenda PART I - Project Context The Downtown Revitalization Program Our DRI Projects Other

More information

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework Welcome Community Consultation Meeting November 28, 2016 Why Are We Here Today? Review and discuss the Bathurst Quay Neighbourhood Plan Framework Review and discuss an Action Plan for Implementation Next

More information