1 Kenilworth Avenue and Town of Cheverly Industrial Study Briefing The Maryland-National Capital Park and Planning Commission Prince George s County Planning Department Vanasse Hangen Brustlin, Inc. March 13, 2014 October 10, 2013
2 Agenda Introduction / Purpose of the Study Market Analysis Case Study Economic Implementation Strategies Concept Plan Key Area Strategies and Illustrative Concepts Conclusion / Next Steps * Note: All concepts shown are for illustration only
3 Introduction Prince George s County Planning Department - M-NCPPC Zunilda Rodriguez, Project Leader Sam White, Team Member Teri Bond, Project Facilitator Consultant Team (VHB / BAE Urban Economics) Paul Moyer- Project Manager Kevin Keeley Planner Dan Lovas Transportation Planning Geoffrey Morrison-Logan -Urban Design David Smith Environmental Nancy Fox Market Assessment
4 Purpose of the Study Assess current uses and economic performance Analysis of existing infrastructure, circulation and visual character Consider environmental conditions and opportunities for improvement Determine if and how these areas can be positioned to meet future needs and relate to adjacent areas Goal of the study is to evaluate and strategies that support recommendations identified during this process
5 Study Area 888 acres including all public right-of-ways Divided by US 50, BW Parkway Regional open space / river - Anacostia Wide range of existing uses Cheverly Metrorail station CSX rail line
6 Summary of Strengths and Challenges Strengths Visibility from and access to US 50 and MD 295, Baltimore Washington Parkway Freight rail lines Access to transit High existing building occupancy Some good quality buildings Proximity to planned Anacostia River Trail Challenges Extensive areas impacted by floodplain and wetlands High percentage of impervious areas Limited stormwater management facilities Poor visual quality Challenging circulation in some areas Lack of continuous pedestrian facilities Lack of buffers between industrial and residential uses
7 Market Analysis: Supply and Demand Modest demand for close-in industrial space County s share of PDR space at the region s core is growing County is absorbing new industrial space at region s core Rent levels are low compared to Northern VA 1,500,000 1,000, , ,000-1,000,000 Total Net Absorption, Inner Beltway Industrial Space, Study Area Source: CoStar, 2013; BAE, 2013 Prince George's Montgomery Washington, DC Northern VA Maryland Comparison of Prince George's County $7.02 Average Asking Rents Cheverly/Hyattsville $6.24 Landover/Largo $9.00 Warehouse/ Lanham $6.75 Manufacturing Space Montgomery County $6.90 Q Northern VA Alexandria $9.60 Annual rent per square foot, NNN Arlington County $10.00 Sources: CBRE; BAE, 2013 Fairfax County $11.69
8 Market Analysis: Supply and Demand Production, Distribution and Repair (PDR) uses Support a broad range of industries and economic activity Seek proximity to region s center Current demand drivers Construction Wholesale trade Goods production and distribution Material recovery
9 Market Analysis: Land Use Opportunities New ways to think about industrial space and making things Creative and innovative Entrepreneurial More diverse mix of commercial uses and amenities Retail and services Compatible with existing PDR users
10 Market Analysis: Land Use Opportunities Retail development Demand from nearby residents and workers could support additional retail Traffic and visibility spurs demand Higher rents for retail space more supportive of conversion and new construction. Supply an amenity base that can strengthen area Estimated Demand from Resident and Worker Captured Expenditures Spending Category Estimated Range of Supportable Square Footage Low High Foodservice & Drinking Places 13,000 22,000 Food & Beverage Stores 18,000 42,000 Health and Personal Care Stores 6,000 17,000 Building Material, Garden & Equipment Stores 7,000 13,000 Total, Select Retail Categories 44,000 94,000 Sources: Claritas/Neilsen; ICSC; BAE, 2013.
11 Market-Based Revitalization Concepts Targeted interventions to leverage existing strengths: create fertile ground for reinvestment Short term, temporary use opportunities Work with the area s industrial character Collaboration among businesses, residents and government
12 Economic Development: Implementation Foster collaboration among businesses, residents, government Provide opportunities/platform for businesses to engage with residents and with one another Increase recognition of area s value Work toward shared solutions to common issues (environmental, aesthetics) Build connections Broaden marketing opportunities
13 Economic Development: Implementation Facilitate development of diverse offering of activities Modern industrial activities to complement existing industrial uses Based on strong ties with area businesses Activities compatible with PDR area Targeted, manageable efforts that focus on Placemaking Activities that promote new business development Partnerships with higher education, research and development, environmental organizations
14 Economic Development: Implementation Encourage incremental change while protecting long term property value Promote temporary uses with underutilized buildings and land Work with area businesses to identify and implement practices that preserve or enhance the area s aesthetics and natural assets
15 Case Study Port Richmond Industrial Development Enterprise (PRIDE) Overview Business improvement district 150 acres, 55 businesses in Northeast Philadelphia Funded by grants and special assessment Organized and facilitated by urban industry initiative of local government Results: millions in new investment, improved security, strengthened relationships, business retention Lessons Learned Impact catalyzed by early institutional support, and magnified by involvement in broader industrial initiatives Shared interests with nearby residential community Organizing allows the community to more effectively seek resources Benefits must be worth additional assessment
16 Suggested Generalized Land Use Plan 1 Encourage redevelopment of Key Opportunity Sites 2 Support high quality light industrial uses 3 Allow for ongoing industrial uses with planned future conversion 4 Actively encourage mixeduse redevelopment in areas near Metrorail station * Note: All concepts shown are for illustration only
17 Suggested Land Use Commercial / Retail Redevelopment Mixed Commercial / Light Industrial On-going industrial future conversion as appropriate Support on-going high quality light industrial uses Continue to support mixed-use redevelopment near Metrorail Strengthen housing / minimize industrial conflicts * Note: All concepts shown are for illustration only
18 Suggested Streetscape and Road Improvements Implement Complete Streets where feasible Kenilworth Avenue Tuxedo Road 52 nd Avenue Study ramp configuration for truck access Improve access to MD 201 * Note: All concepts shown are for illustration only
19 Bike and Trail Network Implement Anacostia Trail Access Study plan Improve bike / pedestrian circulation in study area Provide future connection to the north to Cheverly Euclid park Improve Columbia Park Bridge and metro to support pedestrian access * Note: All concepts shown are for illustration only
20 Existing 52 nd / Kenilworth Focus Area * Note: All concepts shown are for illustration only
21 Potential 52 nd / Kenilworth Focus Area Strategies Incorporate bike lanes on 52 nd Ave. Pedestrian improvements at Lawrence and Kenilworth Create visual focus and 52 nd and Kenilworth with retail and commercial development Incorporate bio-retention areas at key locations * Note: All concepts shown are for illustration only
22 Potential Streetscape Improvements Before View of 52 nd Avenue from Kenilworth Avenue After * Note: All concepts shown are for illustration only
23 Existing Kenilworth Junction Focus Area * Note: All concepts shown are for illustration only
24 Potential Kenilworth Junction Focus Area Strategies Stream restoration and Trail Streetscape Improvements Retail / Commercial Frontage Bike Lanes * Note: All concepts shown are for illustration only
25 Possible Roadway Circulation Modifications in Kenilworth Junction Focus Area Existing Road Configuration Potential Road Configuration * Note: All concepts shown are for illustration only
26 Potential Streetscape Improvement Strategies in Kenilworth Junction Area Before View of Frolich Lane toward Kenilworth Avenue After * Note: All concepts shown are for illustration only
27 Potential Streetscape Improvement Strategies in Kenilworth Junction Area Before View of Tuxedo Road from Kenilworth Avenue After * Note: All concepts shown are for illustration only
28 Next Steps Revised recommendations based on stakeholder feedback Prepare Draft and Final Report Contact: Zunilda Rodriguez, Planning Coordinator (301) Project Website -
A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN
A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN Public Meeting October 2016 1 Plan Summary and Discussion Public Meeting May 4 2017 City of Brockton Bill Carpenter, Mayor Department of Planning
More informationBROOKLYN PARK / 85TH AVE LRT STATION CDI DEVELOPMENT GUIDELINES DRAFT
August 2018 Page intentionally left blank The Brooklyn Park Library adjacent to the 85th Ave LRT Station Area. OVERVIEW The Blue Line LRT Extension / Bottineau corridor offers a unique opportunity to leverage
More informationMONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE
MONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE Shady Grove Metro Station Area Charrette Closing Presentation October 25-28, 2000 MONTGOMERY COUNTY, MD M-NCPPC Design Collective, Inc. Architects
More informationRECOMMENDED GOALS, CONCEPTS, GUIDELINES PUBLIC PARTICIPATION PROGRAM
2015 RECOMMENDED GOALS, CONCEPTS, GUIDELINES PUBLIC PARTICIPATION PROGRAM THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION PRINCE GEORGE S COUNTY PLANNING DEPARTMENT SEPTEMBER 24, 2015 INTRODUCTION
More informationPrince George s County Economic Development Corporation David Iannucci President & CEO
Prince George s County Economic Development Corporation David Iannucci President & CEO WBC REGIONAL ECONOMIC DEVELOPMENT FORUM THE FUTURE OF PRINCE GEORGE S COUNTY Wednesday, March 6, 2019 Why Prince George
More informationROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES
August 2018 OVERVIEW The City of Robbinsdale has a prime-opportunity site in the middle of the 13 mile stretch of the Bottineau LRT corridor / Blue Line extension. Robbinsdale offers a prominent, vital,
More informationAt first Work Session on October 22, At second Work Session on November 19, At third Work Session on December 3, 2015
At first Work Session on October 22, 2015 Staff Reviewed Infrastructure: Transportation Capacity School Capacity Willett Branch Proposed Staging Language At second Work Session on November 19, 2015 Land
More informationCity of Le Sueur DOWNTOWN MASTER PLAN
City of Le Sueur DOWNTOWN MASTER PLAN City Council Update 9/11/2017 Hoisington Koegler Group Inc. Presentation Agenda 01 Schedule Update / Tonight s Objectives 02 What We ve Heard - Engagement Comments
More informationPreliminary Recommendations Tk Takoma/Langley Crossroads Sector Plan
Preliminary Recommendations Tk Takoma/Langley Crossroads Sector Plan Vision is to achieve a Transit Oriented, pedestrian friendly Community that Celebrates and builds upon the cultural Diversity of the
More informationRio/29 Small Area Plan. Design Plan & Implementation Framework Open House - January 25, 2018
Rio/29 Small Area Plan Design Plan & Implementation Framework Open House - January 25, 2018 MEETING PURPOSE PRESENTATION 1. Orient to the updated design plans 2. Introduce implementing options 3. Explain
More informationJANUARY 19, 2011 CENTRAL AVENUE-METRO BLUE LINE TRANSIT-ORIENTED DEVELOPMENT IMPLEMENTATION PROJECT COMMUNITY FORUM
CENTRAL AVENUE-METRO BLUE LINE TRANSIT-ORIENTED DEVELOPMENT IMPLEMENTATION PROJECT COMMUNITY FORUM JANUARY 19, 2011 THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION PRINCE GEORGE S COUNTY PLANNING
More informationFOUR MILE RUN VALLEY WORKING GROUP AND CHARGE
FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE Adopted April 16, 2016 Amended July 19, 2016 Overview of Integrated Effort The overall goal of the Four Mile Run Valley (4MRV) initiative is to develop a comprehensive
More informationANC 2A Presentation. November 9, 2006
ANC 2A Presentation November 9, 2006 Introduction & Overview Applicants Boston Properties and KSI Services (project developers) The George Washington University (land owner) 2.66 acre site (former GW hospital
More informationTransportation Working Team Duane Diggs, Co-Chair (VOICE Buffalo) Kelly Dixon, Co-Chair (GBNRTC) Paul Ray, Facilitator (UB Regional Institute)
towards a more sustainable Buffalo Niagara Transportation Working Team Duane Diggs, Co-Chair (VOICE Buffalo) Kelly Dixon, Co-Chair (GBNRTC) Paul Ray, Facilitator (UB Regional Institute) Agenda Welcome,
More informationPreliminary Port Towns Sector Plan and Proposed Sectional Map Amendment March 2009
Preliminary Port Towns Sector Plan and Proposed Sectional Map Amendment March 2009 BLADENSBURG u COLMAR MANOR u COTTAGE CITY u EDMONSTON The Maryland-National Capital Park and Planning Commission Prince
More informationINDEPENDENCE BOULEVARD AREA PLAN
INDEPENDENCE BOULEVARD AREA PLAN Public Meeting October 28, 2008 Tonight s Agenda Introduction 4:00 4:05 Tom Warshauer Presentation 4:05 5:00 Blake Drury Group Exercises 5:00 5:50 All Wrap Up & Next Steps
More informationStudy Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project
Olympia, WA: Greening Capitol Way Supporting Communities move towards sustainability is a priority for the federal government. A Greening America s Capitals Project Office of Sustainable Communities U.S.
More informationThe West Vaughan Employment Area Secondary Plan Policies
Part 2: The West Vaughan Employment Area Secondary Plan Policies 2.1 General Policies It is the policy of Council: 2.1.1. That the West Vaughan Employment Area (the WVEA), identified on Schedule 1, will
More informationRobbinsdale LRT Station. CDI Development Guidelines. August Overview
Robbinsdale LRT Station August 2018 Overview The City of Robbinsdale may have the coolest opportunity site along the 13 mile stretch of the Bottineau LRT corridor / Blue Line extension. Located a block
More informationForeword. Sincerely, Elizabeth M. Hewlett. Approved Sector Plan and Sectional Map Amendment for the Tuxedo Road/Arbor Street/Cheverly Metro Area
Foreword The Prince George s County Planning Board of The Maryland-National Capital Park and Planning Commission (M-NCPPC) is pleased to make available the Approved Sector Plan and Sectional Map Amendment
More informationThe Community and Transportation Linkage Planning Program
The Community and Transportation Linkage Planning Program Sandy Misiewicz, AICP Capital District Transportation Committee Senior Transportation Planner II CSS National Dialog 2 October 1, 2013 Capital
More informationDRAFT Subject to Modifications
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 8 From: Date: Subject: Staff May 19, 2017 Council Meeting Florida Department of Transportation Complete Streets
More information38 Queen s University Campus Master Plan Part 1
38 Queen s University Campus Master Plan Part 1 46 The Campus at the City Scale Chapter 4 The Campus at the City Scale 39 Queen s is an urban University centrally located in Kingston. Decisions made by
More informationThe transportation system in a community is an
7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons
More informationDEPARTURE FROM DESIGN STANDARDS DDS-586
The Maryland-National Capital Park and Planning Commission Prince George s County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.
More informationDanvers High Street I-1 District Study
Danvers High Street I-1 District Study Presentation of Final Recommendations Planning Board Presentation June 26 th, 2018 1 Introductions Metropolitan Area Planning Council Sam Cleaves AICP, Principal
More informationJuly 27, 2016 Parks Operations Bldg. Working Group Meeting #3
July 27, 2016 Parks Operations Bldg. Working Group Meeting #3 Meeting Agenda 7:05 pm Opening Comments 7:10 pm Presentation: Transportation Background 7:30 pm Presentation: Update on Ongoing Projects 8:00
More informationCHAPTER VIII Implementation
CHAPTER VIII Implementation VIII. Implementation The vision for the Marlboro Pike Corridor will require that a variety of participants work together to make it a reality. The following action steps outline
More informationHopkins. Development Guidelines May Overview. Sponsored by: Blake Road Corridor Collaborative City of Hopkins
Hopkins Blake Road LRT Station Area Development Guidelines May 2015 Sponsored by: Blake Road Corridor Collaborative City of Hopkins Overview Hopkins is a dynamic community of over 17,000 residents located
More informationTransportation. Strategies for Action
Transportation A major priority for the Overlake Neighborhood is to develop a multimodal transportation system. To achieve this system, a balance has to be found among travel, circulation and access needs;
More informationScope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan
Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity
More informationCorridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program
1Pursue Minnehaha-Hiawatha Community Works Project Minnehaha-Hiawatha Community Works is a project within the Hennepin Community Works (HCW) program. The mission of the HCW program is to enhance how the
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2 DATE: January 27, 2017 SUBJECT: The Virginia Department of Transportation s Transform I-66 Inside the
More informationGold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan
Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated
More informationImplementation Guide Comprehensive Plan City of Allen
Implementation Guide 2030 Comprehensive Plan City of Allen DRAFT 2015 Implementation Guide Allen 2030 Comprehensive Plan INTRODUCTION The Comprehensive Plan serves as a guide for the growth and development
More informationSubregion 4 Central Avenue-Metro Blue Line Corridor Transit-Oriented Development (TOD) Implementation Project. Community Meeting April 27, 2011
Subregion 4 Central Avenue-Metro Blue Line Corridor Transit-Oriented Development (TOD) Implementation Project Community Meeting April 27, 2011 Overview Introduction to Subregion 4 TOD Implementation Program
More informationTHE 355/270 CORRIDOR:
THE 355/270 CORRIDOR: Strategic Ideas for Sustaining a Livable Work Place Project Summary ACCESS LIFE DESIGN HEALTH WORK Montgomery County Planning Department The Maryland-National Capital Park and Planning
More informationThe Village of Shirlington
The Village of Shirlington Suburban Smart Growth Without Rail Transit July 2018 Agenda History (1940 to present) Attributes and Outcomes Lessons Learned Setting the Stage Arlington County Arlington is
More informationb r a n c h av e n u e tr a n s it co r r i d o r r e vita lization pl a n a m o d el fo r s u b u r ban retro fit
b r a n c h av e n u e tr a n s it co r r i d o r r e vita lization pl a n a m o d el fo r s u b u r ban retro fit P R I N C E G EO RG E S CO U NT Y, M D ADO PTED 0 p R O J E C T C AT E G O R Y : U R B
More informationChapter 1: Introduction
Chapter 1: Introduction The Penn Avenue Community Works Corridor Vision and Implementation Framework presents an integrated communitybased vision and a coordinated, long-term implementation framework for
More informationPRINCE GEORGE S PLAZA TRANSIT DISTRICT DEVELOPMENT PLAN AND TRANSIT DISTRICT OVERLAY ZONE UPDATE
PRINCE GEORGE S PLAZA TRANSIT DISTRICT DEVELOPMENT PLAN AND TRANSIT DISTRICT OVERLAY ZONE UPDATE UNIVERSITY PARK TOWN LISTENING SESSION JUNE 12, 2014 Prince George s County Planning Department The Maryland-National
More informationASPEN HILL Minor Master Plan Amendment
ASPEN HILL Minor Master Plan Amendment Project Briefing Planning Board Agenda Item #7 Andrea Gilles, Area 2 June 5, 2014 Briefing Purpose 1. Follow-up evaluation on Mixed-Use land use in the Minor Amendment
More informationSPRINGHILL LAKE TRANSIT VILLAGE
Greenbelt Metro Area Sector Plan - Subarea Design Policies and Guidelines - Springhill Lake Transit Village 113 SPRINGHILL LAKE TRANSIT VILLAGE Residential Neighborhood and Village Center CONCEPT Springhill
More informationThe Five Components of the McLoughlin Area Plan
The Five Components of the McLoughlin Area Plan This documents contains the complete language of the five components of the McLoughlin Area Plan: The Vision Statement The Values The Guiding Principles
More informationPIKE PINE RENAISSANCE: ACT ONE. October 19, 2017
PIKE PINE RENAISSANCE: ACT ONE October 19, 2017 WATERFRONT SEATTLE PROGRAM PROJECT INTRODUCTION Pike and Pine streets, between First and Melrose avenues Pedestrian and streetscape improvements Budget:
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting October 15, 2005 DATE: September 28, 2005 SUBJECT: Request to Advertise the adoption of the 2005 Clarendon Sector Plan C. M. RECOMMENDATION:
More informationAnimating the Rideau Canal December 2013
Executive Summary Animating the Rideau Canal December 2013 Why study the Rideau Canal? The Rideau Canal has been an important part of Ottawa throughout its history, and has shaped and been shaped by the
More informationPublic Workshop: November 12, 2009
Marlboro Hamlet Master Plan Public Workshop: November 12, 2009 Agenda Project Introduction Land Use Concepts and Zoning Connectivity and Gateways New Development Hamlet Center Open Space and Recreation
More informationReinventing Miner Avenue as a
Reinventing Miner Avenue as a Complete Street Reinventing Miner Avenue as a Complete Street Agenda Project Overview / Introductions Previous Meeting Recap Economic Considerations Opportunities & Constraints
More informationStrategic plan framework Steering Committee Meeting
Strategic plan framework Steering Committee Meeting September 26, 2018 1 agenda 1 Welcome and Strategic Planning introductions Process Strategic Analyses Plan Framework 2 3 Brand Brand Development Naming
More informationStatus Report: MD 355 Project
Status Report: MD 355 Project OCTOBER 2006 M-NCPPC MONTGOMERY COUNTY PLANNING DEPARTMENT Summary of Community Comments, and break to the Results of the MD 355 Participation Session Brookside Gardens -
More informationRosslyn Plaza PDSP (SP #422) SPRC Staff Presentation
Rosslyn Plaza PDSP (SP #422) SPRC Staff Presentation ote Guiding Principles included in this document are taken from the latest working draft of the Guiding Principles dated. The illustrations included
More informationPrince George s County Transitway Systems Planning Study
Final Report - December, 0 Prince George s County Transitway Systems Planning Study Prince George s County, Maryland Prepared for the: Prince George s County Planning Department, M-NCPPC Prince George
More informationCITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA
CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James
More informationFROM METRO STATIONS TO GREAT URBAN PLACES
FROM METRO STATIONS TO GREAT URBAN PLACES New Downtowns for Prince George s County 2016 Rail~Volution Conference San Francisco CA BRIEF HISTORY OF WASHINGTON METRO SYSTEM Washington regional Metro System
More informationCorridors. Re-vitalize our Corridors and Gateways
Corridors Re-vitalize our Corridors and Gateways Artist s rendering from the 287 Strategic Plan, 2015 Corridors are the major throughways of Loveland but they also provide important commercial, community
More informationNassau County Cultivating Opportunities for Sustainable Development Nassau County Infill Redevelopment Feasibility Study
Nassau County Cultivating Opportunities for Sustainable Development Nassau County Infill Redevelopment Feasibility Study NY-CT Sustainable Communities Steering Committee Meeting March 14, 2014 Project
More informationIMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK
IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK SMART CONSERVATION THROUGH SMART GROWTH NJ LAND CONSERVATION RALLY March 22, 2014 Laurette Kratina, PP, AICP, Supervising Planner Somerset County Planning
More informationMONTGOMERY COUNTY PLANNING DEPARTMENT
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No.: Date: 5-03-18 Pike and Rose, Phase I: Site Plan Amendment No. 82012002D Rhoda Hersson-Ringskog,
More informationPlanning Board Briefing
Planning Board Briefing Why Now? The Sector Plan Implementation Chapter States: Before Stage 1 begins, the following must occur: Approval of the Sectional Map Amendment. Approval of the Greater Lyttonsville
More informationDescription of Preferred Alternative
Chapter 2 Description of Preferred Alternative 2.1 Introduction This chapter of the programmatic Sammamish Town Center Sub-area Plan Final EIS provides a more detailed description of the Preferred Alternative
More informationDraft Bergamot Area Plan
ATTACHMENT 1 Draft Bergamot Area Plan Taskforce on the Environment April 15, 2013 www.bergamotplan.net 1 Overview WHAT IS THE BERGAMOT AREA PLAN? A Community-Based Planning Document Guiding the Future
More informationRE-Imagining the Downtown Colorado Springs Master Plan
RE-Imagining the Downtown Colorado Springs Master Plan 2016 APA Colorado State Conference October 25, 2016 Overview 8:00 Welcome, Introductions, and Overview 8:15 Downtown s Planning History 8:30 A Market
More informationmaster plan of highways bus rapid transit amendment
Scope of Work master plan of highways bus rapid transit amendment September 2011 Montgomery County Planning Department M-NCPPC MontgomeryPlanning.org 1 Scope of Work master plan of highways bus rapid transit
More informationVisioning Statement and Guiding Principles
Visioning Statement and Guiding Principles Planning for the Future The General Plan The General Plan represents Woodland's shared vision of the future and defines a path to lead the community toward its
More informationULI St. Louis Technical Assistance Panel
ULI St. Louis Technical Assistance Panel ULI St. Louis Technical Assistance Panel Sponsored by: Citizens for Modern Transit in partnership with METRO ULI St. Louis Mission Statement The mission of the
More informationDyersville Downtown Plan. Open House October 24, 2017
Dyersville Downtown Plan Open House October 24, 2017 What is a Comprehensive Plan? - Vision - Guidance for decisions - Basis for regulations What is a Downtown Plan? - Understand priorities - Identify
More informationCity of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004
City of Farmington Amendment to the 1998 Master Plan Adopted October 11, 2004 Introduction Planning Background 1 Scope and Components of the Plan Amendment 2 Concept Introduction 3 Plan Concepts 3 Conceptual
More informationTOWN COUNCIL / PLANNING COMMISSION
Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011 Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L.
More informationMini Technical Assistance Panel. Rock Spring Park
Mini Technical Assistance Panel Rock Spring Park May 22, 2013 The Team Jason Bonnet, Forest City Washington Matthew Flis, Town of Vienna William Herbig, National Capital Planning Commission Sophie Lambert,
More informationQUINCE ORCHARD/FIRSTFIELD CORRIDOR CITY OF GAITHERSBURG MTAP 2017
QUINCE ORCHARD/FIRSTFIELD CORRIDOR CITY OF GAITHERSBURG MTAP 2017 ULI LEADERSHIP INSTITUTE 2017 The Team Allison Davis, WMATA Daniel Park, Rodgers Consulting Debbie Albert, Arlington County Harry Ross,
More informationRoute 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347
The GREENING of Route 347 The Greening of Route 347 The Greening of Route 347: History 3 The Greening of Route 347 4 The Greening of Route 347 5 The Greening of Route 347 Smith Haven Mall 6 The Greening
More informationEstablish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area.
This Plan s urban design goals are to create an urban scale, walkable community with connections to transit, parks, and services and with amenities and facilities for residents and employees. The 1992
More informationLEED-ND 101: Practical Strategies for Achieving Sustainability Goals. Travis Parker Lakewood Planning Director
LEED-ND 101: Practical Strategies for Achieving Sustainability Goals Travis Parker Lakewood Planning Director Metro Vision Idea Exchange Oct 11, 2012 West Corridor Stations West Corridor Overview West
More informationEXISTING PLANS Harriet Festing Center for Neighborhood Technology Midlothian Community Meeting March 12, 2015
EXISTING PLANS Harriet Festing Center for Neighborhood Technology Midlothian Community Meeting March 12, 2015 BENEFITS Bring economic, community + environmental benefits Enhance property values Use
More informationSecrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018
Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018 Background and Process Monroe Expressway will be open by the end of 2018 Union County and Indian Trail identified a need to revisit
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT DATE: January 26, 2017 SUBJECT: The Virginia Department of Transportation s Transform I-66 Inside the
More informationEXECUTIVE SUMMARY DRAFT CHAPTER 1 INTRODUCTION EXECUTIVE SUMMARY
CHAPTER 1 EXECUTIVE SUMMARY INTRODUCTION Through the joint efforts of the City of Tulsa planning staff and the Land Services division of Indian Nations Council of Governments (INCOG), the Berryhill Land
More informationBAYFRONT INDUSTRIAL AREA RENEWAL STRATEGY. Public Open House #1
BAYFRONT INDUSTRIAL AREA RENEWAL STRATEGY Public Open House #1 1 BAYFRONT STUDY AREA 1,607 ha. Study Area 1.2 billion in annual tax revenue Once housed over 50% of the City s employment Today home to over
More informationALMONO. Hazelwood, City of Pittsburgh. A riverfront investment opportunity combining residential, office and light industrial uses A L M O N O S I T E
Tecumseh St. ALMONO Hazelwood, City of Pittsburgh A riverfront investment opportunity combining residential, office and light industrial uses Downtown Pittsburgh Oakland South Side Flats Birmingham Bridge
More informationAGENDA 7:00 p.m. Welcome 7:15 p.m. Staff Presentation 7:45 p.m. Questions and Responses 8:00 p.m. Open House
AGENDA 7:00 p.m. Welcome 7:15 p.m. Staff Presentation 7:45 p.m. Questions and Responses 8:00 p.m. Open House 2 PLANNING CONTEXT - WHAT IS A MASTER PLAN? Master Plans are comprehensive amendments to the
More informationS C O P E O F W O R K A P R I L
white flint 2 sector plan S C O P E O F W O R K A P R I L 2 0 1 2 MONTGOMERY COUNTY PLANNING DEPARTMENT M-NCPPC MontgomeryPlanning.org 1 white flint 2 sector plan Scope of Work abstract This scope of work
More informationCobb County Design Guidelines Mableton Parkway & Veterans Memorial Highway Community Design Workshop January 12, 2017
Community Design Workshop January 12, 2017 Agenda Opening Remarks / Introductions Scope of Work Existing Conditions Key Issues / Opportunities VPS Summary Draft Vision & Goal Statement Implementation Concepts
More informationThis Review Is Divided Into Two Phases:
Semiahmoo Town Centre Review The purpose of this review: To review the Semiahmoo Town Centre Concept Plan, originally approved in 1993, to ensure that this centre will continue to serve the needs of South
More informationWelcome to the Oakridge Centre Open House
Welcome to the Oakridge Centre Open House Why is the City hosting this event? This open house is to inform you of a rezoning application submitted to the City of Vancouver to amend the existing CD-1 (Comprehensive
More informationPotential Green Infrastructure Strategies May 6, 2015 Workshop
Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National
More informationStreet Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017
Street Flooding Mitigation Plan KYOVA Interstate Planning Commission Presented to AMPO National Conference October 18, 2017 Saleem Salameh, Ph.D., P.E., M.ASCE Chet Parsons, AICP CTP Agenda: Background
More informationTonight s Agenda. Summary Presentation Open House. Group Discussion Next Steps: online community wide survey
Community Open House February 22, 2018 Tonight s Agenda Summary Presentation Open House Station 1: Project Overview and Community Input Station 2: Draft Vision and Guiding Principles Station 3: Western,
More informationSH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017
Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year
More informationThe Mobile Peninsula Corridor Master Plan Dauphin Island Parkway I 10 to Dog River
The Mobile Peninsula Corridor Master Plan Dauphin Island Parkway I 10 to Dog River Welcome and Introductions Alice Keel Co Founder Prayer Rev. Jim Langston Fulton Road Baptist Church Comments Stewart Hanley,
More information40 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor
40 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor A presentation by the Arlington County Department of Community Planning,
More informationgreenprint midtown SUSTAINABILITY ACTION PLAN 2012
greenprint midtown SUSTAINABILITY ACTION PLAN 2012 MIDTOWN ALLIANCE SOUTHFACE ENERGY INSTITUTE RENAISSANCE PLANNING GROUP SUSTAINABLE ATLANTA PERKINS+WILL 2 GREENPRINT MIDTOWN 1. Introduction Sustainability
More informationOF SOUTHWEST ECODISTIRCT
SOUTHWEST ECODISTRICT WASHINGTON D.C., USA JULY, 2017 SNAPSHOT PROJECT TYPE: Urban Revitalization SITE SIZE: 110 acres ECONOMY: - Reduce federal operating expenses and federal lease expenses - Generate
More informationEXPANDING THE NETWORK ALEXANDRIA, VIRGINIA
EXPANDING THE NETWORK ALEXANDRIA, VIRGINIA David Whyte david.whyte@kimley-horn.com Overview Project Context Corridors Land Use Coordination Concepts Outreach and Coordination Results Core of the region
More informationFOUR MILE RUN VALLEY WORKING GROUP AND CHARGE Adopted April 16, 2016 Amended July 19, 2016
FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE Adopted April 16, 2016 Amended July 19, 2016 Working Group Charge The Working Group is charged by the County Board to collaborate with staff to provide commission,
More informationCommunity Open House March 26 th, 2018
Community Open House March 26 th, 2018 Open House Agenda 1. Overview of Planning Process What we heard 2. Future Land Use Policy 3. Priority Growth Areas 4. Plan Elements Making it happen What is a Comprehensive
More informationTown Center (part of the Comprehensive Plan)
Town Center (part of the Comprehensive Plan) Mercer Island Town Center Looking North (2014) In 1994, a year-long process culminated in a set of design guidelines and code requirements for the Town Center
More informationPlan-It Greenville (2009) Comprehensive Plan 5-Year Update
Plan-It Greenville (2009) Comprehensive Plan 5-Year Update What is the comprehensive plan: Collecting communitywide data Projecting future population growth Setting communitywide goals Framing policies
More informationFUNDING CORRIDOR REVITALIZATION
FUNDING CORRIDOR REVITALIZATION Integrated corridor planning for the 21 st Century America Planning Association Annual Conference Atlanta, GA April 27, 2014 Mariia Zimmerman, MZ Strategies, LLC mariia@mzstrategies.com
More informationCity of Tacoma Planning and Development Services
Agenda Item E-1 City of Tacoma Planning and Development Services To: Planning Commission From: Elliott Barnett, Planning Services Division Subject: Tacoma Mall Regional Center Subarea Plan and EIS Meeting
More information