TREASURE ISLAND PHASE ONE PROJECTS PUBLIC ART PROJECT OUTLINE

Size: px
Start display at page:

Download "TREASURE ISLAND PHASE ONE PROJECTS PUBLIC ART PROJECT OUTLINE"

Transcription

1 TREASURE ISLAND PHASE ONE PROJECTS PUBLIC ART PROJECT OUTLINE BACKGROUND (DEVELOPMENT PROJECT OVERVIEW) The Treasure Island Development is an approved 405-acre redevelopment project on Treasure Island and parts of Yerba Buena Island in San Francisco Bay between San Francisco and Oakland within San Francisco city limits. The Treasure Island Development Authority (TIDA) is a nonprofit organization city agency that oversees the goal of reusing the island in an environmentally and economically viable way, as well as creating and minting the master development plan. A new ferry terminal will connect to a retail center as part of an urban core with a 40-story tower and hotels. Three distinct residential neighborhoods will radiate from the core area and feature townhouses, along with flats and a 14-story residential tower. Also proposed are: five high-rise towers, a K-8 school, 450,000 sq ft of retail and commercial buildings, a 275-acre park, a 20-acre organic farm, and a 400-slip marina and beach along with state-of-the-art community facilities. The entire redevelopment will take 20 to 30 years to build and will create 8,000 new households for approximately 20,000 people. [1]

2 The large-scale redevelopment of Treasure Island provides an unparalleled opportunity to commission bold, imaginative and forward-thinking contemporary art projects. The new artworks will embody the spirit of innovation that characterized the 1939 Golden Gate International Exposition. A vibrant and robust art program will affirm Treasure Island s reputation as a remarkable place to live and visit and establish it as a magnet for cultural tourism. Construction is currently commencing in locations on the island where three artwork projects have been identified in the Treasure Island Arts Master Plan, which is scheduled for final approval in June Approval of this project outline for these three phase one artwork projects will allow staff to prepare to advertise the call to artists once the plan has received final approval thus enabling these phase one artwork projects to be completed on schedule within a tight timeline. The high level curatorial framework, vision, goals and objectives articulated in the Treasure Island Arts Master Plan as approved will guide the development of these artwork commissions. ART OPPORTUNITIES 1. WATER FRONT PLAZA SITE DESCRIPTION The public plaza, ferry shelter, and associated coastal landscape serves as an intermodal hub connecting multiple modes of transit including cyclists, pedestrians, ferries, shuttles, and buses. Numerous seating nodes and terraces radiate from the central Ferry Shelter to take full advantage of the views to the bay and the San Francisco skyline. ART OPPORTUNITY Large-scale gateway sculpture and interactive works in plazas and open spaces flanking or adjacent to Ferry Plaza. PROJECT GOAL This artwork will mark an important point of entry to the island. The work should be iconic, grand and of sufficient scale to command its bayfront location. The artwork should respond to the unique vantage points from which it will be viewed. [2]

3 PROJECT BUDGET Waterfront Plaza Art Budget Artwork Design, Fabrication, Installation $ 1,500,000 Artist Selection Costs $ 20,000 Other Costs and Contingency $ 180,000 Total $ 1,700, CITYSIDE WATERFRONT PARK SITE DESCRIPTION Situated on the western edge of Treasure Island with dramatic views of the Bay Bridge, downtown San Francisco and the Golden Gate Bridge, Cityside Park is an attractive destination that draws visitors and residents alike to partake in various forms of recreation and leisure along this spectacular waterfront. Cityside Waterfront Park is a 24-acre open space, 300 feet wide from the shore to Cityside Avenue and three-quarters of a mile in length. Oriented to deflect and reduce the prevailing northwesterly winds, the double allees of windrow blue gum trees are both utilitarian and formal, structuring space, framing views and defining a series of large rooms, each of which has a specific program and identity. ART OPPORTUNITY This will be the first in a series of large scale sculptures to be installed along the shoreline of this linear park in its many outdoor rooms. PROJECT GOAL Episodic installations of sculpture will create a sustained and engaging art experience for viewers from land and from the bay. Artworks may respond to various themes such as Art on the Edge or Where the Land Meets the Sea, or may respond to the design and programmed use of the artwork s site. [3]

4 PROJECT BUDGET Cityside Waterfront Artwork - Phase 1 Artwork Design, Fabrication, Installation $ 1,500,000 Artist Selection Costs $ 20,000 Other Costs and Contingency $ 180,000 Total $ 1,700, YERBA BUENA ISLAND HILLTOP PARK SITE DESCRIPTION This site is a cultural and ecological arboretum. It tells an evolutionary story with layers of time embedded (stairs, foundation, ruins) as the site flora transitions from a historic ecology to a more cultural landscape. The northern and southern hilltops act as foci of two distinct experiences within the arboretum. The southern hilltop retains and reveals the site s ecological history, while the northern hilltop cultivates an attention to the island s cultural history through remnants and a focus on the built landscape. ART OPPORTUNITY The northern hilltop offers an excellent opportunity for a large scale sculpture to function as a focal point for the built landscape. PROJECT GOAL Artwork created for Hilltop Park will enhance or respond to the natural setting. PROJECT BUDGET Yerba Buena Island Hilltop Park (Space 4) Artwork Design, Fabrication, Installation $ 1,500,000 Artist Selection Costs $ 20,000 Other Costs and Contingency $ 180,000 Total $ 1,700,000 ARTIST RECRUITMENT APPROACH AND ELIGIBILITY SFAC staff will publicize the project opportunity through distribution of a Request for Qualifications (RFQ) and will conduct curatorial research to recruit applications from qualified artists. There are no [4]

5 geographic restrictions associated with this competition. Professional practicing artists from around the world are encouraged to apply. PRE-APPLICATION WORKSHOP A pre-application workshop for these opportunities will be conducted by SFAC staff to discuss the following topics: Treasure Island s Art Master Plan objectives and the strategies for achieving these objectives Information about the overall application and selection process Review of potential sites Technical assistance regarding the application Contract requirements ARTIST SELECTION PROCESS After the application deadline, Arts Commission staff will screen applications to establish a pool of qualified artists. The list of qualified artists will be presented to the Treasure Island Phase One Projects Selection Panel consisting of: One member appointed by the Treasure Island Director One member appointed by the SFAC Three members appointed by the Treasure Island Art Steering Committee, two of whom shall be arts professionals. The panel will identify three finalists for each project opportunity who will be invited to develop conceptual site specific proposals after attending an orientation session with the project team and key stakeholders. These finalists will be paid an honorarium of $3,000 plus travel reimbursement for development of a proposal. The Treasure Island Phase One Projects Project Selection Panel will reconvene to consider the finalists proposals in an interview format and will select one artist and an alternate for the project for review and comment by the Arts Commission prior to presentation to the Treasure Island Art Steering Committee and Treasure Island Development Authority for approval. COMMUNITY INVOLVEMENT The finalists proposals will be on display for public comment on the SFAC and TIDA websites for two weeks prior to the final selection panel meeting. All selection panels, Visual Arts Committee (VAC), Arts Commission and Treasure Island Development Authority meetings are open to the public. TIMELINE (Subject to change) Project Outline Presentation to VAC May 17, 2017 Final Approval of Treasure Arts Master Plan June 7, 2017 RFQ Issued June 8, 2017 Pre-Application Workshop June 27, 2017 RFQ Deadline August 11, 2017? First Project Artist Selection Panel between August 28 and September 8, 2017 Artist Finalist Orientation Early October 2017 Finalist Proposals Due Late December 2017 Display of Proposals Early January 2018 Final Project Artist Selection Panel Mid January 2018 VAC Review and Comment January 2018 TIASC Approval TBD TIDA Approval TBD Artist Under Contract March 2018 [5]

6 Tentative Artwork Completion Dates (Subject to change) WATER FRONT PLAZA Spring 2020 CITYSIDE WATERFRONT PARK Spring 2020 HILLTOP PARK Spring 2019 FURTHER INFORMATION Contact Jill Manton, Director of Public Art Trust and Special Initiatives at (415) or by at or Jennifer Lovvorn, Senior Program Manager, Public Art at (415) or by at [6]

7 WATERFRONT PLAZA

8 WATERFRONT PLAZA

9 CITYSIDE WATERFRONT PARK

10 YERBA BUENA ISLAND HILLTOP PARK

A playground for the arts and cultural experiments. Governors Island (New York)

A playground for the arts and cultural experiments. Governors Island (New York) A playground for the arts and cultural experiments Governors Island (New York) 2 A platform for artistic and aesthetic democracy Socrates Sculpture Park (Long Island City, New York) 3 Military, the World's

More information

Westside Pump Station Reliability Improvements Project Public Art Project Plan For approval at the December 21, 2016 Visual Arts Committee meeting

Westside Pump Station Reliability Improvements Project Public Art Project Plan For approval at the December 21, 2016 Visual Arts Committee meeting Westside Pump Station Reliability Improvements Project Public Art Project Plan For approval at the December 21, 2016 Visual Arts Committee meeting BACKGROUND The San Francisco Public Utilities Commission

More information

RIVERWALK EAST PUBLIC ART DESIGN PROJECT

RIVERWALK EAST PUBLIC ART DESIGN PROJECT RIVERWALK EAST PUBLIC ART DESIGN PROJECT PREFACE In August 2018, Mayor Rahm Emanuel announced plans to improve the east end of the Chicago Riverwalk. These improvements are part of ongoing efforts to build

More information

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ)

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ) Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ) The Project The Ashland Public Art Commission (PAC) seeks an artist, or artist team, to develop a site specific, permanent,

More information

Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting

Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee Ninth Meeting Date: 5 October 2005 Time: 3:30pm Venue: Conference Room 15/F, North Point Government Offices, 333 Java Road, North

More information

Downtown Cleveland s Main Avenue Bridge

Downtown Cleveland s Main Avenue Bridge Downtown Cleveland s Main Avenue Bridge Underpass Improvement Competition Project Summary Downtown Cleveland Alliance seeks a creative professional or team (architect, designer, artist, engineer, landscape

More information

PLAN ELEMENTS WORKSHOP. April 5, 2016

PLAN ELEMENTS WORKSHOP. April 5, 2016 PLAN ELEMENTS WORKSHOP April 5, 2016 needs more housing. But there is no one-size fits-all solution. Every neighborhood has its own character. In some places, density is not only appropriate it is badly

More information

4. PARKS AND OPEN SPACE

4. PARKS AND OPEN SPACE 4. PARKS AND OPEN SPACE 4.1 4.2 OVERALL PARKS AND OPEN SPACE MAJOR PHASE 1 PARKS AND OPEN SPACE OVERVIEW 4.2.1 WATERFRONT PLAZA 92 95 99 4.2.2 4.2.3 4.2.4 4.2.5 4.2.6 4.2.7 4.2.8 4.2.9 4.2.10 4.2.11 4.2.12

More information

Queens Quay East & Lake Shore Boulevard East & 26 Richardson Street Public Art Plan

Queens Quay East & Lake Shore Boulevard East & 26 Richardson Street Public Art Plan STAFF REPORT ACTION REQUIRED 130-132 Queens Quay East & 143-177 Lake Shore Boulevard East & 26 Richardson Street Public Art Plan Date: April 20, 2016 To: From: Toronto East York Community Council Director,

More information

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership Workshop 3 City of Burlington Waterfront Hotel Planning Study September 14, 2017 The Planning Partnership The Waterfront Hotel Planning Study 01 The Brant & Lakeshore Planning Study will establish a Strategic

More information

Maple Leaf Square 15 York Street Public Art Plan

Maple Leaf Square 15 York Street Public Art Plan STAFF REPORT ACTION REQUIRED Maple Leaf Square 15 York Street Public Art Plan Date: December 17, 2007 To: From: Wards: Toronto East York Community Council Robert Freedman, Director, Urban Design Ward 28

More information

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework Welcome Community Consultation Meeting November 28, 2016 Why Are We Here Today? Review and discuss the Bathurst Quay Neighbourhood Plan Framework Review and discuss an Action Plan for Implementation Next

More information

Jefferson Street Pedestrian Tunnel Mural Project 2018

Jefferson Street Pedestrian Tunnel Mural Project 2018 Milwaukee Downtown Placemaking Task Force & Milwaukee Downtown, BID #21 Jefferson Street Pedestrian Tunnel Mural Project 2018 Mural Invitational Request for Qualifications (RFQ) Issue Date: Wednesday,

More information

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose: Page 1 of Report PB-23-18 SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building Report Number: PB-23-18 Wards Affected: 2 File Numbers:

More information

Summary Community Workshop #1 Fruitvale San Antonio Senior Center Monday, March 23, :00-9:00 p.m.

Summary Community Workshop #1 Fruitvale San Antonio Senior Center Monday, March 23, :00-9:00 p.m. Summary Community Workshop #1 Fruitvale San Antonio Senior Center Monday, March 23, 2009 7:00-9:00 p.m. Workshop Format and Process The City of Oakland is preparing a Specific Plan that will help define

More information

Illustrative Development Plan

Illustrative Development Plan Illustrative Development Plan December 7, 005 045 Sansome St., Studio 3 San Francisco, CA 94 Area A - Increase visibility to waterfront and aquatic center from the Embarcadero - Provide streets rather

More information

RESOURCE PACKET River Crossing

RESOURCE PACKET River Crossing RESOURCE PACKE River Crossing Overall Project Focus: "River Crossing" project is funded through an NEA Our own grant that provides a comprehensive plan for public art and arts experiences that will connect

More information

Palm Jebel Ali - Dubai, United Arab Emirates

Palm Jebel Ali - Dubai, United Arab Emirates Palm Jebel Ali - Dubai, United Arab Emirates LOCATION: CLIENT: Dubai Tony Perrin Senior Development Manager Dubai Waterfront Co LLC PROJECT SIZE: 1000 acres SCOPE OF WORK: Urban Design and Landscape Architecture

More information

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004 City of Farmington Amendment to the 1998 Master Plan Adopted October 11, 2004 Introduction Planning Background 1 Scope and Components of the Plan Amendment 2 Concept Introduction 3 Plan Concepts 3 Conceptual

More information

PUBLIC ART CALL LIONS GATE COMMUNITY CENTRE. For Expressions of Interest Submission Deadline: March 18, 2018 Project Value: $85,000(inclusive)

PUBLIC ART CALL LIONS GATE COMMUNITY CENTRE. For Expressions of Interest Submission Deadline: March 18, 2018 Project Value: $85,000(inclusive) LIONS GATE COMMUNITY CENTRE PUBLIC ART CALL For Expressions of Interest Submission Deadline: March 18, 2018 Project Value: $85,000(inclusive) LGCC EOI 1 LIONS GATE COMMUNITY CENTRE (LGCC) PUBLIC ART CALL

More information

B. AESTHETICS SETTING. IV. Environmental Setting and Impacts B. Aesthetics

B. AESTHETICS SETTING. IV. Environmental Setting and Impacts B. Aesthetics B. AESTHETICS The Setting discussion in this section describes existing visual conditions as a baseline against which project impacts are identified and evaluated under Impacts. It describes the existing

More information

Welcome! Please sign-in and participate in the activities in the registration area before finding your seat. Thank you!

Welcome! Please sign-in and participate in the activities in the registration area before finding your seat. Thank you! Welcome! Please sign-in and participate in the activities in the registration area before finding your seat. Thank you! Planning Kickoff July 31, 2018 University of Baltimore Public Planning Kick-off Agenda

More information

ANCHOR TO ANCHOR. Rescale the street to create an iconic boulevard.

ANCHOR TO ANCHOR. Rescale the street to create an iconic boulevard. ANCHOR TO ANCHOR Rescale the street to create an iconic boulevard. UR NE ER UV GO NE LA OBJECTIVES 1. Maintain appropriate traffic flow and prioritize commercial curb access 2. Mark gateways at the street

More information

Baselands Trails Master Plan Public Meeting. April 28, 2015 Fire Academy, 895 Eastern Avenue, Toronto 6:30 p.m. to 9:00 p.m.

Baselands Trails Master Plan Public Meeting. April 28, 2015 Fire Academy, 895 Eastern Avenue, Toronto 6:30 p.m. to 9:00 p.m. Baselands Trails Master Plan Public Meeting April 28, 2015 Fire Academy, 895 Eastern Avenue, Toronto 6:30 p.m. to 9:00 p.m. Baselands Trails Master Plan Meeting Purpose To present and get feedback on:

More information

Community Workshop #2 December 4, 2014 Team Tonight s Agenda 6:00 pm Welcome! 6:05 pm The Future of Downtown Tustin Ideas, Strategies and Recommendations 6:35 pm Questions and Comments 6:50 pm Open

More information

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

1.0 Purpose of a Secondary Plan for the Masonville Transit Village Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village

More information

Introduction and Overview

Introduction and Overview Introduction and Overview Articulate local values and priorities Guide land use and development decisions Coordinate transportation, infrastructure, and City services with expected growth and available

More information

Waterfront Development Master Plan

Waterfront Development Master Plan PORT of VANCOUVER USA Vancouver, WA Waterfront Development Master Plan DRAFT - FINAL CONCEPTUAL MASTER PLAN PROJECT TEAM NBBJ Heritage Research Associates JLA Kittelson Associates Leland Consulting Group

More information

Sustainability, Health, Safety, Recreation & Open Space Working Group August 3, 2017

Sustainability, Health, Safety, Recreation & Open Space Working Group August 3, 2017 Sustainability, Health, Safety, Recreation & Open Space Working Group August 3, 2017 DOWNTOWN OAKLAND SPECIFIC PLAN WELCOME Sustainability, Health, Safety, Recreation & Open Space Working Group Social

More information

Toronto East York Community Council. Robert Freedman, Director, Urban Design

Toronto East York Community Council. Robert Freedman, Director, Urban Design STAFF REPORT ACTION REQUIRED The Burano Public Art Plan, 832 Bay Street Date: August 6, 2008 To: From: Wards: Reference Number: Toronto East York Community Council Robert Freedman, Director, Urban Design

More information

CENTRAL ESTUARY PLAN AVISION FOR OAKLAND S WATERFRONT

CENTRAL ESTUARY PLAN AVISION FOR OAKLAND S WATERFRONT Central Estuary Plan A VISION FOR OAKLAND S WATERFRONT Specific Plan and Environmental Assessment Presentation to the Parks and Recreation Advisory Commission December 9, 2009 This Afternoon s Presentation

More information

Public Art Plan. We have elected to submit Public Art Plans before or concurrently with the CSP Submittal per the FDP Manual

Public Art Plan. We have elected to submit Public Art Plans before or concurrently with the CSP Submittal per the FDP Manual Public Art Plan The intent of the Horizon Uptown Public Arts Program is to create great places that engage the community and leverage the neighborhood development and economic vitality. The Horizon Uptown

More information

CHONGMING ISLAND SHANGHAI CENTRAL CITY

CHONGMING ISLAND SHANGHAI CENTRAL CITY Chongming Island CHONGMING ISLAND SHANGHAI CENTRAL CITY Chongming Island Shanghai, China THE VISION: A GREEN ISLAND Chongming Island benefits from a magnificent setting, adjacency to the vibrant center

More information

PUBLIC ENGAGEMENT & SIX THEMES OF THE PLAN

PUBLIC ENGAGEMENT & SIX THEMES OF THE PLAN Connecting the heart of Eagle to the soul of the river - Kathy Chandler-Henry, Commissioner Eagle County CHAPTER 1 PUBLIC ENGAGEMENT & SIX THEMES OF THE PLAN town of eagle - river corridor plan 1 PUBLIC

More information

Call to Artists Public Art for Los Angeles Metro Stations

Call to Artists Public Art for Los Angeles Metro Stations Conceptual Design for Call to Artists Public Art for Los Angeles Metro Stations Artesia Transit Center Union Station/Patsaouras Transit Plaza Los Angeles County Metropolitan Transportation Authority February

More information

REQUEST FOR QUALIFICATIONS Entrance: Entertainment and Sports Center

REQUEST FOR QUALIFICATIONS Entrance: Entertainment and Sports Center CITY OF SACRAMENTO SACRAMENTO METROPOLITAN ARTS COMMISSION Art in Public Places Program REQUEST FOR QUALIFICATIONS Sacramento Entertainment and Sports Center Entrance: Entertainment and Sports Center Entertainment

More information

Streets for People, Place-Making and Prosperity. #TOcompletestreets

Streets for People, Place-Making and Prosperity.  #TOcompletestreets COMPLETE STREETS FOR TORONTO Streets for People, Place-Making and Prosperity COMPLETE STREETS: A NEW APPROACH A Complete Streets design approach considers the needs of all users people who walk, bicycle,

More information

To submit comments: Public Art Installation // Fairport Public Art Trail

To submit comments: Public Art Installation // Fairport Public Art Trail Public Art Installation // Fairport Public Art Trail Public Review Period January 14-25, 2019 In November a Jury selected three Artists to submit a proposal for the First Art Installation for the Fairport

More information

1 October Dear Citizens of Charlotte and Mecklenburg County,

1 October Dear Citizens of Charlotte and Mecklenburg County, 1 October 2011 Dear Citizens of Charlotte and Mecklenburg County, As co-chairs of the Center City 2020 Vision Plan Steering Committee, we are proud to present the Center City 2020 Vision Plan, which sets

More information

CALL FOR ARTIST QUALIFICATIONS SUBMISSIONS. DIA Urban Arts Projects Phase One

CALL FOR ARTIST QUALIFICATIONS SUBMISSIONS. DIA Urban Arts Projects Phase One CALL FOR ARTIST QUALIFICATIONS SUBMISSIONS DIA Urban Arts Projects Phase One ART IN PUBLIC PLACES City of Jacksonville, Florida Submissions Due March 31, 2016, midnight MST Through CAFÉ: callforentry.org

More information

East Midtown Greenway East 53 rd 61 st Street. Community Board 8 Project Introduction November 16, 2017

East Midtown Greenway East 53 rd 61 st Street. Community Board 8 Project Introduction November 16, 2017 East Midtown Greenway East 53 rd 61 st Street Community Board 8 Project Introduction November 16, 2017 Agenda Overview - Development of the East Midtown Waterfront Esplanade Current East Midtown Greenway

More information

JACKsON STREET PIER CONCEPTUAL DESIGN PACKAGE SEPTEMBER 21, 2017

JACKsON STREET PIER CONCEPTUAL DESIGN PACKAGE SEPTEMBER 21, 2017 JACKsON STREET PIER CONCEPTUAL DESIGN PACKAGE SEPTEMBER 21, 2017 JACKsON STREET PIER Process outline DESIGN PROCESS OVERVIEW: Sandusky s Jackson Street Pier Conceptual Design process included input from

More information

M i s s i o n B a y W a t e r f r o n t

M i s s i o n B a y W a t e r f r o n t 114 M i s s i o n B a y W a t e r f r o n t Character of the Area: The Mission Bay Waterfront extends from Pier 48 at China Basin Channel to 18th Street in the Central Basin. This area of the waterfront

More information

TOWN OF MIDLAND TERMS OF REFERENCE AND REQUEST FOR PROPOSALS

TOWN OF MIDLAND TERMS OF REFERENCE AND REQUEST FOR PROPOSALS TOWN OF MIDLAND TERMS OF REFERENCE AND REQUEST FOR PROPOSALS UNIMIN WATERFRONT LANDS MASTER PLAN STUDY August 2012 Town of Midland 575 Dominion Avenue Midland, Ontario L4R 1R2 705-526-4275 TOWN OF MIDLAND

More information

This Review Is Divided Into Two Phases:

This Review Is Divided Into Two Phases: Semiahmoo Town Centre Review The purpose of this review: To review the Semiahmoo Town Centre Concept Plan, originally approved in 1993, to ensure that this centre will continue to serve the needs of South

More information

MASTER PLANNING: THE CRITICAL ROLE OF ELECTED LEADERS AND THE PLANNING COMMISSION Planning Michigan Conference

MASTER PLANNING: THE CRITICAL ROLE OF ELECTED LEADERS AND THE PLANNING COMMISSION Planning Michigan Conference MASTER PLANNING: THE CRITICAL ROLE OF ELECTED LEADERS AND THE PLANNING COMMISSION 2018 Planning Michigan Conference Today s Presenters: Chris McLeod, AICP, Sterling Heights City Planner Gerald (Jerry)

More information

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions Consultation Summary Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions This report is not intended to provide a verbatim transcript

More information

Welcome! HORSESHOE BAY PARK. Welcome!

Welcome! HORSESHOE BAY PARK. Welcome! Welcome! HORSESHOE BAY PARK Welcome! Where are we in the process? Today we would like your input on how Horseshoe Bay Park can be upgraded to serve the community s needs better. CONSULT STAKEHOLDERS TAKE

More information

BUILDING 1 PLAZA - VIEW AT UPPER PLAZA

BUILDING 1 PLAZA - VIEW AT UPPER PLAZA BUILDING 1 PLAZA - VIEW AT UPPER PLAZA FIGURE 4.38 BUILDING 1 PLAZA VIEW FROM UPPER PLAZA TREASURE ISLAND & YERBA BUENA ISLAND MAJOR PHASE 1 APPLICATION 4 - PARKS AND OPEN SPACE 131 FIGURE 4.39 MARINA

More information

Lehigh Acres Land Development Regulations Community Planning Project

Lehigh Acres Land Development Regulations Community Planning Project Lehigh Acres Land Development Regulations Planning Effort Summary In July, 2010 Commissioner Frank Mann invited the Lehigh Acres community to start discussing how to achieve their recently adopted community

More information

NORTH LAKE SPECIFIC PLAN AREA

NORTH LAKE SPECIFIC PLAN AREA NORTH LAKE SPECIFIC PLAN AREA June 21, 2018 WELCOME Workshop Agenda Introduction Provide information about the program and introduce the team Background Information Share information about the North Lake

More information

Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation Love Locks Concept Plan

Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation Love Locks Concept Plan Date: June 30, 2015 TO: FROM: SUBJECT: Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation Love Locks Concept Plan RECOMMENDATION A. THAT the Vancouver Park Board

More information

UNION STUDIO Greater Kennedy Plaza!

UNION STUDIO Greater Kennedy Plaza! April May 2013 UNION STUDIO Greater Kennedy Plaza! It s time: Providence s civic plaza and transit hub is re-imagined as a vibrant urban gathering place 1 Kennedy Plaza Reborn THE TEAM Client: The City

More information

1.1 WATERFRONT SEATTLE

1.1 WATERFRONT SEATTLE 1.1 WATERFRONT SEATTLE Over the past few years, the City of has been actively re-imagining the future of its Central Waterfront. The imminent replacement of the Elliott Bay Seawall and removal of the Alaskan

More information

WELCOME TO THE CHOUTEAU GREENWAY DESIGN, DEVELOPMENT AND CONSTRUCTION WORKING GROUP!

WELCOME TO THE CHOUTEAU GREENWAY DESIGN, DEVELOPMENT AND CONSTRUCTION WORKING GROUP! WELCOME TO THE CHOUTEAU GREENWAY DESIGN, DEVELOPMENT AND CONSTRUCTION WORKING GROUP! Chouteau Greenway Steering Committee and Working Groups Overview Overview January 9, 2019 Chouteau Greenway will transform

More information

TOWN COUNCIL / PLANNING COMMISSION

TOWN COUNCIL / PLANNING COMMISSION Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011 Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L.

More information

Final Master Plan and Development Control Regulations

Final Master Plan and Development Control Regulations 1. INTRODUCTION CHECK LIST a. Introduction b. Table of contents c. Definitions. d. scope of works. 2. FINAL OVERALL MASTER PLAN a. SITE ANALYSIS and OVERVIEW: i. Existing and Proposed Site Plan Levels.

More information

VERSION 2018 ACTION PLAN WITH THE INTENT OF INTRODUCING BEAUTIFICATION AND MONUMENTAL GRANDEUR IN OUR CITY PUBLIC ARTS COMMISSION

VERSION 2018 ACTION PLAN WITH THE INTENT OF INTRODUCING BEAUTIFICATION AND MONUMENTAL GRANDEUR IN OUR CITY PUBLIC ARTS COMMISSION VERSION 2018 ACTION PLAN WITH THE INTENT OF INTRODUCING BEAUTIFICATION AND MONUMENTAL GRANDEUR IN OUR CITY 17-073 PUBLIC ARTS COMMISSION WHAT IS PAC? PAC leads a community-wide coalition in the development

More information

Four Big Ideas. Three Key Opportunities. Principles. Draft Place Making Master Plan. 1. The Foreshore 2. Green Links. 3.

Four Big Ideas. Three Key Opportunities. Principles. Draft Place Making Master Plan. 1. The Foreshore 2. Green Links. 3. project background Four Big Ideas 1. The Healthy Thriving Place. An International Focus 3. Reclaiming Mooloolaba 4. The Resort Heart of the Coast In November 01 a big ideas workshop was held involving

More information

India Basin/Hunters Point Shoreline Community Workshop May 21, 2008

India Basin/Hunters Point Shoreline Community Workshop May 21, 2008 India Basin/Hunters Point Shoreline Community Workshop May 21, 2008 Workshop Agenda Welcome Process Overview Context & Existing Conditions Presentation of Draft Concepts Land Use and Open Space Priorities

More information

2.0 Urban Design Concepts

2.0 Urban Design Concepts 0 Urban Design Concepts Urban Design Concept diagrams The Waterfront Axis The Park Axis The Wharf Axis Waterfront Precincts 0.1 The Four Key Concepts: This Concept for the Wynyard Quarter establishes four

More information

Request for Proposals: Architectural/Design Guidelines

Request for Proposals: Architectural/Design Guidelines Request for Proposals: Architectural/Design Guidelines January 11, 2017 1.0 INTRODUCTION The City of Issaquah, Washington is soliciting proposals from qualified consulting firms to lead a community conversation

More information

Request for Qualifications For Administration of the 2016 Summer Sprout Program

Request for Qualifications For Administration of the 2016 Summer Sprout Program Page 1 of 6 Request for Qualifications For Administration of the 2016 Summer Sprout Program Requested by: City of Cleveland, Department of Community Development 601 Lakeside Avenue, room 320 Cleveland,

More information

The Land of Oak & Iron - Sculpture Commission

The Land of Oak & Iron - Sculpture Commission The Land of Oak & Iron - Sculpture Commission Background Set within the countryside of north east England, the Land of Oak & Iron stretches from the fringes of the North Pennines following the course of

More information

Prosperity Hucks Area Plan. Transportation and Planning Committee May 11, 2015

Prosperity Hucks Area Plan. Transportation and Planning Committee May 11, 2015 Prosperity Hucks Area Plan Transportation and Planning Committee May 11, 2015 Presentation Outline 1. Background and Location 2. Community Dialog Process 3. Activity Center Recommendations 4. Wedge Recommendations

More information

A. WHAT IS A GENERAL PLAN?

A. WHAT IS A GENERAL PLAN? I. Introduction A. WHAT IS A GENERAL PLAN? A general plan is the planning guideline for the future of a city. It contains goals and policies which regulate urban development, the protection of the natural

More information

CITY OF EMERYVILLE PUBLIC ART PROGRAM REQUEST FOR QUALIFICATIONS FOR A PUBLIC ART PROJECT AT THE EMERYVILLE MARINA

CITY OF EMERYVILLE PUBLIC ART PROGRAM REQUEST FOR QUALIFICATIONS FOR A PUBLIC ART PROJECT AT THE EMERYVILLE MARINA I N C O R P O R A T E D 1 8 9 6 1333 Park Avenue. Emeryville, CA 94608-3517 t (510) 596-4300 f (510) 596-4389 CITY OF EMERYVILLE PUBLIC ART PROGRAM REQUEST FOR QUALIFICATIONS FOR A PUBLIC ART PROJECT AT

More information

CALL TO ARTISTS: REQUEST FOR QUALIFICATIONS

CALL TO ARTISTS: REQUEST FOR QUALIFICATIONS CALL TO ARTISTS: REQUEST FOR QUALIFICATIONS CALL TO ARTISTS: REQUEST FOR QUALIFICATIONS Public Artwork for Haymarket Plaza: Eau Claire, WI Proposals due: October 29th, 2018 Summary / Description of Haymarket

More information

CALL TO ARTISTS REQUEST FOR QUALIFICATIONS STart PUBLIC ART PROGRAM

CALL TO ARTISTS REQUEST FOR QUALIFICATIONS STart PUBLIC ART PROGRAM CALL TO ARTISTS REQUEST FOR QUALIFICATIONS STart PUBLIC ART PROGRAM DOWNTOWN TACOMA GATEWAY ARTWORK Sound Transit s Public Art Program (STart) is seeking an artist or artist team to create a site-responsive

More information

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE Overview I. Draft Plan Process II. Draft Plan Overview a. Market Analysis b. Master Land Use Plan

More information

Task Force on Kai Tak Harbourfront Development. Station Square at Kai Tak

Task Force on Kai Tak Harbourfront Development. Station Square at Kai Tak For discussion on 24 February 2017 Station Square at Kai Tak PURPOSE This paper seeks Members views on the design of the Station Square at Kai Tak. BACKGROUND 2. Upon the relocation of the Hong Kong International

More information

In March 2012, the County of Yolo was awarded a grant from the California State Department of Parks

In March 2012, the County of Yolo was awarded a grant from the California State Department of Parks Request for Proposals (RFP) Deadline for Submittal: January 23, 2019 The County of Yolo wishes to expand the public s experience with the visual arts; to make available artwork of the highest quality to

More information

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN ELMVALE ACRES SHOPPING CENTRE MASTER PLAN Contents 1.0 INTRODUCTION... 2 2.0 LOCATION... 2 3.0 EXISTING CONTEXT... 2 4.0 VISION & GUIDING PRINCIPLES... 2 5.0 LAND USE AND BUILT FORM... 4 5.1 St. Laurent

More information

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Planning and Capital Projects

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Planning and Capital Projects Date August 5, 2015 To: Through: From: Subject: Recreation and Park Commission Capital Committee Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Planning and Capital Projects Nicole Avril,

More information

WEST BLACKHALL STREET PUBLIC REALM + TOWN CENTRE CONNECTIONS Public Exhibition 28 th June 2018

WEST BLACKHALL STREET PUBLIC REALM + TOWN CENTRE CONNECTIONS Public Exhibition 28 th June 2018 WEST BLACKHALL STREET PUBLIC REALM + TOWN CENTRE CONNECTIONS Public Exhibition 28 th June 2018 Welcome Introduction Design Your Involvement Thank you for coming Engagement We would like to gather to this

More information

MARINA MARKET & WATERFRONT DEVELOPMENT STUDY PORT ARANSAS, TEXAS

MARINA MARKET & WATERFRONT DEVELOPMENT STUDY PORT ARANSAS, TEXAS MARINA MARKET & WATERFRONT DEVELOPMENT STUDY PORT ARANSAS, TEXAS FEBRUARY 2015 PRESENTATION OUTLINE 1 2 3 4 5 6 7 REGIONAL POSITIONING SITE IMPRESSIONS PLANNING & DESIGN PRINCIPLES EXISTING IMPROVEMENTS

More information

SECTION ONE: INTRODUCTION. introduction

SECTION ONE: INTRODUCTION. introduction introduction 1 INTRODUCTION Since it was first established in 1843 as a trading post for the Hudson s Bay Company, Victoria has evolved into a Provincial capital city that is recognized across Canada and

More information

Vision Plan Kickoff Meeting Summary Report

Vision Plan Kickoff Meeting Summary Report Vision Plan Kickoff Meeting Summary Report October 2018 The Vision Plan With the redevelopment of the Amtrak Property, Penn Station Partners (PSP) seeks to build on the creative talent and entrepreneurial

More information

MY BILL OF RIGHTS.ORG COMMISSIONING GUIDELINES & STANDARDS VISION AND PROCESS

MY BILL OF RIGHTS.ORG COMMISSIONING GUIDELINES & STANDARDS VISION AND PROCESS MY BILL OF RIGHTS.ORG CELEBRATING AMERICA S FOUNDING FREEDOMS THE BILL OF RIGHTS MONUMENT PROJECT A LEGACY OF LANDMARK INSTALLATIONS ART AND INSPIRATION IN OUR PUBLIC SQUARE COMMISSIONING GUIDELINES &

More information

THE TOWN OF WASAGA BEACH

THE TOWN OF WASAGA BEACH THE TOWN OF WASAGA BEACH Downtown Development Master Plan Committee of the Whole Presentation January 26 th 2017 Uses within this designation should reflect a dependence on tourism as opposed to the permanent

More information

Hialeah Gardens Library Branch at Westland Gardens Park

Hialeah Gardens Library Branch at Westland Gardens Park Hialeah Gardens Library Branch at Westland Gardens Park 1 Brief Project Name Hialeah Gardens Library Branch at Westland Gardens Park Introduction Department of Cultural Affairs through its Program and

More information

arts, culture & Entertainment district

arts, culture & Entertainment district arts, culture & Entertainment district how we got here, and where we are going Creating an East Sherman Avenue Master Plan to revitalize the eastern gateway of the city is a spotlight project of the CDA

More information

Crofton Manor 2803 West 41st Avenue WHAT WE HEARD. Public Consultation: Phase 1

Crofton Manor 2803 West 41st Avenue WHAT WE HEARD. Public Consultation: Phase 1 Crofton Manor 2803 West 41st Avenue WHAT WE HEARD Public Consultation: Phase 1 Background CROFTON MANOR What s Happening The City of Vancouver is undertaking a planning and public engagement process to

More information

Public Art Guidelines And Public Art Donation Program

Public Art Guidelines And Public Art Donation Program Public Art Guidelines And Public Art Donation Program Adopted by City Council Resolution No. 3787 October 12, 2004 Ordinance No. 557 October 26, 2004 Amended by City Council Resolution No. 4411 November

More information

Subarea 4 Indian Creek. Vision The combination of park networks and transportation amenities make Subarea 4 the greenest hub in the Corridor.

Subarea 4 Indian Creek. Vision The combination of park networks and transportation amenities make Subarea 4 the greenest hub in the Corridor. indian creek 180 extends south from 101st Street to I-435. The I-435 and Metcalf intersection is one of the primary intersections in the Kansas City Metro Area. The area includes several residential neighborhoods

More information

PLANNING ADVISORY BOARD AGENDA OCTOBER

PLANNING ADVISORY BOARD AGENDA OCTOBER ! City of Langley PLANNING ADVISORY BOARD AGENDA OCTOBER 1, 2014 3-5pm LANGLEY CITY HALL - 112 2 nd Street, Langley WA 1) Call to Order and Roll Call 2) Approval of the Minutes September 10, 2014 3) Public

More information

the village at market creek

the village at market creek the village at market creek executive summary october 2012 i ii introduction The Village at Market Creek is primed to grow into one of San Diego s most lively, multi-cultural arts destinations. Our community

More information

PUBLIC. Ai + Architecture LLC., 90 Belknap Street, Concord, MA 01742, USA (t) (f)

PUBLIC. Ai + Architecture LLC., 90 Belknap Street, Concord, MA 01742, USA (t) (f) PUBLIC Ai + Architecture LLC., 90 Belknap Street, Concord, MA 01742, USA www.ai-architecture.com +1 978 369 2730 (t) +1 978 369 2731 (f) 2004 Olympic Sailing Center & Marina Village Agios Kosmas, Athens,

More information

THE NEIGHBORHOOD TODAY

THE NEIGHBORHOOD TODAY THE NEIGHBORHOOD TODAY CORE AREA VISION How are we Good Urbanism A Site s DNA thinking about Elements of great Unique elements urban communities embedded in a place the site and design? ELEMENTS LIKE:

More information

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to

More information

Promoting Economic Development Through Upfront SEPA Review: Lessons from South Downtown Tacoma

Promoting Economic Development Through Upfront SEPA Review: Lessons from South Downtown Tacoma Promoting Economic Development Through Upfront SEPA Review: Lessons from South Downtown Tacoma 1 This session will focus on the City of Tacoma s South Downtown Subarea Plan and associated Non-Project SEPA

More information

A Public Art Project for the New Pittsburgh Arena INTRODUCTION 1

A Public Art Project for the New Pittsburgh Arena INTRODUCTION 1 Garden Passage A Public Art Project for the New Pittsburgh Arena GARDEN PASSAGE A COLLABORATIVE PUBLIC ART DESIGN PROJECT AT THE NEW PITTSBURGH ARENA REQUEST FOR QUALIFICATIONS DEADLINE: FEBRUARY 11 INTRODUCTION

More information

Presentation of the Staff Draft. July 17, 2014 SSRVP Team, Area 3

Presentation of the Staff Draft. July 17, 2014 SSRVP Team, Area 3 Presentation of the Staff Draft July 17, 2014 SSRVP Team, Area 3 Presentation Overview Introduction Plan Framework Plan Recommendations Implementation Next Steps and Request for Public Hearing on September

More information

South Central Connecticut Region Plan of Conservation & Development 2018 Update. Municipal Planners

South Central Connecticut Region Plan of Conservation & Development 2018 Update. Municipal Planners South Central Connecticut Region Plan of Conservation & Development 2018 Update Municipal Planners July 28th, 2017 1 Introductions 2 Purpose of Today s Meeting Supplement data analysis with qualitative

More information

Toronto and East York Community Council. Robert Freedman, Director, Urban Design

Toronto and East York Community Council. Robert Freedman, Director, Urban Design 56 Blue Jays Way - Public Art Plan STAFF REPORT ACTION REQUIRED Date: September 14, 2011 To: From: Wards: Reference Number: Toronto and East York Community Council Robert Freedman, Director, Urban Design

More information

As is referenced in the site analysis, the current site access is along Loggers Lane and on to Galbraith Avenue.

As is referenced in the site analysis, the current site access is along Loggers Lane and on to Galbraith Avenue. 4.12 Archaeological Assessment The land above sea level at the Oceanfront was created over the last 100 years by the fill from dredging of the Mamquam Blind Channel, the Cattermole Slough and the Squamish

More information

Lynn Waterfront Master Plan

Lynn Waterfront Master Plan Lynn Waterfront Master Plan Public Meeting #2 December 10th, 2018 1 Project Schedule Update September 26, 2018 December 10, 2018 Development of the Master Harbor Plan Amendment and Revised Waterfront Master

More information

North Fair Oaks Community Plan Summary and Information

North Fair Oaks Community Plan Summary and Information North Fair Oaks Community Plan Summary and Information WHAT IS THE NORTH FAIR OAKS COMMUNITY PLAN? The North Fair Oaks Community Plan is part of the San Mateo County General Plan, and establishes policies

More information

EASTSIDE REGIONAL PARK MASTER PLAN

EASTSIDE REGIONAL PARK MASTER PLAN EASTSIDE REGIONAL PARK MASTER PLAN Goal 3: Promote the visual image of El Paso Goal 4: Enhance El Paso s Quality of Life through Recreational, Cultural and Educational Environments Goal 4.1: Deliver bond

More information

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File # 0 'O DI Lan-171-14 1 - THE CORPORATION OF THE TOWN OF COBOURG..,. STAFF REPORT TO: FROM: Mayor and Members of Council Dean A. Hustwick, Director of Recreation and Culture DATE OF MEETING: Committee of

More information