1 OFFERING MEMORANDUM Contact: Yates & Company Realty, LLC 255 Alhambra Circle Suite 325, Coral Gables, FL Phone: Cell: Website: Disclaimer: While the information contained in this Memorandum and any other Evaluation Material is believed to be reliable, Owner does not guarantee its accuracy or completeness, as such information is provided without representation or warranty by Owner. The Property is being offered on an "As-Is, Where-Is" basis. A prospective purchaser or other party authorized by the prospective purchaser to use such material solely to facilitate the prospective purchaser's investigation, must make its independent investigations, projections and conclusions regarding the acquisition of the Property without reliance on this Memorandum or any other Evaluation Material. Although additional Evaluation Material, which may include engineering, environmental or other reports, may be provided to qualified parties as the marketing period proceeds, prospective purchasers should seek advice from their own attorneys, accountants, engineers and environmental experts.

2 North Hutchinson Island 7.55 Acres Vacant Land Approved for 30 Townhome Units North Hutchinson Island Ft. Pierce, FL Yates & Company Realty, LLC 2

3 North Hutchinson Island Townhomes The Property is located in the highly desirable North Hutchinson Island Beach Front Community Area. This property has views of the Atlantic ocean, with access on the west side of North A1A. The prior site plan was approved in 2006 for 30 townhome units consisting of ten 3-unit buildings with 1 st floor garages. St Lucie County Utilities available include existing Force Main, Water Main and Reclaimed Water Main in SR A1A adjacent to property. Project Details Acreage: 7.55 acres Approval: Minor Site Plan for 30 townhome units consisting of ten 3 unit buildings with 1 st floor garages; Units 3,094 sf; 3.55 acres conservation easement, cabana, pool; Certificate of Capacity approved for 30 townhome units Ordinance GM approved 08/23/06. Site: 210 LF frontage on SR A1A and Ft. Pierce with small abandoned motel on site Access: North A1A Address: 4001 N A1A, Ft. Pierce, FL Taxes: St. Lucie County Folio No s: and Zoning: HIRD Hutchinson Island Residential District; Price: $3,300,000 Yates & Company Realty, LLC 3

4 Site Plan Yates & Company Realty, LLC 4

5 North Hutchinson Island Condominiums Yates & Company Realty, LLC 5

6 North Hutchinson Island Projects C. Landscaping Along A1A This project is intended to improve the aesthetics at the Jensen Beach round-about and in areas all along A1A by providing native, colorful flowering ground covering, shrubs and trees. A typical landscaping pod could be developed and used around both the Jensen Beach round-about and also the proposed round-about at MacArthur Boulevard. The same landscaping pod could be modified and amended to be used for landscaping along the length of A1A. The intent would be to design a consistent landscaping plan for the length of A1A and a complementary landscaping plan for the round-abouts. E. Improved Pedestrian Crosswalks/Landscape Medians at Intersections This would be both an esthetic and safety project, which would provide native, flowering plants within raised medians and stamped asphalt, or paver block crosswalks for safe landing areas while crossing one lane of traffic at a time. This work could be in conjunction with improvements to the round-about, see projects H & I. F. Pedestrian Crosswalks and Landscaped Medians This project s intent is to provide safer pedestrian crossing of A1A. There are a number of condominium complexes that own property on both the ocean and river side of the island and, there are very few striped crosswalks for pedestrians to use to cross A1A. This project is to consider such locations and construct safer crosswalks, possibly with pavers or stamped asphalt, signage and landscaped medians to provide for a safe area between travel lanes. Possible locations for these cross walks would in the area of Hutchinson House, Buttonwood, Maritimes Condo, Ocean View, Sandpebble, and Holiday Inn Oceanside (pictured in exhibit). H. Enlarge and Add Right-hand Turn Lanes to Jensen Beach Round-About This is a traffic improvement project that proposes to construct right-hand turn lanes on both, A1A south onto Jensen Beach Causeway and also from Jensen Beach Causeway east onto A1A south. The right hand turn lanes would incorporate landscaped medians and improved pedestrian crosswalks, see project E. The project would consider enlarging the round-about to better accommodate larger vehicles and trailers. I. Enhancements to Jensen Beach Round-About This would be an aesthetics project that proposes to enhance the center of the round-about with a statue, similar to the dolphins at the Indian Riverside Park and possibly incorporating a water fountain, lighting or landscape bed. J. Enhancements to The Entrances of the Public Beaches The project s intent would be to develop a consistence artistic design (such as a sailfish) that identifies the entrances to the public beaches and incorporate the design in the beach access roadway by the use of pavers or on enhanced signage. K. Add and Lengthen Turn Lanes for Holiday Inn This project proposes to add a left turn lane into the Holiday Inn Oceanside and to lengthen the right and turn lanes to avoid a potential stopped traffic situation. Yates & Company Realty, LLC 6

7 Fort Pierce Attractions Ft. Pierce is a diverse yet neighborly community, embracing both the richness of our heritage and the promise of the future in St. Lucie County. Downtown has retained its old Florida charm and scale, as it has welcomed new development and revitalization. The historic waterfront downtown affords residents contemporary shopping, dining, great fishing and a range of entertainment and activities from the Farmers Market, Bike Night, Friday Fest, Jazz Market and the city owned and operated historic, 1,200 seat Sunrise Theatre for the Performing Arts. Main Attractions Include: A. E. BACKUS MUSEUM & GALLERY DOWNTOWN ROUNDABOUT: The Downtown roundabout is the best-known public space in the city. It was the first of many streets rebuilt in the mid-1990's designed to improve pedestrian safety and enhance the aesthetics of otherwise routine public works. Future urban projects throughout the Treasure Coast of Florida, including several roundabouts built in Fort Pierce and St. Lucie County, followed many of its innovative features. FORT PIERCE BRANCH LIBRARY: The Fort Pierce Public Library is the most used facility in the library system. Citizens and visitors enjoy the waterfront location and the comfort of the Mediterranean style building. FORT PIERCE CITY MARINA: Features a state of the art dock system, located on Florida s Treasure coast in historic downtown Fort Pierce, and is a short distance from the Bahamas. ST. LUCIE COUNTY AQUARIUM THE NATIONAL NAVY SEAL MUSEUM Yates & Company Realty, LLC 7

8 Distances to Popular Destinations Vero Beach 3.4 miles Sebastian 14.5 miles Palm Bay 31.6 miles Orlando 108 miles Tampa 143 miles Fort Pierce 16.4 miles West Palm Beach 76.5 miles Miami 141 miles Key West 298 miles 8

9 Please contact: Brenda Yates, Broker Yates & Company Realty, LLC 255 Alhambra Circle, Suite 325 Coral Gables, FL Phone: Fax: Disclaimer: While the information contained in this Memorandum and any other Evaluation Material is believed to be reliable, Owner does not guarantee its accuracy or completeness as such information is provided without representation or warranty by Owner. Because of the foregoing and since the Property is being offered on an "As-Is, Where-Is" basis, a prospective investor or other party authorized by the prospective investor to use such material solely to facilitate the prospective purchaser's investigation, must make its independent investigations, projections and conclusions regarding the acquisition of the Property without reliance on this Memorandum or any other Evaluation Material. Although additional Evaluation Material, which may include engineering, environmental or other reports, may be provided to qualified parties as the marketing period proceeds, prospective purchasers should seek advice from their own attorneys, accountants, engineers and environmental experts. 9

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle GREENING THE BOULEVARD Katherine Spitz Associates Inc. 4212½ Glencoe Avenue Marina Del Rey, CA 90292 310 574 4460 Fax 574 4462 January 2008 Table of Contents Overview Proposed Design Improvements Illustration

More information

Current City Warehouse Facility. City Market Re-Use Concept. Indoor Market/ Maker s Incubator 1.06 acres +/- Open Air Market 1.

Current City Warehouse Facility. City Market Re-Use Concept. Indoor Market/ Maker s Incubator 1.06 acres +/- Open Air Market 1. Current City Warehouse Facility City Market Re-Use Concept Indoor Market/ Maker s Incubator 1.06 acres +/- Open Air Market Open 1.63 acres Air Market +/- 1.63 acres +/- 4.59 acres +/- Artists Workshops/

More information

Villa Vizcaya PUD Amendment No. 3 4 April 16, 2008 May 29, 2015 Presented to: City of Port St. Lucie Planning and Zoning Department 121 SW Port St. Lucie Boulevard Port St. Lucie, Florida 34984 Exhibit

More information

FDOT D4 Complete Streets

FDOT D4 Complete Streets FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,

More information

STUART MASTER PLAN. The Town on its Western Waterfront. Treasure Coast Regional Planning Council/City of Stuart TCRPC/Tom Spain

STUART MASTER PLAN. The Town on its Western Waterfront. Treasure Coast Regional Planning Council/City of Stuart TCRPC/Tom Spain STUART MASTER PLAN C i t y O f S t u a r t F l o r i d a 1998 TCRPC/Tom Spain The Town on its Western Waterfront Treasure Coast Regional Planning Council/City of Stuart STUART MASTER PLAN A WATERFRONT

More information

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails Appendix A: Park Classifications The intent of parks and recreation classifications is to aid in making acquisition and design decisions for park sites, facilities and the organization of recreation space

More information

CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS

CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS N Project Location -Town Square -Villages at Ocean SE 1st St, between E Woolbright Rd and SE 2nd Ave Project Location -Boynton One -Publix

More information

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). Pelican Bay Community Improvement Plan Traffic,JI Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). D1 -A: Provide consistent signing, marking

More information

Johnson Street Bridge Public Realm Update

Johnson Street Bridge Public Realm Update Johnson Street Bridge Public Realm Update August 20, 2015 Background Johnson Street Bridge Replacement Project impacts a diverse range of stakeholders In addition to a new bridge, the project also includes

More information

ARCHITECTURAL ALLIANCE LANDSCAPE WINTER

ARCHITECTURAL ALLIANCE LANDSCAPE WINTER ARCHITECTURAL ALLIANCE LANDSCAPE WINTER 2015 COMPANY PROFILE Formed in 1991, Architectural Alliance Landscape is a mid-sized firm in business in South Florida for over 24 years. Our goal is to bring new

More information

EXISTING COMPREHENSIVE PLAN

EXISTING COMPREHENSIVE PLAN EXISTING COMPREHENSIVE PLAN Town Center Land Use Element: V. LAND USE POLICIES Town Center Mercer Island's business district vision as described in "Your Mercer Island Citizen-Designed Downtown" was an

More information

Civic Center District

Civic Center District Civic Center District The Civic Center district is the civic and social heart of Warrenville, containing such public buildings as the City Hall, Warrenville Public Library, Police Station, Park District

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 8B5

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 8B5 TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 8B5 From: Date: Subject: Staff February 17, 2017 Council Meeting Local Government Comprehensive Plan Review

More information

WHO SAYS YOU CAN T HAVE IT ALL? marina.

WHO SAYS YOU CAN T HAVE IT ALL? marina. WHO SAYS YOU CAN T HAVE IT ALL? Gain a new perspective on waterfront living with Koi Residences and Marina a master-planned collection of waterfront villas, lofts, and condominium homes featuring resort-style

More information

Zoning and Development Considerations in the Boothbay Harbor Maritime/Water Dependent District

Zoning and Development Considerations in the Boothbay Harbor Maritime/Water Dependent District Zoning and Development Considerations in the Boothbay Harbor Maritime/Water Dependent District Bob Faunce Lincoln County Planner Lincoln County Regional Planning Commission Board of Selectmen and Planning

More information

WILMINGTON WATERFRONT Approved Project

WILMINGTON WATERFRONT Approved Project LA Waterfront WILMINGTON WATERFRONT Approved Project pp j Approved Project Annual Program Update February 28, 2011 AGENDA Welcome Update on the LA Waterfront Program Projects Underway Upcoming Projects

More information

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan Notes: This document is provided for information purposes

More information

SCTPO Project Summary September 2014

SCTPO Project Summary September 2014 A1A MULTIMODAL CORRIDOR PLANNING AND ENGINEERING ANALYSIS Florida Department of Transportation SCTPO Project Summary September 2014 PRESENTATION FOOTER Meeting Agenda What We Plan To Do Project Background

More information

MEMORANDUM. DATE: March 15, Chairman and Members Community Redevelopment Agency. Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director

MEMORANDUM. DATE: March 15, Chairman and Members Community Redevelopment Agency. Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director MEMORANDUM DATE: March 15, 2019 TO: FROM: Chairman and Members Community Redevelopment Agency Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director SUBJECT: Camino Square, IDA No. CRP-16-02, located at 171

More information

Downtown North Las Vegas Demonstration Site Project. Project Update

Downtown North Las Vegas Demonstration Site Project. Project Update Downtown North Las Vegas Demonstration Site Project Project Update 7.16.14 Presentation Overview Project Purpose and Process Planning Context Opportunities and Barriers Summary Community Input Preliminary

More information

IMAGINE CLEARWATER. Community Workshop 3. November 2016

IMAGINE CLEARWATER. Community Workshop 3. November 2016 IMAGINE CLEARWATER Community Workshop 3 November 2016 Imagine Clearwater has been a 6-month community-focused process to re-envision the downtown waterfront. VISIONING FRAMEWORK MASTER PLAN HOW CAN WE

More information

TAC/CAC, TPO Project Update February 2016

TAC/CAC, TPO Project Update February 2016 A1A MULTIMODAL CORRIDOR PLANNING AND ENGINEERING ANALYSIS Florida Department of Transportation TAC/CAC, TPO Update February 2016 PRESENTATION FOOTERT Meeting Agenda What We Plan To Discuss Background New

More information

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: October 18, 2018 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction and Traffic Highlights

More information

North Coast Retail Center Newly constructed Shopping Center in daily retail destination

North Coast Retail Center Newly constructed Shopping Center in daily retail destination [ Conceptual Sprint Signage ] North Coast Retail Center Newly constructed Shopping Center in daily retail destination 1479 SE Discovery Lane, Warrenton, OR 97146 Featured Photos [ Conceptual Sprint Signage

More information

III. PROJECT DESCRIPTION

III. PROJECT DESCRIPTION III. PROJECT DESCRIPTION LOCATION AND BOUNDARIES The City of Manhattan Beach is located in the South Bay region of Los Angeles County, California, approximately 2 miles south of the Los Angeles International

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting October 15, 2005 DATE: September 28, 2005 SUBJECT: Request to Advertise the adoption of the 2005 Clarendon Sector Plan C. M. RECOMMENDATION:

More information

Section 4: Goals, Objectives, and Strategies

Section 4: Goals, Objectives, and Strategies 99 Section 4: Goals, Objectives, and Strategies Goal 1 Resource Protection, Maintenance, Preservation, and Enhancement Protect, preserve, maintain, and enhance the natural, recreational, archaeological,

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

LIVE. WORK. ENTERTAIN.

LIVE. WORK. ENTERTAIN. LIVE. WORK. ENTERTAIN. A Charming, Mixed-use Development in Midlothian, Virginia BLACKWOOD DEVELOPMENT COMPANY, INC. d e s i g n s t u d i o 5701 grove avenue richmond va 23226 804.740.7500 www.1hg.net

More information

preliminary master plan Cover Slide executive summary public presentation

preliminary master plan Cover Slide executive summary public presentation preliminary master plan public presentation executive summary Cover Slide {agenda} + Master Plan Process + Context and Overviews + Preliminary Concepts - Entry/Gateways - Core District - Streetscape +

More information

ENVISIONING TOMORROW S FORT MYERS BEACH

ENVISIONING TOMORROW S FORT MYERS BEACH ENVISIONING TOMORROW S FORT MYERS BEACH NATURAL ENVIRONMENT... 2-1 MOBILITY... 2-1 TIMES SQUARE... 2-1 AVENUE OF PALMS... 2-2 RESIDENTIAL NEIGHBORHOODS... 2-2 A SECOND MAIN STREET... 2-4 FORT MYERS BEACH,

More information

Capital Projects impacting Odenton Town Center

Capital Projects impacting Odenton Town Center Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000

More information

Previous Stakeholder Meetings

Previous Stakeholder Meetings Titusville Tomorrow Previous Stakeholder Meetings Workshop 1 SWOT CVS Workshop 2 SWOT and CVS Results Value of Place Based Design 3 Table Top Designs The Waterfront The Gateways The Downtown Key Points

More information

DRAFT Tavares Square EXHIBIT A

DRAFT Tavares Square EXHIBIT A EXHIBIT A An opportunity to develop a trend setting mixed-use project off shores of Lake Dora in downtown Tavares, Florida America s Seaplane City Notice of Request for Proposals for Development of Tavares

More information

Carlsbad Village Redevelopment Concept Summary of Features

Carlsbad Village Redevelopment Concept Summary of Features Carlsbad Village Redevelopment Concept Summary of Features Calthorpe Associates November 5, 2003 The Redevelopment Concept illustrates a vision for the future of Carlsbad Village. The overall vision of

More information

Public input has been an important part of the plan development process.

Public input has been an important part of the plan development process. Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the

More information

Project Consulting Team:

Project Consulting Team: THE DOWNTOWN CHERRYVILLE LAND USE + STREETSCAPE MASTER PLAN WAS FUNDED THROUGH THE GENEROUS DONATIONS OF THE FOLLOWING: The Community Foundation of Gaston County ElectriCities of North Carolina The Cherryville

More information

DRAFT City of Titusville 2040 Comprehensive Plan Future Land Use, Housing, and Transportation Elements April 16, 2018

DRAFT City of Titusville 2040 Comprehensive Plan Future Land Use, Housing, and Transportation Elements April 16, 2018 DRAFT City of Titusville 2040 Comprehensive Plan Future Land Use, Housing, and Transportation Elements April 16, 2018 Prepared by Canin Associates for the City of Titusville About the Comprehensive Plan:

More information

3.1 community vision. 3.3 required plan elements

3.1 community vision. 3.3 required plan elements Chapter 3 Community Form 3.1 community vision 3.2 Parks & landscaping concepts 3.3 required plan elements D R A F T 20 Community Form Chapter 3 3.0 Community form 3.1 community vision The Specific Plan

More information

Mayor Leon Skip Beeler and Members of the City Commission. Anthony Caravella, AICP, Director of Development Services

Mayor Leon Skip Beeler and Members of the City Commission. Anthony Caravella, AICP, Director of Development Services CITY COMMISSION BRIEFING & Planning Board Report For Meeting Scheduled for June 7, 2012 Inner Room Cabaret Site Plan/Architectural Review Downtown Overlay District/Primary Downtown Area Site Plan Consent

More information

Pine Island Road Corridor Master Plan

Pine Island Road Corridor Master Plan RECOMMENDED DEVELOPMENT PLAN Figure 9: Del Prado Village District Conceptual Framework The Conceptual Framework (Figure 8) for development of the Pine Island Corridor is to encourage mixed-use development

More information

Reinventing Miner Avenue as a

Reinventing Miner Avenue as a Reinventing Miner Avenue as a Complete Street Reinventing Miner Avenue as a Complete Street Agenda Project Overview / Introductions Previous Meeting Recap Economic Considerations Opportunities & Constraints

More information

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016 KASPER City of Georgetown, Texas PUD Planned Unit Development December 30, 2015 Revised January 27, 2016 Applicant: Sentinel Land Company, LLC 4910 Campus Drive Newport Beach, CA Prepared by: SEC Planning

More information

Please read the entire document

Please read the entire document projects impacting the waterfront revitalization area. The waterfront revitalization area of the town will have to subareas to the west and east of the village. Page 6 of 6 Wayfinding master plan create

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 10

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 10 TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 10 From: Date: Subject: Staff March 18, 2016 Council Meeting Village of North Palm Beach Charrette Work-In-Progress

More information

Capital Projects in and near Odenton Town Center

Capital Projects in and near Odenton Town Center Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately

More information

Special Joint Meeting. Emerald Isle Planning Board. Emerald Isle Board of Commissioners. January 18, 2017

Special Joint Meeting. Emerald Isle Planning Board. Emerald Isle Board of Commissioners. January 18, 2017 Special Joint Meeting Emerald Isle Planning Board Emerald Isle Board of Commissioners January 18, 2017 STEERING COMMITTEE: Jim Normile Town Commissioner Ken Sullivan Planning Board Larry Watson Retail

More information

{Best Practices. Summary of Tools, Strategies and Best Practices from 11 Michigan Case Study Communities

{Best Practices. Summary of Tools, Strategies and Best Practices from 11 Michigan Case Study Communities Case Studies Michigan Coastal Community Working Waterfronts { Summary of Tools, Strategies and from 11 Michigan Case Study Communities Table of Contents Zoning...2 Community and Stakeholder Collaboration

More information

The Wildflower Property

The Wildflower Property Jonathan Kolbe, FRSA The Wildflower Property An inclusive alternative Table of Contents Table of Figures... 2 Background... 3 Location... 3 Purpose... 3 Existing Conditions... 3 Silver Palm Park... 3 The

More information

Metro. Activity Center Design Guidelines. Recommendations For Developing Focused, Mixed-Use Commercial/Residential Centers

Metro. Activity Center Design Guidelines. Recommendations For Developing Focused, Mixed-Use Commercial/Residential Centers Metro Activity Center Design Guidelines Recommendations For Developing Focused, Mixed-Use Commercial/Residential Centers Metro Activity Centers What is a MAC? Legacy, the adopted guide for the future growth

More information

City Council of Fort Walton Beach ENGINEERING & UTILITY SERVICES MEMORANDUM

City Council of Fort Walton Beach ENGINEERING & UTILITY SERVICES MEMORANDUM City Council of Fort Walton Beach ENGINEERING & UTILITY SERVICES MEMORANDUM To: From: Michael D. Beedie, City Manager Tim Bolduc, Engineering and Utilities Services Director Date: April 26, 2016 Subject:

More information

Point Defiance Park. Master Plan Update. April 23 rd 2015

Point Defiance Park. Master Plan Update. April 23 rd 2015 Point Defiance Park Master Plan Update April 23 rd 2015 Public Participation 1/29, 2/26, 3/26 & 4/23 Tonight s Agenda: Introduction: March Meeting Recap: Overview Feedback Responses Presentation of Master

More information

Chapter 14 Streetscape Improvements

Chapter 14 Streetscape Improvements This chapter presents streetscape design concepts for key streets and gateways in the Downtown Specific Plan area. This chapter is organized as follows: 14 Streetscape Improvements 14.1 Streetscape Treatments

More information

BRADENTON RIVERWALK EXPANSION MASTER PLAN

BRADENTON RIVERWALK EXPANSION MASTER PLAN BRADENTON RIVERWALK EXPANSION MASTER PLAN INTRODUCTION & AGENDA Process Update Community Engagement Summary Center for Active Design (CfAD) Recommendations Context and Existing Conditions Master Plan Alternatives

More information

Highest & Best Use Study Marina Park Lands

Highest & Best Use Study Marina Park Lands Executive Summary of Report MARCH 2006 TABLE OF CONTENTS 1. Introduction...1 2. Study Process...2 3. Highest And Best Use Program...3 4. Concept Plan...8 5. Public Area Animation...9 6. Marina Park Implementation

More information

COW BAY DEVELOPMENT LANDS

COW BAY DEVELOPMENT LANDS PRINCE RUPERT PORT AUTHORITY COW BAY DEVELOPMENT LANDS MARCH 28TH, 2012 % of Completion 0 25 50 75 100 4 guiding principles & OBJECTIVES COMMUNITY FEEDBACK BUSINESS & COW BAY MERCHANT FEEDBACK COMMUNITY

More information

G. RECREATION AND OPEN SPACE ELEMENT. The following summarizes the Recreation and Open Space Element:

G. RECREATION AND OPEN SPACE ELEMENT. The following summarizes the Recreation and Open Space Element: G. RECREATION AND OPEN SPACE ELEMENT The purpose of the Element is to provide the framework and direction for a comprehensive system of public and private sites for recreation, including, but not limited

More information

A Vibrant Downtown. Chapter 5 Cary Public Art Opportunities 31

A Vibrant Downtown. Chapter 5 Cary Public Art Opportunities 31 A Vibrant Downtown Cary s vision for Downtown is a unique, vibrant, dynamic, pedestrian friendly location; a regional destination and a place to live, work, and recreate, according to the 2001 Town Center

More information

See additional legal disclaimers on last page. Artist s Conceptual Rendering.

See additional legal disclaimers on last page. Artist s Conceptual Rendering. ORAL REPRESENTATIONS CANNOT BE RELIED UPON AS CORRECTLY STATING THE REPRESENTATIONS OF THE DEVELOPER. FOR CORRECT REPRESENTATIONS, MAKE REFERENCE TO THIS BROCHURE AND TO THE DOCUMENTS REQUIRED BY SECTION

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 05-22-14 Consent Item - Park Potomac: Site Plan Amendment No. 82004015K MCS. Molline

More information

RESEDA - WEST VAN NUYS COMMUNITY PLAN

RESEDA - WEST VAN NUYS COMMUNITY PLAN RESEDA - WEST VAN NUYS COMMUNITY PLAN Executive Summary As part of the initial outreach effort, the Department of City Planning hosted two workshops for the Reseda-West Van Nuys Community Plan Area during

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: October 19, 2017 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction and Traffic Highlights

More information

3.1 Existing Land Use

3.1 Existing Land Use 3.0 Land Use This strategy has been developed taking into account the position of the Town of Sidney as the economic center of the Saanich Peninsula. It acknowledges existing land use patterns in the downtown

More information

8 October 14, 2015 Public Hearing

8 October 14, 2015 Public Hearing 8 October 14, 2015 Public Hearing APPLICANT & PROPERTY OWNER: PRICE S HOLDINGS, LLC STAFF PLANNER: Karen Lasley REQUEST: A. Conditional Use Permit (Automobile Repair Garage) B. Change in Nonconforming

More information

Assessment of the Extent and Quality of the Landscape Features of the Campus.

Assessment of the Extent and Quality of the Landscape Features of the Campus. Assessment of the Extent and Quality of the Landscape Features of the Campus. 1. In 2012 the University used geographic information systems to create georeferenced layers for all landscape and hardscape

More information

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC MEMORANDUM CHARLES PUTMAN & ASSOCIATES, INC. LAND DEVELOPMENT CONSULTANTS PLANNING ZONING PERMITTING 4722 NW Boca Raton Boulevard, Suite C-106 Boca Raton, Florida 33431 Phone: 561/994-6411 FAX: 561/994-0447

More information

Coast Highway Oceanside, California

Coast Highway Oceanside, California Coast Highway Oceanside, California Coast Highway Plan Zones What We ve Heard - Walkable/Bikeable Community (Senior and Child Friendly) -Wider Sidewalks -Street Trees -Traffic Calming -Bike Lanes -Paseos

More information

Activities for All Ages. Small Community Feel. Entertainment. Mix of Uses

Activities for All Ages. Small Community Feel. Entertainment. Mix of Uses DRAFT PROPOSALS Safety Walkability Open Space/Views to Ocean/Beach Access Activities for All Ages Small Community Feel Entertainment Mix of Uses Gathering Place Celebrate Our Assets: Enhance the four major

More information

Treasure Coast Regional Planning Council

Treasure Coast Regional Planning Council Treasure Coast Regional Planning Council Began these Services in 1989 Lead 93 Public Charrettes Regionally & Statewide Assisted with 23 Other Public Charrettes Services Include: Citizen-Based Planning

More information

Proposed Staging Plan For:

Proposed Staging Plan For: 701 Waterford Way, Suite 450, Miami, FL 33126 Suffolk Page 1 Proposed Staging Plan For: St aging Plan Includes: 1.0 Construction Site 2.0 MOT Traffic Circulation Plan 2.1.P1 MOT Road Closures (Alhambra)

More information

Appendix C Implementation Schedule

Appendix C Implementation Schedule Implementation Schedule Regional, Historical and Environmental Setting Seek recollection of 20th Century Shipyard products for historical preservation and community display. Implement recommendations from

More information

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA FINANCIAL PROJECT ID NUMBER 411189-2-22-01 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 4 Prepared

More information

Appendix I ARLINGTON COUNTY SECTOR PLANS SUMMARY RECOMMENDATIONS RELATED TO PUBLIC SPACES

Appendix I ARLINGTON COUNTY SECTOR PLANS SUMMARY RECOMMENDATIONS RELATED TO PUBLIC SPACES Appendix I ARLINGTON COUNTY SECTOR PLANS SUMMARY RECOMMENDATIONS RELATED TO PUBLIC SPACES The County has developed Sector Plans for various planning areas within Arlington County s Metro corridors. Following

More information

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES Goal 7 To provide park facilities, recreation programs, and open space resources that are safe, adequate, and accessible to all City residents,

More information

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT AUGUST 18, 2016

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT AUGUST 18, 2016 REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT AUGUST 18, 2016 AWH The Planning and Development Department hereby forwards to the Planning

More information

4.1.3 LAND USE CATEGORIES

4.1.3 LAND USE CATEGORIES 4.1.3 LAND USE CATEGORIES a. City Center District The City Center District incorporates the existing character and mix of uses in downtown Belmont to encourage redevelopment and new development in keeping

More information

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m. Public Hearing Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, 2019 open house at 4 p.m., formal presentation at 5 p.m. Welcome to the Public Hearing for the Harborview Road (CR 776)

More information

About Momentum Midland

About Momentum Midland About Momentum Midland Achieving a community s full potential in terms of economic development and quality of life is critically important to its long term sustainability. Core to achieving this is a vibrant

More information

East Central Area Plan

East Central Area Plan East Central Area Plan Steering Committee Meeting March 8 th, 2018 CHUN Tears McFarlane House Vision Statement Development Opportunities Analysis Vision Elements 1. Equitable, Affordable and Inclusive

More information

2.1 Location and Size

2.1 Location and Size 2.0 Context 7 2.1 Location and Size The Saanich Penninsula The study area is centrally located within the Town boundaries on the east side of Highway 17, which runs through Sidney in a north-south direction.

More information

OCEAN BOULEVARD PLANNED DEVELOPMENT DISTRICT (PD-5)

OCEAN BOULEVARD PLANNED DEVELOPMENT DISTRICT (PD-5) OCEAN BOULEVARD PLANNED DEVELOPMENT DISTRICT (PD-5) Ordinance History: C-5562, 1982 The intent of the Planned Development Plan is to provide a framework to guide new development in a way that is sensitive

More information

OCEANSIDE DEVELOPER S CONFERENCE

OCEANSIDE DEVELOPER S CONFERENCE 1 AGENDA OCEANSIDE DEVELOPER S CONFERENCE Tuesday, November 15th, 2016, 8:30 a.m. City Hall South, 1 st Floor, Guajome Room 1. 8:30-9:30 a.m. Proposed 57 lot residential subdivision of an approximately

More information

Public responses to the question what do you want Muscatine to be, 20 years from now? (Responses were categorized as follows)

Public responses to the question what do you want Muscatine to be, 20 years from now? (Responses were categorized as follows) Mississippi Drive Kickoff Event 9/1/2015 Blue Zones Kickoff Presentation Public responses to the question what do you want Muscatine to be, 20 years from now? (Responses were categorized as follows) Physical

More information

SECTION 3: PROJECT DESCRIPTION

SECTION 3: PROJECT DESCRIPTION San Ramon City Center - City of San Ramon Draft Subsequent EIR Project Description SECTION 3: PROJECT DESCRIPTION This section describes the proposed San Ramon City Center Project (proposed project) that

More information

Official Community Plan Bylaw No. 4360, 2004, Amendment Bylaw No. 4897, 2016 (Sewell s Landing)

Official Community Plan Bylaw No. 4360, 2004, Amendment Bylaw No. 4897, 2016 (Sewell s Landing) District of West Vancouver Official Community Plan Bylaw No. 4360, 2004, Amendment Bylaw No. 4897, 2016 (Sewell s Landing) Effective Date: 1089612v1 District of West Vancouver Official Community Plan Bylaw

More information

Commercial Node Plan Devine Street/Jackson Blvd. COLUMBIA, SC

Commercial Node Plan Devine Street/Jackson Blvd. COLUMBIA, SC Commercial Node Plan Devine Street/Jackson Blvd. COLUMBIA, SC 9.17.13 AGENDA 1 Introductions 2 Project Update 3 Concepts 4 Recommendations 5 Next Steps Introductions Project Update Process 5-Phase Process

More information

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities A. Background 1 A Main Street Master Plan Study was performed and completed in October of 2007. The study was initiated to review current land uses and development patterns along Main Street, from Parrish

More information

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals.

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals. CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES Introduction The Greensburg Comprehensive Plan is intended as a working community document. A combination of long and short-term goals, this document is intended

More information

Pinellas County Greenways

Pinellas County Greenways Pinellas County Greenways USING GREENWAYS TO LINK OPEN SPACES The Florida Greenways Commission has defined a greenway as...a corridor of protected open space that is managed for conservation and/or recreation.

More information

EVALUATION OF THE PROPOSED CENTAL BEACH MASTER PLAN BY T H E C E N T R A L B E A C H A L L I A N C E October 2010 INTRODUCTION

EVALUATION OF THE PROPOSED CENTAL BEACH MASTER PLAN BY T H E C E N T R A L B E A C H A L L I A N C E October 2010 INTRODUCTION Please read this report which will be presented to the membership for approval at the meeting on November 4, 2010. To read the Master Plan go to www.fortlauderdale.gov/planning_zoning/central_beach_masterplan.htm

More information

SR 916/NW/NE 135 Street Public Hearing

SR 916/NW/NE 135 Street Public Hearing Florida Department of TRANSPORTATION SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project From NW 6 Avenue to west of SR 5/Biscayne Boulevard FM #429346-1-52-01

More information

Small Area Plan. South Gateway

Small Area Plan. South Gateway Small Area Plan Adopted May 12, 2008 South Gateway Purpose. The South Gateway Small Area Plan defines the City s expectations for the future of the southern entrance to the City at Interstate 85 and Highway

More information

East Whiteland Township Current Land Development Projects

East Whiteland Township Current Land Development Projects Current Land Development Projects A. Lincoln Court (Lancaster Avenue / Malin Road) Demolish existing 2 story brick and stucco structure Build onto existing 1 story masonry shopping center to add 8 new

More information

OPEN HOUSE. Future. Neighborhood. Thursday April 27, :30 8:30 PM Refreshments provided Discovery Center, 4444 Hadley Avenue North

OPEN HOUSE. Future. Neighborhood. Thursday April 27, :30 8:30 PM Refreshments provided Discovery Center, 4444 Hadley Avenue North OPEN HOUSE Thursday April 27, 2017 6:30 8:30 PM Refreshments provided Discovery Center, 4444 Hadley Avenue North The City Council has ini ated a planning process to guide future development on 206 acres

More information

Millbrae TOD #2 Project Analysis

Millbrae TOD #2 Project Analysis Millbrae TOD #2 Project Analysis Project Description A Site Development Permit and Conditional Use Permit are proposed to allow for a mixed-use transitoriented development on approximately 9 Acres located

More information

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File # 0 'O DI Lan-171-14 1 - THE CORPORATION OF THE TOWN OF COBOURG..,. STAFF REPORT TO: FROM: Mayor and Members of Council Dean A. Hustwick, Director of Recreation and Culture DATE OF MEETING: Committee of

More information

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ)

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ) Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ) The Project The Ashland Public Art Commission (PAC) seeks an artist, or artist team, to develop a site specific, permanent,

More information

V. Gateways GATEWAYS / V-1

V. Gateways GATEWAYS / V-1 V. GATEWAYS / V-1 Many of Chesapeake s gateways are located on highways and call for bold and attractive designs that motorists can understand, appreciate, and enjoy. can also take the form of natural

More information

REQUEST FOR PROPOSALS (RFP) DEVELOPMENT OF CITY-OWNED PROPERTY LOCATED AT THE NORTHWEST CORNER OF OLIVE BOULEVARD AND MIDLAND BOULVARD

REQUEST FOR PROPOSALS (RFP) DEVELOPMENT OF CITY-OWNED PROPERTY LOCATED AT THE NORTHWEST CORNER OF OLIVE BOULEVARD AND MIDLAND BOULVARD REQUEST FOR PROPOSALS (RFP) DEVELOPMENT OF CITY-OWNED PROPERTY LOCATED AT THE NORTHWEST CORNER OF OLIVE BOULEVARD AND MIDLAND BOULVARD CITY OF UNIVERSITY CITY 6801 DELMAR BOULEVARD UNIVERSITY CITY, MO

More information