1 Digital Terrestrial Television Infrastructure Rollout Environmental Impact Assessment - Kongola -

2 1 1 ENVIRONMENTAL IMPACT ASSESSMENT: KONGOLA 1.1 RATIONALE FOR THE SITE Kongola is situated in the Caprivi corridor in the north eastern part of Namibia. This corridor is a very popular tourist route stretching from Katima Mulilo towards Rundu and the rest of Namibia. This little town is relatively densely populated with commercial activities evident. There are numerous tourist attractions and parks around Kongola which makes it a very popular tourism destination. Servicing the area by constructing the NBC mast will further enhance the tourist experience by supplying good radio and television reception. 1.2 SITE DESCRIPTION Two possible sites were investigated in this study. The first site has existing mast infrastructures which can be used for this project, but the stay wires cannot be fitted into the available space surrounding the existing mast. It was therefore necessary to identify an alternative site in close proximity. The location of this proposed site is represented in the following image (refer to the Google Earth image below). This site is situated on a very level topographical area with sandy soils next to the Trans Caprivi Highway. The biggest concern is the fact that there are numerous other masts (cell-phone and communication) present in town. This is a real concern for radiation levels for both the residents and tourists alike. Figure 1: Locality map of the existing and proposed Kongola sites.

3 2 In order to assess the sufficiency of the site, an assessment form was completed during the site visit. This is based on the visual observations and technical information available. The following table (Table 1) depicts the completed description for this site: Table 1: Site description ACTIVITY INFORMATION 1 Position of the site 2 Footprint of mast Latitude Longitude Proposed height of mast Diameter of stay wires Describe how the stay wires will be anchored to the ground (e.g. concrete, rock foundation). Proposed position 17 49'12.00"S 23 23'51.40"E 120m 26mm 48mm Concrete blocks with fence 3 Land ownership To whom does the land on which the proposed site is located, belong? (e.g. Private land, state land, town lands, etc.) Local Authority 4 Description of the site General locality, surrounding landscape, etc. North -mahangu field close to town, south about 400m the road to Katima Mulilo, east mahangu field, east also mahangu field. The 33Kva power line lies to the north and the west. 5 Project outputs Define any nuisances or negative impacts that could result from the project during the construction and operation (e.g. vibration, noise, radiation, dust). Radiation in the town of Kongola is a big concern. There are currently 4 different towers present in the town. 6 Access to site Existing Road (Yes/No) No New Road (Yes/No) Distance of new road Grading of new road (paved, unpaved, tar or gravel, etc.) Slope where new road will be situated Best position for new road (photo nr) Yes 100m Gravel Flat Existing access 7 Civil Aviation Distance to the nearest airport 10km

4 3 8 Waste generation 9 Energy provision Distance to nearest dump site Distance to nearest power line Required structures (e.g. substations, steel structures) Length of the required power line Within Kongola On site N/A None Is the power line more than 2 km? If yes, then the assessment of the proposed location for the power line should be included in the assessment of the site for the mast. No 1 Landscape Describe the surrounding landscape, e.g. Ridgeline, plateau, side slope of hill/mountain, closed valley, open valley, plain, undulating plain/low hills, dune, sea-front, etc. Plains How accessible is the site by vehicle? Very accessible 2 Soil and Geology Photo numbers Unstable rocky slopes/ steep slopes with loose soil/ rocky with limited soil Describe soil (e.g. clay, sand, etc.) Identify areas where erosion is likely (Photo nrs). Flat plains with sandy soils Sand Unlikely 3 Habitat Natural veld in good condition, natural veld with scattered aliens, natural veld with heavy alien infestation, build-up area, bare soil. In the centre of old field. Very little activity is noted on the outskirts of the proposed site a Vegetation Describe the natural vegetation on the site (e.g. dwarf-shrub land) Trees with small shrubs dominate the area. Photo numbers b Birds Is the area likely to be sensitive for birds (i.t.o. Cliffs, Ridges, possible flight paths, trees, water sources)? Unknown but it is expected that there will be abundant bird life due to the amount of water sources around the town.

5 4 c Reptiles Is the area likely to be sensitive for reptiles (e.g. rocky outcrops)? d Archaeology Take a picture facing towards the proposed site (photo nr). e Surface water Are there any surface water sources located close to the proposed site (e.g. Rivers, Pans, dams, farms dams, oshanas, etc). Estimate the distance from the site. In the town - very unlikely None known Not close but the Kwato river runs to the east about 3 km Are there any signs of a wetland located close to the proposed site (e.g. mottled soil, grass with plumes, reeds, two-tone vegetation, standing water, birdlife). Estimate the distance from the site. No 4 Visual Take 360 picture from the site (Picture nrs). Particularly the four major directions (i.e. N, E, S, W). Consider the aesthetic value of the area (Is it located in a scenic area, what are the lines of sight, are there tourism activities in the area?). Less sensitive due to the fact that the tower will be located in a small depression Identify possible sensitive receptors (e.g. neighbours, road users, tourism ventures etc.) If a new road will be constructed to the site, what will the visual impact be? (e.g. will it be highly visible or will it be out of sight for the largest group of sensitive receptors). There are structures and residents in close proximity to the existing and proposed structures. None Consider the following: The potential location of a development on landform features within the landscape will influence the visual absorption capacity. For example, structures will be difficult to hide on a ridgeline compared to a deeply incised valley. The tower will be visible from an unknown distance as well as the auxiliary infrastructure Developments on lower slopes will be potentially easier to hide than those on upper slopes. N/A

6 5 * The visibility of a location of a structure is also influenced by the location height relative to the heights of surrounding topographic features. For example, if a location is lower than the majority of the immediately surrounding landscape it will be less visible and intrusive than a location which is generally higher than the immediate surrounds. The area is very flat and the buildings will be visible from adjacent land owners * A potential tower location will be easier to hide in a very rugged/diverse landscape and more difficult to do so if the landscape is more homogenous, such as a plain. 5 Social context Describe the surrounding community and land uses (e.g. urban, suburban, grazing livestock, grazing game, crops (type), tourism activities, mining, industrial etc.). How far is the nearest inhabited area from the centre point of the mast? (i.t.o. the radiation). Give a short description of the populated area. What type of settlement is it? Urban with agricultural activities taking place as mentioned Houses and other commercial / educational structures are present about 600m to the west

7 6 1.3 PUBLIC PARTICIPATION There was no public participation done during or before this site visit. Public consultation will be done before commencement with the construction activities. 1.4 ASSESSMENT OF SITE SUITABILITY The proposed site was found to be inadequate for the construction of the NBC mast. With the location of the site being so close to a populated area, a risk of radiation exposure to the residents of Kongola exists. This is further exacerbated by the radiation already being emitted by numerous other towers currently in operation in town. Furthermore, the aesthetic value would be disturbed to an even greater extent with the addition of another mast in town. From this assessment it is evident that the proposed site is not optimal for the construction of the mast. Therefore, it is recommended that alternative site positions be investigated. Specific criteria (based on specialist recommendations) are listed below that aids in determining an optimal area within which a suitable site may be located (Table 2): ENVIRONMENTAL FEATURE Table 2: CRITERIA Criteria for determining a sufficient site. SITE S ADHERENCE TO THE CRITERIA Distance to nearest populated area Biodiversity Civil Aviation Visual Impacts No mast should be erected within a 3km radius of an inhabited area to minimize the effect of radiation. The construction of a mast in close vicinity to an outcrop should be avoided. There is a strong correlation between outcrops and areas of biodiversity significance. Any mast to be erected within a 8km radius from an aerodrome, airfield, airstrip or airport needs clearance from the Directorate of Civil Aviation in compliance with the International Civil Aviation Organization (ICAO). The visibility of the mast should be kept as low as possible. The perspective of all sensitive receptors, including the road user and the nearest residents to the site, should be taken into account. A 3km radius buffer zone around the town of Kongola. No mast erected within this buffer zone. A 500m radius buffer zone around all significant outcrops. No mast erected within this buffer zone. An 8km buffer zone has been created around the aerodrome, airfield, airstrip or airport. A buffer zone of 800m to either side of all major roads to limit the visual impact for road users. Located at least 3km outside of town. Obscure the view of the buildings of the mast by utilizing the surrounding topography (e.g. behind mountains with only the tip of the mast visible). Infrastructure Avoid or minimize the construction of New roads and a power line might be

8 7 ENVIRONMENTAL FEATURE Archaeology Birds CRITERIA infrastructure e.g. roads or power lines. If new infrastructure is to be built, its length should be kept to a minimum. The inferred archaeological sensitivity of the Kongola area is expressed on a scale of 1 to 25 as being 8 to13. The most important and sensitive areas are islands in the floodplain or between minor drainage lines. There are 18 species in the Kongola region that are affected by, or affect, power lines. 17 of these 18 species are red data listed bird species being affected and include 7 endangered species. Secretary birds found in the area prefer a pannetjies habitat (ephemeral water bodies). SITE S ADHERENCE TO THE CRITERIA needed for the Kongola site. New infrastructure should be located close to the already existing infrastructure. A 500m radius buffer zone around islands and drainage lines. A 500m buffer zone around all pannetjies and other wetland areas. By mapping the buffer zones set out above, different areas can be shown according to their adherence to the criteria. These areas range from being suitable for the construction of the mast to inadequate areas (i.e. no-go areas). Although the suitable zone theoretically adheres to the set of criteria, and is therefore deemed appropriate for the construction of a mast, a reconnaissance visit is still required. This will be undertaken by one of the consultants once a potential site has been identified to verify the site s suitability. Figure 2 below shows these different areas identified for the Kongola site.

9 8 Figure 2: Suitable zone around Kongola.

10 9 1.5 ASSESSMENT OF IMPACTS Should the mast be constructed within the sufficient area, environmental impacts will be minimal. However, residual impacts associated with construction and operation activities will still need to be mitigated and monitored in order to ensure that the negative effects are avoided or minimized while optimizing the positive ones. Table 3: Impact evaluation ENVIRONMENTAL FEATURE POTENTIAL IMPACT OF PROJECT ON FEATURE KEY IMPACT DEGREE OF SENSITIVITY ISSUES ADDRESSED IN: CONSTRUCTION PHASE GEOLOGY AND SOILS The movement of vehicles will impact on this aspect. Soil compaction Low Sandy soils and existing access TOPOGRAPHY No topographical high or low points will be affected. Visual impact Low Few receptors WATER QUALITY Construction vehicles, domestic and construction waste generated on site. Water pollution Low activities does not pose any negative impact FLORA Clearing and grubbing during construction. Destruction natural vegetation of Medium surrounding area contains sensitive plant species. Site EMP specific Encroachment of alien invasive species. The establishment and spreading of alien invasive species Low small footprint FAUNA Movement of construction vehicles. Destroy habitat for reptiles and small mammals. Low movement of vehicles in veld Illegal poaching. Killing of fauna for usage by contractors. low possible, especially if workers stay in the veld during construction Birds Collision impacts. Presence of vulnerable and endangered bird species. Medium sensitive area Site EMP specific AIR QUALITY Movement of vehicles during construction Dust generated. Low short hauling

11 10 ENVIRONMENTAL FEATURE POTENTIAL IMPACT OF PROJECT ON FEATURE KEY IMPACT DEGREE OF SENSITIVITY ISSUES ADDRESSED IN: ARCHAEOLOGICAL / CULTURAL There are no graves or other archaeological sites present on the site. Potential historical disadvantage None SOCIO-ECONOMIC Spreading of HIV/AIDS by contractors. Increased HIV/AIDS Low not situated in the town, but relatively close OPERATIONAL PHASE FAUNA The stay wires and the mast might pose a threat to birds Loss of birds due to collisions Medium This corridor is well known for number of fauna and situated close to rivers Site EMP specific SOCIO-ECONOMIC Radiation emitted by the mast. Radiation impact Low - If constructed in the suitable zone at least 3km outside of town. Civil aviation More than 8km from airport Low sensitivity Waste generated should there be personnel on site Waste generated Low not expected that personnel will reside at this site Construction and operation of the mast. Visual and aesthetic deterioration of the surrounding area Low if constructed in the suitable zone. Positive impact due to the educational value of the project Social improvement due to NBC radio broadcasts Low tourists and residents will benefit Impacts that can sufficiently be addressed through the implementation of a are indicated as such and addressed in the without further investigation. Key issues (those impacts that do not necessarily require specialist inputs but require detailed attention), on the other hand, are indicated and specific management measures are prescribed in the site specific EMP.

12 Implication Description 11 The overall sensitivity of the sufficient area can thus be rated as MEDIUM as indicated in the table below. Table 4: Sensitivity ratings of the preferred Alternative and the associated implications. LOW MEDIUM HIGH The site is not sensitive at all. No additional specialist studies are required. The site is moderately sensitive and although specialist inputs are not required, it requires specific management measures. X The site has sensitive elements that need to be further investigated by a specialist. Sites that have a "high" sensitivity rating should only be used as the preferred alternative once all other options have been eliminated. is sufficient An additional Appendix is required to the document that contains site specific mitigation measures. Specialist investigations are required. 1.6 CONCLUSIONS AND RECOMMENDATIONS The combination of two potential impacts visual and radiation concerns deemed the original proposed position for the NBC mast within Kongola to be inadequate. An alternative location for the mast was therefore investigated by developing a set of criteria which - if adhered to - describes a sufficient site. Furthermore, should the site be constructed within the zone identified as suitable it will fall outside of the jurisdiction of the Directorate of Civil Aviation and no approval will be required. An area composed only of sufficient sites has been identified. It is concluded that all sites located within this area would pose minor environmental impacts on the town of Kongola and surrounds.

Digital Terrestrial Television Infrastructure Rollout. Site-specific Environmental Management Plan - Omega -

Digital Terrestrial Television Infrastructure Rollout. Site-specific Environmental Management Plan - Omega - Digital Terrestrial Television Infrastructure Rollout Site-specific Environmental Management Plan - Omega - 2 1 ENVIRONMENTAL IMPACT ASSESSMENT: OMEGA 1.1 RATIONALE FOR THE SITE Omega is situated in the

More information

Digital Terrestrial Television Infrastructure Rollout. Environmental Impact Assessment - Tsumkwe -

Digital Terrestrial Television Infrastructure Rollout. Environmental Impact Assessment - Tsumkwe - Digital Terrestrial Television Infrastructure Rollout Environmental Impact Assessment - Tsumkwe - 1 1 ENVIRONMENTAL IMPACT ASSESSMENT: TSUMKWE 1.1 RATIONALE FOR THE SITE Tsumkwe is a small town located

More information

Digital Terrestrial Television Infrastructure Rollout. Environmental Impact Assessment - Corridor -

Digital Terrestrial Television Infrastructure Rollout. Environmental Impact Assessment - Corridor - Digital Terrestrial Television Infrastructure Rollout Environmental Impact Assessment - Corridor - 1 1 ENVIRONMENTAL IMPACT ASSESSMENT (EIA): CORRIDOR 1.1 INTRODUCTION Corridor is a small farming community

More information

Digital Terrestrial Television Infrastructure Rollout

Digital Terrestrial Television Infrastructure Rollout Digital Terrestrial Television Infrastructure Rollout Environmental Impact Assessment - Ruacana - ENVIRONMENTAL IMPACT ASSESSMENT: RUACANA 1 INTRODUCTION Ruacana is a town in the Omusati Region, in northern

More information

Figure 6e: Ndwalane Mainline Toll Plaza Viewshed Analysis

Figure 6e: Ndwalane Mainline Toll Plaza Viewshed Analysis Figure 6e: Ndwalane Mainline Toll Plaza Viewshed Analysis CAVE KLAPWIJK AND ASSOCIATES 27 Figure 6f: Alternative Ndwalane Mainline Toll Plaza Viewshed Analysis CAVE KLAPWIJK AND ASSOCIATES 28 Figure 6g:

More information

ESKOM PROPOSED CONSTRUCTION OF A 88KV POWER LINE BETWEEN CLOCOLAN AND FICKSBURG VISUAL IMPACT ASSESSMENT DRAFT REPORT

ESKOM PROPOSED CONSTRUCTION OF A 88KV POWER LINE BETWEEN CLOCOLAN AND FICKSBURG VISUAL IMPACT ASSESSMENT DRAFT REPORT ESKOM PROPOSED CONSTRUCTION OF A 88KV POWER LINE BETWEEN CLOCOLAN AND FICKSBURG VISUAL IMPACT ASSESSMENT DRAFT REPORT April 2013 PREPARED BY PO BOX 2122, WESTVILLE, 3630, SOUTH AFRICA FOR ACER Environmental

More information

Basic Information: Vernal Pool Systems

Basic Information: Vernal Pool Systems Basic Information: Assessment Area Name: Project Name: Assessment Area ID #: Project ID #: Assessment Team Members for This AA Date: AA Location: Latitude: Longitude: Datum: Wetland Category: Natural Constructed

More information

APPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM

APPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM APPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM This form is intended for use by applicants (primarily private landowners) who need to conduct a Scoped EIS in support of minor development

More information

Genex Kidston Connection Project: Draf t Environmental Assessment Report Powerlink Queensland

Genex Kidston Connection Project: Draf t Environmental Assessment Report Powerlink Queensland : Draf t Environmental Assessment Report Powerlink Queensland Chapter 14 \\autsv1fp001\projects\605x\60577456\6. Draft Docs\6.1 Reports\4. Compiled draft 17 September\Covers\Chapters\Ch 14.docx Rev ision

More information

APPENDIX 9 POSSIBLE INTERCHANGES ALONG THE DE BEERS PASS ROUTE AVIFAUNAL ASSESSMENT

APPENDIX 9 POSSIBLE INTERCHANGES ALONG THE DE BEERS PASS ROUTE AVIFAUNAL ASSESSMENT APPENDIX 9 POSSIBLE INTERCHANGES ALONG THE DE BEERS PASS ROUTE AVIFAUNAL ASSESSMENT 1 EXECUTIVE SUMMARY This appendix assesses, from an avifaunal perspective, the expected impacts of seven possible interchanges

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

Town of Vershire Road Erosion Inventory Report

Town of Vershire Road Erosion Inventory Report Town of Vershire Road Erosion Inventory Report Taylor Valley Road. Photo taken by TRORC staff. Prepared by: 128 King Farm Road Woodstock, VT 05091 Inventory and report funded by the Vermont Agency of Transportation

More information

PRESENTATION ON JOHANNESBURG S BIODIVERSITY PROGRAMME

PRESENTATION ON JOHANNESBURG S BIODIVERSITY PROGRAMME PRESENTATION ON JOHANNESBURG S BIODIVERSITY PROGRAMME Member of Mayoral Committee: Cllr Prema Naidoo Environmental Management & Johannesburg City Parks PRESENTATION OVERVIEW Jo burg Overview & Context

More information

UNIT 3. LANDSCAPES CHANGE. PRIMARY 3/ Social Science Pedro Antonio López Hernández

UNIT 3. LANDSCAPES CHANGE. PRIMARY 3/ Social Science Pedro Antonio López Hernández UNIT 3. LANDSCAPES CHANGE PRIMARY 3/ Social Science Pedro Antonio López Hernández LANDSCAPES They are all the elements you can see in a specific area of land. There are two types of landscapes 1. Natural

More information

Water Sensitive Urban Design Site Development Guidelines and Practice Notes. Appendix

Water Sensitive Urban Design Site Development Guidelines and Practice Notes. Appendix Water Sensitive Urban Design Site Development Guidelines and Practice Notes Appendix 108 Appendix A Water sensitive developments involve simple design and management practices that take natural site features

More information

Local Area Key Issues Paper No. 11: Extractive industry - Yandina Creek and Browns Creek Road

Local Area Key Issues Paper No. 11: Extractive industry - Yandina Creek and Browns Creek Road Draft Sunshine Coast Planning Scheme Review of Submissions Local Area Key Issues Paper No. 11: Extractive industry - Yandina Creek and Browns Creek Road Key Issue: No. of submissions: Sites identified

More information

Chapter 7: Landscape and Visual Impact Assessment

Chapter 7: Landscape and Visual Impact Assessment Chapter 7: Landscape and Visual Impact Assessment Landscape Character and Visual Impact Assessment 7. Landscape Character and Visual Impact Assessment... 2 7.1 Methodology... 2 7.2 Assessment Findings...

More information

14 Visual Amenity 14-1

14 Visual Amenity 14-1 Visual Amenity 14 CONTENTS 14 Visual Amenity 14.1 14.1 Introduction Introduction 14.2 14.2 Project Setting Project Setting 14.3 14.3 Project Overview Project Overview 14.4 14.4 Viewing Locations Viewing

More information

Visual Impact Assessment - December Figure 5.2: Viewshed analysis of the haul route.

Visual Impact Assessment - December Figure 5.2: Viewshed analysis of the haul route. Visual Assessment - December 2014 Figure 5.2: Viewshed analysis of the haul route. 21 Baobab Resources (Pty) Ltd 5.1.3 Visual Exposure The following can be deduced from the Figure 5.1: the area to the

More information

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 September 2014 Site HNP 006 Land East of Stanbridge Road and North of Lower Road 1. Background information Site location and use Site

More information

Public Information Centre. Welcome

Public Information Centre. Welcome Transportation Improvements from the Beaver Creek Bridge to the Entrance of Santa s Village District of Muskoka Municipal Class Environmental Assessment Welcome Please sign in Take a comment sheet Staff

More information

Nob Hill Pipeline Improvements Project EIR

Nob Hill Pipeline Improvements Project EIR Section 3.1 Aesthetics This section addresses the visual aspects that may affect the views experienced by the public, including the potential to impact the existing character of each area that comprises

More information

APPENDIX 4. 5 ST AGNES LOCAL LANDSCAPE CHARACTER ASSESSMENT TABLE ST AGNES BEACON

APPENDIX 4. 5 ST AGNES LOCAL LANDSCAPE CHARACTER ASSESSMENT TABLE ST AGNES BEACON APPENDIX 4. 5 ST AGNES LOCAL LANDSCAPE CHARACTER ASSESSMENT TABLE ST AGNES BEACON CHARACTER AREA: ST AGNES BEACON DATE OF ASSESSMENT May 2016 Character Attribute Landscape reference guide ST AGNES BEACON

More information

Visual Impact Assessment January 2013

Visual Impact Assessment January 2013 Measures Maintain as much natural vegetation as possible between the mine buildings and the perimeter of the mine. The layout for mine buildings should include vegetation such as trees and thicket to break

More information

Lower Sensitivity. VS Classification Level 2: Hills, Lower Plateau & Scarp Slopes (74%)/ Lowland Valleys (17%) / Exposed Upland/Plateau (7%)

Lower Sensitivity. VS Classification Level 2: Hills, Lower Plateau & Scarp Slopes (74%)/ Lowland Valleys (17%) / Exposed Upland/Plateau (7%) S06 Coedwig Gwydyr Reproduced from the Ordnance Survey map with the permission of Ordnance Survey on behalf of the Controller of Her Majesty s Stationery Office, Crown copyright Licence No. 100023387 Location

More information

Development. Within of 25% or greater. ridges anticipated that the. foundations. and walk out. Page 1 of 4

Development. Within of 25% or greater. ridges anticipated that the. foundations. and walk out. Page 1 of 4 Ridge Estates May 11, 2016 LAND SUITABILITY ANALYSIS REPORT 1. INTRODUCTION This report is provided in accordance with the submittal requirements of the Planned Development Plan (PPD). The report accompanies

More information

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report Page 1 of 18 ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville Environmental Screening Report July 2011 Page 2 of 18 Table of Contents 1.0 INTRODUCTION

More information

Development. Within of 25% or greater. ridges anticipated that the. foundations. and walk out. Page 1 of 4

Development. Within of 25% or greater. ridges anticipated that the. foundations. and walk out. Page 1 of 4 Ridge Estates May 11, 2016 LAND SUITABILITY ANALYSIS REPORT 1. INTRODUCTION This report is provided in accordance with the submittal requirements of the Planned Development Plan (PPD). The report accompanies

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

Section 3b: Objectives and Policies Rural Environment Updated 19 November 2010

Section 3b: Objectives and Policies Rural Environment Updated 19 November 2010 Page 1 of Section 3b 3b RURAL ENVIRONMENT 3b.1 Introduction The Rural Environment comprises all the land outside of the Residential, Town Centre and Industrial Environments. Most land within the District

More information

3.1 AESTHETICS Background and Methodology

3.1 AESTHETICS Background and Methodology 3.1 AESTHETICS 3.1.1 Background and Methodology 3.1.1.1 Regulatory Context The California Environmental Quality Act (CEQA) requires that project sponsors evaluate the project s potential to cause aesthetic

More information

Mollers Lane, Leopold, Victoria Significant Landscape Overlay Re-assessment

Mollers Lane, Leopold, Victoria Significant Landscape Overlay Re-assessment XURBAN Mollers Lane, Leopold, Victoria Significant Landscape Overlay Re-assessment For: TGM Group November 2016 Final Mollers Lane, Leopold, Victoria Significant Landscape Overlay Re-assessment Client

More information

THE CORPORATION OF THE CITY OF WINDSOR Office of the City Solicitor Planning Department

THE CORPORATION OF THE CITY OF WINDSOR Office of the City Solicitor Planning Department THE CORPORATION OF THE CITY OF WINDSOR Office of the City Solicitor Planning Department REPORT TO THE CITY OF WINDSOR PLANNING ADVISORY COMMITTEE DATE OF REPORT: August 19, 2010 SUBJECT: Official Plan

More information

INTRODUCTION Key Issues and Findings Goals, Objectives, and Policies - Natural Resources - Map M18 - Environmental Resources

INTRODUCTION Key Issues and Findings Goals, Objectives, and Policies - Natural Resources - Map M18 - Environmental Resources Natural, Environmental, Cu INTRODUCTION This Element provides policies related to the preservation and protection of the Centre Region s natural, environmental, cultural, and historic resources. This Element

More information

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL IMPACT ASSESSMENT NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FOR THE SARATOGA VEGETATION CLEARING SECTION 24G ON PORTION 4 OF THE FARM KLAAS VOOGDS RIVIER NO. 40, ROBERTSON, WESTERN

More information

Staff Report CONDITIONAL USE

Staff Report CONDITIONAL USE Staff Report PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT To: From: Salt Lake City Planning Commission Daniel Echeverria, (801) 535-7165, daniel.echeverria@slcgov.com Date: May 21, 2015 Re: PLNPCM2015-00139

More information

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11 Overview of Sedimentation and Erosion Control Practices Practice no. 6.11 PERMANENT SEEDING Permanent vegetation controls erosion by physically protecting a bare soil surface from raindrop impact, flowing

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

Burrowing Owl Habitat Project at the Albany Plateau. (a component project of the Gilman Street Playing Fields Project City of Berkeley) March 10, 2006

Burrowing Owl Habitat Project at the Albany Plateau. (a component project of the Gilman Street Playing Fields Project City of Berkeley) March 10, 2006 Burrowing Owl Habitat Project at the Albany Plateau (a component project of the Gilman Street Playing Fields Project City of Berkeley) March 10, 2006 Submitted by The City of Berkeley Project history During

More information

Tables of Criteria and Matrices for Landscape Assessment (LSCA & LVIA)

Tables of Criteria and Matrices for Landscape Assessment (LSCA & LVIA) Carly Tinkler CMLI Environmental, Landscape and Colour Consultancy 46 Jamaica Road, Malvern, Worcestershire WR14 1TU Tel +44 (0)7711 538854 carlytinkler@hotmail.co.uk Tables of Criteria and Matrices for

More information

H7 Open Space zones. (a) provide for the needs of the wider community as well as the needs of the community in which they are located;

H7 Open Space zones. (a) provide for the needs of the wider community as well as the needs of the community in which they are located; H7. Open Space zones H7.1. Background The majority of land zoned as open space is vested in the Council or is owned by the Crown. However some areas zoned open space are privately owned. While the open

More information

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION FOR AVALON INN (APN 069-241-27 & -04) 1201 & 1211 NORTH MAIN STREET FORT BRAGG, CA MENDOCINO COUNTY prepared for:

More information

Chapter 131 GENERAL REFERENCES

Chapter 131 GENERAL REFERENCES Chapter 131 STREAM CORRIDOR PROTECTION ZONE 131-1. Objectives. 131-2. Definitions. 131-3. Establishment of the Stream Corridor Protection Zone. 131-4. Uses permitted. 131-5. Uses expressly prohibited.

More information

VREDEFORT DOME EXTENDED STUDY

VREDEFORT DOME EXTENDED STUDY INDUSTRIAL S ERVICES ZEUS-MERCURY 765KV TRANSMISSION POWER LINE PROJECT VREDEFORT DOME EXTENDED STUDY Prepared by: J. Beater Checked by: Stuart Dunsmore Date: 1 November 2007 DEAT Ref.: 12/12/20/433 Project

More information

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS In West Sadsbury Township, Chester County, Pennsylvania TABLE OF CONTENTS I. Introduction 3 II. Importance of Stormwater Management

More information

Reading the Driftless Landscape

Reading the Driftless Landscape Reading the Driftless Landscape Author, Cindy Ramseyer Editors and Contributors: Katie Abbott, Chuck Bauer, Darcy Kind, Heidi Nelson, Carroll Schaal A Publication of the Blue Mounds Area Project with generous

More information

Green Roof Field Trip

Green Roof Field Trip Adapted from the rain garden curriculum created by the University of Wisconsin, Madison, Arboretum s Earth Partnership for Schools Grade level: Elementary (K 6); Group size: 12 35; Time needed: 1 to 3

More information

16 LANDSCAPE AND VISUAL IMPACT

16 LANDSCAPE AND VISUAL IMPACT 16 LANDSCAPE AND VISUAL IMPACT 16.1 Introduction The term landscape refers primarily to the visual appearance of an area, including its shape, form and colour and the interaction of these elements to create

More information

PURPOSE OF MEETING MEETING GUIDELINES PROJECT BACKGROUND ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE

PURPOSE OF MEETING MEETING GUIDELINES PROJECT BACKGROUND ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE DRAFT BASIC ASSESSMENT REPORT PUBLIC REVIEW LANDOWNERS MEETING FICKSBURG 23 JULY 2013 T his project is being conducted on behalf of Eskom PRESENTATION

More information

APPENDIX C. Architectural and Environmental Design Standards. Environmentally sensitive areas should be protected.

APPENDIX C. Architectural and Environmental Design Standards. Environmentally sensitive areas should be protected. APPENDIX C Architectural and Environmental Design Standards Environmentally Sensitive Areas Goal A. Environmentally sensitive areas should be protected. Development, such as roads, houses, and other structures,

More information

Northland Regional Landscape Assessment Worksheet

Northland Regional Landscape Assessment Worksheet Northland Regional Landscape Assessment Worksheet Unit name TE POUAHI HEADLAND DESCRIPTION AND CHARACTERISATION Component Land Types (refer to list overleaf) Dune complex Coastal cliffs / escarpment Reefs

More information

LANDSCAPE GUIDELINES. Countryside & Coastal Countryside Environments. Landscape, Natural Character & Amenity Values Guide

LANDSCAPE GUIDELINES. Countryside & Coastal Countryside Environments. Landscape, Natural Character & Amenity Values Guide Landscape, Natural Character & Amenity Values Guide Copyright WDC 2009 Version A2 18May09 Environmental Services Group Publication Countryside & Coastal Countryside Environments START HERE Quality Land

More information

Chapter 3: Natural Environment. Proposed Waikato District Plan Stage 1. (Notified version)

Chapter 3: Natural Environment. Proposed Waikato District Plan Stage 1. (Notified version) Chapter 3: Natural Environment Proposed Waikato District Plan Stage 1 Page 2 of 7 Contents Chapter 3: Natural Environment... 3 3.1 Indigenous Vegetation and Habitats... 3 3.1.1 Objective Biodiversity and

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

Route Alignment Options Summary Report

Route Alignment Options Summary Report Brechfa Forest Connection Project February 2014 Summary report 1. RSK Environment Ltd (RSK) was commissioned by Western Power Distribution (WPD) to provide environmental consultancy support services for

More information

5.11 AESTHETICS ENVIRONMENTAL SETTING

5.11 AESTHETICS ENVIRONMENTAL SETTING 5.11 AESTHETICS ENVIRONMENTAL SETTING The lies on a relatively flat valley floor surrounded by rugged hills and mountains. The topography of the planning area is defined by the Box Springs Mountains and

More information

3. Highway Landscaping Assessment

3. Highway Landscaping Assessment Guidelines for Highway Landscaping 3-1 3. Highway Landscaping Assessment 3.1 Introduction This section outlines the steps necessary to assess the highway landscaping component of a state highway construction

More information

3. STATEMENTS OF DESIRED CHARACTER FOR PLANNING AREAS AND PRECINCTS

3. STATEMENTS OF DESIRED CHARACTER FOR PLANNING AREAS AND PRECINCTS 3.30 Planning Area No. 30 Mary River Valley 3.30.1 Location and Role This Planning Area encompasses rural lands in the western part of the Shire. These lands are located within the catchment area of the

More information

Division 13 Local Business and Industry Buffer Zone: Assessment Criteria and Assessment Tables

Division 13 Local Business and Industry Buffer Zone: Assessment Criteria and Assessment Tables Division 13 Local Business and Industry Buffer Zone: Assessment Criteria and Assessment Tables 4.13.1 Local Business and Industry Buffer Zone The provisions in this division relate to the Local Business

More information

An Bord Pleanála. Eirgrid Plc. Meath County Council Cavan County Council Monaghan County Council

An Bord Pleanála. Eirgrid Plc. Meath County Council Cavan County Council Monaghan County Council An Bord Pleanála Ref: PL02.VS0002 Prospective Applicant: Eirgrid Plc. Local Authorities: Meath County Council Cavan County Council Monaghan County Council Nature of Application: Written opinion on information

More information

7. The Landscape. 7.1 Introduction. Environmental Impact Statement (EIS) Scoping Report

7. The Landscape. 7.1 Introduction. Environmental Impact Statement (EIS) Scoping Report 7. The Landscape 7.1 Introduction The purpose of this section of the EIS Scoping Report is to describe the scope of work and methods to be applied in the identification and assessment of landscape and

More information

APPENDIX C: HILLSIDE DEVELOPMENT REGULATIONS (prev. Ordinance #2008-1)

APPENDIX C: HILLSIDE DEVELOPMENT REGULATIONS (prev. Ordinance #2008-1) APPENDIX C: HILLSIDE DEVELOPMENT REGULATIONS (prev. Ordinance #2008-1) 1. PURPOSE: The purpose of this section is to define the conditions under which hillside development may occur that will not result

More information

Chapter 5: Natural Resources and Environment

Chapter 5: Natural Resources and Environment NATURAL RESOURCES AND ENVIRONMENT 5-1 5 Chapter 5: Natural Resources and Environment BACKGROUND AND INTENT Urban expansion represents the greatest risk for the future degradation of existing natural areas,

More information

TO: Port of Orcas FROM: Tina Whitman, Science Director SUBJECT: Master Plan Update DATE: September 7, 2018

TO: Port of Orcas FROM: Tina Whitman, Science Director SUBJECT: Master Plan Update DATE: September 7, 2018 TO: Port of Orcas FROM: Tina Whitman, Science Director SUBJECT: Master Plan Update DATE: September 7, 2018 Friends of the San Juans appreciates the opportunity to provide input to the Port of Orcas Master

More information

BASIC ASSESSMENT REPORT. Background Information Document

BASIC ASSESSMENT REPORT. Background Information Document BASIC ASSESSMENT REPORT Background Information Document BASIC ASSESSMENT FOR THE PROPOSED LUIPERDSHOEK 33 KV POWER LINE PROJECT TO BE LOCATED NORTH OF THE TOWN OF POFADDER IN THE NORTHERN CAPE (DEA Ref

More information

TOWN OF SPRINGFIELD, NEW HAMPSHIRE

TOWN OF SPRINGFIELD, NEW HAMPSHIRE TOWN OF SPRINGFIELD, NEW HAMPSHIRE NATURAL RESOURCES INVENTORY EXECUTIVE SUMMARY March 2008 Prepared by: Watershed to Wildlife, Inc. Natural Resource Consultants 42 Mill Street, Suite 3 Littleton, NH 03561

More information

McKay Road Interchange and Salem / Lockhart Crossing

McKay Road Interchange and Salem / Lockhart Crossing McKay Road Interchange and Salem / Lockhart Crossing The McKay Road Interchange Class EA has two components: 1. A new MacKay Road Interchange at Highway 400; and 2. A new bridge crossing of Highway 400

More information

ROAD AND CAR PARK DESIGN GUIDELINES

ROAD AND CAR PARK DESIGN GUIDELINES 3.2 ROAD AND CAR PARK DESIGN GUIDELINES PIHA AREA DESIGN GUIDELINES AUCKLAND REGIONAL COUNCIL 37 Existing Road and Car Park Photos: North Piha carpark Anawhata carpark Winstone Track carpark off Piha Road

More information

Town of Corinth Road Erosion Inventory Report

Town of Corinth Road Erosion Inventory Report Town of Corinth Road Erosion Inventory Report Grist Mill Road. Photo taken by TRORC staff. Prepared by: 128 King Farm Road Woodstock, VT 05091 Inventory and report funded by the Vermont Agency of Transportation

More information

LYNWOOD QUARRY. Earth Bund Options Environmental Impact Analysis FINAL

LYNWOOD QUARRY. Earth Bund Options Environmental Impact Analysis FINAL LYNWOOD QUARRY Earth Bund Options Environmental Impact Analysis FINAL October 2014 LYNWOOD QUARRY Earth Bund Options Environmental Impact Analysis FINAL October 2014 Prepared by on behalf of Holcim (Australia)

More information

-MENDOCINO COUNTY PLANNING AND BUILDING SERVICES- DIVISION II OF TITLE 20--COASTAL ZONING CODE

-MENDOCINO COUNTY PLANNING AND BUILDING SERVICES- DIVISION II OF TITLE 20--COASTAL ZONING CODE CHAPTER 20.504 VISUAL RESOURCE AND SPECIAL TREATMENT AREAS Sec. 20.504.005 Applicability. Sec. 20.504.010 Purpose. Sec. 20.504.015 Highly Scenic Areas. Sec. 20.504.020 Special Communities and Neighborhoods.

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

HRA PLANNING Chartered Town Planning and Environmental Consultants

HRA PLANNING Chartered Town Planning and Environmental Consultants HRA PLANNING Chartered Town Planning and Environmental Consultants Screening Statement for the Purposes of Determining the need for Appropriate Assessment Proposed development of 74 no. residential units

More information

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations.

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations. This section of the Draft EIR addresses the existing land uses on and adjacent to the project site and discusses the potential impacts of the proposed project on existing land uses. Key issues addressed

More information

Project Narrative For Fruita RV Resort Conditional Use Permit

Project Narrative For Fruita RV Resort Conditional Use Permit Project Narrative For Fruita RV Resort Conditional Use Permit Date: November 18, 2016 Prepared by: Robert W. Jones, II, P.E. Vortex Engineering & Architecture, Inc. 2394 Patterson Rd., Ste. 201 Grand Junction,

More information

APPENDIX 9: Archaeological Assessment by Ken Phillips

APPENDIX 9: Archaeological Assessment by Ken Phillips APPENDIX 9: Archaeological Assessment by Ken Phillips ARCHAEOLOGICAL ASSESSMENT PROPOSED SERVICE STATION DEVELOPMENT BRUCE ROAD, PAPAMOA TAURANGA Prepared by KEN PHILLIPS (MA HONS) MARCH 2016 ARCHAEOLOGY

More information

SITE ASSESSMENT CHECKLIST

SITE ASSESSMENT CHECKLIST 1. Site Details a. What is the site s name/reference? SITE ASSESSMENT CHECKLIST CR3NPWHY 3007 Gasometer Site Godstone Road CR3 0EG b. Where is the site located? Wyhteleafe; Godstone Road. Urban category1

More information

CHAPTER 10 AESTHETICS

CHAPTER 10 AESTHETICS CHAPTER 10 AESTHETICS CHAPTER 10 AESTHETICS This section identifies and evaluates key visual resources in the project area to determine the degree of visual impact that would be attributable to the project.

More information

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT Veterans Way (previously Powerline Road) and Klondike Park Road Wasaga Beach Welcome Please sign in Take a comment

More information

MERIDAN PLAINS SAND RESOURCE AREA

MERIDAN PLAINS SAND RESOURCE AREA MERIDAN PLAINS SAND RESOURCE AREA INFORMATION SHEET October 2010 BACKGROUND The Meridan Plains Extractive Resource Area is located on the western fringe of the coastal urban communities of Caloundra West

More information

RURAL ZONE - POLICY. Rural Zone Policy. Issue: Rural Environment. Ruapehu District Plan Page 1 of 8

RURAL ZONE - POLICY. Rural Zone Policy. Issue: Rural Environment. Ruapehu District Plan Page 1 of 8 Rural Zone Policy RU2 RURAL ZONE - POLICY RU2.1 Introduction The natural resources of the rural environment in the Ruapehu District provide the basis for the existing and potential character, intensity

More information

Milkweed & Monarch Data Collection Sheets 2016

Milkweed & Monarch Data Collection Sheets 2016 Milkweed & Monarch Data Collection Sheets 2016 Please fill out the following fields. When finished please enter the data into one of our digital reporting tools found at www.xerces.org/milkweedsurvey Observer

More information

APPENDIX G: TOWN ORDINANCE REVIEW

APPENDIX G: TOWN ORDINANCE REVIEW APPENDIX G: TOWN ORDINANCE REVIEW TYLin (225740) Woodard & Curran SWMP January 2013 Stormwater LID strategies, ranked for Zoning Bylaw and Site Plan Review Standards Dimensional Requirements Permit the

More information

Natura 2000 network or a sum of sites

Natura 2000 network or a sum of sites Natura 2000 network or a sum of sites Analysis of the connectivity of target zones with other Natura 2000 sites Summary Goal of the analysis Analysis was made within project Restoration and conservation

More information

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS Caldwell County Pathways along with our co-partners City of Lenoir, Town of Gamewell,

More information

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS 5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically

More information

BACKGROUND INFORMATION DOCUMENT:

BACKGROUND INFORMATION DOCUMENT: BACKGROUND INFORMATION DOCUMENT: Proposed Construction of Mpophomeni Shopping Centre, Umgungundlovu District Municipality, KZN A Project of Dymatron (Pty) Ltd 21 NOVEMBER 2014 BID DOCUMENT DESCRIPTION

More information

Tackling Difficult SEQR Topics

Tackling Difficult SEQR Topics Presented by Nan Stolzenburg AICP CEP and Don Meltz AICP Tackling Difficult SEQR Topics COMMUNITY CHARACTER, HISTORIC/ARCHAEOLOGICAL RESOURCES & HABITATS/ENDANGERED SPECIES Training Agenda Introductions

More information

LEAP. Wetland and watercourse Rehabilitation and Management Plan

LEAP. Wetland and watercourse Rehabilitation and Management Plan December 2015 LEAP Dr. Gwen Theron PrLArch No 97082 Landscape Architect Environmental Planner Imbrilinx cc 2010/089810/23 P.O. Box 13185 Hatfield 0028 FAX: 086 606 6130 012 343 2751 083 302 2116 CLAYVILE

More information

PEOPLE, WATER, AND WILDLIFE: BLUE PRINCIPLES FOR RIVER DESIGN

PEOPLE, WATER, AND WILDLIFE: BLUE PRINCIPLES FOR RIVER DESIGN PEOPLE, WATER, AND WILDLIFE: BLUE PRINCIPLES FOR RIVER DESIGN Category One: People Protecting and Enhancing the Quality of Life Role of the Chicago River People and the River For many, the connection between

More information

Rannoch 132 / 33 kv Substation Extension

Rannoch 132 / 33 kv Substation Extension Who we are Scottish and Southern Energy Power Distribution is part of the SSE plc group of companies. We own, maintain and invest in the networks in the north of Scotland the electricity transmission network

More information

PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY APRIL 2010 INTRODUCTION This document is the Non-Technical Summary (NTS) of an Environmental Statement

More information

Skamania County Community Development Department

Skamania County Community Development Department Skamania County Community Development Department Building/Fire Marshal Environmental Health Planning Skamania County Courthouse Annex Post Office Box 1009 Stevenson, Washington 98648 Phone: 509-427-3900

More information

B - Coalfield River Corridor Landscape Character Type

B - Coalfield River Corridor Landscape Character Type B - Coalfield River Corridor Landscape Character Type Landscape Character Type - Coalfield River Corridor The Coalfield River Corridors Landscape Character Type is located in the two converging valleys

More information

Article 6 Tree Protection

Article 6 Tree Protection Article 6 Tree Protection 8.1 Purpose 8.2 Applicability 8.2.1 General Provisions 8.2.2 Exemptions 8.3 Permitting Procedure 8.4 Planting Procedure 8.5 Performance Guarantee Required for Belated Planting

More information

Section 6A 6A Purpose of the Natural Features and Landscapes Provisions

Section 6A 6A Purpose of the Natural Features and Landscapes Provisions Section 6A 6A Purpose of the Natural Features and Landscapes Provisions This Chapter addresses the protection and management of natural features and landscapes within the City. The City has a number of

More information

PARK CITY MUNICIPAL CODE TABLE OF CONTENTS TITLE 15 LAND MANAGEMENT CODE - CHAPTER 2.21

PARK CITY MUNICIPAL CODE TABLE OF CONTENTS TITLE 15 LAND MANAGEMENT CODE - CHAPTER 2.21 PARK CITY MUNICIPAL CODE TABLE OF CONTENTS TITLE 15 LAND MANAGEMENT CODE - CHAPTER 2.21 TITLE 15 - LAND MANAGEMENT CODE CHAPTER 2.21 - SENSITIVE LAND OVERLAY ZONE (SLO) REGULATIONS 15-2.21-1. PURPOSE...1

More information

CHAPTER FIVE COMMUNITY DESIGN

CHAPTER FIVE COMMUNITY DESIGN CHAPTER FIVE COMMUNITY DESIGN CHAPTER FIVE - COMMUNITY DESIGN Assumptions Frazier Park and Lebec have historically developed according to different patterns of spatial form. While both communities are

More information

Parks & Landscape Services Section, Municipal Services Department

Parks & Landscape Services Section, Municipal Services Department Parks & Landscape Services Section, Municipal Services Department Proposed Development of Fernhill Park & Gardens, Stepaside, Co. Dublin with Works within the Curtilage of the Protected Structure (Fernhill

More information

CB1 Moderately undulating landscape with slight gilgai (few inches) formation: broad ridge tops and upper slopes of moderately shallow grey cracking

CB1 Moderately undulating landscape with slight gilgai (few inches) formation: broad ridge tops and upper slopes of moderately shallow grey cracking CB1 Moderately undulating landscape with slight gilgai (few inches) formation: broad ridge tops and upper slopes of moderately shallow grey cracking clays (Ug5.22 and Ug5.23). Associated are: (i) some

More information