Index to Projects by Project Name
|
|
- Vanessa Rich
- 5 years ago
- Views:
Transcription
1 Index to Projects by Project Name Project # PROJECT NAME PAGE PR-1109 Clayton Road (Market Street to Oakland Avenue) Sidewalk Repair 911 System Replacement and Dispatch Room Remodel ADA Barrier Removal for City Facilities (Park Facilities) UF-802 UF-803 Arnold Industrial Place/Peralta Road 223 Arnold Industrial Place/SR 4 Eastbound Ramps Arnold Industrial Way/Laura Alice Way/Peralta Drive Traffic Signal Arnold Industrial Way/SR 4 Westbound Ramps 161 Arterial Pavement Overlay Holding Account 113 Arts and Cultural Center 2 Bailey Road Traffic 119 Bates Avenue/Commercial Circle Traffic Signal 162 UF-518 (DS- 005) Belmont Road/Waltham Road Drainage Improvement Building Component Management Program 3 Cambridge Community Center Room Addition 13 Capital Facility Reserve 102 CCCSD Capital Program 103 IND/G -1
2 1103 City Government Channel Programming & Support City Wide Technology Hardware and Software Replacement Citywide Bridge Repair Program Citywide Entryway Signage and Downtown Wayfinder Program UF-509 (PJ 743) 2135 Citywide Sidewalk Improvement Annual Program 108 Citywide Traffic/Street Program 112 Civic Center ADA Barrier Removal 6 Civic Center Building B Reconstruction 195 Clayton Rd Intersection Sidewalk Repairs Clayton Rd/Treat Blvd Intersection Capacity Clayton Road Intersections Rehabilitation Clayton Road Rehabilitation: Market Street to Oakland Avenue UF-102 UF Clayton Road/Chestnut Avenue Traffic Signal 160 Clayton Road/SR 242 N/B On-Ramp 177 Clayton Road/SR 242 S/B Off-Ramp 176 Commerce Avenue Pavement Rehabilitation UF-514 (LSR- 101) Commerce Avenue Roadway Extension and Bridge at Pine Creek Concord Avenue at Diamond Blvd. Intersection Concord Boulevard Median Landscaping--Kirker Pass Road to Clayton City Limits IND/G -2
3 2052 Concord Boulevard Sidewalk (Farm Bureau Road to Sixth Street) 123 UF UF-521 (PJ 762) 2011 Concord Community Center 211 Concord Community Park Bocce Ball Courts 45 Concord Library Expansion 209 Concord Reuse Planning Concrete Trunk Sewer Main Rehab/Replace-Phase II & Gravity Connection in Lieu of Pumping to CCCSD Construct Equipment Shelter at Newhall Park 58 Curb, Gutter, & Sidewalk Repair Program Demolition of Various RDA Properties and Related Sidewalk Repairs UF-1001 Detention CSU 20 Downtown Streetscape and Lighting 121 Drain 33A Concord Blvd Drainage Crossing 170 UF-1102 East Street Undergrounding, Pacheco Street to SR UF-606 UF-702 UF-608 (123) 2139 GC-003 GC-303 EECBG-Energy Efficiency Lighting Parking Lots 4 Fleet Replacement Fund 33 Galaxy Way Bridge over Walnut Creek 218 Galindo House and Gardens Master Plan Build-Out 221 Galindo Street/Oak Street Traffic Signal 219 Gateway Boulevard Accessibility. 16 Golf Course Greens Replacement 22 Golf Course Irrigation 23 IND/G -3
4 UF-519 (GC302) Golf Course Lakes Improvement Study/Phase I & II Grant Street/Hwy 242 Landscape 137 UF-805 Hickory Drive/Ponderosa Drive Pavement Cross- Slope Improvement 225 UF-103 (769) Highway 242/Clayton Road Ramps Landscaping Highway 680/Burnett Avenue Off Ramp Right Of Way Closeout PR PR-1107 Hillcrest Park Creek Repair 50 Install Back-up Pump at Concord Community Pool 55 Install New Playground Equipment at Newhall Park 83 Install Shade Structure at Hillcrest Park 60 Install Split-Rail Fence at Hillcrest Park Installation of Irrigation Well at Boatwright Playfields IT HVAC Several Locations 41 UF-507 (PJ 177) UF-515 (LSR- 105) Kirker Pass Rd. Median Landscape (Concord Blvd. to Clayton Shopping Center) Kirker Pass Road Median Landscaping (Clearbrook to Concord Boulevard) Lead Base Paint Grant 99 Lead Base Paint Grant Light Emitting Diode (LED) Signal Lamps Upgrading Program Maintenance Patch Paving Market St Utility Undergrounding (Willow Pass to Fryway) 168 IND/G -4
5 UF Market St. Utility Undergrounding (Fry Way to Concord Ave.) Marsh Dr Bridge Over Walnut Creek Channel Seismic Retrofit Meadow Homes Spray Park and Restroom UF-1101 Meridian Park Boulevard Utility Undergrounding Michael Chavez Monument Economic Opportunity Center Monument Boulevard Corridor Streetscape Urban Design Study and Design Guidelines Monument Corridor Pedestrian Infrastructure UF-511 (PJ 941) Network Cable Infrastructure Repairs 38 Olivera Grant Street Landscaping Outdoor Play Area Rehabilitation - Concord Child Care Center 18 UF-603 Panoramic Drive Extension 217 PR-1004 Park Pathways, Parking Lots, Basketball/Tennis Courts, Playgrounds Asset Management Pave Loop Road at Camp Concord 47 PR-1108 Pave Trail Gap in Newhall Park (Treat Blvd. Entrance) Pavilion Debt Service 36 Police and Public Works Radio Replacement Police CAD/RMS Hardware and Software Replacement 31 MSC-1103 UF-807 Police Department Video Feasibility Study 42 Port Chicago Highway Sidewalk 227 IND/G -5
6 2019 PR-1116 Public-Educational-Government (PEG) Cable Television Capital Support Reconstruct Tennis Courts at Concord Community Park Recurring Parks Facilities Costs Program Refurbish/Upgrade Camp Concord Family Camp Bathhouse Removal of Barriers to the Mobility Impaired Replace Irrigation Main Line, Valves and Irrigation Controller at Sun Terrace Park Replace Maintenance Building at Hillcrest Park 49 Replace Playground Equipment at Cambridge Park PR-1122 PR-1121 Replace Playground Equipment at Ygnacio Valley Park Replace Pump System Concord Community Park Replace Pump System Components at Cambridge Park PR-1114 PR-1119 UF-510 (PJ 901) Replace Pump System Components at Ellis Lake 79 Replace Pump System Components at Newhall Park 85 Replace Security Locks City-wide UF-1004 Resurface Tennis Courts at Willow Pass Park, Concord, Community Park and Pine Hollow Park. Riley Court Apartments Roof Replacement - Resources for Community Development Route 4/ Port Chicago Highway Interchange Sanitary Sewer Replacement 105 Street Surface Seal Program & Striping 111 IND/G -6
7 1239 The Alameda Utility Undergrounding, Clayton Road to Cordova Way 166 UF Traffic Calming 188 Traffic Signal Controller Systems Upgrade 155 Traffic Signal Retiming Program 158 UF-1103 UF-602 UF-601 Treat Boulevard (San Miguel to Cowell Road) Median Landscape Improvement Treat Boulevard Sidewalk - North Side Cobblestone Drive to Cowell Road Treat Boulevard Sidewalk - North Side, Coco's Restaurant to Cobblestone Drive Utility Undergrounding Project 164 Video Capital Improvement and Equipment 32 Waterworld Parkway Bridge over Walnut Creek UF-508 (PJ 178) UF-302 Willow Pass Community Park - Sports Field Willow Pass Rd. Landscape Landana Drive to Ashdale Drive Willow Pass Rd. Landscape - Port Chicago Hwy. to Landana Dr UF-1003 Willow Pass Rd/ SR 4 Ramp Reconstruction Willow Pass Road / SR 4 Freeway Ramp Reconstruction Study Willow Pass Road Rehabilitation (Gateway Blvd to Port Chicago Hwy) PR UF-520 (PJ 044) Ygnacio Valley Park Electrical Service Repair 72 Ygnacio Valley Rd. Permanent Restoration (Phase 2) 135 Ygnacio Valley Road Widening 208 IND/G -7
Index to Projects by Project Name
Index to Projects by Project Name 2062 1701 & 1711 Concord Avenue Purchase and Demolition of Structures 85 1279 1024 UF-802 UF-803 Affordable Housing 77 Annual CIP/TIP Management Program 105 Arnold Industrial
More informationPROJECTS UNDER CONSTRUCTION
Project Name Project Status Project Funding Project Manager PJ 2144 Clayton Rd-Treat Blvd Intersection Improvements Widen the Clayton Road/Treat Blvd intersection and upgrade the traffic signal. Construction
More informationTHREE-YEAR CAPITAL IMPROVEMENT PLAN FY
THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering
More informationFall 2017 Construction Update
Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,
More information2040 Long Range Transportation Plan
2040 Long Range Transportation Plan Adopted: April 15, 2013 APPENDIX D HIGHWAY NEEDS PLAN PROJECTS FREDERICKSBURG Existing and Committed Projects Fall Hill Avenue/Mary Washington Blvd. (Fredericksburg)
More informationMunicipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights
ANCHORAGE PARKS & RECREATION Nichols Park Design and improve neighborhood park 2008 Challenge Grant applicant. 2008 $500K State Grant for Neighborhood Parks. Tikishla Park Lighting, paved parking, hockey
More informationEXHIBIT A 2019 FINANCING: PROJECT AUTHORIZATIONS
EXHIBIT A 2019 FINANCING: PROJECT AUTHORIZATIONS Projects with Prior City Commission Authorization (No Changes) Downtown Canopy PW17B4CIP Prior Authorizing Ordinance: Ordinance No. 9428 Estimated Total
More informationApril 21, 2007 CCRP Workshop Summary
April 21, 2007 CCRP Workshop Summary Group 1 1. Reuse around BART with a lot of housing and jobs 2. Greenway around creek 3. Transit and auto connection all through the site from Kirker Pass to Port Chicago
More informationCity of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*
12/6/2017 3012115-03 Northwood Dr NE, Glass to s/o Brookland $980,000.00 J. 4/16/2018 12/13/2017 3012121-02 O Ave NW, 16th to Ellis $4,065,000.00 Tippe; Lee J. 3/19/2018 Collins Rd NE from E of Northland
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
ADA Central, Contract 1 DBNUM: 15417 / UPC: 154170 This contract will bring projects into compliance with current ADA design requirements that could not be completed within original design or construction
More information4.1 Build Alternative 1 Construction Phasing
SECTION 4 Implementation Plan This section discusses potential segmentation of the build alternatives into multiple projects for implementation of improvements to the NSH from Rabbit Creek Road to 36th
More informationHighway 15 Project - Hutchinson
Highway 15 Project - Hutchinson Agenda What are we going to talk about today? Goals and benefits of the project Details about the proposed work Project schedule and costs Any questions you may have about
More informationSpecial Revenue Funds
Special Revenue Funds Special Revenue Funds account for the proceeds of specific revenue sources (other than special assessments for major capital projects) that are legally restricted to expenditures
More informationCITY OF SIMI VALLEY MEMORANDUM
CITY OF SIMI VALLEY MEMORANDUM AGENDA ITEM NO. 9.1 May 18, 2016 TO: FROM: Planning Commission Department of Environmental Services SUBJECT: REVIEW OF POTENTIAL FISCAL YEAR (FY) 2016-17 CAPITAL IMPROVEMENT
More informationCity of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS
56TH STREET AND 17TH AVENUE IMPROVEMENTS FUNDING: Bonded ESTIMATED COST: $3,885,000 COMPLETION DATE: Fall 2018 SCOPE OF PROJECT: Widening of 56th Street from 6th Avenue to 19th Avenue, and widening 17th
More informationCorridor Investment Projects (FY FY2012)
City of Long Beach, California Department of Development Services Corridor Investment Projects (FY1980 - FY2012) Building A Better Long Beach North Long Beach Corridor Investments Bixby Knolls on Long
More informationTown of Yucca Valley Capital Improvement Projects Report July 24, 2014
Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 SR 62 Traffic and Pedestrian Improvements from Apache Trail to Palm Avenue (PLHD) The project includes construction of curbs, gutters,
More informationCity of Waukee, Iowa Capital Plan PROJECTS BY DEPARTMENT
City of Waukee, Iowa Capital Plan FY '12 FY '21 thru PROJECTS BY DEPARTMENT City Hall City Hall at Waukee Elementary CH-03 1 City Hall at Waukee Elementary-Land Acquisition Fire/EMS Department CH-04 2
More informationAbbott Loop. Community Council Survey Capital Projects Needs Ranking Survey. Comm Council Priority Rank. Rank # ABBOTT LOOP COMMUNITY PARK
Municipality of Anchorage Community Council Survey ABBOTT LOOP COMMUNITY PARK This state funding request would be used to implement the remaining elements of the Community Park Master Plan Vision including
More informationMPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals
MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals Purpose: The Midlothian Road entrance to Mundelein Park & Recreation District s (MPRD s) Keith Mione (Community) Park would
More informationSpring 2018 Construction Update
Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the
More information4GROWTH MANAGEMENT 4.1 BACKGROUND AND CONTEXT 4-1
4GROWTH MANAGEMENT 4.1 BACKGROUND AND CONTEXT The purpose of the Growth Management Element is to provide guidance and specific actions to manage and mitigate the impacts of future urban growth and development
More informationROAD PAVING VARIOUS LOCATIONS LANE KM
ROAD PAVING VARIOUS LOCATIONS 9.317 LANE KM $1,465,200 General: $1,465,200 BASED ON CONDITION ASSESSMENTS OF THE ENTIRE ROAD NETWORK; USING ASSET MANAGEMENT PRINCIPLES, ROADS THAT ARE SUITABLE FOR REPAVING
More informationTable L-1 Summary Action Strategy. Action Item Timing Status Responsible Agency
CHAPTER 4: CIRCULATION ELEMENT ISSUE #1: MAJOR THOROUFARES AND TRANSPORTATION ROUTES A balanced transportation system for Fontana is provided that meets the mobility needs of current and future residents
More informationFY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Schooleys Mountain Bridge Rehabilitation Project ID Numbers: N1707 / 173470 Schooleys Mountain Road Bridge was built in 1920 and widened in 1937. The project is a replacement of the bridge structure and
More informationAwarded Small Works Projects
Small Works Projects Kamins Construction TBD 4th Avenue West Sidewalk Project 12/6/2018 $47,056 Tube Art Group 1451 Wayfinding Signs 9/4/2018 $11,000 POP Electric Inc 1354 Repurposed Exterior Light for
More informationTown of Cornelius Bond Update August, 2017
Town of Cornelius Bond Update August, 2017 Referendum Results Roads, Intersections, & Sidewalks ($11.15 mil) Pass rate 81.38% in favor Parks and Recreation ($5.25 mil) Pass rate 72.09% in favor Town Center
More information2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015
AGENCY: 2016 REVISIONS COMMENT FORM Section Title Number Chapter 1 Introduction Comment 1.1 CDOT Mission Statement 1.2 Purpose of Rules and Regulations for Construction in the Public Way 1.3 Chicago Department
More informationLITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION
LITTLE ELM 2009-2014 CAPTIAL IMPROVEMENT BOND STREET PRESENTATION Denton Frisco Little Elm Lewisville Legacy Southlake Grapevine Addison DENTON COUNTY & LEWISVILLE LAKE MATCHING FUNDS DENTON COUNTY BOND
More informationPedestrian and Bike Bridge LOGO
6.2.2 Pedestrian and Bike Bridge The proposed pedestrian and bike crossing re-envisions the existing bridge at Pismo Creek on Cypress Street. The bridge is currently underutilized by vehicular through
More informationINFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities
7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure
More informationFY 2005 TRANSPORTATION CAPITAL PROGRAM
Camden County Civic Center Access Study, Pennsauken 03340 This project will address operational and access improvements on Routes 30, 73 and 90 related to the Crossroads redevelopment project around the
More informationProposed Capital Improvement Program and Capital Budget FY & FY
Proposed Capital Improvement Program and Capital Budget FY 2016-17 & FY 2017-18 Page Number Project (All figures in thousands of dollars) Costs Funded Gap FY 2016-17FY 2017-18 4 Proposed Capital Budget
More informationNorthwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS
4.4 STATION AREA FINDINGS Each station is different, and each one requires a separate set of recommendations based on the vision for the site. This section outlines an initial TOD strategy and recommendations
More informationPotential Green Infrastructure Strategies May 6, 2015 Workshop
Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National
More informationWaukee. City of. The Key to Good Living
Waukee City of The Key to Good Living City of Waukee FY15 - FY20 CIP Project Summary FY2015 FY2018 Parks Windfield Park Improvements Parks Centennial Park Amphitheater Parks Grant Park Improvements Parks
More informationCommunity Engagement Committee Meeting #1 December 10, :30pm-8:30pm
Community Engagement Committee Meeting #1 December 10, 2014 6:30pm-8:30pm Welcome and Introductions Dana Murdoch Minneapolis Park and Recreation Board Project Manager Ryan French Walker Art Center Director
More information2017 General Obligation Bond
2017 General Obligation Bond Presentation of Public and Council Projects to the Transportation & Mobility Stakeholder Committee April 13, 2017 Agenda Deferred Maintenance Project Development Process Projects
More informationPublic Works Annual Report FY
Public Works Annual Report FY 2016-17 About the Department The Public Works Department is comprised of five divisions that oversee eight separate budget programs. These divisions include Administration,
More informationConstruction Engineering & Inspection
Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over
More information30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN
LEGAL PROPERTY DESCRIPTION SEE NOTES SHEET FOR LEGAL PROPERTY DESCRIPTIONS THE CITY OF PLEASANT RIDGE GAINSBORO PARK IMPROVEMENT PROJECT CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN 4444 Second Avenue
More informationRZC Public View Corridors and Gateways
RZC 21.42 Public View Corridors and Gateways 21.42.010 Purpose 21.42.020 Scope and Authority 21.42.030 Administration 21.42.040 Gateways Design 21.42.050 Unidentified Public Views 21.42.060 Identification
More information29 Bella Fontaine Park
29 Bella Fontaine Park 9565 Bellefontaine Road St. Louis County Parks Master Plan Planning Zone 2 Visit Date: July 2016 Page 1 129 Bella Fontaine Park 9565 Bellefontaine Road St. Louis County Parks Master
More informationRoads Plan
Roads Plan 2019-2023 Background Road conditions have been a problem for Painesville City over the past decade. Between 2009 and 2013, the city was only able to dedicate $1.9 million in total road repairs
More informationPublic input has been an important part of the plan development process.
Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the
More informationSR 483 Clyde Morris Boulevard FDOT District 5
This project occurs on a 3.0 mile section of SR 483 (Clyde Morris Blvd.) south of Beville Road (SR 400) to north of International Speedway Boulevard (SR 600). Ghyabi is providing project management and
More informationProject Output Indicators for Federal Gas Tax Investments
Municipalities are required to report results achieved through the investment of federal Gas Tax funds under the Municipal Funding Agreement. AMO uses the indicators listed below to capture the outputs
More informationTOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06
TOWNSHIP OF HOWELL DEPARTMENT OF COMMUNITY DEVELOPMENT & LAND USE DIVISION OF ENGINEERING 251 Preventorium Road Phone: (732) 938-4500 x2300 Post Office Box 580 Fax: (732) 919-1080 Howell, NJ 07731-0580
More informationRESOLUTION NO. PC
RESOLUTION NO. PC 16-1173 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF WEST HOLLYWOOD FINDING, PURSUANT TO CALIFORNIA GOVERNMENT CODE SECTION 65401, THAT THE CITY'S CAPITAL IMPROVEMENTS PLAN
More informationGYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015
GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado Schematic Design January 2015 1 2 3 4 5 6 7 8 9 DESIGN WORKSHOP Landscape Architecture Land Planning Urban Design Tourism Planning Asheville Aspen Austin
More informationMaster Plan Presentation August 12, 2015
Master Plan Presentation August 12, 2015 A vision for tomorrow... May, 13 2015 prepared for: prepared by: SITE LOCATION SITE NTS SITE ANALYSIS +/- 17.8 Ac. RESIDENTIAL HOMES 1 2 RAIL ROAD (SAFETY CONCERNS)
More informationCHAPTER 8. Mrs. Zimman s Class - Central Elementary
SUSTAINABILITY CHAPTER 8 Mrs. Zimman s Class - Central Elementary 8.1 OVERVIEW Green infrastructure also known as low impact development (LID) and environmental or sustainable site design is an environmentally
More informationConcluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).
Pelican Bay Community Improvement Plan Traffic,JI Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). D1 -A: Provide consistent signing, marking
More informationPROPOSED IMPROVEMENTS
IV. PROPOSED IMPROVEMENTS The proposed improvements for each alternative carried forward are discussed below. A. FUNCTIONAL CLASSIFICATION AND ROADWAY CROSS-SECTIONS The classifications of the roadways
More informationTable of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.
Table of Contents Introduction 1 Existing Context 1 Figure 1 2 Plan Guidelines 3 Future Urban Form 4 The West-End 4 Main Street 6 The East-End 7 Figure 2 9 Public Improvement Recommendations 7 General
More informationWELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A
WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project
More informationTown Center. Block 5 Existing multifamily residential units are expected to remain.
Area Guidelines Germantown s districts should be developed as distinct communities with unique features that are supported through the guidelines. The guidelines not only help distinguish these districts
More informationProject will Replace: Utilities Curb Pavement Lighting. City of Madison
Project will Replace: Utilities Curb Pavement Lighting Replace sanitary sewer main & laterals Winnebago: Existing 8 main, 1905 Linden: Existing 6 main, 1915, upsize to 8 main Atwood: Existing 12 main,
More informationCity of Hermosa Beach Administrative Policy #
City of Hermosa Beach Administrative Policy # SUBJECT: Living Streets Policy Date: Approved by: City Council Authority: Public Works Department & Community Development Department Mayor, PURPOSE The City
More informationCAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013
Office of Capital Planning and Development; 130 Oak Creek Building; Corvallis, Oregon 97331-2001 CPC STAFF REPORT: SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN
More informationPlay areas overlooking climbing hill. School & playgrounds overlooking pond bottom ballfields. Project experience while at Loris and Associates, Inc.
City of Thornton Parks & Open Space Cherrywood Park Thornton, CO Architect: Design Concepts Construction of this seven-acre City park, located adjacent to Adams Twelve Five Star Prairie Hills Elementary
More informationProposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Carteret Industrial Road 98547 This project will address the upgrade of Carteret Industrial Road. The federal Transportation Equity Act for the 21st Century (TEA-21) provided funding for this project under
More informationNew Stanton Project Update July 3, 2012
New Stanton Project Update July 3, 2012 The Needs BACKGROUND INFO I-70 Geometric Concerns Substandard Horizontal & Vertical Clearance at Center Ave. Bridge (The Center Avenue Bridge is Replaced in all
More informationBlue Line LRT Extension
v e Noble Pkwy Noble Pkwy Xerxes Ave N Shingle Creek Penn Ave N Penn Ave N Fremont Ave N Lyndale Ave N S Washington Ave University Ave NE Blue Line LRT Extension LIGHT RAIL PLATFORM AND STATION DESIGN
More informationAGENDA ACTION ITEMS INFORMATION ITEMS
NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION
More informationVISION PLAN PRESENTATION - SEPTEMBER 28, 2013
AREAS OF IMPROVEMENT E A POOL HOUSE POOL DECK B B MAIN BUILDING UPPER PLAZAS A D F G C MAJOR BLEACHERS DUGOUTS FIELD MAIN COURTYARD D REGGIE PARK C E SPORT COURT ADA RAMP H F G H TENNIS COURTS KITCHENETTE
More informationPlanning Districts INTRODUCTION
INTRODUCTION To facilitate detailed examination of development prospects for all areas of the community, Delano has been divided into 14 planning districts. The location of these planning districts is
More informationGetting Started On Your Green Infrastructure (GI) Plan
Getting Started On Your Green Infrastructure (GI) Plan Peter Schultze-Allen EOA Inc. Annual SCVURPPP C3 Workshop June 16, 2015 Presentation Outline MRP 2.0 C.3.j (GI) requirements GI Framework elements
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
69th Street Bridge 02311 02311 A grade separation at 69th Street would eliminate the current at-grade crossing which causes frequent automobile delays due to long freight trains moving through this area.
More informationIMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES
In This Chapter Goals & Strategies 182 Project List 183 Future Land Use 186 11 IMPLEMENTATION STRATEGIES NORTH AUGUSTA, SC 2017 COMPREHENSIVE PLAN 179 Individual commitment to a group effort that is what
More informationTRANSPORTATION ELEMENT
TRANSPORTATION ELEMENT GOAL I: To create and maintain a safe, efficient and aesthetic transportation system that encourages multi-modal transportation and promotes the mobility strategies of the Ocala
More informationCONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE
CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE CITY STREETS AS PART OF STATE HIGHWAYS GUIDELINES REACHED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
More informationCapital Projects impacting Odenton Town Center
Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000
More informationTRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES
TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future
More informationPine Avenue Improvement Project
Seaside Way to ocean Boulevard ocean Boulevard to 7 th Street 7 th Street to anaheim Street L O ng BeACh DeveLOpment ServiC e S Building a Better long Beach Pine Avenue Improvement Project Seaside Way
More informationEast Whiteland Township Current Land Development Projects
Current Land Development Projects A. Lincoln Court (Lancaster Avenue / Malin Road) Demolish existing 2 story brick and stucco structure Build onto existing 1 story masonry shopping center to add 8 new
More informationConstruction Projects Report
Construction Projects Report Week of September 17 23, 2018 For general inquiries and questions, please contact the Project Management Office at (940) 349 7227 Street/Intersection From To CURRENT PROJECTS
More informationOPERATING BUDGET
PUBLIC WORKS OPERATING BUDGET 2017-18 LARKSPUR CITY COUNCIL MEETING APRIL 19, 2017 UBLIC WORKS OPERATING BUDGET 2017-18 APRIL 19, 2017 PUBLIC WORKS ENGINEERING STREETS AND FACILITIES MAINTENANCE PARK MAINTENANCE
More informationExhibit A. SH 161 RTC Work Program of New Projects. Collin County
Exhibit A SH 161 RTC Work Program of New Projects Collin County 0918-24-969 N/A 0918-24-970 N/A 0918-24-973 N/A 2351-01-020 N/A 2679-03-010 N/A On Exchange Parkway from US 75 to Allen Heights On Country
More informationExecutive Summary. NY 7 / NY 2 Corridor
Executive Summary NY 7 / NY 2 Corridor Transportation and Land Use Study December 2005 Prepared for: Town of Colonie Capital District Transportation Committee Prepared by: Introduction: Land use decisions
More informationI-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018
I-4 Beyond the Ultimate Florida Transportation Builders Association February 9, 2018 FDOT: Improving Mobility & Safety in Central Florida FDOT is Designing and building a better I-4 through Central Florida
More informationProject Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples.
Gordon River Project Location Naples Beach Golf Club East Naples Naples Naples Bay Evergreen Golf and Country Club and Gordon River Greenway Connector Bridge Gordon River Greenway CONNECTOR BRIDGE AND
More informationARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET
A RROYO P ROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEARS 214-218 HAHAMONGNA Priority Description 1 Hahamongna Watershed Park - Implement Master Plan 211,6 211,6 (77565) 2 Hahamongna -
More informationJohn Portman Boulevard Corridor
Corridor Multi-use Path + Streetscape Improvements February 8, 13 SOUTH SIDE BLOCK IMPROVEMENT NOTES: Consolidation of Utility/Sign Locations Remove Existing Trees Centennial Olympic Park Drive Planter
More informationSH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017
Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year
More informationDRAFT MAJOR CORRIDORS 48 EAST BENCH MASTER PLAN
DRAFT MAJOR CORRIDORS 48 EAST BENCH MASTER PLAN DRAFT 05 Introduction Foothill Drive, Parley s Way, Sunnyside Avenue and 1300 East serve as thoroughfares into the City and are important pieces in the regional
More informationLocation. Served. Category. Units Start Year. Previous Appropriations
20142018 CAPITAL IMPROVEMENT PLAN ($ Thouss) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: TC Jester: Washington to I 10 N100002 Paving Drainage Project Description Project provides for the design
More informationMemorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street
Memorandum DATE November 10, 2011 CITY OF DALLAS TO Trinity River Corridor Project Committee Members: Vonciel Jones Hill (Chair) Linda Koop (Vice Chair), Monica Alonzo, Scott Griggs, Angela Hunt, and Delia
More informationAPPENDIX F: DETAIL DRAWINGS
APPENDIX F: DETAIL DRAWINGS DRAWING DIVISION 100 GENERAL NOTES 200 ROAD WAYS 300 TRAFFIC CONTROL 400 FENCES 500 SEDIMENT CONTROL 600 SANITARY AND STORM SEWERS 700 WATERMAIN 800 PARKS AND LANDSCAPING 900
More informationPROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES
CITY OF LARKSPUR PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES PRESENTED BY Julian Skinner Larkspur Public Works Director DATE July 13, 2016 Bon Air Bridge
More informationChapter 14 Streetscape Improvements
This chapter presents streetscape design concepts for key streets and gateways in the Downtown Specific Plan area. This chapter is organized as follows: 14 Streetscape Improvements 14.1 Streetscape Treatments
More informationHidden Pointe Landscape Master Plan. June, archi terra
Hidden Pointe Landscape Master Plan June, 2006 t h e archi terra g r o u p 1 Table of Contents Background Purpose and Goals of the Master Plan Master Plan Process Existing Conditions Entrance Hidden Pointe
More informationConstruction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT)
Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT) 1 Firm Overview 2 We are a well established multi disciplinary firm that has
More informationAttachment M 9. PARKS AND RECREATION 9.1 PARKS, TRAILS AND OPEN SPACE PLAN
Attachment M 9. PARKS AND RECREATION Goal: Create a comprehensive, maintained, and interconnected system of parks, pathways, and open spaces as well as a balanced program of recreational activities for
More informationTENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. SR-37 US-19E No Projects Under Development in Carter County
CARTER COUNTY SR-37 US-19E No Projects Under Development in Carter County PIN: 125256.00 AT LM 8.7 (ROCKFALL MITIGATION) Length - 0.0 (Mitigation - Rockfall) CARTER COUNTY SR-91EXT PIN: 043975.01 FROM
More informationFocus Group First Meeting Belfountain Community Centre Tuesday June 29, :00 p.m. to 9:00 p.m.
Focus Group First Meeting Belfountain Community Centre 7:00 p.m. to 9:00 p.m. Mississauga Road/Old Main Street and Bush Street, from Olde Base Line Road to Winston Churchill Boulevard Environmental Assessment
More informationConst. ROADS - Description
Road Projects make up the bulk of the capital expenditures for the township. For the term of this CIP, road projects total $9,843,000 or 72.0% of the total capital expenditures for all capital projects
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Garden State Parkway, Interchange 67, at Bay Avenue, CR 554 NS0210 NS0210 This project will provide new and modified movements to the Garden State Parkway, Interchange 67 at Bay Avenue (CR 554). Currently,
More informationTIRZ 17/Redevelopment Authority Capital Improvements Plan Projects
Gessner Widening: T-1701 What: Widen the road from a six-lane divided boulevard to an eight-lane divided boulevard street section, increase turn lanes, update traffic signal system, improve drainage by
More informationADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS
ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS HAHAMONGNA FY 212-216 Capital Improvement Program Priority Description Total Estimated Costs Appropriated Through FY 211 Adopted FY 212 FY 213
More information