1 I-11 Corridor Tier 1 EIS Scoping Summary Report Final APPENDIX C Agency Scoping Meeting Materials Agency Scoping Meeting Agendas Agency Scoping Meeting Presentation Agency Scoping Meeting Boards Agency Scoping Meeting Handout Contract No / Project No. M P / Federal Aid No. 999-M(161)S January 2017

2 AGENCY SCOPING MEETING #1 IN PHOENIX JUNE 7, :30 TO 3:30 PM LEADERSHIP AND EMPLOYEE ENGAGEMENT CONFERENCE ROOM 2739 E. WASHINGTON STREET PHOENIX, AZ AND/OR CLICK HERE: MEETING NUMBER/CALL-IN: ; ACCESS CODE: # * * * AGENDA * * * 1. Introductions and Purpose of Meeting 2. Presentation on I-11 Corridor Environmental Review Process a. History of Corridor b. Study Goal and Objective c. Overview of Process 3. Purpose of Scoping a. Purpose and Need b. Alternatives to be Studied c. Impacts to be Evaluated d. Evaluation Methods to be Used 4. Comments and Questions 5. Next Steps Please submit all official comments in writing to: Mr. Aryan Lirange, Senior Urban Engineer Federal Highway Administration 4000 North Central Avenue, Suite 1500 Phoenix, AZ or via at Aryan.Lirange@dot.gov Contract No / Project No. M P / Federal Aid No. 999-M(161)S Page C-1

3 AGENCY SCOPING MEETING #2 IN CASA GRANDE JUNE 8, :30 TO 3:00 PM DOROTHY POWELL SENIOR ADULT CENTER DINING ROOM 405 E. 6 TH STREET CASA GRANDE, AZ AND/OR CLICK HERE: MEETING NUMBER/CALL-IN: ; ACCESS CODE: # * * * AGENDA * * * 1. Introductions and Purpose of Meeting 2. Presentation on I-11 Corridor Environmental Review Process a. History of Corridor b. Study Goal and Objective c. Overview of Process 3. Purpose of Scoping a. Purpose and Need b. Alternatives to be Studied c. Impacts to be Evaluated d. Evaluation Methods to be Used 4. Comments and Questions 5. Next Steps Please submit all official comments in writing to: Mr. Aryan Lirange, Senior Urban Engineer Federal Highway Administration 4000 North Central Avenue, Suite 1500 Phoenix, AZ or via at Aryan.Lirange@dot.gov Contract No / Project No. M P / Federal Aid No. 999-M(161)S Page C-2

4 AGENCY SCOPING MEETING #3 IN TUCSON JUNE 22, :00 TO 11:30 AM PIMA ASSOCIATION OF GOVERNMENTS, LARGE CONFERENCE ROOM 1 E. BROADWAY BOULEVARD, SUITE 401 TUCSON, AZ AND/OR CLICK HERE: MEETING NUMBER/CALL-IN: ; ACCESS CODE: # * * * AGENDA * * * 1. Introductions and Purpose of Meeting 2. Presentation on I-11 Corridor Environmental Review Process a. History of Corridor b. Study Goal and Objective c. Overview of Process 3. Purpose of Scoping a. Purpose and Need b. Alternatives to be Studied c. Impacts to be Evaluated d. Evaluation Methods to be Used 4. Comments and Questions 5. Next Steps Please submit all official comments in writing to: Mr. Aryan Lirange, Senior Urban Engineer Federal Highway Administration 4000 North Central Avenue, Suite 1500 Phoenix, AZ or via at Aryan.Lirange@dot.gov Contract No / Project No. M P / Federal Aid No. 999-M(161)S Page C-3

5 I-11 Corridor Tier 1 Environmental Impact Statement June 2016 Purpose of Scoping Meeting Federal environmental review process Share information about process Seek input on scope and content Describe opportunities for involvement Page C-4

6 History of I-11 Corridor Intermodal Surface Transportation Efficiency Act 1991 North American Free Trade Agreement 1993 CANAMEX Trade Corridor 1995 National Highway System High Priority Corridor 2012 I-11 and Intermountain West Corridor Study 2014 Fixing America s Surface Transportation Act 2015 Federal Environmental Review Process 2016 Federal Lead Agency: Federal Highway Administration (FHWA) Local Lead Agency: Arizona Department of Transportation Alternatives Selection Report (ASR) and Tier 1 Environmental Impact Statement (EIS) Study Goal and Objective Complete ASR and Tier 1 EIS Reach consensus on Selected Corridor Alternative from Nogales to Wickenburg Set stage for future proposed projects Page C-5

7 Environmental Review Process We are here What is Scoping? Early step in environmental review process Allows for early coordination and outreach Notify public, agencies, and tribal communities Tier 1 EIS is being prepared Solicit input on overall process and corridor Guide scope and content of Tier 1 EIS Purpose and need Alternatives to be studied Impacts to be evaluated Evaluation methods to be used Page C-6

8 What are the Goals for I-11? Provide access-controlled, northsouth transportation corridor Connect key metropolitan areas and markets in Arizona with Mexico and Canada Support improved regional mobility for movement of people, goods, and homeland security Provide enhanced transportation opportunities for economic vitality What is being Studied? 280-mile study area from Nogales to Wickenburg 2,000-foot corridor alternatives Proposed transportation facility Phased Implementation Plans North Central South Page C-7

9 Corridor Alternatives Identifying Corridor Alternatives Conduct free-to-roam analysis looking for routes Identify route trends for corridor alternatives Evaluate corridor alternatives Note: These are sample graphics showing steps to identify corridor alternatives. Page C-8

10 Recommended Corridor Alternatives Phased Implementation Plans Page C-9

11 What Topics will be Studied? Air quality Biological resources Economic impacts Geology, soils, and farmlands Hazardous materials Historic and archaeological Land use and neighborhoods Noise and vibration Parks and recreation Title VI and environmental justice Transportation Visual and aesthetics Water resources South Critical habitat Cultural resources Historic trail Parks and recreation Rivers and floodplains Tribal lands Urbanized areas Wildlife and mitigation corridors Page C-10

12 Central Areas of critical environmental concern Cultural resources Historic trail National monument Parks and recreation Rivers and floodplains Wilderness North Areas of critical environmental concern Cultural resources Parks and recreation Rivers and floodplains Other avoidance areas Page C-11

13 What are Next Steps? What Questions will the Tier 1 EIS Answer? Reach consensus on Selected Corridor Alternative for I-11 Corridor Potential social, economic, and natural environmental impacts Type of vehicular transportation facility Potential multimodal facility (rail and utility) opportunities Proposed projects for Phased Implementation Plan The Tier 1 EIS will provide a roadmap for advancing proposed projects in the future. Page C-12

14 How Can You Participate? Scoping meetings Review information on display boards and handouts Provide written comments on comment cards Provide comments verbally to court reporter Additional opportunities (bilingual) i11study.com/arizona (on-line survey) Interstate 11 Tier 1 EIS Study Team c/o ADOT Communications 1655 W. Jackson Street, Mail Drop 126F Phoenix, AZ Future public meetings and hearings Please submit scoping comments by July 8, 2016 I-11 Corridor Tier 1 Environmental Impact Statement Page C-13

15 Potential Topics and Environmental Issues The Tier 1 EIS will document technical analysis conducted on a number of potential topics and environmental issues. Help us identify areas or resources that you feel must be avoided or are important to serve. Transportation Land Use and Neighborhoods Geology, Soils, and Farmlands Parks and Recreation Historic and Archaeological Noise and Vibration Air Quality Visual and Aesthetics Biological Resources Hazardous Materials Economic Impacts Water Resources What Else? Title VI and Environmental Justice ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION June 2016 Page C-14

16 North Section Environmental and Other Sensitive Areas Avoidance Areas Critical Habitat Lakes and Ponds Wetlands Area of Critical Environmental Concern on BLM Land Wilderness * National Monument (N.M.) * Park and Recreation Area Tribal Lands * Toyota Proving Grounds Military Airports Urban Areas 100-Year Floodplains DeAnza Historic Trail * Trail * * Not found in North Section BLACK BUTTE ACEC Vulture Mountain Recreation Area VULTURE MOUNTAINS ACEC Wickenburg Coffinger Park YAVAPAI COUNTY MARICOPA COUNTY BNSF Railway I-11 Corridor North Section (Buckeye to Wickenburg) Corridor Study Area City/Town County Limits Freeway State/US Highway Major Street Railroad Bureau of Land Management Reclamation Park And Recreation Area National Park (N.P.) National Monument (N.M.) Tribal Lands Private (no color) State Land Military Hassayampa River NORTH SECTION CENTRAL SECTION Luke Air Force Base White Tank Mountain Park Buckeye Miles ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION June 2016 Page C-15

17 Central Section North Section Central Section 85 Luke Air Force Base White Tank Mountain Park Buckeye 60 Surprise Luke Air Force Base Goodyear 101 Environmental and Other Sensitive Areas Avoidance Areas 101 Critical Habitat * Not found in Central Sky Section Harbor Int'l Airport 101 Lakes and Ponds Scottsdale Wetlands Area of Critical Environmental Concern on BLM Land Wilderness Phoenix National Monument (N.M.) National Park * 202 Park and Recreation Fort McDowell Area Yavapai Nation Tribal Lands * Military Airports Salt River Pima Maricopa Indian Community 202 Urban Areas 100-Year Floodplains DeAnza Mesa Historic Trail Trail Gila River 85 MARICOPA COUNTY PINAL COUNTY 347 Gila River Indian Community Phoenix-Mesa Gateway Airport Gila Bend 238 Sonoran Desert N.M. Maricopa Ak-Chin Indian Community 10 Casa Grande lroad 85 I-11 Corridor Central Section (Casa Grande to Buckeye) Barry M. Goldwater Air Force Range Corridor Study Area City/Town County Limits Freeway Bureau of Land Management Reclamation National Forest (N.F.) Park And Recreation Area 8 MARICOPA COUNTY 84 PINAL COUNTY PIMA COUNTY 8 Central Section South Section 287 State/US Highway Major Street Railroad National Park (N.P.) National Monument (N.M.) Tribal Lands Ironwood Forest N.M Private (no color) State Land Tohono O'odham Nation Miles Military ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION June 2016 Page C-16

18 South Section Casa Grande 8 10 Central Section South Section 287 Eloy Ironwood Forest N.M. Santa Cruz River 79 Picacho Peak State Park Marana Oro Valley PINAL COUNTY PIMA COUNTY Environmental and Other Sensitive Areas Avoidance Areas Critical Habitat Lakes and Ponds Wetlands Area of Critical Environmental Concern on BLM Land * Wilderness 76 National Monument (N.M.) National Park Park and Recreation Area Tribal Lands Military Tucson Mitigation Corridor Airports Urban Areas 100-Year Floodplains Saguaro National Park Tucson Mountain County Park South Tucson 77 DeAnza Historic Trail Coronado N.F. Trail * Not found in South Section Saguaro N.P. Pascua Yaqui Tribe Tucson 86 I-11 Corridor South Section (Nogales to Casa Grande) San Xavier District Tohono O'odham Davis Monthan Air Force Base Tucson Int'l Airport 10 Corridor Study Area City/Town County Limits Freeway State/US Highway 286 Major Street Railroad Bureau of Land Management Buenos Aires N.W.R. Reclamation National Forest (N.F.) Park And Recreation Area National Park (N.P.) National Monument (N.M.) Tribal Lands Private (no color) State Land Military Miles Coronado N.F. 19 UPRR 189 Sahuarita SANTA CRUZ COUNTY Coronado N.F. PIMA COUNTY Tubac Presidio State Park Tumacacori Nat'l Historical Park 82 Nogales 83 Coronado N.F. U N I T ED E D STATES OF AMERICA MEXICO 90 ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION June 2016 Page C-17

19 I-11 Corridor Tier 1 Environmental Impact Statement What is a Tier 1 EIS? The Federal Highway Administration (FHWA) and Arizona Department of Transportation (ADOT) are initiating the environmental review process for the Interstate 11 (I-11) Corridor from Nogales to Wickenburg, Arizona. An Alternatives Selection Report (ASR) and Tier 1 Environmental Impact Statement (EIS) are being prepared as part of this process in accordance with the National Environmental Policy Act (NEPA) and other regulatory requirements. This hand-out compares the level of analysis and compliance activities typically conducted for a programmatic Tier 1 EIS versus project level Tier 2 environmental reviews that would be conducted at a later date. In a tiered process, Tier 2 would be similar to a traditional project level NEPA review. Tier 1 Environmental Impact Statement: Analyzes a program, large project, or undefined corridor on a broad scale. Tier 2 Environmental Reviews: Involves a specific project and applicable NEPA class of action that could include an EIS, Environmental Assessment (EA), or Categorical Exclusion (CE), but focused on the corridor identified in the Tier 1 EIS document. Activities Tier 1 Programmatic EIS Tier 2 Project Environmental Reviews NEPA Class of Action Tier 1 EIS EIS, EA, or CE Purpose and Refine purpose and need from prior feasibility study Refine purpose and need from Tier 1 Need Consider federal, state, regional, and local needs Address needs specific to proposed project Alternatives Develop, evaluate, and screen corridor alternatives Define project alignment and configuration Identify types of proposed transportation facility Identify potential design options Very conceptual design More refined engineering Engineering Typical sections for proposed transportation facility Detailed drawings, vertical profiles, and typical Phased Implementation Plan for smaller proposed sections projects Access details and interchange design Analysis Broad, high-level Site-specific resource information, impacts, and Relies heavily on readily available information mitigation Primarily geographic information system (GIS) based Agency and Identify key issues early Established relationships Public Input Build consensus No surprises Select Preferred Corridor Alternative (2000 feet wide) Select well-defined project alignment and Proposed Action Proposed transportation facility configuration Phased Implementation Plan Right-of-way (ROW) requirements Mitigation strategies Specific mitigation commitments Other Information Obtained from Existing Sources / Detailed Studies and Impact Assessments / Regulatory Agencies Involved Agency Actions Compliance Minimize impacts to critical habitat for protected Presence/absence surveys, species protocol surveys, Endangered Species Act National Historic Preservation Act Sections 4(f)/6(f) Clean Water Act Clean Air Act Permit Requirements General Permits species Strategies for mitigation commitments United States Fish and Wildlife Service (USFWS) and Arizona Game and Fish Department (AGFD) additional field studies, and Biological Assessments Specific mitigation commitments USFWS action to provide concurrence Implement PA from Tier 1 Avoid potential high sensitivity cultural resources (i.e., Historic and archaeological surveys historic and archaeological) Determinations of National Register of Historic Places Arizona State Historic Preservation Office (SHPO), (NRHP) eligibility Tribes and other Consulting Parties to develop Identify and resolve potential effects among SHPO, Section 106 Programmatic Agreement (PA) Tribes, and other Consulting Parties Identify Section 4(f) resources (i.e., publicly owned Detailed Section 4(f) evaluation to determine parks, recreation areas, refuges, and historic sites) avoidance, de minimis, or use determinations by Identify Section 6(f) properties (i.e., established with FHWA in coordination with officials with jurisdiction Land and Water Conservation Funds) Potential acquisition and conversion of 6(f) land to National Park Service (NPS), SHPO, and other transportation use in agreement with NPS, Bureau of officials with jurisdiction Land Management (BLM), and other agencies Minimize impacts to Waters of the US, surface Delineate Waters of the US, identify ordinary high waters, and 100-year floodplains water mark, and determine mitigation Mitigation strategies Stormwater runoff and drainage requirements United States Army Corps of Engineers (USACE) and Potential USACE and ADEQ actions Arizona Department of Environmental Quality (ADEQ) Identify non-attainment areas and ambient air quality Project level hot-spot and air quality conformity data analyses United States Environmental Protection Agency Potential USEPA and ADEQ actions (USEPA) and ADEQ During Tier 1 EIS Future Tier 2 Identify likely permits and requirements in coordination and consultation with agencies Provide information to support permit applications with agencies Project No. M P / Federal Aid No. 999-M(161)S Page C-18

20 Page 2 Page C-19

Highlights of the I-11 Draft Tier 1 Environmental Impact Statement and Preliminary Section 4(f) Evaluation Nogales to Wickenburg

Highlights of the I-11 Draft Tier 1 Environmental Impact Statement and Preliminary Section 4(f) Evaluation Nogales to Wickenburg 1TIER ENVIRONMENTAL IMPACT STATEMENT Highlights of the I-11 Draft Tier 1 Environmental Impact Statement and Preliminary Section 4(f) Evaluation Nogales to Wickenburg April 2019 Pursuant to Title VI of

More information

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204 DISTRICT TWO PUBLIC HEARING I 10 (SR 8) from I 295 to I 95 Project Development & Environment Study Duval County, Florida Financial Project Number 213326 2 22 01 Efficient Transportation Decision Making

More information

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009 SOUTHWEST CORRIDOR EXTENSION Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009 AGENDA I. Welcome/Introductions II. Project Review and Status III. Environmental

More information

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222 PD&E STUDY SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # 435808-1-22-02 ETDM 14222 WELCOME TO THE KICK-OFF MEETING May 24, 2016 1 1 2 3 4 5 6 PLANNING PROJECT DEVELOPMENT AND ENVIRONMENT

More information

Preservation of Scenery National Historic Trails. Rob Sweeten BLM Kevin Rauhe EPG

Preservation of Scenery National Historic Trails. Rob Sweeten BLM Kevin Rauhe EPG Preservation of Scenery National Historic Trails Rob Sweeten BLM Kevin Rauhe EPG EPG Background Landscape architects with expertise in visual resources Resource staff includes: archaeologists, biologists,

More information

ITS Concept Development Activity Descriptions

ITS Concept Development Activity Descriptions ITS Concept Development Activity Descriptions October 2015 Procedures are subject to change without notice. Check the NJDOT website to ensure this is the current version. Table of Contents Concept Development

More information

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity. US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility. SUMMARY THE I-69 LOCATION STUDY The proposed I-69 Location Study from El Dorado to McGehee, Arkansas, represents one section (Section of Independent Utility No. 13) of the nationally designated I-69 Corridor

More information

SECTION 4(f) DE MINIMIS DOCUMENTATION

SECTION 4(f) DE MINIMIS DOCUMENTATION SECTION 4(f) DE MINIMIS DOCUMENTATION Illinois Route 60/83 IL 176 to the intersection of IL 60 (Townline Road) Lake County P-91-084-07 Mundelein Park and Recreation District Project Limit SECTION 4(f)

More information

Transportation Improvements

Transportation Improvements Transportation Improvements 0 0 Volume II of the Final EIS for the DHS Headquarters consolidation at St. Elizabeths includes analysis to transportation improvements for the DHS Headquarters Consolidation

More information

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development Overview The Chicago Transit Authority (CTA), in partnership with the Chicago Department

More information

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project

More information

Corridor Management Committee. September 29, 2017

Corridor Management Committee. September 29, 2017 Corridor Management Committee September 29, 2017 1 Today s Topics Chair s Update Proposed Corridor Protection Wall Aesthetic Design Overview Public Outreach Environmental Review Civil Construction Update

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION To: All Interested Parties Subject: Notice of Preparation of an Environmental Impact Report From: City of Petaluma Address: 11 English Street, Petaluma, CA 94952-2610 Contact: Heather

More information

BeltLine Corridor Environmental Study

BeltLine Corridor Environmental Study BeltLine Corridor Environmental Study Citywide Conversation on Transit and Trails April 2, 2009 Agenda & Introductions Introductions Environmental Study Process Overview of the BeltLine Project BeltLine

More information

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION Suite 900 - James K. Polk Building 505 Deaderick Street Nashville, Tennessee 37243-0334 MEMORANDUM TO: FROM: Files Joe W. Matlock,

More information

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES 7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES The following list of social, economic, and environmental issues have been identified based on a preliminary inventory of resources in the project area, an

More information

Technical Memorandum 5

Technical Memorandum 5 Technical Memorandum 5 Environmental Resources August 2015 PREPARED BY AECOM Table of Contents Introduction... 3 Natural Features... 6 Watersheds... 6 Rivers, Lakes, Creeks... 6 Wetlands... 8 Floodplains...

More information

Appendix E Section 4(f) Evaluation

Appendix E Section 4(f) Evaluation Appendix E Section 4(f) Evaluation Appendix E Draft Section 4(f) Evaluation E.1 Introduction This appendix addresses a federal regulation known as Section 4(f), which protects parks, recreation areas,

More information

APPENDIX I PUBLIC MEETING AT PROJECT INCEPTION

APPENDIX I PUBLIC MEETING AT PROJECT INCEPTION APPENDIX I PUBLIC MEETING AT PROJECT INCEPTION OKLAHOMA DEPARTMENT OF TRANSPORTATION STATE HIGHWAY 10 ENVIRONMENTAL ASSESSMENT (MIAMI, OKLAHOMA) OPEN HOUSE SEPTEMBER 7, 2006 PROJECT OVERVIEW The Oklahoma

More information

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina 1.0 INTRODUCTION Section 4(f) of the Department of Transportation Act of 1966, 49 U.S.C. 303, requires that prior to

More information

WASHINGTON COUNTY OREGON

WASHINGTON COUNTY OREGON WASHINGTON COUNTY OREGON LONG RANGE PLANNING DIVISION North Bethany Subarea Stream Corridors: Existing Regulations In Oregon, there is a distinct difference between the land use rules that apply in rural

More information

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT 2. AGENCY COORDINATION AND PUBLIC INVOLVMENT This chapter discusses the process carried out for conducting agency coordination and public involvement activities. TECHNICAL ADVISORY COMMITTEE A Technical

More information

BeltLine Corridor Environmental Study

BeltLine Corridor Environmental Study BeltLine Corridor Environmental Study Joint TAC and SAC Meeting December 8, 2008 What We Will Discuss Today Outreach and Agency Coordination Scoping Results Existing Conditions Historical and Archeological

More information

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

North Carolina Department of Transportation Project Development and Environmental Analysis Branch North Carolina Department of Transportation Project Development and Environmental Analysis Branch Citizens Informational Workshop I-85, from I-485 to NC 73 Mecklenburg and Cabarrus Counties October 30,

More information

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS Caldwell County Pathways along with our co-partners City of Lenoir, Town of Gamewell,

More information

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m. Public Hearing Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, 2019 open house at 4 p.m., formal presentation at 5 p.m. Welcome to the Public Hearing for the Harborview Road (CR 776)

More information

DRAFT MAP AMENDMENT FLU 04-4

DRAFT MAP AMENDMENT FLU 04-4 DRAFT MAP AMENDMENT FLU 04-4 SW 24 TH AVENUE ROADWAY CORRIDOR The University of Florida participates with the Metropolitan Transportation Planning Organization (MTPO) in its responsibilities for the continuing,

More information

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension RESOLUTION NO. R2018-32 Refining the route, profile and stations for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 09/13/2018

More information

Northwest Corridor LRT Line to Irving/DFW Public Meeting No. 1 Project Overview

Northwest Corridor LRT Line to Irving/DFW Public Meeting No. 1 Project Overview LRT Line to Irving/DFW Public Meeting No. 1 Project Overview January 21, 2004 Agenda Purpose Corridor Background Environmental Impact Assessment Public Involvement Plan Project Schedule Purpose Project

More information

KITT PEAK LINKAGE WILDLIFE CONNECTIVITY: WILDLIFE OVERPASSES AND FENCING. State Route 86

KITT PEAK LINKAGE WILDLIFE CONNECTIVITY: WILDLIFE OVERPASSES AND FENCING. State Route 86 KITT PEAK LINKAGE WILDLIFE CONNECTIVITY: WILDLIFE OVERPASSES AND FENCING State Route 86 Tohono O odham Nation Department of Natural Resources Wildlife and Vegetation Management Program In partnership with

More information

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008 Atlanta BeltLine Corridor Environmental Study Scoping Meeting August 2008 What Will We Be Discussing Today? Study Overview - How Did We Get Here? - What Is the Study About? - Who Is Involved? - Where Is

More information

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

PROJECT BACKGROUND. Preliminary Design Scope and Tasks PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of

More information

1.0 Circulation Element

1.0 Circulation Element 5/9/18 1.0 Circulation Element 1.1 Introduction As growth and development occur in Apache County, enhancements to its circulation system will be necessary. With time, more roads will be paved and air and

More information

Santa Cruz River Master Plan. Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011

Santa Cruz River Master Plan. Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011 Santa Cruz River Master Plan Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011 Introduction Who is FICO? 2 Project Team Kimley-Horn and Associates, Inc. River

More information

Stewardship. Streamlining. Consensus

Stewardship. Streamlining. Consensus Stewardship Streamlining Consensus Translating Section 106: Building Consensus among Multiple Responsible Parties For the Doyle Drive Replacement Project in the Presidio of San Francisco National Historic

More information

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies Vision Statement Queen Creek s interconnected network of parks, trails, open spaces and recreation opportunities provide safe and diverse activities and programs that sustain its unique, small town, equestrian

More information

Irvington to Kino 138 kv Transmission Line Project April 2018

Irvington to Kino 138 kv Transmission Line Project April 2018 EXHIBIT H: EXISTING PLANS To the extent applicant is able to determine, state the existing plans of the state, local government and private entities for other developments at or in the vicinity of the

More information

ROSEMONT 138kV TRANSMISSION LINE PROJECT. Public Open House Meeting #2 August 27, 2009

ROSEMONT 138kV TRANSMISSION LINE PROJECT. Public Open House Meeting #2 August 27, 2009 ROSEMONT 138kV TRANSMISSION LINE PROJECT Public Open House Meeting #2 August 27, 2009 Project Overview Tucson Electric Power (TEP), as a part of its obligation to serve, is proposing to construct and operate

More information

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity

More information

Interstate 10 Hassayampa Valley Roadway Framework Study. Chapter 6. Alternative Transportation Network Description and Evaluation.

Interstate 10 Hassayampa Valley Roadway Framework Study. Chapter 6. Alternative Transportation Network Description and Evaluation. Interstate 10 Hassayampa Valley Roadway Framework Study Chapter 6 Alternative Transportation Network Description and Evaluation Prepared for Prepared by Table of Contents 6.1 Alternatives Considered...6-1

More information

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP) Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP) Presented to Pennsylvania Agency Coordination Meeting May 27, 2015 Doug Smith & Ryan Gordon 1 Southwestern

More information

Phase 2 Eden Landing Ecological Reserve Scoping Meeting for EIS/EIR. June 30, 2016

Phase 2 Eden Landing Ecological Reserve Scoping Meeting for EIS/EIR. June 30, 2016 Phase 2 Eden Landing Ecological Reserve Scoping Meeting for EIS/EIR June 30, 2016 Today s Purpose Introduction to Scoping / Purpose of Meeting South Bay Salt Pond Restoration Project Project Overview EIS/EIR

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY KICK-OFF PRESENTATION SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PROJECT IDENTIFICATION NUMBER (PID): #001036A May 13, 2015 1 2 PROJECT LOCATION PROJECT HISTORY

More information

Existing Transportation System 5-1

Existing Transportation System 5-1 5-1 The Jackson County transportation system is served by several modes of transportation including streets and highways, multi-modal, non-motorized, rail, and aviation. While the focus of the transportation

More information

7.0 DRAFT SECTION 4(f) EVALUATION

7.0 DRAFT SECTION 4(f) EVALUATION 7. DRAFT SECTION 4(f) EVALUATION 7.1 Background Information and Regulatory Requirements This chapter presents the existing conditions and potential effects on parks, recreation areas, wildlife and waterfowl

More information

7.0 SECTION 4(F) EVALUATION

7.0 SECTION 4(F) EVALUATION Chapter 7 Section 4(f) Evaluation 7.0 SECTION 4(F) EVALUATION 7.1 Background Information and Regulatory Requirements This chapter presents the existing conditions and potential effects to parklands and

More information

Longmeadow Parkway Fox River Bridge Corridor. August 6, 2015

Longmeadow Parkway Fox River Bridge Corridor. August 6, 2015 Longmeadow Parkway Fox River Bridge Corridor August 6, 2015 Longmeadow Parkway Bridge Corridor 5.6 miles from Huntley Road to IL 62 Unique municipal/county/state/federal partnership Links Randall Road

More information

Inglewood Transit Connector Environmental Impact Report Scoping Meeting July 26, 2018

Inglewood Transit Connector Environmental Impact Report Scoping Meeting July 26, 2018 Inglewood Transit Connector Environmental Impact Report Scoping Meeting July 26, 2018 Tonight s Speakers and Key Staff City of Inglewood Honorable Mayor James T. Butts, Jr. Louis A. Atwell, Director, Public

More information

City of Nogales General Plan

City of Nogales General Plan Open Space, Parks, Recreation and Trails City of Nogales General Plan Residents of Nogales place a high priority in the development of a comprehensive system of open space, parks, recreation and trails

More information

Pinal Regional Transportation Plan

Pinal Regional Transportation Plan Pinal Regional Transportation Plan Central Arizona Governments 1075 S. Idaho Road, Suite 300 Apache Junction, AZ 85119 June 2017 INTRODUCTION The Regional Transportation Plan for Pinal County, overseen

More information

Situating the Rosemont Mine Proposal Geographically & Historically: Toward a Political Ecology of a Copper Mine Owen King Owen.King@uwe.ac.uk @OMKingy @Hydrosocial This presentation Geographical Context

More information

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation Department of Community Development Michael J. Penrose, Acting Director Divisions Building Permits & Inspection Code Enforcement County Engineering Economic Development & Marketing Planning & Environmental

More information

Present. and. Future

Present. and. Future Present and Future July 1985 303 from MC 85 to I-17 included in the Regional Freeway System May 1989 State Transportation Board adopts Loop 303 1990 Revenues from Proposition 300 insufficient; 303 removed

More information

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project 1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA 1.1.1 Project Description The Trunk Highway (TH) 14 West Corridor is a two-lane roadway approximately 22 miles in length. Located in Nicollet County, the corridor

More information

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana JOINT PUBLIC NOTICE 26 June 2017 United States Army Corps of Engineers State of Louisiana New Orleans District Department of Environmental Quality Regulatory Branch Office of Environmental Services 7400

More information

2. Arizona Department of Environmental Quality The Flow of Arizona s Stormwater Program Chris Henninger

2. Arizona Department of Environmental Quality The Flow of Arizona s Stormwater Program Chris Henninger 1. Pima Association of Governments Web links and Contact List 1 2. Arizona Department of Environmental Quality The Flow of Arizona s Stormwater Program Chris Henninger 2 3. Pima County Pima County MS4

More information

Pine Flat Lake Master Plan Update FACT SHEET September 2014

Pine Flat Lake Master Plan Update FACT SHEET September 2014 Pine Flat Lake Master Plan Update FACT SHEET September 2014 PURPOSE AND OBJECTIVE The U.S. Army Corps of Engineers Sacramento District is revising the 1976 Pine Flat Lake Master Plan and is seeking public

More information

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates... PROJECT COMMITMENTS SUMMARY... S-1 1. Type of Action... S-1 2. Description of Action... S-1 3. Summary of Purpose and Need... S-1 4. Alternatives Considered... S-2 5. NCDOT Alternatives Carried Forward...

More information

2.1.8 Cultural Resources Regulatory Setting. Affected Environment, Environmental

2.1.8 Cultural Resources Regulatory Setting. Affected Environment, Environmental REVISED DRAFT ENVIRONMENTAL IMPACT REPORT/ Affected Environment, Environmental 2.1.8 Cultural Resources This section evaluates the potential for historical and archaeological resources within the proposed

More information

RESPONSES TO PUBLIC CONCERNS AND QUESTIONS

RESPONSES TO PUBLIC CONCERNS AND QUESTIONS RESPONSES TO PUBLIC CONCERNS AND QUESTIONS Stations and Summary Questions for Public Meeting #2 June 23, 2015 General Questions / Concerns: 1. Is there any way this development can raise revenue for the

More information

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 July 7, 2015 RFP NO. 16-02 POPES CREEK RAIL TRAIL DESIGN ADDENDUM NUMBER ONE TO: All

More information

IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK

IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK SMART CONSERVATION THROUGH SMART GROWTH NJ LAND CONSERVATION RALLY March 22, 2014 Laurette Kratina, PP, AICP, Supervising Planner Somerset County Planning

More information

Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment

Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment Arroyo Seco Headwaters in the San Gabriel Mountains Major tributary to the Los Angeles River 44 square mile

More information

ROSEMONT 138KV TRANSMISSION LINE SITING STUDY PROJECT

ROSEMONT 138KV TRANSMISSION LINE SITING STUDY PROJECT ROSEMONT 138KV TRANSMISSION LINE SITING STUDY PROJECT Public Open House Meeting #3 - Corona de Tucson April 14, 2010 - Quail Creek 5:30pm 8:30pm Presentation and Question and Answer: 6:30pm 7:00pm Project

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651) DATE: December 20, 2011 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000; TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Tori Dupre, Senior

More information

Congestion Management Safety Plan. Michael Corbett State Program Administrator September 2017

Congestion Management Safety Plan. Michael Corbett State Program Administrator September 2017 Congestion Management Safety Plan Michael Corbett State Program Administrator September 2017 Agenda Topic 1 What is the Congestion Management Safety Plan (CMSP)? 2 Relevance to Congestion Investments 3

More information

Southeast Extension to RidgeGate Parkway Scoping Booklet

Southeast Extension to RidgeGate Parkway Scoping Booklet Southeast Extension to RidgeGate Parkway Scoping Booklet PUBLIC SCOPING MEETING SCHEDULE Public Scoping Meeting Wednesday, November 2, 2011 6:00pm to 7:30pm City of Lone Tree Recreation Center Willow Room

More information

Biology and Wildlife. Erosion, Drainage, and Storm water. Chavez Ranch Road Project Comment Response Table - Page 1 January 2017

Biology and Wildlife. Erosion, Drainage, and Storm water. Chavez Ranch Road Project Comment Response Table - Page 1 January 2017 Air Quality Commenters are concerned that there would be increased particulate matter and introduction of chemical pollutants during the construction of the project that could affect the air quality and

More information

Appendix H ETDM Screening Results Meeting Minutes

Appendix H ETDM Screening Results Meeting Minutes Appendix H ETDM Screening Results Meeting Minutes RECORD OF MEETING - DRAFT SR 7 Corridor Extension PD&E Study FPID No. 229664-2-22-01 ETDM #8127 SUBJECT: ETDM Screening Results Meeting DATE AND TIME:

More information

HAZARD MITIGATION GOALS AND OBJECTIVES

HAZARD MITIGATION GOALS AND OBJECTIVES SEWRPC Community Assistance Planning Report No. 282, 2nd Edition CITY OF MILWAUKEE ALL HAZARDS MITIGATION PLAN UPDATE Chapter IV HAZARD MITIGATION GOALS AND OBJECTIVES [NOTE: Throughout this plan update

More information

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the first Public Meeting for the proposed interchange improvement

More information

[FWS R8 R 2015 N087; FXRS282108E8PD0 156 F ] South Bay Salt Pond Restoration Project, Phase 2; Don Edwards National Wildlife

[FWS R8 R 2015 N087; FXRS282108E8PD0 156 F ] South Bay Salt Pond Restoration Project, Phase 2; Don Edwards National Wildlife Surname Billing Code: 4310 55 Deputy RD ARD Refuges DEPARTMENT OF THE INTERIOR Fish and Wildlife Service Solicitor Refuge Supervisor Asst. Refuge Supervisor Ch. Natural Resources Project Leader [FWS R8

More information

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014. Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014. Board 1: Welcome Welcome to the Wilson Transfer Station Project Public Hearing. The purpose

More information

A project of the Arizona State Land Department,/ facilitated by East Valley Partnership & Pinal Partnership

A project of the Arizona State Land Department,/ facilitated by East Valley Partnership & Pinal Partnership A project of the Arizona State Land Department,/ facilitated by East Valley Partnership & Pinal Partnership September 4, 2008 Ms. Peggy Fiandaca Pinal County Comprehensive Plan 13771 Fountain Hills Blvd.,

More information

Illiana Corridor CPG/TTF Meeting #1

Illiana Corridor CPG/TTF Meeting #1 Illiana Corridor CPG/TTF #1 March 14, 2013 #10 1 Agenda Tier One Recap What happens in Tier Two? Tier Two Purpose and Need Identify Range of Alternatives Landowner Outreach Initial Context Sensitive Solution

More information

2017 General Obligation Bond

2017 General Obligation Bond 2017 General Obligation Bond Presentation of Public and Council Projects to the Transportation & Mobility Stakeholder Committee April 13, 2017 Agenda Deferred Maintenance Project Development Process Projects

More information

The Trinity River Corridor Project Update

The Trinity River Corridor Project Update The Trinity River Corridor Project Update Councilmember Carolyn A. Davis Community Meeting October 14, 2008 The project covers 20 miles of the Trinity River, approx. 10,000 acres 2 Trinity River Corridor

More information

I-70 Corridor Enhancement Plan

I-70 Corridor Enhancement Plan i - Table of Contents Table of Contents Chapter I Overview Chapter II Bridge and Roadway Improvements Chapter III Landscape Enhancements Chapter IV Riparian Corridors Chapter V Showcase Missouri Plan Chapter

More information

City of Richland Comprehensive Plan: Integrated Non-project Final Environmental Impact Statement

City of Richland Comprehensive Plan: Integrated Non-project Final Environmental Impact Statement City of Richland Comprehensive Plan: Integrated Non-project Final Environmental Impact Statement September 12, 2017 Prepared for: City of Richland Prepared by: Oneza & Associates With assistance from:

More information

Bassett Creek Valley Working Group. October 4, 2017

Bassett Creek Valley Working Group. October 4, 2017 Bassett Creek Valley Working Group October 4, 2017 1 Today s Topics Introductions Overview of Design Teams (P+W and WSP) Expertise Working Group Roles and Responsibilities Schedule & Community Engagement

More information

Decision Notice. Proposed Action

Decision Notice. Proposed Action Decision Notice Paving Weld County Road 105 USDA Forest Service Arapaho and Roosevelt National Forest and Pawnee National Grassland Pawnee National Grassland Ranger District Weld County, Colorado November

More information

National Historic Preservation Act Section 106 Compliance

National Historic Preservation Act Section 106 Compliance National Historic Preservation Act Section 106 Compliance Regulatory Program Workshop Erin E. Hess Cultural Resource Specialist National Historic Preservation Act Compliance Regulatory Division, Sacramento

More information

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement October 12, 2006 CEQR No.: TO COME ULURP Nos.: TO COME Lead Agency: Lower Manhattan Development Corporation

More information

City of Fort Lupton Administrative Site Plan Process

City of Fort Lupton Administrative Site Plan Process City of Fort Lupton Administrative Site Plan Process Purpose The Site Plan process is meant to promote orderly and sound development standards as they apply to the City. These site development standards

More information

Eastside Transit Corridor Phase 2 Technical Study Update Community Outreach Meeting February 2017

Eastside Transit Corridor Phase 2 Technical Study Update Community Outreach Meeting February 2017 Eastside Transit Corridor Phase 2 Technical Study Update Community Outreach Meeting February 2017 Purpose of Tonight s Meeting Recap of Board motion (2014) and technical study process Provide update on

More information

Section 106 Consulting Party Meeting Summary Report March 29, 2018

Section 106 Consulting Party Meeting Summary Report March 29, 2018 On, the Chicago Department of Planning and Development (DPD) and the Chicago Department of Transportation (CDOT) jointly hosted the second Section 106 Consulting Party Meeting at the Logan Center for the

More information

Summary Report No. 3 - Public Involvement, Round Three

Summary Report No. 3 - Public Involvement, Round Three Pinal County Corridors Definition Study Summary Report No. 3 - Public Involvement, Round Three ADOT Project No. T04-49-P0001 ADOT Purchase Order No. PGKG 2642 Prepared by: Kaneen Advertising & Public Relations

More information

Environmental Assessment

Environmental Assessment Hudson-Bergen Light Rail (HBLR) Route 440 Extension Environmental Assessment Project Sponsor: Prepared by: AKRF, Inc. BEM Systems, Inc. Gannett Fleming Inc. InGroup, Inc. Richard Grubb & Associates, Inc.

More information

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016 2035 General Plan Update and Belmont Village Specific Plan Joint Study with the City Council and Planning Commission April 12, 2016 Agenda 1. Welcome and Introductions 2. General Plan Update Status of

More information

Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio. Informational Handout

Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio. Informational Handout Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio SR 46 (Niles Cortland Road) and SR 82 Proposed Improvements Howland Township, Trumbull County, Ohio

More information

systems is available on the Colorado Wetland Information Center (CWIC) website.

systems is available on the Colorado Wetland Information Center (CWIC) website. Colorado Natural Heritage Program Wetland Program Plan -- Dec 2015 Status Update and Addendum -- The Colorado Natural Heritage Program (CNHP) developed a Wetland Program Plan (WPP) in 2010 for the planning

More information

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY WELCOME Northeast River Crossing Functional Planning Study Phase 2 Public Meeting 4 to 8 PM Informal drop-in format and discussion tables Meeting Purpose Introduce the Northeast River Crossing Functional

More information

Creating Complete Roadway Corridors:

Creating Complete Roadway Corridors: Creating Complete Roadway Corridors: The AASHTO Guide to Transportation Landscape Architecture and Environmental Design NCHRP Project 15-33 Status Report AASHTO Standing Committee on Design Technical Committee

More information

Presentation August 20, 2013

Presentation August 20, 2013 Presentation August 20, 2013 St. Vital Transmission Complex Stakeholder Workshop WELCOME! Manitoba Hydro 9:00am to 1:50pm Purpose of Workshop Share current project information Including outcomes of the

More information

Public Review Draft Encinitas Subarea Plan

Public Review Draft Encinitas Subarea Plan Encinitas Subarea Plan Prepared for City of Encinitas Community Development Department 505 S. Vulcan Encinitas, California 92024 Prepared by Ogden Environmental and Energy Services Co., Inc. 5510 Morehouse

More information

Capital Projects in and near Odenton Town Center

Capital Projects in and near Odenton Town Center Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately

More information

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment (PD&E) STUDY Miami-Dade County, Florida Preliminary Executive Summary Alternative Corridor Evaluation (ACE) Report

More information

Project Engagement Summary Report

Project Engagement Summary Report I-11 & Intermountain West Corridor Study Project Engagement Summary Report Prepared for In partnership with Maricopa Association of Governments Regional Transportation Commission of Southern Nevada Federal

More information