1 COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING Subject: Recommendation Prepared by: PRELIMINARY DESIGN REVIEW OF LOCUST STREET BRIDGE CONSTRUCTION & COURT AVENUE, SCOTT AVENUE, AND SW 1 ST STREET BRIDGE REHABILITATION X APPROVE DISAPPROVE NO ACTION OTHER ERIN OLSON-DOUGLAS, ECONOMIC DEVELOPMENT DIRECTOR, Attachment Listing: Summary: The City is in the midst of a major $22 million downtown bridge overhaul project known as Bridges to Opportunity: Des Moines Community Connection, consisting of the reconstruction and replacement of several roadway and multi-use trail bridges crossing the Des Moines River. In July of 2016, the City received an $8 million TIGER transportation infrastructure grant, setting the design work in motion on multiple downtown bridge projects that will be reconstructed or rehabilitated over the next 5 years (project span from 2016 through 2021). This will include the reconstruction of the Locust Street Bridge, the historic renovation of the Court Avenue Bridge, and rehabilitations on the Scott Avenue and SW 1 st Street Multi-Use Pedestrian Trail bridges, all of which are also subject to State Historic Preservation Office (SHPO) review prior to final design. The Walnut Street Bridge will require future replacement or renovation, but is not a part of this project at this time. The scope of work proposed on each of the bridges within this project is below: Locust Street Bridge The existing bridge was originally constructed in 1909, and an engineering feasibility study has determined that the most economical solution is bridge replacement. The new bridge design will largely mimic the approved design of the Grand Avenue Bridge that is currently under construction, and will have an $8 million dollar project budget. There are slight variations from the Grand Avenue Bridge design including the width of travel lanes, parking lanes and sidewalks. The reconstructed bridge will feature two 12 wide travel lanes, two 9 wide parking lanes, and 12 wide sidewalks on each side of the bridge. The eastbound travel lane will incorporate bike lane sharrow pavement markings, as they currently exist. The vehicle and pedestrian barrier is combined into one element at the outer edges of the bridge, consisting of galvanized steel, which allows for a better view of the river for pedestrians that typical concrete barriers would. Overhead roadway lights will consist of the Mid-American standard found throughout downtown, which includes upgraded black light poles and LED light fixtures. Pedestrian lights will be integrated into the barrier to more directly illuminate the sidewalk and eliminate the need for additional overhead lighting. The exterior of the bridge entails painted metal panels with galvanized framing that is concealed from view, which creates a scalloped effect on the sides of the bridge. This design is derived from the input and direction previously received from the Grand Avenue Bridge Aesthetic Review Committee.

2 PAGE 2 SW 1 st Street Pedestrian Bridge The SW 1 st Street Multi-Use Trail Bridge was originally built in 1937 for vehicular traffic, and was known as the Riverside Drive Bridge. Repairs to the bridge were conducted in 1973, and the structure was converted to a trail bridge in To prolong the life of the bridge, additional structural repairs are needed at this time, which constitutes the majority of the scope of work on this $950,000 project. The existing raised planter beds are proposed to be removed from the structure, which have proven to be difficult to maintain. Additionally, the planter removal on the southern terminus of the bridge will make room for a planned B-Cycle bike rental kiosk to be installed. The existing bridge railing, decorative lighting and benches will remain in place. Court Avenue Bridge An estimated $7 million dollar restoration of the circa-1917 Court Avenue Bridge is proposed, that will prolong the life of the structure and keep the historic appearance intact. The bridge is listed on the National Register of Historic Places and is a vital part of the Civic Center Historic District. The work will remove and replace the bridge deck paving and sidewalks, repair abutments, pierces, spandrel walls, columns and floor beams, and will remove and replace the existing barrier rail. The replacement of the rail will either consist of a concrete replica of the current railing or will use alternate materials such as granite. The damaged limestone on the bridge fascia will be replaced with new limestone, and the existing limestone segments will be cleaned to remove growth and discoloration. The existing historic light fixtures are in inefficient, in poor repair, are no longer being manufactured, and have been replaced in other areas of Court Avenue where they were previously installed. Additional study is being conducted to determine an appropriate LED light fixture that will be historically compatible with the bridge, and study is also being conducted on how to provide architectural lighting of the historic railing and bridge fascia. The roadway and sidewalk dimensions as proposed will be similar to the existing roadway configuration. Scott Avenue Bridge The Scott Avenue Bridge was built in 1937 and was substantially rehabilitated in Current conditions of the bridge warrant significant repairs to extend the useful life of the bridge. The scope of work on this $3.9 million dollar bridge rehabilitation will largely be structural in nature, however, the bridge railing and lighting will be replaced, and the roadway and sidewalk will be repaired with a new concrete overlay. Scope of Review Board to make recommendation to City Council on: Design review of renovation /remodeling/new construction for City-owned or leased project. Design review for urban renewal project with specific development requirements. Whether a proposed urban renewal project qualifies for funding from tax increment. Whether the level of financial assistance funded from tax increment revenues proposed for a specific individual project are reasonable and appropriate. The selection of urban renewal sites for clearance or rehabilitation and problems relating to acquisition, clearance or rehabilitation of property, relocation of displaced persons and disposition of acquired property. Skywalk System Other

3 PAGE 3 Urban Design Review Board Action: The Board is asked to make its recommendation on the preliminary design of the projects at this meeting. A final design review of the project will be scheduled at a later date. Staff Recommendation: Staff recommends approval of the preliminary design review subject to the following comments: SW 1 st Street Multi-Use Bridge: 1. Evaluate the installation of the missing trail segment on the riverfront east of Principal Park as a component of this project. Court Avenue Bridge: 1. Consider construction of a bump out on the east end of the bridge to improve the pedestrian crossing conditions, similar to what s been installed on the west end of the bridge. 2. A more defined and historically compatible strategy for overhead and pedestrian lighting on the bridge should be provided. Scott Avenue Bridge: 1. Provision of decorative black light poles and LED lights installed on bridge, similar to the enhanced fixtures installed within the Downtown Overlay District. 2. Provision of an enhanced decorative railing, including the railing on the sidewalk separator. 3. Consideration of pedestrian lighting installed for the sidewalks. Background: The Grand Avenue Bridge was the first of several additional major downtown bridge reconstruction and rehabilitation efforts, and the bridge is currently under construction with an anticipated spring 2018 completion date. The previously convened Aesthetic Steering and Review Committee considered the visual appearance of the future downtown bridges relative to the Grand Avenue Bridge. While their recommendations were not solidly resolved, the general direction they provided was to replicate the aesthetics from the bridge deck down and have further conversation about the pedestrian experience for future bridges. Additionally, the Board previously reviewed and provided design approval to the Grand Avenue Bridge project on the August 4, 2015 meeting, and provided the following pertinent design comments that are relevant to the complimentary design of the Locust Street Bridge: More of a focus on the pedestrian experience, addition of bike lanes should be given to new bridge design Future bridge design should be kept open-ended to respond to the specific site conditions and evolving technologies. Do not feel an absolute need to match the bridges.

4 PAGE 4 Would not want to see four distinctly different bridges. Feel that the bridges should be similar, but respond to the individual design requirements at each location. All bridges within this project with the exception of the Locust Street Bridge have been deemed to be contributing structures within the Civic Center Historic District that encompasses much of the downtown riverfront

5 PAGE 5

Spring 2018 Construction Update

Spring 2018 Construction Update Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the

More information

MINUTES URBAN DESIGN REVIEW BOARD

MINUTES URBAN DESIGN REVIEW BOARD MINUTES URBAN DESIGN REVIEW BOARD Date: Tuesday, May 16, 2017 Location: Members present: Members absent: Staff present: Guests: City Council Chambers Scott, Naura Heiman-Godar, Tim Hielkema, Colleen MacRae,

More information

Fall 2017 Construction Update

Fall 2017 Construction Update Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,

More information

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1] nhancements [1] STATUS OF PROJECT: The project has recently moved from the Preliminary Design Phase to the Final Design Phase following the most recent Public Involvement Meeting held on January 9, 2019

More information

Victoria Bridge Municipal Class EA Civic Works Committee

Victoria Bridge Municipal Class EA Civic Works Committee Municipal Class EA John Pucchio, P. Eng., Project Manager June 19 2018 Introduction Existing Conditions Municipal Class EA Proposed Bridge Proposed Road Reconstruction Proposed Improvements Construction

More information

Cottage Grove Road Reconstruction. City of Madison Engineering

Cottage Grove Road Reconstruction. City of Madison Engineering Public Informational Meeting Cottage Grove Road Reconstruction October 8, 2015 Presentation Outline Introduction Project Purpose & Need Proposed Design Overview Environmental Concerns Pedestrian Needs

More information

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1 EXHIBIT A Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1 1 As amended by Resolution No. 2008-02-001(TR1R) of the Tax Increment Reinvestment Zone No.1, and approved to

More information

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons West Dennis Center: Bass River to Old Main Street West Dennis Business District: Old Main Street to Dennis Commons Dennisport Center: Dennis Commons to Division Street Main Street Project Goals Project

More information

The purpose of tonight s PIC is to:

The purpose of tonight s PIC is to: The purpose of tonight s PIC is to: Provide an overview of the work completed to date and a summary of the Class EA process being followed; Provide a summary of public input received so far, including

More information

Final Design Meeting. September 25, Creating Bridges As Art. Welcome & Introductions. Terry Ward - Project Manager

Final Design Meeting. September 25, Creating Bridges As Art. Welcome & Introductions. Terry Ward - Project Manager Final Design Meeting September 25, 2014 Creating Bridges As Art 1 Welcome & Introductions Terry Ward - Project Manager 2 VQRC Final Design Meetings Meeting Date Items for Discussion Final Design Meeting

More information

Transportation Committee

Transportation Committee Transportation Committee Business Item No. 2013-286SW Meeting date: October 14, 2013 For the Metropolitan Council meeting of October 16, 2013 Subject: Southwest Light Rail Transit (Green Line Extension):

More information

Parapet/Formliner/Fencing

Parapet/Formliner/Fencing Parapet/Formliner/Fencing Cross Parapet/Formliner/Fencing Street Aesthetic Features Context The I-290 Phase I study is evaluating improvements along 13 miles of the Eisenhower Expressway, from west of

More information

Rundel Library Elevated River Terrace Reconstruction City of Rochester, N.Y. Application Number July 2017

Rundel Library Elevated River Terrace Reconstruction City of Rochester, N.Y. Application Number July 2017 Rundel Library Elevated River Terrace Reconstruction City of Rochester, N.Y. Application Number 75047 July 2017 PROJECT DESCRIPTION The Rundel Library is a nationally registered historic building surrounded

More information

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project OHIO DEPARTMENT OF TRANSPORTATION DISTRICT 6 400 EAST WILLIAM STREET DELAWARE, OHIO 43015 800.372.7714 Columbus City Council City Hall 90 West Broad Street Columbus, OH 43215-9015 RE: I-70/71 Columbus

More information

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014 IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014 INTRODUCTION The City of Cedar Falls and the Iowa Department of Transportation are conducting a Public Informational

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street Memorandum DATE November 10, 2011 CITY OF DALLAS TO Trinity River Corridor Project Committee Members: Vonciel Jones Hill (Chair) Linda Koop (Vice Chair), Monica Alonzo, Scott Griggs, Angela Hunt, and Delia

More information

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies Vision, Objectives & Strategies The is the public framework and guide for future development of the Grand Traverse Commons. The establishes public polices for infrastructure, the preservation of natural

More information

US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007

US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007 US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007 Sponsored by: The Ohio Department of Transportation and The City of Defiance Project

More information

SOUTH MAIN RIVER COMMUNITY REINVESTMENT PROJECT AREA PLAN DATED AUGUST 31, 2018

SOUTH MAIN RIVER COMMUNITY REINVESTMENT PROJECT AREA PLAN DATED AUGUST 31, 2018 SOUTH MAIN RIVER COMMUNITY REINVESTMENT PROJECT AREA PLAN DATED AUGUST 31, 2018 Redevelopment Agency of the City of Logan, Utah South Main River Community Reinvestment Project Area - 1 - INTRODUCTION 1.

More information

FDOT D4 Complete Streets

FDOT D4 Complete Streets FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,

More information

SUMMARY Downtown Malabar Meeting on July 30, 2013 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study

SUMMARY Downtown Malabar Meeting on July 30, 2013 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study SUMMARY Downtown Malabar Meeting on July 30, 2013 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study www.sr514malabar.com LOCATION: TIME: ATTENDEES: Malabar Town Hall 2725

More information

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre Main Street Reconstruction From Ninth Line to Stouffer Street Town of Whitchurch-Stouffville Public Information Centre November 23, 2016 4:30 to 6:00 pm & 7:00 to 8:00 pm 6240 Main Street, Stouffville

More information

Berkshire Regional Planning Commission Clearinghouse Review Report

Berkshire Regional Planning Commission Clearinghouse Review Report August 19, 2013 SUBJECT: Reconstruction of Housatonic Street, Dalton, MA EOEA#: 15083 LOCATION: Dalton ESTIMATED COST: $8.1 million REVIEW TYPE: ENF PROPONENT: MassDOT and Town of Dalton COMMENTS DUE:

More information

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH 112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG060310124909PGH C ontents Introduction 1 Project Overview 1 Public Involvement and Technical Coordination 4 Description

More information

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project

More information

bridges to opportunity des moines community connection

bridges to opportunity des moines community connection 2016 bridges to opportunity des moines community connection Contents A. Table of Contents... i B. Mayor s Letter of Endorsement... ii 1. Project Description...1 1.1 Locust Street over Des Moines River

More information

City of Los Angeles Department of Public Works

City of Los Angeles Department of Public Works City of Los Angeles Department of Public Works Environmental Scoping Meeting for the Proposed Sixth Street Park, Arts, River & Connectivity Improvements (PARC) Project May 3, 2017 1 Agenda Introductions

More information

open house 3 CITY OF SALEM Downtown Streetscape Plan

open house 3 CITY OF SALEM Downtown Streetscape Plan open house 3 Streetscape concepts CITY OF SALEM Downtown Streetscape Plan analysis concepts we are here refined concepts & document Feb 13th 1 2 3 apr 18th KICKOFF OPEN HOUSE Streetscape Work Group Walking

More information

Public input has been an important part of the plan development process.

Public input has been an important part of the plan development process. Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the

More information

Fifth and Detroit Street Design/South University Update Capital Improvement Committee Meeting

Fifth and Detroit Street Design/South University Update Capital Improvement Committee Meeting 1 Fifth and Detroit Street Design/South University Update Capital Improvement Committee Meeting Kick-off Meeting Agenda 2 1. Introductions 2. Update on South University 3. Fifth and Detroit-project scope

More information

Clay Street Bridge Replacement Project

Clay Street Bridge Replacement Project Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) No. 2 April 4, 2018 The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar

More information

MOUNTAIN VIEW ELEMENTARY SCHOOL SITE REDEVELOPMENT OPEN HOUSE. MacPherson Room, 10 am 5 pm

MOUNTAIN VIEW ELEMENTARY SCHOOL SITE REDEVELOPMENT OPEN HOUSE. MacPherson Room, 10 am 5 pm MOUNTAIN VIEW ELEMENTARY SCHOOL SITE REDEVELOPMENT OPEN HOUSE MacPherson Room, 10 am 5 pm MOUNTAIN VIEW SCHOOL SITE REDEVELOPMENT 1 WELCOME TO THE OPEN HOUSE FOR THE MOUNTAIN VIEW SCHOOL SITE WHY WE ARE

More information

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017 Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year

More information

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering AGENDA 1. Project Scope & Schedule 2. Steering Committee & Community

More information

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director 2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director 1 Jefferson County, Missouri Road and Bridge Sales Tax: Jefferson County has a one-half cent sales tax that

More information

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. 67 HEARING LOCATION: ERICKSEN COMMUNITY CENTER 1401 11 TH AVENUE NORTH

More information

Olde Towne Vision Plan

Olde Towne Vision Plan Olde Towne Vision Plan Introduction In 2016, the City of Bellevue will complete its move of City offices from Olde Towne Bellevue to its new municipal complex on Wall Street. The City intends to sell its

More information

Enhance the High Line Canal Projects

Enhance the High Line Canal Projects Enhance the High Line Canal Projects Joint Project Proposal for Arapahoe County Open Spaces Funding Partner Sponsors: South Suburban Park and Recreation District City of Centennial City of Littleton October

More information

Mississippi Skyway Preliminary Engineering Report

Mississippi Skyway Preliminary Engineering Report EXECUTIVE SUMMARY Mississippi Skyway Preliminary Engineering Report CITY OF RAMSEY, MINNESOTA DECEMBER 2014 City of RAMSEY EXECUTIVE SUMMARY Project Need and Intent The Mississippi Skyway pedestrian bridge

More information

Project Output Indicators for Federal Gas Tax Investments

Project Output Indicators for Federal Gas Tax Investments Municipalities are required to report results achieved through the investment of federal Gas Tax funds under the Municipal Funding Agreement. AMO uses the indicators listed below to capture the outputs

More information

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS 56TH STREET AND 17TH AVENUE IMPROVEMENTS FUNDING: Bonded ESTIMATED COST: $3,885,000 COMPLETION DATE: Fall 2018 SCOPE OF PROJECT: Widening of 56th Street from 6th Avenue to 19th Avenue, and widening 17th

More information

Corridor Enhancements

Corridor Enhancements Corridor Enhancements Safety is MoDOT s first priority in widening and rebuilding I-70 across the state of Missouri. MoDOT also understands that the interstate - and its interchanges and overpasses - are

More information

Open Space and Recreational Resources

Open Space and Recreational Resources Chapter 3: Open Space and Recreational Resources A. INTRODUCTION Under the 2012 City Environmental Quality Review (CEQR) Technical Manual guidelines, open space is defined as publicly accessible, publicly

More information

Southern Gateway Project and Public Green

Southern Gateway Project and Public Green Southern Gateway Project and Public Green Transportation and Trinity River Project Committee May 23, 2016 Purpose of Presentation Provide the history and an overview of the Southern Gateway Project (SGP)

More information

The Project. In 2013, construction was completed between 100 Street and 102 Street.

The Project. In 2013, construction was completed between 100 Street and 102 Street. The Project Jasper Avenue New Vision (JANV) is a major catalyst project identified in the Capital City Downtown Plan (2010) between 92 Street and 109 Street, including the streets half a block north and

More information

EXHIBIT A 2019 FINANCING: PROJECT AUTHORIZATIONS

EXHIBIT A 2019 FINANCING: PROJECT AUTHORIZATIONS EXHIBIT A 2019 FINANCING: PROJECT AUTHORIZATIONS Projects with Prior City Commission Authorization (No Changes) Downtown Canopy PW17B4CIP Prior Authorizing Ordinance: Ordinance No. 9428 Estimated Total

More information

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension RESOLUTION NO. R2018-32 Refining the route, profile and stations for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 09/13/2018

More information

CENTERTON ROAD BRIDGE REPLACEMENT

CENTERTON ROAD BRIDGE REPLACEMENT CENTERTON ROAD BRIDGE REPLACEMENT FEASIBILITY STUDY BURLINGTON COUNTY BRIDGE C4.4 OVER RANCOCAS CREEK TOWNSHIPS OF MOUNT LAUREL, WESTAMPTON & WILLINGBORO 1 prepared for: BOARD OF CHOSEN FREEHOLDERS BURLINGTON

More information

Edenfield Avenue Green Street Demonstration Project Neighborhood Meeting

Edenfield Avenue Green Street Demonstration Project Neighborhood Meeting Edenfield Avenue Green Street Demonstration Project Neighborhood Meeting Edenfield Avenue Green Street Demonstration Project Neighborhood Meeting Road Reconstruction Elements Grant Background What is a

More information

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering

More information

Downtown Lead Revitalization Project Final Recommendations. Three Proposed Options for the Revitalization of Downtown Lead

Downtown Lead Revitalization Project Final Recommendations. Three Proposed Options for the Revitalization of Downtown Lead Downtown Lead Revitalization Project Final Recommendations Three Proposed Options for the Revitalization of Downtown Lead November 1, 2011 Three Proposed Options for the Revitalization of Downtown Lead

More information

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017 GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017 Glen Road Pedestrian Bridge Class Environmental Assessment 1 WELCOME! Welcome to the second Public

More information

8 October 14, 2015 Public Hearing

8 October 14, 2015 Public Hearing 8 October 14, 2015 Public Hearing APPLICANT & PROPERTY OWNER: PRICE S HOLDINGS, LLC STAFF PLANNER: Karen Lasley REQUEST: A. Conditional Use Permit (Automobile Repair Garage) B. Change in Nonconforming

More information

Rights-of-Way Preservation Guidelines

Rights-of-Way Preservation Guidelines Rights-of-Way Preservation Guidelines Summary of Policy The purpose of the Rights-of-Way Preservation Guidelines is to help staff make decisions about preserving rights-ofway for future transportation

More information

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome! FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW Welcome! Meeting Agenda 6:00 PM Open House 6:30 PM Presentation 7:00 PM Open House / Q&A at the Boards Project Design Team Connecticut Avenue, NW Project

More information

Places29: List of Implementation Projects

Places29: List of Implementation Projects Important Points to Keep in Mind When Using This List Places29: List of s Each of the projects in this List represents an action needed to implement the Places29 Master Plan. The projects are grouped first

More information

TOWN COUNCIL / PLANNING COMMISSION

TOWN COUNCIL / PLANNING COMMISSION Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011 Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L.

More information

D ESIGN REVIEW COMMITTEE

D ESIGN REVIEW COMMITTEE CVDRC STAFF REPORT C REATIVE VILLAGE D ESIGN REVIEW COMMITTEE March 14, 2017 Case Number LDC2017-00035 Applicant AGENDA ITEM 1 CREATIVE VILLAGE STREETSCAPE DESIGN GUIDELINES AMENDMENT Craig Ustler, Manager

More information

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF. Overall Map Summit Chicago Bloomington-Normal Lincoln New Station Planned New Station Planned Dwight Pontiac Joliet Pedestrian overpass and second platform planned Higher speed service began in this section

More information

Committee Meeting: Downtown Today & Concept Refinement September 11, 2017

Committee Meeting: Downtown Today & Concept Refinement September 11, 2017 Committee Meeting: Downtown Today & Concept Refinement September 11, 2017 AGENDA 1. Brief Input Update 2. Comprehensive Plan Principles 3. Downtown Today 4. Concept Updates 5. Future Schedule What is a

More information

City of Des Moines: Downtown Transportation Restoration

City of Des Moines: Downtown Transportation Restoration 2014 TIGER Discretionary Grant «1 Grand Avenue over Des Moines River Bridge Replacement 2 Locust Street over Des Moines River Bridge Replacement «City of Des Moines: Downtown Transportation Restoration

More information

Oconee Rivers Greenway Project. TSPLOST 2018 Project # 5 Project Concept Sub-projects 7, 8, 9, 10, & 11. Mayor & Commission Work Session

Oconee Rivers Greenway Project. TSPLOST 2018 Project # 5 Project Concept Sub-projects 7, 8, 9, 10, & 11. Mayor & Commission Work Session Oconee Rivers Greenway Project Project # 5 Project Concept Sub-projects 7, 8, 9, 10, & 11 Mayor & Commission Work Session February 13, 2018 North Oconee River Greenway 1 Project # 05 - Oconee Rivers Greenway

More information

Corporate Report. Further, that Legal Services be directed to prepare the necessary amendments to the City s Delegation By-law.

Corporate Report. Further, that Legal Services be directed to prepare the necessary amendments to the City s Delegation By-law. Corporate Report Report from Planning and Building Services, Planning Services Date of Report: April 27, 2016 Date of Meeting: May 16, 2016 Report Number: PBS-122-2016 File: 60.2.43 Subject: Expansion

More information

Project Purpose. Project Need

Project Purpose. Project Need Project Purpose The purpose of the project is to implement a bridge improvement solution that corrects the existing safety problem at the Strasburg Pike Bridge. The project will provide a structurally

More information

Planning Districts INTRODUCTION

Planning Districts INTRODUCTION INTRODUCTION To facilitate detailed examination of development prospects for all areas of the community, Delano has been divided into 14 planning districts. The location of these planning districts is

More information

Preliminary Design of Major Rehabilitation Works for the Bridge Structure on PTH 1A Over Assiniboine River and CP Rail (Bridge Site No.

Preliminary Design of Major Rehabilitation Works for the Bridge Structure on PTH 1A Over Assiniboine River and CP Rail (Bridge Site No. Preliminary Design of Major Rehabilitation Works for the Bridge Structure on PTH 1A Over Assiniboine River and CP Rail (Bridge Site No. 2582-00) Public Consultation Report December 2014 First Street Bridge

More information

Preferred Riverwalk Alternative Components August 17, 2017:

Preferred Riverwalk Alternative Components August 17, 2017: Preferred Riverwalk Alternative Components August 17, 2017: 1. Entrance and Future Pump Station Location: Entrance location to line up with main parking entrance to Captain Parkers and allows future Pump

More information

foi"#'.w County Road Needs Report i*"-i"s;a,i=?;;,#'1 County udges' Association of Arkansas 20L7 Annual Winter Meeting le0isrtnet tta shsl201-7

foi#'.w County Road Needs Report i*-is;a,i=?;;,#'1 County udges' Association of Arkansas 20L7 Annual Winter Meeting le0isrtnet tta shsl201-7 FLOOD PLAIN SERVICES County Road Needs Report County udges' Association of Arkansas 20L7 Annual Winter Meeting Thomas F. Black, P.E., CFM shsl201-7 i*"-i"s;a,i=?;;,#'1 tta le0isrtnet foi"#'.w Flood Plain

More information

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below: Race Road/Jessup Village Planning Study (H550601) Project Newsletter Spring 2015 Project Description The Study Team, consisting of staff from Anne Arundel County (Department of Public Works and Department

More information

Broadway Avenue Streetscape Project City of Albert Lea. Streetscape Design Committee Meeting October 29, 2012

Broadway Avenue Streetscape Project City of Albert Lea. Streetscape Design Committee Meeting October 29, 2012 Broadway Avenue Streetscape Project City of Albert Lea Streetscape Design Committee Meeting October 29, 2012 1 Presentation Outline Street Widths, Sidewalk Widths and Bump-Out Configuration Decorative

More information

Capital Improvement Program. Development Services Staff Recommended Projects

Capital Improvement Program. Development Services Staff Recommended Projects 2014-2019 Capital Improvement Program Development Services Staff Recommended Projects Ongoing Capital Improvement Ellsworth Road Ryan to Germann Roads $3.5 M Germann Rd Ryan Rd Half-street improvements

More information

Elgin O Hare Western Access Project Local Advisory Committee. February 10, 2014

Elgin O Hare Western Access Project Local Advisory Committee. February 10, 2014 Elgin O Hare Western Access Project Local Advisory Committee February 10, 2014 Agenda Project status update Design and construction Funding Aesthetics Project events and outreach Land acquisition Next

More information

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017 PIKE PINE RENAISSANCE: ACT ONE October 19, 2017 WATERFRONT SEATTLE PROGRAM PROJECT INTRODUCTION Pike and Pine streets, between First and Melrose avenues Pedestrian and streetscape improvements Budget:

More information

Middlebury RS 0174(8)

Middlebury RS 0174(8) Middlebury RS 0174(8) Preferred Alternative Meeting VT 125 Bridge #13 over Middlebury River August 6, 2012 Presented to Presented by Town of Middlebury VTrans & VHB Introductions: Jennifer Fitch VTrans

More information

4.1 Build Alternative 1 Construction Phasing

4.1 Build Alternative 1 Construction Phasing SECTION 4 Implementation Plan This section discusses potential segmentation of the build alternatives into multiple projects for implementation of improvements to the NSH from Rabbit Creek Road to 36th

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

Preliminary Sketch Plan for Fort Hunter Park

Preliminary Sketch Plan for Fort Hunter Park Preliminary Sketch Plan for Fort Hunter Park Public Presentation November 19, 2009 Dauphin County Parks and Recreation 100 Fort Hunter Road Harrisburg, PA 17110 (717) 599-5188 www.dauphinc.org THOMAS COMITTA

More information

Project Consulting Team:

Project Consulting Team: THE DOWNTOWN CHERRYVILLE LAND USE + STREETSCAPE MASTER PLAN WAS FUNDED THROUGH THE GENEROUS DONATIONS OF THE FOLLOWING: The Community Foundation of Gaston County ElectriCities of North Carolina The Cherryville

More information

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004 City of Farmington Amendment to the 1998 Master Plan Adopted October 11, 2004 Introduction Planning Background 1 Scope and Components of the Plan Amendment 2 Concept Introduction 3 Plan Concepts 3 Conceptual

More information

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016 Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment May 5, 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service

More information

STAFF REPORT Agenda Item: J.4 To: Mayor and City Council Date:

STAFF REPORT Agenda Item: J.4 To: Mayor and City Council Date: STAFF REPORT Agenda Item: J.4 To: Mayor and City Council Date: 2-14-2007 Thru: Charles McNeely, City Manager Subject: Staff Report: Approval of a project to be submitted for the NDOT 2007-2009 Landscape

More information

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North. MEMORANDUM Date: August 28, 2015 Our File: 1010-20-15-062 To: Design Review Committee From: Lisa Berg, Senior Community Planner Re: Amendment to Development Permit for Park Royal North This memo deals

More information

E kv Transmission Line Underground Relocation Project. Initial Evaluation of Bridge Structures

E kv Transmission Line Underground Relocation Project. Initial Evaluation of Bridge Structures E-183 115 kv Transmission Line Underground Relocation Project Introduction Initial Evaluation of Bridge Structures July 11, 2017 Robinson and Cole, LLP contacted Power Delivery Consultants, Inc. (PDC)

More information

Transforming the Downtown Riverfront. Your Presenters. Mark Kelsey, Esq., Director, Ann Aubry, P.E., Deputy Director,

Transforming the Downtown Riverfront. Your Presenters. Mark Kelsey, Esq., Director, Ann Aubry, P.E., Deputy Director, How to Herd Cats: Coordinating City Departments and Private Partnerships to Transform the Downtown Riverfront Your Presenters Mark Kelsey, Esq., Director, City of Columbus, Department of Public Service

More information

I-70/71 Innerbelt Project

I-70/71 Innerbelt Project I-70/71 Innerbelt Project Project Progress Meeting and Design Enhancement Update November 9, 2009 Ohio Department of Transportation MS Consultants MSI Design Overview of Presentation 1. Recap Recent Project

More information

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2. Table of Contents Introduction 1 Existing Context 1 Figure 1 2 Plan Guidelines 3 Future Urban Form 4 The West-End 4 Main Street 6 The East-End 7 Figure 2 9 Public Improvement Recommendations 7 General

More information

Location. Served. Category. Units Start Year. Previous Appropriations

Location. Served. Category. Units Start Year. Previous Appropriations 20142018 CAPITAL IMPROVEMENT PLAN ($ Thouss) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: TC Jester: Washington to I 10 N100002 Paving Drainage Project Description Project provides for the design

More information

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Potential Green Infrastructure Strategies May 6, 2015 Workshop Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National

More information

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 SR 62 Traffic and Pedestrian Improvements from Apache Trail to Palm Avenue (PLHD) The project includes construction of curbs, gutters,

More information

Victoria Street Pedestrian Bridge

Victoria Street Pedestrian Bridge Township of Centre Wellington Victoria Street Pedestrian Bridge Class Environmental Assessment County of Wellington & Township of Centre Wellington Badley Bridge Replacement/Rehabilitation (County of Wellington),

More information

Charles P. Johnson and Associates. Annapolis Landscape Architects

Charles P. Johnson and Associates. Annapolis Landscape Architects Charles P. Johnson and Associates Annapolis Landscape Architects AGENDA Introduction Project Limits and Scope Site Analysis Opportunities & Constraints Program Goals Image Boards Design Alternatives Pros

More information

MUNICIPALITY OF ANCHORAGE

MUNICIPALITY OF ANCHORAGE MUNICIPALITY OF ANCHORAGE ANCHORAGE PARKS & RECREATION Memorandum PRC 08-38 DATE: June 4, 2008 TO: FROM: SUBJECT: Parks & Recreation Commission Monique Anderson, Parks Superintendent PRC 08-38 Creekside

More information

Jewel. Platte. of the. Plattsmouth Main Street Landscape Architecture by HDR

Jewel. Platte. of the. Plattsmouth Main Street Landscape Architecture by HDR Jewel of the Platte Plattsmouth Main Street Landscape Architecture by HDR Plattsmouth, Nebraska is a historic community of 6,500 residents located along the west bank of the Missouri River, just south

More information

Grand River Ravines Georgetown Township

Grand River Ravines Georgetown Township Grand River Ravines Georgetown Township Project Description: The Grand River Ravines County Park property is composed of the 68-acre former Fillmore at the Bend Open Space purchased in 1999 and two more

More information

5.7 Design Criteria for the Private Realm Organization of Private Realm Design Standards and Guidelines Guidelines vs.

5.7 Design Criteria for the Private Realm Organization of Private Realm Design Standards and Guidelines Guidelines vs. 5.7 Design Criteria for the Private Realm The Private Realm (shown in Exhibit 5.7a) includes the privately owned property not included in the Setback Realm described in the previous section. It encompasses

More information

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary New York Avenue Streetscape and Trail Project Public Meeting #1 Summary I. King Jordan Student Academic Center (SAC) Gallaudet University, Washington, DC February 23, 2017 Table of Contents 1.0 Introduction...

More information

Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge

Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge MEPA Meeting, EEA#14702 Wednesday, March 2, 2011 6:30 PM Dr. Martin Luther King, Jr. School 100 Putnam Avenue, Cambridge, MA Rendering by:

More information

Downtown Dubuque...it s a great time.

Downtown Dubuque...it s a great time. Downtown Dubuque...it s a great time. Your timing could not be better to invest in Downtown. With hundreds of millions in public and private investment occurring on the City s downtown waterfront, millions

More information

South Yonge Street Corridor

South Yonge Street Corridor South Yonge Street Corridor Streetscape Master Plan Study Draft Final Executive Summary Prepared by: January 2012 In Partnership with: Introduction The Future... Yonge Street is at the forefront of York

More information