Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill. March 30, 2017
|
|
- Cecily Green
- 5 years ago
- Views:
Transcription
1 Public Open House Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017
2 Open House Review of Project Purpose and Process Policy Refresher Highlights of Background Stage of Work Opportunities and Constraints What We Heard Options Framework Draft Options Review Next Steps
3 The Project and Our Team Our Task To create a more detailed, site-specific plan for the Bernard and Yonge area to implement the Official Plan Our Team Planning and Urban Design Transportation Servicing and Stormwater Groundwater Natural Heritage
4 The Project Process We are here
5 Why Bernard and Yonge? where public rapid transit services intersect with major nodes of retail and commercial where opportunities exist for redevelopment of new public streets, parks and urban open space connections Section 4.4, Town of Richmond Hill Official Plan
6 Policy Refresher times FSI (density) per development block Minimum height 3 storeys Base building max 6 storeys Tower height max 15 storeys Tallest buildings directed to Yonge and Bernard Neighbourhood and Mixed Use Regional Corridor within context OP Schedule 2A Land Use, Excerpt
7 Background Stage Summary of Work What did we do? Stakeholder interviews with landowners and key public agencies Planning Policy Review Preliminary Transportation Analysis Preliminary Servicing and Storm Water Capacity Analysis Natural Heritage Desktop Study Geotechnical + Hydrogeological Desktop Study Public Workshop
8 Existing Neighbourhoods Natural Heritage Limited Street Network Height and Density Policies Groundwater Placemaking Bus Terminal Large Blocks Existing Neighbourhoods Natural Heritage Commercial Uses Existing Conditions: Site Opportunities and Constraints
9 Public Workshop March 1st, 2017 Approximately attendees
10 Public Workshop Feedback Key Takeaways A common desire to reduce traffic and improve the pedestrian network Concern with high density development village-feel important and concern that new development will not integrate or transition to existing context Importance of commercial character current retail environment well-supported Desire to define a sense of place and create a destination Improve connections to open space and greenway systems
11 Draft Options Framework What are the Elements Driving the Options Development?
12 The Big Ideas Open Space Connectivity
13 The Big Ideas Reinforcing Yonge St
14 The Big Ideas Integrated Bus Transit
15 The Big Ideas Integrated Commercial Uses
16 The Big Ideas Interconnected Street Network
17 Draft Options 1. Two scenarios that can reach the minimum and maximum density prescribed A focus on the Yonge Street Corridor Creation of a node at Yonge and Bernard 2. Street Network Options 3. Open Space Structure
18 Yonge Street Corridor DENSITY DISTRIBUTION FSI Max Min Total
19 Yonge Street Corridor DENSITY DISTRIBUTION FSI Max Min Total storey min 10 storey max 10 storey min 15 storey max 4 storey min 10 storey max. 3 storey max
20 Looking North
21 Looking South
22 Yonge and Bernard Node DENSITY DISTRIBUTION FSI Max Min Total
23 Yonge and Bernard Node DENSITY DISTRIBUTION FSI Max Min Total storey min 6 storey max 4 storey min 10 storey max 10 storey min 15 storey max 4 storey min 10 storey max 3 storey max
24 Looking North
25 Looking South
26 Draft Options Framework How the Bus Loop and Long Term Commercial Uses have been Considered
27 Evolution of Form Over time Development can go forward while long term uses stay in place Existing Bus Loop and Terminal Looking Northwest Existing Loblaws and commercial uses
28 Evolution of Form Over time Large format retail integrated into mixed use building on Yonge Bus interface evolves away from existing loop can take various forms in future Looking Northwest Long term redevelopment potential of Loblaws site
29 Draft Options Street Network Three Variations on how a future street network could function
30 1. Leyburn Collector 2. Internal Private Streets 3. North South Public Street 4. Mid Block Connection 5. Connection to Yonge Street 6. Connection to Brookside 7. Integrate the Community KEY DIFFERENCES A. New Intersection at Yonge B. Naughton Land Swap Street Network A
31 1. Leyburn Collector 2. Internal Private Streets 3. North South Public Street 4. Mid Block Connection 5. Connection to Yonge Street 6. Connection to Brookside 7. Integrate the Community KEY DIFFERENCES B. Naughton Land Swap C. Connectivity to Yonge Street Street Network B
32 1. Leyburn Collector 2. Internal Private Streets 3. North South Public Street 4. Mid Block Connection 5. Connection to Yonge Street 6. Connection to Brookside 7. Integrate the Community KEY DIFFERENCES D. Connect Naughton out to Yonge Street Street Network C
33 Draft Options Open Space An Open Space Structure Supporting All The Options
34 1. Linear Park Loop Street Network and Open Space - A new crossing of Yonge Street
35 2. Connections to Open Space 3. Urban Squares Enhance the Watercourse Connection across Yonge Street Street Network and Open Space - A new crossing of Yonge Street
36 What Feedback are We Looking For? Our next step is refining these option into a preferred option Height + Density - Which height and density option best supports transit and a mix of uses across the Bernard KDA over the long term? Parks and Open Space Please tell us how this parks system improves upon and enhances access to new and existing parks, linkages and urban open spaces over the long term? Street Network Please tell us which Option do you think provides the best access and connectivity for vehicles and pedestrians across the KDA over the long term and why?
37 What is Next for the Study Review Feedback Prepare a Preferred Option and Policy Direction Report for early May Public and Stakeholder Comment on the Preferred Option Targeting a Final Recommendation Report to Council in July
38 Public Open House Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017
Getting and Giving the Most
Getting and Giving the Most It s OUR meeting participate enthusiastically Focus on the future Terminology expertise is secondary There is such a thing as a bad idea! Respect (for each other and the process)
More informationComplete Neighbourhood Guidelines Review Tool
Complete Neighbourhood Guidelines Review Tool Prepared By: City of Regina Planning Department October 2014 Page 1 of 14 Community Development Review Checklist for Secondary Plans and Concept Plans The
More informationHistoric Yonge Street HCD Plan Community Consultation October 14, 2015
Historic Yonge Street HCD Plan Community Consultation October 14, 2015 Archaeological Services Inc. Philip Goldsmith Architect BRAY Heritage Historic Yonge Street HCD Plan Agenda: 6:30 Open House 7:30
More information[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014
[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue May 23, 2014 Contents 1.0 Introduction... 2 2.0 Site Context... 2 2.1 Adjacent Uses... 2 Figure 1: Site
More informationGO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018
GO Station Mobility Hubs: Draft Precinct Plans Committee of the Whole July 12, 2018 Purpose of this Workshop Present Draft Precinct Plans for the 3 GO Station Mobility Hubs Continue the conversations that
More informationGATEWAY AREA STRUCTURE PLAN
CHESTERMERE GATEWAY AREA STRUCTURE PLAN COMMUNITY OPEN HOUSE SEPTEMBER 22 nd, 2015 PLAN AREA ± 512 hectares (± 1,265 acres) GATEWAY LOCATION UNDEVELOPED LANDS PRESENT AGRICULTURAL USE REGIONAL LAND USE
More informationMAYFIELD WEST SECONDARY PLAN PHASE 2
MAYFIELD WEST SECONDARY PLAN PHASE 2 Council Information Workshop February 16, 2010 Draft Preferred Land Use Plan TOWN OF CALEDON PLANNING & DEVELOPMENT DEPARTMENT Workshop Agenda TOWN OF CALEDON 1. Welcome
More information1.0 Purpose of a Secondary Plan for the Masonville Transit Village
Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village
More informationMAYFIELD WEST SECONDARY PLAN PHASE 2
MAYFIELD WEST SECONDARY PLAN PHASE 2 Public Open House #3 February 25, 2010 Draft Preferred Land Use Scenario TOWN OF CALEDON PLANNING & DEVELOPMENT DEPARTMENT Open House Agenda TOWN OF CALEDON 1. Welcome
More informationLAKEVIEW LOCAL ADVISORY PANEL. THE COPORATION OF THE CITY OF MISSISSAUGA THURSDAY, NOVEMBER 18, 2010
LAKEVIEW LOCAL ADVISORY PANEL THE COPORATION OF THE CITY OF MISSISSAUGA www.mississauga.ca/lakeviewportcreditreview THURSDAY, NOVEMBER 18, 2010 MISSISSAUGA SENIORS CENTRE LUCY TURNBALL ROOM (1389 Cawthra
More informationRio/29 Small Area Plan. Design Plan & Implementation Framework Open House - January 25, 2018
Rio/29 Small Area Plan Design Plan & Implementation Framework Open House - January 25, 2018 MEETING PURPOSE PRESENTATION 1. Orient to the updated design plans 2. Introduce implementing options 3. Explain
More informationYONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.
PART A: PREAMBLE 1.0 PURPOSE The purpose of this Secondary Plan is to provide a development framework for intensification of the Yonge/ Steeles corridor including the north side of Steeles Avenue West
More informationCrofton Manor 2803 West 41st Avenue WHAT WE HEARD. Public Consultation: Phase 1
Crofton Manor 2803 West 41st Avenue WHAT WE HEARD Public Consultation: Phase 1 Background CROFTON MANOR What s Happening The City of Vancouver is undertaking a planning and public engagement process to
More informationThis Review Is Divided Into Two Phases:
Semiahmoo Town Centre Review The purpose of this review: To review the Semiahmoo Town Centre Concept Plan, originally approved in 1993, to ensure that this centre will continue to serve the needs of South
More informationSUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies
Page 1 of Report PB-81-17 SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies TO: FROM: Committee of the Whole Planning and Building Department Report Number: PB-81-17
More informationDOWNTOWN GEORGETOWN PLANNING STUDY
DOWNTOWN GEORGETOWN PLANNING STUDY Community Workshop #3 Thursday, May 4, 08 The Planning Partnership OVERVIEW OF STUDY, PROCESS & MILESTONES We are here PURPOSE OF THE STUDY To develop a clear vision
More informationCITY OF VAUGHAN D R A F T YONGE STREET STUDY. June 2008 YOUNG + WRIGHT /IBI GROUP ARCHITECTS DILLON CONSULTING LTD.
CITY OF VAUGHAN June 2008 YOUNG + WRIGHT /IBI GROUP ARCHITECTS GHK SUSTAINABILITY INTERNATIONAL + LIVABILITY (CANADA) LTD. = COMMUNITY VALUE DILLON CONSULTING LTD. Public Open House Tonight s Meeting WELCOME
More informationImagining Ward 3 Session #2. April 18, :00 pm 8:30 pm
Imagining Ward 3 Session #2 April 18, 2016 7:00 pm 8:30 pm Project Team City of Mississauga Karen Crouse, Project Leader, Policy Planning Division Frank Marzo, Planner, Policy Planning Division Brook McIlroy
More informationSUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting
Page 1 of Report PB-76-17 SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO TO: FROM: Planning and Development Committee - Public Meeting Planning and Building
More informationWELCOME and introduction
1 WELCOME and introduction Mobility Hub Locations within Burlington STUDY OVERVIEW STUDY OBJECTIVES The City of Burlington is developing four Area Specific Plans, one for each of Burlington s Mobility
More informationJohn M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference
Report to Planning and Environment Committee To: From: Subject: Chair and Members Planning & Environment Committee John M. Fleming Managing Director, Planning and City Planner Old East Village Dundas Street
More informationGOLDEN MILE SECONDARY PLAN. Community Consultation Meeting #3 June 26, 2018
GOLDEN MILE SECONDARY PLAN Community Consultation Meeting #3 June 26, 2018 Meeting Overview 1. Introduction 2. Principles + Vision 3. Street + Block Alternatives 4. Parks + Open Space Alternatives 5. Land
More informationColchester Growth Management Strategy. Open House Meeting October 1, 2015
Colchester Growth Management Strategy Open House Meeting October 1, 2015 6:00 View panels and meet the consultant team 6:30 Presentation and Q&A 7:30 Informal discussion and fill out comment sheets The
More informationPUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN
PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN Tuesday, February 28, 2012 6pm 9pm 1 st Floor Atrium, City Hall 2 Wellington Street West, Brampton 1 POLICY FRAMEWORK The 2006 Provincial Growth
More informationURBAN DESIGN ACTION PLAN. Community Design and Environmental Services Committee April 20, 2009
URBAN DESIGN ACTION PLAN Community Design and Environmental Services Committee April 20, 2009 What is the Urban Design Action Plan? The Action Plan is a guiding document to address how design-thinking
More informationUniversity of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT
University of Saskatchewan CAMPUS MASTER PLAN Senate Meeting Preliminary Presentation April 21, 2018 DIALOG ECS DA WATT project process presentation agenda Stakeholder Engagement Project Control phase1
More informationCONTENTS 2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH 2.1 MANAGING SUSTAINABLE GROWTH THE VISION TO GOALS AND OBJECTIVES 2.3 MARKHAM STRUCTURE
2 A Framework for Sustainable Growth 2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS 2.1 MANAGING SUSTAINABLE GROWTH THE VISION TO 2031 2.2 GOALS AND OBJECTIVES 2.2.1 Protecting the Natural Environment
More informationWorkshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership
Workshop 3 City of Burlington Waterfront Hotel Planning Study September 14, 2017 The Planning Partnership The Waterfront Hotel Planning Study 01 The Brant & Lakeshore Planning Study will establish a Strategic
More informationWelcome. Walk Around. Talk to Us. Write Down Your Comments
Welcome This is an information meeting introducing the applications for proposed redevelopment of the Yorkdale Shopping Centre site at 3401 Dufferin Street and 1 Yorkdale Road over the next 20+ years,
More informationPART 1. Background to the Study. Avenue Study. The Danforth
The Danforth 1.1/ Study Purpose & Key Municipal Goals 1.2/ The Local Advisory Committee 1.3/ The Project Team 1.4/ Study Process/Summary of Method 1.5/ Summary of Consultation 1.1 Study Purpose and Key
More informationRapid Transit Implementation Working Group September 14, 2017
Rapid Transit Implementation Working Group September 14, 2017 BACKGROUND Council approved the Rapid Transit Master Plan and Updated Business Case on July 25, 2017. Approval of the RTMP confirmed the BRT
More informationSUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:
Page 1 of Report PB-23-18 SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building Report Number: PB-23-18 Wards Affected: 2 File Numbers:
More informationREVIEW AND EVALUATION OF REGIONAL LAND USE
REVIEW AND EVALUATION OF REGIONAL LAND USE AND TRANSPORTATION SCENARIOS #220831 Environmental Justice Task Force October 7, 2014 VISION 2050 Process Development of Guiding Vision for Land Use and Transportation
More informationReport to: Development Services Committee Report Date: April 24, 2017
SUBJECT: Cornell Rouge National Urban Park Gateway - Report on Design Charrette and Next Steps PREPARED BY: Lilli Duoba, MES, MCIP, RPP, Manager, Natural Heritage (ext. 7925) REVIEWED BY: Marg Wouters,
More information2 STATUTORY PUBLIC MEETING AND INFORMATION REPORT FOR PUBLIC MEETING ON AMENDMENT NO. 62 TO THE YORK REGION OFFICIAL PLAN
2 STATUTORY PUBLIC MEETING AND INFORMATION REPORT FOR PUBLIC MEETING ON AMENDMENT NO. 62 TO THE YORK REGION OFFICIAL PLAN Pursuant to Section 17(15) of the Planning Act, as amended, the Regional Planning
More informationCambie Corridor Planning Program Phase Two Draft Plan. Standing Committee on City Services and Budgets May 5, 2011
Cambie Corridor Planning Program Phase Two Draft Plan Standing Committee on City Services and Budgets May 5, 2011 Cambie Corridor Program Terms of Reference approved July 2009 Land Use Transportation Energy
More informationCOURTICE MAIN STREET COMMUNITY IMPROVEMENT PLAN
COURTICE MAIN STREET COMMUNITY IMPROVEMENT PLAN Public Meeting #1 April 28, 2016 Birdseye view of the study area PIC #1 AGENDA Agenda and Format 6:30 6:50 Registration 6:50 7:45 Introductions, Presentation
More informationCoronation Park Neighbourhood Plan. Open House #2 15 September 2016
Coronation Park Neighbourhood Plan Open House #2 15 September 2016 Outline What is a Neighbourhood Plan? Project Status Update Policy Context Refresher Coronation Park Yesterday & Today What We Heard -
More informationTysons Circulator Study: Process and Preliminary Results Summary. March 2012
Tysons Circulator Study: Process and Preliminary Results Summary March 2012 Background: 1. The Comprehensive Plan for the Tysons Corner Urban Center calls for a System of Circulators in Tysons Corner to:
More informationWhat We Heard. Downtown Georgetown Planning Study. Consultation Event #3 May 24, 2018
What We Heard Downtown Georgetown Planning Study Consultation Event #3 May 4, 08 Workshop - July 5, 07 0 WORKSHOP The Downtown Georgetown Planning Study will guide growth and development in the downtown
More informationFurther input invited as Colchester Growth Strategy nears final phase
IUE 3 / NOVEMBER 2015 Further input invited as Colchester Growth trategy nears final phase trathcona County is seeking public feedback as it enters the final phase of work on a Growth Management trategy
More informationWELCOME TO OPEN HOUSE # 3
Bayview Avenue Class Environmental Assessment Study Steeles Avenue to Elgin Mills Road WELCOME TO OPEN HOUSE # 3 Please sign in and join our mailing list Why Are We Here Tonight? Study Process and Purpose
More information9 th Street Sub Area Plan
9 th Street Sub Area Plan In the 1990 s, when the Township prepared the last Master Plan, the 9 th Street corridor was studied as part of a larger 9 th Street Focus Area that included the West Main Street
More informationAppendix 1 Structure plan guidelines
Appendix 1 Structure plan guidelines This appendix forms part of the regional policy statement [rps]. 1.1. Introduction Structure plans are an important method for establishing the pattern of land use
More informationRelief Line Project Assessment
Relief Line Project Assessment Public Information Centre April 5, 2017 Tonight s Meeting PURPOSE To review the preferred alignment for the Local Segment. AGENDA 6:30 Open House 7:00 Presentation / Discussion
More informationburlington mobility hubs study Downtown Burlington Mobility Hub
burlington mobility hubs study Downtown Burlington Mobility Hub Draft Precinct Plan Workbook PIC #3, September 7, 2017 downtown mobility hub objectives City staff and their consultants are proposing an
More informationBroadway District Specific Plan. Community Workshop #2 February 23,2016
Broadway District Specific Plan Community Workshop #2 February 23,2016 1 Agenda Introductions Project Progress Status Upcoming Milestones Emerging Framework Land Use Urban Design Circulation Infrastructure
More informationPlan Framework Report. Attachment A
Plan Framework Report Attachment A Uptown-Douglas Corridor Plan - Plan Framework Report Contents Introduction... 1 Planning Process... 3 Project Objectives... 4 Vision... 5 Community Values... 6 Structural
More informationCommercial Development Proposal Tenth Line Road. Planning Rationale Report. Minto Developments Inc.
Commercial Development Proposal 2168 Tenth Line Road Report September 2015 Prepared for Minto Developments Inc. Paquette Planning Associates Ltd. 56 Hutchison Avenue Ottawa, Ontario K1Y 4A3 PH: 613-722-7217
More informationCourtice Main Street Study Community Vision Workshop PLANNING SERVICES DEPARTMENT
Courtice Main Street Study Community Vision Workshop PLANNING SERVICES DEPARTMENT July 22, 2009 Tonight s Meeting 7:00 pm Introduction David Crome, Director of Planning 7:05 Presentation Stasia Bogdan,
More informationMILTON HEIGHTS COMMUNITY January 2006 Revised February 2015 Revised November 2015
REVISED DRAFT MILTON HEIGHTS COMMUNITY January 2006 Revised February 2015 Revised November 2015 Urban Design Guidelines Milton Heights Landowners Group This page has been intentionally left blank. Contents
More information5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN
5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN The Planning and Economic Development Committee recommends the following: 1. The communication from Brendan O Callaghan,
More informationHistoric Yonge Street HCD Study Public Meeting #2
Historic Yonge Street HCD Study Public Meeting #2 March 26, 2014 Archaeological Services Inc. Philip Goldsmith Architect Agenda: 7:00 p.m. Open House 7:30 p.m. Welcome and Presentation 8:00 p.m. Questions
More informationClairtrell Area Context Plan
Clairtrell Area Context Plan March 2005 Urban Development Services City Planning Contents 1. Introduction... 4 2. Development Structure... 6 2.1 Streets... 7 2.1.1 Sheppard Avenue and Bayview Avenue...
More informationPlanning for the Future Urban Area. in north Markham. Update. Development Services Committee. December 9, De Development Services Committee
Planning for the in north Markham 1 Update De December 9, 2014 Overview - Growth Management Strategy and new Official Plan 2014 Status - Official Plan 2014 and ROPA3 Update - Planning for the Future Urban
More information280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report
STAFF REPORT ACTION REQUIRED 280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report Date: March 11, 2014 To: From: Wards: Reference Number:
More informationWelcome to the Oakridge Centre Open House
Welcome to the Oakridge Centre Open House Why is the City hosting this event? This open house is to inform you of a rezoning application submitted to the City of Vancouver to amend the existing CD-1 (Comprehensive
More informationDOWNTOWN GEORGETOWN PLANNING STUDY
DOWNTOWN GEORGETOWN PLANNING STUDY Downtown Visioning Workshop #1 Tuesday, February 20, 2018 The Planning Partnership 1 INTRODUCTION TO PROJECT THE TEAM The Planning Partnership Meridian Planning Consultants
More informationLaird in Focus Community Information Session
Laird in Focus Community Information Session Tuesday, December 5, 2017 St. Anslem Catholic School, 182 Bessborough Drive Session 1: 5:30 pm - Presentation and Question and Answer Period 6:15 pm - Breakout
More information13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154
13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 The Planning and Economic Development Committee recommends the adoption of the recommendations contained
More information2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS
2-2 A Framework for Sustainable Growth 2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS 2.1 MANAGING SUSTAINABLE GROWTH THE VISION TO 2031 2.2 GOALS AND OBJECTIVES 2.2.1 Protecting the Natural Environment
More information12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN
12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN The Planning and Economic Development Committee recommends the adoption of the recommendation contained in the following report August
More informationCONTENTS 8.0 LAND USE 8.1 GENERAL LAND USE 8.2 RESIDENTIAL 8.3 MIXED USE 8.4 COMMERCIAL 8.5 EMPLOYMENT LANDS
8-2 Land Use 8.0 LAND USE CONTENTS 8.1 GENERAL LAND USE 8.1.1 Uses provided for in all Land Use Designations 8.1.2 Uses prohibited in Hazardous Lands, Hazardous Sites and Special Policy Areas 8.1.3 Uses
More informationBurnside Gorge Neighbourhood Plan. Engagement Summary
Burnside Gorge Neighbourhood Plan Engagement Summary Table of Contents Engagement Summary... 3 Phase One Engagement (April May 2015)... 4 Phase Two Engagement (January March 2016)... 4 Appendix One: Summary
More informationMavis Road Class Environmental Assessment
Mavis Road Class Environmental Assessment Public Information Centre #2 Wednesday November 9, 2016 6:00 to 8:00 p.m. Please sign in and complete a comment sheet Review the displays on your own or join in
More informationCITY OF VAUGHAN KIRBY GO TRANSIT HUB SUB-STUDY
WELCOME! Thank you for attending, and welcome to the first of three Public Meetings for the Kirby GO Transit Hub Study. Your feedback is important to us, and will help inform the development of the draft
More informationMEMORANDUM. Future Urban Area Conceptual Master Plan Cultural Heritage Resources
MEMORANDUM TO: FROM: Heritage Markham Committee Regan Hutcheson, Manager-Heritage Planning DATE: June 14, 2017 SUBJECT: STUDI / PROJECTS Future Urban Area Conceptual Master Plan Cultural Heritage Resources
More informationCarrville District Centre Urban Design Streetscape Master Plan Study
THE CITY OF VAUGHAN Carrville District Centre Urban Design Streetscape Master Plan Study Council Approved June 2010 THE CITY OF VAUGHAN Carrville District Centre Urban Design Streetscape Master Plan Study
More informationOfficial Plan Review: Draft Built Form Policies
PG.30.1 REPORT FOR ACTION Official Plan Review: Draft Built Form Policies Date: May 15, 2018 To: Planning and Growth Management Committee From: Chief Planner and Executive Director, City Planning Division
More informationWorkshop #1 Outcomes. The Planning Partnership
Workshop #1 Outcomes The Planning Partnership 1 Background Review Planning Provincial Policy Statement Greenbelt Plan Places to Grow: Growth Plan York Region Official Plan York Region Draft Official Plan
More informationMoody Centre Station TOD Area Today
Moody Centre Station TOD Area Today WHAT IS a transit-oriented Murray Street development area? A Transit-Oriented Development (TOD) Area is a dense, walkable residential and commercial area built to support
More informationDon Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions
Consultation Summary Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions This report is not intended to provide a verbatim transcript
More informationHamilton Pier 7&8 Draft Urban Design Plan
Hamilton Pier 7&8 Draft Urban Design Plan Public Open House October 29, 2015 Contents 1. Study Overview 2. Area Design Goals 3. Urban Structure 4. Public Realm 5. Urban Design Plan Options 6. Next Steps
More informationUrban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas
111111 PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction The ION rapid transit system will link Waterloo, Kitchener and Cambridge through a central transit corridor (CTC). There are a number
More informationONTARIO MUNICIPAL BOARD
PL 120483 ONTARIO MUNICIPAL BOARD Applicant/Appellant: 2124123 Ontario Limited Subject: OPA, Rezoning and Draft Plan of Subdivision Municipal Address: 3940 Highway 7 East Municipality: City of Markham
More informationVILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN
Page 1 1. INTRODUCTION AND BACKGROUND 1.1 THE PROJECT VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN TERMS OF REFERENCE The Town of Caledon (Town) is a large, predominantly rural municipality with
More informationMOUNT PLEASANT SECONDARY PLAN & VILLAGE BLOCK PLAN. Wednesday, March 5, 2008 Informal Public Open House
MOUNT PLEASANT SECONDARY PLAN & VILLAGE BLOCK PLAN Wednesday, March 5, 2008 Informal Public Open House 1. Welcome & Introductions 2. Highlights of Provincial Growth Plan 3. Overview and Status Update -
More information2900 Steeles Avenue East at Don Mills Road in the Town of Markham
STAFF REPORT INFORMATION ONLY 2900 Steeles Avenue East at Don Mills Road in the Town of Markham Date: January 23, 2008 To: From: Wards: Reference Number: North York Community Council Director, Community
More informationScope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan
Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity
More information2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS
2-2 A Framework for Sustainable Growth 2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS 2.1 MANAGING SUSTAINABLE GROWTH THE VISION TO 2031 2.2 GOALS AND OBJECTIVES 2.2.1 Protecting the Natural Environment
More informationCambie Corridor Planning Program Phase One. Standing Committee on Transportation and Traffic January 19, 2010
Cambie Corridor Planning Program Phase One Standing Committee on Transportation and Traffic January 19, 2010 Work Program Terms of Reference approved July 2009 Land Use Transportation Energy Cambie Corridor
More informationElfrida Growth Area Study
Elfrida Growth Area Study Public Information Centre #2 December 6, 2017 6:00-8:30 pm PLANNING & ECONOMIC DEVELOPMENT DEPARTMENT Purpose of the Study The Elfrida Area has been identified as the preferred
More informationCHAPTER 5: GUIDING PRINCIPLES
CHAPTER 5: GUIDING PRINCIPLES The following 10 principles were developed based on public consultation, planning policy and the background analysis conducted during Phase 1. The Guiding Principles significantly
More informationAtlanta BeltLine Subarea 3 Master Plan Update
Atlanta BeltLine Subarea 3 Master Plan Update April 14, 2018 Workshop Meeting 1 22 miles, connecting 45 neighborhoods 22 MILES of transit 46 MILES of streetscapes and complete streets 33 MILES of urban
More informationPortage Parkway Environmental Assessment Public Information Centre No. 1
City of Vaughan Portage Parkway Environmental Assessment Public Information Centre No. 1 November 25, 2015 Welcome to the Public Information Centre This first Public Information Centre (PIC) introduces
More informationEAST VILLAGE STRATEGIC SITE NOVEMBER 2017
EAST VILLAGE STRATEGIC SITE NOVEMBER 2017 East Village will be a sustainable, mixeduse precinct with a focus on innovative employment and education opportunities. Enhanced by green spaces and places for
More informationAtlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008
Atlanta BeltLine Corridor Environmental Study Scoping Meeting August 2008 What Will We Be Discussing Today? Study Overview - How Did We Get Here? - What Is the Study About? - Who Is Involved? - Where Is
More informationCreate Policy Options Draft Plan Plan Approval. Public Consultation Events. Phase 2
Background Grandview-Woodland Community Plan In the spring of 2012, the City of Vancouver embarked on a comprehensive community planning program in the Grandview-Woodland neighbourhood. The process has
More informationPLAN ELEMENTS WORKSHOP. April 5, 2016
PLAN ELEMENTS WORKSHOP April 5, 2016 needs more housing. But there is no one-size fits-all solution. Every neighborhood has its own character. In some places, density is not only appropriate it is badly
More informationLakeview. March 18, N. Barry Lyon Consultants Ltd. UEM TMIG
Lakeview March 18, 2014 N. Barry Lyon Consultants Ltd. UEM TMIG Mississauga s Waterfront A Coordinated Approach mississauga.ca/waterfront Mississauga s Waterfront - Projects Natural Heritage and Urban
More informationDRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to:
AUGUST 29, 2017 12.15 Northeast Quadrant of Kipling Avenue and Highway 7 12.15.1 Goals 12.15.2 Land Use The goals of this Plan are to: 12.15.2.1 General Provisions: a) Ensure the development of a compact
More informationTHE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER A By-law to adopt Amendment Number 1 to the Official Plan of the Vaughan Planning Area.
THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER 015-2014 A By-law to adopt Amendment Number 1 to the Official Plan of the Vaughan Planning Area. NOW THEREFORE the Council of the Corporation of the City of Vaughan
More informationSCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference
Scarborough Subway Extension Final Terms of Reference 1 1.0 Introduction and Background 1.1 Introduction Toronto City Council recently confirmed support for an extension of the Bloor-Danforth Subway from
More informationRyoko Iizuka Finance, Economics and Urban Department
THE WORLD BANK www.worldbank.org/eco2 Eco 2 Cities Guide Ryoko Iizuka Finance, Economics and Urban Department 09.12.2011 1 Challenge: How? The 350 page Eco 2 Book elaborates on the principles, methods
More informationPUBLIC MEETING AND OPEN HOUSE: Don Mills Crossing Phase 2 Celestica Development Applications. February 21, 2017
PUBLIC MEETING AND OPEN HOUSE: Don Mills Crossing Phase 2 Celestica Development Applications February 21, 2017 PURPOSE OF TONIGHT S MEETING Engage the community on the Don Mills Crossing Study and development
More informationMunicipal Development Plan Update Urban Service Area and Hamlets
ENCLOSURE 1 Municipal Development Plan Update Urban Service Area and Hamlets Priorities Committee January 24, 2017 MUNICIPAL DEVELOPMENT PLAN UPDATE SHAPING OUR FUTURE MDP Update - Agenda MDP Update Public
More informationGrowth Area Reviews Preliminary Directions for Midtown Oakville, the Uptown Core and Palermo Village
Growth Area Reviews Preliminary Directions for Midtown Oakville, the Uptown Core and Palermo Village Livable Oakville Council Subcommittee January 15, 2018 1 Introduction Why a study? January 2014 Signaled
More informationINDEPENDENCE BOULEVARD AREA PLAN. June 24, 2008
INDEPENDENCE BOULEVARD AREA PLAN Public Meeting #1 June 24, 2008 Tonight s Agenda Introduction Welcome and Ground Rules Overview Presentation Purpose of the Plan What Brings Us Here? A Tour of the Corridor
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016
Item 5, Report No. 26, of the Committee of the Whole (Working Session), which was adopted without amendment by the Council of the City of Vaughan on June 7, 2016. 5 MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT
More informationDUFFERIN CENTRE STUDY REPORT March 7, 2017 DRAFT. with Poulos & Chung Limited
DUFFERIN CENTRE STUDY REPORT March 7, 2017 DRAFT with Poulos & Chung Limited DUFFERIN CENTRE STUDY REPORT March 7, 2017 with Poulos & Chung Limited \\ toc CONTENTS intro Introduction 1 1 2 3 Background
More information