1 Chapter 6: Stormwater Management 6.1. INTRODUCTION This Chapter describes the current drainage patterns on the Project Site, the stormwater management system that is proposed as part of the Proposed Project, and analyzes potential impacts stormwater flow as a result of the Proposed Project. As such, these analyses address the potential for the Proposed Action to have one or more significant adverse environmental impacts that were identified in the Lead Agency s Positive Declaration (see Appendix A-5). The Project Site generally slopes, and surface water runoff generally flows, from north to south. An existing detention basin (also identified as Wetland D) is located along the east side of the Project Site. This basin receives stormwater runoff from the existing building and parking lot, as well as runoff from adjacent Village properties to the east. Stormwater runoff exits the detention basin and is discharged to the municipal drainage system below Arbor Drive, through Harkness Park, and then along the Blind Brook High School driveway to King Street. There are two easements onto the Project Site containing storm drain lines that drain into the existing detention basin from the Rye Brook Village Hall, Rye Brook Police Department, and Rye Brook Fire Department (RBFD) property. The Proposed Project would result in a decrease in the amount of impervious area on the Project Site from the current condition. In order to manage stormwater runoff from the Proposed Project, the Applicant s engineer prepared a Stormwater Pollution Prevention Plan (SWPPP) in accordance with Chapter 9: Redevelopment Projects of the New York State Stormwater Management Design Manual and Chapter 217, Stormwater Management of the Village of Rye Brook (the Village ) Code (see Appendix C-1). The stormwater management system for the Proposed Project includes standard stormwater practices, including vegetated swales, subsurface infiltration systems, and improvements to the existing stormwater detention basin. To accommodate an increase in the Site s main drainage as a result of proposed Site grading and layout, the existing stormwater detention basin would be slightly expanded. The Project Site does not currently have any known stormwater practices with infiltration to provide water quality and runoff reduction. The SWPPP for the Proposed Project, however, includes practices that enhance water quality and provide runoff reduction volume through infiltration. Infiltration measures include the grasscrete paver emergency drive, vegetated swales, and disconnected impervious areas throughout the Site. As demonstrated in the SWPPP, the stormwater design of the Proposed Project would result in a reduction in both the rate and volume of stormwater exiting the Site for each modeled storm event when compared to the existing condition EXISTING CONDITIONS The Project Site, which is located in the Coastal Long Island Sound Drainage Basin, generally slopes, and surface water runoff generally flows, from north to south. An existing detention basin (also identified as Wetland D) is located along the east side of the Project Site. This basin receives stormwater runoff from the existing building and parking lot, as well as runoff from adjacent Village properties to the east. Stormwater runoff exits the detention basin and is discharged to the municipal drainage system within Arbor Drive, through Harkness Park, and then along the Blind Brook High School driveway to King Street. There are two easements onto the Project Site DEIS 6-1 9/12/2018

2 900 King Street Redevelopment containing storm drain lines that drain into the existing detention basin from the Village Hall, RBPD, and RBFD property. Along the northern property line, two storm drain lines convey runoff from the Hutchinson River Parkway (the Parkway ) onto the Project Site. All stormwater runoff from these outlets was included in all stormwater calculations. Two Design Points have been designated on the Site, DP-1 and DP-2. Each design point conveys the stormwater from one of the Site s Existing Drainage Areas (EDA s) (see Figure 6-1). DP-1 is located to the southeast of the Site and conveys stormwater runoff from EDA-1. EDA-1 includes the eastern portion of the Project Site, as well as portions of the Parkway and the Village-owned lots to the east of the Site. With the exception of a small area of the Site along Arbor Drive, stormwater from the Project Site is conveyed via an on-site pipe network into the existing detention basin. From the detention basin, stormwater flows into Stream S and under Arbor Drive through an existing 24- inch reinforced concrete pipe underneath Arbor Drive and through DP-1. The existing 24-inch pipe under Arbor Drive has a capacity to convey a maximum of cubic feet per second (cfs) (see Appendix C-2). Two off-site areas that include the Parkway and residential areas to the north of the Site, noted as EDA-1F and the bypass area on Figure 6-1, convey stormwater runoff through the Project Site in a separate piped network and discharge directly to Stream S prior to passing through the existing 24-inch pipe underneath Arbor Drive and through DP-1. DP-2 is located in the southwest corner of the Project Site and collects stormwater runoff from EDA- 2, which is made up primarily of the western portion of the Project Site, as well as off-site areas to the north and portions of the townhouse complex to the west. EDA-2 drains west into a small watercourse, Stream A, and then into a 15 inch diameter pipe at the southwestern corner of the site, which is designated as DP-2. The pipe is part of the Village s drainage conveyance system that runs beneath Arbor Drive and towards the adjacent school. The peak rates of runoff to each Design Point for each modeled storm event are shown in Table 6-1. The volume of runoff to each Design Point from each modeled storm event is shown in Table 6-2. Table 6-1 Existing Peak Runoff Rates Storm Recurrence Interval DP-1 (cfs) DP-2 (cfs) 1 year year year year year year Notes: cfs = cubic feet per second 9/12/ DEIS

3 Chapter 6: Stormwater Management Table 6-2 Existing Runoff Volume Storm Recurrence Interval DP-1 (cf) DP-2 (cf) 1 year 187,631 14,536 2 year 265,706 21, year 495,031 46, year 680,786 67, year 856,809 87, year 1,067, ,019 Notes: cf = cubic feet 6.3. POTENTIAL IMPACTS OF THE PROPOSED PROJECT The Proposed Project would redevelop the Project Site into an age-restricted residential community. The redevelopment would result in a decrease in the amount of impervious area on the Project Site. In order to manage stormwater runoff from the Proposed Project, the Applicant s engineer prepared a SWPPP in accordance with Chapter 9: Redevelopment Projects of the New York State Stormwater Management Design Manual and Chapter 217, Stormwater Management of the Village Code (see Appendix C-1). The stormwater management system for the Proposed Project includes standard stormwater practices, including vegetated swales, subsurface infiltration systems, and improvements to the existing stormwater detention basin. To accommodate an increase in the Site s main drainage as a result of proposed Site grading and layout, the existing stormwater detention basin would be slightly expanded. In addition to this slight expansion, the Proposed Project would enhance the functionality of this basin area by removing overgrown and dead vegetation, debris, etc. The Project Site does not currently have any known stormwater practices with infiltration to provide water quality and runoff reduction. The SWPPP for the Proposed Project, however, includes practices that enhance water quality and provide runoff reduction volume through infiltration. Infiltration measures include the grasscrete paver emergency drive, vegetated swales, and disconnected impervious areas throughout the Site. These practices will result in additional infiltration that was not considered in the SWPPP s hydrologic model, resulting in a conservative analysis presented in the SWPPP. Two Design Points, which are the same as the existing condition design points, were designated on- Site and convey water from the Site s two Proposed Drainage Areas (PDA s) (see Figure 6-2). In general, PDA-1 includes the developed portion of the Site, similar to the existing condition, and the same off-site areas and bypass. PDA-2 would continue to serve the western, undeveloped portion of the Site. As with the existing condition, stormwater from the developed portion of the Site (i.e., PDA-1) would flow through a piped network into the existing detention basin with the Proposed Project. However, several underground infiltration systems would be installed to promote infiltration and improve water quality 1. The stormwater generated from off-site locations that pass through the Project Site would be accommodated with the Proposed Project in the same manner as present. 1 Soil testing has been performed on-site. Soil testing for the infiltration practice located within the existing building will be performed when the site design is advanced and the results would be provided during the site plan approval process. DEIS 6-3 9/12/2018

4 900 King Street Redevelopment As with the existing condition, DP-2 would collect stormwater runoff from the western, undeveloped, portion of the Project Site, shown as PDA-2 in Figure 6-2. PDA-2 is approximately one acre smaller than EDA-2 due to slight changes in the grade in the adjacent area. As demonstrated in the SWPPP, the stormwater design of the Proposed Project would result in a reduction in both the rate and volume of stormwater exiting the Site for each modeled storm event when compared to the existing condition. Table 6-3 and Table 6-4 summarize the reductions. Table 6-3 Proposed Peak Runoff Rate Design Point Storm Recurrence Interval Existing Peak Runoff Rate (cfs) Proposed Peak Runoff Rate (cfs) Percent Reduction (%) 1 year year year year year year year year year year year year Notes: cfs = cubic feet per second Table 6-4 Proposed Runoff Volume Design Point Storm Recurrence Interval Existing Peak Runoff Rate (cf) Proposed Peak Runoff Rate (cf) Percent Reduction (%) 1 year 187, , year 265, , year 495, , year 680, , year 856, , year 1,067,613 1,067, year 14,536 12, year 21,963 18, year 46,072 39, year 67,072 56, year 87,696 73, year 113,019 94, Notes: cf = cubic feet The existing downstream drainage infrastructure accepting stormwater run-off from the site is comprised of two separate systems. The first system conveys stormwater run-off exiting the site from the southeastern area where Stream S flows beneath Arbor Drive via an existing 24-inch reinforced concrete pipe (RCP), (Design Point No.1). From this point the system continues south underground through Harkness Park. As noted above, the existing 24-inch pipe under Arbor Drive 9/12/ DEIS

5 Chapter 6: Stormwater Management has a maximum capacity of cfs. During periods of peak flows (e.g., the 50- and 100-year storms), the maximum flow rate through the 24-inch pipe would be cfs and cfs, respectively, which is a reduction from the current maximum flow rate (see Appendix C-2). Therefore, the existing pipe under Arbor Drive has the capacity to accommodate the projected stormwater flow from the Proposed Project MITIGATION MEASURES As summarized above, and presented in more detail in the SWPPP in Appendix C-1, the Proposed Project utilizes a variety of practices to enhance stormwater quality and reduce peak rates of runoff associated with the Proposed Project. With the implementation of the SWPPP, runoff volumes would be reduced in all the analyzed storms from the existing condition. As implementation of the SWPPP would provide water quantity and quality enhancements that exceed the regulatory requirements, stormwater runoff from the Proposed Project is not anticipated to have a significant adverse impact to the Project Site or downstream areas. DEIS 6-5 9/12/2018

6 COPYRIGHT 2017 by JMC All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of JMC PLANNING, ENGINEERING, LANDSCAPE ARCHITECTURE & LAND SURVEYING, PLLC JMC SITE DEVELOPMENT CONSULTANTS, LLC JOHN MEYER CONSULTING, INC. (JMC). Any modifications or alterations to this document without the written permission of JMC shall render them invalid and unusable. Source: JMC Engineering No. Revision Date By KING STREET ANY ALTERATION OF PLANS, SPECIFICATIONS, PLATS AND REPORTS BEARING THE SEAL OF A LICENSED PROFESSIONAL ENGINEER OR LICENSED LAND SURVEYOR IS A VIOLATION OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW, EXCEPT AS PROVIDED FOR BY SECTION 7209, SUBSECTION 2. Drawing: DRAINAGE Date: Time: 10:49 AM By: PROGRESS PLOTTING Scale: Drawn: Date: Project No: Approved: Drawing No: Existing Drainage Areas Figure 6-1

7 COPYRIGHT 2017 by JMC All Rights Reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of JMC PLANNING, ENGINEERING, LANDSCAPE ARCHITECTURE & LAND SURVEYING, PLLC JMC SITE DEVELOPMENT CONSULTANTS, LLC JOHN MEYER CONSULTING, INC. (JMC). Any modifications or alterations to this document without the written permission of JMC shall render them invalid and unusable. Source: JMC Engineering No. Revision Date By KING STREET ANY ALTERATION OF PLANS, SPECIFICATIONS, PLATS AND REPORTS BEARING THE SEAL OF A LICENSED PROFESSIONAL ENGINEER OR LICENSED LAND SURVEYOR IS A VIOLATION OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW, EXCEPT AS PROVIDED FOR BY SECTION 7209, SUBSECTION 2. Drawing: DRAINAGE Date: Time: 10:46 AM By: PROGRESS PLOTTING Scale: Drawn: Date: Project No: Approved: Drawing No: Proposed Drainage Areas Figure 6-2

6.1. INTRODUCTION AND SUMMARY OF FINDINGS

6.1. INTRODUCTION AND SUMMARY OF FINDINGS Chapter 6: Stormwater Management 6.1. INTRODUCTION AND SUMMARY OF FINDINGS A Stormwater Pollution Prevention Plan (SWPPP) has been prepared for the Proposed Project in accordance with the requirements

More information

City of Waco Stormwater Management Regulations

City of Waco Stormwater Management Regulations 1.0 Applicability: City of Waco Stormwater Management Regulations These regulations apply to all development within the limits of the City of Waco as well as to any subdivisions within the extra territorial

More information

4. CONCEPT PLAN DEVELOPMENT

4. CONCEPT PLAN DEVELOPMENT 4. CONCEPT PLAN DEVELOPMENT Concept Plan Step 1: Identify Site Constraints and Opportunities Review the existing site to identify constraints and opportunities for GI Practices to meet the RRv. Constraints

More information

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information

More information

PHASE III DRAINAGE REPORT

PHASE III DRAINAGE REPORT PHASE III DRAINAGE REPORT FOR Eastlake Assisted Living & Memory Care April 20, 2016 June 3, 2016 August 5, 2016 Prepared for: 3301 E 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite 150 Greenwood Village

More information

When planning stormwater management facilities, the following principles shall be applied where possible.

When planning stormwater management facilities, the following principles shall be applied where possible. 2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between

More information

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK MAY 19, 2014 Prepared By: Timothy M. Lavocat, P.E., CFM

More information

Chapter 4 - Preparation of Stormwater Site Plans

Chapter 4 - Preparation of Stormwater Site Plans Chapter 4 - Preparation of Stormwater Site Plans The Stormwater Site Plan is the comprehensive report containing all of the technical information and analysis necessary for the City to evaluate a proposed

More information

Appendix I. Checklists

Appendix I. Checklists Appendix I Checklists Town of Greenwich Drainage Manual Department of Public Works - Engineering Division Town Hall - 101 Field Point Road, Greenwich, CT 06836-2540 Phone 203-622-7767 - Fax 203-622-7747

More information

Table of Contents G.1.a Water Resources - Surface Water - Drainage

Table of Contents G.1.a Water Resources - Surface Water - Drainage Table of Contents G.1.a Water Resources - Surface Water - Drainage 1. INTRODUCTION... 1335 2. ENVIRONMENTAL SETTING... 1335 a. Regional Hydrology... 1335 b. Local Hydrology... 1337 c. On-site Hydrology...

More information

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS DRAINAGE REPORT STATEMENT ENGINEER'S STATEMENT: The attached drainage plan and report were prepared under my direction and supervision and are correct

More information

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment CHAPTER 9 STORM DRAINAGE 9.01 General The standards established by this chapter are intended to represent the minimum standards for the design and construction of storm drainage facilities. 9.02 Design

More information

DRAINAGE CALCULATIONS

DRAINAGE CALCULATIONS DRAINAGE CALCULATIONS For the Carroll Single Family Residence At Santa Clara County Saratoga, California APN: 517-26-010 December 18, 2015 Prepared For: John and Peggy Carroll Prepared By: RI Engineering,

More information

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains Chapter 10: Stormwater Management A. INTRODUCTION AND SUMMARY OF FINDINGS This chapter describes existing and proposed stormwater management on the Site. Potential impacts to stormwater infrastructure

More information

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO STORMWATER REPORT FOR WALMART SUPERCENTER STORE # 2443-00 SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO. 3286 March 1, 2012 I hereby certify that this engineering document was prepared by me

More information

Post Construction BMPs

Post Construction BMPs Post Construction BMPs Why are Post Construction BMPs important? With increased development brings the increase of impervious cover Parking lots, rooftops, driveways Storm water runoff volume increases

More information

New Development Stormwater Guidelines

New Development Stormwater Guidelines New Development Stormwater Guidelines CITY OF MOUNTLAKE TERRACE Table of Contents Introduction... 2 Ecology s Minimum Requirements for stormwater management... 2 Description of the 9 Minimum Requirements...

More information

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Potential Impacts of New Development Urban development can significantly increase stormwater runoff Water quality considerations

More information

Draft Rhode Island Stormwater Design and Installation Standards Manual

Draft Rhode Island Stormwater Design and Installation Standards Manual Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately

More information

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT INTRODUCTION In recent years, the University of Cincinnati (University) has demonstrated a commitment to identifying and implementing sustainable goals and objectives throughout University s Uptown Campuses.

More information

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS 5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically

More information

French American School of New York

French American School of New York STORMWATER POLLUTION PREVENTION PLAN French American School of New York 400 RIDGEWAY CITY OF WHITE PLAINS, NEW YORK Applicant/Operator/ Owner: French American School of New York 525 Fenimore Road Mamaroneck,

More information

4. Contractor (and subcontractors if applicable) certification statement(s)

4. Contractor (and subcontractors if applicable) certification statement(s) CHEMUNG COUNTY STORMWATER COALITION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SUBMITTAL CHECKLIST GENERAL INFORMATION: 1. Owner/Operator name, legal address, phone number 2. Copy of signed Notice of

More information

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend, WA 98368 Tel: 360.379.4450 Fax: 360.379.4451 Web: www.co.jefferson.wa.us/communitydevelopment E-mail: dcd@co.jefferson.wa.us STORMWATER

More information

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE Codes analyses for each subcommittee were completed to assist participants of the Richland County Site Planning Roundtable.

More information

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith Urban Stormwater Management Rebecca Leonardson Rui Teles Brooke Ray Smith Introduction Stormwater in Portugal Why urban stormwater is currently a problem What is green stormwater management? Why it is

More information

Low Impact Development (LID) Techniques. Associate BD Presentation, October 7, 2014

Low Impact Development (LID) Techniques. Associate BD Presentation, October 7, 2014 Low Impact Development (LID) Techniques Associate BD Presentation, October 7, 2014 Low Impact Development (LID) Techniques What are LIDs? Why are they used? Where are they used? How are they designed or

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 (360) 754-4126 (FAX) Email: cdd@ci.tumwater.wa.us APPENDIX II-C SHORT FORM CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

More information

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report October 7, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report and

More information

Reducing Runoff with Green Infrastructure. Lake George, NY May 5, 2011

Reducing Runoff with Green Infrastructure. Lake George, NY May 5, 2011 Reducing Runoff with Green Infrastructure Lake George, NY May 5, 2011 The Duties of a Stormwater Designer: Reduce Peak Runoff Rates Remove Pollutants from Runoff Reduce Runoff Volume Runoff Reduction from

More information

Article 20 Stormwater Management

Article 20 Stormwater Management Article 20 Section 20.01 Intent Article 20 The purpose of this Article is to protect the health, safety, and general welfare of the citizens by requiring compliance with accepted standards and practices

More information

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach Turgay Dabak, Joni Calmbacher, Sara DeGroot, Andrea Ryon Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach Presentation Outline Project Background Project Overview BMPs Evaluated

More information

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS Source: Center for Watershed Protection, 2007 Southern Tier Central Regional Planning & Development Board Chemung County Stormwater Team OUTLINE

More information

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS In West Sadsbury Township, Chester County, Pennsylvania TABLE OF CONTENTS I. Introduction 3 II. Importance of Stormwater Management

More information

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook 67 67 General Terms Specific Terms 66 Low Impact Development Approaches Handbook The vocabulary of low impact development is evolving, and many terms are used interchangeably and to describe the same or

More information

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving 4.2-i PAVING PARKING AREAS AND ROADS Alternate Names: Pavement Practices, Impervious Paving DESCRIPTION All roads, driveways, and parking lots proposed for year-round use shall be paved with a hard plowable

More information

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST City of Seminole 9199 113 th Street N. Seminole, FL 33772 Ph: (727) 392-1966 Fx: (727) 319-6583 SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST Note: This checklist is designed to aid designers in the review

More information

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council Introduction to Low Impact Development Fred Milch East Central Florida Regional Planning Council Low Impact Development (LID) Low impact development (LID) is a term used to describe a land planning and

More information

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

SECTION 1 CLEARING /GRADING PERMIT APPLICATION: PLEASE REFER TO THE CLEARING & GRADING PERMIT CHECKLIST BELOW FOR SUBMITTAL REQUIREMENTS. SECTION 1 CLEARING /GRADING PERMIT APPLICATION: PROJECT ADDRESS (Street, Suite #): Parcel(s) #: Total Site Area

More information

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division Putting a LID on Stormwater Pollution Michele Loudenback, RPES Stormwater Enforcement Water Quality Division Outline Brief Regulatory History Conventional vs. Green Practices LID/GI Controls in Use Clean

More information

APPENDIX B. Hydrologic and Hydraulic Analysis

APPENDIX B. Hydrologic and Hydraulic Analysis APPENDIX B Hydrologic and Hydraulic Analysis HYDROLOGIC AND HYDRAULIC ANALYSIS PETERSBURG ROAD IMPROVEMENTS DOT&PF Project No. 67879 Prepared for: State of Alaska Department of Transportation and Public

More information

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013 Lincoln 270 City of Lincoln Stormwater Management Plan April 2, 2013 # 2005.48 Prepared By: Civil Engineering Solutions, Inc. 590 E Street Lincoln, Ca 95648 (916) 645 5700 1.0 Background: The project site

More information

APPENDIX C: STORMWATER CONTROL PLAN

APPENDIX C: STORMWATER CONTROL PLAN APPENDIX C: STORMWATER CONTROL PLAN STORM WATER MANAGEMENT PLAN FOR PLEASANT HILL, CALIFORNIA Prepared for Compliance with the Clean Water Program (C.3) and the San Francisco Bay Regional Water Quality

More information

USF System Campus Master Plan Updates Goals, Objectives and Policies

USF System Campus Master Plan Updates Goals, Objectives and Policies 2015-2025 USF System Campus Master Plan Updates Goals, Objectives and Policies Tampa Goals, Objectives, and Policies Table of Contents Executive Summary 2015 2025 USF Campus Master Plan Update Introduction

More information

Leduc Industrial Outline Plan SE W4

Leduc Industrial Outline Plan SE W4 Leduc Industrial Outline Plan SE 1-50-25-W4 Within the North Leduc Industrial ASP Prepared for: Leduc Energy Park Ltd. Prepared by: Stantec Consulting Ltd. File No. 1161 104655 V5 Table of Contents 1.0

More information

BROADSTONE WHITE PLAINS

BROADSTONE WHITE PLAINS EXPANDED ENVIRONMENTAL ASSESSMENT BROADSTONE WHITE PLAINS MAMARONECK AVENUE AND EAST POST ROAD CITY OF WHITE PLAINS WESTCHESTER COUNTY, NY Prepared for: Alliance Realty Partners 300 Lighting Way, Suite

More information

a. Site Topography and Relationship to Surrounding Topography

a. Site Topography and Relationship to Surrounding Topography C. Topography and Slopes 1. Existing Conditions a. Site Topography and Relationship to Surrounding Topography The Site is gently rolling, as is the surrounding topography (Figure I.A-8). The Property is

More information

Erosion & Sediment Control Plan Application Form & Checklist

Erosion & Sediment Control Plan Application Form & Checklist Erosion & Sediment Control Plan Application Form & Checklist GENERAL INFORMATION Application Date: Project Address: Tax Map / Parcel Number(s): PROPERTY OWNER / DEVELOPER Firm Name: Contact Person: Title:

More information

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

STORMWATER PERMIT SUBMITTAL REQUIREMENTS STORMWATER PERMIT SUBMITTAL REQUIREMENTS Most development within the City of Bellingham that involves disruption of soils, or construction of buildings, streets, parking lots, etc. requires a Stormwater

More information

PepsiCo R & D Facility Expansion Town of Mount Pleasant, Westchester County, NY Draft Environmental Impact Statement Scoping Outline

PepsiCo R & D Facility Expansion Town of Mount Pleasant, Westchester County, NY Draft Environmental Impact Statement Scoping Outline PepsiCo R & D Facility Expansion Town of Mount Pleasant, Westchester County, NY Draft Environmental Impact Statement Scoping Outline 10-17-2016 This document identifies the issues to be addressed in the

More information

STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70

STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70 STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70 Client: Central Developments 09 April 2018 _ Rev00 Report no: SWMP/410/00 SWMP FOR ERAND GARDENS X70 TABLE OF CONTENTS 1 INTRODUCTION... 1 2 GENERAL INFORMATION...

More information

IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT

IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT 4.1 Overview Description: Requirements and standards for controlling runoff from development are critical to addressing water quantity and

More information

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number: Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number

More information

Planning & Development. Background. Subject Lands

Planning & Development. Background. Subject Lands Planning & Development APPLICATION BRIEFING Prepared For: Planning Advisory Committee Submitted by: Jason Fox, Director of Planning & Development Date: Subject: Development Agreement Application by Brentwood

More information

Concreteville, CT. March 10, 2004

Concreteville, CT. March 10, 2004 Concreteville, CT March 10, 2004 Reducing Runoff is the most topically direct follow up to Linking Land Use to Water Quality (Basic NEMO). There is a good deal of overlap, but the major differences is

More information

Problem Understanding

Problem Understanding Introduction...2-1 Previous Data and Mapping...2-2 Known Problem Areas...2-3 Resident Survey.2-3 Introduction The Village of Downers Grove stormwater system includes storm sewers, streams, wetlands, roadway

More information

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT LOTS B, RECORDED EXEMPTION 1211-2-1, RECX13-0096 LOCATED IN THE NORTH 1/2 OF SECTION 2, TOWNSHIP 3 NORTH, RANGE 66 WEST, 6 TH PRINCIPAL

More information

CHECKLIST FOR PHASE II DRAINAGE REPORT

CHECKLIST FOR PHASE II DRAINAGE REPORT I. COVER SHEET CHECKLIST FOR PHASE II DRAINAGE REPORT A. Name of Project B. Address C. Owner D. Developer E. Engineer F. Submittal date and revision dates as applicable II. GENERAL LOCATION AND DESCRIPTION

More information

Appendix 6-A. Site Plan Preparation and Submission as Part of the Land Development Process

Appendix 6-A. Site Plan Preparation and Submission as Part of the Land Development Process Appendix 6-A Site Plan Preparation and Submission as Part of the Land Development Process Table of Contents Appendix Section Headings 6-A.1.0 INTRODUCTION 6-A-2 6-A.2.0 THE STORMWATER MANAGEMENT PLAN 6-A-6

More information

Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019

Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019 Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019 Article 2 General Provisions Section 2.2 Definitions Definitions- FIRE LANE The aisle immediately adjacent to a building

More information

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK A. Authority As set forth in the Overland Park Municipal Code (OPMC), Chapter 16.210, the Director of Planning and Development

More information

Sustainable Urban Drainage Systems (SuDs)

Sustainable Urban Drainage Systems (SuDs) Sustainable Urban Drainage Systems (SuDs) Brendan Colgan, Chartered Engineer Hydrological Cycle - managing the entire cycle is the goal Disruption of the Hydrological Cycle Why use SuDS? G Traditional

More information

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM I. PROJECT DATA Project Name Bay Meadows Development Phase II Project Address 2600

More information

Impervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey

Impervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey Impervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey Christopher C. Obropta, Ph.D., P.E. obropta@envsci.rutgers.edu www.water.rutgers.edu March 24, 2015 Rutgers Cooperative Extension

More information

Urban Water Management and Soils (ESRM 311 & SEFS 507)

Urban Water Management and Soils (ESRM 311 & SEFS 507) Urban Water Management and Soils (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA Lecture Today Some Urban Water management terms Examples of water management in urban

More information

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013 Keele Campus Storm Drainage Presented by Mark Hagesteijn September 24, 2013 1 Presentation Overview Urbanization Impact on the Hydrologic Cycle Why Do We Manage Stormwater? Typical Stormwater Management

More information

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT Source: City of Bend Chapter Organization 11.1 Purpose... 11-1 11.2 Applicability... 11-1 11.3 Low Impact Development Overview... 11-2 11.3.1 Key Strategies...

More information

PROP. 84 REMOVING BARRIERS TO LID: MUNICIPAL CODE UPDATE ASSISTANCE CASE STUDY: CODE UPDATES IN ARCATA

PROP. 84 REMOVING BARRIERS TO LID: MUNICIPAL CODE UPDATE ASSISTANCE CASE STUDY: CODE UPDATES IN ARCATA PROP. 84 REMOVING BARRIERS TO LID: MUNICIPAL CODE UPDATE ASSISTANCE CASE STUDY: CODE UPDATES IN ARCATA OCTOBER 7, 2015 CASE STUDY: CODE UPDATES IN ARCATA Arcata is a city located in Humboldt County immediately

More information

Going Green with the NYS Stormwater Design Standards

Going Green with the NYS Stormwater Design Standards Going Green with the NYS Stormwater Design Standards Shohreh Karimipour, P.E. NYSDEC History of Stormwater Management Ancient Greek Cisterns Water Cistern Systems in Greece from Minoan to Hellenistic Period,

More information

DCA , Stormwater Quality and Facilities Ordinance June 23, 2009

DCA , Stormwater Quality and Facilities Ordinance June 23, 2009 PROPOSED NEW SECTION 10.486 Stormwater Quality and Detention Facilities, Public Streets. A. Purpose. It is the City s policy to maintain the natural hydrology and preserve water quality by mitigating the

More information

J. Paul Guyer, P.E., R.A.

J. Paul Guyer, P.E., R.A. J. Paul Guyer, P.E., R.A. Paul Guyer is a registered civil engineer, mechanical engineer, fire protection engineer, and architect with over 35 years experience in the design of buildings and related infrastructure.

More information

Regional Stormwater Management Program

Regional Stormwater Management Program Business Risk Exposure (BRE) Score BTU Community Cost-Share Program (CCSP) Cistern Condition Rating of RSS Asset Criticality of a RSS asset Detention Basin Education Credit Equivalent Residential Unit

More information

Understanding Stormwater Drainage Maintenance

Understanding Stormwater Drainage Maintenance WARREN COUNTY STORMWATER DISTRICT Understanding Stormwater Drainage Maintenance Home Owner s Association Guide Introduction Our goal is to help property owners and Home Owner s Associations (HOA) understand

More information

NPDES - PCSM. Permit Preparation

NPDES - PCSM. Permit Preparation NPDES - PCSM National Pollutant Discharge Elimination System Post Construction Stormwater Management Permit Preparation Jim Pillsbury, PE Engineer s Workshop - March 4 and 5, 2010 Who needs NPDES? Earth

More information

Stormwater Low Impact Development - A Natural Solution

Stormwater Low Impact Development - A Natural Solution Stormwater Low Impact Development - A Natural Solution Sarah U Ren Program Director The Watershed Center of Grand Traverse Bay 231-935-1514, suren@gtbay.org Our Mission: The Watershed Center advocates

More information

Three Rivers Park District Administration Center Rain Garden

Three Rivers Park District Administration Center Rain Garden Three Rivers Park District Administration Center Rain Garden Introduction There are significant changes to the hydrologic regime and nutrient loading following urban and industrial development. The post-development

More information

Appendix D - Technical Design Criteria for BMPs

Appendix D - Technical Design Criteria for BMPs Appendix D - Technical Design Criteria for BMPs City of Wayzata Page 3 On-site infiltration features Definitions and Scope: Infiltration facilities are constructed basins or depressions located in permeable

More information

SOIL EROSION AND SEDIMENT CONTROL

SOIL EROSION AND SEDIMENT CONTROL SOIL EROSION AND SEDIMENT CONTROL SECTION 1: AUTHORITY, TITLE AND PURPOSE 11. STATUTORY AUTHORIZATION This ordinance is adopted pursuant to the provisions of the Federal Water Pollution Control Act 86

More information

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Standard Operating Procedures Central Massachusetts Regional Stormwater Coalition SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Erosion and sedimentation from land-disturbing

More information

the To: April 8, 2016 Date: Ltd., to amend Permits, to of the Work municipal Ridge Town of and Center in The Lower Blind Branch.

the To: April 8, 2016 Date: Ltd., to amend Permits, to of the Work municipal Ridge Town of and Center in The Lower Blind Branch. To: Date: Subject: Robert I. Goodman, Chairman, and Planning Board of Village of Rye Brook April 8, 2016 Bowman Avenue Development Strip Property Application to Amend Subdivision and Site Plans As requested,

More information

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006.

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006. Urban Stormwater: Best Practice Environmental Management Guidelines. Chapter 5 Water Sensitive Urban Design Key references Department of Planning, 1993, Better Drainage: Guidelines for the Multiple Use

More information

Tennessee Stormwater Management Program. Stormwater Management Site Assessment and Inventory Checklist. Quick Check o Vicinity Map within Watershed

Tennessee Stormwater Management Program. Stormwater Management Site Assessment and Inventory Checklist. Quick Check o Vicinity Map within Watershed Tennessee Stormwater Management Program Project Name: Location: File Number: Reviewer: Date of Submittal: Review Date: Project Meeting Chronology: Type of Meeting: Date: Stormwater Management Site Assessment

More information

GRACE CHURCH EXPANSION

GRACE CHURCH EXPANSION GRACE CHURCH EXPANSION REVIEW: NOVEMBER 24, 2014 200 SAGE ROAD, CHAPEL HILL NORTH CAROLINA PROJECT DATA OVERALL SITE MAP SITE INFORMATION OWNER PIN ACREAGE VICINITY MAP GRACE CHURCH 9890503171 271,600

More information

Chapter 3 Site Planning and Low Impact Development

Chapter 3 Site Planning and Low Impact Development CHAPTER 3 Site Planning and Low Impact Development Chapter 3 Site Planning and Low Impact Development 3.0 Introduction The City of Charleston requires that major residential, large commercial (>1 acre),

More information

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST St. Mary s Soil Conservation District 26737 Radio Station Way, Suite B Leonardtown, MD 20650 Phone: 301-475-8402 ext. 3 Fax: 301-475-8391 www.stmarysscd.com St. Mary s County Government Department of Public

More information

Why a new Food & Farm Ordinance?

Why a new Food & Farm Ordinance? Growing for Kane Why a new Food & Farm Ordinance? 1. Growing obesity issue 64% of Kane adults are overweight or obese 2. Low rates of fruit & vegetable consumption Healthy diets include more fruits & veggies.

More information

Innovative Stormwater Management in Urban Environments

Innovative Stormwater Management in Urban Environments Innovative Stormwater Management in Urban Environments Cahill Associates Environmental Consultants www.thcahill.com Urban SW Issues No Stormwater Management Combined Sewers Buried Streams and Dead Streams

More information

DEALING WITH STORM WATER MANAGEMENT

DEALING WITH STORM WATER MANAGEMENT December 2012 DEALING WITH STORM WATER MANAGEMENT This fact sheet provides information on the guiding principles of storm water management practices, explains the difference between structural and non-structural

More information

Prepared for: Central Coast Low Impact Development Initiative centralcoastlidi.org

Prepared for: Central Coast Low Impact Development Initiative centralcoastlidi.org Page 1 of 37 USER GUIDE & TEMPLATE: Municipal Landscape Gap Analysis Tool for Planning & Development Review Standards and Procedures Prepared for: Central Coast Low Impact Development Initiative centralcoastlidi.org

More information

Homeowners Guide to Stormwater BMP Maintenance

Homeowners Guide to Stormwater BMP Maintenance Homeowners Guide to Stormwater BMP Maintenance What You Need to Know to Take Care of Your Property Rain Barrel Dry Well Rain Garden Pervious Asphalt Porous Pavers City of El Monte Stormwater BMP Management

More information

TENTATIVE MAP CHECKLIST

TENTATIVE MAP CHECKLIST Business License 707.648.4357 www.cityofvallejo.net Central Permit Center 555 Santa Clara Street Vallejo CA 94590 Building 707.648.4374 Planning 707.648.4326 TENTATIVE MAP CHECKLIST Public Works/Engineering

More information

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018 COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018 A. California Residential Code Requirement - Construction plans shall indicate how

More information

CAPE ELIZABETH, MAINE TOWN CENTER STORMWATER MANAGEMENT PLAN UPDATE

CAPE ELIZABETH, MAINE TOWN CENTER STORMWATER MANAGEMENT PLAN UPDATE CAPE ELIZABETH, MAINE TOWN CENTER STORMWATER MANAGEMENT PLAN UPDATE September 2015 This report was prepared by The Town of Cape Elizabeth under award CZM NA14NOS4190066 to the Maine Coastal Program from

More information

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA Lecture Today Urban Water management terms Examples of water management in urban areas Field

More information

Presenting a live 90-minute webinar with interactive Q&A. Today s faculty features: John Epperson, Partner, Cooper White & Cooper, San Francisco

Presenting a live 90-minute webinar with interactive Q&A. Today s faculty features: John Epperson, Partner, Cooper White & Cooper, San Francisco Presenting a live 90-minute webinar with interactive Q&A Stormwater Discharge and CWA Compliance After EPA Rule Revisions and Recent High Profile Spills Navigating EPA Permitting Requirements, Overcoming

More information

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water C. WATER 1. Surface Water Runoff See Section C.3, Flood Hazard/Mudflow Hazard, page 67. 2. Ground Water Determined not significant by the October 1984 and January 1999 Initial Studies conducted by the

More information

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County ORDINANCE NUMBER DRAFT 1 1 1 1 1 1 0 1 An ordinance amending Title 1 Environmental Protection of the Los Angeles County Code, establishing Low Impact Development standards. The Board of Supervisors of

More information

Washington County, Maryland Division of Public Works Policy Manual

Washington County, Maryland Division of Public Works Policy Manual Washington County, Maryland Division of Public Works Policy Manual Subject: Downstream Drainage Easement Category: Land Development Engineering Number: 7-4.1 Date: June 1, 2009 (effective) PURPOSE: The

More information

Review Zone Application for D&R Canal Commission Decision

Review Zone Application for D&R Canal Commission Decision Review Zone Application for D&R Canal Commission Decision MEETING DATE: July 20, 2016 DRCC #: 16-4803 Latest Submission Received: June 13, 2016 Applicant: Robert McCarthy, PE PSE&G 4000 Hadley Road, 2

More information

Storm Water Managament at the University of Michigan

Storm Water Managament at the University of Michigan Storm Water Managament at the University of Michigan Standard Operating Procedure Date: 06/23/17 Revision #: 03 The green roof installed on top of the Mott Children s & Von Voigtlander Women s Hospital.

More information