Proposed Student Accommodation Development

Size: px
Start display at page:

Download "Proposed Student Accommodation Development"

Transcription

1 Statement of Response to the Notice of Pre- Application Consultation Opinion Former "Matts of Cabra" public house and lands to the rear, Fassaugh Avenue, Cabra, Dublin 7 Proposed Student Accommodation Development Prepared for Labinies Limited by IMG Planning Limited 75 Fitzwilliam Lane Dublin 2 January 2018

2 1. Introduction Following consultations with Dublin City Council, a request to enter into preapplication consultations with An Bord Pleanála was submitted on 19 October 2017 and a subsequent consultation meeting was held on 21 November The Board issued a Notice of Pre-Application Consultation Opinion on 11 December 2017, which states that the Board is of the opinion that the documents submitted with the request to enter into consultations require further consideration and amendment to constitute a reasonable basis for an application for strategic housing development. The five items were identified to be addressed were: The scale, form, massing, elevational treatment/expression and finishes of the proposed development; The proposed retail element of the scheme, in particular relating to public accessibility and their availability for use by the wider public; The quality, functionality and accessibility of proposed open space; The internal layout of the proposed development, having particular regard to the extent of communal facilities concentrated at basement level with limited natural light; and Drainage details require further examination having regard to the Pre- Connection Enquiry Report of Irish Water. The Board also requested, pursuant to article 285(5)(b) of the Planning and Development (Strategic Housing Development) Regulations 2017, the provision of the following specific information: 1. A schedule of the proposed floor areas relative to the Development Plan standards, as set out in Section of the Dublin City Development Plan Colour coded drawing indicating individual clusters within the student accommodation scheme. 3. Additional photomontages and cross sections showing the proposed development from various vantage points in the public realm. 4. Lighting Plan. 5. Construction Management Plan. 2. Response to Issues Raised in the Board s Notice of Pre-Application Consultation Opinion The following sets out how the applicant has addressed the issues raised in the Board s Notice of Pre-Application Consultation Opinion, with reference to the Architectural Design Statement prepared by DMOD Architects submitted with the application, to ensure the subject application constitutes a reasonable basis for an application for strategic housing development. and lands to the rear, Fassaugh Avenue, Cabra, Dublin 7. Page 2

3 2.1 Item No. 1: The scale, form, massing, elevational treatment/expression and finishes of the proposed development The Board stated: Further consideration and/or justification of the documents as they relate to the scale, form, massing, elevational treatment/expression and finishes of the proposed development, having regard to the context of this elevated site within an established residential area. The further consideration of these issues may require an amendment to the documents and/or design proposals submitted at application stage. On foot of the comments in the Board s Notice of Pre-Application Consultation Opinion, there has been a comprehensive reconsideration of the proposed development: The overall architectural expression has been changed through the introduction of different and varied external materials and more variety in building form and massing. The height of the building onto Fassaugh Avenue has been reduced in and the general roofscape has been modified to include a roof garden for student amenity The uppermost levels of the building blocks have been substantially remodelling to address potential overlooking and mitigate the visual impact of the buildings. The total number of bedspaces has been reduced from 225 no. as contained in the pre-application documentation to 208 no. Consultation Planning Application and lands to the rear, Fassaugh Avenue, Cabra, Dublin 7. Page 3

4 Consultation Planning Application The massing for each block have been modified, has assisted to change the perception of the scheme - the building onto Fassaugh Avenue has been redesigned as a four storey with roof garden over; the uppermost floor along the length of the eastern elevation has been remodelled through the introduction of set backs and carefully considered window positions allowing lateral views only to provide variety that reduces the potential for overlooking A variety of complementary brick colours, combined with a flat panel detail at the window reveals have been introduced into the elevations along the length of the facades that assists in modulating the various buildings forms, presenting greater variety and interest as one transitions from the main street into the campus. and lands to the rear, Fassaugh Avenue, Cabra, Dublin 7. Page 4

5 The uppermost level of the internal street elevation has been remodelled along its length, combining building set-backs and projected aluminium and opaque glass boxes. 2.2 Item No. 2: The proposed retail element of the scheme, in particular relating to public accessibility and their availability for use by the wider public The Board stated: Further consideration and/or justification of the documents as they relate to the proposed retail element of the scheme, in particular relating to public accessibility and their availability for use by the wider public. The further consideration of these issues may require an amendment to the documents and/or design proposals submitted at application stage. The total retail floor area has been increased from sq. m. as contained in the pre-application documentation to sq. m. It is noted that the retail component of the development granted planning permission by Dublin City Council under register reference 3420/16 was sq. m. The retail floor space is arranged over three levels in Block A, (basement, ground and first floor) and over two levels in Block C (basement and ground floor) and will be accessible to the general public as well as being a facility for the student population. The entrance area to the development has been redesigned to be open and the proposed gates been removed and replaced with mechanically retractable bollards. The objective is to generate a sense of activity and interest at the entrance to the site and the south facing orientation optimises the use of proposed outdoor seating areas. 2.3 Item No. 3: The quality, functionality and accessibility of proposed open space The Board stated: Further consideration and/or justification of the documents as they relate to the proposed open space provision and public realm. In this regard, the documents should clearly show that the proposed open space is comprised of high quality, functional and accessible areas. In addition, further justification of the documents as they relate to connectivity between the proposed development and the public realm should be included, including justification for the proposed gateway. The further consideration of these issues may require an amendment to the documents and/or design proposals submitted. and lands to the rear, Fassaugh Avenue, Cabra, Dublin 7. Page 5

6 The external shared communal area at ground level within the site is a shared leisure space accessible to the residents and includes areas in and around the reception hub, particularly on the western side along the railway line as outdoor leisure space and barbeque areas, which benefits from a western orientation and is which on the other side of the proposed buildings from the existing residential houses to the east of the site. The shared-surface strategy for the internal street is a crucial component of the landscape design approach for the site. Pedestrians, cyclists and cars will all use the same space that results in slower and safer speeds and also requires less area of paved surface. This has allowed the inclusion of privacy buffer planting for the bedrooms at ground floor and enhanced planting elsewhere within the space. The overall landscape approach is to draw the verdant nature of the railway corridor into the site and improve upon it, leading to a relatively green site notwithstanding the urban-level density of the proposed development. This planting continues through to the front of the site to alleviate the hardscape character of the public realm in this area and to create a positive impact of the development for the surroundings. A roof garden on the uppermost level of Block A is proposed and is accessible from a lift core that connects vertically with the amenity areas at basement level. In regard to the connectivity between the proposed development and the public realm, as has been explained, the site is a linear, east west in orientation and runs parallel to the railway line and between the railway cutting and an established residential area. Accordingly, the site is essentially a cul-de-sac. Every effort however has been made to design a street frontage with colour and activity to physically and visually connect the new development with the local streets. The proposed active retail frontages street level onto Fassaugh Avenue and the active ground level it creates that is not exclusive to residents but is also accessible to the public, will form an integral element of the local centre of this part of Cabra. 2.4 Item No. 4: The internal layout of the proposed development, having particular regard to the extent of communal facilities concentrated at basement level with limited natural light The Board stated: Further consideration and/or justification of the documents as they relate to the internal layout of the proposed development, having particular regard to the extent of communal facilities concentrated at basement level with limited natural light. The further consideration of these issues may require an amendment to the documents and/or design proposals submitted at application stage. and lands to the rear, Fassaugh Avenue, Cabra, Dublin 7. Page 6

7 The extent and depth of the lightwells to the basement level along the western elevation of Blocks A and B have been substantially increased from those indicated in the pre-application consultation documentation. These now generously sized lightwells facilitate natural daylight to the common rooms and study rooms within the basement. The shared amenity space includes the main reception area and management suite, which can be used by students to meet and socialise and includes a first floor dual aspect mezzanine area that overlooks the railway line and forms an integral part of the welcome area for incoming students. The reception connects directly into the main shared amenity space at basement level, which is arranged in a split level linear plan with multiple vertical connections through the blocks to the student accommodation. The layout of the amenity space has the benefit of the south and west facing light-wells that provide interesting light and aspect into what are carefully considered, fully glazed, planted and paved areas. The study areas and common room in the basement that require daylight are located along the western side of the basement, whereas those uses requiring limited aspect and daylight, e.g. kitchen area, cinema, TV room and the gym are located on the eastern side of the basement area. 2.5 Item No. 5: Drainage details require further examination having regard to the Pre-Connection Enquiry Report of Irish Water The Board stated: Drainage details require further examination having regard to the Pre-Connection Enquiry Report of Irish Water dated 21 st March 2017 submitted by the prospective applicant as part of the Section 5 Pre-Application Consultation request. McElroy Associates received the Pre-connection Enquiry Report from Irish Water on 21 March Following receipt of the Pre-connection Enquiry Report a meeting was arranged with Conor McCarey, Senior Design Engineer, Irish Water and Peter Glynn, Executive Engineer, Dublin City Council. The meeting took place at the offices of Dublin City Council on 2 May Enda Byrne attended the meeting on behalf of McElroy Associates, the Consulting Engineers for the project. The purpose of the meeting was to agree in principle the drainage arrangements for the proposed development. The minutes of the meeting with Irish Water and Dublin City Council are reproduced in Appendix G of the Engineers Drainage Report, prepared by McElroy Associates which accompanies the application for planning permission. These minutes were ed to the attendees after the meeting. The key points from this meeting are summarised below: The proposed arrangement is acceptable to Irish Water. All aspects of the work should be carried out in accordance with the Codes of Practice published by Irish Water and lands to the rear, Fassaugh Avenue, Cabra, Dublin 7. Page 7

8 Irish Water require that 24 hour foul storage capacity be provided upstream of the foul pumping station Both Dublin City Council and Irish Water stated that the pumped pipelines from the site would not be taken in charge by the Council or Irish Water. These parts of the drainage infrastructure must be maintained by the developer New gravity sewers would need to be constructed between the new Rising Main Discharge Manholes to be located on Fassaugh Avenue and the existing sewers on Carnlough Road Irish Water commented that once agreement on all issues, including cost, was reached with the developer, Irish Water would carry out the construction of the new foul sewer from the new Foul Rising Main Discharge Manhole on Fassaugh Avenue to the existing foul sewer on Carnlough Road Details of the proposed drainage arrangements agreed with Irish Water and Dublin City Council are described in the Engineers Drainage Report and shown on the drawings prepared by McElroy Associates submitted with the application. McElroy Associates intend to engage with Irish Water and the Dublin City Council Drainage Department post-planning and agree all drainage connection details with them. It is the applicant s intention to comply fully with the Irish Water and Dublin City Council Drainage Department requirements for drainage works. The means by which the foul and surface water drains from the site would be routed to the west side of the railway cutting have been discussed with Nick West, Senior Track and Structures Engineer, Irish Rail. In principle Irish Rail will permit drainage rising mains from the site to be installed under the railway tracks. The approval process for undertrack crossings is set out in the Irish Rail document Technical Management Standard CCE-TMS-344 Requirements for Undertrack Crossings and Pressure Pipelines. Post-planning, McElroy Associates intend to engage with Irish Rail to agree the details of the proposed undertrack crossing in accordance with Technical Management Standard CCE-TMS-34. It is the applicant s intention to comply fully with the Irish Rail requirements for such works. and lands to the rear, Fassaugh Avenue, Cabra, Dublin 7. Page 8

9 3. Statement of Response to Specific Information Required The following sets out how the applicant has addressed the Board s request for additional specific information in respect of the proposed development A schedule of the proposed floor areas relative to the Development Plan standards, as set out in Section of the Dublin City Development Plan 2016 Schedules of the overall development and the floor areas of the proposed student accommodation relative to the standards in the Dublin City Development Plan have been prepared by DMOD Architects and are submitted with the application. 3.2 Colour coded drawing indicating individual clusters within the student accommodation scheme The individual clusters within the student accommodation scheme have been colour coded on the floor plans submitted with the application AP0103, AP0104, AP0105, AP0106 and AP Additional photomontages and cross sections showing the proposed development from various vantage points in the public realm Photomontages and CGI views of the proposed development prepared by DMOD Architects are submitted with the application. 3.4 Lighting Plan A lighting plan is submitted with the application see drawing Exterior Site Lighting prepared by RM Breen Associates and drawing DN Landscape Masterplan prepared by Bernard Seymour Landscape Architects 3.5 Construction Management Plan An Outline Construction Management Plan prepared by DCON Safety Consultants Limited is submitted with the application. and lands to the rear, Fassaugh Avenue, Cabra, Dublin 7. Page 9

10 4. Conclusion This document sets out how the items outlined in the pre-application consultation opinion from An Bord Pleanála in relation to the proposed student accommodation development on the site have been addressed in full by the applicant and design team prior to lodgement of the application to the Board. The layout and design changes incorporated into the final scheme are considered to result in improvements to the overall development and ensure that a high-quality development will be provided. It is therefore submitted that the proposed development is consistent with the proper planning and sustainable development of the area, and is consistent with all relevant national, regional and local planning policies and guidelines. and lands to the rear, Fassaugh Avenue, Cabra, Dublin Page

Statement of Consistency with Planning Policy. Proposed Student Accommodation Development. January 2018

Statement of Consistency with Planning Policy. Proposed Student Accommodation Development. January 2018 Statement of Consistency with Planning Policy Former "Matts of Cabra" public house and lands to the rear, Fassaugh Avenue, Cabra, Dublin 7 Proposed Student Accommodation Development Prepared for Labinies

More information

Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT.

Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT. ITEM 9 Application Number: 18/00266/DISCON Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT. AT The Point, 602 Midsummer Boulevard,

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Bel-Air Lexus Automobile Service Station

Bel-Air Lexus Automobile Service Station Bel-Air Lexus Automobile Service Station Design Brief 443-447 McArthur Avenue Ottawa April 30, 2015 14-1299-MCA Site Details Application: Site Plan Control Legal Description and Municipal Addresses: 443

More information

Cambridge. West Cambridge site. What is a Shared Facilities Hub? Welcome

Cambridge. West Cambridge site. What is a Shared Facilities Hub? Welcome Cambridge West Cambridge site What is a Shared Facilities Hub? Welcome Thank you for taking the time to attend our public exhibition on proposals for the Shared Facilities This will be a landmark building

More information

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17 Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS A New Garden Neighbourhood Matford Barton 17 2.1. SUMMARY AND STATUS OF THE PROPOSALS 2.1.1. The parameter plans and associated wording in this chapter

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This exhibition gives you the chance to view and comment on our proposals for a new residential development of 165 high-quality homes, along with

More information

Former North Works, Lickey Road, Longbridge, Birmingham

Former North Works, Lickey Road, Longbridge, Birmingham Committee Date: 14/11/2013 Application Number: 2013/06431/PA Accepted: 27/08/2013 Application Type: Full Planning Target Date: 26/11/2013 Ward: Longbridge Former North Works, Lickey Road, Longbridge, Birmingham

More information

(DC1) Direct Development Control Provision DC1 Area 4

(DC1) Direct Development Control Provision DC1 Area 4 . General Purpose (DC) Direct Development Control Provision DC Area 4 The purpose of this Provision is to provide for an area of commercial office employment and residential development in support of the

More information

Application Recommended for Approval Hapton with Park Ward

Application Recommended for Approval Hapton with Park Ward Application Recommended for Approval Hapton with Park Ward APP/2017/0036 Outline Planning Application Outline application for the construction of a new 3 bedroom dwelling (with all matters reserved for

More information

Former Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT.

Former Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT. OPEN SPACE TEMPLE COWLEY LIBRARY library beyond Proposed apartments Proposed apartments Proposed houses Temple Road * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT. * Welcome

More information

ACU DEVELOPMENT PLAN OBJECTION RESPONSE

ACU DEVELOPMENT PLAN OBJECTION RESPONSE Inappropriate location for consolidation of ACU campus Intentions for remaining ACU land unknown; residents would like to see a full master plan of all ACU sites proposed for the next 10-15 years ACU has

More information

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN ELMVALE ACRES SHOPPING CENTRE MASTER PLAN Contents 1.0 INTRODUCTION... 2 2.0 LOCATION... 2 3.0 EXISTING CONTEXT... 2 4.0 VISION & GUIDING PRINCIPLES... 2 5.0 LAND USE AND BUILT FORM... 4 5.1 St. Laurent

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities)

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities) SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 12 January 2011 AUTHOR/S: Executive Director (Operational Services) Corporate Manager (Planning and New Communities) Notes: S/1848/10

More information

Welcome to the Oakridge Centre Open House

Welcome to the Oakridge Centre Open House Welcome to the Oakridge Centre Open House Why is the City hosting this event? This open house is to inform you of a rezoning application submitted to the City of Vancouver to amend the existing CD-1 (Comprehensive

More information

MEETING OF DÚN LAOGHAIRE-RATHDOWN COUNTY COUNCIL 7 TH JULY 2014 PROPOSED HOUSING DEVELOPMENT, CLONTIBRET HOUSE, FRASCATI ROAD, BLACKROCK, CO.

MEETING OF DÚN LAOGHAIRE-RATHDOWN COUNTY COUNCIL 7 TH JULY 2014 PROPOSED HOUSING DEVELOPMENT, CLONTIBRET HOUSE, FRASCATI ROAD, BLACKROCK, CO. MEETING OF DÚN LAOGHAIRE-RATHDOWN COUNTY COUNCIL 7 TH JULY 2014 PROPOSED HOUSING DEVELOPMENT, CLONTIBRET HOUSE, FRASCATI ROAD, BLACKROCK, CO. DUBLIN IN ACCORDANCE WITH PART 8, ARTICLE 81 OF THE PLANNING

More information

GREENFORD HALL & ADJOINING LAND

GREENFORD HALL & ADJOINING LAND GREENFORD HALL & ADJOINING LAND CONTENTS 1. Introduction 1. Introduction 2. Urban Context 2.1 The Site and Surroundings 2.2 Urban Context Map 2.3 Access and Movement 3. Planning Context 3.1 Planning History

More information

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario URBAN DESIGN BRIEF New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario TABLE OF CONTENTS: 1.0 Executive Summary 2.0 Creating Vibrant and Sustainable Urban Places: Excerpts from

More information

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN Official Plan Amendment XX to the Official Plan for the City of Ottawa 1 INDEX THE STATEMENT OF COMPONENTS PART A THE PREAMBLE PAGE Purpose...

More information

1. Welcome. Background

1. Welcome. Background 1. Welcome The purpose of this exhibition is to provide you with an update on progress on the Kilnwood Vale Scheme. In order to improve the scheme and deliver key facilities earlier in the development,

More information

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 DESIGN BRIEF CONTENTS PART A 1.0 INTRODUCTION 2.0 DESCRIPTION & ANALYSIS OF SITE CONTEXT 3.0 DESIGN CONSTRAINTS AND OPPORTUNITIES

More information

PHASE III: Reserved Matters Submission

PHASE III: Reserved Matters Submission Statement of Compliance with the outline approval for the proposed residential development of land at: BURGES LANE, WIVELISCOMBE PHASE III: Reserved Matters Submission Foreword Contents: This Statement

More information

Application Guide. Should you have any questions on the Outline Application please contact:

Application Guide. Should you have any questions on the Outline Application please contact: Application Guide Application Guide This guide describes the structure of the Outline Application, explains the different documents that have been submitted with it and identifies what will happen next.

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 23 rd March 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: LA11/2015/0395/F Residential Development

More information

design & access statement Proposed Erection of 68 Bedroom Hotel and Restaurant with Associated Landscaping

design & access statement Proposed Erection of 68 Bedroom Hotel and Restaurant with Associated Landscaping Proposed Erection of 68 Bedroom Hotel and Restaurant with Associated Landscaping Promenade, design & access statement lawrencemcphersonassociates 6 new road, ayr, ka8 8ex On Behalf of July 2015 CONTENTS

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

Statement of Consistency with Planning Policy

Statement of Consistency with Planning Policy Statement of Consistency with Planning Policy In respect of PROPOSED MIXED USE DEVELOPMENT AT THE FORMER CIE LANDS, 2-4 CARNLOUGH ROAD, CABRA, DUBLIN 7 Prepared by John Spain Associates On behalf of CREKAV

More information

Report Author/Case Officer: Joanne Horner Contact Details:

Report Author/Case Officer: Joanne Horner Contact Details: APP 04 Application Number: 16/00140/FUL Other Two storey side extension to existing dwelling and formation of hard standing to provide parking for number 54 (Resubmission of withdrawn application 15/02852/FUL)

More information

3.1 The hybrid planning application proposes the following description of development:

3.1 The hybrid planning application proposes the following description of development: CHAPTER 3: PROPOSED DEVELOPMENT 3.1 The hybrid planning application proposes the following description of development: Hybrid (part-outline/part-full) planning application for a single composite development

More information

appendix and street interface guidelines

appendix and street interface guidelines appendix five: building and street interface guidelines appendix 5 building and street interface guidelines BOULEVARDS Boulevards are generally characterized by higher levels of traffic movement at higher

More information

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD Proposals for land at Smug Oak Lane BRICKET WOOD Previous Linden Homes and Wates Developments scheme Welcome Welcome to Linden Homes and Wates Developments public exhibition. Working together as joint

More information

Your ref: 1608 My ref: PA16/03150/PREAPP Date: 7 December 2016

Your ref: 1608 My ref: PA16/03150/PREAPP Date: 7 December 2016 Redesign Architecture Ltd The Workbox Fourth Floor PZ360 St Marys Terrace Penzance Cornwall TR18 4DZ Your ref: 1608 My ref: PA16/03150/PREAPP Date: Dear Sir/Madam Pre-application enquiry reference Proposal

More information

BROADWAY-ARBUTUS POLICIES. Adopted by City Council on July 7, NOTE: To be considered in combination with applicable guidelines

BROADWAY-ARBUTUS POLICIES. Adopted by City Council on July 7, NOTE: To be considered in combination with applicable guidelines 50 City of Vancouver Land Use and Development Policies and Guidelines Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 873.7344 fax 873.7060 planning@city.vancouver.bc.ca BROADWAY-ARBUTUS POLICIES

More information

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC 2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from

More information

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014 [PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue May 23, 2014 Contents 1.0 Introduction... 2 2.0 Site Context... 2 2.1 Adjacent Uses... 2 Figure 1: Site

More information

DRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to:

DRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to: AUGUST 29, 2017 12.15 Northeast Quadrant of Kipling Avenue and Highway 7 12.15.1 Goals 12.15.2 Land Use The goals of this Plan are to: 12.15.2.1 General Provisions: a) Ensure the development of a compact

More information

CITY CLERK. Consolidated Clause in North York Community Council Report 8, which was considered by City Council on October 26, 27 and 28, 2004.

CITY CLERK. Consolidated Clause in North York Community Council Report 8, which was considered by City Council on October 26, 27 and 28, 2004. CITY CLERK Consolidated Clause in Report 8, which was considered by City Council on October 26, 27 and 28, 2004. 28 Request for Direction Report - Site Plan Approval Application 03 200020 NNY 24 SA - Marek

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

St Michaels C of E Junior & Infant School, Nantmel Grove, Bartley Green, Birmingham, B32 3JS

St Michaels C of E Junior & Infant School, Nantmel Grove, Bartley Green, Birmingham, B32 3JS Committee Date: 06/03/2014 Application Number: 2013/08595/PA Accepted: 19/11/2013 Application Type: Full Planning Target Date: 14/01/2014 Ward: Bartley Green St Michaels C of E Junior & Infant School,

More information

4780 Eglinton Avenue West - Zoning By-law Amendment and Draft Plan of Subdivision Applications - Preliminary Report

4780 Eglinton Avenue West - Zoning By-law Amendment and Draft Plan of Subdivision Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 4780 Eglinton Avenue West - Zoning By-law Amendment and Draft Plan of Subdivision Applications - Preliminary Report Date: May 29, 2014 To: From: Wards: Reference Number: Etobicoke

More information

BLETCHLEY PARK AREA - DEVELOPMENT FRAMEWORK

BLETCHLEY PARK AREA - DEVELOPMENT FRAMEWORK ANNEX A To Item 9 REVISED TEXT: additions shown bold and underlined, deletions in (brackets and in italics). BLETCHLEY PARK AREA - DEVELOPMENT FRAMEWORK This framework sets out the key objectives and requirements

More information

Planning and Growth Management Committee. Chief Planner and Executive Director, City Planning Division. Pg12013 (File No NNY 34 OZ)

Planning and Growth Management Committee. Chief Planner and Executive Director, City Planning Division. Pg12013 (File No NNY 34 OZ) 865 York Mills Road Official Plan Amendment Application Preliminary Report STAFF REPORT ACTION REQUIRED Date: February 28, 2012 To: From: Wards: Reference Number: Planning and Growth Management Committee

More information

Complete Neighbourhood Guidelines Review Tool

Complete Neighbourhood Guidelines Review Tool Complete Neighbourhood Guidelines Review Tool Prepared By: City of Regina Planning Department October 2014 Page 1 of 14 Community Development Review Checklist for Secondary Plans and Concept Plans The

More information

Welcome to our public exhibition

Welcome to our public exhibition About Our Scheme Welcome to our public exhibition This exhibition gives you the chance to view and comment upon our emerging proposals for a new residential development of 68 new homes on the site of the

More information

SUB AREA 3 CENTRAL STRATFORD AND SOUTHERN QUEEN ELIZABETH OLYMPIC PARK

SUB AREA 3 CENTRAL STRATFORD AND SOUTHERN QUEEN ELIZABETH OLYMPIC PARK 191 ADOPTED LOCAL PLAN: THE SUB AREAS SUB AREA 3 CENTRAL STRATFORD AND SOUTHERN QUEEN ELIZABETH OLYMPIC PARK SECTION 12 Vision VISION Central Stratford and Southern Queen Elizabeth Olympic Park will become

More information

Uptown Rideau Street Secondary Plan [Amendment #166, January 12, 2016]

Uptown Rideau Street Secondary Plan [Amendment #166, January 12, 2016] [Amendment #166, January 12, 2016] The policies of this Secondary Plan are in effect, save and except for the property at 560 Rideau Street, for which there remains a site specific appeal to this Secondary

More information

THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER

THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER 123-2013 A By-law to designate the whole of the City of Vaughan as a Site Plan Control Area, and to adopt site development guidelines and rules of procedure for

More information

4.00 STAKEHOLDERS. urbanprojects

4.00 STAKEHOLDERS. urbanprojects 4.00 STAKEHOLDERS 94 heuston gateway: regeneration strategy and development framework plan 95 The Heuston Gateway presents one of the greatest concentrations of brown field development sites located adjacent

More information

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville URBAN DESIGN BRIEF 2136&2148 Trafalgar Road Town of Oakville Prepared By: METROPOLITAN CONSULTING INC For 2500674 Ontario Inc November 2016 TABLE OF CONTENTS Page No. 1.0 Introduction/Description of Subject

More information

523, 525 and 525A Adelaide Street West - Zoning Amendment Application - Preliminary Report

523, 525 and 525A Adelaide Street West - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 523, 525 and 525A Adelaide Street West - Zoning Amendment Application - Preliminary Report Date: May 12, 2012 To: From: Wards: Reference Number: Toronto and East York Community

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 1 April 2015 AUTHOR/S: Planning and New Communities Director Application Number: Parish(es): Proposal: Site address: Applicant(s): Recommendation:

More information

Queensborough Eastern Neighbourhood Node. Community Open House

Queensborough Eastern Neighbourhood Node. Community Open House Queensborough Eastern Community Open House The Vision The Queensborough Eastern will become the heart of eastern Queensborough. Through a sensitive mix of viable commercial and residential areas, the neighbourhood

More information

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Welcome. Walk Around. Talk to Us. Write Down Your Comments Welcome This is an information meeting introducing the applications for proposed redevelopment of the Yorkdale Shopping Centre site at 3401 Dufferin Street and 1 Yorkdale Road over the next 20+ years,

More information

Building Distinctive Safe and Pleasant. Better

Building Distinctive Safe and Pleasant. Better Planning Committee Tour 2015 Building Distinctive Safe and Pleasant Better Welcoming Adaptable Resource Efficient Places Easy to Move Around and Beyond Thursday 3rd September Contents Tour Times and Map

More information

Development Control Plan

Development Control Plan Development Control Plan Rhodes Corporate Park (Also known as the Digital Site) Development Control Plan Date of Adoption: 4 September 2007 Effective Date: 7 March 2008 Index 1 INTRODUCTION... 3 1.1 LAND

More information

SUBMISSION TO DRAFT FINGAL COUNTY DEVELOPMENT PLAN RE: LANDS AT CASTLEKNOCK VILLAGE CENTRE

SUBMISSION TO DRAFT FINGAL COUNTY DEVELOPMENT PLAN RE: LANDS AT CASTLEKNOCK VILLAGE CENTRE April 2016 SUBMISSION TO DRAFT FINGAL COUNTY DEVELOPMENT PLAN 2017-2023 RE: LANDS AT CASTLEKNOCK VILLAGE CENTRE On behalf of: Lidl Ireland GmbH Submitted to: Planning & Strategic Infrastructure Department

More information

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 The Planning and Economic Development Committee recommends the adoption of the recommendations contained

More information

East Bayshore Road Neighbourhood

East Bayshore Road Neighbourhood East Bayshore Road Neighbourhood Northridge Property Management Urban Design Brief 3195 East Bayshore Road City of Owen Sound January 2016 East Bayshore Road Neighbourhood Northridge Property Management

More information

SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN

SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN DD/MM/YY Proposed C120 SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY Shown on the planning scheme map as DDO12. GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN 1.0 Design objectives DD/MM/YY Proposed

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition housing development A46 Wildmoor Alcester Road Canal Quarter A422 Town Centre housing development Warwickshire-based IM Properties, one of the UK s largest privately owned property

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions Consultation Summary Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions This report is not intended to provide a verbatim transcript

More information

DESIGN AND ACCESS STATEMENT NEW TALYBONT HALLS, CARDIFF UNIVERSITY JULY 2018

DESIGN AND ACCESS STATEMENT NEW TALYBONT HALLS, CARDIFF UNIVERSITY JULY 2018 DESIGN AND ACCESS STATEMENT NEW TALYBONT HALLS, CARDIFF UNIVERSITY JULY 2018 1 FILE NTHCU-STL-XX-XX-RP-A-9075-RP013 PROJECT New Talybont Halls, Cardiff University CLIENT Cardiff University STRIDE TREGLOWN

More information

URBAN DESIGN BRIEF 305, 309, & 315 SOUTHDALE ROAD WEST LONDON ONTARIO

URBAN DESIGN BRIEF 305, 309, & 315 SOUTHDALE ROAD WEST LONDON ONTARIO URBAN DESIGN BRIEF 305, 309, & 315 SOUTHDALE ROAD WEST LONDON ONTARIO CARVEST PROPERTIES LTD. December 2013 Section 1 - Land Use Planning Context 1.1 Subject Lands The subject lands are located immediately

More information

Warren Farm, Ampthill

Warren Farm, Ampthill 1 Welcome The developers of the Warren Farm site, Bloor Homes and Connolly Homes, are holding this exhibition on the emerging Design Codes for the development prior to their formal submission to Central

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

URBAN DESIGN BRIEF NORTHVIEW FUNERAL HOME HIGHBURY AVE N, LONDON, ON

URBAN DESIGN BRIEF NORTHVIEW FUNERAL HOME HIGHBURY AVE N, LONDON, ON URBAN DESIGN BRIEF NORTHVIEW FUNERAL HOME - 1490 HIGHBURY AVE N, LONDON, ON 1.1Purpose The intent of the following report is to identify an opportunity for redevelopment of two residential properties within

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

New Street Proposed Redevelopment Architecture & Urban Design Brief

New Street Proposed Redevelopment Architecture & Urban Design Brief 2130 2136 New Street Proposed Redevelopment Architecture & Urban Design Brief Prepared By: Cynthia Zahoruk Architect Inc. 3077 New Street, Burlington, ON, L7N 1M6 TABLE OF CONTENTS Background and Objective

More information

Thank you for sparing the time to visit our exhibition and to provide us with your feedback on our proposals displayed here today.

Thank you for sparing the time to visit our exhibition and to provide us with your feedback on our proposals displayed here today. WELCOME Aerial image of the application site in context Thank you for sparing the time to visit our exhibition and to provide us with your feedback on our proposals displayed here today. Plymouth City

More information

ARCHITECTURAL DESIGN BRIEF

ARCHITECTURAL DESIGN BRIEF VANDENBERG & WILDEBOER ARCHITECTS INC. ARCHITECTURAL DESIGN BRIEF BARRHAVEN FELLOWSHIP CHURCH 3058 JOCKVALE ROAD NOVEMBER 30, 2017 November 30, 2017 City of Ottawa: Planning Department 110 Laurier Avenue

More information

Ullswater Court 92 Holders Hill Road London NW4 1LN

Ullswater Court 92 Holders Hill Road London NW4 1LN Location Ullswater Court 92 Holders Hill Road London NW4 1LN Reference: 17/5396/CON Received: 18th August 2017 Accepted: 18th August 2017 Ward: Finchley Church End Expiry 13th October 2017 Applicant: IBSA

More information

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD 1.0 Introduction: The relocation of the City Council stores and depot from Bolton Street creates an exciting opportunity for development

More information

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment Urban Design Brief Proposed Official Plan & Zoning By-Law Amendment 3244, 3263 and 3274 Wonderland Road South Southside Group December 23, 2015 TABLE OF CONTENTS Page No. INTRODUCTION... 1 SECTION 1 LAND

More information

17A. Wind Microclimate

17A. Wind Microclimate 17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 17A.1.3 17A.1.4 This Chapter, which has been prepared by Waterman and BMT, provides further information with regard to the potential wind microclimate

More information

Wide asphalt driveway abutting school property. garage built with incompatible materials, too close to park. incompatible fencing materials

Wide asphalt driveway abutting school property. garage built with incompatible materials, too close to park. incompatible fencing materials Wide asphalt driveway abutting school property incompatible fencing materials garage built with incompatible materials, too close to park Lack of plantings as a buffer between private property and open

More information

1296 Kennedy Road - Zoning Amendment Application - Preliminary Report

1296 Kennedy Road - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 1296 Kennedy Road - Zoning Amendment Application - Preliminary Report Date: January 15, 2016 To: From: Wards: Reference Number: Scarborough Community Council Acting Director,

More information

178 Carruthers Properties Inc.

178 Carruthers Properties Inc. 178 Carruthers Properties Inc. Planning Rationale for 178 Carruthers Avenue Site Plan Control Application June 2014 Table of Contents 1.0 Introduction 2.0 Overview of Subject Property 3.0 Current Zoning

More information

Harrow Lane, St Leonards-on-Sea, East Sussex, TN37 7JZ ERECTION OF 113 DWELLINGS TOGETHER WITH ESTATE ROADS (DETAILED SUBMISSION)

Harrow Lane, St Leonards-on-Sea, East Sussex, TN37 7JZ ERECTION OF 113 DWELLINGS TOGETHER WITH ESTATE ROADS (DETAILED SUBMISSION) AGENDA ITEM NO: Report to: PLANNING BOARD Date: 10 September, 2003 Report from: Borough Planning Officer Application Address: Proposal: Application No: Recommendation: Ward: File No: Applicant: Interest:

More information

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

1 The development hereby permitted shall be carried out in accordance with the following approved plans: Location 59 Greenway Close London N20 8ES Reference: 16/00011/HSE Received: 30th December 2015 Accepted: 7th January 2016 Ward: Totteridge Expiry 3rd March 2016 Applicant: Mr Ankit Shah Proposal: Part

More information

HS2 Interchange Station Design

HS2 Interchange Station Design Working on behalf of HS2 Interchange Station Design October 2018 www.hs2.org.uk 1 Interchange Station, Solihull Introduction In February 2018, HS2 Ltd appointed Arup to take forward the design of Interchange

More information

A1 Portrait: Pdf/print with bleed & slug

A1 Portrait: Pdf/print with bleed & slug 01 Hammersmith Campus Imperial West St Mary's Campus South Kensington Campus Charing Cross Campus Royal Brompton Campus Chelsea and Westminster Campus Existing Imperial College London campuses ABOUT IMPERIAL

More information

Figure 1- Site Plan Concept

Figure 1- Site Plan Concept Figure 1- Site Plan Concept Parking will be provided underground on three levels at rate of 1.0 space/ unit; this rate includes all visitors parking. MMM Group has prepared a parking assessment (April,

More information

8 & 10 Donalda Crescent Official Plan & Rezoning Application Final Report

8 & 10 Donalda Crescent Official Plan & Rezoning Application Final Report STAFF REPORT ACTION REQUIRED 8 & 10 Donalda Crescent Official Plan & Rezoning Application Final Report Date: July 26, 2010 To: From: Wards: Reference Number: Scarborough Community Council Director, Community

More information

URBAN DESIGN BRIEF REPORT

URBAN DESIGN BRIEF REPORT URBAN DESIGN BRIEF REPORT PREPARED FOR 2568401 ONTARIO INC NEW GASBAR, CONVENIENCE STORE & CARWASH DEVELOPMENT @ 1509 FANSHAWE PARK ROAD WEST LONDON, ONTARIO GAMA ENGINEERING INC. PROJECT NUMBER 1669 PREPARED

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

Welcome. Land adjacent Sandy Lane WALTHAM CHASE THE PROPOSED SITE

Welcome. Land adjacent Sandy Lane WALTHAM CHASE THE PROPOSED SITE Land adjacent Sandy Lane WALTHAM CHASE Existing Linden Homes developments Welcome Welcome to Linden Homes Southern s ( Linden ) public exhibition about its proposals for a range of high-quality homes for

More information

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager 4(4)(iii) 13/81 Erection of sports hall, associated changing facilities, offices

More information

Bloor St. W. Rezoning - Preliminary Report

Bloor St. W. Rezoning - Preliminary Report STAFF REPORT ACTION REQUIRED 1638-1644 Bloor St. W. Rezoning - Preliminary Report Date: April 1, 2008 To: From: Wards: Reference Number: Toronto and East York Community Council Acting Director, Community

More information

URBAN DESIGN BRIEF 181 Burloak Drive, Oakville

URBAN DESIGN BRIEF 181 Burloak Drive, Oakville URBAN DESIGN BRIEF 181 Burloak Drive, Oakville February 2017 Our File: 1730B 230-7050 WESTON ROAD / WOODBRIDGE / ONTARIO / L4L 8G7 / T: 905 761 5588/ F: 905 761 5589/WWW.MHBCPLAN.COM TABLE OF CONTENTS

More information

URBAN DESIGN BRIEF. Terms of Reference. Purpose. When is an Urban Design Brief Required

URBAN DESIGN BRIEF. Terms of Reference. Purpose. When is an Urban Design Brief Required Purpose An Urban Design Brief (UDB) is intended to describe and illustrate proposed designs for new development projects and demonstrate how the City s Urban Design Guidelines and other City policies have

More information

Eastbourne Borough Council. Summary Proof of Evidence Of Barry John Cansfield BA (Hons), BTP, MRTPI on behalf of PRLP

Eastbourne Borough Council. Summary Proof of Evidence Of Barry John Cansfield BA (Hons), BTP, MRTPI on behalf of PRLP Eastbourne Borough Council (Arndale Centre and surrounding Land at Terminus Road, Sutton Road and Ashford Road) (Compulsory Purchase Order 2015) Section 226 (1)(a) of the Town and Country Planning Act

More information

6 Site Framework Strategies

6 Site Framework Strategies 6 Site Framework Strategies 6.1 Introduction Section 6 identifies a number of specific areas which are considered to be key sites within the Plan area and which may have potential for development / redevelopment.

More information

CITY OF ALAMEDA PLANNING BOARD Draft RESOLUTION

CITY OF ALAMEDA PLANNING BOARD Draft RESOLUTION CITY OF ALAMEDA PLANNING BOARD Draft RESOLUTION A RESOLUTION OF THE PLANNING BOARD OF THE CITY OF ALAMEDA APPROVING DESIGN REVIEW AND DEVELOPMENT PLAN AMENDMENT APPLICATION PLN13-0157 TO CONSTRUCT ELEVEN

More information

Carton Avenue Action Area Plan Maynooth

Carton Avenue Action Area Plan Maynooth Carton Avenue Action Area Plan Maynooth Kildare County Council JULY 2006 (AAP) Table of Contents Section 1. Introduction...3 Statement of Strategy...3 Location of the Lands...3 Context in the Town Development

More information

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham 1.0 INTRODUCTION Welcome to this exhibition of our proposals for the regeneration of the Brantham Industrial Area located off Factory Lane in Brantham. This presentation will give you an opportunity to

More information

Reserved Matters application for a site that straddles the boundary between CBC and BBC

Reserved Matters application for a site that straddles the boundary between CBC and BBC BBC APPLICATION 15/02682/MAR NUMBER CBC APPLICATION CB/15/04294/RM NUMBER LOCATION Wixams Land at former storage depot, Bedford Road, Wilstead Bedfordshire PROPOSAL Reserved Matters Application for Strategic

More information

Draft Eastern District Plan

Draft Eastern District Plan Draft Eastern District Plan Submission_id: 31238 Date of Lodgment: 13 Dec 2017 Origin of Submission: Online Organisation name: Turrulla Gardens Pty Ltd C/- Mecone Organisation type: Industry First name:

More information

Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1

Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1 Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) 345786 Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1 APPROVAL OF RESERVED MATTERS FROM APPLICATION CHE/12/00234/OUT (1) LAYOUT,

More information

Nelson Residential Street Frontage Guideline

Nelson Residential Street Frontage Guideline DRAFT 22-06-2012 Nelson Residential Street Frontage Guideline June 2012 1317273 Contents and purpose Residential s are important Residential s are much more than corridors which move traffic. Streets allow

More information