1 County of San Mateo
2 Project History Measure T Nov.1996 Plans and Permits Task Force meetings Hired a team Board support Budget
3 Project Overview
4 Programming and Linkages Park hours Multi use trail Pedestrians Equestrian Bicycle Dogs on leash Future trail linkages Caltrans parking lot
5 Public Comment Process Received comments in the following topic areas on 30% drawings Programming and trail linkages Paving surface durability and safety Equestrian access K-rail improvements Trail safety Bird protection fencing aesthetics Today s presentation of 90% drawings will attempt to address these comments
6 Next Steps Transfer title to County (August 2013) Board of Supervisors approval (October 1st) Construction (Winter 2013/ 2014) Trail opening (March 2014)
7 Presentation Overview Pavement, Striping, Signage & K-rail, and Other Improvements Environmental Review & Overlooks Maintenance, Schedule & Next Steps Questions Roland Haga, P.E, LEED AP BKF Engineers Sarah Sutton, ASLA, LEED AP, The Planning Center DC&E Gary Lockman County of San Mateo Project Team
8 Overview of Trail Improvements 1.3 Mile Trail Paving and Striping Signage/Interpretation Accessibility K-Rail Improvements Overlooks Accessibility
9 Paving/ Striping 6 bike lanes each way pedestrian/ equestrian Repair and resurface existing asphalt pavement (microsurfacing)
10 Before K-Rail simulation
11
12 Microsurfacing Prevents pavement degradation- seals underlying surface from water and air intrusion More skid resistant than slurry (micro 0.8 vs. slurry 0.5 friction coefficient) Longer lifespan than slurry (5-7 years vs. 3-5 years) Widely used throughout Bay Area and California
13 Paving and Striping
14 User Safety Signage Speed limit paint on trail pavement and posted on each end Horse signs posted at each trailhead K-rails and cable fencing keeping people back from cliff edge 2 buffer between bike lane and K-rail Ambassadors- verbal warnings
15 Signage Remove existing roadway signage New regulatory signage (minimize number, and location to protect views) Interpretive panels
16 Accessibility Improvements Bathroom & drinking fountains (north and south trailheads) Interpretive panels Overlooks Observation scopes ADA access provided to overlooks from parking per County trail standards
17 K-Rail Improvements Moving K-rail for smooth trail edge Removing limited K-rail to expose old rock wall Power wash and paint tan Clear debris and weeds along K-rail Future opportunities artistic teaming/ fundraising
18 Environmental Review May 2002 EIS/EIR supplement to 1986 certified by Caltrans Sept California Coastal Commission upheld July 2004 approved CDP Trail improvements are consistent with CDP Project will provide memorandum including detailed analysis of biological resources
19 Potential Wetlands Four potential Wetlands Two require K-rail relocation Supervision of a qualified wetland biologist
20 Bird Nesting Protection Trail is directly adjacent to important bird nesting locations philseu.blogspot.com/2011/ Birds are acclimated to vehicular traffic only Views of pedestrians may cause nests to be abandoned Bird nest protection is critical Bird species include: Peregrine Falcon, Murres, Brandt s, Pelagic Cormorants, Western Gulls, Pigeon Guillemots, Brown Pelicans
21 Bird Nesting Protection 2011 Common Murre Report recommends visual barrier Nesting season January- September Year round fencing option is preferred Visual Barrier Sensitive Nests/ Breeding Areas
22 Bird Nesting Protection Movable blinds- view & maintenance concerns, not required due to line of sight 6 Chain-link fencingaesthetic concerns sierrafencetx.com Clear fencingmaintenance concerns Cable fencing- climbing concerns Preferred Option- 4 Tall mesh with vegetation behind
23 Bird Nesting Similar fence example showing transparency
24 Bird Nesting Protection
25 Bird Nesting Protection 4 tall mesh fencing Durable vandal proof wire Small mesh openings and top spikes difficult to climb See-through transparent panels Galvanized steel with black powder coating finish 10 year warranty 4 Omega Secur Fence
26 Before photo of trail
27 After photo simulation of trail (BKF)
28 Bunker Historic value Site protection fencing 6 high mesh fencing and gate
29 Northern Overlook
30 Northern Overlook Plan view color
31 Northern Overlook Plan view color Added 2 benches and included in wall design Similar approach
32 Northern Overlook Replaced chain-link with relocated K-rail for aesthetics
33
34 Northern Overlook
35 Northern Overlook
36 Northern Overlook
37 Material Palette
38 Material Palette
39 Interpretive Area
40 Interpretive Area
41 Interpretive Area Plan color
42 Interpretive Area Plan color Added 3 benches Added 1 interpretive sign
43 Interpretive Area Section color
44 Interpretive Area
45 Southern Overlook
46 Southern Overlook
47 Southern Overlook Plan color
48 Southern Overlook Plan color Moved observation scopes Added 2 interpretive signs
49 Southern Overlook
50 Southern Overlook
51 Future Maintenance Bird monitoring Wetland monitoring Pampas grass removal Rock removal Rock slide repair (funding and expectations)
52 Questions/ Comments Gary Lockman County of San Mateo Roland Haga, P.E, LEED AP BKF Engineers Sarah Sutton, ASLA, LEED AP, The Planning Center DC&E
53 County of San Mateo
BUSINESS OF THE PLANNING COMMISSION OF THE CITY OF HALF MOON BAY AGENDA REPORT
For meeting of: BUSINESS OF THE PLANNING COMMISSION OF THE CITY OF HALF MOON BAY AGENDA REPORT TO: FROM: Honorable Chair and Planning Commissioners Jill Ekas, Community Development Director Brittney Cozzolino,
More informationMinto-Brown Island. November 18, City of Salem, Parks & Transportation Services
Minto-Brown Island Park Master Plan Public Meeting #1 November 18, 2014 City of Salem, Parks & Transportation Services Division, i i Public Works Welcome... and thanks for participating in the master planning
More informationADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS
ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS HAHAMONGNA FY 212-216 Capital Improvement Program Priority Description Total Estimated Costs Appropriated Through FY 211 Adopted FY 212 FY 213
More informationCONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE
CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE CITY STREETS AS PART OF STATE HIGHWAYS GUIDELINES REACHED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
More informationCity of San Juan Capistrano PROJECT PRESENTATION NORTHWEST OPEN SPACE COMMUNITY PARK (CIP 09209) March 22, 2016 FOR THE PROJECT PRESENTATION
City of San Juan Capistrano PROJECT PRESENTATION PROJECT PRESENTATION FOR THE NORTHWEST OPEN SPACE COMMUNITY PARK (CIP 09209) PLANNING COMMISSION 1 PROCESS & OBJECTIVES A. Develop a new Concept Plan for
More informationDaniels Park Master Plan
Daniels Park Master Plan Prepared for: Douglas County & The City and County of Denver October, 2007 EXHIBIT A Contents Daniels Park Overview 2 Project History & Goals 2-3 Regional Context Map 4 Park Zone
More informationCity of Los Angeles Department of Public Works
City of Los Angeles Department of Public Works Environmental Scoping Meeting for the Proposed Sixth Street Park, Arts, River & Connectivity Improvements (PARC) Project May 3, 2017 1 Agenda Introductions
More informationMetroParks Board Meeting 2018 Capital Improvement Projects
MetroParks Board Meeting 2018 Capital Improvement Projects Stephen L. Avery Planning & Operations Director Last Edited: 3.12.18 Presentation Outline MetroParks Mission Statement Strategic Master Plan MetroParks
More informationTOWN COUNCIL / PLANNING COMMISSION
Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011 Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L.
More informationBurrowing Owl Habitat Project at the Albany Plateau. (a component project of the Gilman Street Playing Fields Project City of Berkeley) March 10, 2006
Burrowing Owl Habitat Project at the Albany Plateau (a component project of the Gilman Street Playing Fields Project City of Berkeley) March 10, 2006 Submitted by The City of Berkeley Project history During
More informationARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET
A RROYO P ROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEARS 214-218 HAHAMONGNA Priority Description 1 Hahamongna Watershed Park - Implement Master Plan 211,6 211,6 (77565) 2 Hahamongna -
More informationCommunity Workshop. City of Richmond. January 25, 2011 SF Bay Trail Connection - Castro St to Richmond-San Rafael Bridge
Community Workshop City of Richmond 1 City of Richmond Lead Agency BPAC Richmond Community ABAG Design and Process Funding Partner Caltrans Environmental; Process Review Design Process State and Federal
More informationCITY OF SIMI VALLEY MEMORANDUM
CITY OF SIMI VALLEY MEMORANDUM AGENDA ITEM NO. Consent (3) August 15, 2016 TO: FROM: City Council Department of Public Works SUBJECT: ADOPTION OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO SOLICIT CONSTRUCTION
More informationLOCATION AND DESIGN DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Landscape Architecture Program NUMBER: SPECIFIC SUBJECT: Integration of Landscape
More informationCOMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING
COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING Subject: Recommendation Prepared by: PRELIMINARY DESIGN REVIEW OF LOCUST STREET BRIDGE CONSTRUCTION & COURT AVENUE,
More informationThe Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass
The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn
More informationPark Types and Attributes
02 APPENDIX B APPENDIX B s and s 194 APPENDIX B 04 Size Level of Service Any privately owned park, of any size, is a neighborhood park Primary Service Area - 1/2 mile or within 15 minutes walking distance
More informationConcluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).
Pelican Bay Community Improvement Plan Traffic,JI Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). D1 -A: Provide consistent signing, marking
More informationNew Brighton Park Shoreline Habitat Restoration Project
Vancouver Board of Parks and Recreation and Port Metro Vancouver New Brighton Park Shoreline Habitat Restoration Project Conceptual Design Public Consultation August 26 September 9, 2015 Discussion Paper
More informationJohnson Street Bridge Public Realm Update
Johnson Street Bridge Public Realm Update August 20, 2015 Background Johnson Street Bridge Replacement Project impacts a diverse range of stakeholders In addition to a new bridge, the project also includes
More informationGrand River Ravines Georgetown Township
Grand River Ravines Georgetown Township Project Description: The Grand River Ravines County Park property is composed of the 68-acre former Fillmore at the Bend Open Space purchased in 1999 and two more
More informationGYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015
GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado Schematic Design January 2015 1 2 3 4 5 6 7 8 9 DESIGN WORKSHOP Landscape Architecture Land Planning Urban Design Tourism Planning Asheville Aspen Austin
More informationWELCOME PG&E HUNTERS POINT COMMUNITY OPEN HOUSE THANK YOU FOR COMING PG&E
WELCOME PG&E HUNTERS POINT COMMUNITY OPEN HOUSE THANK YOU FOR COMING NEWHALL ST JENNINGS ST B SHORELINE I SHORELINE EVANS AVE J C/D MIDDLE POINT ROAD OPERATING SUBSTATION A SHORELINE H Remediation Complete
More informationBAY DRIVE PARK Questions and Answers
Q. How tall is the building near the beach and what will it look like? A. The Park Amenity Building is a two-story metal-roofed coquina-faced building with a restroom on the first floor and an observation
More informationCorridor Enhancements
Corridor Enhancements Safety is MoDOT s first priority in widening and rebuilding I-70 across the state of Missouri. MoDOT also understands that the interstate - and its interchanges and overpasses - are
More information2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015
AGENCY: 2016 REVISIONS COMMENT FORM Section Title Number Chapter 1 Introduction Comment 1.1 CDOT Mission Statement 1.2 Purpose of Rules and Regulations for Construction in the Public Way 1.3 Chicago Department
More informationKenilworth Station Art and Landscape Committee (KSALC) July 16, 2015
Kenilworth Station Art and Landscape Committee (KSALC) July 16, 2015 1 Today s Topics Welcome and Introductions Review Proposed Concepts in Development Upcoming Events/Next Steps Questions and Open Discussion
More informationGREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle
GREENING THE BOULEVARD Katherine Spitz Associates Inc. 4212½ Glencoe Avenue Marina Del Rey, CA 90292 310 574 4460 Fax 574 4462 January 2008 Table of Contents Overview Proposed Design Improvements Illustration
More informationMission Bay Park Master Plan Update: Fiesta Island Amendment (Information) Mission Bay Park Committee October 3, 2017
Mission Bay Park Master Plan Update: Fiesta Island Amendment (Information) Mission Bay Park Committee October 3, 2017 Tonight s Agenda Introduction & Project Overview Proposed Circulation Changes Overview
More informationStreet Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017
Street Flooding Mitigation Plan KYOVA Interstate Planning Commission Presented to AMPO National Conference October 18, 2017 Saleem Salameh, Ph.D., P.E., M.ASCE Chet Parsons, AICP CTP Agenda: Background
More informationThe open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..
The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. Mixed-use and infill development should maintain or enhance
More information1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails
Appendix A: Park Classifications The intent of parks and recreation classifications is to aid in making acquisition and design decisions for park sites, facilities and the organization of recreation space
More informationMaster Plan Objectives and Policies
Master Plan Objectives and Policies Introduction This chapter identifies the Park issues and recommended policies established by this Master Plan. The issues were identified through meetings with staff,
More informationFall Creek Greenway. Indy Greenways Master Plan
Fall Creek Greenway 168 Indy Greenways Master Plan chapter four DESIGN STANDARDS DESIGN STANDARDS 169 chapter four DESIGN STANDARDS inside this chapter: INTRODUCTION..............................................
More informationPLANNING AND NATURAL RESOURCES COMMITTEE. Public Access Conceptual Design Alternatives for the Red Barn Area of La Honda Creek Open Space Preserve
PLANNING AND NATURAL RESOURCES COMMITTEE R-17-56 May 9, 2017 AGENDA ITEM AGENDA ITEM 2 Public Access Conceptual Design Alternatives for the Red Barn Area of La Honda Creek Open Space Preserve GENERAL MANAGER
More informationPublic Meeting December 1 st, 2011
San Francisco Bay Trail Connection Castro Street to Richmond-San Rafael Bridge Public Meeting December 1 st, 2011 Architecture & Engineering Report Agenda Introductions & Opening Remarks Project Purpose
More informationFDOT D4 Complete Streets
FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,
More informationBENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION)
BENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION) COUNTY BOARD MEETING DECEMBER 16, 2017 County Board Consideration: Adopt the Benjamin Banneker Park Framework Plan and Design Guidelines Framework
More informationWelcome to the Sellwood Bridge Project Pre-Construction Open House
Welcome to the Sellwood Bridge Project Pre-Construction Open House 5:30 7:30 p.m. Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting
More informationThe Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies
Vision, Objectives & Strategies The is the public framework and guide for future development of the Grand Traverse Commons. The establishes public polices for infrastructure, the preservation of natural
More informationFort Ord Regional Trails Planning
Fort Ord Regional Trails Planning FORA Board July 11, 2014 Josh Metz, Associate Planner Overview Base Reuse Plan (BRP) trails planning context Trails planning in FORA jurisdictions and related entities
More informationCOASTAL CONSERVANCY. Staff Recommendation December 13, 2007 COASTAL TRAIL AT LAND S END. File No Project Manager: Joan Cardellino
COASTAL CONSERVANCY Staff Recommendation December 13, 2007 COASTAL TRAIL AT LAND S END File No. 07-086-01 Project Manager: Joan Cardellino RECOMMENDED ACTION: Authorization to disburse up to eight hundred
More information3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies
Vision Statement Queen Creek s interconnected network of parks, trails, open spaces and recreation opportunities provide safe and diverse activities and programs that sustain its unique, small town, equestrian
More informationFall 2017 Construction Update
Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,
More informationR STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist
R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist Applicant s Name: Project Address: Phone: Email: Applicant shall fill out the design guidelines checklist for
More informationSF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department
SF REC & PARK STANYAN STREET IMPROVEMENT COMMUNITY MEETING #3 THURSDAY, JANUARY 25 TH, 2018 Supervisor London Breed District 5 Project Manager Dan Mauer Recreation and Parks Department Design Team William
More information4.1 AESTHETICS Setting
4.1.1 Setting 4.1 AESTHETICS a. Overall Visual Character of the MBSST Network. The Master Plan corridor stretches the entire length of Santa Cruz County from the San Mateo County line north of Davenport
More informationCAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013
Office of Capital Planning and Development; 130 Oak Creek Building; Corvallis, Oregon 97331-2001 CPC STAFF REPORT: SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN
More informationMaster Plan Workshop October 25, 2007 Charlotte Mecklenburg Government Center
Master Plan Workshop October 25, 2007 Charlotte Mecklenburg Government Center Land Discussion 1. What are the most important land related issues we need to address? Protect natural areas Passive walking
More informationAppendix C Park Design Guidelines
Appendix C Park Design Guidelines The following guidelines apply to the design of parks, open space areas and trails in Talent. These guidelines are based on the need for safe, easily maintained spaces,
More informationArana Gulch Park Master Plan
809 Center Street, Santa Cruz, CA 95060 Arana Gulch Park Master Plan Executive Summary The Arana Gulch Master Plan completes the last master planning work for the parks and open spaces within the City
More informationSF REC & PARK MOSCONE RECREATION CENTER: EAST SITE. Supervisor Mark Farrell District 2. Project Manager Dan Mauer Recreation and Parks Department
SF REC & PARK MOSCONE RECREATION CENTER: EAST SITE COMMUNITY WORKSHOP: MEETING #3 WEDNESDAY, FEBRUARY 10, 2016 Supervisor Mark Farrell District 2 Project Manager Dan Mauer Recreation and Parks Department
More informationCURL CURL BEACH LANDSCAPE DRAFT MASTERPLAN
LANDSCAPE 03 04 05 07 06 08 LANDSCAPE KEY BENEFITS OPEN SPACE EXISTING = 25600m2 PROPOSED = 29000m2 NATURAL/LANDSCAPED AREA EXISTING = 36200m2 PROPOSED = 38450m2 PARKING SPACES MAIN CAR PARK EXISTING =
More informationPipeline Trail Master Plan Preliminary Concept Design. O Connor Mokrycke Consultants May 14, 2015 meeting
Pipeline Trail Master Plan Preliminary Concept Design O Connor Mokrycke Consultants May 14, 2015 meeting 1 Purpose of the Meeting: - Share information regarding traffic studies - Present ideas arising
More informationPreliminary Sketch Plan for Fort Hunter Park
Preliminary Sketch Plan for Fort Hunter Park Public Presentation November 19, 2009 Dauphin County Parks and Recreation 100 Fort Hunter Road Harrisburg, PA 17110 (717) 599-5188 www.dauphinc.org THOMAS COMITTA
More informationSouth Bend Park. Visioning Plan
South Bend Park Visioning Plan 2007 South Bend Park, Visioning Program, Executive Summary The South Bend Park Visioning Program began with the receipt of an application from the Friends of South Bend Park,
More informationNOTICE OF PREPARATION
NOTICE OF PREPARATION To: All Interested Parties Subject: Notice of Preparation of an Environmental Impact Report From: City of Petaluma Address: 11 English Street, Petaluma, CA 94952-2610 Contact: Heather
More informationBUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5
VISION STATEMENT 3 UTILIZATION OF THE GUIDELINES 3 IMPLEMENTATION 3 PROCEDURES FOR DESIGN REVIEW 3 LAND USE AND ZONING 4 LAND USE 4 ELEMENTS:... 4 ZONING 4 ELEMENTS:... 4 BUILDING SCALE AND SETBACKS 5
More informationWoods Chapel Park. Park Amenities: Playground, basketball court, single table shelter, small pond and multi-use trail.
Woods Chapel Park Park Location: 3925 NW Dogwood Park Land Established: 1979 Park Size: 10 acres Developed Acres: 6 acres Undeveloped Acres: 4 acres Park Type: Neighborhood Park Amenities: Playground,
More informationCottage Grove Road Reconstruction. City of Madison Engineering
Public Informational Meeting Cottage Grove Road Reconstruction October 8, 2015 Presentation Outline Introduction Project Purpose & Need Proposed Design Overview Environmental Concerns Pedestrian Needs
More informationBARD COLLEGE REGIONAL GREEN INFRASTRUCTURE DEMONSTRATION PROJECT A Case Study Addressing Stormwater Management for a Small Watershed
BARD COLLEGE REGIONAL GREEN INFRASTRUCTURE DEMONSTRATION PROJECT A Case Study Addressing Stormwater Management for a Small Watershed Presenter: Barbara Z. Restaino, RLA, ASLA Restaino Design Landscape
More informationPedestrian Trails Within Regulated Areas
New Jersey Department of Environmental Protection Pedestrian Trails Within Regulated Areas Joslin Tamagno, Environmental Specialist Division of Land Use Regulation, Bureau of Inland Regulation www.nj.gov/dep/landuse
More informationPG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER
PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER CEQA scoping Meeting March 19 th, 2014 Winters City Council Chambers - 6:30 pm AGENDA FOR THE MEETING 6:30 Welcome (John Donlevy) 6:40 Overview
More informationRoute 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347
The GREENING of Route 347 The Greening of Route 347 The Greening of Route 347: History 3 The Greening of Route 347 4 The Greening of Route 347 5 The Greening of Route 347 Smith Haven Mall 6 The Greening
More informationOpen House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK
Open House 10.12.16 RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK MEETING AGENDA Great Rivers Greenway and Project Partners River des Peres Greenway Overview Project
More informationNavarre Town Center Plan. Prepared for the December 4, 2013 meeting of Navarre Inc.
Navarre Town Center Plan Prepared for the December 4, 2013 meeting of Navarre Inc. N T C What is it? A plan. Created in 2004. Community-driven. Topic Areas: Land Use Infrastructure Landscaping Architecture
More informationWhirlwind Beach Neighborhood Meeting No.2
Whirlwind Beach Neighborhood Meeting No.2 August 20, 2015 Gina Gobo Austin, Project Engineer City of Bellingham Parks and Recreation Design and Development Division 1 Topics for Tonight Current status
More informationPennsy Greenway Trail
Town of Schererville Pennsy Greenway Trail DES. #s: 0401062, 1173595 & 1382661 Construction of Pennsy Greenway Trail beginning at Wilhelm Street and continuing northwest along the former Penn Central railroad
More informationMADISON MANOR PARK RENOVATIONS
MADISON MANOR PARK RENOVATIONS COMMUNITY KICK-OFF MEETING MINUTES To: Wilfredo Calderon, Steven Torgerson (AMT), Tom Mitchler, Kevin Stalica, Vincent Verweij, Greg Anselene, Chris Willett, Peter Alchin,
More informationMunicipality of Anchorage, Alaska Parks & Recreation Department
Municipality of Anchorage, Alaska Parks & Recreation Department 632 W. 6 th Avenue, Suite 630 P.O. Box 196650 Anchorage, AK 99519 Tel 907-343-4355 URL www.muni.org/departments/parks MEMORANDUM Date: October
More informationToday We re Talking About:
Today We re Talking About: 4 Street S.E. to Highfield 160 AVENUE N Station (Above Grade and 144 AVENUE N At Grade Stations) NORTH POINTE 4 Street S.E. in the Beltline TUSCANY 96 AVENUE N BEDDINGTON SADDLETOWNE
More informationMichigan State University Barrier-Free/Accessibility Project Status Summary March 2017
Projects Completed FY14, FY15 and FY16 (arranged alphabetically) Abrams Planetarium Install automatic door opener on main doors of the Planetarium. Completed: Summer 2016 Cost: $13,000 Akers Hall Renovations
More informationUnion Station Master Plan Task 2 Briefing
Union Station Master Plan Task 2 Briefing Goals and Organization for Tonight s Meeting Presentation Master Plan Schedule and Scope Key Findings Guiding Principles Alternatives Process Draft Alternatives
More informationACADEMY AREA CONCEPT PLAN
ACADEMY AREA Strip ling C hape l Roa d CONCEPT PLAN 7 S2 U Stripling 52 ROADWAYS AND PARKING: ADVENTURE PLAYGROUND AND SPRAYGROUND: Current roadways follow existing drives. It is recommended that the Folds
More information4.1 AESTHETICS AND VISUAL QUALITY
SCOPE AND METHODOLOGY 4.1 AESTHETICS AND VISUAL QUALITY This section evaluates the potential impacts to aesthetics and visual quality. Aesthetics refers to visual resources and the quality of what can
More informationCentury Park to Ellerslie Road Preliminary Engineering
Century Park to Ellerslie Road Preliminary Engineering South LRT Extension Stakeholder Information Panel Brochure March 2010 www.edmonton.ca/lrtprojects LRT Station (left) and Transit Centre Architectural
More informationCoyote Hills Restoration and Public Access Project Coyote Hills Regional Park C o n c e p t P l a n a n d S i t e P r o g r a m
Coyote Hills Restoration and Public Access Project Coyote Hills Regional Park C o n c e p t P l a n a n d S i t e P r o g r a m Chris Barton Environmental Programs Manager Aquisition Stewardship Development
More informationVEHICULAR AND PEDESTRIAN CIRCULATION
This perspective sketch communicates the intended character and quality of a proposed streetscape design. Locate benches near a major intersection where people tend to gather. Seating and lighting provide
More information4/8/2015 Item #10D Page 1
MEETING DATE: April 8, 2015 PREPARED BY: Christy Villa, Associate Civil Engineer DEPT. DIRECTOR: Glenn Pruim DEPARTMENT: Public Works CITY MANAGER: Larry Watt SUBJECT: NORTH COAST HIGHWAY 101 STREETSCAPE
More informationAbingdon Urban Path System
Abingdon Urban Path System Transportation Enhancement Program Application (FY 2012-2013) Submitted by: Town of Abingdon,Virginia P. O. Box 789 133 West Main Street Abingdon, VA, 24212 November 1, 2011
More informationAPPENDIX I: GREENWAY DESIGN STANDARDS
APPENDIX I: GREENWAY DESIGN STANDARDS The goal of this report is to develop a palette of standard design elements that will help establish a distinct identify for the Bronx River Greenway. The greenway
More informationAESTHETIC APPEARANCE. Design Guidelines for Grade-Separated Pedestrian, Cyclist and Equestrian Structures
III. AESTHETIC APPEARANCE The aesthetic qualities of a grade-separated structure are as important as the specific design criteria. For example, a structure may be constructed to the exact criteria set
More information1.0 Circulation Element
5/9/18 1.0 Circulation Element 1.1 Introduction As growth and development occur in Apache County, enhancements to its circulation system will be necessary. With time, more roads will be paved and air and
More informationMaplewood Avenue Downtown Complete Street Project
Maplewood Avenue Downtown Complete Street Project Second Public Meeting January 24, 2018 Welcome and Introduction of Project Team City Planning and Public Works Staff City of Portsmouth Juliet Walker Planning
More informationCharles P. Johnson and Associates. Annapolis Landscape Architects
Charles P. Johnson and Associates Annapolis Landscape Architects AGENDA Introduction Project Limits and Scope Site Analysis Opportunities & Constraints Program Goals Image Boards Design Alternatives Pros
More informationChain Bridge Road Sidewalk Improvements Citizen Council Work Session
Chain Bridge Road Sidewalk Improvements Citizen Council Work Session May 10, 2016 Project Location 2 Project Objectives Provide a continuous pedestrian facility (sidewalk) connection from Downtown City
More informationNuts and Bolts (or Gravel and Asphalt) of the Main Street Project
Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project What is the Main Street Project? The Main Street Project is a roadway project that addresses pavement, infrastructure and safety issues
More informationParapet/Formliner/Fencing
Parapet/Formliner/Fencing Cross Parapet/Formliner/Fencing Street Aesthetic Features Context The I-290 Phase I study is evaluating improvements along 13 miles of the Eisenhower Expressway, from west of
More informationGreen Streets and Green Infrastructure Planning A Tale of Two Cities: San Mateo and Emeryville
Green Streets and Green Infrastructure Planning A Tale of Two Cities: San Mateo and Emeryville SCVURPPP Annual C3 Workshop June 4, 2014 Peter Schultze-Allen, EOA Presentation Overview Goals/Incentives
More informationP A R K L E T 2016 PILOT PROJECT
GRAND FORKS, NORTH DAKOTA P A R K L E T 2016 PILOT PROJECT City of Grand Forks Planning & Community Development Department LIVE, LEARN, WORK, PLAY, AND STAY The purpose of the Grand Forks Parklet Application
More informationRingsend & Irishtown Local Environmental Improvement Plan
Ringsend & Irishtown Local Environmental Improvement Plan Study Area East Link Bridge St. Patrick s Boat Club Ringsend Technical Institute Stella Maris Boat Club St. Patrick s Church Ringsend Library Ringsend
More informationPoint Defiance Park. Master Plan Update. April 23 rd 2015
Point Defiance Park Master Plan Update April 23 rd 2015 Public Participation 1/29, 2/26, 3/26 & 4/23 Tonight s Agenda: Introduction: March Meeting Recap: Overview Feedback Responses Presentation of Master
More informationPreferred Riverwalk Alternative Components August 17, 2017:
Preferred Riverwalk Alternative Components August 17, 2017: 1. Entrance and Future Pump Station Location: Entrance location to line up with main parking entrance to Captain Parkers and allows future Pump
More informationStewardship. Streamlining. Consensus
Stewardship Streamlining Consensus Translating Section 106: Building Consensus among Multiple Responsible Parties For the Doyle Drive Replacement Project in the Presidio of San Francisco National Historic
More informationNob Hill Pipeline Improvements Project EIR
Section 3.1 Aesthetics This section addresses the visual aspects that may affect the views experienced by the public, including the potential to impact the existing character of each area that comprises
More information3.0 master plan concept
3.0 master plan concept 3.1 introduction The purpose of the Huron Church Road Master Plan Concept is to provide an overview of the Master Plan design process, identify preliminary streetscape installations
More informationThe McCoppin Hub. Boor Bridges Architecture
The McCoppin Hub Boor Bridges Architecture Comments on the Original Concept: - Unify - explore means of making the layout feel less broken up and compartmentalized. Suggestions include: remove one level
More informationMARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012
MARINA BAY NEIGHBORHOOD PRESENTATION City of Richmond Officer Bradley A. Moody Memorial Underpass April 11, 2012 TEAM INTRODUCTIONS Project Oversight and Approval City of Richmond Formally Richmond Community
More informationCity of Langford Green Development Checklist
City of Langford Green Development Checklist The following Green Development Checklist creates a sustainability standard for all comprehensive development within the City of Langford. The commitments made
More informationBISCUIT RUN PARK MASTER PLAN
BOARD OF SUPERVISORS November 14, 2018 BISCUIT RUN PARK MASTER PLAN COUNTY OF ALBEMARLE ANHOLD ASSOCIATES Contents Project Introduction Property Background County Park Planning Process Existing Site &