US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007

Size: px
Start display at page:

Download "US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007"

Transcription

1 US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007 Sponsored by: The Ohio Department of Transportation and The City of Defiance

2 Project Consulting Engineers The Mannik & Smith Group MSG Partner in Charge C. Michael Smith, P.E. Project Manager Jean Hartline, P.E. Transportation Planner Patrick Etchie, A.I.C.P. Chief Roadway Designer Christopher Beaulieu, P.E. Chief Structural Designer Christopher Homan, P.E.

3 Ohio Department of Transportation Project Manager Kirk Slusher, P.E. Bridge Engineer - James Clark, P.E. Engineering Administrator - Dan Kaseman, P.E. Environmental Engineering Clark Nash P.E. Real Estate Administrator - Michelle Miller Public Information Rhonda Pees

4 Project Overview

5 Local Highway Planning

6 Our Purpose Today 1. Review Project History 2. Review and Refine Project Objectives 3. Identify Project Schedule and Funding Sources 4. Obtain Public Input

7 Project Background Identified by Local Leaders as an area of concern due to congestion, safety, and continued land developments. On ODOT s Hot Spot Listing for Crashes Sandwiched between two segments of the multi-million dollar US 24 Fort to Port Projects

8 Project History ODOT SR 66 Corridor Capacity Study 2000 City Strategic Plan 2003 Interchange Modification Study 2004 Received Federal Earmark 2005 Highway Bill Commencement of Preliminary Engineering

9 Why are we doing this project? 1. Provide Structural Upgrade of Bridge 2. Improve Traffic Flow 3. Improve Safety 4. Improve US 24 Pavement

10 1. Structural Upgrade of the Bridge Bridge has poor structural rating Inadequate clearance (14 3 with 17 preferred) 2-lane width is not adequate for the traffic demands

11 2. Improve Traffic Flow Poor Traffic Flow due to: 2 Lane Bridge pinch point Volume of Traffic Several Traffic Signals Private Drive Access

12 3. Improve Safety Safety Hot Spot List Crash Rate of 5.55 crash rate (per 100 million vehicle miles traveled) is higher the state average of 1.21 Crashes Rear End Right Angle Turning Other

13 4. US 24 Pavement Performance Pavement Evaluation noted need to for pavement rehabilitation by 2010 Provide pavement structure consistent with adjacent Fort to Port projects

14 Proposed Project 1. Bridge Improvements 2. Interchange Improvements 3. Improve US 24 Pavement 4. Increase Safety and Reduce Congestion 5. Aesthetic Improvements

15 Improvement Scenario 1. Bridge Improvements 2. Interchange Improvements 3. US 24 Pavement Improvements Corridor Improvements 4. Safety and Congestion Improvements 5. Aesthetic Improvements

16 1. Bridge Improvements Improve bridge structure with bridge rehabilitation or replacement Widen bridge to five lanes to eliminate pinch point Improve bridge clearance to US 24 from existing 14 3 inches to 17 feet (raise SR 66, lower US 24 or a combination of both) Aesthetic Theme to Benchmark the SR 66 Corridor as a Gate Way

17 Sample Bridges Findlay Tuttle Crossing Columbus Findlay Possible Defiance Theme

18 Sample Bridges

19 2. Interchange Improvements Capacity Improvements with Lane Additions to Off Ramps at SR 66 to provide 2 lane off ramps Signal Improvements Provide required 600 foot Limited Access Right-of-way at interchange Signing Improvements

20 3. US 24 Pavement Reconstruction/Rehabilitation Reconstruct US 24 pavement between the two adjacent Fort to Port Projects

21 4. Corridor Improvements Updating the Character of North Clinton Street (SR 66) Through: Safety and Congestion Improvements Widening to 5 lanes Turn Lane Improvements Corner Radii Improvements Signal Improvements Signing Improvements Aesthetic Improvements Gateway Theme Concrete Treatments Interchange Area Landscaping Mast Arm Signal Poles

22 5. Corridor Aesthetics Color and Texture Landscaping Gateway Theme Improving the Character of the N. Clinton St. Signals and Sign

23 Project Schedule Preliminary Engineering Detailed Engineering Right of Way Acquisition Project Bidding Construction Project Completion May 2006 Feb 2007 March 2007 Dec Early 2010 Spring 2010 Fall 2010

24 Project Funding Interchange Modification and Bridge Widening 80% State/Federal & 20% Local US 24 Pavement Replacement 100% State/Federal Corridor Improvements Small City and Safety Funds with 10-20% Local match Preliminary Project Cost estimate is between $12 Million and $14 Million

25 Public Involvement = Project Success 1. Stakeholder Meeting December Public Open House December 2007

26 Comment Sheet Provided in your handout Include your name and address (we can t respond to your questions/comments without it) Form can be left with us today, mailed, faxed or ed. Comments required by December 13th

27 What we want to know. Have we given you enough information? Is there additional project needs that we should address with this project? Do you need more information on the Alternatives? Is there a project impact to your business that we should be aware of? Do you have a business operational need that we should be aware of?

28 Thank you! Questions?

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary Executive Summary Background As congestion continues to affect mobility in the region, the Ozarks Transportation Organization (OTO) is particularly concerned with traffic movement. The North-South Corridor

More information

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

I-70/71 Innerbelt Project

I-70/71 Innerbelt Project I-70/71 Innerbelt Project Project Progress Meeting and Design Enhancement Update November 9, 2009 Ohio Department of Transportation MS Consultants MSI Design Overview of Presentation 1. Recap Recent Project

More information

Congestion Management Safety Plan. Michael Corbett State Program Administrator September 2017

Congestion Management Safety Plan. Michael Corbett State Program Administrator September 2017 Congestion Management Safety Plan Michael Corbett State Program Administrator September 2017 Agenda Topic 1 What is the Congestion Management Safety Plan (CMSP)? 2 Relevance to Congestion Investments 3

More information

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING I-66 EASTBOUND WIDENING INSIDE THE BELTWAY From the Dulles Connector Road (Route 267) to Fairfax Drive (Route 237) PARDON OUR DUST MEETING Bill Cuttler, PE (VDOT District Construction Engineer, Northern

More information

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015 St. Laurent Transit Improvements Innes / Industrial to Smyth Public Information Session December 2, 2015 Agenda Introduction Project Background Preliminary Design Widening for transit lanes Roadway resurfacing

More information

Cottage Grove Road Reconstruction. City of Madison Engineering

Cottage Grove Road Reconstruction. City of Madison Engineering Public Informational Meeting Cottage Grove Road Reconstruction October 8, 2015 Presentation Outline Introduction Project Purpose & Need Proposed Design Overview Environmental Concerns Pedestrian Needs

More information

I-90 Mississippi River Bridge & Interchange Project

I-90 Mississippi River Bridge & Interchange Project I-90 Mississippi River Bridge & Interchange Project Presentation Outline I. Background: Context & Need for Project II. Preferred Alternative Overview III. Project Development IV. Project Management Tools

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

AGENDA ACTION ITEMS INFORMATION ITEMS

AGENDA ACTION ITEMS INFORMATION ITEMS NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION

More information

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project

More information

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING Subject: Recommendation Prepared by: PRELIMINARY DESIGN REVIEW OF LOCUST STREET BRIDGE CONSTRUCTION & COURT AVENUE,

More information

FDOT D4 Complete Streets

FDOT D4 Complete Streets FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,

More information

The Ambassador Bridge/ Gateway Project

The Ambassador Bridge/ Gateway Project The Ambassador Bridge/ Gateway Project Connecting Neighbors & Driving the Economy 2008 Ohio Conference on Freight Given by the Toledo Metropolitan Area Council of Governments, National Association of Regional

More information

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee Memorandum DATE January 23, 2019 CITY OF DALLAS TO Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee SUBJECT I-30 East Project Update On Monday, January 28, 2019,

More information

New Stanton Project Update July 3, 2012

New Stanton Project Update July 3, 2012 New Stanton Project Update July 3, 2012 The Needs BACKGROUND INFO I-70 Geometric Concerns Substandard Horizontal & Vertical Clearance at Center Ave. Bridge (The Center Avenue Bridge is Replaced in all

More information

Project Overview. Get Involved. Public Information Meeting. Contact Information

Project Overview. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project OHIO DEPARTMENT OF TRANSPORTATION DISTRICT 6 400 EAST WILLIAM STREET DELAWARE, OHIO 43015 800.372.7714 Columbus City Council City Hall 90 West Broad Street Columbus, OH 43215-9015 RE: I-70/71 Columbus

More information

Parapet/Formliner/Fencing

Parapet/Formliner/Fencing Parapet/Formliner/Fencing Cross Parapet/Formliner/Fencing Street Aesthetic Features Context The I-290 Phase I study is evaluating improvements along 13 miles of the Eisenhower Expressway, from west of

More information

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below: Race Road/Jessup Village Planning Study (H550601) Project Newsletter Spring 2015 Project Description The Study Team, consisting of staff from Anne Arundel County (Department of Public Works and Department

More information

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014 IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014 INTRODUCTION The City of Cedar Falls and the Iowa Department of Transportation are conducting a Public Informational

More information

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY SEPTEMBER 2016 Introduction The Platteview Road Corridor Study was led by the Metropolitan Area Planning Agency (MAPA) with assistance from

More information

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017 Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year

More information

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m. Public Hearing Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, 2019 open house at 4 p.m., formal presentation at 5 p.m. Welcome to the Public Hearing for the Harborview Road (CR 776)

More information

SUMMARY Downtown Malabar Meeting on July 30, 2013 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study

SUMMARY Downtown Malabar Meeting on July 30, 2013 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study SUMMARY Downtown Malabar Meeting on July 30, 2013 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study www.sr514malabar.com LOCATION: TIME: ATTENDEES: Malabar Town Hall 2725

More information

Southern Gateway Project and Public Green

Southern Gateway Project and Public Green Southern Gateway Project and Public Green Transportation and Trinity River Project Committee May 23, 2016 Purpose of Presentation Provide the history and an overview of the Southern Gateway Project (SGP)

More information

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B Public Meeting US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B Mark Leiferman Chief Road Design Engineer April 28, 2014 Why

More information

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204 DISTRICT TWO PUBLIC HEARING I 10 (SR 8) from I 295 to I 95 Project Development & Environment Study Duval County, Florida Financial Project Number 213326 2 22 01 Efficient Transportation Decision Making

More information

5.0 IMPLEMENTATION STRATEGIES

5.0 IMPLEMENTATION STRATEGIES 5.0 IMPLEMENTATION STRATEGIES 5.1 Recommended Alternative This chapter discusses the anticipated steps needed to move each project from recommendation to construction. Since full funding for these alternatives

More information

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation State Highway 121 Southwest Parkway Fort Worth s Transportation Success Story in Design and Cooperation Greater Fort Worth Association of Realtors October 24, 2007 Presented by: Dan Lamers, P.E. North

More information

Fairfax County Parkway (Route 286) Widening Project

Fairfax County Parkway (Route 286) Widening Project Fairfax County Parkway (Route 286) Widening Project Route 29 (Lee Highway) to Route 123 (Ox Road) State Project No. 0286-029-259, P101; UPC 107937 Fairfax Station HOA Meeting January 30, 2018 7:00 to 9:00

More information

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity

More information

SR 916/NW/NE 135 Street Public Hearing

SR 916/NW/NE 135 Street Public Hearing Florida Department of TRANSPORTATION SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project From NW 6 Avenue to west of SR 5/Biscayne Boulevard FM #429346-1-52-01

More information

US 95 Phase 2B/5 Open House

US 95 Phase 2B/5 Open House US 95 Phase 2B/5 Open House www.us95nw.com Wednesday, Mountain Crest Community Center 4701 N Durango Drive Las Vegas, NV 89129 Brian Sandoval Governor Rudy Malfabon Director Nevada Department of Transportation

More information

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director 2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director 1 Jefferson County, Missouri Road and Bridge Sales Tax: Jefferson County has a one-half cent sales tax that

More information

Highway & Bridge Capabilities

Highway & Bridge Capabilities Highway & Bridge Capabilities Part of a diversified family of solutions www.jmt.com An Employee Owned Company I-95/I-295/I-495 Interchange, Woodrow Wilson Memorial Bridge, Prince George s County, MD Our

More information

Capital Projects in and near Odenton Town Center

Capital Projects in and near Odenton Town Center Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately

More information

Route 1 Corridor Study

Route 1 Corridor Study Route 1 Corridor Study Westbrook, Connecticut A Vision for the Connecticut Shoreline Public Informational Meeting July 28, 2015 Lower Connecticut River Valley Council of Governments Fitzgerald & Halliday,

More information

foi"#'.w County Road Needs Report i*"-i"s;a,i=?;;,#'1 County udges' Association of Arkansas 20L7 Annual Winter Meeting le0isrtnet tta shsl201-7

foi#'.w County Road Needs Report i*-is;a,i=?;;,#'1 County udges' Association of Arkansas 20L7 Annual Winter Meeting le0isrtnet tta shsl201-7 FLOOD PLAIN SERVICES County Road Needs Report County udges' Association of Arkansas 20L7 Annual Winter Meeting Thomas F. Black, P.E., CFM shsl201-7 i*"-i"s;a,i=?;;,#'1 tta le0isrtnet foi"#'.w Flood Plain

More information

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, 2013 Our Perspective Broward Fort Lauderdale 1 Broward Metropolitan Planning Organization Fort Lauderdale Fort Lauderdale Skyline

More information

I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010

I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010 I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010 I-75/I-475 Interchange Upgrade Project David R. Dysard, AICP District Two Deputy Director Theresa Pollick Public Information

More information

4.1 Build Alternative 1 Construction Phasing

4.1 Build Alternative 1 Construction Phasing SECTION 4 Implementation Plan This section discusses potential segmentation of the build alternatives into multiple projects for implementation of improvements to the NSH from Rabbit Creek Road to 36th

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018 I-4 Beyond the Ultimate Florida Transportation Builders Association February 9, 2018 FDOT: Improving Mobility & Safety in Central Florida FDOT is Designing and building a better I-4 through Central Florida

More information

TENNESSEE STATE ROUTE 109 CORRIDOR MANAGEMENT AGREEMENT MEMORANDUM OF UNDERSTANDING CORRIDOR MANAGEMENT ALONG STATE ROUTE 109

TENNESSEE STATE ROUTE 109 CORRIDOR MANAGEMENT AGREEMENT MEMORANDUM OF UNDERSTANDING CORRIDOR MANAGEMENT ALONG STATE ROUTE 109 TENNESSEE STATE ROUTE 109 CORRIDOR MANAGEMENT AGREEMENT MEMORANDUM OF UNDERSTANDING CORRIDOR MANAGEMENT ALONG STATE ROUTE 109 I. Purpose The purpose of this Agreement is to provide a framework for the

More information

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: Welcome Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: - Review Environmental Assessment - Share Preferred Alternative -Receive Public Comments 2003 EA Preferred Alternative

More information

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting Rosecrans/Marquardt Grade Separation Project Community Open House Meeting October 17, 2017 Rosecrans/Marquardt Presentation Agenda 1. Welcome Remarks & Introductions 2. Community Outreach 3. Project Goals

More information

Highway 100 / The Grandview Green Feasibility Study

Highway 100 / The Grandview Green Feasibility Study Highway 100 / The Grandview Green Feasibility Study Request for Funding Support January 26, 2016 Executive Summary The City of Edina requests support to investigate the feasibility of constructing a public

More information

Borderland Expressway Coalition Status Report Camino Real RMA Board Meeting. El Paso, TX April 11, 2018

Borderland Expressway Coalition Status Report Camino Real RMA Board Meeting. El Paso, TX April 11, 2018 Borderland Expressway Coalition Status Report Camino Real RMA Board Meeting El Paso, TX April 11, 2018 Coalition Key Stakeholders Texas Department of Transportation New Mexico Department of Transportation

More information

Welcome & Introductions

Welcome & Introductions Creating a Pedestrian Friendly Street American Public Works Association: 2009 Congress Session 4791 September 16, 2009 Welcome & Introductions Doug Roberts, P.E. Transportation Design Section Manager City

More information

SR 15 SECTION 088 CSVT SOUTHERN SECTION PUBLIC MEETING JUNE 16, 2015

SR 15 SECTION 088 CSVT SOUTHERN SECTION PUBLIC MEETING JUNE 16, 2015 PUBLIC MEETING JUNE 16, 2015 AGENDA PROJECT HISTORY NORTHERN SECTION UPDATE SOUTHERN SECTION OVERVIEW INTERCHANGES PROJECT SCHEDULE UPCOMING ACTIVITIES OPEN DISCUSSION & GROUP QUESTIONS ONE-ON-ONE QUESTIONS

More information

South Davis County COMMUNITY SPOTLIGHT

South Davis County COMMUNITY SPOTLIGHT South Davis County COMMUNITY SPOTLIGHT Davis/SLC Community Connector Bus Rapid Transit line connecting SLC & Davis County RTP Phase 1 Project Generate 3,100 average weekday riders Relieve congestion on

More information

Request for Proposal

Request for Proposal Request for Proposal 10 th Street Corridor Master Plan Department of Planning and Zoning 500 Quartermaster Court Suite 200 Jeffersonville, IN 47130 April 18, 2017 For further information contact: Chad

More information

Mississippi Skyway Preliminary Engineering Report

Mississippi Skyway Preliminary Engineering Report EXECUTIVE SUMMARY Mississippi Skyway Preliminary Engineering Report CITY OF RAMSEY, MINNESOTA DECEMBER 2014 City of RAMSEY EXECUTIVE SUMMARY Project Need and Intent The Mississippi Skyway pedestrian bridge

More information

Mavis Road Class Environmental Assessment

Mavis Road Class Environmental Assessment Mavis Road Class Environmental Assessment Public Information Centre #2 Wednesday November 9, 2016 6:00 to 8:00 p.m. Please sign in and complete a comment sheet Review the displays on your own or join in

More information

4/8/2015 Item #10D Page 1

4/8/2015 Item #10D Page 1 MEETING DATE: April 8, 2015 PREPARED BY: Christy Villa, Associate Civil Engineer DEPT. DIRECTOR: Glenn Pruim DEPARTMENT: Public Works CITY MANAGER: Larry Watt SUBJECT: NORTH COAST HIGHWAY 101 STREETSCAPE

More information

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation. We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation. We will provide you information on the overall project and

More information

Bucks Bar Road Bridge Project Public Informational Meeting Wednesday, January 6, 2010

Bucks Bar Road Bridge Project Public Informational Meeting Wednesday, January 6, 2010 PRESENTED BY: Bucks Bar Road Bridge Project Public Informational Meeting Wednesday, January 6, 2010 Matthew Smeltzer, P.E. Deputy Director of Engineering, DOT Supervisor Ray Nutting El Dorado County, District

More information

Constructing PCCP Under High Traffic Volume

Constructing PCCP Under High Traffic Volume Constructing PCCP Under High Traffic Volume THE LANE CONSTRUCTION CORPORATION Jim Seybert Casey Hurley PE, PLS November 18, 2016 Agenda Lane Experience Challenges Access Design Elements Staging of Construction

More information

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION AASHTO SUBCOMMITTEE ON DESIGN June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION CENTRAL FLORIDA INTERSTATE 4 FACTS Trucks and Others 12% Tourist

More information

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

North Carolina Department of Transportation Project Development and Environmental Analysis Branch North Carolina Department of Transportation Project Development and Environmental Analysis Branch Citizens Informational Workshop I-85, from I-485 to NC 73 Mecklenburg and Cabarrus Counties October 30,

More information

Route 9 Gateway Project. October 9, 2014 Informational Meeting

Route 9 Gateway Project. October 9, 2014 Informational Meeting Route 9 Gateway Project NYS DOT P.I.N. 1759.67 Town of Lake George, New York October 9, 2014 Informational Meeting Open House 3:00-3:30 Presentation 3:30-4:15 Introductions Town Representatives Dennis

More information

I-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280

I-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280 I-25 / Rio Bravo Interchange TONIGHT S MEETING SCHEDULE OPEN HOUSE 6:00 PM TO 6:30 PM PRESENTATION BEGINS AT 6:30 PM Q & A FOLLOWING PRESENTATION CN A300280 / PNA300280 I-25 / Rio Bravo Interchange THIRD

More information

Building Great Neighbourhoods. Strathcona

Building Great Neighbourhoods. Strathcona Building Great Neighbourhoods Strathcona March 21, 2018 Becky Redford Project Manager, Planning & Design Building Great Neighbourhoods Integrated Infrastructure Services Welcome and Purpose To provide

More information

A Connected Region for Our Future. Tampa Bay Regional Planning Council

A Connected Region for Our Future. Tampa Bay Regional Planning Council A Connected Region for Our Future Tampa Bay Regional Planning Council TBARTA Vision A world class transportation network for the Tampa Bay region that will connect people and places, move goods and services,

More information

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222 PD&E STUDY SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # 435808-1-22-02 ETDM 14222 WELCOME TO THE KICK-OFF MEETING May 24, 2016 1 1 2 3 4 5 6 PLANNING PROJECT DEVELOPMENT AND ENVIRONMENT

More information

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future

More information

TRANSPORTATION COMMITTEE

TRANSPORTATION COMMITTEE TRANSPORTATION COMMITTEE CITY OF OTTAWA Ministry of Transportation Detailed Design Assignment G.W.P.# 4058-01-00 Highway 417 (Ottawa Queensway) Widening & Rehabilitation from Maitland Avenue to Island

More information

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Carteret Industrial Road 98547 This project will address the upgrade of Carteret Industrial Road. The federal Transportation Equity Act for the 21st Century (TEA-21) provided funding for this project under

More information

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016 Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment May 5, 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service

More information

WELCOME TO OPEN HOUSE TWO November 28, 2018

WELCOME TO OPEN HOUSE TWO November 28, 2018 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting

More information

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights ANCHORAGE PARKS & RECREATION Nichols Park Design and improve neighborhood park 2008 Challenge Grant applicant. 2008 $500K State Grant for Neighborhood Parks. Tikishla Park Lighting, paved parking, hockey

More information

FDOT/FTBA Construction Conference Work Plan

FDOT/FTBA Construction Conference Work Plan FDOT/FTBA Construction Conference 19 2019 2023 Work Plan Ben Dreiling, P.E., Director of Construction Central Florida Expressway Authority January 18, 2019 Major Projects Map FY 2019-2023 Work Plan 2 FY

More information

6:00 8:00 PM I-95 FROM EXIT 57 TO EXIT 60 PROJECT

6:00 8:00 PM I-95 FROM EXIT 57 TO EXIT 60 PROJECT PUBLIC INFORMATIONAL MEETING TUESDAY, APRIL 27, 2010 AT NEWBURYPORT CITY HALL, AUDITORIUM 60 PLEASANT STREET NEWBURYPORT, MASSACHUSETTS 6:00 8:00 PM FOR THE PROPOSED WHITTIER BRIDGE / I-95 IMPROVEMENTS

More information

A Claustrophobic Corridor Grows Up

A Claustrophobic Corridor Grows Up A Claustrophobic Corridor Grows Up Presenters: Chris Bauserman, PE, PS Delaware County Engineer Jeff Griffin, PE Burgess & Niple, Inc. Brian Moore, PE Burgess & Niple, Inc. PROJECT OVERVIEW Sawmill Parkway

More information

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons West Dennis Center: Bass River to Old Main Street West Dennis Business District: Old Main Street to Dennis Commons Dennisport Center: Dennis Commons to Division Street Main Street Project Goals Project

More information

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects Gessner Widening: T-1701 What: Widen the road from a six-lane divided boulevard to an eight-lane divided boulevard street section, increase turn lanes, update traffic signal system, improve drainage by

More information

Construction Engineering & Inspection

Construction Engineering & Inspection Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over

More information

Memorandum CITY OF DALLAS

Memorandum CITY OF DALLAS Memorandum DATE September 23, 2016 CITY OF DALLAS TO The Honorable Members of the Transportation and Trinity River Project Committee: Lee M. Kleinman (Chair), Deputy Mayor Pro Tem Erik Wilson (Vice-Chair),

More information

Corridor Enhancements

Corridor Enhancements Corridor Enhancements Safety is MoDOT s first priority in widening and rebuilding I-70 across the state of Missouri. MoDOT also understands that the interstate - and its interchanges and overpasses - are

More information

Welcome. to the 95th Street Terminal Improvement Project Public Hearing

Welcome. to the 95th Street Terminal Improvement Project Public Hearing Welcome to the 95th Street Terminal Improvement Project Public Hearing The purpose of this Public Hearing is to solicit comments from the community about the Environmental Assessment prepared for the 95th

More information

Presentation Overview

Presentation Overview DETROIT RIVER INTERNATIONAL CROSSING STUDY Presentation to Windsor Rotary Club October 23, 2006 1 Presentation Overview 1. Overview 2. Progress Update Technical Work Program Environmental Work Program

More information

Research Road Map. 4. Quiet Pavements

Research Road Map. 4. Quiet Pavements Research Road Map Research Area 1. System 2. Smoothness 3. 4. Quiet s 5. Construction Practices 6. Mechanistic- Empirical Design 7. Long Life s 8. Sustainability Current Problem Statement Information data

More information

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Potential Green Infrastructure Strategies May 6, 2015 Workshop Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National

More information

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). III. ALTERNATIVES A. CONSTRUCTION METHOD ALTERNATIVES NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). One of the

More information

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the first Public Meeting for the proposed interchange improvement

More information

Citizen Information Meeting

Citizen Information Meeting Prince William County Government Citizen Information Meeting Vint Hill Road Extension May 11, 2016 Benefits: Route 28 Corridor Improvement Program Estimated significant cost savings versus bidding these

More information

Wilbur Cross Parkway (Route 15) Woodbridge/New Haven/Hamden, Connecticut State Project No

Wilbur Cross Parkway (Route 15) Woodbridge/New Haven/Hamden, Connecticut State Project No Wilbur Cross Parkway (Route 15) Woodbridge/New Haven/Hamden, Connecticut State Project No. 167-108 Department of Transportation Prime Consultant CDM Smith Theodore Nezames, P.E. Manager of Bridges (860)

More information

Southeast Extension to RidgeGate Parkway Scoping Booklet

Southeast Extension to RidgeGate Parkway Scoping Booklet Southeast Extension to RidgeGate Parkway Scoping Booklet PUBLIC SCOPING MEETING SCHEDULE Public Scoping Meeting Wednesday, November 2, 2011 6:00pm to 7:30pm City of Lone Tree Recreation Center Willow Room

More information

I-84 Karcher Interchange to Franklin Blvd Interchange Summary of Community Workshop #1 December 13, 2017

I-84 Karcher Interchange to Franklin Blvd Interchange Summary of Community Workshop #1 December 13, 2017 I-84 Karcher Interchange to Franklin Blvd Interchange Summary of Community Workshop #1 December 13, 2017 The Idaho Transportation Department hosted a community workshop on Dec. 13, 2017 to gather input

More information

Figure 5. Previously Identified Viable Corridors

Figure 5. Previously Identified Viable Corridors OVERVIEW The Central Florida Expressway Authority (CFX) is evaluating the potential to expand SR 408 from its current eastern terminus along SR 50 to SR 520 in northeastern Orange County, Fl. This new

More information

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street Memorandum DATE November 10, 2011 CITY OF DALLAS TO Trinity River Corridor Project Committee Members: Vonciel Jones Hill (Chair) Linda Koop (Vice Chair), Monica Alonzo, Scott Griggs, Angela Hunt, and Delia

More information

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates... PROJECT COMMITMENTS SUMMARY... S-1 1. Type of Action... S-1 2. Description of Action... S-1 3. Summary of Purpose and Need... S-1 4. Alternatives Considered... S-2 5. NCDOT Alternatives Carried Forward...

More information

State Project No Heroes Tunnel

State Project No Heroes Tunnel Public Scoping Meeting State Project No. 167-108 Bridge No. 00773 Heroes Tunnel Route 15 Wilbur Cross Parkway Through West Rock Ridge Towns of Hamden, Woodbridge City of New Haven Agenda Show Project Location

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Landscape Architecture Program NUMBER: SPECIFIC SUBJECT: Integration of Landscape

More information

Capital Projects impacting Odenton Town Center

Capital Projects impacting Odenton Town Center Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000

More information

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. 67 HEARING LOCATION: ERICKSEN COMMUNITY CENTER 1401 11 TH AVENUE NORTH

More information

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1] nhancements [1] STATUS OF PROJECT: The project has recently moved from the Preliminary Design Phase to the Final Design Phase following the most recent Public Involvement Meeting held on January 9, 2019

More information

Executive Summary. NY 7 / NY 2 Corridor

Executive Summary. NY 7 / NY 2 Corridor Executive Summary NY 7 / NY 2 Corridor Transportation and Land Use Study December 2005 Prepared for: Town of Colonie Capital District Transportation Committee Prepared by: Introduction: Land use decisions

More information

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

PROJECT BACKGROUND. Preliminary Design Scope and Tasks PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of

More information

2040 Long Range Transportation Plan

2040 Long Range Transportation Plan 2040 Long Range Transportation Plan Adopted: April 15, 2013 APPENDIX D HIGHWAY NEEDS PLAN PROJECTS FREDERICKSBURG Existing and Committed Projects Fall Hill Avenue/Mary Washington Blvd. (Fredericksburg)

More information