1 Specimen Format (1) COMPANY PROFILE 1. Name of the Firm: Sheltech Consultants (Pvt.) Ltd. 2. Nature of Professional services: Urban Planning, Engineering, Architecture, Urban Design 3. Address (Full Postal Address) : Sheltech Tower, 60, Sheikh Russel Square (New), 55, Lake Circus, Kalabagan (Old), West Panthapath, Dhaka-1205, Bangladesh. Tel: (02) ; Fax: ; info@scplbd.com; 4. Name of the Managing Director/CEO: Dr. Toufiq M. Seraj Direct land phone: Name and position of the Person/Director next to the Managing Director: Zeenat Nahreen Position: Executive Director; Direct land phone/ Mob: (02) Date of Incorporation in the Office of the Registrar of Joint Stock Companies and : 1st November 1990, Dhaka, No C (864)/90 7. TIN Number: , Circle-095, Zone-05 (Company) 8. Trade License No. Dhaka South City Corporation, No Field of activities :..(Kindly put tick ( ) marks in the attached Matrix Form): Page 1 of 7

2 10. Name of 10 major completed /ongoing projects with following information: 1. Name of the project Master Plan Preparation for Maulvibazar, Habiganj, Lakshmipur, Khagrachari, Rangamati & Bandarban Pourashava under UGIIP-III of LGED; ADB Loan No BAN Urban Planning, Urban Policy, Master Plan, Land Use Plan, Action Plan, Structure Plan, Investment Plan, Urban Area Plan, Development, Urban Design, Transportation System, Road Network, Traffic Management, GIS, Remote Sensing, Satellite Imagery, RTK GPS, Site Assessment, Water Resource, Hydrology, Water Supply, Solid Waste, Sewerage, Drainage, Environment, Environmental Management - April 2016 to September 2018 Local Government Engineering Department (LGED) Volume of the project US$ 484, Name of the project Construction of 11-storied Building with 11-storied Foundation for 1000 Students & 11-storied House Tutor Quarters (20 Flats) with 11-storied Foundation at Jatir Janak Bangabandhu Sheikh Mujibor Rahman Hall, University of Dhaka. Survey, Sub-soil Investigation, Site Layout Plan, Landscaping Plan, Preliminary and Detailed Architectural Design & Drawings, Furniture and Fixture Layout Drawings, Structural Design & Drawing, Sanitary & Plumbing, Gas Connection, Electrical & Mechanical Design & Drawing, Cost Estimation, BOQ & Tender Document Preparation, Top Supervision - January 2018 to December 2019 University of Dhaka Volume of the project BDT 68,00,00,000 Page 2 of 7

3 3. Name of the project Rural Access Road Improvement Project in Sylhet Division Survey, investigation and analysis for all works; Road design, engineering drawings & BoQ for each road; Structure design, engineering drawings & BoQ for each structures; Detailed architectural drawings, structural drawings of all markets; Supervision of all construction contracts; Preparation of bidding documents for procurement of goods and construction works; Regular inspection of materials and workmanship and tests to ensure compliance with specifications; Certifying payments to contractors and procedures; and develop procedures for laboratory and field tests for materials quality control, LGED material laboratories operation and certification of quality and work progress; Certify variation order and claims for extensions of time or any change in works according to the contract; Assist LGED in bid evaluation; Prepare monthly, quarterly, bi-annual and annual progress reports Desh Upodesh Ltd. October 2017 to April 2021 Volume of the project BDT 4,50,00,000 Local Government Engineering Department (LGED) 4. Name of the project Supervision and Management Consultant for Construction of 4-Lane Rajapara-Payra Port Connecting Road, Payra Port, Bangladesh Review sub-soil investigation report and other related data; Review road and structural design; Construction supervision of RCC Road, Structures and other related Structures; Field engineering/site supervision and witness of testing and commissioning; Project Management and Contract Administration; Arrange monthly meetings Desh Upodesh Ltd. SARM Associates Ltd. March 2017 to May 2019 Payra Port Authority Volume of the project BDT 4,50,00,000 Page 3 of 7

4 5. Name of the project Preparation of Development Plan for Fourteen Upazilas (Package # 02) Urban Planning, Urban Policy, Master Plan, Land Use Plan, Detailed Area Plan, Structure Plan, Urban Area Plan, Development, Urban Design, Transportation System, Road Network, Traffic Management, GIS, Remote Sensing, Satellite Imagery, RTK GPS, Site Assessment, Water Resource, Hydrology, Water Supply, Solid Waste, Sewerage, Drainage, Environment, Environmental Management, Subsoil Investigation, Seismic Risk Assessment, Vulnerability Assessment, Rapid Visual Assessment, Building Assessment Arc Bangladesh Ltd. January 2015 to June 2018 Volume of the project BDT 2,80,00,000 Urban Development Directorate (UDD) 6. Name of the project Preparation of Development Plan of Cox s Bazar Town and Sea Beach up to Teknaf including Maheshkhali and St. Martin Island Tourism Planning, Urban Planning, Master Plan, Land Use Plan, Detailed Area Plan, Structure Plan, Urban Area Plan, Development, Urban Design, Transportation System, Road Network, Traffic Management, GIS, Remote Sensing, Satellite Imagery, RTK GPS, Site Assessment, Water Resource, Hydrology, Solid Waste, Sewerage, Drainage, Environment, Environmental Management, IEE, EIA Srejanee Upadeshta Limited, Arc Bangladesh Ltd. and SURVEY October 2009 to June 2011 Urban Development Directorate (UDD) Volume of the project BDT 1,38,00,000 Page 4 of 7

5 7. Name of the project TA 6504 REG: Improving Connectivity & Destination Management of Cultural & Natural Resources in the South Asia Sub-region (Package T2 BANGLADESH) Tourism Planning Volume of the project US$ 172,237 October 2009 to June 2010 Asian Development Bank (ADB) 8. Name of the project Preparation of Master Plan for Paurashavas under District Towns Infrastructure Development Project (Package S04) Volume of the project - Urban Planning, Urban Policy, Structure Plan, Detailed Area Plan, Urban Area Plan, Drainage, Engineering Survey, Engineering Design, Infrastructure Development, Urban Design, Road Network, GIS, Remote Sensing, RTK GPS, Environment, Environmental Management, EIA, Electricity, Solid Waste, Water Resource - June 2008 to June 2014 Local Government Engineering Department (LGED) 9. Name of the project Planning and Designing for Various Infrastructure and Utility Plans and Components with Ancillary Works for Uttara Residential Model Town (3rd Phase) Project Volume of the project BDT 43,00,000 Master Plan, Urban Design, Architectural Design, Traffic Development, Construction Supervision, Environment Design Planning and Management Consultants Ltd. January 2008 to December 2010 Rajdhani Unnayan Kartipakkha (RAJUK) Page 5 of 7

6 10. Name of the project Preparation of Structure Plan, Master Plan and Detailed Area Plan for Barisal Divisional Town Urban Planning, Urban Policy, Structure Plan, Detailed Area Plan, Urban Area Plan, Tourism Planning, Drainage, Development, Urban Design, Road Network, GIS, Remote Sensing, RTK GPS, Environment, Environmental Management, EIA, Solid Waste, Water Supply, Water Resource Engineering & Planning Consultants Ltd. (EPC) June 2006 to June 2010 Volume of the project BDT 93,15,000 Urban Development Directorate (UDD) Page 6 of 7

7 Specimen Format (2) MAJOR FIELDS OF ACTIVITIES 1. Architecture 2. Landscape Planning 3. Acoustic Design 4. Air-conditioning 5. Building Engineering (Civil/structure) 6. Construction supervision 7. Building Electromechanical 8. Soils/Foundation Engineering 9. Materials Engineering 10. Land and Hydrographic Survey 11. Traffic Transportation Studies 12. Roads and Highways Design 13. Bridge Engineering 14. Harbor, Jetty and Marine structure 15. River Training 16. Flood control and Drainage 17. Water Resources planning 18. Inland waterways 19. Land use and Urban physical planning 20. Rural Development 21. Agriculture and Aquaculture 22. Water supply and Sanitation 23. Power Generation 24. Power Transmission and Distribution 25. Industrial Planning and Installation 26. Environment and Health 27. Project Management 28. Human Resources Development 29. Institutional studies 30. Telecommunication 31. Computer application and IT 32. Others Page 7 of 7

ENGINEERING CONSULTANTS (PVT.) LIMITED

ENGINEERING CONSULTANTS (PVT.) LIMITED ENGINEERING CONSULTANTS (PVT.) LIMITED Engineering Consultants (Pvt.) Limited ( ECL) is a multi-disciplinary independent consulting firm established in 1968 as a partnership and incorporated on 21 st April

More information

COMPANY PROFILE. Sellhorn Middle East Engineering

COMPANY PROFILE. Sellhorn Middle East Engineering COMPANY PROFILE Sellhorn Middle East Engineering Page 1/7 Our Business Activities Sellhorn Middle East s.a.r.l. [Sellhorn ME] is a consultancy practice for civil and structural engineering works. We are

More information

BRIDGES, FLYOVERS AND ELEVATED MRTS STRUCTURES

BRIDGES, FLYOVERS AND ELEVATED MRTS STRUCTURES 2016 Edition BRIDGES, FLYOVERS AND ELEVATED MRTS STRUCTURES Trends, Outlook and Projections Research Report Data-set (Excel) Four Quarterly Updates India Infrastructure Research www.indiainfrastructure.com

More information

IMMERSED TUNNEL An innovation to cross a water-body. Presented by: Sumit Kar & Vishnu Saini On 20 February 2015 Page 1

IMMERSED TUNNEL An innovation to cross a water-body. Presented by: Sumit Kar & Vishnu Saini On 20 February 2015 Page 1 IMMERSED TUNNEL An innovation to cross a water-body Presented by: Sumit Kar & Vishnu Saini On 20 February 2015 Page 1 RoyalHaskoningDHV 100 Offices 35 Countries 8,000 Employees Independent, international

More information

IND: MFF - North Karnataka Urban Sector Investment Program - Tranche 2

IND: MFF - North Karnataka Urban Sector Investment Program - Tranche 2 Resettlement Planning Document Project Number: 38254-043 January 2016 IND: MFF - North Karnataka Urban Sector Investment Program - Tranche 2 Subproject: Yadgir 02FES03 Submitted by Karnataka Urban Infrastructure

More information

CSL Projects Limited

CSL Projects Limited Company Profile October - 2015 Phone: +880 960 9000 501, Fax: +880-2-985 1584, E-mail: info@cslprojectsbd.com, Web: www.cslprojectsbd.com CSL Projects Limited is a recently formed sister company of Consolidated

More information

DATE OF BIRTH : 23 October 1971 YEARS EXPERIENCE : 21

DATE OF BIRTH : 23 October 1971 YEARS EXPERIENCE : 21 POSITION NAME OF FIRM SPECIALISATION : Director : UrbanEQ Consulting Engineers (Pty) Ltd : Transportation Engineer DATE OF BIRTH : 23 October 1971 NATIONALITY : South African YEARS EXPERIENCE : 21 Andrew

More information

Reg. No. 2008/004627/07 VAT No Facsimile: (044) Progress Street, George Web:

Reg. No. 2008/004627/07 VAT No Facsimile: (044) Progress Street, George Web: C ape E nvironmental A ssessment P ractitioners (Pty) Ltd Reg. No. 2008/004627/07 VAT No 4720248386 Telephone: (044) 4) 874 0365 1 Floor Eagles View Building Facsimile: (044) 874 0432 5 Progress Street,

More information

Pre-seen case study for Strategic level examinations Papers E3, P3 and F3. For examinations in May 2014 and September 2014

Pre-seen case study for Strategic level examinations Papers E3, P3 and F3. For examinations in May 2014 and September 2014 Pre-seen case study for Strategic level examinations Papers E3, P3 and F3 For examinations in May 2014 and September 2014 PRE-SEEN MATERIAL, PROVIDED IN ADVANCE FOR PREPARATION AND STUDY FOR THE EXAMINATIONS

More information

2002/ Modernisation Road N 4

2002/ Modernisation Road N 4 2002/000-606.02 - Modernisation Road N 4 1. Basic Information 1.1. CRIS Number 2002/000-606.02 1.2. Title: Modernisation of the national road No 4 1.3 Sector : Cross Border Co-operation / Infrastructure

More information

City of Norfolk Coastal Flood Mitigation Program. March 13, 2013

City of Norfolk Coastal Flood Mitigation Program. March 13, 2013 City of Norfolk Coastal Flood Mitigation Program March 13, 2013 Topics Brief overview of Norfolk s Coastal Flood Program Data-driven analysis and decision making City-wide vulnerability, project concepts,

More information

INTRA- AND INTER-CITY CONNECTIVITY IN THE MEKONG REGION

INTRA- AND INTER-CITY CONNECTIVITY IN THE MEKONG REGION BRC RESEARCH REPORT No. 6 INTRA- AND INTER-CITY CONNECTIVITY IN THE MEKONG REGION 2011 EDITED BY MASAMI ISHIDA Bangkok Research Center IDE-JETRO Bangkok, THAILAND CONTENTS Preface Project Members iv vi

More information

Health Chapter ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE

Health Chapter ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE Health Chapter 420-5-22 ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE CHAPTER 420-5-22 SUBMISSION OF PLANS AND SPECIFICATIONS FOR HEALTH CARE FACILITIES TABLE OF

More information

Faculty of Civil Engineering & Planning

Faculty of Civil Engineering & Planning Faculty of Civil Engineering & Planning Graduates from the Faculty of Civil Engineering and Planning play roles widely at national and international levels, from public to private sectors even owning national

More information

Urban Greening and Roof Top Gardening: Scope and Opportunities in Bangladesh

Urban Greening and Roof Top Gardening: Scope and Opportunities in Bangladesh Urban Greening and Roof Top Gardening: Scope and Opportunities in Bangladesh Khan Mortuza Bin Asad Town Planner, Habitat Planning Associates Ltd. mortuza.urp34@gmail.com Ms. Fauzia Farzana Associate Professor

More information

Dauphin Island s East End Beach and Barrier Island Restoration Project. April 16, :00 PM Dauphin Island Sea Lab, Shelby Hall

Dauphin Island s East End Beach and Barrier Island Restoration Project. April 16, :00 PM Dauphin Island Sea Lab, Shelby Hall Dauphin Island s East End Beach and Barrier Island Restoration Project Town of Dauphin Island, Alabama April 16, 2015 6:00 PM Dauphin Island Sea Lab, Shelby Hall Team Introduction South Coast Engineers

More information

Detail Notice Inviting Expression of Interest for Survey & Fire Safety Audit

Detail Notice Inviting Expression of Interest for Survey & Fire Safety Audit Detail Notice Inviting Expression of Interest for Survey & Fire Safety Audit of High Rise Buildings and Areas under Nabadiganta Industrial Township Authority Unnayan Bhavan, 1 st Floor, Block - A, Sector

More information

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015 RFP 2018-02 DRAINAGE OUTFALL DESIGN AND PERMITTING Mandatory Meeting for Proposers August 15, 2015 IMPORTANT DATES August 15 th, 2:00pm August 17 th, 5:00pm August 22 nd, 5:00pm September 5 th, 2:00pm

More information

Remi Mendoza City Planning Academy March 13, 2017

Remi Mendoza City Planning Academy March 13, 2017 Remi Mendoza City Planning Academy March 13, 2017 1 What is the General Plan? The 2030 General Plan 5-Year Update (2035 General Plan) Questions and Answers 2 Guidebook for development and growth Required

More information

TABLE OF CONTENTS. Tender Forms Letter of Tender A20 Appendix to Tender A20 A20 Contract Agreement A20

TABLE OF CONTENTS. Tender Forms Letter of Tender A20 Appendix to Tender A20 A20 Contract Agreement A20 TABLE OF CONTENTS VOLUME I TENDER DOCUMENTS Part 1 Instructions to Tenderers... thru - 27 Part 2 Part 3 A16 Part 4 Tender Forms Letter of Tender A20 Appendix to Tender A20 A20 Contract Agreement A20 Forms

More information

Making Asian Cities Livable and Smart Case Study from Kolkata. Neeta Pokhrel Principal Urban Development Specialist Asian Development Bank

Making Asian Cities Livable and Smart Case Study from Kolkata. Neeta Pokhrel Principal Urban Development Specialist Asian Development Bank Making Asian Cities Livable and Smart Case Study from Kolkata Neeta Pokhrel Principal Urban Development Specialist Asian Development Bank Capital city of 4rth most populous state (West Bengal), and 6 th

More information

THE GOVERNMENT SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness No. 37/2010/ND CP Hanoi, April 07, 2010

THE GOVERNMENT SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness No. 37/2010/ND CP Hanoi, April 07, 2010 THE GOVERNMENT SOCIALIST REPUBLIC OF VIET NAM ------- Independence - Freedom Happiness --------- No. 37/2010/ND CP Hanoi, April 07, 2010 DECREE ON THE FORMULATION, EVALUATION, APPROVAL AND MANAGEMENT OF

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: October 18, 2018 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction and Traffic Highlights

More information

HIGHWAY DEPARTMENT: Planning and Programming Division: An Inventory of Its Transportation Planning Studies

HIGHWAY DEPARTMENT: Planning and Programming Division: An Inventory of Its Transportation Planning Studies MINNESOTA HISTORICAL SOCIETY Minnesota State Archives HIGHWAY DEPARTMENT: Planning and Programming Division: An Inventory of Its Transportation Planning Studies OVERVIEW OF THE RECORDS Agency: Minnesota.

More information

TRANSPORTATION: Roads and Highways Services

TRANSPORTATION: Roads and Highways Services TRANSPORTATION: Roads and Highways Services Profile Our background GIBB is a leading multi-disciplinary engineering consulting firm based in South Africa with 67% Black ownership. The firm has a strong

More information

Contracts Awarded in April 2009

Contracts Awarded in April 2009 Contracts Awarded in April 2009 TA No. : 7208-ARM Sector : Roads & Highways Project Name : North-South Road Corridor Development Program Executing Agency : Ministry of Transport & Communication Name of

More information

City of Miami MIAMI RIVER BASIN WATER QUALITY IMPROVEMENT REPORT FOR FOURTH QUARTER 2010

City of Miami MIAMI RIVER BASIN WATER QUALITY IMPROVEMENT REPORT FOR FOURTH QUARTER 2010 Action Items 1. Storm water* j. Citywide Inlet and Outfall Cleaning* The Public Works crews continue cleaning citywide inlets and outfalls. k. Inlet Retrofit for the Wagner Creek Basin* No inlet retrofits

More information

PUBLIC REALM STRATEGY

PUBLIC REALM STRATEGY CONSULTATION DRAFT PUBLIC REALM STRATEGY Trenchard Street & Frogmore Street City Design Group Place Directorate Public Realm Strategy Trenchard Street & Frogmore Street Contents 1. Introduction 2. Understanding

More information

LANDSCAPE ARCHITECTURAL ASSISTANT, 7931 LANDSCAPE ARCHITECTURAL ASSOCIATE, 7932 LANDSCAPE ARCHITECT, 7929

LANDSCAPE ARCHITECTURAL ASSISTANT, 7931 LANDSCAPE ARCHITECTURAL ASSOCIATE, 7932 LANDSCAPE ARCHITECT, 7929 2-24-84 LANDSCAPE ARCHITECTURAL ASSISTANT, 7931 Summary of Duties : Performs professional landscape architectural work in the design and preparation of plans, sketches, and drawings for the development

More information

Bringing the Community Together. TOWN SQUARE UPDATE November 1, 2017

Bringing the Community Together. TOWN SQUARE UPDATE November 1, 2017 Bringing the Community Together TOWN SQUARE UPDATE November 1, 2017 TOWN SQUARE COMMUNITY VISION The City currently owns 16.5 acres in downtown Boynton Beach which contains several historic structures

More information

PART 4.2 HYDE CREEK. Emergency Services Contact Royal Canadian Mounted Police British Columbia Ambulance Service 9-1-1

PART 4.2 HYDE CREEK. Emergency Services Contact Royal Canadian Mounted Police British Columbia Ambulance Service 9-1-1 PART 4.2 HYDE CREEK 4.2.1 Overview The Hyde Creek area is roughly bounded by Port McNeill to the west and the Nimpkish River to the east. The Spring Hill portion of the community is found just east of

More information

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018 Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018 Proposal Information The Western Pennsylvania Conservancy (WPC) is seeking proposals

More information

BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT

BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT 2017-18 Summary 1 Progress on local development documents 1 Local development documents adopted in the monitoring period 1st April 2017 31st

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

AILA CPD TREE OF KNOWLEDGE DESIGNING AND CONSTRUCTING

AILA CPD TREE OF KNOWLEDGE DESIGNING AND CONSTRUCTING AILA CPD TREE OF KNOWLEDGE This Tree of Knowledge provides a list of core competencies on which the CPD framework will evolve, and is designed to provide a filing repository for future CPD resources. DESIGNING

More information

Ferguson is the world s leading specialist distributor of plumbing and heating products.

Ferguson is the world s leading specialist distributor of plumbing and heating products. Corporate profile Ferguson is the world s leading specialist distributor of plumbing and heating products. We supply plumbing and heating products to professional contractors and consumers in the USA,

More information

Course Title: Introduction to Modeling and Design 774Z

Course Title: Introduction to Modeling and Design 774Z Assessments/Resources Unit 2, October Unit 1, September What is my learning style? How do engineers and designers put their ideas into forms that can be understood by others? How is a tower designed and

More information

BEACH AND INLET PROJECTS UPDATE

BEACH AND INLET PROJECTS UPDATE BEACH AND INLET PROJECTS UPDATE USACE DELTA PROJECT USACE Delta Project Project Extents Elevation Elevation (ft NAVD88) (ft NAVD88) USACE Delta Project Project Cross-Section 20 18 20 16 18 14 16 12 14

More information

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011)

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011) Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011) Description The Corps of Engineers, Rock Island District (District) and the Illinois

More information

West Gate Tunnel Project. Incorporated Document May Incorporated document pursuant to section 6(2)(j) of the Planning and Environment Act 1987.

West Gate Tunnel Project. Incorporated Document May Incorporated document pursuant to section 6(2)(j) of the Planning and Environment Act 1987. West Gate Tunnel Project Incorporated Document May 2017 Incorporated document pursuant to section 6(2)(j) of the Planning and Environment Act 1987. Drafting Note: The planning control contained in this

More information

SUSTAINABLE URBAN DEVELOPMENT INVESTMENT PROGRAM FOUR YEARS OF PROGRESS

SUSTAINABLE URBAN DEVELOPMENT INVESTMENT PROGRAM FOUR YEARS OF PROGRESS SUSTAINABLE URBAN DEVELOPMENT INVESTMENT PROGRAM FOUR YEARS OF PROGRESS Yerevan is the economic, scientific and cultural center of the Republic of Armenia. It is considered as the major regional transportation

More information

Community-based Green Infrastructure Initiative in New Jersey

Community-based Green Infrastructure Initiative in New Jersey Community-based Green Infrastructure Initiative in New Jersey Rutgers Cooperative Extension Water Resources Program www.water.rutgers.edu February 21, 2018 Christopher C. Obropta, Ph.D., P.E. obropta@envsci.rutgers.edu

More information

2993-ARM: North-South Road Corridor Investment Program - Tranche November 2015, 15:00 (Yerevan time)

2993-ARM: North-South Road Corridor Investment Program - Tranche November 2015, 15:00 (Yerevan time) Invitation for Bids Date: 30 September 2015 Loan No. and Title: Contract No. and Title: Deadline for Submission of Bids: 1. The Republic of Armenia has received financing from the Asian Development Bank

More information

HAZARD MITIGATION GOALS AND OBJECTIVES

HAZARD MITIGATION GOALS AND OBJECTIVES SEWRPC Community Assistance Planning Report No. 282, 2nd Edition CITY OF MILWAUKEE ALL HAZARDS MITIGATION PLAN UPDATE Chapter IV HAZARD MITIGATION GOALS AND OBJECTIVES [NOTE: Throughout this plan update

More information

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan 425 Hillside Avenue Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan I. INTRODUCTION The is seeking the services of a qualified consulting firm to prepare plans

More information

SUSTAINABLE URBAN DEVELOPMENT PROJECT (SUDP)

SUSTAINABLE URBAN DEVELOPMENT PROJECT (SUDP) SUSTAINABLE URBAN DEVELOPMENT PROJECT (SUDP) STRATGIC CITIES DEVELOPMENT PROGRAME (SCDP) MINISTRY OF MEGAPOLIS AND WESTERN DEVELOPMENT Strategic Cities Development Programme (SCDP) SCDP Kandy Galle Jaffna

More information

Environmental Impact Assessment System and Its Improvement in Myanmar

Environmental Impact Assessment System and Its Improvement in Myanmar Environmental Impact Assessment System and Its Improvement in Myanmar Mr. Tomohiro Shibayama 1 Engineering Department Nippon Koei Co. Ltd. Environmental and oorestry Eppert Environmental Science and Abstract

More information

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number: Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number

More information

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016 2035 General Plan Update and Belmont Village Specific Plan Joint Study with the City Council and Planning Commission April 12, 2016 Agenda 1. Welcome and Introductions 2. General Plan Update Status of

More information

Electrical Safety Policy and Management System

Electrical Safety Policy and Management System TITLE: PAGE: 1 OF 14 Housing Solutions Limited Electrical Safety Policy and Management System Page 1 of 15 TITLE: PAGE: 2 OF 14 FOREWORD This document details the system for the management of electrical

More information

REPORT CARD TO THE COMMUNITY MAY 15, 2018

REPORT CARD TO THE COMMUNITY MAY 15, 2018 REPORT CARD TO THE COMMUNITY MAY 15, 2018 O On May 10, 2014 voters in Greenville ISD approved a $72,275,000 bond election. BOND PROPOSAL PROJECT BOND AMOUNT CONSTRUCT A NEW BOWIE ELEMENTARY SCHOOL $17,600,000

More information

Pollinator and Monarch Habitat Grant Program

Pollinator and Monarch Habitat Grant Program Pollinator and Monarch Habitat Grant Program An opportunity for FFA Chapters and other student groups to propagate, plant, and monitor milkweed and other native wildflowers on rural lands Grant amount:

More information

TABLE OF CONTENTS PAGE

TABLE OF CONTENTS PAGE 1989 BROWARD COUNTY LAND USE PLAN Original adoption March 1, 1989 Text amendments adopted as of March 10, 2015, are incorporated herein. BROWARD COUNTY BOARD OF COUNTY COMMISSIONERS BROWARD COUNTY PLANNING

More information

Witteveen+Bos. Strategy // Planning // Design for resilient urban places. Rachael Cox April 2017

Witteveen+Bos. Strategy // Planning // Design for resilient urban places. Rachael Cox April 2017 Healthy Witteveen+Bos: & Resilient Cities: Designing Urban Healthy Planning & and Resilient Engineering Cities 1 Witteveen+Bos Strategy // Planning // Design for resilient urban places Rachael Cox April

More information

City of Guelph - Wilson Street Parkade / Wilson Street Reconstruction Proposed Project Schedule April 21,

City of Guelph - Wilson Street Parkade / Wilson Street Reconstruction Proposed Project Schedule April 21, City of Guelph - Wilson Street Parkade / Wilson Street Reconstruction Proposed Project Schedule April 21, 2016 2016 2017 Activity Date March April May June July August September October November December

More information

WELCOME TO PUBLIC INFORMATION CENTRE #2. Please Sign In

WELCOME TO PUBLIC INFORMATION CENTRE #2. Please Sign In WELCOME TO PUBLIC INFORMATION CENTRE #2 Replacement of Oxtongue Lake Narrows Bridge & Oxtongue River Bridge, Highway 60 (G.W.P. 93-89-00 & G.W.P. 5550-04-00) Class Environmental Assessment (Group B) Please

More information

Chapter 11. Implementation Plan

Chapter 11. Implementation Plan Chapter 11 Implementation Plan 127 D O W N T O W N T AV A R E S R E D E V E L O P ME N T MA S T E R P L A N IMPLEMENTATION PLAN This section shows how the Master Plan translates to a phased series of

More information

2007 Fhwa Geotechnical Technical Guidance Manual

2007 Fhwa Geotechnical Technical Guidance Manual 2007 Fhwa Geotechnical Technical Guidance Manual Highway Administration (FHWA) to identify research Guidance for the reuse of foundations is needed geotechnical issues in a holistic manner. Technical drivers.

More information

Świętokrzyskie region (PL): Modern water supply and sewerage disposal for more effective utilisation of local assets.

Świętokrzyskie region (PL): Modern water supply and sewerage disposal for more effective utilisation of local assets. Świętokrzyskie region (PL): Modern water supply and sewerage disposal for more effective utilisation of local assets. SYNTHESIS The Serwis village project was an infrastructure project in Nowa Słupia commune

More information

H2M acquires Ehasz Giacalone Architects, PC. September 05, Front Section

H2M acquires Ehasz Giacalone Architects, PC. September 05, Front Section H2M acquires Ehasz Giacalone Architects, PC September 05, 2017 - Front Section Shown above (from left) are: Louis Giacalone, R.A., Rich Humann, P.E., Russell Ehasz, R.A. Melville, NY H2M architects + engineers

More information

ARCHITECTURE AND PLANNING

ARCHITECTURE AND PLANNING ARCHITECTURE AND PLANNING Subject Code: AR Course Structure Sections/Units Topics Section A Section B Section C Section D Section E Section F Section G Section H Architecture and Design Building Materials,

More information

EU Support Project to Freetown City Council and Urban Planning Authorities Project No. FED/2010/ The Urban Planning Project

EU Support Project to Freetown City Council and Urban Planning Authorities Project No. FED/2010/ The Urban Planning Project EU Support Project to Freetown City Council and Urban Planning Authorities Project No. FED/2010/250-190 The Urban Planning Project 2011-2014 FREETOWN STRUCTURE PLAN Presentation at Tuesday 7 th April,

More information

The Dresden Sustainable Urban Mobility Plan (SUMP)

The Dresden Sustainable Urban Mobility Plan (SUMP) The Dresden Sustainable Urban Mobility Plan (SUMP) photo: Frank Fiedler UN-Habitat III Regional Meeting Side-event Sustain and clean mobility for the New Urban Agenda Prague, 16.03.2016 Dipl.-Ing. Frank

More information

Broward County Coastal Engineering Consultant Services For Segment III Shore Protection T P1 R. Harvey Sasso, P.E. Danielle Irwin, CFM

Broward County Coastal Engineering Consultant Services For Segment III Shore Protection T P1 R. Harvey Sasso, P.E. Danielle Irwin, CFM Coastal Systems International, Inc. Broward County Coastal Engineering Consultant Services For Segment III Shore Protection T2112588P1 R. Harvey Sasso, P.E. Danielle Irwin, CFM Experts in Coastal Engineering,

More information

Design Review of Facility Improvement Projects

Design Review of Facility Improvement Projects Design Review of Facility Improvement Projects Agenda Board Meeting Schedule Scope of Work Summary Overall Building Plans and Scope Summary Update on Areas of Design Development Programming and Space planning

More information

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB Program Goals, Activities and Accomplishments I. Beach Front Multi-modal Transportation, Aesthetic and Parking Improvements III. Connector

More information

4 January 11, 2012 Public Hearing APPLICANT:

4 January 11, 2012 Public Hearing APPLICANT: . 4 January 11, 2012 Public Hearing APPLICANT: MID-ATLANTIC AUTO PROPERTY OWNER: DZR, LLC STAFF PLANNER: Leslie Bonilla REQUEST: Conditional Use Permit (truck rental, automobile service, and automotive/bulk

More information

HAZARD MAPPING AND VULNERABILITY ASSESSMENT PRIORITIZATION WORKHSOP GRENADA

HAZARD MAPPING AND VULNERABILITY ASSESSMENT PRIORITIZATION WORKHSOP GRENADA HAZARD MAPPING AND VULNERABILITY ASSESSMENT PRIORITIZATION WORKHSOP GRENADA Coyaba Beach Resort, Grand Anse 1.0 SESSION 1: Overview of Hazards 1.1 The meeting noted: i) The occurrence of fires resulting

More information

Presentation Overview

Presentation Overview DETROIT RIVER INTERNATIONAL CROSSING STUDY Presentation to Windsor Rotary Club October 23, 2006 1 Presentation Overview 1. Overview 2. Progress Update Technical Work Program Environmental Work Program

More information

Rural Roads for Development 2017 RURAL ROADS FOR DEVELOPMENT 2017

Rural Roads for Development 2017 RURAL ROADS FOR DEVELOPMENT 2017 RURAL ROADS FOR DEVELOPMENT 2017 Day 1 (September 11): Rural Roads for Development Session 0815-0845 0 Registration 0845-0930 1 Introduction and welcome to course Dr Gurmel Ghataora and Dr Michael Burrow,

More information

PROFILE. industrial services rental trading

PROFILE. industrial services rental trading PROFILE industrial services rental trading Introduction Power Corp General Trading & Contracting Company W.L.L. is incorporated by technocrats having vast experience in Engineering and Construction field

More information

4/8/2015 Item #10D Page 1

4/8/2015 Item #10D Page 1 MEETING DATE: April 8, 2015 PREPARED BY: Christy Villa, Associate Civil Engineer DEPT. DIRECTOR: Glenn Pruim DEPARTMENT: Public Works CITY MANAGER: Larry Watt SUBJECT: NORTH COAST HIGHWAY 101 STREETSCAPE

More information

Goat Island Masterplan

Goat Island Masterplan Goat Island Masterplan City of Georgetown Georgetown, South Carolina December 4, 2013 City Council: Mr. Jack Scoville, Mayor Ms. Peggy Wayne, Mayor Pro-Tempore Mr. Brendon Barber, Sr. Mr. Clarence Smalls

More information

Project phasing plan (if applicable) 12 copies of site plan

Project phasing plan (if applicable) 12 copies of site plan SITE PLAN REVIEW PERMIT APPLICATION City of Grand Haven, 11 N. Sixth Street, Grand Haven, MI 49417 Phone: (616) 847-3490 Fax: (616) 844-2051 Website: www.grandhaven.org 1. Project Information Address/location

More information

SMART CITIES IN INDIA 2018

SMART CITIES IN INDIA 2018 Now Available SMART CITIES IN INDIA 2018 Segment Analysis, Outlook and Opportunities Report (PDF) Data-set (Excel) India Infrastructure Research Smart Cities in India 2018 Table of Contents 1. Executive

More information

A Water Meter System Upgrade and Its Long Term Benefits - Utilization of AMR/AMI Data and Smart Metering

A Water Meter System Upgrade and Its Long Term Benefits - Utilization of AMR/AMI Data and Smart Metering A Water Meter System Upgrade and Its Long Term Benefits - Utilization of AMR/AMI Data and Smart Metering Adam Hogan, PE, Alliance Consulting Engineers, Inc. Cory Cox, PE, Gaffney Board of Public Works

More information

Australian Standard. Fire detection, warning, control and intercom systems System design, installation and commissioning

Australian Standard. Fire detection, warning, control and intercom systems System design, installation and commissioning AS 1670.3 1997 Australian Standard Fire detection, warning, control and intercom systems System design, installation and commissioning Part 3: Monitoring network performance This Australian Standard was

More information

GATEWAY BUILDING ELEVATOR AND ESCALATOR SERVICES

GATEWAY BUILDING ELEVATOR AND ESCALATOR SERVICES 29 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 Tel metro.net SYSTEM SAFETY AND OPERATIONS COMMITTEE JANUARY 16, 2014 SUBJECT: ACTION: GATEWAY BUILDING ELEVATOR AND ESCALATOR SERVICES APPROVE

More information

CURRICULUM VITAE. James J. Valenta, PE, MSCE, FITE 8463 Shield Road Dexter, MI (734)

CURRICULUM VITAE. James J. Valenta, PE, MSCE, FITE 8463 Shield Road Dexter, MI (734) CURRICULUM VITAE James J. Valenta, PE, MSCE, FITE 8463 Shield Road Dexter, MI 48130 (734) 904-2652 Email: jvalenta@prodigy.net Areas of Expertise: Roadway Hydroplaning Analysis, Guardrail, Highway Design,

More information

REVIEW AND EVALUATION OF REGIONAL LAND USE

REVIEW AND EVALUATION OF REGIONAL LAND USE REVIEW AND EVALUATION OF REGIONAL LAND USE AND TRANSPORTATION SCENARIOS #220831 Environmental Justice Task Force October 7, 2014 VISION 2050 Process Development of Guiding Vision for Land Use and Transportation

More information

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary TABLE OF CONTENTS Page Executive Summary 1.0 INTRODUCTION...1-1 1.1 Purpose of the Undertaking...1-1 1.2 Study Area Description...1-1 1.3 Description of the Undertaking...1-1 1.4 Rationale for the Undertaking...1-2

More information

Middlebury RS 0174(8)

Middlebury RS 0174(8) Middlebury RS 0174(8) Preferred Alternative Meeting VT 125 Bridge #13 over Middlebury River August 6, 2012 Presented to Presented by Town of Middlebury VTrans & VHB Introductions: Jennifer Fitch VTrans

More information

volume 11 environmental assessment section 2 environmental impact assessment Part 2 ha 202/08 environmental impact assessment

volume 11 environmental assessment section 2 environmental impact assessment Part 2 ha 202/08 environmental impact assessment DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental section 2 environmental impact Part 2 ha 202/08 environmental impact SUMMARY This Advice Note provides guidance for undertaking statutory and

More information

SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, :00 pm - 8:00 pm

SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, :00 pm - 8:00 pm SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, 2010 6:00 pm - 8:00 pm 1 Project Area 2 Sheridan Parking Structure RTD Ownership 3 Project Elements Structure and amenities include: 1.

More information

Randle Siddeley associates landscape architecture environment urban design

Randle Siddeley associates landscape architecture environment urban design Summer Palace Private Garden, Syria Landscape Consultancy Fee Proposal Date: 11 th November 2010 Doc. No. RS/FP CONTENTS 1.0 Site Visit & Project Development 2.0 Concept Design 3.0 Design Development 4.0

More information

SURREY COASTAL FLOOD ADAPTATION STRATEGY (CFAS) Phase 1 Open House

SURREY COASTAL FLOOD ADAPTATION STRATEGY (CFAS) Phase 1 Open House SURREY COASTAL FLOOD ADAPTATION STRATEGY (CFAS) Phase 1 Open House CFAS Open House Photo Contest Winners #SurreyCoastal Activity Gail Stephan Under crescent beach pier. Great place to take a long exposure

More information

LIDBURY, SUMMERS & WHITEMAN

LIDBURY, SUMMERS & WHITEMAN LIDBURY, SUMMERS & WHITEMAN Consulting Surveyors, Planners & Engineers Incorporating Degotardi, Smith & Partners (Forster) The Institution of Surveyors NSW The Institution of A.B.N. 48 470 231 954 P.O.

More information

Beaufort County Community College. Maintenance and House Keeping Plan

Beaufort County Community College. Maintenance and House Keeping Plan Beaufort County Community College Maintenance and House Keeping Plan Summary: The College s facility management is handled by the Maintenance Department. The Director of Plant and Maintenance Operations

More information

Social Screening and Impact Assessment for Sub Projects

Social Screening and Impact Assessment for Sub Projects Social Screening and Impact Assessment for Sub Projects Code No: 7 A. Sub Project Description: Rehabilitation of McCallum Lock Gates and Construction of Bank Protection Wall with Linear Walk Around Beira

More information

Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018

Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018 Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3. September 18, 2018 Agenda Welcome Introductions Rules of the Ad-Hoc Presentation Background Vulnerability Assessment Results Non-Agenda

More information

Executive Office of Energy and Environmental Affairs Massachusetts Vulnerability Preparedness Program. June 6, 2018

Executive Office of Energy and Environmental Affairs Massachusetts Vulnerability Preparedness Program. June 6, 2018 Executive Office of Energy and Environmental Affairs Massachusetts Vulnerability Preparedness Program June 6, 2018 Presentation Outline: 1. What Natural Hazards Impact Falmouth 2. Coastal Resiliency Efforts

More information

INTRODUCTION TAQQAT Global Co. Abdulla Fouad Group

INTRODUCTION TAQQAT Global Co. Abdulla Fouad Group TAQQAT PROFILE INTRODUCTION TAQQAT Global Co. is a subsidiary of Abdulla Fouad Group, one of the pioneer organizations in the Kingdom of Saudi Arabia with over 65 years of untainted service. TAQQAT Global

More information

Welcome to the. Open House

Welcome to the. Open House Welcome to the 5th Street to Kinsman Road Open House November 14 5:30 7:00 p.m. Please sign in Project Overview In December 2016, City Council adopted SW 5th Street as the preferred alignment to connect

More information

Downtown Brampton Capital Project

Downtown Brampton Capital Project Downtown Brampton Capital Project BIA Update November 1 st, 2017 Anthony Parente, Director, Wastewater Region of Peel Public Works 1 Agenda Why Now? Design Update Construction Sequencing Traffic Management

More information

HARVARD PROJECT ON SOUTHWEST FLORIDA AND SEA LEVEL: THE CASE OF COLLIER COUNTY (INCLUDING NAPLES, MARCO ISLAND & EVERGLADES CITY)

HARVARD PROJECT ON SOUTHWEST FLORIDA AND SEA LEVEL: THE CASE OF COLLIER COUNTY (INCLUDING NAPLES, MARCO ISLAND & EVERGLADES CITY) HARVARD PROJECT ON SOUTHWEST FLORIDA AND SEA LEVEL: THE CASE OF COLLIER COUNTY (INCLUDING NAPLES, MARCO ISLAND & EVERGLADES CITY) PROPOSAL DATE: MAY 21, 2016 Professor Charles Waldheim, Principal Investigator

More information

We provide exceptional solutions to help our clients achieve success.

We provide exceptional solutions to help our clients achieve success. We provide exceptional solutions to help our clients achieve success. We began as a small, two-person surveying firm called M.E. Berry & Associates in Hollywood, Florida. Known today as Calvin, Giordano

More information

Transport Planning And Design Manual Volume 2 Chapter 3

Transport Planning And Design Manual Volume 2 Chapter 3 Transport Planning And Design Manual Volume 2 Chapter 3 Chapter 300 Design Documentation, Approval, and Process Review 120-2. Transportation Improvement Programs. 120-3. Linking Planning and Programming

More information

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006 Project Goal Town of Halifax Revitalization Project RRRC Living Towns Planning Workshp July 12, 2006 Town of Halifax Halifax County *** Revitalization Project Goal*** To create Economic Opportunity and

More information

FIRE SUPPRESSION SPRINKLER SYSTEM

FIRE SUPPRESSION SPRINKLER SYSTEM PART 1 GENERAL 1.01 DESCRIPTION A. The provisions of the General Requirements, Supplementary Requirements, and Division 1 apply to the plumbing work specified in this Division. B. The requirements of this

More information

CURRICULUM VITA Mr. Praipol Koomsup

CURRICULUM VITA Mr. Praipol Koomsup Faculty of Economics Thammasat University Bangkok 10200, Thailand Phone: 66-2-613-2409 (Office), 66-1-828-2092 (Mobile) Fax: 66-2-224-9428 E-mail : praipol@econ.tu.ac.th Personal Data Place of Birth :

More information