Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information
|
|
- Gervais Bishop
- 5 years ago
- Views:
Transcription
1 Bridgewater State University Virtual Commons - Bridgewater State University Phase II Final Report Taunton River Watershed Project 2011 Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information Horsley Witten Group, Inc. Recommended Citation Horsley Witten Group, Inc. (2011). Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information. Taunton River Watershed Project Phase II Final Report. Item 11. Available at: This item is available as part of Virtual Commons, the open-access institutional repository of Bridgewater State University, Bridgewater, Massachusetts.
2 APPENDIX C. LID PARKING LOT DESIGN AND TEACHING TOOL AT BRIDGEWATER STATE UNIVERSITY, BRIDGEWATER SUPPORTING INFORMATION
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17 Parameter Specification Size Notes Planting Soil Media See Below n/a USDA soil types loamy sand or sandy loam Mulch shredded hardwood Aged 6 months, minimum. Finely shredded softwood will be considered by Engineer as required with sample submission. Pea Gravel Layer 2 to 4 inch layer of washed stone 3/8 inch For use between the filter media and the underdrain gravel. Filter Fabric Mirafi 140N, Geotex 351 or approved equal n/a Non-woven geotextile fabric w/ flow rate of > 110 gallons/minutes/square foot. Erosion Control Bionet S150BN n/a Short term biodegradable erosion control Blanket blanket. Gravel Layer (underdrain) AASHTO M to 0.75 Underdrain Piping Underdrain Cleanout ASTM D 1785 or AASHTO M inch perforated schedule 40 PVC Non-perforated PVC pipe, PVC 4 inch elbow, cap, and all associated fittings 3/8 6 on center, 4 holes per row. T s and Y s as needed depending on underdrain configuration. Extend cleanout pipes to surface with vented caps at Ts and Ys. BIORETENTION SCHEDULE: Bottom Surface Area (sf) Lowest Top Elevation/ Spillway (ft) Design Freeboard (ft) Depth Bottom Depth Planting Soil Planting Soil Pea (ft) (ft) Gravel (ft) OVF Type OVF Rim Ponding Bottom Depth Mulch Bottom No. & # (ft) Depth (ft) Elev. (ft) 1 (ft) Mulch (ft) WEIR ,466 DI WEIR DI BIORETENTION UNDERDRAIN SCHEDULE: Elevation Change Min. Underdrain Underdrain from Lower Stone cover Pipe Size No. Bio Cell Cell (ft) (in.) (in) Length Underdrain (ft) Slope Underdrain (ft/ft) Bottom Underdrain Stone (ft) Distal Underdrain Stone Depth (ft) Outlet Depth Stone (ft) Underdrain Distal Inv (ft) Underdrain Inv In (ft) Min. Outlet Inv (ft) 2 1 UPPER LOWER UPPER LOWER Abbreviations: SA Bottom Surface Area CB Catchbasin OVF Overflow Inv Invert Bottom Pea Gravel (ft)
18 UNDERGROUND RECHARGE CHAMBER SCHEDULE RECHARGE AREA # COVER TYPE NUMBER OF UNITS URC1 PAVEMENT 36 URC2 PAVEMENT 69 CHAMBER TYPE/MODEL STORMTECH SC-740 STORMTECH SC-740 DIVERSION WEIR - ELEV. A (FT) CHAMBER HEIGHT (IN.) BOTTOM OF CHAMBER TO INVERT (IN.) DIAMETER HEADER MANIFOLD (IN) DIAMETER CHAMBER INLET STUB (IN) INVERT HEADER MANIFOLD ELEV. B (FT) INLET PIPE INVERT ELEV. C (FT) OUTLET PIPE INVERT ELEV. (FT) BOTTOM OF CHAMBERS ELEV. D (FT) STONE UNDER CHAMBER (IN) BOTTOM OF STONE ELEV. E (FT) TOP OF CHAMBER ELEV. (FT) STONE ABOVE CHAMBER (IN) TOP OF STONE ABOVE CHAMBER ELEV. F (FT) MAXIMUM FINISH GRADE (FT) MINIMUM FINISH GRADE (FT) MAXIMUM COVER OF CHAMBERS (FT) MINIMUM COVER OF CHAMBERS (FT) ESTIMATED SHGW (FT) (SEE NOTE) SEPARATION FROM SHGW (FT)
19
20 ITEM NUMBER TAUNTON RIVER WATERSHED PLAN - BRIDGEWATER STATE UNIVERSITY BRIDGEWATER, MA PARKING LOT IMPROVEMENTS - SCIENCE BUILDING 75% DESIGN PLANS CONSTRUCTION COST ESTIMATE 12/9/2010 DESCRIPTION ESTIMATED QUANTITY UNIT UNIT PRICE TOTAL AMOUNT 1.0 MOBILIZATION/DEMOBILIZATION 1 LUMP SUM $10, $10, TEMPORARY FENCE AROUND WORK ZONE 2,000 LUMP SUM $10.00 $20, GENERAL GRUBBING & VEGETATION CLEARING 1 LUMP SUM $5, $5, EARTH EXCAVATION 560 CUBIC YARD $25.00 $14, RELOCATE EARTH EXCAVATION WITHIN SITE 560 CUBIC YARD $4.00 $2, COMPACTED FILL 9,790 CUBIC YARD $35.00 $342, DENSE GRADE BASE MATERIAL 3,510 CUBIC YARD $65.00 $228, FINE GRADING AND COMPACTING 10,530 SQUARE YARD $4.00 $42, BITUMINOUS ASPHALT PAVEMENT 10,530 SQUARE YARD $30.00 $315, BIT. TACK COAT FOR PAVEMENT 1 LUMP SUM $5, $5, EXISTING PAVEMENT EXCAVATION 1,000 CUBIC YARD $25.00 $25, RIPRAP STONE 50 CUBIC YARD $85.00 $4, LOAM & SEED (GRASS) 4,610 SQUARE YARD $9.00 $41, SAWCUT & SEALING PAVEMENT 1,240 LINEAR FOOT $12.00 $14, VERTICAL CURBING 1,720 LINEAR FOOT $45.00 $77, ASPHALT BERM 3,110 LINEAR FOOT $8.00 $24, SIDEWALK - BITUMINOUS 400 SQUARE YARD $30.00 $12, HANDICAP SIDEWALK RAMP 60 SQUARE YARD $ $7, TRAFFIC SIGNS 1 LUMP SUM $15, $15, REMOVE SIGN 1 EACH $ $ REMOVE & RESET SIGN 6 LUMP SUM $ $ RELOCATE HYDRANT 2 LUMP SUM $2, $4, WATER LINE EXTENSION 40 LINEAR FOOT $80.00 $3, REMOVE CURBING 466 LINEAR FOOT $5.00 $2, REMOVE & RESET VERTICAL CURB 181 LINEAR FOOT $30.00 $5, REMOVE GUARDRAIL/DISPOSE 340 LINEAR FOOT $5.00 $1, REMOVE & RELOCATE CURBING 181 LINEAR FOOT $25.00 $4, ADJUST/RAISE MANHOLE COVER 18 EACH $ $9, ADJUST/RAISE VALVE COVER 5 EACH $ $1,250 Prepared by: Horsley Witten Group, Inc. Page 1 of 2
21 30.0 RELOCATED UTILITY POLE 2 EACH $8, $16, REMOVE/DISPOSE BUILDINGS 566 SQUARE FOOT $25.00 $14, PAINTED STOPLINE 20 SQUARE FOOT $1.50 $ CROSSWALKS STRIPING 480 SQUARE FOOT $1.50 $ PARKING STRIPING (WATERBOURNE) 6,040 LINEAR FOOT $1.50 $9, BOLLARDS W/ PAINT 2 EACH $ $1, BIORETENTION FACILITY MATERIALS W/ LANDSCAPING 3,570 SQUARE FOOT $15.00 $53, STONE WALL 75 SQUARE FOOT $90.00 $6, DRAINAGE INLETS 2 LUMP SUM $1, $2, PRECAST STANDARD CATCHBASIN 2 EACH $3, $6, DRAINAGE MANHOLE 4 EACH $3, $14, DRAINAGE MANHOLE - DOGHOUSE TYPE 1 EACH $4, $4, BIO DRAINAGE STRUCTURE 2 EACH $2, $4, " PVC DRAINAGE PIPE 344 LINEAR FOOT $15.00 $5, " HDPE DRAINAGE PIPE 159 LINEAR FOOT $40.00 $6, CLEANOUTS/INSPECTION MANHOLES 2 EACH $ $ PAVED DRAINAGE FLUME 17 EACH $ $10, " HDPE FLARED END SECTION 1 EACH $ $ WEIRS STRUCTURES 2 EACH $6, $12, UNDERGROUND CHAMBER SYSTEM W/ INSTALLATION 105 PER CHAMBER $ $94, CONSTRUCTION ENTRANCE 120 SQUARE YARD $60.00 $7, EROSION CONTROL - SILT SOCK 2,740 LINEAR FOOT $6.00 $16, EROSION CONTROL - SILT SACKS 12 EACH $ $3, RELOCATE LIGHT W/ POLES 15 EACH $3, $45, LIGHTING PROVISION 1 LUMP SUM $90, $90, DEWATERING MEASURES 1 LUMP SUM $5, $5, TESTING - COMPACTION 1 LUMP SUM $15, $15, POLICE DETAIL 40 HOURS $45.00 $1,800 SUB TOTAL $1,684,745 ESTIMATED BID PRICE $ 1,685,000 Owner Contingency 30% $ 506,000 ESTIMATED CONSTRUCTION BUDGET $ 2,191,000 NOTES: CONTINGENCY IS PROVIDED BASED ON 75% DESIGN PLANS REFLECTING THE FACT THAT UNCERTAINTY EXISTS BETWEEN THIS STAGE AND CONSTRUCTION STAGE DRAWINGS. FINAL CONSTRUCTION ESTIMATES WILL BE DEPENDANT ON FACTORS RESOLVED AT THE CONSTRUCTION BIDDING STAGE. Prepared by: Horsley Witten Group, Inc. Page 2 of 2
Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information
Bridgewater State University Virtual Commons - Bridgewater State University Phase II Final Report Taunton River Watershed Project 2011 Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool
More informationFinal Report: Appendix F. LID Driveway Retrofit at Ocean Spray Processing Facility, Middleboro Supporting Information
Bridgewater State University Virtual Commons - Bridgewater State University Phase II Final Report Taunton River Watershed Project 2011 Final Report: Appendix F. LID Driveway Retrofit at Ocean Spray Processing
More informationAnalyzing the Bioretention Construction Sequence
Analyzing the Bioretention Construction Sequence Avoiding future problems through careful installation procedures, construction inspection and first year maintenance 20 Steps to Better Bioretention Step
More informationBioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake
Bioretention Matt Scharver Northeast Ohio Regional Sewer District Stormwater Management Training for MS4 Municipal Employees Training Session Agenda Pre-Training Survey Presentation & Site Visit Post-Training
More informationLetter of Credit Itemized Cost Estimate For: 100% Site Development Costs
Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs The following form is to be filled out by the Project Consultant(s) and submitted to the City of Kitchener, Planning Division for
More informationCase Study Bioretention Installation and Maintenance
Case Study Bioretention Installation and Maintenance Bioretention Crime Scene Investigation A reality TV series where you get to watch disturbing bioretention crimes and use advanced forensics to solve
More informationKey Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence
Key Topics Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence Bioretention Crime Scenes Investigation A 9 part reality TV series where you get to watch disturbing
More informationLow Impact Development Practices
Low Impact Development Practices Michael Dietz, Ph.D. CT Nonpoint Education for Municipal Officials (NEMO) Center for Land Use Education and Research May 8, 2013 Town of Bolton Planning and Zoning Commission
More informationThe following general requirements will be met for all planter box installations:
Greenville County Technical Specification for: WQ-25 PLANTER BOX 1.0 Planter Box 1.1 Description Planter boxes are designed to capture and temporarily store stormwater runoff. Planter Boxes are intended
More informationPREPARED UNDER. The 319 Nonpoint Source Pollution Grant Program FUNDED BY. MA Department of Environmental Protection Boston, MA PREPARED BY
PREPARED UNDER The 319 Nonpoint Source Pollution Grant Program FUNDED BY MA Department of Environmental Protection Boston, MA PREPARED BY Vanasse Hangen Brustlin, Inc. Watertown, MA Horsley Witten Group,
More informationFinal Report: Appendix D. Mill River park and Riverwalk at City Hall, Taunton Supporting Information
Bridgewater State University Virtual Commons - Bridgewater State University Phase II Final Report Taunton River Watershed Project 2011 Final Report: Appendix D. Mill River park and Riverwalk at City Hall,
More informationChapter 2 Roof Downspout Controls
Chapter 2 Roof Downspout Controls 2.1 Description This section presents the criteria for design and implementation of roof downspout controls. Roof downspout controls are simple pre-engineered designs
More information5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS
5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically
More informationGuidance on Preparation of Construction and Maintenance Costs
INVER GROVE HEIGHTS Northwest Area Appendix F Guidance on Preparation of Construction and Maintenance Costs Northwest Area (NWA) Inver Grove Heights Stormwater Manual Guidance on Preparation of Construction
More informationPR 2 PM 3 PR 2 PR 2 BIORETENTION AND FOREBAY PLANTINGS (IN HATCHED AREA) TO INCLUDE: NORTHERN BAYBERRY (MORELLA PENSYLVANICA) VIRGINIA ROSE (ROSA VIRGINIANA) SWITCH GRASS (PANICUM VIRGATUM) DWARF HUCKLEBERRY
More informationAppendix G. Detailed Design
Appendix G Detailed Design G1: Construction details Construction detail drawings usually include important details and specifications for required project design elements. This section provides information
More information6.2 Flow-Through Planter
SAN MATEO COUNTYWIDE WATER POLLUTION PREVENTION PROGRAM 6.2 Flow-Through Planter Figure 6-8: At-grade flow-through planter. Source: City of Emeryville Best uses Treating roof runoff Next to buildings Dense
More information2008 SWMM, 2010 Revision City of Tacoma
2008 SWMM, 2010 Revision City of Tacoma 2.2.3.1 BMP L630 Rain Gardens Purpose and Definition Bioretention areas are shallow stormwater retention facilities designed to mimic forested systems by controlling
More informationPlease make the following changes in your copy of the bid proposal for the captioned project:
Charles A. Kilpatrick, P.E. Commissioner September 8, 2014 DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000 Order No.: F50 Route: 0501 Project: (NFO) 0501-005-640,C501,B648
More information2.1.4 Roof Downspout Rain Gardens
2008 SWMM, 2010 Revision City of Tacoma 2.1.4 Roof Downspout Rain Gardens Purpose and Definition Bioretention areas are shallow stormwater retention facilities designed to mimic forested systems by controlling
More informationROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID
ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK 13440 DELTA PROJECT NO. 2017.226.001 SEPTEMBER 2017 ISSUED FOR BID INDEX OF DRAWINGS GENERAL CIVIL ARCHITECT/ENGINEER PROJECT
More informationFeet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary
0 25 50 00 Feet Parcel Boundary, Approximate 202 LIDAR 2 FT CONTOURS, VCGI BING AERIAL NRCS SOIL MAPPING MMI FIELD DATA Culvert Pipe Swale 0 Scale: "=40' SOURCE(S): NRCS Soil Area Boundary Overland st
More informationOld Mill Community Association Bioretention Facility
Project Overview This project will install a bioretention facility in a community recreation area owned by the Old Mill Community Association, Inc. Drainage from the area is currently unmanaged and has
More informationTable 4.7.1: Swales Potential Application and Storm Water Regulation
4.7. Swales A swale is a vegetated open channel, planted with a combination of grasses and other herbaceous plants, shrubs, or trees. A traditional swale reduces peak flow at the discharge point by increasing
More informationSTANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL
STANDARD SPECIFICATIONS SECTION 01570 TEMPORARY EROSION AND SEDIMENT CONTROL PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements, procedures, and methods related to responsibilities for providing
More information6.1 Bioretention Areas
SAN MATEO COUNTYWIDE WATER POLLUTION PREVENTION PROGRAM 6.1 Bioretention Areas Figure 6-1. Bioretention Area. Source: City of Brisbane Bioretention areas 1, or rain gardens, are concave landscaped areas
More informationCITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS
CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS 2010 EDITION CITY OF OZARK, MISSOURI REVISIONS TO THE 2009 EDITION The following revisions have been made to the 2009 edition of the city
More informationBesides performing this function, they also look really nice
Roger Williams Park Botanical Center Providence, RI March 31 & April 1, 2011 Michael Dietz, Ph.D. University of Connecticut CT Nonpoint Education for Municipal Officials Program Short answer: a depression
More informationPlacement of the soil should be in lifts of mm and loosely compacted (tamped lightly with a backhoe bucket).
6 Rain Gardens Rain Gardens 6.1 Introduction A rain garden is used to attenuate peak flows and to provide stormwater treatment. Rain gardens use the concept of bioretention, a water quality practice in
More informationPLANS FOR THE CONSTRUCTION OF A NEW COMMERCIAL BUILDING FOR: & MONTGOMERY ROAD, SYCAMORE TOWNSHIP, HAMILTON COUNTY, OHIO ZONED "E"
GENERAL NOTES: PLANS FOR THE CONSTRUCTION OF A NEW COMMERCIAL BUILDING FOR: 1086 & 10875 MONTGOMERY ROAD, SYCAMORE TOWNSHIP, HAMILTON COUNTY, OHIO LOCATION MAP 17 1.00 Acres PROPOSED SITE 12 OWNER / APPLICANT:
More informationn1. Design 5.4.6a Urban Bioretention 5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions.
5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions. Description: Urban bioretention SCM are similar in function to regular bioretention practices except they
More informationCHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES
CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES TOPICS Steps Prior to construction Pre-Construction Meeting Defining the Critical Stages with the Contractor Brady s Run Lake Site
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES
01050-1 Construction Surveying 1 LS 01500-1 Temporary Fences & Barricades 1,500 LF 02600-1 Shoring, Cofferdam, Temp. Sheeting, & Dewatering 1 LS 01565-1 Storm Drainage & Erosion Sediment Control 1 LS 01565-2
More informationInspection and Maintenance of Stormwater Best Management Practices
FAC T S H E E T Inspection and Maintenance of Stormwater Best Management Practices is a general term that refers to vegetated stormwater best management practices (BMPs) that temporarily store rainwater
More informationAppendix B DETAILED DESIGN
Appendix B DETAILED DESIGN Design details for bioretention/bioswale Figures 1 and 2 provide cross-sectional details of standard bioswales and bioretention installations used in design drawings. Table 1
More informationStructural Storm Water Best Management Practices (BMPs)
Structural Storm Water Best Management Practices (BMPs) Storm Water Permitting: The SWPPP Revealed By Deron Austin, PE January 11, 2006 3:30-5:00 PM Orlando, Florida Presentation Outline Preface About
More informationLocal Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011
Local Stormwater Retrofit Case Studies Westmoreland County Conservation District Updated 11/2011 WCD 2010 Why we do Sustainable Stormwater Management Retrofits To reduce flooding events and combined sewer
More information4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design
4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design Specification Bioretention O & M Manual Draft Green
More information- 33 Years. - HQ in Richmond VA. - New England Merrimack NH Compost Silt fence. - Product Distributors, Manufacturers and Innovators
Rick Fotino New England Contractor Focused Lee Jones New England BMP Specialist Dewatering Bags Silt fence Scott Gorneau, P.E. National Product Manager Rob Woodman, P.E. C.P.E.S.C Senior Stormwater Engineer
More informationSTORMWATER MANAGEMENT DESIGN ASSISTANCE MANUAL. Guide to Choosing Stormwater BMPs
STORMWATER MANAGEMENT DESIGN ASSISTANCE MANUAL Guide to Choosing Stormwater BMPs TABLE OF CONTENTS TABLE OF CONTENTS...2 INTRODUCTION... 5 http://www.elibrary.dep.state.pa.us/dsweb/view/collection-8305
More informationBMP #: Recharge Garden/Rain Garden/Bioretention Garden
Structural BMP Criteria BMP #: Recharge Garden/Rain Garden/Bioretention Garden A Recharge Garden (also called a Rain Garden or a Bioretention Garden) is an excavated shallow surface depression planted
More informationRainwater Management an issue for the 21 st Century. Hydrological Cycle
Canadian Society of Landscape Architects CONGRESS 2014 Rainwater Management an issue for the 21 st Century Don Crockett, BCSLA, CSLA Principal, Golder Associates Ltd. May 2014 Hydrological Cycle PRE- URBAN
More informationSevern River Sub-Watershed: BMP 09-Retrofit
Project ID: BMP_09 Total Treated Drainage Area: 4.57 acres Total Treated Impervious Area: 2.9 acres Total Water Quality Volume (WQv): ~10,300 cubic feet; 0.236 acre-foot Rainfall Depth Treated (Pe): 1
More informationSILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.
STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. ATTACH FABRIC TO POSTS WITH MINIMUM 3 ZIP TIES (50 LB. TENSILE) PER POST IN TOP 8" OF FABRIC. MONOFILAMENT GEOTEXTILE FABRIC PER MNDOT TABLE
More informationSUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE
SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE Please complete this narrative form and submit with your SWPPP drawings. Refer to Kitsap County Stormwater Design Manual Vol.
More informationSECTION A-1: DESCRIPTION
URBAN BIORETENTION Stormwater Planters Expanded Tree Pits Stormwater Curb Extensions VERSION 1.0 SECTION A-1: DESCRIPTION Urban bioretention practices are similar in function to regular bioretention practices
More informationFEB 2016 COUNTY MAP NTS
COUNTY MAP NTS MILWAUKEE COUNTY SHEET INDEX N. 76TH STREET N. 70TH STREET N. 60TH STREET PROJECT LOCATION N. PARK PLAZA COURT ALDI'S SITE N. 51ST STREET SHEET SHEET TITLE G1 TITLE SHEET G2 GENERAL SYMBOLS
More informationGREEN INFRASTRUCTURE DESIGNS RAIN GARDEN
GREEN INFRASTRUCTURE DESIGNS RAIN GARDEN JULY 2015 RAIN GARDEN SCALABLE TOOL AND DESIGN TEMPLATE This tool and associated design files are one section of a larger toolkit: Green Infrastructure Designs:
More informationHILCORP ALASKA, LLC HAPPY VALLEY MIDDLE NATURAL GAS EXPLORATION PROJECT DEEP CREEK UNIT BOUNDARY PROPOSED ACCESS ROAD T02S T03S R14W
, LLC STERLING HWY. M.P. 142.8 28 33 TIM AVE. DEEP CREEK UNIT BOUNDARY 27 26 25 TIM AVE. CULVERT REPLACEMENT PROPOSED ACCESS ROAD 34 35 36 T2S T3S 31 NINILCHIK, ALASKA 5 4 3 2 BEGIN ROAD CONSTRUCTION 1
More informationSTANDARD DETAILS QUICK REFERENCE
STANDARD DETAILS QUICK REFERENCE Note: DWGs need to be saved locally before opening file. Requires AutoCad, DWG TrueView, or Autodesk Design Review (the later two are available for free from http://usa.autodesk.com/)
More informationR1a: REINFORCED TURF TO REPLACE GRAVEL /GRASS PARKING ADJACENT TO SOUTH PENNSYLVANIA AVENUE.
R1a: REINFORCED TURF TO REPLACE GRAVEL /GRASS PARKING ADJACENT TO SOUTH PENNSYLVANIA AVENUE. Description The retrofit site is located along South Pennsylvania Avenue, between Maplewood Street and just
More informationWHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area
City/CCSD 28E Agreement February 14, 2017 Page 1 28E Agreement Between the City of Cedar Rapids, Iowa (City) and College Community School District (CCSD) Regarding the construction of a roundabout at the
More informationGPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts
Sectional View of Concepts PAVEMENT FEATURES PAVEMENTS INTERSECTION INTERSECTION TREATMENTS LANDSCAPE BUFFER LANDSCAPE DESIGN GPCID CD D: GWINNETT P LACE DRIVE & MALL B COMPLETE STREET DESIGN ELEMENTS
More informationRequest for Approval of Design Modification
March 7, 2017 Piper Peterson U. S. Environmental Protection Agency 1200 Sixth Avenue, ECL-122, Suite 900 Seattle, Washington 98101 Subject: Request for Approval of Design Modification T-117 Early Action
More information2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88.
1. EXISTING CONDITIONS AND UTILITY INFORMATION SHOWN ON THESE PLANS ARE BASED ON A SET OF PLANS ENTITLED "SCHOOL OF COMMUNICATIONS AND MEDIA BUILDING AND LIFE HALL RENOVATION" DATED MARCH 11, 2015 REVISED
More informationAPPENDIX E DESIGN CRITERIA FOR POST-CONSTRUCTION WATER QUALITY BMPS
APPENDIX E DESIGN CRITERIA FOR POST-CONSTRUCTION WATER QUALITY BMPS This Appendix presents design criteria for Post-Construction Water Quality BMPs to meet 80% TSS removal for use on SCDOT projects: Section
More informationWQ-07 INFILTRATION TRENCH
Greenville County Technical Specification for: WQ-07 INFILTRATION TRENCH 1.0 Infiltration Trench 1.1 Description Infiltration Trenches are excavations filled with stone to create an underground reservoir
More informationTree Pits Construction Guide
Tree Pits Construction Guide What are tree pits? Tree pits collect stormwater runoff from small carpark areas or roads. Runoff filters through the tree roots and surrounding soil mix, trapping sediment
More information4. CONCEPT PLAN DEVELOPMENT
4. CONCEPT PLAN DEVELOPMENT Concept Plan Step 1: Identify Site Constraints and Opportunities Review the existing site to identify constraints and opportunities for GI Practices to meet the RRv. Constraints
More informationSIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS
SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS Introduction As required by federal and state law, the Borough of Swarthmore has adopted regulations that affect stormwater runoff and surface
More informationConstruction Site Erosion Control
Construction Site Erosion Control Site: New Residence Halls for the Board of Trustees of the University of Alabama, Tuscaloosa Location North of UA Campus: North of 2nd Street (north of AIME and Bevill
More informationBioretention cell schematic key
Bioretention Cells Bioretention cell schematic key 1 3 Hardwood mulch 2 Curb cut 3 18-30 Modified soil 4 Stone aggregate choker layer 5 Stone aggregate base layer 6 Subdrain 7 Undisturbed soil 8 Overflow/Cleanout
More informationUrban Rain Gardens: Capturing our local water. Martha Berthelsen The Watershed Project
Urban Rain Gardens: Capturing our local water Martha Berthelsen The Watershed Project www.thewatershedproject.org The Watershed Project s mission is to inspire Bay Area communities to understand, appreciate,
More informationRAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION
ILLINOIS URBAN MANUAL PRACTICE STANDARD RAIN GARDEN (feet) CODE 897 Source: Kendall County Soil and Water Conservation District DEFINITION Rain gardens are small, shallow, flat bottomed depressions constructed
More informationLONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST
LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST Planning Department Date Stamp Design Review Formal Application All information provided and submitted with this Application Checklist shall
More informationSmall Town Sustainable Stormwater Solutions
Small Town Sustainable Stormwater Solutions Kathryn Hamilton, RLA, ASLA Westmoreland Conservation District PA/DE ASLA Annual Meeting April 8-9, 8 2011 Urban, Industrial, Residential, Agricultural Flooding,
More informationStandard for Bioretention Systems
New Jersey Stormwater Best Management Practices Manual February 2004 http://www.state.nj.us/dep/watershedmgt/bmpmanualfeb2004.htm Definition Purpose C H A P T E R 9. 1 Standard for Bioretention Systems
More informationLONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST
LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST Planning Department Date Stamp Design Review Formal Application Change of Use (No Site Improvements)* All information provided and submitted
More informationNuts and Bolts (or Gravel and Asphalt) of the Main Street Project
Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project What is the Main Street Project? The Main Street Project is a roadway project that addresses pavement, infrastructure and safety issues
More informationOperation Maintenance and Repair Plan Rain Garden
Operation Maintenance and Repair Plan Property Owner / Operator Unit wall system Minimum 1 Repair, replace, reset, soil mix and mulch to remove gullies when erosion is evident. Replenish soil mix and mulch
More information3" TO 4" OF TOPSOIL 2:1 MIRAFI HP 565 GEO FABRIC OR EQUIVALENT 9' SPILLWAY EL=7147 2:1 SPILLWAY SECTION N.T.S. TOP OF POND EL=7149' RIP-RAP D 50 8" WRAPPED IN FILTER FABRIC 45 MIL HDPE POND LINER OR EQUIVALENT
More informationAppendix D - Technical Design Criteria for BMPs
Appendix D - Technical Design Criteria for BMPs City of Wayzata Page 3 On-site infiltration features Definitions and Scope: Infiltration facilities are constructed basins or depressions located in permeable
More informationPLAN SUBMITTER'S CHECKLIST
Page 1 of 8 PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and reference the plan sheets/pages where the information may be found, where appropriate, or write
More informationCharles County, MD Low Impact Development (LID)/ Environmental Site Design (ESD) Ordinance & Design Manual
Charles County, MD Low Impact Development (LID)/ Environmental Site Design (ESD) Ordinance & Design Manual Presentation Highlights Background What is LID / ESD? Why adopt LID/ESD MD SWM Act 2007 Planning
More informationPERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11
Overview of Sedimentation and Erosion Control Practices Practice no. 6.11 PERMANENT SEEDING Permanent vegetation controls erosion by physically protecting a bare soil surface from raindrop impact, flowing
More informationJohn F. Kennedy STEM High School Green Infrastructure Information Sheet
John F. Kennedy STEM High School Green Infrastructure Information Sheet Location: 127 Preakness Avenue Paterson, NJ 07522 Ward: 2 Green Infrastructure Description: Bioswale and bioretention system series
More informationHILCORP ALASKA, LLC KALOTSA PAD
, LLC ACCESS ROAD, PAD & FLOWLINE FLOWLINE END SEC 7 T1S R13W SM NINILCHIK, ALASKA FLOWLINE & ACCESS ROAD START PROPOSED 200' x 300' DRILL PAD M.P. 130 STERLING HWY ACCESS ROAD END INDEX S 0 1000 VICINITY
More informationStormwater Control Plan: Small (Tier 1) Land Development Project
Stormwater Control Plan: Small (Tier 1) Land Development Project Project ID for Tracking (for City Staff only): The California Regional Water Quality Control Board for the Central Coast Region (Water Board)
More informationTable of Contents. Preface... xv
Table of Contents Preface... xv Objective... xv Organization of this Manual...xvi How to Use this Manual...xvii Development of Best Management Practices (BMPs) for Stormwater Management...xviii Best Management
More informationAPPENDIX F: DETAIL DRAWINGS
APPENDIX F: DETAIL DRAWINGS DRAWING DIVISION 100 GENERAL NOTES 200 ROAD WAYS 300 TRAFFIC CONTROL 400 FENCES 500 SEDIMENT CONTROL 600 SANITARY AND STORM SEWERS 700 WATERMAIN 800 PARKS AND LANDSCAPING 900
More informationABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET
TABLE OF CONTENTS: ABBREVIATIONS: SHEET NO. A SHEET DESCRIPTION REFERENCE SHEETS TITLE SHEET COS CSO GPM PVC SF CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET
More informationSTORMWATER MANUAL: A GUIDE TO STORMWATER REQUIREMENTS FOR LAND DISTURBING ACTIVITIES IN ARLINGTON COUNTY. March 2018
STORMWATER MANUAL: A GUIDE TO STORMWATER REQUIREMENTS FOR LAND DISTURBING ACTIVITIES IN ARLINGTON COUNTY March 2018. 1 Introduction... 1 2 Stormwater Pollution Prevention Plan (SWPPP) Requirements... 2
More informationRainwater and Land Development Manual Bioretention Design Specification Updates. Jay Dorsey & John Mathews ODNR-DSWR June 18, 2014
Rainwater and Land Development Manual Bioretention Design Specification Updates Jay Dorsey & John Mathews ODNR-DSWR June 18, 2014 Why Change? Improved Design -> Better Performance, Fewer Failures; Based
More informationBioretention Systems
New Jersey Stormwater Best Management Practices Manual February 2009 Definition Purpose C H A P T E R 9. 1 Bioretention Systems A bioretention system consists of a soil bed planted with suitable non-invasive
More informationIntroduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management
Introduction to Low Impact Development Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management http://hawaii.gov/dbedt/czm/resource/publication.php A Comprehensive
More informationStructural Stormwater Best Management Practices
Structural Stormwater Best Management Practices for Small Commercial and Residential Applications Timothy Bruno Watershed Manager PA Department of Environmental Protection What are STRUCTURAL BMPs? Physical
More informationSite Formation Excavation - 6' depth square yard $8.00 $0.00 Grading square yard $1.50 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.
SURFACE SAND FILTER COST ESTIMATE WORKSHEET 2005 Prices Project Title Owner Location Project Number Date Description Units Quantity Unit Cost Total Estimated Price Site Preparation Tree removal - up to
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 362 Featherstone Dr Project ID Number: 27-3 Problem: Anecdotal evidence suggests a natural spring exists in the backyard
More informationGRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.
GRAND ARBOR RESERVE BIRCHWOOD POINT, LOT-1 10203 MINERAL POINT ROAD MADISON, WISCONSIN GRAND ARBOR RESERVE, LLC 6417 ODANA RD MADISON, WISCONSIN 53719 CONTACT: DAN SCHMIDT PHONE: 608-285-8680 FAX: 608-255-3387
More informationHigh Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards
High Point Community Site Drainage Technical Standards Prepared by SvR Design Company for High Point Community Seattle, Washington 5/2004 Revised 12/2006 101 Acknowledgements: for innovative development
More informationROADWAY SECTION PRINCIPAL ARTERIAL 2-01
ROADWAY SECTION PRINCIPAL ARTERIAL 2-01 ROADWAY SECTION MINOR ARTERIAL COMMERCIAL/MIXED USE 2-02 ROADWAY SECTION MINOR ARTERIAL REDISENTIAL 2-03 ROADWAY SECTION COLLECTOR COMMERCIAL MIXED USE 2-04 ROADWAY
More informationTypes and Basic Design of Post-Construction BMPs
Types and Basic Design of Post-Construction BMPs F O R R E S I D E N T I A L L A N D S C A P E R S D A N B O G O E V S K I O H I O E P A N O R T H E A S T D I S T R I C T O F F I C E J U L Y 9, 2 0 1 3
More informationSTANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS
STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B
More informationSECTION EARTHWORK
SECTION 02200 - EARTHWORK PART 1 GENERAL 1.1 SECTION INCLUDES A. Grading and Excavation B. Trenching C. Bedding D. Backfill and Compaction (New and Native) E. Aggregate Material F. Geotextile Fabric PART
More informationGeneral Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration
Model Construction SWPPP Planning & Development Services 1800 Continental Place Mount Vernon WA 98273 voice 360-416-1320 inspections 360-416-1330 www.skagitcounty.net/stormwaterpermitting Permit #: General
More informationSTORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough
STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough DATE Application is hereby made to Manheim Borough for the issuance of a Storm Water Management Plan approval pursuant to the Manheim Borough Storm
More informationA. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.
The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language
More informationTechnical Guidance for Stormwater Treatment and Site Design Measures
Chapter 6 Technical Guidance for Stormwater Treatment and Site Design Measures In this Chapter, technical guidance is provided for the stormwater treatment measures allowed by permit requirements as well
More informationBIORETENTION FACILITY
ILLINOIS URBAN MANUAL PRACTICE STANDARD BIORETENTION FACILITY (feet) CODE 800 Source: Jessica Cocroft, Winnebago Soil and Water Conservation District DEFINITION Facility that utilizes a soil media, mulch,
More informationABBREVIATIONS. Dwg LID of 1. Abbreviations
ABBREVIATIONS DIA DIAMETER EL ELEVATION FT2 SQUARE FOOT GAL/MIN GALLONS PER MINUTE H HORIZONTAL HDPE HIGH DENSITY POLYETHYLENE HMAC HOT MIX ASPHALT CONCRETE IE INVERT ELEVATION MAX MAXIMUM NO. NUMBER ODEQ
More information