CORALAIS BODYSPA BATH AND SHOWER FAUCET
|
|
- Oswald Miles
- 6 years ago
- Views:
Transcription
1 CORALAIS BODYSPA BATH AND SHOWER FAUCET 1. BEFORE YOU BEGIN HOW TO USE THESE INSTRUCTIONS Please read these instructions carefully to familiarize yourself with the required tools, materials, and installation sequences. Follow the sections that pertain to your particular installation. This will help you avoid costly mistakes. In addition to proper installation, read all operating and safety instructions. All information in these instructions is based on the latest product information available at the time of publication. Kohler Co. reserves the right to make changes in product characteristics, packaging, or availability at any time without notice. NOTES This instruction provides installation information for two faucet models. Be sure to follow only the steps that apply to your installation. The K-1097 uses two valves, one for the bath fill, and another for the shower. Pay special attention to this feature when planning your site preparation. Avoid excessive heat if you solder connections, to prevent damage to the fitting. Flush all piping thoroughly before installing the valve. Observe all local plumbing codes. Do not force the handle(s) in any direction. To turn the valve off, gently turn to the Off position. For the K-1097, do not use any plastic pipe between the Rite-Temp valve and spout. Do not connect a deck-mount spout, diverter, or hand shower to the spout outlet, unless you cap the shower outlet on valve. Install pipe or tube in a straight drop of 7 to 18 with only one elbow between the valve and the wall-mounted spout. Other types of installations may cause unsatisfactory shower performance. CAUTION: Risk of product damage. Remove the aspirator, plaster guards, and valve units before you apply heat to the yoke. TOOLS AND MATERIALS REQUIRED Assorted screwdrivers Plumbers putty Thread sealant Thread sealant tape Adjustable wrenches Strap wrench Pipe wrench 5/32 hex wrench 1/2 piping 1/2 elbows Solder/flux Propane torch Hacksaw or tubing cutter 1999 Kohler Co.
2 IMPORTANT INSTRUCTIONS READ AND SAVE FOR THE CONSUMER WARNING: Risk of scalding or other severe injury. Before completing installation, the installer must set the maximum water temperature setting of this valve to minimize the risks associated with scalding hazards according to ASTM F 444. Do not install a shut-off device on either outlet of this valve. The installation of any such device may create a cross-flow condition at the valve and affect the water temperature. Factors that change the temperature of the water supplied to the valve, such as seasonal water temperature changes, and water heater replacement or servicing, will change the maximum water temperature supplied by the valve and may create a scalding hazard. The pressure-balanced valve will not compensate for changes in the water supply temperature; adjust the maximum water temperature setting of this pressure-balanced valve when such changes occur. Pressure-balanced valves may not provide protection against scalding if there is a failure of other temperature-limiting devices elsewhere in the plumbing system. The installer is responsible for installing the valve and adjusting the maximum water temperature of this pressure-balanced valve according to instructions. This valve meets or exceeds ANSI A M and ASSE If you do not understand any of the installation or temperature adjustment instructions in this document, in the United States please contact our Customer Service Department at KOHLER. Outside the U.S. please contact your distributor. IMPORTANT: Please fill in the blanks below and on the valve label. Then insert these instructions into the plastic bag included with the valve package, and attach the plastic bag to the valve handle for the owner s reference. This device has been preset by of to ensure a safe maximum temperature. Any change in the setting may raise the discharge temperature above the limit considered safe, and lead to scalds. Date: 2
3 2. SITE PREPARATION ROUGH-IN PLUMBING Turn off the water supplies. Install or relocate the supplies as necessary to conform to the roughing-in dimensions. NOTE: If the bath or foot bath has already been installed, be sure to cover it to prevent damage before you proceed. Inspect the waste and supply tubing for damage. Replace if necessary. SUPPORT FRAMING K-1096 MODEL ONLY Determine the installation location of the valve, showerhead, and spout. Install the support framing as required. IMPORTANT! Secure the bath and shower piping to the support framing. Proceed to Fig. # TO FLOOR (TYPICAL) 4 Fig. #1 SUPPORT FRAMING K-1097 MODEL ONLY Determine the installation location of both valves, the showerhead, and the spout. Install the support framing as required. IMPORTANT! Secure the bath and shower piping to the support framing. Proceed to Fig. # TO FLOOR (TYPICAL) 48 TO FLOOR (SHOWER ONLY) 10 4 Fig. #2 3. PRE-INSTALLATION PROCEDURES K-1096 MODEL ONLY CAUTION: Risk of product damage. Remove the aspirator, plaster guards, and valve units before you apply heat to the yoke. Remove the valve units, plaster guards, and the aspirator from the yoke. Proceed to Fig. #5. Aspirator Yoke Valve Unit Plaster Guard Fig. #3 3
4 4. PRE-INSTALLATION PROCEDURES K-1097 MODEL ONLY To prevent damage to the Rite-Temp valve components due to heat while soldering, open the valve as follows: Remove and save the plaster guard and mud guard. Rotate the valve stem fully clockwise. Valve Body Stop Valve Stem Mud Guard If the valve has stops, rotate both stop adjustments fully counterclockwise. Plaster Guard Fig. #4 Proceed to Fig. #5. 5. INSTALLATION INSTALL 2-HANDLE YOKE ALL MODELS The yoke has a two-sided pipe adapter that can be reversed for use with either 1/2 N.P.T. pipe or copper tubing. Connect the hot and cold supplies to the yoke so they are between 2 and 3-1/2 from the finish wall. Ceiling Supplies Aspirator Cold The faucet fitting is factory assembled specifically for hot and cold water supplies from the floor. If installing the faucet for ceiling supplies, turn the yoke over so the supplies connect from the top. Hot For the K-1098, reinstall the aspirator at the top of the yoke. Do not overtighten. For the K-1097, discard the aspirator. D-shape Up Reinstall the valve units with the colored dot valve on the left side (right side for ceiling supplies). Reinstall the plaster guards. For K-1096 model, proceed to Fig. #6. For K-1097 model, proceed to Fig. #7. D-shape Down Fig. #5 INSTALL 2-HANDLE YOKE K-1096 MODEL Install elbows and adapters (if used) onto 1/2 copper tubing or 1/2 pipe of proper length. Connect the piping to both the shower and bath yoke outlets. IMPORTANT! Secure the tubing to the framing. Install temporary 1/2 nipples into the bath and shower ells. The temporary nipple used for slip-fit spout installations must extend at least 6 beyond the finish wall. Turn on the water supplies. Open both the hot and cold valves for about one minute to flush debris from the water lines. Complete the finish wall, and discard the plaster guards. Proceed to Fig. #12 or Fig. #13. Shower Ell Bath Ell Fig. #6 Shower Outlet 1/2 Copper or Pipe 1/2 Adapter or Solder Direct 1/2 Copper or Pipe Bath Outlet 4
5 INSTALL 2-HANDLE YOKE K-1097 MODEL Install elbows and adapters (if used) onto 1/2 copper tubing or 1/2 pipe of proper length. Connect the piping to the bath yoke outlet. IMPORTANT! Secure the tubing to the framing. Shower Outlet Plug 1/2 Adapter or Solder Direct 1/2 Copper or Pipe Install a temporary 1/2 nipple into the bath ell. Bath Outlet Install a plug in the shower outlet. Use thread sealant. Bath Ell Fig. #7 INSTALL SINGLE-CONTROL VALVE K-1097 MODEL Install elbows and adapters (if used) onto 1/2 copper tubing or 1/2 pipe of proper length. Connect the piping to the shower yoke outlet. Be sure the UP marking on the valve body is facing upward. Use thread sealant on all threaded connections. IMPORTANT! Secure the tubing to the framing. Install a temporary 1/2 nipple into the shower ell to extend at least 2 beyond the finish wall. Install a pipe cap on the bath outlet. Use thread sealant. 1/2 Copper or Pipe 1/2 Adapter or Solder Direct Shower Outlet Hot Side 1/2 Pipe Cap Shower Ell Fig. #8 INSTALL SINGLE-CONTROL VALVE K-1097 MODEL CAUTION: Risk of product damage. The shower valve contains plastic components. Do not apply excessive heat if you solder the valve connections. NOTE: If the valve is to be installed in a two valve, back-to-back configuration, proceed to Back-to-Back Installation procedures on Page 5. 1/2 Adapter or Solder Direct 1/2 Copper or Pipe Hot Supply 1/2 Elbow To Showerhead Connect the hot and cold supplies to the valve body using elbows, 1/2 copper tubing or pipe, and adapters (if used) as illustrated. Fig. #9 Cold Supply INSTALL SINGLE-CONTROL VALVE K-1097 MODEL Back-to-Back Installation: Never install the valve body upside down. If the two valves are installed in a back-to-back configuration, install them as previously described. The supplies to one of the valves will now be reversed. Valve Body Hot Supply Cap Assembly Remove the cap assembly from the valve with the reversed supply connections. Rotate the cap assembly 180, so the tab is on the bottom. Reattach the cap assembly with two screws. Cold Supply Screw 180 Fig. #10 Tab 5
6 INSTALLATION CHECKOUT ALL MODELS Install caps on the temporary bath and shower nipples. Turn on the hot and cold water supplies, and check the new installation for leaks. Remove the caps from the temporary nipples. Turn the valve control to the On position, and cycle the control through the operating range. Check for leaks. Turn the valve control off. If the valve has stops, rotate both stop adjustments fully clockwise. Turn the valve control On, and note that water does not flow. Turn the valve control Off, and rotate both stop adjustments fully counterclockwise. INSTALL PLASTER GUARD K-1097 MODEL Thick Wall Installation (Tile, Plaster, Marble, etc.): Cut a 5-9/16 diameter hole in the rough wall material. Identify the plaster guard side that must face out for thick wall installation. Install the plaster guard and mud guard over the cap assembly, and secure them to the valve body with screws. NOTE: The finish wall must line up within the front-to-back depth of the installed plaster guard. The plaster guard may be removed after the wall is completed. Remove and discard the mud guard. Thin Wall Installation: Cut a 4 diameter hole in the wall material. Identify the plaster guard side that must face out for thin wall installation. Install the plaster guard and mud guard over the cap assembly, and secure them to the valve body with screws. Valve Body Thick Wall Installation Thin Wall Installation Plaster Guard Mud Guard Screws Remove and discard the mud guard after the finish wall is completed. NOTE: The plaster guard should remain installed to the valve body behind the finish wall. PLASTER GUARD FINISH WALL PLASTER GUARD THIN WALL UP HOT UP 5-9/16 D. HOT 4 D. 2-3/4 4 ROUGH-IN DEPTH THICK WALL 2-3/4 ROUGH-IN DEPTH THIN WALL Fig. #11 6
7 INSTALL SLIP-FIT SPOUT ALL MODELS NOTE: To improve clarity, only the diverter spout used for the K-1096 model is shown. Installation of both diverter and non-diverter spouts is identical. CAUTION: Risk of internal seal damage. Loosen spout setscrew with a 5/32 hex wrench prior to installing the spout. CAUTION: Risk of internal seal damage. Do not use petroleum-based lubricants. If spout will not slide over tubing, use soapy water or a silicone-based lubricant. Cut the tubing so it extends between 1-1/2 and 2-7/8 beyond the finish wall. Loosen spout setscrew with 5/32 hex wrench. Slide the spout over the 1/2 copper tube, and carefully retighten the setscrew. 1/2 Copper Tube Slip-Fit Spout 1-1/2 to 2-7/8 Setscrew Fig. #12 Flush hot and cold water through the spout for one minute. INSTALL N.P.T. SPOUT ALL MODELS NOTE: To improve clarity, only the diverter spout used for the K-1096 model is shown. Installation of both diverter and non-diverter spouts is identical. Remove the temporary nipple from the bath ell. Apply thread sealant to the threads of a 1/2 nipple. Install the nipple to the bath ell so it extends 3-7/8 beyond the finish wall. Carefully thread the spout to the nipple with a clean strap wrench. 3-7/8 Nipple N.P.T. Spout Flush hot and cold water through the spout for one minute. Fig. #13 INSTALL SHOWER ARM AND SHOWERHEAD ALL MODELS CAUTION: Risk of product damage. To avoid plugging the showerhead spray outlets, use thread sealant tape on shower arm threads. Do not use thread sealant (pipe dope). Remove the temporary nipple from the shower ell. Apply a bead of plumbers putty or other sealant around the wall flange according to the manufacturer s instructions. Slide the wall flange onto the shower arm. Apply thread sealant tape to the shower arm threads. Thread the shower arm into the shower ell. Tighten with a clean strap wrench. Slide the wall flange against the wall, and tighten the setscrew. Remove any excess sealant. Shower Ell Wall Flange Shower Arm Plumbers Putty Setscrew Showerhead Fig. #14 Flush hot and cold water through the shower arm for one minute. Install the showerhead to the shower arm using thread sealant tape. Tighten with a clean strap wrench. 7
8 SHOWERHEAD OPERATION ALL MODELS For three-way showerhead operation, grasp the outer ring of the showerhead, and gently rotate it clockwise or counterclockwise. There are two small detents within the outer ring to provide three operating positions. Fig. #15 6. ADJUSTMENTS K-1097 MAXIMUM WATER TEMPERATURE ADJUSTMENT If the handle and face plate are installed, remove them. Turn on the water to the maximum temperature by rotating the valve stem fully clockwise. To adjust the maximum temperature, slide the O-ring out of the groove, and part way up the valve stem. Move the upper limit stop part way up the valve stem. Rotate the valve stem until the desired maximum water temperature is achieved. Rotate the lower limit stop until it contacts the tab. Slide the upper limit stop down the valve stem to engage the lower limit stop. Slide the O-ring into the valve stem groove. Rotate the valve stem counterclockwise to shut the water off. Reinstall the handle and face plate. 7. INSTALL VALVE TRIM Fig. #16 INSTALL ESCUTCHEONS TO 2-HANDLE Finish Wall YOKE ALL MODELS Apply a bead of plumbers putty or other sealant to the escutcheon according to the putty manufacturer s instructions. Install the escutcheons over the threaded Plumbers Putty sleeves, and align on the wall. Remove any excess putty or sealant. Fig. #17 INSTALL HANDLES TO 2-HANDLE YOKE ALL MODELS Disassemble the handle components. Correct Handle Alignment (off position) Slide the insert over the valve so the external threads face outward. Press the handle adapter onto the valve stem, and secure with the screw. Press the handle onto the handle adapter so the slots and tabs engage, then thread the insert into the handle. Securely hand tighten. Fig. #18 Valve Tab Lower Limit Stop Groove Upper Limit Stop O-Ring Valve Stem Threaded Sleeve Escutcheon Insert Handle Adapter Screw Handle INSTALL SINGLE-CONTROL HANDLE K-1097 MODEL Slide the faceplate over the valve stem, and carefully secure it with two long screws. Do not overtighten. Valve Stem Fig. #19 Faceplate Screw 8
Installation Guide. Engineering Excellence. Single Handle Tub & Shower Valve Set: 4010B 4011B
Engineering Excellence Installation Guide Single Handle Tub & Shower Valve Set: 4010B 4011B This product meets the following standards: ASME A112.18.1 ANSI A117.1 CUPC / IAPMO LISTED Pioneer Industries,
More informationInstructions. Certifications Brass w/built-in Stop Valve. Pressure Balance Shower Valve. Tools Required. Important Points.
Instructions Tools Required Adjustable Wrench Groove Joint Pliers Pipe Wrench Phillips Screwdriver Pipe Tape or Pipe Thread Compound Safety Tips If you solder the joints during installation, the seats,
More informationHandshower, Hose & Handshower Accessories
P24443, P24445, P24446, P24452, P24453, P24456 1 of 6 INSTALLATION INSTRUCTIONS Thank You For Choosing KALLISTA We appreciate your commitment to KALLISTA quality products. Please take a moment to review
More informationCable Drain & Cable Drain Trim Kit
INSTALLATION INSTRUCTIONS Cable & Cable Trim Kit P21581 & P21582 1 of 6 INSTALLATION INSTRUCTIONS Cable & Cable Trim Kit THANK YOU FOR CHOOSING KALLISTA We appreciate your commitment to Kallista quality
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS MODEL: BISTRO THERMO SHOWER KIT (RH-5344) 1 Restoration Hardware Thermo Shower Kit Specification Diagram 2 All Threaded Connections are 3/4 NPT Dimensions are in Inches and Approximation
More informationHandshower, Hose & Handshower Accessories
INSTALLATION INSTRUCTIONS P21650, P21660, P24452, P24453, P24454, P24456, P24743, P24745, P24746, P24761, P24843 1188577-2-F 2014 KALLISTA 1 of 5 THANK YOU FOR CHOOSING KALLISTA We appreciate your commitment
More informationLavatory Faucet INSTALLATION INSTRUCTIONS P24490-CR, P24490-LV, P24491-CR, P24491-LV, P24492-CR, P24492-LV, P24700, P24705, P24706, P24736, P24800
P24490-CR, P24490-LV, P24491-CR, P24491-LV, P24492-CR, P24492-LV, P24700, P24705, P24706, P24736, P24800 2018 1 of 7 KALLISTA THANK YOU FOR CHOOSING KALLISTA We appreciate your commitment to KALLISTA quality
More informationSingle-Control Lavatory Faucet
P22740 P23201 P24407 1 of 5 Thank You For Choosing KALLISTA We appreciate your commitment to KALLISTA quality products. Please take a moment to review this manual before you install your KALLISTA product.
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS 67000 6700 MODEL: SPRITZ 67000 (RH-600) 6700 (RH-600X) REV.C Restoration Hardware Faucet Product Size Specification Diagram Recommended Deck Hole Size -/8 Diameter Dimensions
More informationWELLWORTH WATERGUARD VITREOUS CHINA SIPHON JET TOILET
WELLWORTH WATERGUARD VITREOUS CHINA SIPHON JET TOILET 1. BEFORE YOU BEGIN HOW TO USE THESE INSTRUCTIONS Please read these instructions carefully to familiarize yourself with the required tools, materials,
More informationBasin Set INSTALLATION INSTRUCTIONS
P24130-CR, P24130-LV, P24131-CR, P24131-LV, P24400-CR, P24400-LV, P24401-CR, P24401-LV, P24402-CR, P24402-LV, P24500-LV, P24500-TT 1 of 5 INSTALLATION INSTRUCTIONS Thank You For Choosing Kallista We appreciate
More informationSS-THVD2-1/2 THERMOSTATIC VALVE WITH 2 WAY DIVERTER SS-THVD3-1/2 THERMOSTATIC VALVE WITH 3 WAY DIVERTER
SS-THVD2-1/2 THERMOSTATIC VALVE WITH 2 WAY DIVERTER SS-THVD3-1/2 THERMOSTATIC VALVE WITH 3 WAY DIVERTER Features: Ability to pre-select water temperature thus conserving water Paraffin wax element maintains
More informationInstallation Guide ASME A ANSI A117.1 CUPC / IAPMO LISTED / ADA COMPLIANT. Engineering Excellence
ngineering Excellenc Engineering Excellence Installation Guide Single Handle Tub & Shower Trim Set: 4LG100T* 4AM100T* 4BR310T* 4LG300T* 4AM200T* 4BR410T* 4LG400T 4BL100T* 4AM300T* 4BR120T 4BL200T* 4AM400T*
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS 5000 700069 50055 MODEL: Dillon 5000 (RH-600) 50055 (RH-600X) 700069 (TRRH-600) REV D Restoration Hardware Faucet Product Size Specification Diagram Recommended Deck Hole Size
More informationTIMES SQUARE TWO-HANDLE THERMOSTAT
TIMES SQUARE TWO-HANDLE THERMOSTAT MODEL NUMBER: TRIM KITS: T184.740 Two-Handle Thermostat Trim Kit With separate volume control. LESS Valve. ROUGH VALVES: TEMPERATURE & ON/OFF VOLUME CONTROL ONLY R50
More informationREVIVAL LITE VITREOUS CHINA REVERSE TRAP TOILET
REVIVAL LITE VITREOUS CHINA REVERSE TRAP TOILET BEFORE YOU BEGIN HOW TO USE THESE INSTRUCTIONS Please read these instructions carefully to familiarize yourself with the required tools, materials, and installation
More informationSEABREEZE. SeaBreeze Rain Shower System Model #1086-CH Owner's Manual
SEABREEZE SeaBreeze Rain Shower System Model #1086-CH Owner's Manual SeaBreeze Model #1086 Please Read The Following Instructions COMPLETELY Before Beginning! Our goal is to ensure your installation goes
More informationAcrylic Claw Foot Tub
Acrylic Claw Foot Tub Wrench or socket Drill & Bits Parts Recommended 2-2 x12 boards 4 Lag Bolts 4 Flat Washers Be sure to re-inforce the floor before securing tub. We recommend 2-2 x12 s securely fastened
More informationSingle-Control Bathroom Sink Faucet
P24407 1 of 5 THANK YOU FOR CHOOSING KALLISTA We appreciate your commitment to KALLISTA quality products. Please take a moment to review this manual before you install your KALLISTA product. If you encounter
More informationK-870-JA-AA K-872-JA-AA
Seawall 6 Whirlpool Baths: K-870-AA K-872-AA K-870-H-AA K-872-H-AA K-870-JA-AA K-872-JA-AA 111818-BA (1093) Copyright 1993 Kohler Co. IMPORTANT SAFETY INSTRUCTIONS ATTENTION INSTALLER: INSTRUCTIONS PERTAINING
More informationSAN RAPHAEL PRESSURE LITE VITREOUS CHINA SIPHON JET TOILET
SAN RAPHAEL PRESSURE LITE VITREOUS CHINA SIPHON JET TOILET BEFORE YOU BEGIN HOW TO USE THESE INSTRUCTIONS Please read these instructions carefully to familiarize yourself with the required tools, materials,
More informationSYSTEM BASIC WHIRLPOOLS
SYSTEM BASIC WHIRLPOOLS 114847-2-CB 2000 Kohler Co. IMPORTANT SAFETY INSTRUCTIONS ATTENTION INSTALLER: INSTRUCTIONS PERTAINING TO RISK OF FIRE, ELECTRIC SHOCK, OR INJURY TO PERSONS READ AND FOLLOW ALL
More informationKallista Bath Flip Drain
P21586 Page 1 of 7 THANK YOU FOR CHOOSING KALLISTA We appreciate your commitment to Kallista quality products. Please take a moment to review this manual before you install your Kallista product. If you
More informationVintage Whirlpool Baths: K-702-AC K-702-H-AC CA (9427) Copyright 1994 Kohler Co.
Vintage Whirlpool Baths: K-702-AC K-702-H-AC K-702-JA-AA K-702-JB-AA 110051-CA (9427) Copyright 1994 Kohler Co. IMPORTANT SAFETY INSTRUCTIONS ATTENTION INSTALLER: INSTRUCTIONS PERTAINING TO RISK OF FIRE,
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS 3580079 3580006 MODEL: LUGARNO 3580006 (RH-5900) 3580079 (RH-5900L) REV C Restoration Hardware Faucet Product Size Specification Diagram Recommended Deck Hole Size -3/8 Diameter
More informationInstallation Instructions / Warranty
Installation Instructions / Warranty IP C 04210000 04211000 04212000 IP S 04203000 04204000 04205000 IP E 04199000 04200000 04201000 IP Trim Sets Valve trim only IP C 04212000 IP E 04201000 IP S 04205000
More informationThermostatic Valve and Trim
ML8950-xx Thermostatic Valve and Trim Description Installation instructions Trim and PL8950 valve Brass lever handles and face plate Standards ASME A112.18.1 Listed IAPMO / UPC & CUPC ADA Accessibility
More informationCOUTURE ECO-LITE VITREOUS CHINA REVERSE TRAP TOILETS
COUTURE ECO-LITE VITREOUS CHINA REVERSE TRAP TOILETS BEFORE YOU BEGIN HOW TO USE THESE INSTRUCTIONS Please read these instructions carefully to familiarize yourself with the required tools, materials,
More informationInstallation Instructions
CENTRAL THERMOSTAT TRIM KIT Installation Instructions T000 T000 Thank you for selecting American-Standard...the benchmark of fine quality for over 00 years. To ensure that your installation proceeds smoothly--please
More informationREVE ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS 现代型分体座便器 CONTEMPORARY TWO-PIECE TOILET K-17178T-S/K-17178T-SP
REVE INSTALLATION INSTRUCTIONS 现代型分体座便器 CONTEMPORARY TWO-PIECE TOILET K-17178T-S/K-17178T-SP Please read these instructions carefully to familiarize yourself with the required tools, materials, and installation
More informationINSTALLATION FOR THERMOSTATIC VALVES
SS-TH1000 1/2 Thermostatic Valve SS-TH3000 3/4 Thermostatic Valve SS-TH2000 1/2 Thermostatic Valve with built in volume control SS-TH4000 3/4 Thermostatic Valve with built in volume control Features: Ability
More informationPALARRE, ROCHELLE WATER-GUARD VITREOUS CHINA SIPHON JET TOILET
PALARRE, ROCHELLE WATER-GUARD VITREOUS CHINA SIPHON JET TOILET BEFORE YOU BEGIN HOW TO USE THESE INSTRUCTIONS Please read these instructions carefully to familiarize yourself with the required tools, materials,
More informationAcrylic Claw Foot Tub
Acrylic Claw Foot Tub Wrench or socket Drill & Bits Parts Recommended 2-2 x12 boards 4 Lag Bolts 4 Flat Washers Be sure to re-inforce the floor before securing tub. We recommend 2-2 x12 s securely fastened
More informationREACH ORDERING INFORMATION NOTES T01-B
REACH INSTALLATION INSTRUCTIONS 3/4.8L SKIRTED VITREOUS CHINA TWO-PIECE TOILET 3/4.8 S-TRAP 305mm K-3991T/K-3991T-S S-TRAP 400mm K-4153T/K-4153T-S Please read these instructions carefully to familiarize
More informationPORTRAIT LITE VITREOUS CHINA REVERSE TRAP TOILET
PORTRAIT LITE VITREOUS CHINA REVERSE TRAP TOILET BEFORE YOU BEGIN HOW TO USE THESE INSTRUCTIONS Please read these instructions carefully to familiarize yourself with the required tools, materials, and
More informationTUB AND SHOWER FAUCET
AquaSource is a registered trademark of LF, LLC. All Rights Reserved. ITEM #004057 0040555 TUB AN SHOWER FAUCET MOEL #873-370 873-377H Francias / Español p. 3 ATTACH YOUR RECEIPT HERE Serial Number Purchase
More informationInfinity Whirlpool Bath: K-1477-V-AB K-1487-V-AB K-1482-V1-AB K-1484-V1-AB
Infinity Whirlpool Bath: K-1477-V-AB K-1487-V-AB K-1482-V1-AB K-1484-V1-AB 111465-CA (1093) Copyright 1993 Kohler Co. IMPORTANT SAFETY INSTRUCTIONS ATTENTION INSTALLER: INSTRUCTIONS PERTAINING TO RISK
More information3/4.8 AERODYNE 3/4.8L CLASS FIVE+
3/4.8 AERODYNE 3/4.8L CLASS FIVE+ INSTALLATION INSTRUCTIONS VITREOUS CHINA SKIRTED TRAPWAY ONE-PIECE TOILET S-TRAP 305mm K-3869T/K-3869T-S S-TRAP 400mm K-4165T/K-4165T-S Please read these instructions
More informationREVE ORDERING INFORMATION NOTES T01-E INSTALLATION INSTRUCTIONS ELONGATED TWO-PIECE TOILET K-17178T-S2/K-17178T-SBG2/K-17178T-SP2
REVE INSTALLATION INSTRUCTIONS ELONGATED TWO-PIECE TOILET K-17178T-S2/K-17178T-SBG2/K-17178T-SP2 Please read these instructions carefully to familiarize yourself with the required tools, materials, and
More informationANTARES ORDERING INFORMATION NOTES T01-G INSTALLATION INSTRUCTIONS
ANTARES INSTALLATION INSTRUCTIONS VITREOUS CHINA P/S TRAP ONE-PIECE TOILET S-TRAP 05mm/P-TRAP180mm K-17609T/K-17609T-S Please read these instructions carefully to familiarize yourself with the required
More informationMEMOIRS VITREOUS CHINA TOILETS
MEMOIRS VITREOUS CHINA TOILETS BEFORE YOU BEGIN HOW TO USE THESE INSTRUCTIONS Please read these instructions carefully to familiarize yourself with the required tools, materials, and installation sequences.
More informationInstructions. Certifications Chrome 2-handle Chrome 3-handle 10-B83-WCH-AD Chrome 3-handle 10-B82-WCH-AD Chrome 2-handle
Instructions 623282 Chrome 2-handle *Image may vary slightly from actual product Tools Required Adjustable Wrench Groove Joint Pliers Pipe Wrench Phillips Screwdriver Pipe Tape or pipe thread compound
More informationSAN RAPHAEL GRANDE ORDERING INFORMATION NOTES T01-B INSTALLATION INSTRUCTIOINS 4.8L SKIRTED CLASS FIVE ONE-PIECE TOILET 4.
SAN RAPHAEL GRANDE INSTALLATION INSTRUCTIOINS 4.8L SKIRTED CLASS FIVE ONE-PIECE TOILET 4.8 S-TRAP 305mm K-8688T-S S-TRAP 400mm K-18728T-S Please read these instructions carefully to familiarize yourself
More informationMINIATURE THERMOSTATIC VALVE
SS-TH500-1/2 Features: Ability to pre-select water temperature thus conserving water Compensates for water pressure fluctuations preventing scalding Safety button at 100 F prevents accidental scalding
More informationTUB AND SHOWER FAUCET
ITEM #043465 TUB AND SHOWER FAUCET MODEL #F0E509CP Français / Español p. 4 Project Source ATTACH YOUR RECEIPT HERE Serial Number Purchase Date Questions, problems, missing parts? Before returning to your
More informationTRU-TEMP VALVE. Tru-Temp Pressure Balance 1/2" Rough-In Valve Owner's Manual 3001-RIV-PB-ORB 3001-RIV-PB-BN 3001-RIV-PB-CH 3003-RIV-PB-ORB
TRU-TEMP VALVE 3001-RIV-PB-CH 3003-RIV-PB-CH Tru-Temp Pressure Balance 1/2" Rough-In Valve Owner's Manual 3001-RIV-PB-BN 3003-RIV-PB-BN 3001-RIV-PB-ORB 3003-RIV-PB-ORB Rough-In Valve Model #3001-RIV-PB
More informationKaress ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS
Karess INSTALLATION INSTRUCTIONS VITREOUS CHINA TWO-PIECE TOILET S-TRAP 305mm K-5331T-S S-TRAP 400mm K-5471T-S Please read these instructions carefully to familiarize yourself with the required tools,
More informationBARRINGTON PRESSURE LITE VITREOUS CHINA SIPHON JET TOILET K-4327
BARRINGTON PRESSURE LITE VITREOUS CHINA SIPHON JET TOILET K-4327 BEFORE YOU BEGIN INSTALLER HAZARD NOTIFICATION WARNING: Risk of injury or water damage. Contents of vessel under pressure can cause severe
More informationARIN THERMOSTATIC SHOWER SYSTEM
ARIN THERMOSTATIC SHOWER SYSTEM INSTALLATION INSTRUCTIONS Before installing, read entire shower system installation instructions. Observe all local building and safety codes. For the following installation
More informationRYLE WIDESPREAD FAUCET INSTALLATION
SKU(s): 934429, 934421 RYLE WIDESPREAD FAUCET INSTALLATION BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing plumbing fixtures. Signature Hardware accepts no
More informationINSTALLATION. Glass Panel Doors (select models) CAUTION
Location Do not install refrigerator near oven, radiator or other heat source. If not possible, shield refrigerator with cabinet material. Do not install where temperature falls below 55 F (13 C) or rises
More informationInstallation S IMPORTANT! Bradley Thermostatic Mixing Valve for Individual Showers. Table of Contents
Installation S59-2006 Bradley Thermostatic Mixing Valve for Individual Showers Table of Contents Supplies Required................. 2 Installation Instructions.............. 2 Valve Adjustments.................
More informationTROCADERO ORDERING INFORMATION NOTES T01-H INSTALLATION INSTRUCTIONS
TROCADERO INSTALLATION INSTRUCTIONS VITREOUS CHINA P/S TRAP ONE-PIECE TOILET S-TRAP 305mm/P-TRAP180mm K-19056T/K-19056T-S Please read these instructions carefully to familiarize yourself with the required
More informationADAIR ORDERING INFORMATION T01-A
ADAIR INSTALLATION INSTRUCTIONS 4.0L SKIRTED CLASS FIVE+ 2PC TOILET 4.0 S-TRAP 305mm K-8699T/K-8699T-S S-TRAP 400mm K-8947T/K-8947T-S Please read these instructions carefully to familiarize yourself with
More information8707T Includes seat. 8745T Includes Bowl
PRESQU ILE INSTALLATION INSTRUCTIONS P/S- VITREOUS CHINA P/S-TRAP TOILET S-TRAP 200mm / P-TRAP 180mm K-8707T/K-8707T-S BEFORE YOU BEGIN Please read these instructions carefully to familiarize yourself
More informationINSTALLATION GUIDELINES
IMPORTANT: To ensure this product is installed properly, you must read and follow these guidelines. The owner/user of this product must keep this information for future reference. This product must be
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Siphonic Ultra-High Efficiency Two-Piece Toilets HOptimum Single Flush Models 88AA / 88CA / 88DA HOption Dual Flush Models 886 / 88 / 889 Thank you for selecting American Standard
More informationWELLWORTH /HIGHLINE WITH PEACEKEEPER VITREOUS CHINA TOILET
WELLWORTH /HIGHLINE WITH PEACEKEEPER VITREOUS CHINA TOILET BEFORE YOU BEGIN HOW TO USE THESE INSTRUCTIONS Please read these instructions carefully to familiarize yourself with the required tools, materials,
More informationInstallation Instructions
Installation Instructions SELECTRONIC Thermostatic Mixing Valve 0XTMV070 Certified to comply with ASME A.8.M 0 American Standard M97 Specifications Installation Adjust Temperature Service Replacement Parts
More informationHourglass Whirlpool Bath: K-1506-H-AB Hourglass Optional Apron: K-1507-AA
Hourglass Whirlpool Bath: K-1506-H-AB Hourglass Optional Apron: K-1507-AA 111976-CA (1093) Copyright 1993 Kohler Co. IMPORTANT SAFETY INSTRUCTIONS ATTENTION INSTALLER: INSTRUCTIONS PERTAINING TO RISK OF
More informationInstallation S
Installation S59-2025 Thermostatic Mixing Valve (TMV25) with Optional Cabinet S59-2025RE (with Recess-Mounted Enamel Cabinet) S59-2025RS (with Recess-Mounted Stainless Steel Cabinet) S59-2025SE (with Surface-Mounted
More informationWATTS WALL-MOUNT WIDESPREAD BATHROOM FAUCET INSTALLATION
SKU(s): 940842 WATTS WALL-MOUNT WIDESPREAD BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing plumbing fixtures. Signature Hardware accepts no liability for any
More informationInstallation Instructions
Installation Instructions SELECTRONIC Thermostatic Mixing Valve 605XTMV Certified to comply with ASME A.8.M 005 American Standard M968808 Specifications Installation Adjust Temperature Service Replacement
More informationInstallation Guide. Pedicure Spa D K-163, K-1006, K-1011, K-1012
Installation Guide Pedicure Spa K-163, K-1006, K-1011, K-1012 1063564-2-D Important Information WARNING: When using electrical products, basic precautions should always be followed, including the following:
More informationINSTALLTION FOR THERMOSTATIC VALVES
SS-TH1000 ½ THERMOSTATIC VALVE SS-TH3000 ¾ THERMOSTATIC VALVE SS-TH2000 ½ THERMOSTATIC VALVE WITH BUILT IN VOLUME CONTROL SS-TH4000 ¾ THERMOSTATIC VALVE WITH BUILT IN VOLUME CONTROL Features: Ability to
More informationPrecedence Bath Whirlpools: K-1355-H1 K-1356-H1
Precedence Bath Whirlpools: K-1355-H1 K-1356-H1 114189-2-CA (9608) Copyright 1996 Kohler Co. IMPORTANT SAFETY INSTRUCTIONS ATTENTION INSTALLER: INSTRUCTIONS PERTAINING TO RISK OF FIRE, ELECTRIC SHOCK,
More informationSign Planogram: Plumbing Repair Bay Name: Plumbing Repair 4.1. Toilet Repair. 72" from floor to bottom of AV. Replacing a Fill Valve
70054 Toilet Repair 700539 70054 Bay Name: Plumbing Repair 4.1 1 of 1 1 Toilet Repair 72" from floor to bottom of AV 2 3 4 5 6 7 2 Installing a Toilet Ensure that Install a new Place the toilet Tighten
More informationInstructions CH Chrome SS Stainless Steel Certifications. Single Handle, Pull-Down, Kitchen Faucet. Tools Required.
Instructions *Image may vary slightly from actual product Tools Required Adjustable Wrench Groove Joint Pliers Pipe Wrench Phillips Screwdriver Pipe Tape or pipe thread compound Safety Tips If you solder
More informationPERSUADETM ORDERING INFORMATION NOTES T01-D INSTALLATION INSTRUCTIONS 3/4.8L TWO-PIECE TOILET 3/4.8L K-3654T-W/K-3654T-CW
PERSUADE TM INSTALLATION INSTRUCTIONS 3/4.8L TWO-PIECE TOILET 3/4.8L K-3654T-W/K-3654T-CW Please read these instructions carefully to familiarize yourself with the required tools, materials, and installation
More informationMEMOIRSS ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS (4.8L) VITREOUS CHINA ONE-PIECE TOILET(4.8L) K-3451T-*/K-3453T-*
MEMOIRSS INSALLAION INSRUCIONS (4.8L) VIREOUS CHINA ONE-PIECE OILE(4.8L) K-3451-*/K-3453-* Please read these instructions carefully to familiarize yourself with the required tools, materials, and installation
More informationSWIVEL HEAD WASTE AND OVERFLOW INSTALL
SKU(s): 921385 SWIVEL HEAD WASTE AND OVERFLOW INSTALL BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing bathroom fixtures and plumbing. Signature Hardware accepts
More informationInstructions. 110-KVD-CYSCH-AD-Z Chrome 110-KVD-CYSSS-AD-Z Stainless Steel Certifications. Single Handle, Pull-Down, Kitchen Faucet
Instructions *Image may vary slightly from actual product Tools Required Adjustable Wrench Groove Joint Pliers Pipe Wrench Phillips Screwdriver Pipe Tape or pipe thread compound Safety Tips If you solder
More informationHow To: PREPARATION REPLACE A KITCHEN SINK
Skill Level: INTERMEDIATE Give these projects a try if you're a confident DIYer with a good working knowledge of a variety of tools. They can take a day or more to complete. If you can build a birdhouse
More informationInstallation Guide BUBBLEMASSAGE. English page T01-A
Installation Guide BUBBLEMASSAGE BATH 368 201419 English page 1-9 10-17 Before You Begin Please read these instructions carefully to familiarize yourself with the required tools, materials, and installation
More informationMAKAI WIDESPREAD FAUCET INSTALLATION
SKU(s): 933814 BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing plumbing fixtures. Signature Hardware accepts no liability for any damage to the faucet, plumbing,
More informationADAIR ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS 4.0L EXPOSED CLASS FIVE ONE-PIECE TOILET 4.0 K-5306T/K-5306T-S
ADAIR INSTALLATION INSTRUCTIONS 4.0L EXPOSED CLASS FIVE ONE-PIECE TOILET 4.0 K-5306T/K-5306T-S Please read these instructions carefully to familiarize yourself with the required tools, materials, and installation
More informationESCALE FREELANCE OVE BEFORE YOU BEGIN OR DE R ING INF OR MAT ION T01-E INSTALLATION INSTRUCTIONS
ESCALE FREELANCE PRESQU'ILE OVE INSTALLATION INSTRUCTIONS VITREOUS CHINA WALL-HUNG P-TRAP TOILET K-19045W/K-18132T/K-18132T-S/K-18133T/K-18133T-S/ K-17647T/K-17647T-S BEFORE YOU BEGIN Please read these
More informationINSTALLATION INSTRUCTIONS. Cubix Widespread Faucet Part #: 3204, 5204, 3304, 5304 HANDLE STYLES
INSTALLATION INSTRUCTIONS Cubix Widespread Faucet Part #: 04, 04, 04, 04 Confidence from start to finish. HANDLE STYLES 04 04 jaclo industries Dermody Street Cranford, NJ 001 p 0..44 00..0 f 0..11 00..4..1
More informationInstallation S
Installation S59-3045 Thermostatic High-Low Mixing Valve (HL45) with Optional Cabinet S59-3045 (Valve Only) S59-3045RE (with Recess-Mounted Enamel Cabinet) S59-3045RS (with Recess-Mounted Stainless Steel
More informationInstallation S
Installation S59-3080 Thermostatic High-Low Mixing Valve (HL80) with Optional Cabinet S59-3080RE (with Recess-Mounted Enamel Cabinet) S59-3080RS (with Recess-Mounted Stainless Steel Cabinet) S59-3080SE
More informationC-IV 60 CEILING FAN READ AND SAVE THESE INSTRUCTIONS. FAN RATING AC 120V. 60Hz
C-IV 60 CEILING FAN READ AND SAVE THESE INSTRUCTIONS FAN RATING AC 120V. 60Hz Please do not use any electric or battery powered tools in the assembly and installation of this or any Matthews Fan Company
More informationKATHRYN ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS 4.8 TM COMFORT HEIGHT 1-PC EB TOILET K-3940
KAHRYN INSALLAION INSRUCIONS 4.8 M COMFOR HEIGH 1-PC EB OILE K-3940 Please read these instructions carefully to familiarize yourself with the required tools, materials, and installation sequences. Follow
More informationChicagoTM. Instruction Manual. Includes our new CoolTouch TM Control System Looks permanent, but goes wherever you go! U.S.
Includes our new CoolTouch TM Control System Looks permanent, but goes wherever you go! U.S. Patent Pending ChicagoTM A Kichler Decor ceiling fan Kichler Lighting 7711 East Pleasant Valley Road P.O. Box
More informationOrrin. Instruction Manual. Includes our new CoolTouch TM Control System Looks permanent, but goes wherever you go! U.S.
Includes our new CoolTouch TM Control System Looks permanent, but goes wherever you go! U.S. Patent Pending Orrin A Kichler Select ceiling fan Kichler Lighting 7711 East Pleasant Valley Road P.O. Box 318010
More informationOVE ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS ELONGATED TWO-PIECE TOILET K-17737T/K-17737T-S
OVE INSTALLATION INSTRUCTIONS ELONGATED TWO-PIECE TOILET K-17737T/K-17737T-S Please read these instructions carefully to familiarize yourself with the required tools, materials, and installation sequences.
More information808 Series. Serie 808 Série 808
808 Series Serie 808 Série 808 Tub & Shower Shower Only Trim Kit Juego con acabado para Tinas y duchas o duchas solamente Bain et douche Douche seule Kit de garniture 11-14-07 EO7203 32004-0100 Copyright
More informationNATURAL GAS CONVERSION KIT
NATURAL GAS CONVERSION KIT Model # 498425 For use with Char-Broil RED Series Grills Only. FOR OUTDOOR USE ONLY This Natural Gas Conversion Kit can be used ONLY with Dual Fuel grills. WARNING CALIFORNIA
More informationM INSTALLATION INSTRUCTIONS M FLEETWOOD SINGLE CROSS HANDLE PRESSURE BALANCE TRIM ONLY, TO SUIT M ROUGH
INSTALLATION INSTRUCTIONS M2-4300 FLEETWOOD SINGLE CROSS HANDLE PRESSURE BALANCE TRIM ONLY, TO SUIT M1-4100 ROUGH M2-4301 FLEETWOOD SINGLE LEVER PRESSURE BALANCE TRIM ONLY, TO SUIT M1-4100 ROUGH M2-4300
More informationButler Mill and Brassworks Ltd. Exposed 1/2 Thermostatic Valve Installation Instructions
American Faucet & Coatings Corporation presents Butler Mill and Brassworks Ltd. Exposed 1/2 Thermostatic Valve Installation Instructions LEAVE FOR HOME OWNER Care Instructions: The Product you have just
More informationSPEAKMAN SPEAKMAN SPECIFICATIONS
SE-575-DP-237 & SE-575-DP-238 Installation, Operation, and Maintenance Instructions EYESAVER EYE/FACE WASH & SAFE-T-ZONE EMERGENCY SURFACE MOUNTED WALL SHOWER DESCRIPTION Barrier-Free wall mounted emergency
More informationCB-4070 BLACK ARCHIPELAGO PRESSURE BALANCE MIXING VALVE TRIM ONLY, TO SUIT M ROUGH
INSTALLATION INSTRUCTIONS CW-4070 WHITE ARCHIPELAGO PRESSURE BALANCE MIXING VALVE TRIM ONLY, TO SUIT M1-4100 ROUGH CB-4070 BLACK ARCHIPELAGO PRESSURE BALANCE MIXING VALVE TRIM ONLY, TO SUIT M1-4100 ROUGH
More informationDELEVINGNE WIDESPREAD FAUCET INSTALLATION
SKU(s): 927254 BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing plumbing fixtures. Signature Hardware accepts no liability for any damage to the faucet, plumbing,
More informationR89-CB 808-CB Series. Serie R89-CB 808-CB Série R89-CB 808-CB. Tub & Shower Shower Only Trim Kit
R89-CB 808-CB Series Serie R89-CB 808-CB Série R89-CB 808-CB Tub & Shower Shower Only Trim Kit Juego con acabado para Tinas y duchas o duchas solamente Bain et douche Douche seule Kit de garniture 11-30-04
More informationInstallation Instructions
Installation Instructions SELECTRONIC Hard-Wired AC Powered ICU Lavatory Proximity Faucet PRODUCT NUMBER 0. Certified to comply with ASME A..M 0 American Standard M 0. ICU Faucet shown Installed on American
More informationInstructions. Certifications CH Chrome SS Stainless Steel. Single Handle, Industrial Style, Pull-Down Kitchen Faucet.
Instructions *Image may vary slightly from actual product Tools Required Adjustable Wrench Groove Joint Pliers Pipe Wrench Phillips Screwdriver Pipe Tape or pipe thread compound Safety Tips If you solder
More informationEntertainment Faucet with Remote Valve
P25205 1 of 7 Thank You For Choosing Kallista We appreciate your commitment to Kallista quality products. Please take a moment to review this manual before you install your Kallista product. If you encounter
More informationSUBCOURSE EDITION EN US ARMY ENGINEER SCHOOL PLUMBING FIXTURES (PLUMBING IV)
SUBCOURSE EDITION EN5113 5 US ARMY ENGINEER SCHOOL PLUMBING FIXTURES (PLUMBING IV) US ARMY PLUMBER MOS 51K SKILL LEVELS 1 AND 2 COURSE PLUMBING FIXTURES (PLUMBING IV) SUBCOURSE NO. EN5113 US Army Engineer
More informationARCHERTM ORDERING INFORMATION NOTES T01-C INSTALLATION INSTRUCTIONS VITREOUS CHINA ONE-PIECE TOILET K-3639T/K-3639T-C
ARCHER TM INSTALLATION INSTRUCTIONS VITREOUS CHINA ONE-PIECE TOILET K-3639T/K-3639T-C Please read these instructions carefully to familiarize yourself with the required tools, materials, and installation
More informationPANACHE ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS
PANACHE INSTALLATION INSTRUCTIONS VITREOUS CHINA TWO-PIECE TOILET S-TRAP 305mm/P-TRAP 180mm K-18182T/K-18182T-S Please read these instructions carefully to familiarize yourself with the required tools,
More informationInstallation. S Series Navigator Thermostatic Mixing Valve
Installation S5-4016N S5-40016Y S5-4016 Series Navigator Thermostatic Mixing Valve S5-4016D ½" NPT/Sweat Connections S5-4016X ½" PEX Connections S5-4016N ¾" NPT Connections S5-4016S ¾" Sweat Connections
More information